CONSTRUCTION COMMITTEE 11/9/2015 304 E. Grand River Ave, Conference Rm 4A, Howell, MI 48843 6:30 PM AGENDA 1. CALL TO ORDER 2. APPROVAL OF MINUTES Minutes of Meeting Dated: October 19, 2015 3. APPROVAL OF AGENDA 4. REPORTS A. Budget Report B. Open PCO Log 5. CALL TO THE PUBLIC 6. ACTION ITEMS A. Clark Pay Application #15: $693,407.75 B. PCO 81 - Credit for T&M work: ($12,095.33) C. PCO 82 - Misc. Drywall Extras: $6,341.00 D. PCO 83 - Sallyport Electrical Demolition: $845.00 E. PCO 84 - Added Sprinkler Heads per RFI 121: $896.00 F. PCO 85 - Rework Fire Protection-Sallyport: $1,563.00 G. PCO 86 - Relocate 2 Sprinkler Heads: $1,099.00 H. PCO 88 - Floor to Wall Joint Caulking: $2,712.00 I. PCO 89 - Replacement Door Savings: ($15,207.00) 7. NEW BUSINESS 8. ADJOURNMENT

Upload: others

Post on 02-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • CONSTRUCTION COMMITTEE11/9/2015

    304 E. Grand River Ave, Conference Rm 4A, Howell, MI 488436:30 PM

    AGENDA

    1. CALL TO ORDER2.

    APPROVAL OF MINUTES Minutes of Meeting Dated: October 19, 2015

    3. APPROVAL OF AGENDA4.

    REPORTS A. Budget Report B. Open PCO Log

    5. CALL TO THE PUBLIC6.

    ACTION ITEMS A. Clark Pay Application #15: $693,407.75 B. PCO 81 - Credit for T&M work: ($12,095.33) C. PCO 82 - Misc. Drywall Extras: $6,341.00 D. PCO 83 - Sallyport Electrical Demolition: $845.00 E. PCO 84 - Added Sprinkler Heads per RFI 121: $896.00 F. PCO 85 - Rework Fire Protection-Sallyport: $1,563.00 G. PCO 86 - Relocate 2 Sprinkler Heads: $1,099.00 H. PCO 88 - Floor to Wall Joint Caulking: $2,712.00 I. PCO 89 - Replacement Door Savings: ($15,207.00)

    7. NEW BUSINESS8. ADJOURNMENT

  • Page 1 of 4 Pages

    MEETING MINUTES LIVINGSTON COUNTY

    OCTOBER 19, 2015 - 6:30 PM

    ADMINISTRATION BUILDING - CONFERENCE ROOM 4 304 E. Grand River Avenue, Howell, MI 48843

    CONSTRUCTION COMMITTEE

    ���� COMM. DOLAN � COMM. CHILDS � COMM. VANHOUTEN

    OTHERS: MIKE KENNEDY CHAD RIEHL

    KEN HINTON HEATHER BRANDENBURG

    NATALIE HUNT TOM CREMONTE

    1. CALL TO ORDER: Meeting called to order by: COMM. DENNIS DOLAN at 6:30 PM.

    2. APPROVAL OF MINUTES: MINUTES OF MEETING DATED SEPTEMBER 14, 2015:

    MOTION TO APPROVE THE MINUTES, AS PRESENTED.

    MOVED BY: VAN HOUTEN / SECONDED BY: CHILDS

    ALL IN FAVOR - MOTION PASSED

    3. APPROVAL OF AGENDA:

    MOTION TO APPROVE THE AGENDA, AS MODIFIED.

    ADD PCO #80 –

    NEW BUSINESS – DISCUSS CELL DOORS

    MOVED BY: CHILDS / SECONDED BY: VAN HOUTEN

    ALL IN FAVOR - MOTION PASSED

    4. REPORTS

    o STEEL CELL INVOICE RECEIVED LATE, WOULD LIKE TO GET THAT ON THE AGENDA.

    o INVOICE WILL BE BROUGHT TO NEXT MEETING ON NOVEMBER 9TH, AGENDA STANDS.

    A. BUDGET REPORT:

    o BUYOUT BALANCE OF ASPHALT WILL NOT BE SENT AND BE PUT BACK IN CONTINGENCY AND $13,000 IN CHANGE ORDERS ON TODAY’S AGENDA LEAVES A $275,073 CONTINGENCY BALANCE

    B. CONSTRUCTION PROGRESS UPDATE: MIKE KENNEDY

    o FURNITURE FOR DAY ROOM HAS BEEN DELIVERED, MATTRESSES HAVE ALSO BEEN DELIVERED.

    o STARTED FINAL CLEANING IN MECHANICAL CHASE, CELL AREA WILL BE NEXT

  • Page 2 of 4 Pages

    o FIXTURES STILL NEED TO BE CAULKED.

    o SPRINKLER HEADS TO BE CHANGED IN THE 2ND FLOOR HALLWAY

    o EXTERIOR – FINISH PAVING THIS FRIDAY, STRIPING FOR PARKING LOT WILL BE DONE ON MONDAY

    o GROUND IS RAKED AND READY FOR SEED, SECURITY FENCES ARE UP, TREES WILL BE PLANTED TOMORROW OR WEDNESDAY

    o SALLY PORT (EXISTING) – FOUNDATION IS IN, MASON STARTED TODAY, STEEL WILL BE SET NEXT WEEK

    o DISCUSSED HOW TO CONNECT THE SALLY PORT DRAIN TO THE CURRENT PLUMBING

    o GLAZING MAY ARRIVE AS SOON AS OCTOBER 30TH

    o DOOR RENAMING WILL ESTABLISHED THIS THURSDAY

    o SHOULD GET WITH RICH & ROBERTA TO GET FINAL FURNITURE AND IT COSTS.

    5. CALL TO THE PUBLIC: None.

    6. ACTION ITEMS:

    A. ACTION REQUIRED: ................. Clark Construction Jail Roof Invoice:

    $7,018.92

    REVIEWED AND APPROVED FOR PAYMENT. NO OBJECTIONS.

    APPROVED FOR PAYMENT: MOVED BY: VAN HOUTEN SECONDED BY: CHILDS

    B. ACTION REQUIRED: ................. Clark Construction Pay Application 14:

    $900,552.95

    REVIEWED AND APPROVED FOR PAYMENT. NO OBJECTIONS.

    APPROVED FOR PAYMENT: MOVED BY: CHILDS SECONDED BY: VAN HOUTEN

    C. ACTION REQUIRED: ................. Clark Construction PCO 67 - Delete Mattresses:

    ($27,430.00)

    REVIEWED AND APPROVED PCO. NO OBJECTIONS.

    APPROVED FOR PAYMENT: MOVED BY: CHILDS SECONDED BY: VAN HOUTEN

    D. ACTION REQUIRED: ................. Clark Construction PCO 68 - Delete VCT:

    ($875.00)

    REVIEWED – APPROVED PCO 67 & 68 ON SEPTEMBER 14TH

    APPROVED FOR PAYMENT: MOVED BY: SECONDED BY:

    E. ACTION REQUIRED: ................. Clark Construction PCO 70 - I.T. Room:

    $15,185.00

    REVIEWED AND APPROVED PCO. NO OBJECTIONS.

    APPROVED FOR PAYMENT: MOVED BY: CHILDS SECONDED BY: VAN HOUTEN

  • Page 3 of 4 Pages

    F. ACTION REQUIRED: ................. Clark Construction PCO 71 - Data Drop:

    $998.00

    REVIEWED AND APPROVED PCO. NO OBJECTIONS.

    APPROVED FOR PAYMENT: MOVED BY: CHILDS SECONDED BY: VAN HOUTEN

    G. ACTION REQUIRED: ................. Clark Construction PCO 72 - Smoke Dampers:

    $1,087.00

    REVIEWED AND APPROVED PCO. NO OBJECTIONS.

    APPROVED FOR PAYMENT: MOVED BY: CHILDS SECONDED BY: VAN HOUTEN

    H. ACTION REQUIRED: ................. Clark Construction PCO 73 - Asphalt Removal:

    $9,700.00

    REVIEWED AND APPROVED PCO. NO OBJECTIONS.

    APPROVED FOR PAYMENT: MOVED BY: CHILDS SECONDED BY: VAN HOUTEN

    I. ACTION REQUIRED: ................. Clark Construction PCO 74 - Sidewalk

    Undercutting:

    $3,700.00

    REVIEWED AND APPROVED PCO. NO OBJECTIONS.

    APPROVED FOR PAYMENT: MOVED BY: CHILDS SECONDED BY: VAN HOUTEN

    J. ACTION REQUIRED: ................. Clark Construction PCO 75 Cut Door:

    $886.00

    REVIEWED AND APPROVED PCO. NO OBJECTIONS.

    APPROVED FOR PAYMENT: MOVED BY: CHILDS SECONDED BY: VAN HOUTEN

    K. ACTION REQUIRED: ................. Clark Construction PCO 76 - Heater:

    $888.00

    REVIEWED AND APPROVED PCO. NO OBJECTIONS.

    APPROVED FOR PAYMENT: MOVED BY: CHILDS SECONDED BY: VAN HOUTEN

    L. ACTION REQUIRED: ................. Clark Construction PCO 77 - Raise DAC 1:

    $1,580.00

    REVIEWED AND APPROVED PCO. NO OBJECTIONS.

    APPROVED FOR PAYMENT: MOVED BY: VAN HOUTEN SECONDED BY: CHILDS

  • Page 4 of 4 Pages

    M. ACTION REQUIRED: ................. Clark Construction PCO 78 BR1 PR 5 & 6:

    $10,200.00

    REVIEWED AND APPROVED PCO. NO OBJECTIONS.

    APPROVED FOR PAYMENT: MOVED BY: CHILDS SECONDED BY: VAN HOUTEN

    N. ACTION REQUIRED: ................. Clark Construction PCO 79 Raising RTU:

    ($2,914.00)

    REVIEWED AND APPROVED PCO. NO OBJECTIONS.

    APPROVED FOR PAYMENT: MOVED BY: CHILDS SECONDED BY: VAN HOUTEN

    O. ACTION REQUIRED: ................. Clark Construction PCO 80 Dimming Switch:

    $1,704.00

    REVIEWED AND APPROVED PCO. NO OBJECTIONS.

    APPROVED FOR PAYMENT: MOVED BY: CHILDS SECONDED BY: VAN HOUTEN

    7. NEW BUSINESS:

    o DISCUSS CELL DOORS – COMMISSIONER DOLAN AND COMMITTEE MEMBERS RECEIVED DOCUMENTS FROM MIKE KENNEDY IN REGARDS TO CELL DOORS THAT WERE REPLACED.

    o NEED DOCUMENTATION THAT CELL DOORS LEFT THE SITE, WHERE, WHEN, AND BY WHOM

    o CONFIRMATION THAT GLASS WAS RE-USED WITH THE NEW DOORS.

    o LINDHOUT GAVE STEEL CELL THE DIRECTION TO REMOVE DOORS FROM THE SITE WHEN DELIVERING OTHER MATERIALS.

    o POTENTIAL CREDIT FROM REICHENBACH COMING

    8. ADJOURNMENT:

    MOTION TO ADJOURN AT 7:24 PM.

    MOVED BY: CHILDS / SECONDED BY: VAN HOUTEN

    ALL IN FAVOR - MOTION PASSED

    Respectfully Submitted NATALIE HUNT RECORDING SECRETARY

  • Budget Report-Budget and Cost

    Summary, Grouped by Sub Project, Cost Items & Bid Pkg

    w/ Formulas & Sub Project Filter w/ Contingency Totals

    Livingston County Jail Expansion Clark Construction CompanyProject # 14-2664

    150 S. Highlander Way, Howell, MI 48843 Tel: Fax:

    PCO # 089 Ref. Most Recent PCO

    PCCO # 014 Ref. Most Recent PCCO

    PCCO # Ref. Approved PCCO

    A B C=A+B D E F=C+D+E G H I=G+H J K L M=I+J+K+L N=F-M

    Line

    Item #

    line Item

    Description

    Projected

    Budget

    Subcontractor Original

    Contract

    Approved

    Change

    Orders

    Revised

    Contract

    Amount

    Anticipated

    Changes

    Est Cost at

    Completion

    Variance

    (Over)/Under

    Buyout

    Balance

    Pending

    Changes

    Current

    Budget

    Original

    Budget

    Approved

    Budget

    Changes

    Pending

    Budget

    Changes

    Anticipated

    Budget

    Changes

    2664 A - Additions

    03 Building Trade Costs

    $28,564.00 $13,991.00 001400 $14,573.00 $0.00 $28,564.00 $0.00 $0.00 G2 Consulting Group, LLC $0.00 $28,564.00 *$28,564.00 $0.00 $28,564.00 $0.00 $0.00 Testing

    $8,440.00 $0.00 001500 $8,440.00 $0.00 $8,440.00 $0.00 $0.00 Performance Environmental Services, Inc. $0.00 $8,440.00 *$8,440.00 $0.00 $8,440.00 $0.00 $0.00 Environmental

    Remediation

    $633,366.00 $165,466.00 003000 $467,900.00 $0.00 $633,366.00 $0.00 $0.00 Albanelli Cement Contractors, Inc. $0.00 $633,366.00 *$633,366.00 $0.00 $633,366.00 $0.00 $0.00 Concrete

    Foundations/Flatwork

    $427,172.19 $169,172.19 031000 $258,000.00 $0.00 $427,172.19 $0.00 $0.00 Sandborn Construction, Inc. $0.00 $427,172.19 *$427,172.19 $0.00 $427,172.19 $0.00 $0.00 Earthwork & Site

    Utilities

    $9,850.00 $9,850.00 031500 $0.00 $45,290.00 $55,140.00 $0.00 $0.00 Sandborn Construction, Inc. $0.00 $55,140.00 *$55,140.00 $0.00 $55,140.00 $0.00 $0.00 Landscaping

    $46,400.00 $46,400.00 032000 $0.00 $55,950.00 $102,350.00 $0.00 $0.00 Sandborn Construction, Inc. $0.00 $102,350.00 *$102,350.00 $0.00 $102,350.00 $0.00 $0.00 Asphalt Paving

    $87,725.00 $87,725.00 032500 $0.00 $0.00 $87,725.00 $0.00 $0.00 Sandborn Construction, Inc. $0.00 $87,725.00 *$87,725.00 $0.00 $87,725.00 $0.00 $0.00 Site Concrete

    $660,024.00 $3,252.00 040000 $656,772.00 $0.00 $662,736.00 $2,712.00 $0.00 Davenport Masonry, Inc. $0.00 $660,024.00 *$662,736.00 $0.00 $660,024.00 $0.00 $2,712.00 Masonry

    $805,410.00 $4,530.00 050000 $800,880.00 $0.00 $842,669.00 $37,259.00 $0.00 Howard Structural Steel $0.00 $805,410.00 *$842,669.00 $0.00 $805,410.00 $0.00 $37,259.00 Structural Steel

    $235,346.00 ($6,170.00)060000 $241,516.00 $0.00 $235,346.00 $0.00 $0.00 Laux Construction, LLC $0.00 $235,346.00 *$235,346.00 $0.00 $235,346.00 $0.00 $0.00 General Trades

    $265,650.00 $0.00 074000 $265,650.00 $0.00 $265,650.00 $0.00 $0.00 CEI Michigan LLC $0.00 $265,650.00 *$265,650.00 $0.00 $265,650.00 $0.00 $0.00 Metal Wall Panels

    $254,432.00 $13,714.00 075000 $240,718.00 $0.00 $254,432.00 $0.00 $0.00 CEI Michigan LLC $0.00 $254,432.00 *$254,432.00 $0.00 $254,432.00 $0.00 $0.00 Roofing & Sheet

    Metal

    $48,929.00 $0.00 084000 $48,929.00 $0.00 $48,929.00 $0.00 $0.00 Lansing Glass Company $0.00 $48,929.00 *$48,929.00 $0.00 $48,929.00 $0.00 $0.00 Alum Windows, Non

    Secure Glazing

    $268,577.00 $68,577.00 092000 $200,000.00 $0.00 $262,822.67 ($5,754.33) $0.00 William Reichenbach Company $0.00 $268,577.00 *$262,822.67 $0.00 $268,577.00 $0.00 ($5,754.33)Drywall, Metal Studs,

    Acoust Ceilings

    $56,125.00 ($875.00)096000 $57,000.00 $0.00 $56,125.00 $0.00 $0.00 William Reichenbach Company $0.00 $56,125.00 *$56,125.00 $0.00 $56,125.00 $0.00 $0.00 Floor Covering

    $123,307.00 $0.00 099000 $123,307.00 $0.00 $123,307.00 $0.00 $0.00 Classic Painting Co., Inc. $0.00 $123,307.00 *$123,307.00 $0.00 $123,307.00 $0.00 $0.00 Painting

    $1,158,769.00 $147,769.00 110000 $1,011,000.00 $0.00 $1,158,769.00 $0.00 $0.00 Pauly Jail Building Company Inc $0.00 $1,158,769.00 *$1,158,769.00 $0.00 $1,158,769.00 $0.00 $0.00 Detention Equipment

    $1,912,715.00 $70,450.00 130000 $1,842,265.00 $0.00 $1,897,508.00 ($15,207.00) $0.00 SteelCell of North America Inc. $0.00 $1,912,715.00 *$1,897,508.00 $0.00 $1,912,715.00 $0.00 ($15,207.00)Manu. Steel Mod

    Cells

    $183,268.00 $1,200.00 210000 $182,068.00 $0.00 $186,826.00 $3,558.00 $0.00 John E. Green Company $0.00 $183,268.00 *$186,826.00 $0.00 $183,268.00 $0.00 $3,558.00 Fire Suppressions

    Systems

    $1,325,049.50 $29,849.50 230000 $1,295,200.00 $0.00 $1,325,049.50 $0.00 $0.00 William E. Walter, Inc. $0.00 $1,325,049.50 *$1,325,049.50 $0.00 $1,325,049.50 $0.00 $0.00 Plumbing/HVAC

    Systems

    $77,440.00 $0.00 231000 $77,440.00 $0.00 $77,440.00 $0.00 $0.00 Technical Energy Solutions $0.00 $77,440.00 *$77,440.00 $0.00 $77,440.00 $0.00 $0.00 Control Systems

    $1,631,015.23 $77,115.23 260000 $1,553,900.00 $0.00 $1,631,860.23 $845.00 $0.00 Superior Electric of Lansing, Inc. $0.00 $1,631,015.23 *$1,631,860.23 $0.00 $1,631,015.23 $0.00 $845.00 Electrical & Electr

    Safety/Security

  • Budget Report-Budget and Cost

    Summary, Grouped by Sub Project, Cost Items & Bid Pkg

    w/ Formulas & Sub Project Filter w/ Contingency Totals

    PCO # 089 Ref. Most Recent PCO

    PCCO # 014 Ref. Most Recent PCCO

    PCCO # Ref. Approved PCCO

    A B C=A+B D E F=C+D+E G H I=G+H J K L M=I+J+K+L N=F-M

    Line

    Item #

    line Item

    Description

    Projected

    Budget

    Subcontractor Original

    Contract

    Approved

    Change

    Orders

    Revised

    Contract

    Amount

    Anticipated

    Changes

    Est Cost at

    Completion

    Variance

    (Over)/Under

    Buyout

    Balance

    Pending

    Changes

    Current

    Budget

    Original

    Budget

    Approved

    Budget

    Changes

    Pending

    Budget

    Changes

    Anticipated

    Budget

    Changes

    $9,345,558.00 $902,015.92 $101,240.00 $10,247,573.92 Subtotals for Building Trade Costs: $10,372,226.59 $23,412.67 $0.00 $0.00 $10,348,813.92 $10,372,226.59 $0.00 $10,348,813.92 $0.00 $23,412.67

    06 Contractor Soft Cost

    $0.00 $0.00 000900 $0.00 $20,721.00 $20,721.00 $0.00 $0.00 $0.00 $20,721.00 $20,721.00 $20,721.00 $0.00 $0.00 $0.00 Preconstruction

    $0.00 $0.00 000980 $0.00 $47,840.00 $47,840.00 $0.00 $0.00 $0.00 $47,840.00 *$47,840.00 $0.00 $47,840.00 $0.00 $0.00 Insurance

    $0.00 $0.00 000990 $0.00 $57,600.00 $57,600.00 $0.00 $0.00 $0.00 $57,600.00 *$57,600.00 $0.00 $57,600.00 $0.00 $0.00 Bonds

    $0.00 $0.00 001000 $0.00 $94,370.58 $94,370.58 $0.00 $0.00 $0.00 $94,370.58 *$94,370.58 $0.00 $94,370.58 $0.00 $0.00 General Conditions

    $0.00 $0.00 001050 $0.00 $52,679.00 $52,679.00 $0.00 $0.00 $0.00 $52,679.00 *$52,679.00 $0.00 $52,679.00 $0.00 $0.00 Building Permit

    $0.00 $0.00 001100 $0.00 $246,611.00 $246,611.00 $0.00 $0.00 $0.00 $246,611.00 *$246,611.00 $0.00 $246,611.00 $0.00 $0.00 CM Labor

    $0.00 $0.00 001200 $0.00 $194,165.10 $194,165.10 $0.00 $0.00 $0.00 $194,165.10 *$194,165.10 $0.00 $194,165.10 $0.00 $0.00 CM Fee

    $0.00 $0.00 $713,986.68 $0.00 Subtotals for Contractor Soft Cost: $713,986.68 $0.00 $0.00 $0.00 $713,986.68 $713,986.68 $20,721.00 $693,265.68 $0.00 $0.00

    07 Contingency

    $0.00 $0.00 999999 $0.00 $142,402.69 $142,402.69 $0.00 $0.00 $0.00 $142,402.69 *$142,402.69 $0.00 $142,402.69 $0.00 $0.00 Contingency

    $0.00 $0.00 $142,402.69 $0.00 Subtotals for Contingency: $142,402.69 $0.00 $0.00 $0.00 $142,402.69 $142,402.69 $0.00 $142,402.69 $0.00 $0.00

    $9,345,558.00 $902,015.92 $957,629.37$10,247,573.92 $11,228,615.96$23,412.67 $0.00Subtotals for Additions: $0.00$11,205,203.29 $11,228,615.96$20,721.00 $11,184,482.29 $0.00 $23,412.67

    2664 R - Renovations

    03 Building Trade Costs

    $1,620.00 $0.00 001400 $1,620.00 $4,817.00 $6,437.00 $0.00 $0.00 G2 Consulting Group, LLC $0.00 $6,437.00 *$6,437.00 $0.00 $6,437.00 $0.00 $0.00 Testing

    $6,685.00 $0.00 001500 $6,685.00 $0.00 $6,685.00 $0.00 $0.00 Performance Environmental Services, Inc. $0.00 $6,685.00 *$6,685.00 $0.00 $6,685.00 $0.00 $0.00 Environmental

    Survey

    $124,000.00 $0.00 040000 $124,000.00 $0.00 $124,000.00 $0.00 $0.00 Davenport Masonry, Inc. $0.00 $124,000.00 *$124,000.00 $0.00 $124,000.00 $0.00 $0.00 Masonry

    $50,422.00 $0.00 050000 $50,422.00 $0.00 $50,422.00 $0.00 $0.00 Howard Structural Steel $0.00 $50,422.00 *$50,422.00 $0.00 $50,422.00 $0.00 $0.00 Structural Steel

    $498,984.00 $0.00 060000 $498,984.00 $0.00 $498,984.00 $0.00 $0.00 Laux Construction, LLC $0.00 $498,984.00 *$498,984.00 $0.00 $498,984.00 $0.00 $0.00 General Trades

    $1,982.00 $0.00 075000 $1,982.00 $0.00 $1,982.00 $0.00 $0.00 CEI Michigan LLC $0.00 $1,982.00 *$1,982.00 $0.00 $1,982.00 $0.00 $0.00 Roofing & Sheet

    Metal

    $74,000.00 $0.00 092000 $74,000.00 $0.00 $74,000.00 $0.00 $0.00 William Reichenbach Company $0.00 $74,000.00 *$74,000.00 $0.00 $74,000.00 $0.00 $0.00 Drywall, Metal Studs,

    Acoust Ceilings

    $103,000.00 $0.00 096000 $103,000.00 $0.00 $103,000.00 $0.00 $0.00 William Reichenbach Company $0.00 $103,000.00 *$103,000.00 $0.00 $103,000.00 $0.00 $0.00 Floor Covering

    $26,179.00 $0.00 099000 $26,179.00 $0.00 $26,179.00 $0.00 $0.00 Classic Painting Co., Inc. $0.00 $26,179.00 *$26,179.00 $0.00 $26,179.00 $0.00 $0.00 Painting

    $571,116.00 $13,116.00 110000 $558,000.00 $0.00 $571,116.00 $0.00 $0.00 Pauly Jail Building Company Inc $0.00 $571,116.00 *$571,116.00 $0.00 $571,116.00 $0.00 $0.00 Detention Equipment

    $29,456.00 $0.00 210000 $29,456.00 $0.00 $29,456.00 $0.00 $0.00 John E. Green Company $0.00 $29,456.00 *$29,456.00 $0.00 $29,456.00 $0.00 $0.00 Fire Suppressions

    Systems

    $530,700.00 $0.00 230000 $530,700.00 $0.00 $530,700.00 $0.00 $0.00 William E. Walter, Inc. $0.00 $530,700.00 *$530,700.00 $0.00 $530,700.00 $0.00 $0.00 Plumbing/HVAC

    Systems

    $3,610.00 $0.00 231000 $3,610.00 $0.00 $3,610.00 $0.00 $0.00 Technical Energy Solutions $0.00 $3,610.00 *$3,610.00 $0.00 $3,610.00 $0.00 $0.00 Control Systems

  • Budget Report-Budget and Cost

    Summary, Grouped by Sub Project, Cost Items & Bid Pkg

    w/ Formulas & Sub Project Filter w/ Contingency Totals

    PCO # 089 Ref. Most Recent PCO

    PCCO # 014 Ref. Most Recent PCCO

    PCCO # Ref. Approved PCCO

    A B C=A+B D E F=C+D+E G H I=G+H J K L M=I+J+K+L N=F-M

    Line

    Item #

    line Item

    Description

    Projected

    Budget

    Subcontractor Original

    Contract

    Approved

    Change

    Orders

    Revised

    Contract

    Amount

    Anticipated

    Changes

    Est Cost at

    Completion

    Variance

    (Over)/Under

    Buyout

    Balance

    Pending

    Changes

    Current

    Budget

    Original

    Budget

    Approved

    Budget

    Changes

    Pending

    Budget

    Changes

    Anticipated

    Budget

    Changes

    $500,675.18 $3,675.18 260000 $497,000.00 $0.00 $500,675.18 $0.00 $0.00 Superior Electric of Lansing, Inc. $0.00 $500,675.18 *$500,675.18 $0.00 $500,675.18 $0.00 $0.00 Electrical & Electr

    Safety/Security

    $2,505,638.00 $16,791.18 $4,817.00 $2,522,429.18 Subtotals for Building Trade Costs: $2,527,246.18 $0.00 $0.00 $0.00 $2,527,246.18 $2,527,246.18 $0.00 $2,527,246.18 $0.00 $0.00

    06 Contractor Soft Cost

    $0.00 $0.00 000900 $0.00 $5,180.00 $5,180.00 $0.00 $0.00 $0.00 $5,180.00 $5,180.00 $5,180.00 $0.00 $0.00 $0.00 Preconstruction

    $0.00 $0.00 000980 $0.00 $11,960.00 $11,960.00 $0.00 $0.00 $0.00 $11,960.00 *$11,960.00 $0.00 $11,960.00 $0.00 $0.00 Insurance

    $0.00 $0.00 000990 $0.00 $14,400.00 $14,400.00 $0.00 $0.00 $0.00 $14,400.00 *$14,400.00 $0.00 $14,400.00 $0.00 $0.00 Bonds

    $0.00 $0.00 001000 $0.00 $16,299.00 $16,299.00 $0.00 $0.00 $0.00 $16,299.00 *$16,299.00 $0.00 $16,299.00 $0.00 $0.00 General Conditions

    $0.00 $0.00 001050 $0.00 $13,170.00 $13,170.00 $0.00 $0.00 $0.00 $13,170.00 *$13,170.00 $0.00 $13,170.00 $0.00 $0.00 Building Permit

    $0.00 $0.00 001100 $0.00 $78,520.00 $78,520.00 $0.00 $0.00 $0.00 $78,520.00 *$78,520.00 $0.00 $78,520.00 $0.00 $0.00 CM Labor

    $0.00 $0.00 001200 $0.00 $50,821.00 $50,821.00 $0.00 $0.00 $0.00 $50,821.00 *$50,821.00 $0.00 $50,821.00 $0.00 $0.00 CM Fee

    $0.00 $0.00 $190,350.00 $0.00 Subtotals for Contractor Soft Cost: $190,350.00 $0.00 $0.00 $0.00 $190,350.00 $190,350.00 $5,180.00 $185,170.00 $0.00 $0.00

    07 Contingency

    $0.00 $0.00 999999 $0.00 $225,486.82 $225,486.82 $0.00 $0.00 $0.00 $225,486.82 *$225,486.82 $0.00 $225,486.82 $0.00 $0.00 Contingency

    $0.00 $0.00 $225,486.82 $0.00 Subtotals for Contingency: $225,486.82 $0.00 $0.00 $0.00 $225,486.82 $225,486.82 $0.00 $225,486.82 $0.00 $0.00

    $2,505,638.00 $16,791.18 $420,653.82$2,522,429.18 $2,943,083.00$0.00 $0.00Subtotals for Renovations: $0.00$2,943,083.00 $2,943,083.00$5,180.00 $2,937,903.00 $0.00 $0.00

    $11,851,196.00 $918,807.10 $1,378,283.19Totals For Project # 14-2664: $12,770,003.10 $14,171,698.96$23,412.67 $0.00$0.00$14,148,286.29 $14,171,698.96$25,901.00 $14,122,385.29 $0.00 $23,412.67

    Contingency Summary: $0.00 $367,889.51 $367,889.51 $0.00 $0.00 $367,889.51 $0.00 $367,889.51 $367,889.51$0.00 $0.00 $0.00 $367,889.51 $0.00

  • Potential Change Order

    Summary Log

    Livingston County Jail Expansion Clark Construction CompanyProject # 14-2664

    150 S. Highlander Way, Howell, MI 48843 Tel: Fax:

    Budget Cost

    Number Description PCCO No Approximate

    (Anticipated)

    Pending Approved Approximate

    (Anticipated)

    Pending Approved Contingency

    Funds

    013 Open cut and form North Foundation wall $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

    023 Cellular Decking per RFI 39 $12,738.00 $0.00 $0.00 $12,738.00 $0.00 $0.00 $0.00

    032 Work overtime on steel erection $4,411.00 $0.00 $0.00 $4,411.00 $0.00 $0.00 $0.00

    036 Girt changes for the NE corner windows $4,868.00 $0.00 $0.00 $4,868.00 $0.00 $0.00 $0.00

    060 Overhead door steel modification and misc siding

    support modifications.

    $15,242.00 $0.00 $0.00 $15,242.00 $0.00 $0.00 $0.00

    081 Credit for T&M work completed in PCO's 53 and 65. -$12,095.33 $0.00 $0.00 -$12,095.33 $0.00 $0.00 $0.00

    082 Misc. Drywall Extras $6,341.00 $0.00 $0.00 $6,341.00 $0.00 $0.00 $0.00

    083 Sallyport electrical demolitioin $845.00 $0.00 $0.00 $845.00 $0.00 $0.00 $0.00

    084 Added spriinkler heads per RFI 121 $896.00 $0.00 $0.00 $896.00 $0.00 $0.00 $0.00

    085 Rework Fire Protection main in Sallyport $1,563.00 $0.00 $0.00 $1,563.00 $0.00 $0.00 $0.00

    086 Relocate 2 sprinkler heads out of door swing $1,099.00 $0.00 $0.00 $1,099.00 $0.00 $0.00 $0.00

    088 Floor to wall joint caulking $2,712.00 $0.00 $0.00 $2,712.00 $0.00 $0.00 $0.00

    089 Replacement door savings -$15,207.00 $0.00 $0.00 -$15,207.00 $0.00 $0.00 $0.00

    Project Totals: $23,412.67 $0.00 $0.00 $23,412.67 $0.00 $0.00 $0.00

    Prolog Converge Printed on: 11/4/2015 Prolog_Converge Page 1

  • Lindhout Associates architects aia pc

    Our Mission

    Integrity in architecture and design in client relationships in employee relationships in community relationships advancement in all these efforts

    10465 citation drive, brighton, michigan 48116

    www.lindhout.com

    810-227-5668 (fax) 810-227-5855

    william p. lindhout frank l. pierron piet w. lindhout robert j. king michael j. kennedy david a. richardsonmichael j. o’leary bradley m. alvord john w. eckstein d. jason mcintyre holly a. osterhout

    November 5, 2015

    Livingston County Jail150 S. Highlander Way Howell, MI 48855

    Attn: Lt. Tom Cremonte, Jail Administrator

    Re: Application and Certificate for Payment No.15

    Dear Lt. Cremonte:

    Attached please find the application and certificate for payment No.15 from Clark Construction Company. We find this work to be in general compliance with the requirements of the contract documents and the level of completeness to be equal to or greater than the amount indicated in the attached application.

    If this action meets with your approval, please proceed with payment to Clark Construction Company in the amount indicated on the application.

    Feel free to contact our office if you have any questions or comments regarding this application for payment.

    Michael J. Kennedy, PresidentLindhout Associates architects aia pc

    c.c. Chad Riehl, Clark Construction Company

  • (Through PCCO #14)

  • Page 1 of 1

    10/21/2015

    Mike Kennedy Lindhout Associates Architects10465 Citation DriveBrighton, MI 48116

    RE: PCO No. 081Livingston County Jail Expansion -14-2664

    Dear Mike Kennedy,

    We have finalized gathering all the required quotations for PCO No. 081 for the following extra work: Credit for T&M work completed in PCO's 53 and 65.. We have reviewed the scopes of work and have verified that all extra work items are in compliance with the Contract Documents.

    The following is a detailed itemization of all extra costs:

    Item Budget Code Description Amount Proposed

    Contractor

    001 2664 A 03 092000 01000 S

    Credit for T&M per PR#4 ($1,561.33) William Reichenbach Co.

    002 2664 A 03 092000 01000 S

    Drywall, Metal Studs, Acoust Ceilings

    ($10,534.00) William Reichenbach Co.

    Total Amount ($12,095.33)

    This change will require 0 days extension to the contract completion date. This quote is void after 30 days.

    If you have any questions regarding this Potential Change Order Request, please call me at your earliest convenience.

    If the above item(s) meet with your approval, please sign a copy of this letter and send back to me.

    Respectfully,

    CLARK CONSTRUCTION COMPANY

    Chad RiehlProject Director

    Livingston County/Date

  • Page 1 of 1

    10/21/2015

    Mike Kennedy Lindhout Associates Architects10465 Citation DriveBrighton, MI 48116

    RE: PCO No. 082Livingston County Jail Expansion -14-2664

    Dear Mike Kennedy,

    We have finalized gathering all the required quotations for PCO No. 082 for the following extra work: Misc. Drywall Extras. We have reviewed the scopes of work and have verified that all extra work items are in compliance with the Contract Documents.

    The following is a detailed itemization of all extra costs:

    Item Budget Code Description Amount Proposed

    Contractor

    001 2664 A 03 092000 01000 S

    Build Chase to cover sprinkler pipe $635.00 William Reichenbach Co.

    002 2664 A 03 092000 01000 S

    Frame wall on lower roof along C line

    $656.00 William Reichenbach Co.

    003 2664 A 03 092000 01000 S

    Build chase around plumbing room 696

    $507.00 William Reichenbach Co.

    004 2664 A 03 092000 01000 S

    Install 2hr shaft ceiling in janitor closet

    $2,476.00 William Reichenbach Co.

    005 2664 A 03 092000 01000 S

    Cut roof decking back at skylight locations

    $2,067.00 William Reichenbach Co.

    Total Amount $6,341.00

    This change will require 0 days extension to the contract completion date. This quote is void after 30 days.

    If you have any questions regarding this Potential Change Order Request, please call me at your earliest convenience.

    If the above item(s) meet with your approval, please sign a copy of this letter and send back to me.

    Respectfully,

    CLARK CONSTRUCTION COMPANY

    Chad RiehlProject Director

    Livingston County/Date

  • Page 1 of 1

    10/21/2015

    Mike Kennedy Lindhout Associates Architects10465 Citation DriveBrighton, MI 48116

    RE: PCO No. 083Livingston County Jail Expansion -14-2664

    Dear Mike Kennedy,

    We have finalized gathering all the required quotations for PCO No. 083 for the following extra work: Sallyport electrical demolitioin. We have reviewed the scopes of work and have verified that all extra work items are in compliance with the Contract Documents.

    The following is a detailed itemization of all extra costs:

    Item Budget Code Description Amount Proposed

    Contractor

    001 2664 A 03 260000 01000 S

    Sallyport electrical Demolition $845.00 Superior Electric

    Total Amount $845.00

    This change will require 0 days extension to the contract completion date. This quote is void after 30 days.

    If you have any questions regarding this Potential Change Order Request, please call me at your earliest convenience.

    If the above item(s) meet with your approval, please sign a copy of this letter and send back to me.

    Respectfully,

    CLARK CONSTRUCTION COMPANY

    Chad Riehl

    Project Director

    Livingston County/Date

  • PROPOSED CHANGE ORDER

    SUPERIOR ELECTRIC OF LANSING212 W. SHERIDAN ROAD

    LANSING, MICHIGAN 48906

    CCN # PCO-023 SALLY PORT DEMODate: 10/16/2015

    Project Name: LIVINGSTON COUNTY JAIL ADDITION

    Project Number: 18000

    Page Number: 1

    Client Address:

    CLARK CONSTRUCTION COMPANYContact: CHAD RIEHL

    3535 MOORES RIVER DRIVE

    LANSING, MICHIGAN 48911

    Work Description

    PER LIVINGSTON COUNTY/ CLARK CONSTRUCTION REQUEST, DEMO ELECTRICAL IN EXISTING SALLY PORT NOT

    SHOWN IN DRAWINGS TIME AND MATERIAL

    We reserve the right to correct this quote for errors and omissions.

    This quote covers direct costs only and we reserve the right to claim for impact and consequential costs.

    This price is good for acceptance within 10 days from the date of receipt.

    We request a time extension of 3 days.

    We will supply and install all materials, labor, and equipment as per your instructions on CCN # PCO-023 SALLY PORT DEMO.

    Itemized Breakdown

    Description Qty Total Mat.

    MISC DEMO 10 0.00

    Totals 10 0.00

    Summary

    ELECTRICAN (10.00 Hrs @ $73.50) 735.00

    Subtotal 735.00

    Markup 15% 110.25

    Subtotal 845.25

    Final Amount $845.25

    CONTRACTOR CERTIFICATION

    Name:

    Date:

    Signature:I hereby certify that this quotation is complete and accurate based on the information provided.

    CLIENT ACCEPTANCE

    ORIGINAL

  • PROPOSED CHANGE ORDER

    SUPERIOR ELECTRIC OF LANSING212 W. SHERIDAN ROAD

    LANSING, MICHIGAN 48906

    CCN # PCO-023 SALLY PORT DEMODate: 10/16/2015

    Project Name: LIVINGSTON COUNTY JAIL ADDITION

    Project Number: 18000

    Page Number: 2

    Client Address:

    CLARK CONSTRUCTION COMPANY3535 MOORES RIVER DRIVE

    LANSING, MICHIGAN 48911

    CCN #: PCO-023 SALLY PORT DEMO

    Final Amount:$845.25

    Name:

    Date:

    Signature:

    Change Order #:I hereby accept this quotation and authorize the contractor to complete the above described work.

    ORIGINAL

  • Page 1 of 1

    10/21/2015

    Mike Kennedy Lindhout Associates Architects10465 Citation DriveBrighton, MI 48116

    RE: PCO No. 084Livingston County Jail Expansion -14-2664

    Dear Mike Kennedy,

    We have finalized gathering all the required quotations for PCO No. 084 for the following extra work: Added spriinkler heads per RFI 121. We have reviewed the scopes of work and have verified that all extra work items are in compliance with the Contract Documents.

    The following is a detailed itemization of all extra costs:

    Item Budget Code Description Amount Proposed

    Contractor

    001 2664 A 03 210000 01000 S

    Added sprinkler heads per RFI 121 $896.00 John E. Green Co

    Total Amount $896.00

    This change will require 0 days extension to the contract completion date. This quote is void after 30 days.

    If you have any questions regarding this Potential Change Order Request, please call me at your earliest convenience.

    If the above item(s) meet with your approval, please sign a copy of this letter and send back to me.

    Respectfully,

    CLARK CONSTRUCTION COMPANY

    Chad RiehlProject Director

    Livingston County/Date

  • Page 1 of 1

    10/21/2015

    Mike Kennedy Lindhout Associates Architects10465 Citation DriveBrighton, MI 48116

    RE: PCO No. 085Livingston County Jail Expansion -14-2664

    Dear Mike Kennedy,

    We have finalized gathering all the required quotations for PCO No. 085 for the following extra work: Rework Fire Protection main in Sallyport. We have reviewed the scopes of work and have verified that all extra work items are in compliance with the Contract Documents.

    The following is a detailed itemization of all extra costs:

    Item Budget Code Description Amount Proposed

    Contractor

    001 2664 A 03 210000 01000 S

    Rework Fire Protection main in Sallyport

    $1,563.00 John E. Green

    Total Amount $1,563.00

    This change will require 0 days extension to the contract completion date. This quote is void after 30 days.

    If you have any questions regarding this Potential Change Order Request, please call me at your earliest convenience.

    If the above item(s) meet with your approval, please sign a copy of this letter and send back to me.

    Respectfully,

    CLARK CONSTRUCTION COMPANY

    Chad RiehlProject Director

    Livingston County/Date

  • Page 1 of 1

    10/21/2015

    Mike Kennedy Lindhout Associates Architects10465 Citation DriveBrighton, MI 48116

    RE: PCO No. 086Livingston County Jail Expansion -14-2664

    Dear Mike Kennedy,

    We have finalized gathering all the required quotations for PCO No. 086 for the following extra work: Relocate 2 sprinkler heads out of door swing. We have reviewed the scopes of work and have verified that all extra work items are in compliance with the Contract Documents.

    The following is a detailed itemization of all extra costs:

    Item Budget Code Description Amount Proposed

    Contractor

    001 2664 A 03 210000 01000 S

    Relocate 2 sprinkler heads out of door swing

    $1,099.00 John E. Green

    Total Amount $1,099.00

    This change will require 0 days extension to the contract completion date. This quote is void after 30 days.

    If you have any questions regarding this Potential Change Order Request, please call me at your earliest convenience.

    If the above item(s) meet with your approval, please sign a copy of this letter and send back to me.

    Respectfully,

    CLARK CONSTRUCTION COMPANY

    Chad Riehl

    Project Director

    Livingston County/Date

  • Page 1 of 1

    11/4/2015

    Mike Kennedy Lindhout Associates Architects10465 Citation DriveBrighton, MI 48116

    RE: PCO No. 088Livingston County Jail Expansion -14-2664

    Dear Mike Kennedy,

    We have finalized gathering all the required quotations for PCO No. 088 for the following extra work: Floor to wall joint caulking. We have reviewed the scopes of work and have verified that all extra work items are in compliance with the Contract Documents.

    The following is a detailed itemization of all extra costs:

    Item Budget Code Description Amount Proposed

    Contractor

    001 2664 A 03 040000 01000 S

    Floor to wall joint caulking $2,712.00 Davenport Masonry

    Total Amount $2,712.00

    This change will require 0 days extension to the contract completion date. This quote is void after 30 days.

    If you have any questions regarding this Potential Change Order Request, please call me at your earliest convenience.

    If the above item(s) meet with your approval, please sign a copy of this letter and send back to me.

    Respectfully,

    CLARK CONSTRUCTION COMPANY

    Chad RiehlProject Director

    Livingston County/Date

  • ATTN: Greg Deuel Clark Construction Company

    RE: Livingston County Jail

    We propose to furnish labor, material, and equipment for the following work:

    Install Dyna Flex SC sealant at the floor to wall conditions were expansion exist

    Approx 450 LF

    Clarifications:

    This quote is for work to be preformed as straight time

    For the sum of: 2,712.00$

    If you should have any questions, please feel free to contact me at any time.

    Sincerely,

    Rick Benner

    517-927-9020

    P.O. Box 188 · 1445 Edgar Rd. · Holt, MI 48842-0188 · Phone: 517.699.4279 · Fax: 517.699.6141 · www.davenpo

    EQUAL OPPORTUNITY EMPLOYER

  • ortmasonry.com

  • Page 1 of 1

    11/4/2015

    Mike Kennedy Lindhout Associates Architects10465 Citation DriveBrighton, MI 48116

    RE: PCO No. 089Livingston County Jail Expansion -14-2664

    Dear Mike Kennedy,

    We have finalized gathering all the required quotations for PCO No. 089 for the following extra work:Replacement door savings. We have reviewed the scopes of work and have verified that all extra work items are in compliance with the Contract Documents.

    The following is a detailed itemization of all extra costs:

    Item Budget Code Description Amount Proposed

    Contractor

    001 2664 A 03 130000 01000 S

    Replacement door savings ($15,207.00) Steel Cell

    Total Amount ($15,207.00)

    This change will require 0 days extension to the contract completion date. This quote is void after 30 days.

    If you have any questions regarding this Potential Change Order Request, please call me at your earliest convenience.

    If the above item(s) meet with your approval, please sign a copy of this letter and send back to me.

    Respectfully,

    CLARK CONSTRUCTION COMPANY

    Chad Riehl

    Project Director

    Livingston County/Date