advancing clean energy in the philippines: using a grid ......apr 04, 2016 · • target...
TRANSCRIPT
![Page 1: Advancing Clean Energy in the Philippines: Using a Grid ......Apr 04, 2016 · • Target Completion of Project: October 2016 Final report will highlight operational changes, flexibility](https://reader034.vdocuments.us/reader034/viewer/2022052105/604042222ea901309a25f8f2/html5/thumbnails/1.jpg)
Advancing Clean Energy in the Philippines: Using a Grid Integration Study to Identify Pathways
Mark Christian P. Marollano Senior Science Research Specialist Department of Energy (DOE) - Philippines
![Page 2: Advancing Clean Energy in the Philippines: Using a Grid ......Apr 04, 2016 · • Target Completion of Project: October 2016 Final report will highlight operational changes, flexibility](https://reader034.vdocuments.us/reader034/viewer/2022052105/604042222ea901309a25f8f2/html5/thumbnails/2.jpg)
Presentation Outline • Philippine Renewable Energy Integration
Study • Luzon and Visayas in 2014 at a Glance • Targets • Assumptions and Methodology • Way Forward
![Page 3: Advancing Clean Energy in the Philippines: Using a Grid ......Apr 04, 2016 · • Target Completion of Project: October 2016 Final report will highlight operational changes, flexibility](https://reader034.vdocuments.us/reader034/viewer/2022052105/604042222ea901309a25f8f2/html5/thumbnails/3.jpg)
3
Greening the Grid Project PHL RE Grid Integration Study Scope
• Geographic focus
o Luzon and Visayas grids
• Study years
o 2014 reference case
o 2030 target year
• RE technology focus
o Wind
o Solar PV
o Other technologies (biomass, hydropower, geothermal) can help reach a RE target
![Page 4: Advancing Clean Energy in the Philippines: Using a Grid ......Apr 04, 2016 · • Target Completion of Project: October 2016 Final report will highlight operational changes, flexibility](https://reader034.vdocuments.us/reader034/viewer/2022052105/604042222ea901309a25f8f2/html5/thumbnails/4.jpg)
4
Greening the Grid Project PHL RE Grid Integration Study Objective of Study: • Identify Potential Grid Reliability Concerns with the scaling of
Variable Renewable Energy (VRE) Resources • Have Options to improve system flexibility and power system
balance; and • Have a new installation and grid integration targets
Partners: • United States Agency for International Development (USAID) • US National Renewable Energy Laboratory (NREL)
Source: DOE DEPARTMENT CIRCULAR NO. Dc2015-11-0017 “Creating a technical advisory committee and modelling working group to enable variable renewable energy integration and installation targets”
![Page 5: Advancing Clean Energy in the Philippines: Using a Grid ......Apr 04, 2016 · • Target Completion of Project: October 2016 Final report will highlight operational changes, flexibility](https://reader034.vdocuments.us/reader034/viewer/2022052105/604042222ea901309a25f8f2/html5/thumbnails/5.jpg)
5
PHL RE Grid Integration Study Organizational Structure
Source: DOE DEPARTMENT CIRCULAR NO. Dc2015-11-0017 “Creating a technical advisory committee and modelling working group to enable variable renewable energy integration and installation targets”
A) Technical Advisory Committee (TAC)
Ad Hoc TAC • Philippine Independent Power Producer Ass’n
(PIPPA) • Philippine Electric Power Owners Ass’n (PEPOA) • MERALCO • Retail Electric Suppliers Association (RESA) • RE Developers Ass’n
• PSPA, WEDAP, BREA, PASSHYDRO • Philippine Rural Electric Cooperative Ass’n Inc.
(PHILRECA) • Affiliated Renewable Energy Centers (ARECs) • National Economic and Development Authority
(NEDA) • University of the Philippines – National Engineering
Center (UP-NEC) • International Grid Experts
• Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ)
Core TAC • Department of Energy (DOE) – Lead
Agency • National Grid Corporation of the
Philippines (NGCP) • Philippine Electricity Market Corporation
(PEMC) • Energy Regulatory Commission (ERC) • Grid Management Committee (GMC) • Distribution Management Committee
(DMC) • National Transmission Corporation
(TransCo) • National Renewable Energy Board (NREB) • National Electrification Administration
(NEA) • Philippine National Oil Company –
Renewable Corporation (PNOC-RC)
![Page 6: Advancing Clean Energy in the Philippines: Using a Grid ......Apr 04, 2016 · • Target Completion of Project: October 2016 Final report will highlight operational changes, flexibility](https://reader034.vdocuments.us/reader034/viewer/2022052105/604042222ea901309a25f8f2/html5/thumbnails/6.jpg)
6
PHL RE Grid Integration Study Organizational Structure
Source: DOE DEPARTMENT CIRCULAR NO. Dc2015-11-0017 “Creating a technical advisory committee and modelling working group to enable variable renewable energy integration and installation targets”
B) Modeling Working Group (MWG)
Composed of representatives from:
PHL RE GRID INTEGRATION STUDY
![Page 7: Advancing Clean Energy in the Philippines: Using a Grid ......Apr 04, 2016 · • Target Completion of Project: October 2016 Final report will highlight operational changes, flexibility](https://reader034.vdocuments.us/reader034/viewer/2022052105/604042222ea901309a25f8f2/html5/thumbnails/7.jpg)
7
PHL RE Grid Integration Study Accomplishments
Source: DOE DEPARTMENT CIRCULAR NO. Dc2015-11-0017 “Creating a technical advisory committee and modelling working group to enable variable renewable energy integration and installation targets”
• Briefing on the Greening the Grid Project : July 2015 • Department Circular Dc2015-11-0017 : November 2015 to
March 2016 • Creation of TAC and MWG • Data Sharing Non-Disclosure Agreement (NDA)
• 1st TAC meeting : 21 January 2016 • Establishment of Assumptions
• 2nd TAC meeting : 3 June 2016 • Validation of 2014 Model • Modeling Assumption of 2030 Model
![Page 8: Advancing Clean Energy in the Philippines: Using a Grid ......Apr 04, 2016 · • Target Completion of Project: October 2016 Final report will highlight operational changes, flexibility](https://reader034.vdocuments.us/reader034/viewer/2022052105/604042222ea901309a25f8f2/html5/thumbnails/8.jpg)
8
Luzon and Visayas in 2014 at a Glance
Source: DOE Power Statistics, 2014
GENERATION MIX
- Interconnection
Luzon RE = 14.8%
Solar&Wind = 0.27%
Total Luzon Generation =
~56.8 TWh Total Visayas Generation =
~11.0 TWh
Visayas RE = 52.6%
Solar&Wind = 0.14%
![Page 9: Advancing Clean Energy in the Philippines: Using a Grid ......Apr 04, 2016 · • Target Completion of Project: October 2016 Final report will highlight operational changes, flexibility](https://reader034.vdocuments.us/reader034/viewer/2022052105/604042222ea901309a25f8f2/html5/thumbnails/9.jpg)
9
PHL RE Grid Integration Study Targets • 30% RE by 2030
• Impact to the Power System • Generation • Capacity • GHG Emission
![Page 10: Advancing Clean Energy in the Philippines: Using a Grid ......Apr 04, 2016 · • Target Completion of Project: October 2016 Final report will highlight operational changes, flexibility](https://reader034.vdocuments.us/reader034/viewer/2022052105/604042222ea901309a25f8f2/html5/thumbnails/10.jpg)
10
PHL RE Grid Integration Study Assumptions and Methodologies
• Establishing 2014 Basecase Model
• Generation • Transmission • Outages • Dispatch
• Four Agreed Scenarios (based on RE Target and Best Location
• Establishing RE Siting
Scenario RE (MWh) Solar and wind siting
strategy
Base case 20% approx. Existing locations
“BR-30” 30% Best resource
“LowTX-30” 30% Minimize new transmission
“BR-50” 50% Best resource
“LowTX-50” 50% Minimize new transmission
Note: Preliminary Results for generation and site selection
2030 Annual Generation (no new RE)
![Page 11: Advancing Clean Energy in the Philippines: Using a Grid ......Apr 04, 2016 · • Target Completion of Project: October 2016 Final report will highlight operational changes, flexibility](https://reader034.vdocuments.us/reader034/viewer/2022052105/604042222ea901309a25f8f2/html5/thumbnails/11.jpg)
11
PHL RE Grid Integration Study Way Forward • Continuing to improve 2030 scenarios • Input Sensitivities in High RE Scenarios • Analyze Results, Prepare Documents • Communicate results with TAC (3rd TAC meeting) and
presentation to DOE Secretary • Target Completion of Project: October 2016
Final report will highlight operational changes, flexibility enhancements, or transmission expansions that may help enable high renewable penetrations on the Luzon and Visayas systems.
![Page 12: Advancing Clean Energy in the Philippines: Using a Grid ......Apr 04, 2016 · • Target Completion of Project: October 2016 Final report will highlight operational changes, flexibility](https://reader034.vdocuments.us/reader034/viewer/2022052105/604042222ea901309a25f8f2/html5/thumbnails/12.jpg)
END OF PRESENTATION Advancing Clean Energy in the Philippines: Using a Grid Integration Study to Identify Pathways Mark Christian P. Marollano Senior Science Research Specialist Department of Energy (DOE) – Philippines Energy Center, Rizal Drive, Bonifacio Global City, Taguig City Philippines 1632 [email protected] www.doe.gov.ph