progress gallery september 2016 advancing our projects · 2017-04-04 · progress gallery september...
TRANSCRIPT
![Page 1: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/1.jpg)
Kamoa Copper Project is being connected to the DRC’s national electricity grid
in time to power mine development work (Kamoa gallery begins at page 10).
PROGRESS GALLERY September 2016
Advancing our projects
![Page 2: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/2.jpg)
KAMOA /
KAKULA
Building our future,
today,
in Sub-Saharan Africa
Democratic
Republic
of Congo
47%-owned
Copper
South Africa
64%-owned
Platinum-group
elements & gold-
nickel-copper
D.R. Congo
68%-owned
Zinc-copper
KIPUSHI PLATREEF
2
![Page 3: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/3.jpg)
Removing broken rock from shaft-sinking operations.
Shaft 1 will provide initial access for early underground
development at the Flatreef Deposit and to fast-track
production during the first phase of the Platreef Project.
Platreef
3
![Page 4: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/4.jpg)
Kibble bucket (left) that is used to remove broken rock
from the bottom of Shaft 1 in the ongoing sinking work.
Tipping of the kibble bucket (right) to dump the broken rock
at surface.
Platreef
4
![Page 5: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/5.jpg)
Muck-clearing operations during a cleaning cycle
in the ongoing sinking work at Shaft 1.
Platreef
5
![Page 6: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/6.jpg)
Left: Shaft-winding engine operator.
Right: Live images of shaft work underway relayed
via a closed-circuit TV system and displayed in front
of the winding-engine operator.
Platreef
6
![Page 7: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/7.jpg)
Silos used for storing concrete-making materials
adjacent to Shaft 1 headframe.
The concrete is used for lining the shaft as it is being sunk.
Platreef
7
![Page 8: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/8.jpg)
Inspection of the jumbo drill being used for shaft-sinking
operations.
Platreef
8
![Page 9: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/9.jpg)
Sealing of concrete joints in storm-water collection ponds
at Platreef.
Platreef
9
![Page 10: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/10.jpg)
Kamoa
Kamoa Project
map shows the
planned initial
mining area
at Kansoko Sud
and the
adjacent Kakula
exploration
area.
10
![Page 11: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/11.jpg)
New high-voltage power line is expected to begin delivering
electricity from the Democratic Republic of Congo’s national
grid in October this year for use in construction of the initial
mine being developed at the Kamoa Copper Project.
Kamoa
11
![Page 12: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/12.jpg)
Construction of 120-kilovolt power lines linking the Kamoa site
to the national electricity grid is nearing completion.
Kamoa
12
![Page 13: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/13.jpg)
Installation of fibre-optic data cables at Kamoa.
Kamoa
13
![Page 14: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/14.jpg)
Storm-water pump being prepared for installation
at the Kamoa box cut as part of the ongoing development
of the twin declines.
Kamoa
14
![Page 15: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/15.jpg)
Jumbo drill completing holes for another blast
in the ongoing excavation of the declines.
Kamoa
15
![Page 16: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/16.jpg)
Kamoa
Underground mine development at Kamoa’s planned mine
at Kansoko Sud is progressing ahead of plan.
The twin declines, incorporating both a service and a conveyor
tunnel, each have advanced more than 160 metres
since the first excavation blast in May of this year.
Kamoa
16
![Page 17: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/17.jpg)
One of the seven
drills in operation
at the Kakula
Discovery,
approximately
10 kilometres
southwest of the
Kamoa box cut.
Kamoa
17
![Page 18: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/18.jpg)
Drill hole DD1054 at the Kakula Discovery.
Kamoa
18
![Page 19: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/19.jpg)
Section from high-grade
chalcocite (80% copper
by weight) in Kakula drill
hole DD1027.
Kamoa
19
![Page 20: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/20.jpg)
Kamoa
Louis Watum (left), Ivanhoe’s Managing Director
of DRC Operations, shows a box of high-grade Kakula drill core
to a group of international mining analysts.
Kamoa
20
![Page 21: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/21.jpg)
Strong chalcocite (80% copper by weight) mineralization
in core from one of the new holes being drilled at Kakula.
Kamoa
21
![Page 22: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/22.jpg)
Kamoa geologists inspecting a drill core of massive chalcocite
from Kakula hole DD1054.
Kamoa
22
![Page 23: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/23.jpg)
Section of core showing +12% copper in one of the recent
Kakula drill holes.
Kamoa
23
![Page 24: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/24.jpg)
Workers upgrading a pump motor and preparing
it for installation on the mine’s 450-metre level.
24
Kipushi
![Page 25: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/25.jpg)
A mechanic machining a pump flange as part of the upgrading
of existing underground mining equipment installed at Kipushi.
Kipushi
25
![Page 26: PROGRESS GALLERY September 2016 Advancing our projects · 2017-04-04 · PROGRESS GALLERY September 2016 Advancing our projects . KAMOA / KAKULA Building our future, today, in Sub-Saharan](https://reader033.vdocuments.us/reader033/viewer/2022042420/5f37e64eb564b63a245951fc/html5/thumbnails/26.jpg)
A motor generator is upgraded (left) and re-installed
underground (right).
Kipushi
26