admin workshop 2017 - jcihk · admin workshop 2017 prepared by 2017 jcihk admin team & digital...

26
Admin Workshop 2017 Prepared by 2017 JCIHK Admin team & Digital Marketing Director 10 th Jan 2017

Upload: vumien

Post on 21-Sep-2018

227 views

Category:

Documents


2 download

TRANSCRIPT

Admin

Workshop 2017 Prepared by 2017 JCIHK Admin team & Digital

Marketing Director

10th Jan 2017

Records & Recognition

By National Records and Recognition Director

Winita Yeung

Spirit of R&R

Project Participation

Spirit of R&R

Spirit of R&R

2017 LOM EFFICIENCY PROGRAM

• Award will be given to LOM(s) that attains 100%

efficiency (if any) or the LOM that attains the

highest score if none of the LOMs attain 100%

efficiency (at least 90%).

• Certificate of Merit will be given to the LOM(s)

that attains 80% efficiency or above.

• For those LOMs that bid for the "Outstanding

Chapter of the Area Award" or the "Outstanding

Progressive LOM Award", the LOM must have

achieved at least 80% under the 2017 LOM

Efficiency Index in both areas,

1. “Administration” and

2. “Project Participation” + “Bonus Point”,

as of 1 August 2017.

LOM

Efficiency

Award

IMPORTANT

NOTE:

(Bidding in National

Convention)

EFFICIENCY INDEX

Project

Participation

2017 LOM EFFICIENCY PROGRAM

2017 LOM EFFICIENCY PROGRAM

Nov 2016 - Oct 2017 Board Meeting minutes 5

2017/02/01 Submit 2017 ND2A form to Company Registry 6

2017/06/30 Submit NOM performance evaluation form 8

2017/08/01 Submit 52nd National Convention report

2017/09/1 Submit project photos for JCI Website 10

Administration

Remarks:

-5The LOM’s efficiency index relating to the submission of Board Meeting minutes will commence from

November 2016. The adopted board meeting minutes for each month should be emailed to Chamber

Office staff ([email protected]) and c.c. to NRRD Team ([email protected]) before the end of next month.

Please note that a copy of November and December 2016 board meeting minutes must be submitted

before 31 January 2017. Thus, the maximum score for the year will be twelve (12) points if all Board

meeting minutes are submitted on time.

-8NOM Performance Evaluation Form will be emailed by NSG to LOM Presidents in June 2017.

-10LOM should submit 2 projects with 2 key project photos of each project and upload them to jci.cc on

or before 1 September 2017.

Visit http://www.icris.cr.gov.hk > Search >

Company name > Input “Junior Chamber International XXXXX”

2017 LOM EFFICIENCY PROGRAM

2017 LOM EFFICIENCY PROGRAM

Document status

is "Available" in

Companies

Registry

-7Membership dues must be settled within 30 days of issue of debit note.

-21Membership updates should be submitted through the website by LOM on or

before 20th of each month.

Membership

Dec 2016 - Nov 2017 Membership Updates 21

2017/01/14 Report Membership data (1st) and issue Membership debit note 7

2017/01/14 Clear all "Update Request" with correct data in the membership system

2017/04/01 Report Membership data (2nd) and issue Membership debit note 7

2017/04/01 Clear all "Update Request" with correct data in the membership system

2017/07/15 Report Membership data (3rd) and Issue Membership debit note 7

2017/07/15 Clear all "Update Request" with correct data in the membership system

2017/09/18 Report Membership data (4th) and Issue Membership debit note 7

2017/09/18 Clear all "Update Request" with correct data in the membership system

2017 LOM EFFICIENCY PROGRAM

-9LOM should submit one event name, one event caption and one photo for

Harbour Lights 1st, 2nd, 3rd & 4th. Submission deadline will be 24 February, 26 May,

4 August and 29 September 2017 respectively. National Publication and Social

Media Commission Chairman will provide you with publication theme before

deadline.

Publication

2017/02/24 Submit Harbour Lights material (1st) 9

2017/05/26 Submit Harbour Lights material (2nd) 9

2017/08/04 Submit Harbour Lights material (3rd) 9

2017/09/29 Submit Harbour Lights material (4th) 9

2017 LOM EFFICIENCY PROGRAM

2017 LOM EFFICIENCY PROGRAM

Project Participation

2017/01/14 2017 Joint Board Meeting (1st) 4

2017/04/01 2017 Joint Board Meeting (2nd) 4

2017/06/24 2017 Joint Directors Meeting (1st) + Executive Development Program 3,4

2017/08/21 2017 Joint Board Meeting (3rd) 4

2017/09/03 Awards Judging Day (National Convention) (1 to Max. 2 judges attend)

PROJECT PARTICIPATION

3Any reference to percentage on LOM’s Board of Directors will be based on the total number of directors with voting

rights as printed in the organization chart of the LOM in the Souvenir Program of the 2017 NOM Inaugural Ceremony.

For attendance taking purpose, sign-in will be required for NOM meetings and events, and registration will be closed

after 30 minutes of scheduled event start time.

For Joint Directors Meetings, in addition to the above sign-in policy, one LOM group photo will be taken on site with

designated props provided by the NRR team at a designated time slot. The photo then has to be sent to the National

Records and Recognition area via email ([email protected]) within one hour after meeting adjournment and will serve

as evidence of attendance for the NRR team.

4For the purposes of this program, the presence of the Acting President will be accepted as "President Present"

provided that the notice is served to NSG Priscilla Wan ([email protected] ) 3 days in advance of the meeting.

Please note that “Out-Town Notice” will not be treated as a formal notice of absence from the meeting.

2017 LOM EFFICIENCY PROGRAM

Membership

2017/03/18-19 26th 5-Star Training Camp 11

2017/06/03 “Star Express” Training Day 11

2017/07/08-08 27th 5-Star Training Camp 11

2017/10/28-29 28th 5-Star Training Camp 11

11 The members should participate in the whole 5-Star Training Camp / "Star Express"

Training Day and attend the graduation ceremony in 5-Star Training Camp / "Star

Express" Training Day to receive the certificates.

2017 LOM EFFICIENCY PROGRAM

2017 LOM EFFICIENCY PROGRAM

2017 LOM EFFICIENCY PROGRAM

Dec 2016 – Nov 2017 Hosting NOM Project 19

Dec 2016 – Nov 2017

Hosting JCI Official Course (JCI Impact, JCI Admin, JCI Achieve, Effective

Meeting, Effective Communication, Effective Leadership, Social Responsibility,

Presenter) or Recommended Training Course 14

Dec 2016 – Nov 2017 Power Learning Path 2, 15

Dec 2016 – Nov 2017 Cooperation with Government Bureau, District Office or District Council 13

Dec 2016 – Nov 2017 Area Conference including Africa & Middle East, Americas, European and JCI

Partnership Summit but excluding ASPAC 16

Dec 2016 – Nov 2017 NOM IA Reception 17

Dec 2016 – Nov 2017 Combo Power Workshop 18

Dec 2016 – Nov 2017 Hosting LOM Project to address UN SDGs 20

2017/03/14 Change Maker Forum 22

2017/03/25 JCI Public Speaking Contest 12

2017/04/19 Debating Workshop

PROJECT PARTICIPATION (BONUS POINT)

2017 LOM EFFICIENCY PROGRAM

Hosting NOM Project 19

Bonus point will be given to LOM after Project File is received. Please submit the Project

File to National Records and Recognition area ([email protected]) by email.

Cooperation with Government Bureau, District Office or District Council 13

Bonus point will be given to “Cooperation with Government Bureau, District Office or

District Council”. The counting will only cover projects that have been carried out before

30 November 2017. In this context, “cooperation” refers to the joint project with

Government Bureau, District Office or District Council, which means reasonable amount of

manpower and time have been contributed to jointly organize a project. Please submit

Project Report with evidence (e.g. supporting letter, event photo) to NRRD and c.c. to

NGLC and NSG.

Area Conference including Africa & Middle East, Americas, European and JCI Partnership

Summit but excluding ASPAC 16

Bonus point will be given to LOM for encouraging members to join Area Conferences

including Africa & Middle East, Americas, European and JCI Partnership Summit but

excluding ASPAC. Members who are on JCIHK Recognition List, except Chapter

President, will not be counted for EI.

2017 LOM EFFICIENCY PROGRAM

NOM IA Reception 17

Bonus point will be given to LOM for attending NOM IA official reception for overseas

guests, for example, JCI President and JCI Vice-President.

Combo Power Workshop 18

Bonus point will be given to LOM for attending Combo Power Workshop. 2 extra points of

2017 EI will be awarded if there are at least 2 members from each chapter attending each

session of the Combo Power Workshop (both morning and afternoon sessions).

Hosting LOM Project to address UN SDGs 20

Bonus point will be given to LOM for encouraging LOM to address UN SDGs in their

projects. Proofs of UN SDGs logos on project promotional materials (e.g. banner, email,

backdrop) must be provided to National Records and Recognition area

([email protected]) by email.

Change Maker Forum 22

Non-member is those not in the membership system.

2017 LOM EFFICIENCY PROGRAM

Source

Source Visit www.jcihk.org > Member Resources Area >

Records & Recognition > 2017 LOM Efficiency Index Explanatory Note

Visit www.jcihk.org > Member Resources Area >

Records & Recognition > 2017 JCIHKLOM Efficiency Index Guidelines

Source

Guest Speakers

JCI Tai Ping Shan 2016 President

Edith Ko

JCI Apex 2016 President

Kacy Yu

Questions You may contact

Senator Zenith Lin

National General Legal Counsel

[email protected]

Winita Yeung

National Records & Recognition Director

[email protected]

Katie Tsang

2017 National Records & Recognition Officer

[email protected]

Steven Chow

2017 National Records & Recognition Officer

[email protected]