admin riley st. scott st. bridge drop r. st. visitor ... · riley st. r. r. l. riley st. scott st....

1
PHASE 1a - INTERIM HOUSING A12 A13 A11 A10 A4 A5 A7 A6 A9 A8 (E) AC PAVING A23 A22 A21 A1 A2 P24 (E) PARKING DSA#02-114769 BLDG B3 BLDG F GYMNASIUM BLDG J CUSTODIAN SHOP BLDG C BLDG I BLDG S BLDG M RMP DN. PREP. B-14 B-13 B-11 PREP. OFFICE / SUPPORT CORR. B-21 STG. JAN. CORRIDOR CORR. CORR. PREP. PREP. CORR. PREP. CORR. PREP. HALL LIVING DINING UTILITY STG. CAVE (E) STAGE (E) ELEC. SWITCHGEAR STAFF SPECIAL ED. MATH ENGLISH B-8 SPEC. ED. B-6 SOCIAL SCI. B-5 B-9 SPEC. ED. B-10 SPEC. ED. B-1 SCIENCE B-2 SCIENCE B-3 SCIENCE B-4 SCIENCE B-20 SOCIAL SCI. SOCIAL SCI. ENGLISH ENGLISH B-19 B-18 B-17 MATH B-16 MATH B-15 B-10.1 SPEC. ED. S-3 SPEC. ED. SPECIAL ED. R.S.P. STG. BOYS' LOCKER WRESTLING (E) QUAD (E) BLEACHERS (E) BLEACHERS 1,900 sf TEACHER / PREP. EQUIP MECH COPY C-1 C-2 C-3 C-4 C-5 STG. 6TH MATH KITCHEN CAFETERIA PLTW WEIGHT RM. 1,773 sf 1,1140 sf S-1 S-2 B-7 YR. BK. / COMP. 6TH ENGLISH / SS B-12 6TH ENGLISH 6TH ENGLISH / SS 6TH ENGLISH / SS 6TH ENGLISH / SS C-6 C-7 C-8 6TH SCI. / MATH 6TH SCI. / MATH 6TH SCI. / MATH BLDG B1 (E) 2 HR. FIRE WALL (E) 2 HR. FIRE WALL (E) 2 HR. FIRE WALL (E) 2 HR. FIRE WALL (E) 2 HR. FIRE WALL BLDG B2 BLDG M2 GIRLS' LOCKER M-1 M-2 BAND CHORAL (E) D.F. (E) D.F. (E) D.F. (E) D.F. (E) D.F. (E) D.F. (E) D.F. (E) D.F. (E) D.F. (E) D.F. (E) D.F. RIM=295.12 CO RWL RWL RWL DS w DS DS GR=290.76 DI(CAR ON TOP) DS DS DS E GR=288.98 AD RWL E GR=286.80 AD(FULL) DS GR=289.06 AD DS TD 4"SD 4"DROP INV=285.35 4"INV(E)=288.11 4"DROP INV=287.98 E RIM=289.07 CO DS RIM=287.54 CO? RWL 8"W (E) PARKING LOT (E) F.H. ADMIN. ART D1 LUNCH ANNEX BLDG D BLDG E DSA #61900 (E) PARKING LOT - DSA #61900 (E) SIGNAL (E) SIGNAL (E) DATA LNDSCP 6 12 13 7 8 9 1 5 LNDSCP LNDSCP ELECT. ELECT. LNDSCP LNDSCP LNDSCP LNDSCP LNDSCP LNDSCP LNDSCP LNDSCP LNDSCP LNDSCP LNDSCP LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LNDSCP LANDSCAPE LANDSCAPE LNDSCP LNDSCP LANDSCAPE LNDSCP LNDSCP LND LNDSCP LNDSCP LANDSCAPE LNDSCP LNDSCP LNDSCP LNDSCP LNDSCP LNDSCP LNDSCP LNDSCP LNDSCP LNDSCP LNDSCP LNDSCP LNDSCP LNDSCP LND LNDSCP LNDSCP LNDSCP LNDSCP LNDSCP LNDSCP D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. D.S. BLDG. AA FFE = 291.02 BLDG. AA FFE = 291.02 BLDG. E - ADMIN. FFE = 292.02 BLDG. AB - MEDIA CENTER FFE = 291.52 LUNCH SHELTER FFE = 292.00' BLDG. D FFE = 295.25' STAGE FFE = 295.25' CLASSROOMS S (e) memorial plaque @ finish grade RILEY ST. PERSIFER ST. S (E) F.H. (E) HARDCOURTS (E) PARKING LOT (E) HARDCOURTS B D.F. PHASE 1 & 2 COMPOSITE SITE PLAN 1" = 30' 0 0 10 20 30 40 50 60 FT FOLSOM CORDOVA USD - SUTTER MIDDLE SCHOOL MEASURE G IMPROVEMENTS FOLSOM CORDOVA USD - SUTTER MIDDLE SCHOOL IMPROVEMENTS - PHASES 1B / C AND 2 Sutter Middle School - Site Access and Logistics 2018-2019 Restricted Access Phase 2 Construction Area Construction Access - DO NOT BLOCK DROP OFF STUDENT 21 20 19 18 17 Visitor Parking 17-21 BUS DROP-OFF NO STUDENT DROP-OFF BUS DROP OFF DO NOT BLOCK Pedestrian Access Legend ADMIN TEMPORARY PATHWAY A-Wing A-Wing A-Wing Vehicular Access R9 R8 R7 R6 R5 R4 R24 R21 R22 R23 R10 R11 R12 R13 R1 R2

Upload: others

Post on 24-Aug-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ADMIN RILEY ST. SCOTT ST. BRIDGE DROP R. ST. Visitor ... · riley st. r. r. l. riley st. scott st. (e) f.h. (e) f.h. (e) f.h. (e) turf field (e) hardcourts (e) parking lot (e) hardcourts

PHASE 1a -INTERIM HOUSING

A12

A13

A11

A10

A4A5A7 A6A9 A8

(E) A

C P

AV

ING

A23A22A21

A1

A2

P24

(E) PARKINGDSA#02-114769

BLDG B3

BL

DG

F

GYMNASIUM

BLDG J

CUSTODIAN

SHOP

BLDG CBLDG I

BLDG S

BL

DG

M

RMP DN.

PREP.

B-14

B-13

B-11

PR

EP

.

OFFICE /SUPPORT

CO

RR

.

B-21STG.

JAN.

CORRIDOR

CO

RR

. C

OR

R.

P

RE

P.

PR

EP

.

CO

RR

. PREP.

CO

RR

.

PR

EP

.

HALL

LIVINGDINING

UTILITY

STG.

CAVE

(E)

ST

AG

E

(E) ELEC. SWITCHGEAR

♂♀

STAFF

♀ ♂

SPECIAL ED.

MATH ENGLISH

B-8SPEC. ED.

B-6SOCIAL SCI.

B-5

B-9SPEC. ED.

B-10SPEC. ED.

B-1SCIENCE

B-2SCIENCE

B-3SCIENCE

B-4SCIENCE

B-20SOCIAL SCI.

SOCIAL SCI.

ENGLISH

ENGLISH

B-19

B-18

B-17MATH

B-16MATH

B-15

B-10.1SPEC. ED.

S-3

SPEC. ED.

SPECIAL ED.R.S.P.

STG.

BOYS'LOCKER

WR

ES

TL

ING

(E) QUAD

(E) BLEACHERS

(E) BLEACHERS

1,9

00

sf

TE

AC

HE

R /

PR

EP

.

EQUIP

MECH

COPY

C-1 C-2 C-3 C-4 C-5

ST

G.

6TH

MATH

KITCHENCAFETERIAPLTWWEIGHT

RM.1,773 sf1,1140 sf

S-1 S-2

B-7YR. BK. /

COMP.

6TH ENGLISH /

SS

B-126TH

ENGLISH

6TH ENGLISH /

SS

6TH ENGLISH /

SS

6TH ENGLISH /

SS

C-6 C-7 C-86TH SCI. /

MATH

6TH SCI. /

MATH

6TH SCI. /

MATH

BLDG B1

(E) 2 HR. FIRE WALL

(E) 2 HR. FIRE WALL (E) 2 HR. FIRE WALL

(E) 2 HR. FIRE WALL (E) 2 HR. FIRE WALL

BLDG B2

BLDG M2

GIRLS'LOCKER

M-1

M-2

BAND

CHORAL

(E)

D.F

.

(E) D.F.

(E)D.F.

(E)D.F.

(E)D.F.

(E)D.F.

(E)D.F.

(E)D.F.

(E)D.F.(E)

D.F.

(E)D.F.

RIM=295.12

CO

RWL

RWL

RWL

DSw

DS

DS

GR=290.76

DI(CAR ON TOP)

DS

DS DS

E

GR=288.98

AD

RWL

E

GR=286.80

AD(FULL)

DS

GR=289.06

AD

DS

TD

4"SD

4"DROP INV=285.35

4"INV(E)=288.11

4"DROP INV=287.98

E

RIM=289.07

CO

DS

RIM=287.54

CO?

RWL

8"W

(E) PARKINGLOT

(E) F.H.

ADMIN.

ARTD1

LUNCHANNEX

BLDG D

BLDG E

DSA #61900

(E) PARKING LOT -DSA #61900

(E) SIGNAL

(E)SIGNAL

(E)DATA

LNDSCP

(E) PARKING LOTDSA #02-115428

612

13

5

20

15

7

8

9

3

121

5

LN

DSC

P

LN

DSC

P

(E) PARKINGLOTDSA

#02-115428

ELECT.

ELECT.

LNDSCP LNDSCP

LNDSCP

LNDSCP

LN

DSC

P

LN

DSC

P

LNDSCP

LN

DSC

P

LNDSCP

LNDSCP

LNDSCP

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LNDSCP

LANDSCAPE

LANDSCAPE

LNDSCP

LNDSCP

LANDSCAPE

LNDSCP

LNDSCP

LND LN

DS

CP

LN

DSC

P

LANDSCAPE LNDSCP

LNDSCP

LNDSCP

LNDSCP

LN

DS

CP

LNDSCP

LNDSCP

LNDSCP

LNDSCP

LNDSCPLNDSCP

LNDSCP

LN

DSC

P

LNDSCP

LND

LN

DSC

P

LNDSCP

LN

DS

CP

LNDSCP

LN

DSC

P

LN

DSC

P

D.S.

D.S.

D.S.

D.S.

D.S.

D.S. D.S. D.S.

D.S

.

D.S

.

D.S

.

D.S.

D.S.

D.S.

D.S

.

D.S

.

D.S

.

D.S.

D.S.

D.S

.

D.S

.

D.S.

D.S

.

D.S

.

D.S.D.S. D.S.

D.S.

D.S.

D.S.

D.S.

D.S

.

D.S

.

D.S.

D.S.

D.S

.

D.S

.

D.S.

D.S.

D.S.

D.S.D.S.

D.S.

D.S.

D.S.

BL

DG

. AA

FF

E =

29

1.0

2

BLDG. AAFFE = 291.02

BLDG. E -ADMIN.

FFE = 292.02

BLDG. AB -MEDIA CENTER

FFE = 291.52

LUNCH SHELTER

FFE = 292.00'

BLDG. D

FFE = 295.25'STAGE

FFE = 295.25'CLASSROOMS

S

(e) m

emor

ial p

laqu

e

@ fi

nish

gra

de

EAST BIDWELL ST.

RIL

EY

ST

.

PERSIFER ST.

PERSIFER ST.

BIDWELL ST.

RIL

EY

ST

.

SC

OT

T S

T.

(E) F.H.

(E) F.H.(E) F.H.

(E) TURF FIELD

(E)HARDCOURTS

(E)

PA

RK

ING

LO

T

(E)HARDCOURTS

BR

ID

GE

ST

.

D.F

.

PHASE 1 & 2 COMPOSITE SITE PLAN1" = 30'

00 10 20 30 40 50 60 FT

Dec. 28, 2016

FO

LS

OM

CO

RD

OV

A U

SD

- S

UT

TE

R M

ID

DL

E

SC

HO

OL

ME

AS

UR

E G

IM

PR

OV

EM

EN

TS

FO

LS

OM

CO

RD

OV

A U

SD

- S

UT

TE

R M

ID

DL

E S

CH

OO

L

IM

PR

OV

EM

EN

TS

- P

HA

SE

S 1

B /

C A

ND

2

Sutter Middle School - Site Access and Logistics 2018-2019

Restricted AccessPhase 2

Construction Area

ConstructionAccess - DONOT BLOCK

DROPOFF

STUDENT

21 20 19 18 17

Visitor Parking 17-21

BUS DROP-OFFNO STUDENT

DROP-OFF

BUS DROP OFF DO NOT BLOCK

Pedestrian Access

Legend

ADMIN

TEMPORARYPATHWAY

A-Wing

A-W

ing

A-Wing

Vehicular Access

R9 R8 R7 R6 R5 R4

R24

R21 R22 R23

R10

R11

R12

R13

R1

R2

Dougn
Flag