Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers 1) an equipment list and 2) a condition assessment of the equipment. 1. Have deficiency inspections been performed on the 58 bridges that identify the significant maintenance requirements? Yes, DK Consultants 2012 2. Has there been any estimate for labor hours required to complete the repairs for each individual bridge? No, this will vary from bridge to bridge. 3. Is there a schedule identifying which bridges will be addressed first? To be determined by flight schedules, owner will schedule work. 4. Exhibit A 3.8 - Contractor shall not be allowed to subcontract any or all work of the work…. In the event a specialized trade is needed, such as a certified welder, would the Owner subcontract this directly under request of the Contractor or will Contractor be allowed to hire these types of services out? If a certified welder is needed, Contractor shall hire welder upon approval of owner. 5. Exhibit A 7.1b – Owner shall supply any spare or replacement parts……. Will the owner be supplying all of the needed fluids and lubricants? Or is this considered a consumable or expendable as stated in 4.16 of Exhibit A? Fluids and lubricants are considered a consumable. 6. Will Owner take sole responsibility for shipping ,receiving and packaging all incoming and outgoing shipments of components? Yes 7. Section 3: Contract – 19: Does the owner have space available for the storage of Contractors supplies and tooling? Yes 8. Will any space be provided for the Contractor to use as a field office? Yes, space will be made available at the Airport’s CLT Center, 5501 Wilkinson Boulevard. The Contractor must supply everything needed for the office space besides a data/phone and power. 9. Will Internet services be available for the Contractor to utilize? Yes 10. Section 3: Contract – 28 – Non – Appropriation of Funds: When does the City of Charlotte’s Fiscal Year end? June 30 th of each year

Upload: trantram

Post on 18-Apr-2018

219 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services

November 21, 2013

*See below questions and answers 1) an equipment list and 2) a condition assessment

of the equipment.

1. Have deficiency inspections been performed on the 58 bridges that identify the significant maintenance requirements?

Yes, DK Consultants 2012

2. Has there been any estimate for labor hours required to complete the repairs for each individual bridge?

No, this will vary from bridge to bridge.

3. Is there a schedule identifying which bridges will be addressed first?

To be determined by flight schedules, owner will schedule work.

4. Exhibit A 3.8 - Contractor shall not be allowed to subcontract any or all work of the work…. In the event a specialized trade is needed, such as a certified welder, would the Owner subcontract this directly under request of the Contractor or will Contractor be allowed to hire these types of services out?

If a certified welder is needed, Contractor shall hire welder upon approval of owner.

5. Exhibit A 7.1b – Owner shall supply any spare or replacement parts……. Will the owner be supplying all of the needed fluids and lubricants? Or is this considered a consumable or expendable as stated in 4.16 of Exhibit A?

Fluids and lubricants are considered a consumable.

6. Will Owner take sole responsibility for shipping ,receiving and packaging all incoming and outgoing shipments of components?

Yes

7. Section 3: Contract – 19: Does the owner have space available for the storage of Contractors supplies and tooling?

Yes

8. Will any space be provided for the Contractor to use as a field office?

Yes, space will be made available at the Airport’s CLT Center, 5501 Wilkinson Boulevard. The Contractor must supply everything needed for the office space besides a data/phone and power.

9. Will Internet services be available for the Contractor to utilize?

Yes

10. Section 3: Contract – 28 – Non – Appropriation of Funds: When does the City of Charlotte’s Fiscal Year end?

June 30th of each year

Page 2: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

11. What is the budget for this project?

$400,000.00 per year

12. Is exterior painting and pressure washing of equipment included in the scope of this project? If so, what are the requirements for providing the paint including environmental concerns and specifications?

No

13. Is the Owner or Contractor responsible for disposal of hazmat materials associated with this project?

Yes, per Section 4.18 of Exhibit A, the Contractor is responsible for the collection and disposal of waste materials including hazardous wastes.

14. Regarding the staffing requirements, how many hours does the Airport estimate utilizing the mechanics?

2000

15. Does the Airport have an established PMI program?

Yes

16. Will the mechanics work with the Airport staff to perform PMI program tasks?

Yes

Page 3: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

TECHNICAL SPECIFICATIONS PASSENGER BOARDING BRIDGE MAINTENANCE PROGRAM

CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT

11

GATE Manf SERIAL MFG Date MODEL TYPE

A-2 FMC Jetway OG30295 2004 A3-68/141-125R 3-Tunnel

A-3 FMC Jetway OG39407 2000 A3-60/119-125R 3-Tunnel

A-4 FMC Jetway OG30296 2004 A3-68/141-125R 3-Tunnel

A-5 Thyssen 05057TB373827 2001 TB37-18.5-3 3-Tunnel

A-6 FMC Jetway OG36341 1981 A3-58/110-125R 3-Tunnel

A-7 FMC Jetway OG39406 2000 A3-58/110-125R 3-Tunnel

A-8 FMC Jetway OG39405 2000 A3-53/104-125R 3-Tunnel

A-10 FMC Jetway OG39409 2000 A3-60/119-125R 3-Tunnel

A-12 FMC Jetway OG39410 2000 A3-64/131-125R 3-Tunnel

B-2 FMC Jetway OG36293 1990 A2-65/99 2 Tunnel

B-7 FMC Jetway OG36546 1989 A3-58/110 3 Tunnel

B-9 FMC Jetway OG36030 1987 A2-65/99 2 Tunnel

B-10 FMC Jetway OG36031 1987 A2-65/99 2 Tunnel

B-11 FMC Jetway OG36028 1987 A2-65/99 2 Tunnel

B-12 FMC Jetway OG36029 1987 A2-65/99 2 Tunnel

B-15 FMC Jetway OG36032 1987 A2-77/111 2 Tunnel

B-16 FMC Jetway OG36033 1987 A2-77/111 2 Tunnel

C-3 FMC Jetway OG36557 1989 A3-58/110 3-

Tunnel

C-6 FMC Jetway OG36549 1989 A3-58/110 3-Tunnel

C-8 FMC Jetway OG39456 2000 A3-58-110-125R 3-tunnel

C-10 FMC Jetway OG39457 2000 A3-58-110-125R 3-tunnel

C-12 FMC Jetway OG35145 1984 A2-65/99 2 Tunnel

C-14 FMC Jetway OG35146 1984 A2-65/99 2 Tunnel

C-15 FMC Jetway OG35147 1984 A2-65/99 2 Tunnel

C-16 FMC Jetway OG35148 1984 A2-65/99 2 Tunnel

C-18 FMC Jetway OG35149 1984 A2-65/99 2 Tunnel

C-19 FMC Jetway OG35150 1984 A2-65/99 2 Tunnel

D-1 FMC Jetway OG36292 1989 A2-61/91 2 Tunnel

D-2 FMC Jetway OG39642 2001 A3-64/131-125R 3-Tunnel

D-3 Thyssen 05057TB373834 2002 37/18.5-3 3-Tunnel

D-4 Thyssen 05057TB413832 2002 41/19.5-3 3-Tunnel

D-5 FMC Jetway OG36034 1988 A2-65/99 2-Tunnel

D-6 Thyssen 05057TB353833 2002 35/17.5-3 3-Tunnel

D-7 FMC Jetway OG36030 1987 A2-65/99 2-Tunnel

D-8 FMC Jetway OG36035 1988 A2-65/99 2-Tunnel

D-9 FMC Jetway OG39408 2000 A3-60/119 3-Tunnel

D-10 Thyssen 05057TB333831 2001 33/17.0-3 3-Tunnel

D-11 Thyssen 05057TB412830 2001 41/24.5-2 2-Tunnel

D-12 Thyssen 05057TB393828 2001 39/19.0-3 3-Tunnel

D-13 Thyssen 05057TB392829 2001 39/22.5-2 2-Tunnel

E-1 Dew 1144 2002 R48-R1DJ 2-tunnel

E-2 Dew 1146 2002 R48-R1DJ 2-tunnel

E-3 Dew 1147 2002 R48-R1DJ 2-tunnel

E-11 Dew 1168 2002 R16-R1DJ 2-tunnel

E-15 Dew 1126 2002 R48-R1DJ 2-tunnel

E-17 Dew 1127 2002 R48-R1DJ 2-tunnel

E-18 Dew 1169 2002 R20-R1J 2-tunnel

Page 4: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

TECHNICAL SPECIFICATIONS PASSENGER BOARDING BRIDGE MAINTENANCE PROGRAM

CHARLOTTE DOUGLAS INTERNATIONAL AIRPORT

12

GATE Manf SERIAL MFG Date MODEL TYPE

E-19 Dew 1170 2002 R20-R1J 2-tunnel

E-13 JBTAerotech OG31214 2008 A2-57/84-125R 2-tunnel

E-20 JBTAerotech OG31642 2010 A2-57/84 2-tunnel

E-22 JBTAerotech OG31211 2008 A2-55/80 2-tunnel

E-24 JBTAerotech OG31215 2008 A2-57/84 2-tunnel

E-25 JBTAerotech OG31216 2008 A2-57/84 2-tunnel

E-26 JBTAerotech OG31212 2008 A2-55/80 2-tunnel

E-27 JBTAerotech OG31210 2008 A2-53/77 2-tunnel

E-28 JBTAerotech OG31213 2008 A2-55/80 2-tunnel

E-30 JBTAerotech OG31209 2008 A2-49/70 2-tunnel

E-32 JBTAerotech OG31641 2010 A2-57/84 2-tunnel

Page 5: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

* ='s Safety issue / immediate atteation-repair suggested: A-2 A-3 A-4 A-5 A-6 A-7 A-8 A-10 A-12

PBB condition recommendation:

PBB needs to be scrapped: √

PBB is a candidate for refurbishment off-site facility:

PBB candidate for an in-place refurbishment: √ √ √ √ √ √ √ √

PBB needs recovery maintenance: √ √ √ √ √ √ √

PBB needs exterior roof re-paint and metal repair: √ √ √ √ √ √ √

PM Maintenance is not being accomplished to PBB: √ √ √ √ √ √ √ √ √

PBB needs interor cleaning and re-lamping: √ √ √ √ √ √ √ √ √

PBB needs interior painting, carpet and ribber rubber repalcement: √ √ √ √ √ √ √ √ √

PBB Apron Drive or Type PBB and components:

Radial

2-Tunnel

3-Tunnel √ √ √ √ √ √ √ √ √

Motor Generator Horizontal Drive PBB √

Solid State Horizontal DC Drive PBB

AC Horizontal Drive VFD's PBB √ √ √ √ √ √ √ √

Vertical Lift Column - Single Motor Gearbox √

Vertical Lift Columns - Independent Motors on Columns √ √ √ √ √ √

Hydraulic Lift Columns: √

Corrugated Roof PBB: √ √ √ √ √

Flat Roof PBB: √ √ √

ACF Cab Floor (factory ): √ √ √

ACF Cab Floor (retro-fit/aftermarket ): √

ACE Cab Floor: √ √ √ √

RJ - Cab Floor: √ √ √ √

Standard Cab Floor:

OPC Cab Floor:

Fall protection on roof of PBB:

Roof Handrails C-Tunnel and Cab: √ √ √ √ √ √ √

Roof Access Ladder on Service Platform: √ √ √ √ √ √ √ √

Cable Sheave system under tunnels: √

Festoon Cable System under Tunnels: √ √ √ √ √ √ √

Trolley System on side of Tunnels: √

Dog Leg on side of Tunnels: √

Inspection defect items noted:

Rotunda:

Rotunda Exterior Flashing to Terminal needs repaired:

Rotunda Curtain out of track or damaged:

Rotunda Curtain damage:

Rotunda Bearing making noise needs serviced: √

Rotunda Bearing appears to be worn - cracking noise: √

Rotunda Hinge Pins needs Service Bulletin accomplished:

Slope Limit Switch inoperative, damaged, missing parts: √ √

Swing Limit Switch/mechanical stop issues(missing stop or arm) : √ √

Rotunda Disconnect Panel issues or damaged: √

Disconnect Panel wiring issues: √ √

Disconnect Panel Door and Gasket issues: √

Rotunda Power Disconnect and S.O. cords issues: √

Dog Leg S.O. Cable issues: √

Dog Leg structural issues:

Rust on rotunda frame, sides, brackets, etc: √

A-Tunnel exterior:

Retract Limit / stops are not working:

Cable Carrier system under tunnels needs repaired: √ √

Cable Sheave system under tunnels need repaired:

Trolley System on side of Tunnels needs maintenance: √

A-Tunnel - Roller Rails damaged -lower rails √ √ √

A-Tunnel Cable Carrier or Cables are damaged: √ √

A-Tunnel seals (A-Tunnel to Rotunda ) damaged or missing √ √ √ √ √

Rust damage on the underside of A-Tunnel √ √ √

Rust damage on the sides of A-Tunnel √

Page 6: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

* ='s Safety issue / immediate atteation-repair suggested: A-2 A-3 A-4 A-5 A-6 A-7 A-8 A-10 A-12

B-Tunnel exterior:

Equalizer Cable bad and needs adjusted or replaced: √ √ √ √ * √ √ √

Power or Communication Cable Carrier issues: * √ √ √

B-Tunnel - under-side of tunnel rusted: √ √ √

B-Tunnel - sides of tunnel rusted:

End of B-Tunnel - tubing and frame rusted:

Roller damage side pans of B-tunnel:

Roller damage to bottom rails of B-tunnel: √ √ √ √ √ √

Loose Rollers, bolts or is out of adjustment: √

Tunnel seals need to be replaced: √ √

Roller covers missing:

Holes cut in side pans of tunnels for roller access:

C-Tunnel exterior:

Power or Communication Cable Carrier issues:

C-Tunnel - under-side of tunnel rusted: √ √

C-Tunnel - sides of tunnel rusted: √ √

End of C-Tunnel - tubing and frame rusted:

Roller damage side pans of C-tunnel: √ √

Damage to bottom rails of C-tunnel:

Roller covers missing: √

Holes cut in side pans of tunnels for roller access: √

Tunnel seals need to be replaced: √ √ √

Junction Box issues:

Vertical Lift columns / wheel boggy:

Lift Column not set up correctly:

Lift Column bolts & nut loose or some type of damaged: √

Lift Columns in rack or Bellville's washers under load √

Wear pads worn out on lift column causing damage: √ √ √

Horizontal Motor Drive Chains rusted: √ √ √ √ √

Motor brake covers, chain guards loose: √

Tires need replaced: √ √ √ √ √

Swivel Column worn out - brass filing on boggie: √

Rotex bearing dry needs serviced √ √ √ √ √ √ √

Trunnion Pin issues: √ √ √ √ √ √

Rusting on Wheel Boggy frame, cross tube, ect.: √ √ √

Hydraulic System - reservoir, pump, filters, fluid, etc. mtc. issues: √

Scissor arm damaged or bad wires: √ √ √ √

Cab / Cab Bubble exterior:

Underside of Cab Bubble Floor - metal rusted out: √ √ √ √ √

Cab Floor metal rusted out: √ √ √

Cab Rollers need replaced: √ √ √ √

Cab Chain rusted and needs changed: √ √ √ √ √ √ √ √ √

Cab Curtain Damaged needs changed: √ √ √ √ √ √

Cab Curtain vision panels / windows missing: √ √ √ √ √

Cab Curtain top weather seal damaged:

Cab Curtain connecting / tension chain rusting:

Cab Frame and supports are rusted out: √

ACF Floor pins rusted/locking up: √ √

Air-craft spacer / bumper issues: √

Canopy pads missing, straps broken, etc.: √ √

Canopy Frame damaged / hinges bad: √ √

Canopy needs replaced: √

Rain Gutter drop tubes missing: √ √

Beacon inop.

Flood Lights damaged: √ √ √

Page 7: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

* ='s Safety issue / immediate atteation-repair suggested: A-2 A-3 A-4 A-5 A-6 A-7 A-8 A-10 A-12

Service Platform and stairs:

Service Stairs damaged: √ √ √

Stair Treads damages / bolts loose: √ √ √ √

Service Stair Handrails damaged: √ √ √ √

Stair casters need replaced: √ √ √

Baggage slide damaged: √ √ √ √ √

Support arm not installed to platform for Baggage Slide: √ √ √

Service Bulletin not done to platform tubing:

Platform attachment issues: √

Service Platform Hand Rail damaged: √

Safety Chain not installed for cut-out in hand rail: √ √ √ √

Service Door damaged / needs repaired - replaced: √

Service Door hinges need replaced: √ √ √ √ √ √ √ √

Service Door glass window falling out: √

Service Door Hold Open latch broken / missing: √ √ √ √ √ √

Service Platform light damaged or light inop.: √ √ √ √ √ √ √ √ √

Platform not equipped with roof access ladder: √

Cab Roof area:

Cab Roof and C-Tunnel not equipped with Safety Handrails √

Cab Roof and C-Tunnel Galvanized Handrails rusting: √ √ √ √

Cab Roof Bearing Service Bulletin (grease fitting ) not accomplished: √ √ √ √ √ √

Cab Roof bearing not being serviced / rusting: √

Cab Roof rusting, paint peeling issues: √ √ √ √ √ √ √ √

Cab Bubble Roof rusting, paint peeling issues: √ √ √ √

Cable Hoist rusting: √ √ √ √ √ √ √

Cab Curtain Roof Seal damaged / torn:

Vertical Drive Motors/Geadbox not being serviced: √ √ √ √ √ √ √ √

Motor Gearbox brake / Ball Screw Brake issues: √

Chain Coupling rusting: √ √ √ √

Ball Screws not being lubed: √ √ √ √ √ √ √ √

Thrust bearing not being grease: √ √ √ √ √ √ √ √

Tunnel Roof areas:

C-Tunnel Roof paint and rust issues: √ √ √ √ √ √ √ √

C-Tunnel Roof roller covers missing:

B-Tunnel Roof paint issues: √ √ √

B-Tunnel Roof roller covers missing:

B-Tunnel roller rail damage issues: √ * √

A-Tunnel Roof paint issues: √ √ √

A-Tunnel roller rail damage issues: √ * √

Rotunda Roof paint issues: √

Interior items:

Cab Bubble Floor wood floor needs replaced: √ √ √ √

Pound down damaged on Cab floor radius:

Cab Floor bad needs replaced: √

Cab Floor ribbed rubber needs to be replaced: √ √ √

Cab Roll up door damaged: √ √ √ √ √ √

Cab Saloon Door damaged:

Canopy needs cleaned or replaced: √ √ √

Canopy covers damaged:

Auto Level issues:

Cab Light damaged / inop.: √ √ √

Console damaged: √

Console needs re-lamped and missing lens, alarms, etc.: √ √ √ √ √ √ √ √

Cab Curtain interior weather seal damaged: √ √ √ √

Carpet bar missing between Cab floor and Tunnel floor: √ √

Page 8: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

* ='s Safety issue / immediate atteation-repair suggested: A-2 A-3 A-4 A-5 A-6 A-7 A-8 A-10 A-12

C-Tunnel interior:

Floor soft spot needs repaired: √ √

Carpet and pound down issues: √ √ √

Rain gutter drains - plugged and gutters rusted: √ √ √ √ √ √ √ √

Roller damage to C-Tunnel wall pans / plates: √ √ √ √ √ √

Roller need adjusted: √ √ √ √

Ceiling lights issues / burnt out √

Ceiling tiles / panels damage or issues: √ √

Wall Board damage: √ √ √ √

B-Tunnel interior:

Transition Ramp damage √ √ √ √ √ √

Handrails damaged / missing: √ √

Tunnel floor bad √

Carpet and pound down issues: √ √

Rain gutter drains plugged and rusting: √ √ √ √ √ √ √ √ √

Wall pans/side plates damaged from rollers √ √

Ceiling tiles / panels damage or issues: √ √ √

Ceiling light issues:

Wall Board damage: √

Tunnel seals / water rail diverters damaged: √ √ √

Rollers need to be adjusted: √ √ √ √ √

A-Tunnel interior:

Transition ramp damaged: √ √ √

Handrail issues: √

Floor damage: √

Carpet and pound down issues: √

Ceiling tiles / panels damage or issues: √ √ √ √

Ceiling light issues: √ √

Wall Board damage:

Tunnel seals / rail water diverters damaged: √ √

Rollers need to be adjusted: √ √ √ √ √ √ √

Rotunda interior:

Rigid Frame Guide rollers need adjusted:

Floor damage to pound down: √

Floor needs leveled: √ √ √ √

Ceiling needs leveled: √ √ √

Carpet and trim issues: √ √ √

Ceiling tiles / panels damage or issues: √

Ceiling light issues: √

Light switch or receptacle issues: √

Curtain interior weather seals damaged: √

Interior metal flashing issues: √ √ √

Threshold Plate issues: √

Walkway:

Carpet and pound down issues:

Ceiling Light issues: √

Hand Rail issues:

Flashing issues:

Threshold issues:

PCAir unit:

PCAir Hose needs replaced: √ √ √ √

PCAir cart damaged: √ √ √ √ √ √

PCAir Milo Adaptor damaged: √ √ √ √ √ √

Case damaged: √ √ √

Power unit:

400 Hz Cable head worn needs replaced: √

Case damaged:

Pendant Control issues: √ √ √

Page 9: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

* ='s Safety issue / immediate atteation-repair suggested: B-2 B-7 B-9 B-10 B-11 B-12 B-15 B-16

PBB condition recommendation:

PBB needs to be scrapped: √ √ √ √ √ √

PBB is a candidate for refurbishment off-site facility: √ √

PBB candidate for an in-place refurbishment:

PBB needs recovery maintenance: √ √ √ √ √ √ √ √

PBB needs exterior roof re-paint and metal repair: √ √

PM Maintenance is not being accomplished to PBB: √ √ √ √ √ √ √ √

PBB needs interor cleaning and re-lamping: √ √ √ √ √ √ √ √

PBB needs interior painting, carpet and ribber rubber repalcement: √ √ √ √ √ √ √ √

PBB Apron Drive or Type PBB and components:

Radial

2-Tunnel √ √ √ √ √ * √ * √

3-Tunnel √

Motor Generator Horizontal Drive PBB

Solid State Horizontal DC Drive PBB √ √ √ √ √ √ √ √

AC Horizontal Drive VFD's PBB

Vertical Lift Column - Single Motor Gearbox

Vertical Lift Columns - Independent Motors on Columns √ √ √ √ √ √ √ √

Hydraulic Lift Columns:

Corrugated Roof PBB: √ √ √ √ √ √ √ √

Flat Roof PBB:

ACF Cab Floor (factory ): √ √

ACF Cab Floor (retro-fit/aftermarket ): √ √ √ √ √ √

ACE Cab Floor:

RJ - Cab Floor:

Standard Cab Floor:

OPC Cab Floor:

Fall protection on roof of PBB:

Roof Handrails C-Tunnel and Cab:

Roof Access Ladder on Service Platform: √ √

Cable Sheave system under tunnels: √ √ √ √ √ √ √ √

Festoon Cable System under Tunnels:

Trolley System on side of Tunnels:

Dog Leg on side of Tunnels: √ √ √ √ √ √ √ √

Inspection defect items noted:

Rotunda:

Rotunda Exterior Flashing to Terminal needs repaired:

Rotunda Curtain out of track or damaged: √ √

Rotunda Curtain damage: √ √

Rotunda Bearing making noise needs serviced: √ √

Rotunda Bearing appears to be worn - cracking noise:

Rotunda Hinge Pins needs Service Bulletin accomplished: √

Slope Limit Switch inoperative, damaged, missing parts: √ √ √

Swing Limit Switch/mechanical stop issues(missing stop or arm) :

Rotunda Disconnect Panel issues or damaged: √ √ √ √

Disconnect Panel wiring issues: √

Disconnect Panel Door and Gasket issues:

Rotunda Power Disconnect and S.O. cords issues: √ √ √

Dog Leg S.O. Cable issues: √

Dog Leg structural issues: √ √ √ √ √

Rust on rotunda frame, sides, brackets, etc:

A-Tunnel exterior:

Retract Limit / stops are not working: √ √

Cable Carrier system under tunnels needs repaired:

Cable Sheave system under tunnels need repaired: √ √ √

Trolley System on side of Tunnels needs maintenance:

A-Tunnel - Roller Rails damaged -lower rails √ √

A-Tunnel Cable Carrier or Cables are damaged: √ √

A-Tunnel seals (A-Tunnel to Rotunda ) damaged or missing √ √ √ √ √ √ √ √

Rust damage on the underside of A-Tunnel

Rust damage on the sides of A-Tunnel √

Page 10: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

* ='s Safety issue / immediate atteation-repair suggested: B-2 B-7 B-9 B-10 B-11 B-12 B-15 B-16

B-Tunnel exterior:

Equalizer Cable bad and needs adjusted or replaced: √

Power or Communication Cable Carrier issues: √ √

B-Tunnel - under-side of tunnel rusted:

B-Tunnel - sides of tunnel rusted: √ √

End of B-Tunnel - tubing and frame rusted:

Roller damage side pans of B-tunnel: √

Roller damage to bottom rails of B-tunnel:

Loose Rollers, bolts or is out of adjustment: √ √ √

Tunnel seals need to be replaced: √ √ √ √ √

Roller covers missing: √ √ √ √ √

Holes cut in side pans of tunnels for roller access:

C-Tunnel exterior:

Power or Communication Cable Carrier issues:

C-Tunnel - under-side of tunnel rusted:

C-Tunnel - sides of tunnel rusted:

End of C-Tunnel - tubing and frame rusted:

Roller damage side pans of C-tunnel:

Damage to bottom rails of C-tunnel:

Roller covers missing:

Holes cut in side pans of tunnels for roller access:

Tunnel seals need to be replaced:

Junction Box issues:

Vertical Lift columns / wheel boggy:

Lift Column not set up correctly: √

Lift Column bolts & nut loose or some type of damaged: * √ √ * √

Lift Columns in rack or Bellville's washers under load √

Wear pads worn out on lift column causing damage: √ √ √ √

Horizontal Motor Drive Chains rusted: √

Motor brake covers, chain guards loose: √

Tires need replaced: √ √ √ √ √

Swivel Column worn out - brass filing on boggie:

Rotex bearing dry needs serviced √ √ √ √ √ √ √ √

Trunnion Pin issues: √ √ √ √ √ √

Rusting on Wheel Boggy frame, cross tube, ect.:

Hydraulic System - reservoir, pump, filters, fluid, etc. mtc. issues:

Scissor arm damaged or bad wires: √ √ √ √ √ √

Cab / Cab Bubble exterior:

Underside of Cab Bubble Floor - metal rusted out: √ √ √

Cab Floor metal rusted out: √ √ √ √ √

Cab Rollers need replaced: √ √ √ √

Cab Chain rusted and needs changed: √ √ √ √ √ √ √ √

Cab Curtain Damaged needs changed: √ √ √ √ √ √ √ √

Cab Curtain vision panels / windows missing: √ √ √ √ √

Cab Curtain top weather seal damaged: √ √

Cab Curtain connecting / tension chain rusting:

Cab Frame and supports are rusted out: √ √ √

ACF Floor pins rusted/locking up:

Air-craft spacer / bumper issues:

Canopy pads missing, straps broken, etc.:

Canopy Frame damaged / hinges bad:

Canopy needs replaced: √

Rain Gutter drop tubes missing: √ √ √ √ √

Beacon inop. √

Flood Lights damaged: √

Page 11: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

* ='s Safety issue / immediate atteation-repair suggested: B-2 B-7 B-9 B-10 B-11 B-12 B-15 B-16

Service Platform and stairs:

Service Stairs damaged: √ √ √ √

Stair Treads damages / bolts loose: √ √ √ √ √ √

Service Stair Handrails damaged: √

Stair casters need replaced: √

Baggage slide damaged: √ √ √ √ √ √

Support arm not installed to platform for Baggage Slide:

Service Bulletin not done to platform tubing: √

Platform attachment issues: √ √ √

Service Platform Hand Rail damaged: √

Safety Chain not installed for cut-out in hand rail: √ √ √ √ √ √ √ √

Service Door damaged / needs repaired - replaced: √ √

Service Door hinges need replaced: √ √ √ √ √ √ √ √

Service Door glass window falling out:

Service Door Hold Open latch broken / missing: √ √ √ √

Service Platform light damaged or light inop.: √ √ √ √ √ √ √

Platform "not equipped " with roof access ladder: √ √ √ √ √

Cab Roof area:

Cab Roof and C-Tunnel "not equipped" with Safety Handrails √ √ √ √ √ √ √ √

Cab Roof and C-Tunnel Galvanized Handrails rusting:

Cab Roof Bearing Service Bulletin (grease fitting ) not accomplished: √ * √ *√ * √ * √ * √ * √

Cab Roof bearing not being serviced / rusting: √

Cab Roof rusting, paint peeling issues: √ √ √

Cab Bubble Roof rusting, paint peeling issues:

Cable Hoist rusting:

Cab Curtain Roof Seal damaged / torn: √ √ √

Vertical Drive Motors/Geadbox not being serviced: √ √ √ √ √ √ √ √

Motor Gearbox brake / Ball Screw Brake issues: √ √ √ √ √ √ √ √

Chain Coupling rusting:

Ball Screws not being lubed: √ √ √ √ √ √ √ √

Thrust bearing not being grease: √ √ √ √ √ √ √ √

Tunnel Roof areas:

C-Tunnel Roof paint and rust issues: √

C-Tunnel Roof roller covers missing:

B-Tunnel Roof paint issues: √ √ √ √

B-Tunnel Roof roller covers missing:

B-Tunnel roller rail damage issues:

A-Tunnel Roof paint issues: √

A-Tunnel roller rail damage issues:

Rotunda Roof paint issues:

Interior items:

Cab Bubble Floor wood floor needs replaced: √ √ √ √ √ √

Pound down damaged on Cab floor radius: √ √ √ √ √ √ √

Cab Floor bad needs replaced: √ √ √ √

Cab Floor ribbed rubber needs to be replaced: √ √ √ √ √ √

Cab Roll up door damaged: √ √ √ √ √ √ √

Cab Saloon Door damaged:

Canopy needs cleaned or replaced: √ √ √ √ √ √

Canopy covers damaged: √

Auto Level issues: √ √ √

Cab Light damaged / inop.:

Console damaged: √ √

Console needs re-lamped and missing lens, alarms, etc.: √ √ √ √ √ √ √ √

Cab Curtain interior weather seal damaged:

Carpet bar missing between Cab floor and Tunnel floor: √ √ √

Page 12: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

* ='s Safety issue / immediate atteation-repair suggested: B-2 B-7 B-9 B-10 B-11 B-12 B-15 B-16

C-Tunnel interior:

Floor soft spot needs repaired:

Carpet and pound down issues:

Rain gutter drains - plugged and gutters rusted: √

Roller damage to C-Tunnel wall pans / plates:

Roller need adjusted: √

Ceiling lights issues / burnt out

Ceiling tiles / panels damage or issues:

Wall Board damage: √

B-Tunnel interior:

Transition Ramp damage

Handrails damaged / missing:

Tunnel floor bad √ √ √ √

Carpet and pound down issues: √ √

Rain gutter drains plugged and rusting: √ √ √ √ √ √ √ √

Wall pans/side plates damaged from rollers √ √

Ceiling tiles / panels damage or issues: √ √

Ceiling light issues: √

Wall Board damage: √ √ √

Tunnel seals / water rail diverters damaged: √ √ √

Rollers need to be adjusted: √ √ √ √ √ √ √

A-Tunnel interior:

Transition ramp damaged: √ √ √ √ √

Handrail issues:

Floor damage: √ √

Carpet and pound down issues: √ √ √

Ceiling tiles / panels damage or issues:

Ceiling light issues: √ √ √

Wall Board damage: √ √ √ √

Tunnel seals / rail water diverters damaged: √ √ √ √ √ √ √

Rollers need to be adjusted: √ √ √ √ √ √ √ √

Rotunda interior:

Rigid Frame Guide rollers need adjusted: √ √ √ √

Floor damage to pound down: √ √ √

Floor needs leveled: √ √

Ceiling needs leveled: √ √ √ √ √ √ √

Carpet and trim issues: √ √ √ √ √ √ √ √

Ceiling tiles / panels damage or issues: √ √ √ √ √

Ceiling light issues: √

Light switch or receptacle issues: √ √

Curtain interior weather seals damaged:

Interior metal flashing issues: √ √ √ √ √ √

Threshold Plate issues: √ √ √

Walkway:

Carpet and pound down issues:

Ceiling Light issues:

Hand Rail issues:

Flashing issues:

Threshold issues:

PCAir unit:

PCAir Hose needs replaced: √

PCAir cart damaged: √ √ √

PCAir Milo Adaptor damaged: √

Case damaged: √ √

Power unit:

400 Hz Cable head worn needs replaced: √ √

Case damaged:

Pendant Control issues:

Page 13: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

* ='s Safety issue / immediate attention-repair suggested: C-3 C-6 C-8 C-10 C-12 C-14 C-15 C-16 C-18 C-19

PBB condition recommendation:

PBB needs to be scrapped: √ √ √ √ √ √

PBB is a candidate for re-build: √

PBB candidate for an in-place up-grade: √ √ √

PBB needs recovery maintenance: √ √ √ √ √ √ √ √ √ √

PBB needs exterior roof re-paint and metal repair: √ √

PM Maintenance is not being accomplished to PBB: √ √ √ √ √ √ √ √ √ √

PBB needs interior cleaning and re-lamping: √ √ √ √ √ √ √ √ √ √

PBB needs interior painting, carpet and ribbed rubber replacement: √ √ √ √ √ √ √ √ √

PBB Apron Drive or Type PBB and components:

Radial

2-Tunnel √ √ √ √ √ √

3-Tunnel √ √ √ √

Motor Generator Horizontal Drive PBB

Solid State Horizontal DC Drive PBB √ √ √ √ √ √ √ √

AC Horizontal Drive VFD's PBB √ √

Vertical Lift Column - Single Motor Gearbox

Vertical Lift Columns - Independent Motors on Columns √ √ √ √ √ √ √ √ √ √

Hydraulic Lift Columns:

Corrugated Roof PBB: √ √ √ √ √ √ √ √ √

Flat Roof PBB:

ACF Cab Floor (factory ): √ √

ACF Cab Floor (retro-fit/aftermarket ): √ √ √ √ √ √

ACE Cab Floor: √ √

RJ - Cab Floor:

Standard Cab Floor:

OPC Cab Floor:

Fall protection on roof of PBB:

Roof Handrails C-Tunnel and Cab: √ √

Roof Access Ladder on Service Platform: √ √ √ √

Cable Sheave system under tunnels: √ √ √ √ √

Festoon Cable System under Tunnels: √ √

Trolley System on side of Tunnels:

Dog Leg on side of Tunnels: √ √ √ √ √ √ √ √

Inspection defect items noted:

Rotunda:

Rotunda Exterior Flashing to Terminal needs repaired:

Rotunda Curtain out of track or damaged: √

Rotunda Curtain damage: √ √

Rotunda Bearing making noise needs serviced: √

Rotunda Bearing appears to be worn - cracking noise:

Rotunda Hinge Pins needs Service Bulletin accomplished: √ √

Slope Limit Switch inoperative, damaged, missing parts: √ √ √ √

Swing Limit Switch/mechanical stop issues (missing stop or arm) : √ √

Rotunda Disconnect Panel issues or damaged: √

Disconnect Panel wiring issues: √

Disconnect Panel Door and Gasket issues:

Rotunda Power Disconnect and S.O. cords issues:

Dog Leg S.O. Cable issues: √ √ * √ * √ √

Dog Leg structural issues: * √ * √

Rust on Rotunda frame, sides, brackets, etc:

A-Tunnel seals (A-Tunnel to Rotunda ) damaged or missing √ √ √ √ √ √ √ √ √ √

A-Tunnel exterior:

Retract Limit / stops are not working: √ √ √ √ √ √

Cable Carrier system under tunnels needs repaired: √

Cable Sheave system under tunnels need repaired: √

Trolley System on side of Tunnels needs maintenance:

A-Tunnel - Roller Rails damaged -lower rails √ √ √

A-Tunnel Cable Carrier or Cables are damaged: * √

Rust damage on the underside of A-Tunnel

Rust damage on the sides of A-Tunnel

Page 14: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

* ='s Safety issue / immediate attention-repair suggested: C-3 C-6 C-8 C-10 C-12 C-14 C-15 C-16 C-18 C-19

B-Tunnel exterior:

B-Tunnel - Equalizer Cable - rusted, needs adjusted or replaced:

B-Tunnel - Power or Communication cable damage issues: √

B-Tunnel - Power or Communication Cable - Carrier damage issues

B-Tunnel - end tubing, supports are rusted and need repairs: √

B-Tunnel - under-side corrugations /pans of tunnel rusted:

B-Tunnel - sides of tunnel rusted:

Roller damage side pans of B-tunnel: √ *√

Roller damage to bottom rails of B-tunnel: √

B-Tunnel - Loose Rollers, bolts or is out of adjustment: √ √ √ √ √ √

B-Tunnel seals - missing, damaged - need to be replaced: √ √ √ √

B-Tunnel Roller covers missing: √ √ √ √

Holes cut in side pans of B-Tunnel for roller access:

C-Tunnel exterior:

C-Tunnel - under-side of tunnel corrugations /pans rusted:

C-Tunnel - sides of tunnel rusted:

End of C-Tunnel - tubing and frame rusted:

Roller damage side pans of C-tunnel:

Damage to bottom rails of C-tunnel:

Roller covers missing C-Tunnel:

Holes cut in side pans of C-Tunnel for roller access:

C-Tunnel - Loose Rollers, bolts or is out of adjustment √

C-Tunnel seals, missing, damaged - need to be replaced: √

Junction Box issues C-Tunnel: √

Vertical Lift columns / wheel boggy:

Lift Column bolts & nut loose or some type of damaged: *√ * √ √

Lift Columns in rack or Bellville's washers under load: √ √ √ *√ √ √

Column Wear pads worn out on lift column causing damage:

Horizontal Motor Drive Chains - dry, rusted: √ √

Motors, Gearbox, brake covers, chain guards loose, etc issues: √ √ √ √ √

Tires need replaced: √ √ √ √ √ √ √ √

Swivel Column worn out - brass filing on boggie: √ √ √ √ √

Rotex bearing dry needs serviced √ √ √ √

Trunnion Pins' need serviced/lubrication issues: √ √ √ √ √ √

Rusting on Wheel Boggy frame, cross tube, ect.:

Hydraulic System - reservoir, pump, filters, fluid, etc. mtc. issues:

Scissor arm damaged or bad wires:

Junction Boxes damaged or S.O. cord issues: √ √ √ * √ √ √

Cab / Cab Bubble exterior:

Underside of Cab Bubble Floor - metal structure is rusted out: √

Cab Floor metal rusted out: √ √ √ √ √ √

Cab Rollers are worn out and need replaced: √ √ √ √ √

Cab Chain rusted and needs changed: √ √ √ √ √ √ √ √ √

Cab Curtain damaged needs changed: √ √ √ √ √ √ √

Cab Curtain vision panels / windows missing: √ √ √ √ √ √

Cab Curtain top weather seal torn / damaged: √ √

Cab Curtain connecting / tension chain rusting:

Cab Frame and metal tubing supports are rusting: √ √ √

Cab side metal rusting, holes in metal: √ √ √ √

ACF Floor pins rusted, hinges failing: √ √

Floor limit switch issues: √ √

Air-craft spacer / bumper issues: √

Canopy pads missing, straps broken, etc.:

Canopy Frame damaged / hinges bad:

Canopy needs replaced: √ √ √

Rain Gutter drop tubes missing: √ √ √ √

Beacon - operate is inop.

Flood Lights are damaged:

Page 15: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

* ='s Safety issue / immediate attention-repair suggested: C-3 C-6 C-8 C-10 C-12 C-14 C-15 C-16 C-18 C-19

Service Platform and stairs:

Service Stairs angles / frame work - bent / damaged: √ √ √ √ √ √

Service Stair Treads are damaged, bolts loose, etc.: √ √ √ √ √ √ √

Service Stair Handrails damaged or issues: √ √ √ √ √

Stair casters worn and need replaced:

Baggage slide damaged: √ √ √ √

Support arm "not installed " to platform for Baggage Slide: √ √

Service Bulletin not done to platform tubing (hole drilled ):

Service Platform attachment issues: √ √

Service Platform Hand Rail damaged:

Safety Chain not installed for cut-out in hand rail: √ √ √ √ √ √ √

Service Platform grating damaged or needs replaced:

Service Door damaged / needs repaired - replaced: √ √ √ √

Service Door hinges rusted, worn and need replaced: √ √ √ √ √ √

Service Door glass window falling out:

Service Door Hold Open Latch broken / missing: √ √ √ √ √

Service Platform light damaged or light inop.: √ √ √ √ √ √ √ √

Cab Roof area:

Cab Roof and C-Tunnel - Handrails - Paint or Galvanized is rusting: √ √

Cab Roof Bearing Service Bulletin (grease fitting ) not accomplished: √ √ √ √ √ √ √ * √ √

Cab Roof bearing not being serviced / rusting:

Cab Roof rusting, paint peeling, rust and paint issues: √ √ √ √ √ √ √

Cab Bubble Roof rusting, paint peeling issues: √ √

Cable Hoist cover rusting: √ √ √ √

Cab Curtain Roof Weather Seal damaged / torn: √

Cab Curtain Roof Barrel Shaft/bearing cover missing: √ √

Vertical Lift column: wiring, j-boxes, component issues/damage: * √

Vertical Drive Motors/Gear-box not being serviced: √ √ √ √ √ √ √ √ √ √

Motor Gearbox brake / Ball Screw Brake issues: √ √ √ √ √ √ √ √ √ √

Chain Coupling rusting / motor and ball screw connection : √ √

Ball Screws not being lubed: √ √ √ √ √ √ √

Thrust bearing not being grease: √ √ √ √ √ √ √

Cab Roof J-Box / wiring damage and issues:

Tunnel Roof areas:

C-Tunnel Roof paint and rust issues: √ √ √ √

C-Tunnel Roof roller covers missing:

B-Tunnel Roof paint and rust issues: √ √ √ √ √

B-Tunnel Roof roller covers missing:

B-Tunnel roller rail damage issues:

A-Tunnel Roof paint and rusting issues: √ √

A-Tunnel roller rail damage issues:

Rotunda Roof paint and rusting issues: √

Interior items:

Cab Bubble Floor wood floor needs replaced: √ √ √ √ √

Pound down damaged on Cab floor radius: √ √ √ √

Cab Floor bad needs replaced: √ √ √

Cab Floor ribbed rubber needs to be replaced: √ √ √ √ √

Cab Floor ACF Floor issues, nosing, handrails, etc.: √ √ √ √ √

Cab Roll up door damaged, i.e. foot plate, lock, gasket, etc.: √ √ √ √ √ √ √ √

Cab Saloon Door damaged:

Canopy needs cleaned or replaced: √ √ √ √ √ √ √ √

Canopy side covers damaged: √ √

Auto Level - wheel, arm, switch, etc. - issues: √ √ √ √

Cab Light damaged / inop.: √ √

Cab Ceiling tile damage or issues:

Operators Console door or frame damage issues: √

Console needs re-lamped and missing lens, alarms, etc.: √ √ √ √ √ √ √ √ √

Cab window glass cracked - left-side, front, right-side window: √

Cab Curtain "interior" weather seal damaged:

Carpet bar missing or damaged between Cab floor and Tunnel floor: √ √ √

Cap Ventilator cover / grill needs cleaned, re-painted: √ √ √

Tunnel and Service Platform light switch or cover issues: √

Cab wall panels and supports metal is rusted / deteriorated, etc: √

Page 16: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

* ='s Safety issue / immediate attention-repair suggested: C-3 C-6 C-8 C-10 C-12 C-14 C-15 C-16 C-18 C-19

C-Tunnel interior:

C-Tunnel - Floor has soft spot and needs repaired:

C-Tunnel - Carpet and pound down issues: √ √

C-Tunnel - Rain gutter drains - plugged, and gutters rusted: √ √ √ √

C-Tunnel - Roller damage tunnel wall pans, rails, plates, etc.: √ √ √

C-Tunnel - Rollers need adjusted: √ √ √ √

C-Tunnel - Ceiling lights issues:

C-Tunnel - Ceiling tiles / panels damage or issues:

C- Tunnel - Wall Board damage:

C-Tunnel - End Cap damage or rusting of wall members / supports: √ √

B-Tunnel interior:

B-Tunnel - Transition Ramp damage √ √ √

B-Tunnel - Transition Handrails - loose, damaged or missing: √

B-Tunnel - end caps damaged or rust damage: √ √ √ √ √

B-Tunnel seals or water rail diverters missing or damaged: √ √ √ √ √

B- Tunnel floor bad in sections:

B-Tunnel - Carpet and pound down issues: √ √ √

B-Tunnel - Rain gutter drains plugged and rusting: √ √ √ √ √ √ √ √ √

B- Tunnel - Ceiling tiles / panels damage or issues: √

B-Tunnel - Ceiling light issues: √ √

B-Tunnel - Wall Board damage: √ * √

B-Tunnel - Roller damage tunnel wall pans, rails, plates, etc. √ √ * √ * √

B-Tunnel Rollers need to be adjusted: √ √ √ √ * √ √ √ √ √

B-Tunnel - End Cap damage or rusting of wall members / supports: √ √ √ √

A-Tunnel interior:

A-Tunnel - Transition ramp damaged: √ √ √ √

A-Tunnel Transition Ramp Handrail issues:

A-Tunnel Wall Handrail issues: √

A-Tunnel - Floor damage: or bad in sections

A-Tunnel - Carpet and pound down issues: √ √ √ √ √

A-Tunnel - Ceiling tiles / panels damage or issues: √ √ √ √ √ √ √

A-Tunnel - Ceiling light issues: √ √ √ √ √ √

A-Tunnel - Wall Board damage: √

A-Tunnel seals / rail water diverters missing or damaged: √ √ √ √ √ √ √

A-Tunnel - Rollers need to be adjusted: √ √ √ √ √ √ √ √

A-Tunnel - End Cap damage or rusting of wall supports: √ √ √

Rotunda interior:

Rotunda - Rigid Frame Guide rollers need adjusted: √ √ √ √ √ √ √ √

Rotunda - Floor damage at "radius" to carpet pound down/nosing: √ √ √ √ √ √

Rotunda Floor needs leveled: √ √

Rotunda Ceiling needs leveled: √ √ √ √ √ √ √

Rotunda - Carpet and trim issues or center cover issues: √ √ √ √ √ √

Rotunda - Ceiling tiles / panels damage or insulation issues: √

Rotunda - Ceiling light issues: √

Rotunda / Corridor - Light switch or receptacle issues: √

Rotunda Curtain - interior weather seals damaged:

Rotunda / Corridor - Interior metal flashing issues: √ √ √ √

Rotunda / Corridor - Threshold Plate issues: √ √

Walkway:

Walkway - Carpet and pound down issues:

Walkway - Ceiling Light issues:

Walkway - Hand Rail issues:

Walkway Flashing issues:

Walkway - Threshold issues:

Walkway - Wallboard or trim issues:

PCAir unit:

PCAir Hose needs replaced:

PCAir cart damaged: √ √ √ √ √

PCAir Milo Adaptor damaged: √ √

PCAir Case damaged: √

Power unit:

400 Hz Cable head worn needs replaced: √

Case damaged: √

Pendant Control issues:

Page 17: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

* ='s Safety issue / immediate attention-repair suggested: D-1 D-2 D-3 D-4 D-5 D-6 D-7 D-8 D-9 D-10 D-11 D-12 D-13

PBB condition recommendation:

PBB needs to be scrapped: √ √

PBB is a candidate for refurbishment off-site facility: √ √

PBB candidate for an in-place refurbishment: √ √ √ √ √ √ √ √ √

PBB needs recovery maintenance: √ √ √ √ √ √ √ √ √ √ √ √ √

PBB needs exterior roof re-paint and metal repair: √ √ √ √ √ √ √ √ √ √ √ √ √

PM Maintenance is not being accomplished to PBB: √ √ √ √ √ √ √ √ √ √ √ √ √

PBB needs interior cleaning and re-lamping: √ √ √ √ √ √ √ √ √ √ √ √ √

PBB needs interior painting, carpet and ribbed rubber replacement: √ √ √ √ √ √ √ √ √ √ √ √ √

PBB Apron Drive or Type PBB and components:

Radial

2-Tunnel √ √ √ √ √ √

3-Tunnel √ √ √ √ √ √ √

Motor Generator Horizontal Drive PBB

Solid State Horizontal DC Drive PBB √ √ √ √

AC Horizontal Drive VFD's PBB √ √ √ √ √ √ √ √ √

Vertical Lift Column - Single Motor Gearbox

Vertical Lift Columns - Independent Motors on Columns √ √ √ √ √ √

Hydraulic Lift Columns: √ √ √ √ √ √ √

Corrugated Roof PBB: √ √ √ √ √ √

Flat Roof PBB: √ √ √ √ √ √ √

ACF Cab Floor (factory ): √ √ √ √ √ √ √ √ √

ACF Cab Floor (retro-fit/aftermarket ): √ √ √

ACE Cab Floor: √

RJ - Cab Floor:

Standard Cab Floor:

OPC Cab Floor:

Fall protection on roof of PBB: √

Roof Handrails C-Tunnel and Cab: √ √

Roof Access Ladder on Service Platform: √ √ √ √ √ √ √ √ √

Service Platform Bagage Slide: √ √ √ √ √ √ √ √ √ √ √ √ √

Service Platform Cut-out for Bagage Slide: √ √ √ √ √ √ √ √ √ √ √

Cable Sheave system under tunnels: √ √ √ √

Festoon Cable System under Tunnels: √ √

Trolley System on side of Tunnels: √ √ √ √ √ √ √

Dog Leg on side of Tunnels: √ √ √ √ √ √ √

Inspection defect items noted:

Rotunda:

Rotunda Exterior Flashing to Terminal needs repaired:

Rotunda Grouting or anchoring issues: √ √ √ √

Rotunda Curtain out of track or damaged: √

Rotunda Curtain connecting / tension chain rusting (TKAS PBB) √ √ √ √ √ √ √

Rotunda Curtain damage: √ √

Rotunda Bearing making noise needs serviced: *√ √

Rotunda Bearing appears to be worn - cracking noise:

Rotunda Hinge Pins need to have Service Bulletin accomplished: √ √ √

Slope Limit Switch inoperative, damaged, missing parts: √

Swing Limit Switch/mechanical stop issues (missing stop or arm) : √ √ * √ * √ ** √ √

Rotunda Disconnect Panel issues or damaged: √

Disconnect Panel wiring issues:

Disconnect Panel Door and Gasket issues: √

Rotunda Power Disconnect and S.O. cords issues: √

Dog Leg S.O. Cable issues: √ √ √ √ √

Dog Leg structural issues: √ √ √

Rust on Rotunda frame, sides, brackets, etc:

A-Tunnel seals (A-Tunnel to Rotunda ) damaged or missing: √ √ √ √ √ √

A-Tunnel exterior:

Retract Limit / stops are not working:

Cable Carrier system under tunnels needs repaired, J-boxes', etc.: √ √

Cable Sheave system under tunnels need repaired: √

Trolley System on side of Tunnels needs maintenance: √ √ √ √

A-Tunnel - Roller Rails damaged -lower rails:

A-Tunnel Cable Carrier or Cables are damaged: * √ ** √

Rust damage on the underside of A-Tunnel: √ √

Rust damage on the sides of A-Tunnel:

Page 18: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

* ='s Safety issue / immediate attention-repair suggested: D-1 D-2 D-3 D-4 D-5 D-6 D-7 D-8 D-9 D-10 D-11 D-12 D-13

B-Tunnel exterior:

B-Tunnel - Equalizer Cable - rusted, needs adjusted or replaced:

B-Tunnel - Power or Communication cable damage issues:

B-Tunnel - Power or Communication Cable - Carrier damage issues:

B-Tunnel - end tubing, supports are rusted and need repairs:

B-Tunnel - under-side corrugations /pans of tunnel rusted: √

B-Tunnel - sides of tunnel rusted: √ √

Roller damage side pans of B-tunnel: √

Roller damage to bottom rails of B-tunnel:

B-Tunnel - Loose Rollers, bolts or is out of adjustment:

B-Tunnel seals - missing, damaged - need to be replaced:

B-Tunnel Roller covers missing: √

Holes cut in side pans of B-Tunnel for roller access:

C-Tunnel exterior:

C-Tunnel - under-side of tunnel corrugations /pans rusted: √

C-Tunnel - sides of tunnel rusted:

End of C-Tunnel - tubing and frame rusted:

Roller damage side pans of C-tunnel:

Damage to bottom rails of C-tunnel:

Roller covers missing C-Tunnel:

Holes cut in side pans of C-Tunnel for roller access:

C-Tunnel - Loose Rollers, bolts or is out of adjustment:

C-Tunnel seals, missing, damaged - need to be replaced:

Junction Box issues C-Tunnel: √

Cable support brackets, wire trough issues, etc.: √

Vertical Lift columns / wheel boggy:

Lift Column bolts & nut loose or some type of damaged: * √ √ * √

Lift Columns in rack or Bellville's washers under load: √ * √

Column Wear pads worn out on lift column causing damage: √ √

Horizontal Motor Drive Chains - dry, rusted, etc.: √ √ √ √ √ √

Motors, Gearbox, brake covers, chain guards loose, etc issues: √

Tires need replaced: √ √ √ √ √ * √ √ √

Swivel Column worn out - brass filing on boggy:

Rotec bearing dry needs serviced: √ √ √ √ √ √ √ √ √ √ √ √ √

Trunnion Pins' need serviced/lubrication issues: √ √ √ √ √ √ √ √ √ √ √ √ √

TKAS - Wheel guard needs to be installed: √ √ √ √ √

Rusting on Wheel Boggy frame, cross tube, lift columns, etc.: √ √ √ √ √ √

Hydraulic System - reservoir, pump, filters, fluid, etc. mtc. issues: √ √ * √ √ * √ * √ * √

Scissor arm damaged or bad wires: √

Junction Boxes damaged or S.O. cord issues:

Cab / Cab Bubble exterior:

Underside of Cab Bubble Floor - metal structure is rusted out: √ √ √ √ √ √ √ √

Cab Floor metal rusted out, paint peeling issues, etc.: √ √ √ √ √ √ √ √ √ √

TKAS - Cab Support Arm needs modified support arm installed: √ √ √ √ √ √

Cab Rollers are worn out and need replaced: √ √ √

Cab Chain rusted and needs changed: √ √ √ √ √ * √ √ √ √ √ * √ √ √

Cab Curtain damaged needs changed: √ √ √

Cab Curtain vision panels / windows missing: √

Cab Curtain top weather seal torn / damaged: √ √

Cab Curtain connecting / tension chain rusting (TKAS PBB's) : √ √ * √ √ √ √ √

Cab Frame and metal tubing supports are rusting: √ √

Cab side metal rusting, holes in metal: √

ACF Floor pins rusted, hinges failing, etc.: √ √ √

Floor limit switch issues:

Air-craft spacer / bumper issues: √

Canopy pads missing, bad, straps broken, etc.: √ √ √ √ √

Canopy Frame damaged / hinges bad: √

Canopy needs replaced: √

Rain Gutter drop tubes missing: √ √ √ √ √

Beacon - operate is inop.:

Flood Lights are damaged - inop., etc.: √ √

Page 19: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

* ='s Safety issue / immediate attention-repair suggested: D-1 D-2 D-3 D-4 D-5 D-6 D-7 D-8 D-9 D-10 D-11 D-12 D-13

Service Platform and stairs:

Service Stairs angles / frame work - bent / damaged: √

Service Stair Treads are damaged, bolts loose, etc.: √ √ √ √ √

Service Stair Handrails damaged or issues: √ √ √

Stair casters worn and need replaced: √

Baggage slide damaged: √ √ √ √ √ √ √ √

Support arm "not installed " to platform for Baggage Slide: √

Service Bulletin not done to platform tubing (hole drilled ):

Service Platform attachment issues:

Service Platform Hand Rail damaged:

Safety Chain not installed for cut-out in hand rail: √ √ √ √ √ √ √ √ √ √ √

Service Platform grating damaged or needs replaced:

Service Door damaged / needs repaired - replaced: √

Service Door hinges rusted, worn and need replaced: √ √ √ √ √ √

Service Door glass window falling out:

Service Door Hold Open Latch broken / missing:

Service Platform light damaged or light inop.: √ √ √ √ √ √ √ √ √ √ √ √ √

Cab Roof area:

Cab Roof and C-Tunnel - Handrails - Paint or Galvanized is rusting: √ √ √

Cab Roof Bearing Service Bulletin (grease fitting ) not accomplished: √ √ √ √ √ √

Cab Roof bearing not being serviced / rusting:

Cab Roof rusting, paint peeling, rust and paint issues: √ √ √ √ √ √ √ √

Cab Bubble Roof rusting, paint peeling issues: √ √ √ √ √

Cable Hoist cover rusting: √ √ √ √ √ √ √ √

Cab Curtain Roof Weather Seal damaged / torn: √ √ √

Cab Curtain Roof Barrel Shaft/bearing cover missing: √

Vertical Lift column: wiring, j-boxes, component issues/damage:

Vertical Drive Motors/Gear-box not being serviced: √ √ √ √ √ √

Motor Gearbox brake / Ball Screw Brake issues: √ √ √ √ √ √

Chain Coupling rusting / motor and ball screw connection :

Ball Screws not being lubed: √ √ √ √ √ √

Thrust bearing not being grease: √ √ √ √ √ √

Cab Roof J-Box / wiring damage and issues:

Tunnel Roof areas:

C-Tunnel Roof paint and rust issues: √ √ √ √ √

C-Tunnel Roof roller covers missing:

B-Tunnel Roof paint and rust issues: √ √ √ √ √ √ √ √

B-Tunnel Roof roller covers missing: √

B-Tunnel roller rail damage issues:

A-Tunnel Roof paint and rusting issues: √ √ √ √ √ √

A-Tunnel roller rail damage issues:

Rotunda Roof paint and rusting issues: √ √ √ √ √ √

Interior items:

Cab Bubble Floor wood floor needs replaced: √

Pound down damaged on Cab floor radius: √

Cab Floor bad needs replaced: √

Cab Floor ribbed rubber needs to be replaced: √ √ √ √ √ √

Cab Floor ACF Floor issues, nosing, handrails, etc.: √ √ √

Cab Roll up door damaged, i.e. foot plate, lock, gasket, etc.: √ √ √ √ √

Cab Saloon Door damaged:

Canopy/inner liner needs cleaned or replaced: √ √ √ √ √

Canopy side covers damaged:

Auto Level - wheel, arm, switch, etc. - issues: √ * √ √ √ √ √ * √ √ √

Cab Light damaged / inop.: √

Cab Ceiling tile damage or issues:

Operators Console door or frame damage issues: √

Console needs re-lamped and missing lens, alarms, etc.: √ √ √ √ √ √ √ √ √ √ √ * √

Cab window glass cracked - left-side, front, right-side window: √

Cab Curtain "interior" weather seal damaged: √

Carpet bar missing or damaged between Cab floor and Tunnel floor: √

Cab Ventilator cover / grill needs cleaned, re-painted: √ √ √ √ √ √ √

Tunnel and Service Platform light switch or cover issues: √ √ √

Cab wall panels and supports metal is rusted / deteriorated, etc:

Page 20: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

* ='s Safety issue / immediate attention-repair suggested: D-1 D-2 D-3 D-4 D-5 D-6 D-7 D-8 D-9 D-10 D-11 D-12 D-13

C-Tunnel interior:

C-Tunnel - Floor has soft spot and needs repaired:

C-Tunnel - Carpet and pound down issues:

C-Tunnel - Rain gutter drains - plugged, and gutters rusted: √ √ √ √ √ √

C-Tunnel - Roller damage tunnel wall pans, rails, plates, etc.:

C-Tunnel - Rollers need adjusted: √

C-Tunnel - Ceiling lights issues:

C-Tunnel - Ceiling tiles / panels damage or issues:

C- Tunnel - Wall Board damage:

C-Tunnel - End Cap damage or rusting of wall members / supports:

B-Tunnel interior:

B-Tunnel - Transition Ramp damage: √ √ √

B-Tunnel - Transition Handrails - loose, damaged or missing:

B-Tunnel - end caps damaged or rust damage: √ √ √

B-Tunnel seals or water rail diverters missing or damaged: √ √ √

B- Tunnel floor bad in sections:

B-Tunnel - Carpet and pound down issues: √

B-Tunnel - Rain gutter drains plugged and rusting: √ √ √ √ √ √ √ √ √ √ √

B- Tunnel - Ceiling tiles / panels damage or issues: √ √

B-Tunnel - Ceiling light issues: √ √

B-Tunnel - Wall Board damage:

B-Tunnel - Roller damage tunnel wall pans, rails, plates, etc.: √ √

B-Tunnel Rollers need to be adjusted: √ √ √ √ √

B-Tunnel - End Cap damage or rusting of wall members / supports: √

A-Tunnel interior:

A-Tunnel - Transition ramp damaged: √ √ √ √ √

A-Tunnel Transition Ramp and Tunnel Handrail issues: √ √ √

A-Tunnel Wall Handrail issues: √ √

A-Tunnel - Floor damage or bad in sections:

A-Tunnel - Carpet and pound down issues:

A-Tunnel - Ceiling tiles / panels damage or issues: √

A-Tunnel - Ceiling light issues: √ √ √ √ √

A-Tunnel - Wall Board damage: √

A-Tunnel seals / rail water diverters missing or damaged: √ √ √ √

A-Tunnel - Rollers need to be adjusted: √ √ √ √ √

A-Tunnel - End Cap damage or rusting of wall supports:

Rotunda interior:

Rotunda - Rigid Frame Guide rollers need adjusted: √ √ √

Rotunda - Floor damage at "radius" to carpet pound down/nosing: √

Rotunda Floor needs leveled: √ √

Rotunda Ceiling needs leveled: √ √ √

Rotunda - Carpet and trim issues or center cover issues: √ √ √ √

Rotunda - Ceiling tiles / panels damage or insulation issues: √ √ √ √ √

Rotunda - Ceiling light issues: √ √ √

Rotunda / Corridor - Light switch or receptacle issues: √ √ √

Rotunda Curtain - interior weather seals damaged:

Rotunda / Corridor - Interior metal flashing issues: *√ √ √

Rotunda / Corridor - Threshold Plate issues: √ √

Walkway:

Walkway - Carpet and pound down issues:

Walkway - Ceiling Light issues: √

Walkway - Hand Rail issues:

Walkway Flashing issues:

Walkway - Threshold issues:

Walkway - Wallboard or trim issues: √

PCAir unit:

PCAir Hose needs replaced: √ √ √ √

PCAir cart damaged: √

PCAir Milo Adaptor damaged: √ √ √ √ √ √

PCAir Case damaged: √ √ * √ √ √ √ √

PCAir Pendant control issues: √ √

Power unit:

400 Hz Cable head worn needs replaced / cable damage: √ √ √ √ √ √

400 Hz Case damaged: √ √ √

Page 21: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

* ='s Safety issue / immediate attention-repair suggested: D-1 D-2 D-3 D-4 D-5 D-6 D-7 D-8 D-9 D-10 D-11 D-12 D-13

400 Hz Filter needs to be serviced - cleaned or replaced: √ √ √ √ √ √ √

400 Hz Pendant Control issues: √

Page 22: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

* ='s Safety issue / immediate attention-repair suggested: E-1 E-2 E-3 E-11 E-15 E-17 E-18 E-19

PBB condition recommendation:

PBB needs to be scrapped:

PBB is a candidate for re-build (off-site at contractor's facility) :

PBB candidate for an in-place up-grade: √ √ √ √ √ √ √ √

PBB needs recovery maintenance: √ √ √ √ √ √ √ √

PBB needs exterior roof re-paint and metal repair: √ √ √ √ √ √ √ √

PM Maintenance is not being accomplished to PBB: √ √ √ √ √ √ √ √

PBB needs interior cleaning and re-lamping: √ √ √ √ √ √ √ √

PBB needs interior painting, carpet and ribbed rubber replacement: √ √ √ √ √ √ √ √

PBB Apron Drive or Type PBB and components:

Teleradial Radial PBB √ √ √ √ √ √ √ √

One - Extending Tunnel and Cab driven by-Hydraulic cylinder extend √ √ √ √ √ √ √ √

Rotunda - ground mount spread footer plate foundation √ √ √ √ √ √ √ √

AC Horizontal VFD Drive - single motor/gearbox drive √ √ √ √ √ √ √ √

Vertical Lift Columns - Independent Motors on Columns √ √ √ √ √ √ √ √

Vertical Lift Column motors' connected together w/drive shaft √ √ √ √ √ √ √ √

Flat Roof PBB tunnels: √ √ √ √ √ √ √ √

ACF and RJ Cab Floor (factory ) with floor flip up's for handrails: √ √ √ √ √ √ √ √

Roof Handrails (galvanized) A-Tunnel cat walkway: √ √ √ √ √ √ √ √

Roof Access Ladder on Service Platform to Tunnel Cat-walkway: √ √ √ √ √ √ √ √

Cat-walkway with Handrails on A-Tunnel roof from ladder to motors √ √ √ √ √ √ √ √

Wire trough on A-tunnel roof: √ √ √ √ √ √ √ √

Wire trough on A-tunnel roof: √ √ √ √ √ √ √ √

Scissor arm wire-trough on right-side of A-Tunnel /c- end to Cab: √ √ √ √ √ √ √ √

Solid tires: √ √ √ √ √ √ √ √

Service Platform Cut-out for Baggage: √ √ √ √ √ √ √ √

Service Platform Baggage Slide:

Inspection defect items noted:

Rotunda:

Rotunda Exterior Flashing to Terminal needs repaired:

Rotunda anchor plate bolts' / nuts' to ramp issues: √

Rotunda Curtain out of track or damaged:

Rotunda Curtain rusting or damage: √

Rotunda table guide roller/ bearings' need greased, or issues: √ √ √ √ √ √ √ √

Rotunda Rotec / table bearing not being greased: √ √ √ √ √ √ √ √

Rotunda - S.O. Cord wires on side and roof or trough issues:

Slope Limit Switch inoperative, damaged, missing parts:

Swing Limit Switch/mechanical stop issues:

Rotunda Power Disconnect and S.O. cords issues:

Rust on Rotunda frame, sides, brackets, etc.:

Curtain covers damaged, rusted, etc.: √

A-Tunnel exterior:

A-Tunnel - rust damage on the underside of tunnel:

A-Tunnel - rust or damage on the sides of tunnel: √ √ √ √

A-Tunnel seals to B-Tunnel damaged/missing:

B-Tunnel exterior:

B-Tunnel to Cab scissor or cable issues:

B-Tunnel - end tubing, supports are rusting: √

B-Tunnel - under-side - pans of tunnel rusted:

B-Tunnel - sides of tunnel rusted:

B-Tunnel - Roller damage to bottom rails:

Page 23: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

* ='s Safety issue / immediate attention-repair suggested: E-1 E-2 E-3 E-11 E-15 E-17 E-18 E-19

B-Tunnel seals - missing, damaged - need to be replaced:

Vertical Lift columns / wheel boggy:

Lift Column bolts & nut loose or some type of damaged:

Lift Columns swivel pin/bearing on truck not service/dry: √ √ √ √ √ √ √ √

Column Wear pads worn out on lift column causing damage:

Lift Column oil cuts dry or they have water in them: √ √ √ √ √ √ √ √

Motors, Gearbox, brake covers, chain guards loose, etc. issues: √ √

Tire axel pillar block bearing rusted need greased: √ √ √ √ √ √ √ √

Tire axel shaft is moving in pillar block bearing: √

Rusting on Wheel Boggy frame, cross tube, lift columns, etc.: √

Hydraulic System - reservoir, pump, filters, fluid, etc. mtc. issues: √ √ √ √ √ √ √ √

Scissor arm damaged or bad wires:

Junction Boxes damaged or S.O. cord issues:

Cab / Cab Bubble exterior:

Underside of Cab Bubble Floor - metal structure is rusting: √ √

Cab Floor metal pan is rusting, paint peeling issues, etc.:

Hydraulic cylinder issues, leaking, bolts loose or missing, etc.: * √

Hydraulic systems and reservoir, issues or not being serviced:

Cab Curtain Covers - damaged or rusting: √

Cab Chain rusted and needs changed: √ √ √ √ √ √ √ √

Cab Curtain - off track or damaged or needs changed: √

Cab Curtain vision panels / windows missing:

Cab Curtain top weather seal torn / damaged: √

Cab Frame and metal tubing supports are rusting: √

Cab side metal rusting: √

Floor limit switch issues:

Air-craft spacer / bumper issues:

Canopy pads missing, bad, straps broken, etc.: √ √ √ √ √ √ √ √

Canopy Frame damaged / hinges bad:

Canopy - holes in material needs repaired or replaced: √ √ √ √ √ √

Beacon warning light/strobe is damaged or inop.: √ √ √ √

Flood Lights are damaged, missing or inoperative: √

Service Platform and stairs:

Service Stairs angles / frame work - bent / damaged:

Service Stair Treads are rusted, damaged, bolts loose, etc.: √ √ √ √

Service Stair Handrails bent / damaged or issues: √

Stair casters worn and need replaced: √ √ √

Service Platform grating damaged or needs replaced:

Service Platform Hand Rail - rusting or damage: √ √

Safety Chain not installed for cut-out in hand rail:

Service Platform grating is rusting or damaged - needs repair: √

Service Door damaged / needs repaired - replaced:

Service Door hinges rusted, worn and need replaced: √ √

Service Door glass window- broken or falling out:

Service Door Hold Open Latch broken / missing:

Service Platform light damaged or light inop.: √ √

Tunnel and Cab Roof areas':

A-Tunnel - Catwalk Handrails - paint is rusting: √ √

A-Tunnel - Catwalk Treads - Galvanize is rusting: √ √

Roof access ladder and cage - is rusting:

Cable Hoist cover rusting: * √ √ √ √ √ √

Page 24: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

* ='s Safety issue / immediate attention-repair suggested: E-1 E-2 E-3 E-11 E-15 E-17 E-18 E-19

Cab Curtain Roof Weather Seal damaged / torn: √ √ √

Motor drive shaft u-joints need inspected and serviced: √ √ √ √ √ √ √ √

Vertical Drive Motors/Gear-box need to be serviced: √ √ √ √ √ √ √ √

Motor Gearbox brake / Ball Screw Brake not being serviced: √ √ √ √ √ √ √ √

Motor to ball screw drive shaft coupling connection needs inspected: √ √ √ √ √ √ √ √

Ball Screw oil cups dry or water infiltrated: √ √ √ √ √ √ √ √

Rotunda Roof paint and rusting issues:

Rotunda top weather seal issues: √ √ √ √ √ √ √

A-Tunnel roof conduit, wire trough, S.O. cord, etc. issues:

A- Tunnel Roof paint issues or rusting: √ √

B-Tunnel Roof paint issues or rusting: √

B-Tunnel roller rail damage issues:

Cab roof paint issues or rusting: √ √ √

Cab hood rusting issues:

Interior items:

Cab Bubble Floor carpet needs replaced:

Pound down damaged on Cab floor radius: √ √ √ √

Cab Floor bad needs replaced:

Cab Floor ribbed rubber needs to be replaced: √

Cab Floor ACF Floor spacer / bumper, etc.:

Cab exterior light damaged, missing lens cover or inop.: √

Cab Swing Door stop/hold open latch issues: √ √ √

Cab swing Door, panel - window glass damage issues:

Cab RJ-handrails damaged, issues:

Cab light switches and receptacle at console - damaged or issues:

Auto Level - wheel, arm, switch, etc. - issues: √

Cab Light damaged / inop.: √

Cab Ceiling tile damage or issues:

Operators Console frame or door damage issues:

Console damaged or missing lens, alarms, etc.:

Cab window glass cracked - left-side, front, right-side window:

Cab Curtain "interior" weather seal damaged: √

Carpet bar missing or damaged between Cab floor and Tunnel floor:

Cab Ventilator cover / grill needs cleaned, re-painted: √ √ √ √ √ √ √ √

Cab and Tunnel Smoke-alarm missing / damaged: √

B-Tunnel interior:

B-Tunnel - Transition Ramp damage: √ √

B-Tunnel - Transition Handrails - loose, damaged or missing: √ √

B-Tunnel - end caps damaged or rust damage:

B-Tunnel Handrails / left and right side issues: √

B- Tunnel floor bad in sections:

B-Tunnel - Carpet and pound down issues:

B-Tunnel - Ceiling tiles / panels damage or issues: √ √ √ √ √

B- Tunnel - Ceiling light issues: √ √ √ √

B-Tunnel - Wall Board damage:

B-Tunnel - Roller damage tunnel wall pans, rails, plates, etc.:

B-Tunnel - interior seals between tunnels - damaged:

B-Tunnel - End Cap damage or rusting of wall members / supports:

A-Tunnel interior:

A-Tunnel - Handrails left side issues:

A-Tunnel Handrails right side issues:

Page 25: Addendum # 1: RFP 2013-10-002 Passenger Boarding … for...Addendum # 1: RFP 2013-10-002 Passenger Boarding Bridge Maintenance Services November 21, 2013 *See below questions and answers

* ='s Safety issue / immediate attention-repair suggested: E-1 E-2 E-3 E-11 E-15 E-17 E-18 E-19

A-Tunnel - Electrical Cabinet Door issues or damage:

A-Tunnel - Tunnel and Service Platform light switch, cover issues:

A-Tunnel - Electrical receptacle/outlet issues:

A-Tunnel - Damage around Service Door frame or trim:

A-Tunnel - Floor damage or bad in sections:

A-Tunnel - Carpet and pound down issues:

A-Tunnel - Ceiling tiles / panels damage or issues:

A-Tunnel - Ceiling light issues: √ √

A-Tunnel - Wall Board damage:

A-Tunnel seals - r-end missing or damaged:

A-Tunnel - End Cap damage or rusting: √ √ √

Rotunda interior:

Rotunda floor to A-tunnel - damage to carpet nosing, etc.:

Rotunda - Carpet and trim issues at radius: √ √ √ √ √ √

Rotunda - Ceiling tiles / panels damage or insulation issues:

Rotunda - Ceiling light issues:

Rotunda / Corridor - Light switch or receptacle issues:

Rotunda Curtain - interior weather seals damaged:

Rotunda / Corridor - Interior metal flashing issues:

Rotunda / Corridor - Threshold Plate issues:

Walkway:

Walkway - Carpet and pound down issues:

Walkway - Ceiling Light issues:

Walkway - Hand Rail issues:

Walkway Flashing issues:

Walkway - Threshold issues:

Walkway - Wallboard or trim issues:

PCAir unit:

PCAir Hose needs replaced:

PCAir cart damaged:

PCAir Milo Adaptor damaged or gasket bad: √ √ √ √ √ √ √

PCAir Case damaged:

PCAir Pendant control issues:

PCAir Hose from unit to TAD damaged or issues:

TAD Tube on side of tunnel damaged: √ √ √

400 Hz Power unit:

400 Hz Cable head worn needs replaced / cable damage: √ √ √ √ √ √ √

400 Hz Case damaged:

400 Hz (Hobart ) Filter needs to be serviced - cleaned or replaced:

400 Hz Pendant Control issues:

28 volt/DC unit:

28 v/dc unit - case / unit rusting damage: √ √ √ √ √

28 v/dc unit - power cord or head damaged or worn: √ √

28 v/dc unit - pendant control issues: