Active gas system status.
S.Konovalov, K.Zhukov
Active gas system operation.
S.Konovalov "Active gas system..." TRT Overview 15.02.2013 2
Good design and high-quality assembling of the gas system. Cooperation with the gas group. Prevention (monitoring of the parameters, analysis of trends). Spare parts.
1200 days of Gas system operation
Start Stop Months
12/09/2008 2/12/2008 3.3
25/09/2009 7/12/2010 14
8/02/2011 7/12/2011 10
29/02/2012 14/02/2013 12,5
≈40
Gas system was stopped.
Date days
27/08/2008 Gas analyzer (CO2 cell) 2
18/12/2009 Mixer rack (pressure gauge) 0.5
5-18/02/2010
Profibus problems 1-2
25/03-8/04/2010
Membrane rack (first stage pump) 13.5 (12+1.5)
29/11/2010 Gas analyzer (CO2 cell) 0.5
7/09/2011 Membrane rack (first stage pump) <1
18Efficiency ≈ 98.5 %Efficiency ≈ 98.5 %
S.Konovalov "Active gas system..." TRT Overview 15.02.2013 3
Plans
Gas system upgrade. Some improvements for more safety, more reliability…
Tests & regulations. Automatic operation of the gas system in auxiliary operational modes (Filling, Recuperation, CF4 mixture, Ar mixture).
Maintenance & reparations. First priority tasks for to address
TRT leaks.
TRT meeting Friday, 15 February 2013 “Gas system status” https://indico.cern.ch/conferenceDisplay.py?confId=236045
List of priorities on the last slide
S.Konovalov "Active gas system..." TRT Overview 15.02.2013 4
First priority tasks for to address TRT leaks
It is possible to stabilize leak in the most part of the leaking channels. For this it is needed to tune and keep with the big accuracy 2 parameters: gas flow in this channel and pressure in the TRT outlet (pump inlet pressure).
leakleak OUTIN
Pressure
OUT pressure is fixed.Input pressure is possible to change by changing of the gas flow.
Leak in 1 place
S.Konovalov "Active gas system..." TRT Overview 15.02.2013 5
First priority tasks for to address TRT leaks
Gas flow regulation.Gas flow regulation in the existent gas manifolds is very rough. Design end production of the fine flow regulation valves is needed. Design of the new flow regulation valves is practically done. It is not needed to produce new distribution manifolds.
old
new
S.Konovalov "Active gas system..." TRT Overview 15.02.2013 6
First priority tasks for to address TRT leaks
Remote gas flow regulation.When leak opens it is developing during some time (sometimes a few hours, sometimes several days). Every time we need to adjust gas flow in the leaking channel we need to ask urgent access and spend 1-2 hours in the cavern. Design, some tests (including tests in the magnetic field) end production of the remote gas flow regulation is needed. This work is began (Sergei Katunin).
S.Konovalov "Active gas system..." TRT Overview 15.02.2013 7
First priority tasks for to address TRT leaks
Pump inlet pressure regulation.
Requirement for the pressure regulation accuracy was ± 1 mbar.
Real pressure regulation accuracy is even better ≈ 0.1 mbar .
It is desirable to decrease fluctuations of the TRT out pressure even more in order to stabilize leak.
0.14 mbar
Output pressure is oscillating.Input pressure is not constant.
leak OUTIN
Pressure
S.Konovalov "Active gas system..." TRT Overview 15.02.2013 8
First priority tasks for to address TRT leaks
Next steps:precise pressure sensorPID algorithm fine tuningpump input resistance regulation
Replacement of the regulation valve.
Before . Now .
Regulation looks better. Pump input pressure fluctuations are at the same level ≈ 0.1 mbar .
Valve opening position
Valve opening set point
S.Konovalov "Active gas system..." TRT Overview 15.02.2013 9
First priority tasks for to address TRT leaks
Pump pressure was regulating relative to the pressure in USA15. Pressure in the cavern differs from the pressure in USA15. This difference is not constant. Sometimes ΔP≈0.2 mbar and even more.
We have got differential pressure sensor. This gauge measures pressure difference between pump input and ID volume.
It helps to stabilize TRT output pressure. More tests is needed with more precise pressure sensor in barrel distribution rack output.
USA15 – UX15 PRESSURE DIFFERENCE FOR CIRCULATION PUMP OPERATION FEEDBACK
UX15-YSA15 pressure difference
0.1 mbar
S.Konovalov "Active gas system..." TRT Overview 15.02.2013 10
First priority tasks for to address TRT leaks
Distribution Input pressure is not constant. It is proportional to the tank pressure. Problems with TRT leak forced us to change gas regulation algorithm.
The original idea was to keep concentrations of the gas components with the best accuracy. Variation of the tank pressure could be quite big.
New regulation algorithm is not perfect.
Fine tuning is needed. It will require quite a long time.
Gas regulation PID Xe CO2 O2 Kp Ti Kp Ti Kp Ti Minimum of the CO2 & O2 concentration fluctuations.
0.05 40 0.1 10 0.1 20 Before 20/08/2012
compromised. Better pressure regulation, concentration stabilities is still good
0.05 10 0.1 10 0.1 20
From 21/08/2012 to 21/11/2012
Minimum of the tank pressure fluctuations.
0.1 5 0.1 4 0.1 10 From 21/11/2012
S.Konovalov "Active gas system..." TRT Overview 15.02.2013 11
First priority tasks for to address TRT leaks
Xe mixture supply blowing out.
Where was a few leaking channels [B43; C1; C4, C6] in which it was not possible to provide detector performance with minimum gas losses working in the loop. They were supplied with the gas from the gas system blowing out. Temporary set-up was assembled in USA15 and distribution part in UX-15.
It is needed to design and produce permanent Xe mixture supply with gas flow, pressure readout, implementation into gas control and DCS, alarms…(practically one more distribution rack + some equipment in USA-15).
Barrel M1, M2
St 1
St 2
St 3
St 4
leakOUTIN
Pressure
breaks
No leakNo leak CO2 in
leak CO2 in
Leak in 2 or more places
leak
Brake-through
compromise
S.Konovalov "Active gas system..." TRT Overview 15.02.2013 12
First priority tasks for to address TRT leaks
Ar mixture supply blowing out.The decision to supply part of the TRT blocks with Ar based mixture could be taken. Gas system has to be ready for that.
Temporary set-up was assembled. It consists of the mixer in SGX-1 and distribution part in UX-15.
It is needed to design and produce permanent Ar mixture supply with gas flow, pressure readout, implementation into gas control and DCS, alarms…(practically another one distribution rack in the cavern + one more mixer in SGX-1).
AR DISTRIBUTIONAR MIXER
First priority tasks for to address TRT leaksNitrogen removal/recuperation system.
Envelop gas which comes to the gas system because if the leak consists some admixture of N2. Membrane module is not able to remove this N2.
Some modifications in the recuperation system gave possibility to replace gas in the gas system and clean gas from N2.
This was 100% manual operation.
Design and production of the nitrogen removal/recuperation system fully remote controlled is needed.
S.Konovalov "Active gas system..." TRT Overview 15.02.2013 13
RUN 2011 0.3÷0.42%
RUN 2013
0.02%/day = 1 l/day
N2 concentration
First priority tasks for to address TRT leaksNitrogen removal/recuperation system.
Design and production of the nitrogen removal/recuperation system fully remote controlled is needed.
S.Konovalov "Active gas system..." TRT Overview 15.02.2013 14
First priority tasks for to address TRT leaksNitrogen removal/recuperation system.
S.Konovalov "Active gas system..." TRT Overview 15.02.2013 15
PRIORITY NEW
RACKS TRT INDIVIDUAL CHANNELS XE SUPPLY
BLOWING OUT . HIGH 2013 OCT
AR MIXTURE SUPPLY HIGH 2013 OCT ANALYZER FOR AR MIXTURE MONITORING HIGH 2013 NOV N2 REMOVAL MEDIUM 2014 SUMM USA15 – UX15 PRESSURE DIFFERENCE FOR
CIRCULATION PUMP OPERATION FEEDBACK
URGENT 2013 JUNE
EXIS. RACKS
PUMP URGENT 2013 JUNE DISTRIBUTION 1 DESIGN AND PRODUCTION OF
GOOD FLOW REGULATORS FOR ALL MANIFOLDS USED
IN GS
HIGH 2013
Distribution 2 REMOTE FLOW REGULATION FOR EACH
CHANNEL TRT 2014
Distribution 3 REPLACEMENT OF THE PRESSURE
TRANSMITTERS AT OUTPUT (PT 6X26) TO ± 10 MBAR
(3 PIECES NEEDED) URGENT
URGENT 2013 MAY
Distribution 4 MODIFICATION OF THE BACK-UP
SYSTEM TO MAKE IT SAFER (SEE FIG. 6) MEDIUM 2013 END
Distribution 5 REPLACEMENT OF SAFETY BUBBLERS
XBUB 6X42 AND XBUB 6X43 BY ONES WITH TWO
VOLUMES (6 PIECES NEEDED)
MEDIUM 2013 END
Distribution 6 REPLACEMENT OF BAD FLOW CELLS
AND INSTALLATION NEW ONES
LOW 2014 SUMM
Distribution 7 REPLACE FLEXIBLE PIPES IN BARREL
CH. 1-16 BY LONGER ONE.
LOW 2014 SUMM
Distribution 8 PREPARE EXHAUST FOR XE AND AR
FLUSHING CHANNELS HIGH OCT
PREDISTRIBUTION URGENT 2013 MAY MIXER MEDIUM 2013 SEPT EXHOUST MEDIUM 2013 SEPT MEMBRANE LOW 2014 RURIFIER LOW 2014 ANALYSIS1 LOW 2014 XE SUPPLY LOW 2014
PVSS
PRIORITIES.