acare airtn infrastructure needs february 2013 · 2016. 4. 15. · saab eurocopter airbus military...
TRANSCRIPT
Industry’s Needs of Aviation InfrastructuresACARE AirTN Meeting, 26th February 2013
February 2013ACARE AirTN Infrastructure Needs
Presented byAxel Flaig, SVP Airbus Flight Physics
Event / Department (optional)
Aviation ChallengesFebruary 2013ACARE AirTN Infrastructure Needs
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Socio-economics & environment
February 2013ACARE AirTN Infrastructure Needs
Industry ChallengesEurope has set ambitious targets in terms of environmental impact reduction , increased innovation and competitiveness
-Emissions:-75% less CO2, 90%less NOx and 65% less noise
World Traffic Growth
-Seamless air transport system including air traffic management
Product Asymptote & Future TechnologiesFebruary 2013ACARE AirTN Infrastructure Needs
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
Product evolution: Step Change Needed
February 2013ACARE AirTN Infrastructure Needs
2015 2030 2050
Future aircraft require radical technologies & configurations
Infrastructure in the Aviation ContextFebruary 2013ACARE AirTN Infrastructure Needs
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
Key Enablers
February 2013ACARE AirTN Infrastructure Needs
Complementary means: Wind tunnel testing, numerical simulation & Flight Tests
Wind Tunnel Testing for configuration and design verification, technology validation in non-linear flight regimes
Numerical Simulation for specific studies, detailed flow physics and data production in linear flight regimes
Flight Tests for design validation
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
Wind Tunnel Testing: Projected Testing Effort
February 2013ACARE AirTN Infrastructure Needs
Unconventional configurations with novel technologies will require significant wind tunnel test effort in concept validation
0
500
1000
1500
2000
2500
2000 2007 2020+ 2025+
Con
vent
iona
l
A35
0-XW
B
A38
0
Unc
onve
ntio
nal
Aircraft developments over time
Win
d Tu
nnel
Tes
t Effo
rt (D
ays)
Requirements on Wind Tunnel FacilitiesFebruary 2013ACARE AirTN Infrastructure Needs
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Aerodynamics technology barrier
February 2013ACARE AirTN Infrastructure Needs
Validation of advanced aerodynamics technologies require advanced testing at high Reynolds numbers
Low Drag Aircraft through Natural Laminar Flow concept and Flow Control
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Engine simulation & Configuration
February 2013ACARE AirTN Infrastructure Needs
Counter Rotating Open Rotors (CROR): Engine Simulation
Configuration testing
The development of these concept simulators is only been possible through significant wind tunnel testing efforts
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Advanced Measurements: Beyond the conventional
February 2013ACARE AirTN Infrastructure Needs
Icing Tests
Landing Gear TestsAeroacoustics
Non-intrusive advanced measurements and visualisation
Significant effort needed to ensure that capabilities are available for industrial exploitation, ready for the next generation of aircraft developments
Outlook on Future Infrastructure DevelopmentsFebruary 2013ACARE AirTN Infrastructure Needs
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Maintenance and upgrade needs
February 2013ACARE AirTN Infrastructure Needs
Maintaining & Developing core facilities is key for securing aircraft developments
Due to the demanding drive for technology and configuration validation, there is huge pressure on facility owners to upgrade their capabilities
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
The current aircraft product panorama
February 2013ACARE AirTN Infrastructure Needs
Max Range (nautical miles)1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
50
100
150
200
250
300
350
400
450
500
550
600
650
Seat
ing
Cap
acity
A318A319
A320A321 NEO derivatives
A330-300
A330-200
A350-1000A350-900
A350-800
Modern and comprehensive Product Range with enhanced capabilities
Open demand of over 28000 aircraft for the existing types with incremental improvements for the next 20 years
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Risks
February 2013ACARE AirTN Infrastructure Needs
“2015+”
« Continuous improvements within constrained architecture and schedule»
No foreseen new aircraft developments in the near future = decreasing workload to key facilities
“2020+”
« Technology validation and de-risking»
“2030+”
« Game Changing aircraft concept»
Next major development not foreseen until 2030: Potential financial risks on key facilities due to lack of revenues from testing volume
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
ATRSAAB
EUROCOPTER
AIRBUS MILITARY
AIRBUS
BAE SYSTEMS
CASSIDIAN
MBDA
DASSAULT
Airframers’ view of the European Landscape
February 2013ACARE AirTN Infrastructure Needs
In 2011, Airbus took the initiative to set up a working group of the major European airframers to review and provide a recommendation on the future wind tunnel infrastructure needs
European Wind Tunnel Infrastructure Landscape
Engine manufacturers and research view not
reflected
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
The current strategic infrastructures
February 2013ACARE AirTN Infrastructure Needs
ONERA-F1
ETW
DNW-LLF
ONERA-S1
ARA-TWT
ONERA-B02
DNW-KRG
CIRA
CEPRA-19Need for many facilities each with specific capabilities
Airframers’ perspective
ConclusionsFebruary 2013ACARE AirTN Infrastructure Needs
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.
Conclusions
February 2013ACARE AirTN Infrastructure Needs
Industrial Wind Tunnels are vital to support the European Aeronautics industry in future aircraft developments; they fulfil societal needs as expressed in the ACARE Vision 2020 and Flightpath 2050 ambitions
No major developments are planned over the next decade; this creates a survival risk for the existing infrastructures due to reduced income from industry
A joint European effort is required to set up a funding mechanism through research programmes to ensure the long term availability of such facilities with state-of-the-art capabilities
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
February 2013ACARE AirTN Infrastructure Needs
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. This document and all information contained herein is the sole property of AIRBUS Operations S.A.S. No intellectual propertyrights are granted by the delivery of this document or the disclosure of its content. This document shall not be reproduced or disclosed to a third party without the express written consent of AIRBUS Operations S.A.S. Thisdocument and its content shall not be used for any purpose other than that for which it is supplied. The statements made herein do not constitute an offer. They are based on the mentioned assumptions and are expressedin good faith. Where the supporting grounds for these statements are not shown, AIRBUS Operations S.A.S. will be pleased to explain the basis thereof.AIRBUS, its logo, A300, A310, A318, A319, A320, A321, A330, A340, A350, A380, A400M are registered trademarks.