aashtoware bridge management update - brmug · 7 materials will be presented during the 2017 brmug...

21
AASHTOWare Bridge Management Update

Upload: others

Post on 06-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AASHTOWare Bridge Management Update - BrMUG · 7 Materials will be presented during the 2017 BrMUG and is included in the list for voting by the conclave. Screen Needs List Export

AASHTOWare Bridge

Management Update

Page 2: AASHTOWare Bridge Management Update - BrMUG · 7 Materials will be presented during the 2017 BrMUG and is included in the list for voting by the conclave. Screen Needs List Export

User Group Priorities

User Group Concern/Priority Description Priority Response

More Training on the Pyramid (Optimization), PONWEB-

22561

The 5.2.3 release will included basic use case examples in the user manual.

In addition there is a series of tutorial videos on the website

(aashtowarebridge.com).

Error Check Pre-Script (Upgrade script should perform all

checks, then all installs. Like a checking pre-script),

PONWEB-2179

2 Part of BrM 5.3

Clearance Table / Form / Report, PONWEB-1564 3Materials will be presented during the 2017 BrMUG and is included in the list for

voting by the conclave.

Default data script (Upgrade scripts need to keep user

customized data.), PONWEB-21904 Part of BrM 5.3

Repsonsiveness of pages to different screens (HTML-5) ,

PONWEB-22655 Part of BrM 5.3 with the rewrite of the condition grid

Cross - Sections Tables / Forms / Reports, PONWEB-1565 6 Part of BrM 5.3

Tracking Historical Changes (Auditing changes to all fields of

database), PONWEB-2900 (Was PONWEB-2204)7

Materials will be presented during the 2017 BrMUG and is included in the list for

voting by the conclave.

Screen Needs List Export , Export All Lists (e.g. Needs List)

and Graphs, PONWEB-23108 Was approved by the TF to be included in the next release.

Load Ratings , PONWEB-2234 9 Part of BrM 5.3

QC / QA Process , PONWEB-2237 10Materials will be presented during the 2017 BrMUG and is included in the list for

voting by the conclave.

JIRA needs some improved filtering -This is an issue that is outside the control of the TF. JIRA is the application

selected by AASHTO

Update Multimedia PONWEB-2200 11Materials will be presented during the 2017 BrMUG and is included in the list for

voting by the conclave.

Page 3: AASHTOWare Bridge Management Update - BrMUG · 7 Materials will be presented during the 2017 BrMUG and is included in the list for voting by the conclave. Screen Needs List Export

User Group Priorities User Group Concern/Priority Description Priority Response

Import Process - More detailed errors, PONWEB-2311 12Materials will be presented during the 2017 BrMUG and is included in the list for

voting by the conclave.

Multiple NBI Deterioration Curves, PONWEB-2312 13

The Taskforce understands the benefit of this enhancement. If this enhancement

is of high priority to the user group the TF will consider including this

enhancement in the next version of the software. I f this enhancement is low

priority and/or is only desired by very few user this will need to be funded

through service units

Incorporate 3-D modeling to inspections (Becky's demo)

PONWEB-219814

Materials will be presented during the 2017 BrMUG and is included in the list for

voting by the conclave.

Reports Stored Elsewhere , PONWEB-2180 15 Part of BrM 5.3

An App Store , PONWEB-2313 16

The Taskforce understands the benefit of this enhancement. If this enhancement

is of high priority to the user group the TF will consider including this

enhancement in the next version of the software. If this enhancement is low

priority and/or is only desired by very few user this will need to be funded

through service units

Cassini Stability , PONWEB 2314 17 Part of BrM 5.3

Network Policy Rules , PONWEB-2315 18 Part of BrM 5.3

Task Scheduler, PONWEB-2195 19Materials will be presented during the 2017 BrMUG and is included in the list for

voting by the conclave.

Sync , PONWEB-2241 20

The Taskforce understands the benefit of this enhancement. If this enhancement

is of high priority to the user group the TF could consider including this

enhancement in the next version of the software. If this enhancement is low

priority and/or is only desired by very few user this may need to be funded

through service units. Bentley is working on a mobile application that should be

availible in 2018 that will have this functionality.

Page 4: AASHTOWare Bridge Management Update - BrMUG · 7 Materials will be presented during the 2017 BrMUG and is included in the list for voting by the conclave. Screen Needs List Export

User Group Priorities Survey Results

Page 5: AASHTOWare Bridge Management Update - BrMUG · 7 Materials will be presented during the 2017 BrMUG and is included in the list for voting by the conclave. Screen Needs List Export

User Group Priorities Survey Results

Page 6: AASHTOWare Bridge Management Update - BrMUG · 7 Materials will be presented during the 2017 BrMUG and is included in the list for voting by the conclave. Screen Needs List Export

Inspection

Bridge

Groups,

Risk, Utility

Functions

Deterioration

Modeling,

Preservation

Action,

and Projects

Enhanced

Deterioration

Modeling, Enhanced

Project/Program

Planning, and

Administration

Features

5.1.2

Bridge Management 5.2 Stages

5.1.3 5.2.1 5.2.2 5.2.3

Page 7: AASHTOWare Bridge Management Update - BrMUG · 7 Materials will be presented during the 2017 BrMUG and is included in the list for voting by the conclave. Screen Needs List Export

• Released in December 2016

• Fully supporting the FHWA Identified Rule Making

• Key Features

• Capability to perform life cycle cost analysis

• Capability to perform network level analysis

• Tracking and reporting of FHWA’s 23 metrics

• Dashboards for easy data visualization and tracking

performance measures

• Enhanced User Help System

• Tunnels module to record and track National

Tunnel Inventory data as required by FHWA

Bridge Management 5.2.3

Page 8: AASHTOWare Bridge Management Update - BrMUG · 7 Materials will be presented during the 2017 BrMUG and is included in the list for voting by the conclave. Screen Needs List Export

• Released March 2017

• Key Updates

• Tunnel Defects expanded to better align with the

Specifications for the National Tunnel Inventory

• Rating Factor of 9 is correctly exported to the NBI

file

• USERINSP is now copied over when creating a

new inspection

• Various other minor enhancements and bug fixes

Bridge Management 5.2.3 Release 3

Page 9: AASHTOWare Bridge Management Update - BrMUG · 7 Materials will be presented during the 2017 BrMUG and is included in the list for voting by the conclave. Screen Needs List Export

• Released September 2017

• Key Features

• Element Condition Grid Re-Do

• New Load Rating Module

• New Cross Section Module

• Migration from Cassini to IIS Express (Workstation)

• Enhanced Rule Builder for Network Policies

• Updates to Handling of Default Data

• Error Check Prescript

• Miscellaneous Small Enhancements/Bug Fixes

Bridge Management 5.3

Page 10: AASHTOWare Bridge Management Update - BrMUG · 7 Materials will be presented during the 2017 BrMUG and is included in the list for voting by the conclave. Screen Needs List Export

Element Condition Grid

Page 11: AASHTOWare Bridge Management Update - BrMUG · 7 Materials will be presented during the 2017 BrMUG and is included in the list for voting by the conclave. Screen Needs List Export

Load Rating Module

Page 12: AASHTOWare Bridge Management Update - BrMUG · 7 Materials will be presented during the 2017 BrMUG and is included in the list for voting by the conclave. Screen Needs List Export

Load Rating Module

Page 13: AASHTOWare Bridge Management Update - BrMUG · 7 Materials will be presented during the 2017 BrMUG and is included in the list for voting by the conclave. Screen Needs List Export

Cross Section Module

Page 14: AASHTOWare Bridge Management Update - BrMUG · 7 Materials will be presented during the 2017 BrMUG and is included in the list for voting by the conclave. Screen Needs List Export

Cross Section Module

Page 15: AASHTOWare Bridge Management Update - BrMUG · 7 Materials will be presented during the 2017 BrMUG and is included in the list for voting by the conclave. Screen Needs List Export

Cross Section Module

Page 16: AASHTOWare Bridge Management Update - BrMUG · 7 Materials will be presented during the 2017 BrMUG and is included in the list for voting by the conclave. Screen Needs List Export

Cross Section Module

Page 17: AASHTOWare Bridge Management Update - BrMUG · 7 Materials will be presented during the 2017 BrMUG and is included in the list for voting by the conclave. Screen Needs List Export

Cross Section Module

Page 18: AASHTOWare Bridge Management Update - BrMUG · 7 Materials will be presented during the 2017 BrMUG and is included in the list for voting by the conclave. Screen Needs List Export

Cross Section Module

Page 19: AASHTOWare Bridge Management Update - BrMUG · 7 Materials will be presented during the 2017 BrMUG and is included in the list for voting by the conclave. Screen Needs List Export

Rule Builder for Network Policies

Page 20: AASHTOWare Bridge Management Update - BrMUG · 7 Materials will be presented during the 2017 BrMUG and is included in the list for voting by the conclave. Screen Needs List Export

Rule Builder for Network Policies

Page 21: AASHTOWare Bridge Management Update - BrMUG · 7 Materials will be presented during the 2017 BrMUG and is included in the list for voting by the conclave. Screen Needs List Export

Questions?