Not only ”Know How” – also ”Know Why”
AET is an independent and leading provider
of biomass fired energy systems.
AET offer complete solution for design, supply,
service, operation & maintenance and retrofit for:
• Boiler plants
• Cogeneration plants
• Power plants
within the range of 25 – 170 MWt.
Aalborg Energie Technick a/s
Page 2
Not only ”Know How” – also ”Know Why”
• 1996: AET was founded
• 1998: First turnkey project: Pfleiderer Gütersloh (DE)
• 2002: Awarded “Entrepreneur of the Year” by E&Y
First turnkey project in Austria
• 2003: Awarded “Gazelle Prize” by Børsen
• 2006: AET plants were awarded BAT by EU IPPC
First turnkey project in UK (WWEP)
• 2008: First O&M Contract (WWEP: 6 years)
Increase of equity to 7,5 mEUR
• 2009: First boiler contract in France and Italy
• 2010: Awarded “Export Prize” by Franco-Danish
Chamber of Commerce
• 2013: 4th order by GDF Suez in France (now ENGIE)
• 2014: AET employee head count increased to 100
• 2015: TGP (UK): turnkey and 20 years O&M (cons.)
Rønne (DK): fuel conversion
Revenue: 34 mEUR, Balance Sheet: 25 mEUR (draft)
AET History
Page 3
-
10,0
20,0
30,0
40,0
50,0
60,0
2012 2013 2014 2015d 2016e
Solvency Ratio (%)
Not only ”Know How” – also ”Know Why”
AET Business
Page 4
Focus
• Right solution to customer
• High performance
• High availability
• Fulfil time schedule
• Dedicated to biomass
• Project management
• Develop products & skills
• Best plants in EU (BAT)
• Customers are ambassadors
• Well-known BRAND
• Growth
0,0
10,0
20,0
30,0
40,0
50,0
60,0
70,0
2012 2013 2014 2015d 2016e
Revenue (mEUR)
0
20
40
60
80
100
120
2012 2013 2014 2015d 2016e
Employees (yearly average)
Not only ”Know How” – also ”Know Why”
AET Added Value Chain & Core Competences
Page 5
Sales Design
Procurement
&
Transport
Customer
inquiry
Offer sent
to customer
Design
approved
Erection
approved
Contract
signed & effective
Take
Over
Warranty
period ends
Erection
&
Commissioning
WarrantyAfter Sales /
O&MTenderProspect
Project
identification
• Heat balance
• Process integration
• Overall & detailed design
• Plant layout
• Detailed engineering
• PLC Programming
• SCADA Programming
• Erection supervisors
• Commissioning engineers
• Project Management
• Basic Engineering support Sales
• After Sales Service – O&M
• Customised business tools
• Open and proactive communication
Lifetime
ends
Not only ”Know How” – also ”Know Why”
AET Team
Page 6
CEO
Hans Erik Askou
Sales & Service
Hans Erik Askou
Customers & Markets
Contracts & Specifications
Service &After Sales
Operation &Maintenance
Marketing
Technology
Jens Jørgen Nørgaard
Basic Technology/Engineering
Boiler Design/ Construction
Electrical Engineering
BusinessTools
Control & SCADA/ Instrumentation
IT
Project
Kim K. Dyrholm
ProjectManagement
Plant Engineering
Erection
Commissioning
Finance
Jan Højmark
HR
Purchasing
Economy
Administration
Secretary
CEO
Hans Erik Askou
Not only ”Know How” – also ”Know Why”
Full Scope and Service – Service Your Need
Page 7
Biomass
Biomass
treatment
system
Biomass
storage
system
AET
Combust.
System
AET
Biomass
Dosing
Flue gas
treatment
system
CEMS &
stackFlue gas
AET
Biomass
Boiler
Water
treatment
system
Water
storage
system
Feed
water
systemWater
Customer Process and Systems AuthoritiesFinance
Steam
Turbine
Generat.
High
voltage
systemPower
Conden-
serHeat /
Cool
Waste
Water
Bottom
ash
storage
Fly
ash
storage
Ashes
Authorities
Supervision Control and Data Acquisition
AET
head
office
Operation & Maintenance
AET
head
office
Not only ”Know How” – also ”Know Why”
AET Core Components – Your Benefit
Core Components:
Dosing Bin
Rotary Valves
Spreader Stoker
Travelling Grate
Overfire Air System
Air Pre-heaters
Boiler
Fly Ash Re-injection
Dust Firing System
SNCR DeNOx
Integrated Cyclones
Control software
Page 8
Advantages:
Uniform fuel dosing
Uniform air injection
Staged air injection
Ideal combustion
Low oxygen content
Very limited refractory
Lower flue gas velocities
Lower carry over
Less soot blowing
Lower wear and tear
Compensate fuel moisture
Quick fault finding
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900
10 20 30 40 50
Ad
iab
ati
cte
mp
era
ture
(°
C)
Fuel Moisture (%)
O2 = 3 %
O2 = 9 %
Outcome for You:
Lower emissions
Higher performance
Lower in-house cons.
Lower fuel cost
Higher availability
Lower O&M cost
Longer lifetime
One Service Company
Not only ”Know How” – also ”Know Why”
Pannovosges
(1994)
Neumarkt
(1997/2001)Gütersloh
(2000)
These three Aalborg-plants are mentioned as example by BAT
("Best Available Technology") in EU "IPPC Report for Large
Combustion Plants", July 2006 (p. 310-312).
Best Available Technology (BAT)
Page 9
Not only ”Know How” – also ”Know Why”
Fuel from industries:
• Sawmill residue
• Olive grains/stones
• Shea nuts/-flour
• Composted wood
• Rape seed extraction
• Bio-Pellets
• Sunflower pellets
• Saw dust
• Silo waste
• Draff (distillers grain)
• Dertal (tall oil)
Fuel from forest:
• Timber
• Trimmings from forest
• Tree roots/stumps
• Bark
• Brash
Agro residues:
• Sorghum
• Miscanthus
• Maize
• Straw
High Fuel Flexibility – Low Fuel Cost
Contaminated fuel:
• Waste wood
• Demolition wood
• Chipboard waste
• Sander dust
• Railway sleepers
• RDF (EBS/SBS)
Other fuels:
• Poultry litter
• Meat and Bone Meal
• Sludge
Page 10
Not only ”Know How” – also ”Know Why”
AET Track Record – High Performance
Page 11
Reference Plant
Commis-
sioning
Year
Boiler
Efficiency -
Guaranteed
Boiler
Efficiency -
Actual
Emissions
Within
Limits?
Delivery
Time -
Guaranteed
[months]
Delivery
Time -
Actual
[months]
Did AET Pay
Liquidated
Damages?
Tilbury Green Power*/*** 2017 92,0% 28
Østkraft*** 2016
Cofely - Biolacq Energies*** 2016 92,3% 93,5% Yes 3½ + 22 3½ + 22 No
Cofely - BES VSG 2015 92,2% 93,3% Yes 8 + 24 8 + 24 No
Cofely - SODC Orléans 2015 92,1% 92,6% Yes 4½ + 22 4½ + 22 No
Rothes - CoRDe 2013 91,8% 91,8% Yes 2 + 24½ 2 + 24½ No
Zignago Power 2012 92,0% 92,6% Yes 24½ 24½ No
Cofely - BCN 2011 91,5% 93,0% Yes 6 + 22½ 6 + 22½ No
Verdo - Randers** 2009 na na Yes na na No
Western Wood Energy Plant* 2008 91,3%* 92,0%* Yes 24 23½ No
FunderMax - Neudörfl 2006 91,0% 91,8% Yes 21 21 No
Linz - Mitte* 2006 89,0%* 89,5%* Yes 20 19½ No
Schneider - Biopower* 2004 91,0% 91,2% Yes 15 15 No
Boehringer Ingelheim** 2004 na na Yes na na No
Kronoply - Heiligengrabe 2002 90,3% 91,0% Yes 18 18 No
Pfleiderer - Neumarkt** 2001 na na Yes na na No
Pfleiderer - Gütersloh 2000 90,3% 91,3% Yes 2 + 19 2 + 19 No
MRE - Glandford Power Station** 1999 na na Yes na na No
* Actual customer guarantee is plant net efficiency. ** Retrofit project. *** Under construction.
Not only ”Know How” – also ”Know Why”
AET Service – Support of High Availability
Page 12
Regular inspection
AET PDMS
System
On-line & remote support
Capacity increase
Spareparts
Full O&M contract
On-site support
Control /SCADAupgrade
Lifetimeextension
Fuelconversion
Emission measurement
Emissionreduction
Thermodynamiccalculation
Efficiency optimisation
Feasibility study
Combustion system upgrade
Availability optimisation
Not only ”Know How” – also ”Know Why”
AET Biomass References
Side 13
2017 Tilbury Green Power 125 MW UK Waste wood
2016 Østkraft, Rønne 106 MW Denmark 0-100%oil, 0-75%coal, 0-50%biomass
2015 Cofely - Biolacq 54 MW France Clean wood
2015 Cofely - BES VSG 50 MW France Clean wood, DerTal
2015 Cofely - Orleans 37 MW France Clean wood
2013 Helius - CoRDe 34 MW UK Wood, draff (distillers grain)
2012 Zignago Power 49 MW Italy Clean wood, energy crops
2011 Cofely - Grand Couronne 55 MW France Clean wood, forest wood
2009 Energi Randers 2 x 95 MW Denmark 0-100 % coal & 0-100 % biomass
2008 Western Wood E. P. 48 MW UK Forest wood, clean rec. waste w.
2006 FunderMax - Neudörfl 50 MW Austria Waste wood, sander dust
2005 Linz Strom - Linz 35 MW Austria Forest wood, bark
2004 Boehringer Ingelheim 70 MW Germany Waste wood
2004 Schneider - Biopower 27 MW Germany Wood residue, sawmill dust
2002 Kronoply 64 MW Germany Waste wood, bark, sander dust
2002 Energi Randers 2 x 95 MW Denmark 100 % coal & 0-40 % biomass
2001 Pfleiderer - Neumarkt 100 MW Germany Waste wood, sander dust
2000 Pfleiderer - Gütersloh 60 MW Germany Waste wood, sander dust
1999 EPR, Fibrogen 51 MW England Poultry litter, MBM
1997 Pfleiderer - Neumarkt 78 MW Germany Waste wood, sander dust
1996 Rettenmeier 21 MW Germany Wood residue, sawmill dust
1994 Egger - Rambervillers 50 MW France Waste wood, sander dust
1993 EPR - Fibrogen 51 MW UK Poultry litter
1992 EPR - Fibropower 48 MW UK Poultry litter
1992 Dong Energy - Grenå (CFB) 80 MW Denmark Straw, coal
1990 Midtkraft - Århus (MCFB) 20 MW Denmark Wood, straw, coal
1988 Dong Energy - Slagelse 34 MW Denmark Straw
1987 Norske Skog - Follum 35 MW Norway Bark, waste wood, sludge
At
AE
TE
mp
loyee a
t
Aalb
org
In
du
str
ies
Not only ”Know How” – also ”Know Why”
AET Track Record – High Performance
Page 14
Reference Plant
Commis-
sioning
Year
Boiler
Efficiency -
Guaranteed
Boiler
Efficiency -
Actual
Emissions
Within
Limits?
Delivery
Time -
Guaranteed
[months]
Delivery
Time -
Actual
[months]
Did AET Pay
Liquidated
Damages?
Tilbury Green Power*/*** 2017 92,0% 28
Østkraft*** 2016
Cofely - Biolacq Energies*** 2016 92,3% 93,5% Yes 3½ + 22 3½ + 22 No
Cofely - BES VSG 2015 92,2% 93,3% Yes 8 + 24 8 + 24 No
Cofely - SODC Orléans 2015 92,1% 92,6% Yes 4½ + 22 4½ + 22 No
Rothes - CoRDe 2013 91,8% 91,8% Yes 2 + 24½ 2 + 24½ No
Zignago Power 2012 92,0% 92,6% Yes 24½ 24½ No
Cofely - BCN 2011 91,5% 93,0% Yes 6 + 22½ 6 + 22½ No
Verdo - Randers** 2009 na na Yes na na No
Western Wood Energy Plant* 2008 91,3%* 92,0%* Yes 24 23½ No
FunderMax - Neudörfl 2006 91,0% 91,8% Yes 21 21 No
Linz - Mitte* 2006 89,0%* 89,5%* Yes 20 19½ No
Schneider - Biopower* 2004 91,0% 91,2% Yes 15 15 No
Boehringer Ingelheim** 2004 na na Yes na na No
Kronoply - Heiligengrabe 2002 90,3% 91,0% Yes 18 18 No
Pfleiderer - Neumarkt** 2001 na na Yes na na No
Pfleiderer - Gütersloh 2000 90,3% 91,3% Yes 2 + 19 2 + 19 No
MRE - Glandford Power Station** 1999 na na Yes na na No
* Actual customer guarantee is plant net efficiency. ** Retrofit project. *** Under construction.
The table is missing the latest two turnkey contracts for JG Pears in UK and Akuo Energy in France.
Not only ”Know How” – also ”Know Why”
Year Customer Boiler Service & supply Fuel2017-2037 Tilbury Green Power (UK) 125 MW 20 year O&M Agreement Waste wood
2016 Østkraft (DK) Up to 106
MW
Fuel conversion to biomass/
coal/oil from coal/oil, with AET
Dual Fuel Spreader
Biomass, coal and oil
2016 TripleNine Fish Protein 9,
Thyborøn (DK)
2 x 20 MWt AET SNCR DeNOx plant Coal
2016 Kronoply - Heiligengrabe (DE) 65 MW SH 1 exchange Demolition wood (A1-A2) & dust
2016 Morsø Fjernvarme (DK) Several SCADA for several boiler
plants, including emergency
back-up plants
Oil, gas
2016 Eramet (NO) 55 MW SCADA and PLC control for
boiler and steam turbine
CO gas
2015 International Paper (FR) 50 MW CO and NOx measurement. Fly
ash re-injection system. AET
System for fuel dosing.
Clean wood, sludge
2015 Kronoply (1) - Heiligengrabe (DE) 30 MW Superheater replacement Dust fired
2015 Egger - Pannosvosges (FR) 46 MW Economiser replacement Clean wood, demolition wood (A1-
A2) & dust
2015 Cofely BCN (FR) 55 MW AET SNCR DeNOx plant Clean wood, forestry wood
2014 Novopan (DK) 27 MW AET SNCR DeNOx plant Waste wood, sander dust
2014 Zignago Power (IT) 50 MW District heating system, inclu-
ding tail end heat exchanger
Clean wood, energy crops
2013 → Zignago Power (IT) 50 MW Regular inspection Clean wood, energy crops
2012-13 Verdo - Randers (DK) 2x95 MW Redesign and supply of new
superheater 2 & 3
Clean wood & dust/coal
2012 → Cofely BCN (FR) 55 MW Regular inspection Clean wood, forestry wood
2012 WWEP (Wales) 48 MW Supply of new superheater 4 Forest Wood, clean rec. waste
wood
2011 Schneider - Biopower (DE) 27 MW Upgrade of boiler, supply steam
turbine and steam/water cycle
Clean wood, demolition wood (A1-
A2) & dust
Major After Sales References
Side 15
Not only ”Know How” – also ”Know Why”
AET References in Europe
Side 16
Not only ”Know How” – also ”Know Why”
Your Biomass Business – Our Challenge
Process integration?
Heat need, variation…..?
Availability?
Need from process, back-up ….
Performance?
Efficiency, power, emissions…
Page 17
Operation & Maintenance
O costs, M costs ….?
Biomass fuel?
Clean wood, waste wood, dust…?
…?
PROJEKT 40xxx
Tender material
AET
AET
AET
AET
26.09.2013
26.09.2013
07.10.2013
11.11.2013
11.11.2013
Clean wood
Clean wood
Waste woodWaste wood
Waste wood
Average loadmax load
Operating hours pr year
h/a
8.000
8.300
8.300
8.300
8.300
Electricity generator terminals
kW
1.900
8.984
8.730
21.500
20.600
Inhouse consumption
kW
-500
-900
-900
-1.500
-1.500
Net Electricity
kW
1.400
8.084
7.830
20.000
19.100
Cycle efficiency, net
%
89,00%
65,40%
60,30%
44,60%
49,40%
Heat supply (steam)
KW
15.800
15.500
15.500
15.500
20.200
Fuel heat
kW
19.326
36.061
38.690
79.596
79.555
Fuel consumption
Wet ton/h
8,54
15,94
10,53
21,67
21,66
Gross efficency
-
91,6%
67,9%
62,6%
46,5%
51,3%
Fuel consumption
Wet ton/a
68.324
132.271
87.413
179.835
179.740
Ash production
ton/a
683
1.323
2.185
4.496
4.494
Heat sales
MWh/a
126.400
128.650
128.650
128.650
167.660
Electricity sales (net)
MWh/a
11.200
67.097
64.989
166.000
158.530
Electricity purchase
MWh/a
0
0
0
0
0
Fuel cost
Euro/ton dry
80,0
92,0
74,9
74,9
74,9
Fuel cost
Euro/MWh fuelheat
17,7
20,3
15,3
15,3
15,3
Heat price (fuel+50%)
Euro/MWh
39,8
39,8
39,8
39,8
39,8
Heat incentive price (RHI)
Euro/MWh
20,0
20,0
20,0
20,0
20,0
Electricity sales price
Euro/MWh
142
142
142
142
142
Electricity purchase price
Euro/MWh
60
60
60
60
60
Ash cost
Euro/ton
80
80
80
80
80
Income from heat sale
Euro/a
5.028.192
5.117.697
5.117.697
5.117.697
6.669.515
Income from CHP incentive (RHI)Euro/a
2.528.000
2.573.000
2.573.000
2.573.000
3.353.200
Income from electricity sale
Euro/a
1.595.177
9.556.420
9.256.156
23.642.801
22.578.875
Total income pr year
Euro/a
9.151.369
17.247.117
16.946.853
31.333.498
32.601.589
Fuel cost
Euro/a
2.732.971
6.084.463
4.909.132
10.099.521
10.094.223
Electricity purchase
Euro/a
0
0
0
0
0
Ash cost
Euro/a
54.659
105.817
174.827
359.670
359.481
Consumables (water, gas/oil…)Euro/a
123.685
149.654
160.563
330.325
330.152
Insurance, other costs
Euro/a
200.989
389.100
417.464
858.845
858.395
Repair and maintenance
Euro/a
1.125.000
1.290.000
1.380.000
2.137.500
2.137.500
Staff cost
Euro/a
675.000
675.000
675.000
675.000
675.000
Total operating cost
Euro/a
4.912.305
8.694.034
7.716.986
14.460.861
14.454.750
EBITDA
Euro/a
4.239.064
8.553.083
9.229.868
16.872.637
18.146.839
Capital service dept
Euro
2.160.315
3.763.130
3.972.193
6.759.696
6.759.696
Net profit 1. full year
Euro
2.078.749
4.789.953
5.257.675
10.112.940
11.387.143
Profit per year / equity
%
22%
29%
30%
34%
38%
Simple pay back year
7,6
6,5
6,4
5,9
5,5
CONFIDENTIAL - Business Cases
→ Heat balance, process, concept,
scope, layout, price….
Not only ”Know How” – also ”Know Why”
QUESTIONS?