A41 MOTORWAY - BRIDGE ABUTMENTS - LA RAVOIRE - FRANCE Roads & Motorways Pure abutments France, Haute-Savoie (74), La Ravoire Owner / Client : ADELAC Engineer : I-LAC / SETEC TPI Main contractor : GIE CONSTRUCTEURS A41 Terre Armée entity : Terre Armee France (France) Date : 2007 A41 Motorway - Bridge Abutments - Underpass/PI 161- La Ravoire - France Activity : Reinforced Earth System : TA "Classic" Reinforcement : HA / HAR steel strips Key figures : Area : 3700 m2 Rise: 23.80 m A41 Motorway - Bridge Abutments - La Ravoire - France The Project The completion of the last link of the A41, a 21 km key axis connecting the cities of Grenoble, Chambéry, Annecy and Geneva; required the construction of two true bridge abutments of exceptional height. The main contractor on this project awarded Terre Armée France the contract for the design, supply and technical assistance of these Reinforced Earth® structures. The Solution For this project, Terre Armée France provided TerraClass® panels and steel reinforcement strips and, prior to the construction, checked the overall stability of the slopes and the soil. Technical assistance was also part of the contract. Construction works began in March 2007 and were completed in July 2007. The Advantages The two 24 m high Reinforced Earth® true abutments were associated to two 35 metres long isostatics decks for a total area of almost 4 000 m² of TerraClass® facings. Construction was carried out without interferring with the nevironmentally sensitive stream flowing under the structure. © Photo library Terre Armee Group www.terre-armee.com

Upload: others

Post on 14-Jan-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

A41 MOTORWAY - BRIDGE ABUTMENTS- LA RAVOIRE - FRANCE

Roads & MotorwaysPure abutments

France, Haute-Savoie (74), La RavoireOwner / Client :ADELACEngineer :I-LAC / SETEC TPIMain contractor :GIE CONSTRUCTEURS A41Terre Armée entity :Terre Armee France (France)Date :2007

A41 Motorway - Bridge Abutments - Underpass/PI 161- La Ravoire - France

Activity :Reinforced EarthSystem :TA "Classic"Reinforcement :HA / HAR steel stripsKey figures :Area : 3700 m2Rise: 23.80 m

A41 Motorway - Bridge Abutments - La Ravoire -France

The ProjectThe completion of the last link of the A41, a 21 km key axis connecting the cities of Grenoble, Chambéry, Annecy and Geneva; required the construction oftwo true bridge abutments of exceptional height.

The main contractor on this project awarded Terre Armée France the contract for the design, supply and technical assistance of these Reinforced Earth®structures.

The SolutionFor this project, Terre Armée France provided TerraClass® panels and steel reinforcement strips and, prior to the construction, checked the overall stabilityof the slopes and the soil. Technical assistance was also part of the contract.Construction works began in March 2007 and were completed in July 2007.

The AdvantagesThe two 24 m high Reinforced Earth® true abutments were associated to two 35 metres long isostatics decks for a total area of almost 4 000 m² ofTerraClass® facings.Construction was carried out without interferring with the nevironmentally sensitive stream flowing under the structure.

© P