a systematic study of cross-talk limitations in rpc timing
DESCRIPTION
A systematic study of cross-talk limitations in RPC timing. D. Gonzalez-Diaz, A. Berezutsky and M. Ciobanu for the CBM-TOF working group 15-10-2008. Index. 1. Cross-talk and timing. General remarks. 2. Measurements and comparison with FEM ( F inite E lement M ethod) description. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/1.jpg)
A systematic study of cross-talk limitations in
RPC timingD. Gonzalez-Diaz, A. Berezutsky and M. Ciobanu
for the CBM-TOF working group
15-10-2008
![Page 2: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/2.jpg)
Index
1. Cross-talk and timing. General remarks.
2. Measurements and comparison with FEM (Finite Element Method) description.
3. Design studies for operation in differential mode.
4. Conclusions.
![Page 3: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/3.jpg)
Basics (RPC rise-time)
D.Gonzalez-Diaz, PhD(2006)
measured with UV source and double-threshold technique
tSoeii avalanche growth until onset of Space-
Charge
P. Fonte et al., IEEE, Trans. Nucl. Sci. 49,3(2002)881
if Space-Charge present already at the level of the comparator, S would beeven higher !
also
![Page 4: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/4.jpg)
Basics (RPC rise-time)
ps2009ln
S(E)
)(trise E=100kV/cm
time domain
GHzt
frise
c 75.135.0
frequency domaincmfc cc 17
FT
(V)
![Page 5: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/5.jpg)
Basics (Q distribution and usual threshold)
HADES 2003 prototype
D.Gonzalez-Diaz, PhD(2006)%10/ signalthreshold VV
2.1/
/
promptq
signalV
qrms
Vrmssignal
not including streamers
measured directly in the scope
![Page 6: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/6.jpg)
Basics (fluctuations in time response)
2talkcross
2noiseexternal
2noiseintrinsic
2propag
2RPC
2T,total
independent sources!
2talkcross
2event single
2T,total
We believe we can make
σsing;e event~80 ps for large
systems (CBM-Techincal Status Report 2005)
?
![Page 7: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/7.jpg)
Cross-talk influence in timing (simple
derivation)
log(Vsignal)
t
Vth
variations in base-line due to cross-talk
variations in time at threshold due to cross-talk2
talkcross
space-charge
exponential regime
![Page 8: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/8.jpg)
Cross-talk influence in timing (simple
derivation)Assumptions: Within the same primary collision cross-talk extends up-to infinite time. It does not depend on position. Fluctuations in time of cross-talk signal are smaller than fluctuations coming from the avalanche charge distribution. Pick-up strips are separated by a typical distance bigger than the area of influence of the avalanche. Charge sharing during induction can be neglected!. Cross-talk influences only the first neighbour, coupling to it with a fraction of its amplitude F. Cross-talk is small.
S
F
V
rms
V
Vrms
signal
V
threshold
signal signal
talkcross
![Page 9: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/9.jpg)
Cross-talk influence in timing (simple
derivation)
eventsingletalkcross rmsrms
SrmsV
rms
V
VF
signal
V
signal
threshold )( eventsingle
1
psrms 80event-single 1.0F
![Page 10: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/10.jpg)
Cross-talk influence in timing (simple
derivation)
psrms
psrms
MCtalkcross
analyticaltalkcross
87
60
events above threshold in neighbour: 20%
cross-talk: F=10%
subtle cross-talk(below threshold)
rough cross-talk(above threshold)
![Page 11: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/11.jpg)
Measurements of cross-talk with RPC mockup
![Page 12: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/12.jpg)
Different ways of shielding
shielding viasshielding strips
![Page 13: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/13.jpg)
Comparison with
simulationsignal injected from a fast scintillator trise~1ns
![Page 14: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/14.jpg)
Cross-talk from cell without shielding
![Page 15: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/15.jpg)
Cross-talk from cell with shielding strips
![Page 16: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/16.jpg)
Cross-talk from cell with shielding vias
![Page 17: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/17.jpg)
Cross-talk from cell with shielding vias(neighbour not terminated on the other side!)
![Page 18: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/18.jpg)
Cross-talk from cell with shielding vias(to 1st and 2nd neighbour!)
![Page 19: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/19.jpg)
simulation of the S coefficient
scattering matrix coefficient to neighbouring anode (equivalently: fraction of signal transmitted)
![Page 20: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/20.jpg)
Comparison with data from spectrum analyzer
preliminary!
![Page 21: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/21.jpg)
simulation of a realistic structure
propagation of exponential signal with 200 ps rise-time in anode and cathode simultaneously (differential mode)
RPC structure: signal width = 22 cm, gap to next strip = 0.3 cm
16 gaps,0.16 mm gap0.3 mm glass0.86 mm PCB
![Page 22: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/22.jpg)
Transmission properties (with vias)
![Page 23: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/23.jpg)
Transmission properties (with vias)
![Page 24: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/24.jpg)
Transmission properties (with vias)
![Page 25: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/25.jpg)
Transmission properties (with vias)
![Page 26: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/26.jpg)
Transmission properties (with vias)
![Page 27: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/27.jpg)
Transmission properties (with vias)
![Page 28: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/28.jpg)
Transmission properties (with vias)
![Page 29: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/29.jpg)
Transmission properties (with vias)
![Page 30: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/30.jpg)
Transmission properties
vias
no vias
![Page 31: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/31.jpg)
Transmission properties
vias
no vias
![Page 32: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/32.jpg)
Transmission properties
vias
no vias
![Page 33: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/33.jpg)
Transmission properties
vias
no vias
![Page 34: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/34.jpg)
Transmission properties
vias
no vias
![Page 35: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/35.jpg)
Transmission properties
vias
no vias
![Page 36: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/36.jpg)
Transmission properties
vias
no vias
![Page 37: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/37.jpg)
Transmission properties
vias
no vias
![Page 38: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/38.jpg)
all in a nut-shell
![Page 39: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/39.jpg)
Dependence with strip length
![Page 40: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/40.jpg)
Dependence with strip length
![Page 41: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/41.jpg)
Dependence with strip length
![Page 42: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/42.jpg)
Dependence with strip length
![Page 43: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/43.jpg)
Conclusions (I)
Cross-talk levels at the level of 10% are capable of destroying timing RPC multi-hit performances.
Cross-talk influence depends critically on the ratio Vth/<Vsignal> and the
signal rise-time. For timing RPCs it corresponds to a 'corner frequency' of 1.75 GHz at least (-3dB drop).
Aplac is a good tool for understanding fast signal propagation. For the measured signals the quality of our groundings is well described
by 'ideal grounding' in APLAC. Detector box affects critically to signal properties. Without a proper
description the simulation fails by factors.
![Page 44: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/44.jpg)
Outlook
Elaborate the results a bit further to establish sound requirements. Use this information to build a prototype. Measure cross-talk in a realistic prototype. Measure experimentally the charge-sharing during induction.
![Page 45: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/45.jpg)
Conclusions (II)
Impedance matching does not help at all from the point of view of cross-talk, however it may allow for desired double-hit capabilities.
Detector matching is extremely complicated and does not fit at all to the required granularities. If impedance matching is requested, the granularity at the outer regions would require strips of 4 mm wide and 6 meters long.
How to get a matched detector?? (first of all, the resulting multi-strip configuration is only truly matched after ALL the corresponding cross-impedances are matched):
Build the detector with the impedance of the FEE. Build the FEE and cables with the impedance of the detector. Build the detector and the FEE and match the impedance with some
driver. Do not care about double-hit capabilities in the same strip (HADES).
![Page 46: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/46.jpg)
Conclusions (III)
suggestion: place the FEE inside the detector,
reduce its input impedance and eliminate
the problem of signal transmission in cables!
![Page 47: A systematic study of cross-talk limitations in RPC timing](https://reader030.vdocuments.us/reader030/viewer/2022012922/56813d65550346895da73e71/html5/thumbnails/47.jpg)