×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [ps risetime]
1 P. Lecoq CERN April 2011 Workshop on Timing Detectors – Chicago 28-29April 2011 Factors influencing time resolution in scintillators Paul Lecoq CERN,
215 views
April 28th, 2011Timing Workshop, Chicago Paul Scherrer Institute Limiting factors in Switched Capacitor Arrays Sampling speed, Timing accuracy, Readout
216 views
1 High-Speed Digital Test & Measurement Chris Allen (
[email protected]
) Course website URL people.eecs.ku.edu/~callen/713/EECS713.htm
218 views
A systematic study of cross-talk limitations in RPC timing
32 views