cc16_055 1 STAFF REPORT MEETING DATE: April 26, 2016 TO: City Council FROM: Cathy Capriola, Interim City Manager Mike Fuson, Interim Assistant City Manager Brian Cochran, Finance Manager Maureen Chapman, Accounting Supervisor SUBJECT: OPERATING BUDGET WORKSHOP #2 OF 2 2016/17 DEPARTMENTAL BUDGET PRESENTATIONS AND OPERATING BUDGET RECOMMENDATIONS REQUEST Hold a budget workshop regarding the proposed 2016/17 operating budget. RECOMMENDATION Receive, ask questions and have preliminary discussion on budget information presented by staff. DISCUSSION In preparation for the annual budget hearings and direction to occur in June, the City holds a series of budget workshops for the City Council and community where the City Manager’s budget recommendations are outlined. The first two sessions, held on April 12 and 26, are on the operating budget with a focus on the General Fund. On May 3, staff will present the capital improvement budget for FY 2016/2017. On May 17, staff will return to the City Council for general direction regarding the budget (both operating and capital), which staff will use to produce the draft budget document for review and decision making in June. During the operating budget workshops, staff will present a variety of data and information regarding the proposed 2016/17 Operating Budget, including General Fund operating budgets and additional items to be funded by Measure F, Measure A (County Parks), Equipment Replacement Fund, etc. Additionally, staff will present information about each departments current year accomplishments, 2016/17 budget recommendations, and 2016/17 goals and objectives. The City Council is encouraged to ask questions of staff and provide general thoughts and feedback. Attachment 1 of this staff report is general background information and the Interim City Manager Recommended Budget Priorities that was included in the staff report for the April 12 workshop. 922 Machin Avenue Novato, CA 94945 415/ 899-8900 FAX 415/ 899-8213 www.novato.org 1

Upload: others

Post on 25-Jan-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 922 Machin Avenue Novato, CA 94945

cc16_055 1

STAFF REPORT

MEETING

DATE: April 26, 2016

TO: City Council

FROM: Cathy Capriola, Interim City Manager

Mike Fuson, Interim Assistant City Manager

Brian Cochran, Finance Manager

Maureen Chapman, Accounting Supervisor

SUBJECT: OPERATING BUDGET WORKSHOP #2 OF 2

2016/17 DEPARTMENTAL BUDGET PRESENTATIONS AND

OPERATING BUDGET RECOMMENDATIONS

REQUEST Hold a budget workshop regarding the proposed 2016/17 operating budget.

RECOMMENDATION Receive, ask questions and have preliminary discussion on budget information presented by staff.

DISCUSSION In preparation for the annual budget hearings and direction to occur in June, the City holds a series of budget workshops for the City Council and community where the City Manager’s budget recommendations are outlined. The first two sessions, held on April 12 and 26, are on the operating budget with a focus on the General Fund. On May 3, staff will present the capital improvement budget for FY 2016/2017. On May 17, staff will return to the City Council for general direction regarding the budget (both operating and capital), which staff will use to produce the draft budget document for review and decision making in June. During the operating budget workshops, staff will present a variety of data and information regarding the proposed 2016/17 Operating Budget, including General Fund operating budgets and additional items to be funded by Measure F, Measure A (County Parks), Equipment Replacement Fund, etc. Additionally, staff will present information about each department’s current year accomplishments, 2016/17 budget recommendations, and 2016/17 goals and objectives. The City Council is encouraged to ask questions of staff and provide general thoughts and feedback. Attachment 1 of this staff report is general background information and the Interim City Manager Recommended Budget Priorities that was included in the staff report for the April 12 workshop.

922 Machin Avenue Novato, CA 94945

415/ 899-8900 FAX 415/ 899-8213

www.novato.org

1

lmcdowall
Typewritten Text
L-4
lmcdowall
Typewritten Text
lmcdowall
Typewritten Text
lmcdowall
Typewritten Text
lmcdowall
Typewritten Text
Page 2: 922 Machin Avenue Novato, CA 94945

2

Logistics and Next Steps A full list of the recommended operating budget additions is attached to this staff report. Additionally, a matrix of the recommended position additions and PowerPoint presentations for the two departments presenting on April 26 are attached. These slides walk through each department’s overview, accomplishments during 2015/16, goals for 2016/17, and proposed budget additions. The Interim City Manager’s opening presentation that was presented at the April 12 Workshop is available for review or download at the following website: (http://cms6ftp.visioninternet.com/novato/agendas/pdfstaffreports/cc041216_L-3.4.pdf) Below is the schedule for all the upcoming budget workshops for both operating and capital budget. April 12, 2016 Operating Budget Budget Workshop #1 (COMPLETED)

Interim City Manager Opening Comments Community Development Department Parks, Recreation, and Community Services Department Police Department

April 26, 2016 Operating Budget Workshop #2

Public Works Department Central Administration Administrative Services Department Budget Overview / Forecast / Sustainability

May 3, 2016 Capital Improvement Budget Workshop #3

Municipal Facilities Parks, Recreation and Community Facilities Transportation, Drainage and Utilities Technology and Organizational Investment

May 17, 2016 Council Initial Budget Direction

Operating Budget Capital Improvement Budget

June 3, 2016 Proposed budget posted for Council and community June 14, 2016 Budget Hearing and Discussion June 28, 2016 Budget Decision and Council approval/direction

ATTACHMENTS

1. General Background Information and Interim City Manager Recommended Budget Priorities (originally presented in staff report for April 12 budget workshop)

2. 2016/17 City Manager Recommended Operating Budget Additions 3. Recommended Positions Matrix 4. Departmental Budget Presentations

Public Works Central Administration and Administrative Services

5. Interim City Manager Budget Overview/Forecast/Sustainability (to be posted on Monday, April 25, 2016)

2

Page 3: 922 Machin Avenue Novato, CA 94945

General Background Information and

Interim City Manager Recommended Budget Priorities

(Originally presented at April 12, 2016 City Council Meeting) As has been the case for a number of years, instructions to departments during the 2016/17 budget development process required flat operations and maintenance (“O&M”) budgets within each department’s General Fund programs. Any requested additions to the budget were added to a request worksheet and considered separately by the Interim City Manager. The Interim City Manager and finance staff then reviewed the requests. The Interim City Manager is recommending to the City Council those expenditures that she believes are important for the organization’s operations and to meet the City’s service needs and the Council’s objectives. Staff will walk through the details of the Interim City Manager’s recommendations, as well as additional budget information, during each department’s PowerPoint presentation. On March 24, City staff met with the Measure F Oversight/Citizens Finance Committee to present a preliminary draft of the budget recommendations. Staff will continue to meet with the Committee over the next few months to update them on budget discussions and proposals. Feedback on the 2016/17 budget from the Committee will be relayed to the City Council at future workshops and Council meetings. Context and Background Novato has historically had less revenue than other cities for services and community improvements. The 2009 recession and loss of redevelopment funding created major service reductions that we are still feeling today. For example, the City of Novato still has 38 fewer positions with which to deliver services compared to pre-recession levels and while there is not an expectation to return to prior staffing levels, it is also clear that some services are not adequate to meet our customers’ expectations. In addition, employees have had reductions to take-home pay and below-inflation raises for at least the past eight years. The recession also impacted CalPERS, creating increasing pension rates to cities which is a new ongoing cost of doing business. Over the past few years, it has become clear that there are key city services that are “just getting by” or slowly degrading over time. Many parks and islands are suffering significant deferred maintenance which impacts the overall appearance, functionality and safety of the community’s amenities. For example, in 2015, the City had to extend the closure for rehabilitation of Hill Recreation fields due to extremely poor turf condition caused by low service levels and the drought. We received complaints from field users stating their concerns that youth could not practice and play safely on these fields. Our street maintenance is also being negatively impacted. Since the expiration of Measure B funds in 2012, the City’s Pavement Condition Index has been declining at the rate of one point per year. Our maintenance staffing levels have not been sufficient to conduct an active crack seal program, which is a fundamental component of basic street preventive maintenance. The Public Works Department will talk more about these challenges in their budget presentation. Overall, all of the City’s infrastructure is aging and requires investment – estimated at a minimum of $1 million per year through the Fiscal Sustainability Plan. The current fiscal year’s budget (2015/16) was proposed and adopted as a “status quo” budget. No new positions were added and the ongoing General Fund non-personnel category budgets increased less than what was included in the forecast. When the budget was approved in June, the City Council had not yet made a decision as to whether a revenue measure would be placed before

3

lmcdowall
Typewritten Text
L-4 1.
lmcdowall
Typewritten Text
lmcdowall
Typewritten Text
lmcdowall
Typewritten Text
lmcdowall
Typewritten Text
Page 4: 922 Machin Avenue Novato, CA 94945

the voters in November. At the end of July 2015, after a long discussion, the City Council voted unanimously to place a ¼ cent sales tax measure on the ballot. With the 72% voter approval of Measure C this past November, the City has more revenue certainty than it has in the past. Continuing recovery of the economy is also leading to increases in a variety of City tax and fee revenue sources while at the same time increasing demand for building inspections, code enforcement, residential inspections, planning inquiries and planning projects. While the City’s General Fund forecast has accounted for some of the increased fee revenues, the additional service demands are now being reflected in this budget in the form of additional Community Development staffing. The ongoing tax revenue improvements, combined with the one-time resources still available from the Measure F sales tax, allow the city to enhance and re-invest in services. Since the recession and with the limited five year revenue from Measure F, the City has been extremely careful regarding any increase in services and overall use of Measure F. This fiscal prudence was warranted and important, since there was no ongoing new revenue until Measure C was passed in November. Measure C provides some stability to the City – but not long term sustainability. The Fiscal Sustainability Plan was built on a ½ cent sales tax measure and Measure C was a ¼ cent sales tax measure. The Council will need to have a conversation this fall regarding revisions to the City’s Fiscal Sustainability plan (“2.0”) and specifically a strategy for maintenance and infrastructure investments. Interim City Manager Recommended Budget Priorities The proposed budget focuses on fundamentals – a reinvestment in Novato city services that provide value and quality of life enhancements for our residents. We have financial stability for the near horizon that allows this increased investment in service levels to the community in key areas. It is important to note that the majority of the 2016/17 budget recommendations in the operating budget and the CIP budget represent an opportunity to focus on fundamental services. These are not “nice to haves” – these are baseline service enhancements required for safety, liability, and fiscal prudence. Workload indicators that will be shown in departments’ presentations illustrate this increased activity and service needs that the City faces. While staff believes investing in some key areas is critical now, we also recognize that the City Council needs to have a discussion regarding the City’s long term fiscal strategy. With this in mind, the Interim City Manager’s budget recommends two key strategies.

• Staff with Limited Term Positions – Rather than placing positions directly onto our roster as

permanent positions, staff recommends the use of limited term positions (some 2 years and some 4 years). This allows the Council future flexibility while at the same time stepping forward to improve service levels now. Also, if there is a recession or a reduction in activity level, these positions can be restructured or the time duration modified without laying off permanent staff.

• Various Funding Strategies – Staff has also carefully reviewed how to make service enhancements without permanently impacting the General Fund. − Some of these new positions are funded by shifting temporary hourly staffing funds or

contract dollars with no new impact.

4

Page 5: 922 Machin Avenue Novato, CA 94945

− In other cases, a modest new expenditure provides significant service level enhancements by increasing staffing hours (increasing a position from ¾ time to full-time).

− The use of Measure F for funding some of the key areas that were directly outlined in the original Measure F ballot language. While Measure F can be used for any municipal purpose, this use of Measure F honors the original messages provided to the public while at the same time preserving a significant portion of unallocated Measure F for other needs or one-time purposes. Measure F is recommended as the funding source for a variety of service level enhancements for police, street and park maintenance and youth services.

Attached is a list of the Interim City Manager’s budget recommendations. Below is a brief summary of the key areas of focus.

1. Focus on Police – Shore up our dispatch night services and augment staffing and professional support for police hiring, retention, training and crime analysis programs.

2. Reinvest in Maintenance – Strategic investments in streets/parks/island deferred maintenance and enhanced custodial/facility maintenance services through a variety of staffing and programs, including a proposed partnership with the Downtown Streets Team. In addition, the following recommendations are also included as part of this reinvestment in maintenance.

o Bobcat / Skid Steer Tractor – The maintenance division’s existing 1983 skid steer

is well beyond its useful life. A new vehicle, combined with new attachments, will substantially enhance the City’s ability to complete a wide array of tasks: high weed mowing, roadside edge maintenance, open space and levee maintenance, planting trees, placing bollards, brush clearing, debris cleanup, and concrete operations and demolition.

o Re-Mobilize Pavement Crack Sealing – The City has not done crack sealing on its

pavement in the past two years due to lack of available staff to dedicate to the work. With Measure B bond proceeds fully spent by 2012, Novato’s pavement condition has slowly been declining for the past three to four years. This recommendation would utilize a combination of temporary staff and maintenance crews over time to re-institute a summer crack sealing program in order to preserve and protect our streets.

o Park and Island Special and Seasonal Projects – Through the recession and resulting

staffing reductions, Novato has accumulated a significant backlog of park/island/median maintenance projects that cannot be handled with existing crews. The recommendation for 2016/17 is to mobilize special projects crews via temporary and overtime staff to complete a variety of these needed projects.

3. Respond to Increased Permit / Inspection Activity – With the economic upswing, One-Stop Shop, building, planning and code enforcement services are all impacted by long queues for service, appointments, and follow-up responses. In these development services functions, there is increasing revenue to cover the cost of the increasing demand for services. On the other hand, future market cycles will cause fluctuations in demand. Staff is proposing adding these positions as “rolling two year limited-term” positions; though

5

Page 6: 922 Machin Avenue Novato, CA 94945

the positions are initially approved for two years, the Council would have the opportunity with each budget to review development levels and choose to extend the position or not. In this way, a 12-18 month glide-path exists for both the City and the position incumbent to downsize staffing if needed.

4. Support Youth and Senior Programs – Increased pre-school and youth programs; expansion of senior fitness program; expansion of the Financial Assistance Program; improved maintenance in parks, fields and facilities allows better coordination and programming for our various customers use of these community amenities.

5. Public Engagement and Outreach – Deliver on the City’s commitment to enhance public engagement and make our public outreach and web site information consistent, accessible, understandable and interactive with enhanced staffing and operational funding. Additional operating funds and a staff position are required in order to implement proactive and up-to-date communication with the community.

6. Employee Investment – Continue to support our employees by providing them with tools (technology, software, maintenance skid steer), support and recognition (training program, evaluation, reward and recognition program).

7. Invest in Economic Development – Continue to support the development of high paying

jobs in Novato, support business retention and attraction, support the vitality of the downtown and redevelop the City’s key properties in Hamilton.

6

Page 7: 922 Machin Avenue Novato, CA 94945

2016/17 City Manager Recommended Budget Additions 4/12/2016

Service Description Duration Staffing Rationale / Budget Information General

Fund

General

Fund (Rev.

Recovery /

Realign)

Measure F

Equip.

Replacement

Fund

Community Development

Enhance public counter and planning

services

Limited Term

2 year rolling

1.0 FTE

Planner I

To respond to increases in economic activity and front counter visitors, add 1.0 FTE

Planner I position (replaces a current 0.8 FTE planner position). Fully fund through

General Fund through 12/31/2018 as a limited term 2 year rolling position.

92,000

Enhance building inspection and code

enforcement services

Limited Term

2 year rolling

1.0 FTE

Building

Inspector

Add a limited term Building Inspector to assist during peak construction periods

due to increase in permitting workload and corresponding revenues. Can also

assist with increased code enforcement case filings and peak resale inspection

periods. Fully fund through General Fund through 12/31/2018 as a limited term 2

year rolling position.

94,000

Police

Increase police dispatch minimum

24-hour service levels

4-Year

Limited Term

1.0 FTE

Dispatcher

Hire (1) one additional police dispatcher position to provide at least (2) police

dispatchers in the dispatch center 24-hours a day; a prudent public safety service

level for a city with the population and geographic size of Novato.

97,200

Additional support to police hiring,

retention and training effortsOngoing

0.25 FTE Senior

Management

Analyst

Increase Senior Management Analyst position from 0.75 to 1.0 FTE, an increase of

10 hours weekly. Assist with support to training, hiring and recruitment efforts.

30,000

Continuation of crime analysis services2-Year

Limited Term

Temp part-time

hourly

Continue funding for part time Crime Analyst, (temp position) to maintain the

department's ability to develop reports from the current records management

software system to use in deploying police personnel.

27,500

Countywide Records and Dispatch

Shared Police SoftwareOngoing

Anticipated 2% to 3% inflation in the contract annual maintenance provided by the

County for: Records Management System, Computer Aided Dispatch ("CAD"), and

Mobile Data Computers. Plus $10,000 for CAD, had warranty during FY 2015/16.

13,900

Major Crimes Task Force Contribution Ongoing

Additional contribution required for three to five years, in addition to a Novato

officer assigned to the task force, as a result of limited ongoing funding sources for

the task force. Reimbursement to Novato may occur in the future.

39,000

Police Recruitment Assistance One-TimeProduce a professional recruitment materials including video and photographs to

recruit and attract qualified Police candidates. 15,000

Continuation of basic police front

counter support services

4-Year

Limited Term

0.5 FTE Office

Assistant

Extend the existing limited term part-time position for 4 years. Already approved

by Council for 16/17; proposal is to extend time duration. -

Continuation of basic police records

services

4-Year

Limited Term

0.5 FTE Records

Specialist

Extend the existing limited term part-time position for 4 years. Already approved

by Council for 16/17; proposal is to extend time duration. -

Page 1 of 4 7

lmcdowall
Typewritten Text
L-4 2.
lmcdowall
Typewritten Text
lmcdowall
Typewritten Text
Page 8: 922 Machin Avenue Novato, CA 94945

2016/17 City Manager Recommended Budget Additions 4/12/2016

Service Description Duration Staffing Rationale / Budget Information General

Fund

General

Fund (Rev.

Recovery /

Realign)

Measure F

Equip.

Replacement

Fund

Parks, Recreation, and Community Services

Enhance coordination of expanded

childcare programsOngoing

0.75 FTE

Recreation

Coordinator

New 0.75 FTE Recreation Coordinator position for preschool programs. New

position would be 30 hours per week / 12 months per year. Proposal is to partially

fund by re-allocating $38,316 in part-time hourly funding to offset cost of new

position. Ongoing position recommended.18,000

Continuation of Youth Financial

Assistance Program4-Years Continuation of youth scholarship program for recreation/parks programs. Existing

Measure F funding of $10,000. Total of $30,000 annually for 4 years. 20,000

Gymnastics Staff Training / Conferences OngoingAnnual training costs for Gymnastics needs to be increased to cover costs of safety

and leadership training. Matched with increased revenues 3,000

Growth of Children's Programs and

FacilitiesOngoing

Children's program growth results in increased hourly employee payroll, additional

wear and tear on facilities, and additional program instructor costs. Matched by

increased revenues. 83,000

Growth of Senior Fitness Programs Ongoing Growth of Senior fitness program. Increased costs and revenues. 15,000

Public Works

Continue development engineering and

stormwater quality regulation and

compliance efforts

One-Time

Development activity levels and NPDES requirements, combined with Sr. Eng level

CIP project work exceed the capacity of one Sr. Engineer. One time funds are

requested to cover 16/17 engineering consultant costs.

60,000

Maintain building maintenance service

levels - various categoriesOngoing

Funds to address supply, repairs, maintenance needs at city buildings, including

Civic Center, MTSC, Gym/DRC, and Hamilton facilities 20,000

One-Time Increase in Tree Services One-TimeTreework services for damaged trees due to drought stress and pine borer

damage. 7,500

Maintain park and field maintenance

servicesOngoing Services and supply increases for park and field maintenance 15,000

Enhance maintenance division

capabilities - high weed mowing, tree

planting, mowing open space, brush

clearing, pavement operations, etc

One-Time

Purchase /

Ongoing

Replacement

Funding

New skid steer tractor and attached equipment. Existing 1983 tractor is well

beyond its useful life. Base tractor is $90,000; attachments are additional $80,000,

to be used by Parks and Streets for various projects. Equipment will be used for

high weed mowing on roadside edges, open space, and the levee; planting trees,

placing bollards and mowing open space; brush clearing and debris cleanup;

pavement and concrete repair operations and demolition; and other tasks.

12,000 170,000

Enhanced Pavement Crack Sealing

ProgramOne-Time

Mobilize crack-filling program for streets citywide for the purpose of raising

Pavement Condition Index (PCI); includes part-time seasonal assistance, materials

and overtime.

125,000

Enhanced Parks/Island Special and

Seasonal ProjectsOne-Time

Mobilize special projects crews to complete various special and seasonal parks

and/or island improvements; includes part-time seasonal assistance, materials and

overtime.

250,000

Augment park and street maintenance

service levels

4-Year

Limited Term

2.0 FTE

Maintenance

Workers

2 full time Maintenance Workers (1 for parks and 1 for streets). 4-year limited

term positions. 170,000

Page 2 of 4 8

Page 9: 922 Machin Avenue Novato, CA 94945

2016/17 City Manager Recommended Budget Additions 4/12/2016

Service Description Duration Staffing Rationale / Budget Information General

Fund

General

Fund (Rev.

Recovery /

Realign)

Measure F

Equip.

Replacement

Fund

Re-align building custodial services Ongoing1.5 FTE

Custodians

Add 1.5 FTE custodians to replace janitorial services at 922 Machin, new Hamilton

Gym, and Lu Sutton child care. Costs will be absorbed by eliminating several

janitorial contracts. Increases staffing flexibility and service levels.

14,000 107,000

Engage the Downtown Streets Team in

community and creek cleaning while

supporting work experience training

One-Time

Contract with the Downtown Streets Team - City share of cooperation with County

of Marin ($75,000) and Sutter Health ($30,000) to provide creek cleaning,

homeless camp cleanup, open space maintenance, and other cleaning. The mission

of Downtown Streets Team (DST) is to eradicate homelessness by empowering

homeless individuals to be part of the solution to homelessness, rather than just

the problem. Team Members participate in a volunteer work experience program

that provides great value to partnered non-profits, local governments, corporate

sponsors, environmental groups and the greater community. In exchange, Team

Members earn food/basic needs assistance, housing search assistance,

housing/shelter placement, case management, transportation assistance, Job

Search Skills classes, employment placement, and more.

45,000

Central Admin / Admin Services

Continuation of Bio/Life Initiative One-TimeContinuation of the Bio Life Science business retention and recruitment initiative

to support the expansion of high-paying jobs. 100,000

Continuation of Hamilton Base Re-Use

Initiative

Through

12/31/18

Continue the Hamilton Base Reuse initiative through 12/31/2018 to conduct a

community process for the redevelopment of available City-owned properties in

Hamilton. Includes the Hamilton Base Re-Use Director position (currently approved

through 12/31/2016) and continuation of the associated operating budget.95,000

Enhance public communication,

engagement, and outreach services to

the Novato community

4-Year

Limited Term

1.0 FTE

Management

Analyst

Public Communications / Webmaster (Management Analyst) position to support

public outreach and engagement program. Four Year Limited Term.90,000

Public Engagement Program Ongoing

Funding for public outreach and engagement program. Includes translators,

graphic design, copy writing, advertising, 2 mailed newsletters annually,

production and mailing of planning and capital projects noticing (including on-site

signs).

58,000

Employee Recognition / Innovation Ongoing Implementation of Employee Recognition / Innovation Program 30,000

Offsite Electronic Backup / Redundant

High Speed Internet - protection of

records and access

OngoingAdditional IT budget - net increase to fund offsite backup for electronic files and

for second high speed internet service to provide redundant internet connection20,000

IT Replacement Fund One-Time

Establish IT equipment replacement fund. Move existing funding that has already

been accumulating for multiple existing pieces of technology to a dedicated

technology replacement fund. - -

Page 3 of 4 9

Page 10: 922 Machin Avenue Novato, CA 94945

2016/17 City Manager Recommended Budget Additions 4/12/2016

Service Description Duration Staffing Rationale / Budget Information General

Fund

General

Fund (Rev.

Recovery /

Realign)

Measure F

Equip.

Replacement

Fund

Citywide Programs and Partnerships OngoingPossible increased mandatory contributions to regional agencies (MGSA, Animal

Control, MERA, Chamber)20,000 -

Citywide Liability Insurance One-TimeAnticipated increase in general liability insurance premium. Can be offset with

excess Bay Cities premiums. 40,000

Subtotal One-Time 82,500 40,000 615,000 170,000

Subtotal Multi-Year 250,900 394,000 443,700

Page 4 of 4 10

Page 11: 922 Machin Avenue Novato, CA 94945

Funding Shifts and Realignments

Cost Recovery / Economic Impacts

Service Level Needs Special Projects (Position Extensions)

Realigning services to better respond to City needs; move away from temps / contracts in some cases

Responding to increased demand for fee-recoveredservices; rolling 2 year limited term positions offset by add’lfee revenue

Enhancing priority services that were reduced during recession; enhancing public engagement; 4-year limited term positions funded by Measure F

Extending the expiration dates of limited term positions to complete work on special projects

Community Development • Planner I• Building Inspector / Code

Enforcement

Police • Senior Management Analyst (Increase from 0.75 to 1.0 FTE)

• Dispatcher• Office Assistant (0.5 FTE;

Already on staff)• Records Specialist (0.5

FTE; Already on staff)

• Crime Analyst (part time)

Parks, Recreation, and Community Services

• Pre-School Coordinator (0.75 FTE; eliminate temp salaries to offset)

Public Works • Custodian (1.5 FTE; offset by elimination of contracts)

• Maintenance Workers (2.0FTE)

Central Admin / Admin Services

• Communications / Webmaster

• Hamilton Base Reuse Director

2016/17 Budget Position Recommendations

11

lmcdowall
Typewritten Text
L-4 3.
lmcdowall
Typewritten Text
lmcdowall
Typewritten Text
Page 12: 922 Machin Avenue Novato, CA 94945

PUBLIC WORKS

1

“The mission of the Public Works Department is to provide top quality programs, projects and services through the design, construction, maintenance and

operation of public use facilities.”

City Council Work Session

FY 2016/17 Operating Budget

April 26, 2016

12

lmcdowall
Typewritten Text
L-4 4.
lmcdowall
Typewritten Text
lmcdowall
Typewritten Text
lmcdowall
Typewritten Text
Page 13: 922 Machin Avenue Novato, CA 94945

2

Expenditures /Transfers Out

Revenues /Transfers In

General Fund Investment

Department Total $6,821,328 $986,100 $5,835,228

Central Admin$1,896,586

7% Admin Services$2,588,026

9%

Citywide Programs$2,151,923

8%

Police$13,499,623

48%

Community Development

$755,513 3%

Public Works$5,835,228

21%

Parks, Recreation & Community Services

$1,190,857 4%

13

Page 14: 922 Machin Avenue Novato, CA 94945

PUBLIC WORKS DIRECTOR / CITY ENGINEER

Public Works Administrative Manager

ManagementAnalyst

Office Assistant II

Maintenance Superintendent

Maintenance Supervisor (2.0 FTE)

Senior Maintenance Worker

(7.0 FTE)

MaintenanceWorker

(17.0 FTE)

Facilities Maintenance Supervisor

SeniorCustodian

Custodian

(5.0 FTE)

Equipment Maintenance Supervisor

Senior EquipmentTechnician

Equipment Technician

Office Assistant II

Engineering Manager

Senior Civil Engineer

Assistant Engineer(3.0)

Engineering Project Coordinator (2.0)

PW Inspector (2.0)

3

Limited Term

14

Page 15: 922 Machin Avenue Novato, CA 94945

4

• grants/funding

• project mgmt

• eng studies

• environmental

• public outreach

• final design

• construction eng

• MVMCC projects

CAPITAL IMPROVEMENT PROJECTS

• development standards

• land development proposal processing

• survey map review

• agreements/bonds

• ROW

PRIVATE DEVELOPMENT

• levee accreditation

• studies

• FEMA

• CRS flood insurance rating

• storm drain master planning

• NPDES

STORM WATER/ FLOODPLAIN MGMNT

• permit processing & utility coordination

• construction inspection

• traffic engineering

• service request tracking

• streetlight maintenance

PERMITTING, INSPECTIONS & TRAFFIC ENG

• contract services

• assessment district mgmt

• lease agreements

• deferred maint mgmt

• technology initiatives

• personnel

PUBLIC WORKS ADMIN

15

Page 16: 922 Machin Avenue Novato, CA 94945

5

• 152 road miles maintained

• 16 sweeper zones serviced every 8 weeks

• sidewalk & street repair and maintenance

• 3 FTEs

• 1 FTE Street Sweeper

STREETS

• striping for 14 parking lots

• striping for all city intersections

• 750 graffiti incidents per year

• 2 FTEs

• 1 FTE Graffiti

STRIPING & SIGNAGE

• 144 miles of storm drains maintained

• 5500 storm drain inlets inspected annually

• 9 creeks walked, inspected and cleaned annually

• 2 FTEs

• 1 FTE Ham CFD

NPDES

• 115 acres of active-use parks

• 14 playgrounds

• 9 maintained athletic fields

• 184 plus acres of open space maintenance

• 8 FTEs

PUBLIC PARKS

• 90 acres of roadway islands

• 460 islands

• seasonal & annual IPM applications

• 3 FTEs and

• 2 FTE Pt Marin CFD

• 2 FTE Ham CFD

MEDIAN ISLANDS

BUILDING MAINTENANCE / CUSTODIAL : 7 FTEs / FLEET & EQUIPMENT MAINTENANCE: 3 FTEs

16

Page 17: 922 Machin Avenue Novato, CA 94945

7

Before PCI = 47

After PCI = 91

Streets / Roads

“California cities and counties own and operate 81 percent of the state’s roads … The report shows that pavement conditions are deteriorating throughout California, and that while the costs are high for even the most basic repair and maintenance, the price tag for waiting is far higher, from both an economic and a public safety standpoint. Simply put: Pay now – or pay much more later.”

2013 Western City Magazine

History of Street Maintenance Investment1989 – $16M in bonds (Measure F)2000 – $15M in bonds (Measure B)2003 – Marin County Local Streets Measure A Since 2008 recession:

-30% Reductions in street maint. crew-30% Decline in gas tax funding-FS Plan = $300k annual commitment

17

Page 18: 922 Machin Avenue Novato, CA 94945

818

Page 19: 922 Machin Avenue Novato, CA 94945

9

Parks / IslandsParks are community assets, and as such, the potential impact of a neighboring park is a strong consideration as part of the decision to purchase, invest or finance a property. Capital improvements in parks can result in increases to both commercial and residential real

estate value. Single-family home sale prices in close proximity to well improved parks typically exceeded

sale prices further from the park. Close proximity to a quality park is a positive site attribute that can enhance the “curb appeal”

and value of adjacent real estate.

From “How Smart Parks Investments Pays Its Way” Ernst & Young 2002 Study NYC

19

Page 20: 922 Machin Avenue Novato, CA 94945

1020

Page 21: 922 Machin Avenue Novato, CA 94945

Completed Nave Drive Multi-Use Path

Completed Measure A projects including:• 25 street segments paved (over 5 miles)

• 30 new ADA ramps installed

• 55 sidewalk trip hazards repaired/replaced

Cleaned sections of Hamilton and Pacheco Creeks

Received Caltrans approval for Olive Ave Class II Bike Lanes and for DeLong and Ignacio Interchanges Repaving project –construction scheduled for this summer.

Commenced design work for Grant Ave Bridge (at Novato Creek) rehabilitation

21

Page 22: 922 Machin Avenue Novato, CA 94945

Completed Hamilton Levee Re-CertificationCompleted design for Hamilton Levee Toe

Drain – construction this summerContinued deferred maintenance at parks

and facilities per the Condition Assessment reports (benches, paths, bollards, MTSC and Hamilton CC)

DeLong Avenue Median island landscaping rehabilitation project

Completed LED conversion of all 4,000 City Street Lights

Completed HVAC replacement at Hill GymHill Field turf renovationReplaced all lights at IVC BallfieldsLaunched preparation of Master Plan for Hill

Recreation Area22

Page 23: 922 Machin Avenue Novato, CA 94945

Completed Storm Drain Master Plan

Developed and Adopted ADA Transition Plan for Facilities and Parks

Secured $317,862 and $30,000 from TFCA and TDA respectively for Bike Lanes on Lamont Ave

Awarded $348,000 in Lifeline Trans Program funds for Crosswalk Enhancements and sidewalk gap closures

Received $45,690 P-TAP Round 17 grant funding to inspect and rate Novato’s streets

23

Page 24: 922 Machin Avenue Novato, CA 94945

Recertification and continued participation in CRS Flood Insurance Program

Coordination with County of Marin in Novato Creek Watershed Study

Outreach regarding new NPDES regulations

Installed high-visibility crosswalks with funds from Safe Pathways to Schools on Ignacio Boulevard and on South Novato Boulevard

Provide staff support to Council-appointed committees:

• Bicycle/Pedestrian Advisory Committee

• Novato Streetscape Committee

• Street Improvement Oversight Advisory Committee

Provide staff support to other committees:

• North Bay Watershed Advisory Committee

• TAM Safe Routes to Schools24

Page 25: 922 Machin Avenue Novato, CA 94945

15

CHALLENGES OPPORTUNITIES

Aging infrastructure and community assets with increasing repairs and maintenance needs

Working with Marin County Flood Control on the Novato Watershed improvements for long term flood control

Declining funding sources for maintenance and reinvestment in infrastructure

Integration with SMART and Marin Transit for community connections and access to public transportation

Low staffing levels for parks/islands and street maintenance that reduce ability to deliver quality services

Collaboration with North Bay agencies on storm water compliance monitoring and reporting

Increased storm water regulationsrequiring increased staff oversight and coordination

Strengthen partnerships to reduce the impact of homelessness on water quality and trash within our watershed

Lack of current software systems to allow efficient and effective deployment and management of services/systems

Build trust through successful project delivery to support future funding methods of needed public projects

25

Page 26: 922 Machin Avenue Novato, CA 94945

Operating Requests Amount Funding

Park and Field Maintenance ServicesIncrease contract services funding to maintain Novato’s recreation fields (e.g., pest management)

$15,000General Fund

(ongoing)

Building MaintenanceIncrease supplies, repairs, maintenance funding for citybuildings, including Civic Center, MTSC, Gym/DRC, and Hamilton facilities.

$20,000General Fund

(ongoing)

Skid Steer and Equipment AttachmentsReplace 1983 skid steer tractor and upgrade attachments. Base tractor: $90,000; attachments: $80,000. Used by Parks and Streets crews for various projects including high-weed mowing on roadside edges and open space, brush clearing and debris cleanup, pavement and concrete demo and repair operations

$170,000Equipment

Replacement(one-time)

Skid Steer ReplacementAnnual set-aside to build replacement funds for skid steer. $12,000

General Fund(ongoing)

1626

Page 27: 922 Machin Avenue Novato, CA 94945

Operating Requests Amount Funding

Downtown Streets Team ContractPartnership with County of Marin and Sutter Health to fund nonprofit community cleaning services.

$45,000Measure F (one-time)

Engineering Contract ServicesCurrent development activity levels and NPDES requirements, combined with CIP project work, exceed the capacity of one Senior Civil Engineer.

$60,000General Fund

(one-time)

Tree ServicesAdditional funding for tree maintenance for damaged trees due to drought stress and pine borer damage.

$7,500General Fund

(one-time)

1727

Page 28: 922 Machin Avenue Novato, CA 94945

Special Initiative Requests Amount Funding

Pavement Crack Sealing ProgramMobilize crack-filling program for the purpose of raising Pavement Condition Index (PCI) from 69 to 70 on city streets.• 15 to 20 miles of local streets and roads treated

$125,000Measure F(one-time)

Parks Special and Seasonal Projects Mobilize special projects crews to complete various special and season parks and/or island improvements.• Hoog Park fencing and renovated picnic area• Enhanced Park Entry Landscape Planting and Mulching

Citywide• Focus on improved turf quality and irrigation efficiency• ADA access improvements

$250,000Measure F (one-time)

1828

Page 29: 922 Machin Avenue Novato, CA 94945

Personnel Requests Amount Funding

Custodial Workers1.5 FTE custodians to replace janitorial services contract at 922 Machin, new Hamilton Gym & Lu Sutton Childcare. Costs largely offset by eliminating janitorial contracts.

$14,000General Fund

(ongoing)

Maintenance WorkersTwo FTE maintenance workers. 4-yr ltd term positions.1 assigned to Streets1 assigned to Parks

$170,000Measure F(ongoing)

1929

Page 30: 922 Machin Avenue Novato, CA 94945

Public outreach and design for Vineyard Roadpavement rehabilitation

Complete environmental review of Novato Boulevard project

Implement Quiet Zones at SMART Crossings

Construct Transit Connection at San Marin Station

Coordinate Phase 1 construction with SMART for Downtown Train Station

Complete permitting and design for Olive Avenue (Redwood to Railroad) Improvements

Implement a first phase of Storm Drain Improvements from Master Plan

Complete concrete work for Measure A Group 8 and 9 pavement projects (~50 new ADA ramps)

Undertake ADA Transition Plan for Right-of-Way

Complete Pacheco Creek clean up30

Page 31: 922 Machin Avenue Novato, CA 94945

Continue deferred maintenance and capital renewal improvements per the Condition Assessment reports (Downtown Rec Center Roof, Police Dept lockers and carpets)

Complete repairs at three priority locations from Retaining Wall assessment report.

Finalize improvements for Dogbone Meadow Park, determine funding, bidding

Complete improvements of Two Parks in Bahia

Finalize Hill Rec Master Plan, determine funding, and develop Phase 1 improvement project for bidding

Citywide park enhancement projects31

Page 32: 922 Machin Avenue Novato, CA 94945

Apply for TFCA funding for bicycle and pedestrian improvements on Vineyard Road

Pursue grant funding for Downtown SMART Station Phase 2

Collaborate with MCSTOPP and other agencies on Prop 1 State Stormwater funding

Continue identification of Computerized Maintenance Management System (CMMS)requirements and implementation

Continue to work with SMART, TAM and Marin Transit on Public Transit Integration at Novato Stations

Complete the implementation of Fuel Management System

32

Page 33: 922 Machin Avenue Novato, CA 94945

Team Members participate in a volunteer work experience program.

Successful programs in San Rafael, Palo Alto and San Jose.

Each program is tailored for the specific community needs.

10 individual; work 4 hours/day

Debris clean-up; creek clean-up; beautification of downtown, parks, islands

Funding Partners

$75,000 – County of Marin

$30,000 – Sutter Health

$45,000 – City of Novato

Presentation by Downtown Streets Team in May

The mission of Downtown Streets Team (DST) is to eradicate homelessness by empowering homeless individuals to be part of the solution to homelessness. The model, which is largely based on peer-to-peer outreach, will recruit unhoused people from the project area to join the Team and begin their transition out of homelessness.

2333

Page 34: 922 Machin Avenue Novato, CA 94945

Complete installation of grant funded Crosswalk Improvements and continue to seek grants for additional installations

Annual public workshops with neighborhood Landscape Assessment Districts

Improved CIP public engagement and public noticing

Complete improvements on Arthur Street and Plum Street as part of Safe Pathways to Schools Grant program

Continue to provide staff support to Council-appointed committees

34

Page 35: 922 Machin Avenue Novato, CA 94945

QUESTIONS

Public Works

35

Page 36: 922 Machin Avenue Novato, CA 94945

CENTRAL ADMINISTRATION / ADMINISTRATIVE SERVICES / CITYWIDE

City Council Work Session

FY 2016/17 Operating Budget

April 26, 2016

The mission of the City of Novato is to provide excellent services and enrich the quality of life within

the community in a fiscally responsible manner.

36

Page 37: 922 Machin Avenue Novato, CA 94945

2

Expenditures /Transfers Out

Revenues /Transfers In

General Fund Subsidy

Central Admin $1,932,986 $36,400 $1,896,586

Admin Services $3,025,626 $437,600 $2,588,026

Citywide $2,219,423 $67,500 $2,151,923

Central Admin$1,896,586

7%

Admin Services$2,588,026

9%

Citywide Programs$2,151,923

8%

Police$13,499,623

48%

Community Development

$755,513 3%

Public Works$5,835,228

21%

Parks, Recreation & Community Services

$1,190,857 4%

37

Page 38: 922 Machin Avenue Novato, CA 94945

3

Central Administration: Receive policy direction from the City Council and direct and manage the

city organization Receive and coordinate legal support from the City Attorney and

administrative/record keeping support from City Clerk’s operation Oversee the City’s economic development program including the reuse of

Hamilton Provide community outreach and engagement in city operations and

initiatives; manage the City’s communication tools and resources Oversee the Marin Valley Mobile Country Club Oversee the Downtown Business Improvement District and coordinate

with DNBA

Administrative Services: Provide centralized internal support services to other City departments

through services of Human Resources, Risk Management, Information Technology and Finance

Manage business license program Assist the City Manager in management, accountability, and recognition

of the City organization’s work and accomplishments38

Page 39: 922 Machin Avenue Novato, CA 94945

4

Citywide Programs

Centralized budget area for expenditures that support all services/departments or are overall citywide investments / services

Managed by Central Administration and Administrative Services staff

Expenditures $2.2 million:

Liability insurance $635K

Animal control $600K

OPEB, required contribution and retiree medical $260K

Memberships and annual dues – TAM/LAFCO/GSA $210K

Clean Renewal Energy Bonds (CREBs) debt service $113K

TOT payment $160K

Personnel / cable casting / community sponsorships / miscellaneous $240K

39

Page 40: 922 Machin Avenue Novato, CA 94945

5

CITY COUNCIL

CITY MANAGER

Economic Development

Manager

Hamilton Base Reuse Director

Public Communications

Coordinator

Assistant City Manager

City Clerk

Executive Assistant / Deputy City Clerk

Application Support Technician

City Attorney (Contract)

Limited Term

40

Page 41: 922 Machin Avenue Novato, CA 94945

6

Management

Prepared a revenue ballot measure for Council’s consideration for the November 2015 election as outlined in the adopted Fiscal Sustainability Plan and provided public information

Developed strategy and information for labor negotiations for Council consideration

Developed information and process for Council decision on SMART Downtown Station

Continued protection of City’s revenue from dissolution of redevelopment and legal actions with the State of California

Advancing improvements in the City’s public engagement and outreach initiative

Public Communications

Produced three City newsletters in both English and Spanish and mailed to every Novato household

Worked with and provided support to the Downtown Novato Business Association, the Novato Chamber of Commerce and the Chamber’s Tourism Committee and Hispanic Chamber of Commerce to enhance business and visitor outreach

Developed a training program for City staff to create ADA-accessible documents

Secured translation and interpretation services in order to broaden the reach of City information.

Provided outreach assistance to City departments for CIP projects, current and advanced planning projects

Provided outreach assistance for community events

Developing improvements to public noticing, information and outreach as recommended in the City’s Public Engagement workshop

Strategic Plan Goal Accomplishments 41

Page 42: 922 Machin Avenue Novato, CA 94945

7

Economic Development

350 new high paying life science jobs - $100 million injection into local economy

Supported Calico (Google) locating facilities and jobs at the Buck Institute on Aging

1,300 new jobs – restoring employment back to pre-recession levels

100 Bio 2016 attendees – scientists and life science executives to visit the Buck Institute on Aging (June 10)

Supported BioMarin R&D and manufacturing expansion in Bel Marin Keys

Conducting marketing and outreach program for North Bay Life Science Association

Hamilton Reuse

Facilitated and expedited the entitlement processes to repurpose the historic Hamilton Hospital into an assisted living and memory care facility with $2 million purchase price for City

Facilitated the Hamilton Cottages senior housing project with $500,000 purchase price for City

Completed the Hamilton Lands to Parks Exchange with the federal government

City Clerk

Implemented online Boards and Commissions solution and administered annual recruitment process

Elections Official for eight candidates in 2015 City Council election

Arranged new Councilmember and Boards and Commissions Orientations

Strategic Plan Goal Accomplishment42

Page 43: 922 Machin Avenue Novato, CA 94945

8

Operating Requests Amount Funding

Continuation of the Bio Life Science business retention and recruitment initiativeContinue funding to support the expansion of high-paying jobs.

$100,000(one-time)

Measure F

Funding for public outreach and engagement programProvide additional funding for public outreach, including translators, graphic design, copy writing, advertising, 2 mailed newsletters annually, production and mailing of planning and capital projects noticing (including on-site signs).

$58,000(ongoing)

General Fund

43

Page 44: 922 Machin Avenue Novato, CA 94945

9

Personnel Requests Amount Funding

Continuation of Hamilton Base Re-Use InitiativeContinue funding through December 31, 2018 to conduct a community process for the redevelopment of available City-owned properties in Hamilton. Includes Hamilton Base Re-Use Director position (currently approved through December 31, 2016).

$95,000(limited term

through12/31/18)

Measure F

Enhance Public Communication, Engagement, and Outreach Services to the Novato CommunityPublic Communications / Webmaster (Management Analyst) position to support public outreach and engagement program.

$90,000(four year

limited term)

Measure F

44

Page 45: 922 Machin Avenue Novato, CA 94945

Management Continue focus on enhancing public engagement, accessibility and transparency Additional goals from upcoming Strategic Plan workshopPublic Communications Work with City departments to improve and maximize the effectiveness of City public noticing—including

process, format, and content Research and recommend open data software for City information plus other public outreach tools Develop a training program to aid City staff with community outreach, community meetings, public

engagement, and communication planning Continue to improve the access to information and navigability of the City website Facilitate the translation of frequently-used city forms and documentsEconomic Development 150 new high paying life science jobs ($43 Million in new spending and 375 additional new jobs) Support increased California state funding for life science research with institutions like the Buck Institute

on Aging Focus outreach to 2,200 Bay Area life science executives through NBLSA website and social media

marketing campaign Promotion and expansion of life science education and training at Novato’s Indian Valley Campus, Marin

and the North Bay Conduct 10 events and tours of the Buck Institute and the North Bay Continue to expand NBLSA support among other governmental entities and the private sector Expand the City’s outreach and assistance to other industry small and med-size businesses Develop a multi-facted business retention program in partnership with the Novato Chamber of Commerce

and the Hispanic Chamber of Commerce

10Strategic Plan Goal45

Page 46: 922 Machin Avenue Novato, CA 94945

11

Hamilton Reuse

Complete the entitlement processes for repurposing the historic Hamilton Hospital into an assisted living and memory care facility and for the Hamilton Cottages senior housing project.

Gain Council approval for disposition strategies for the Hamilton Lands to Parks Exchange properties and proceed accordingly.

City Clerk

Implement Agenda Management solution

Develop RFP for Electronic Document Management System

Initiate development of an email retention policy

Update Records Retention Schedule

Strategic Plan Goal46

Page 47: 922 Machin Avenue Novato, CA 94945

12

ASSISTANT CITY MANAGER

Human Resources Manager

Principal HR Analyst

HR Analyst

HR Assistant

Finance Manager

Accounting Supervisor

Payroll / Accounting Technician

Senior Accounting Assistant

Accounting Assistant II

Technology Manager

Network Administrator

SeniorIT Analyst

IT BusinessAnalyst

GIS Technician (vacant)

Information Technology

Assistant

Management Analyst I/II

Limited Term

47

Page 48: 922 Machin Avenue Novato, CA 94945

13

Human Resources / Risk Management Research, prepare and negotiate with all labor groups for new agreements effective 7/1/2016

Constructed an employee web portal for HR resources, benefits, etc

Conducted recruitments resulting in 28 newly hired employees during calendar year 2015.

Implemented web-based safety training available via BCJPIA.

Conducted first ever Wellness Fair and hosted bimonthly wellness events including Bike to Work Day and several activities aimed at educating employees about their health and wellness benefits.

Hosted the annual employee holiday celebration and employee recognition events, including a reception to celebrate employee tenure in January 2016.

Finance Selected a consultant to complete a detailed RFP development and selection process for a new

finance / HR / payroll enterprise software solution

Continued Successor Agency post redevelopment initiatives

Implemented new Business License software and online Business License renewals

Updated the City’s financial policies with completion of Reserve Policy and adoption of Purchasing Policy / Ordinance

Implemented GASB 68 reporting requirements for pension costs and liabilities within the City’s Comprehensive Annual Financial Report

Strategic Plan Goal Accomplishment 48

Page 49: 922 Machin Avenue Novato, CA 94945

14

Information Technology

Supported departments in researching and planning a variety of technology projects as outlined in the IT Master Plan including:

Selection of new Parks and Recreation software system

Development of RFP for Finance/HRIS software system

Developed and launched a new employee Intranet

Implemented new Mobile Device Management platform to support and protect all City mobile devices

Upgraded GIS & developed several new internal use applications - partnership with Marin Map

Implemented new Police Department Virtualization – Storage Area Network

Updated the City’s Information Technology policies and procedures

Completed review and refinement of the City telecommunication services billing

Migrated the City’s hosted email services to Microsoft Office 365

Replaced obsolete copiers with new Xerox Multi-Function Devices and renegotiated the contracts

Implemented new IT Help Desk system

Strategic Plan Goal Accomplishments 49

Page 50: 922 Machin Avenue Novato, CA 94945

15

Operating Requests Amount Funding

Employee Recognition / InnovationImplementation of Employee Recognition / Innovation Program

$30,000(ongoing)

General Fund

Citywide Programs and PartnershipsPossible increased mandatory contributions to regional agencies (MGSA, Animal Control, MERA, Chamber)

$20,000 (ongoing)

General Fund

Citywide Liability InsuranceAnticipated increase in general liability insurance premium. Can be offset in FY 16/17 with excess Bay Cities premiums.

$40,000(ongoing)

General Fund

IT Replacement FundEstablish IT equipment replacement fund. Move existing funding that has already been accumulating for multiple existing pieces of technology to a dedicated technology replacement fund.

$400,000 (one-time)

Transfer existingfunds from Equipment

Replacement to new IT

Replacement Fund50

Page 51: 922 Machin Avenue Novato, CA 94945

Human Resources / Risk Management Develop comprehensive employee communication, engagement, recognition, and team building

program

Overhaul the City’s evaluation system including new software for improved tracking and communication with supervisors and employees

Research options for Human Resources Information System with new Finance system

Provided training for supervisor/managers on core management skills including coaching & communication

Streamline and improve internal processes for workers’ comp

Finance Manage the implementation of the enterprise financial/accounting system to improve efficiency,

financial management, and access to information

Revise the business license renewal process for January 2017 to maximize processing efficiencies; cross train Finance division staff on new software

Conduct and implement a development impact fee study

Re-finance four series of bonds: 2005, 2005A, and 2011 redevelopment bonds and the Pointe Marin CFD bonds

Research and implement an open data / open budget platform on the City’s website to provide detailed and timely budget / expenditure information to the public

Research and implement a “pension rate stabilization” trust program16Strategic Plan Goal51

Page 52: 922 Machin Avenue Novato, CA 94945

17

Information Technology

Continue to support departments in a variety of technology projects as outlined in the IT Master Plan

• Select a new Financial System / ERP with Finance

• Select a new Registration and Facility use System with PRCS

• Select a new Computerized Maintenance Management System with Public Works

• Select a new agenda management system with City Clerk

• Develop new GIS applications for mobile, public website and staff use

• Complete the digitizing of all remaining microfiche records with Community Development

• Complete the installation of a new Fuel Management System with Public Works

• Complete the document scanning and indexing project

Continue to update City Information Technology policies and procedures

Implement OneDrive & SharePoint team and project collaboration sites

Implement Skype for Business web meeting and collaboration tools

Strategic Plan Goal 52

Page 53: 922 Machin Avenue Novato, CA 94945

QUESTIONS

Central Administration/Administrative Services/Citywide

53