3b. firm’s references relevant services …. firm’s references relevant services carried out in...

11
3B. FIRM’S REFERENCES Relevant Services Carried Out in the Last Five Years That Best Illustrate Qualifications Firm’s Name: MES Engineering consultancy Limited Consulting Authorized Signature: Assignment Name: The Proposed Design And Construction Supervision o f AVIC Town-Phase 1 Country: United Republic Of Tanzania Location within Country: Armani Beach Dar Es Salaam Professional staff Provided by Your Firm/Entity/(Profiles):Electrical, Mechanical Engineers & ICT Engineers Name of Client: AVIC Town No of Staff: 5 Address: Longido Street Plot No. 406 Upanga – Dar es Salaam No of Staff – Months; Duration of Assignment: : on going Start Date (Month/Year): March 2014 Completion Date (Month/Year): on going Approx. Value of Services (in Current Tshs or US$): TSh 150 Billion Name of Associated Consultans, If Any: Space- in- Space Architects Ltd No of Months of Professional Staff provided by Associated Consultants: 3 Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed Eng. Gervas. Gervas Eng. Elivs. Ngowi Eng. Sakina Mohamed Isaac Chanzi Mohamedy Sakila (Team Leader service), (Mechanical Eng.) (Electrical Eng.) (ICT Engineer), (Ass Mechanical Engineer) Narrative description of Project: The site is located thirty (25) kilometers from the Ferry. The project consists of 104 bangalows, and 58 double storey houses. The power will be distributed through underground cable. The main sources of water is boreholes which will be pumped to elevated tanks and distributed to the constructed house by gravity systerm . There are road construction ongoing works with expectation of a clear tarmac road reaching the site. The site is enclosed by two access roads leading to Changani Beach on the Western side and Amani beach on the Eastern side. (Caption 01). Description of actual services provided by your Staff: Designing and supervision of Electrical system 104 bungalows and 58 double storages houses and structured cabling and security installations Design and supervision of Mechanical system for 104 bungalows and 58 double storages houses, design of fire detection , alarm system, plumbing and drainage Design of the conference centres and solar water heating system.

Upload: nguyenphuc

Post on 27-May-2018

227 views

Category:

Documents


1 download

TRANSCRIPT

3B. FIRM’S REFERENCES Relevant Services Carried Out in the Last Five Years

That Best Illustrate Qualifications

Firm’s Name: MES Engineering consultancy Limited Consulting

Authorized Signature:

Assignment Name: The Proposed Design And Construction Supervision o f AVIC Town-Phase 1

Country: United Republic Of Tanzania

Location within Country: Armani Beach Dar Es Salaam

Professional staff Provided by Your Firm/Entity/(Profiles):Electrical, Mechanical Engineers & ICT Engineers

Name of Client: AVIC Town

No of Staff: 5

Address: Longido Street Plot No. 406 Upanga – Dar es Salaam

No of Staff – Months; Duration of Assignment: : on going

Start Date (Month/Year): March 2014

Completion Date (Month/Year): on going

Approx. Value of Services (in Current Tshs or US$): TSh 150 Billion

Name of Associated Consultans, If Any: Space- in- Space Architects Ltd

No of Months of Professional Staff provided by Associated Consultants: 3

Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed Eng. Gervas. Gervas Eng. Elivs. Ngowi Eng. Sakina Mohamed Isaac Chanzi Mohamedy Sakila

(Team Leader service), (Mechanical Eng.) (Electrical Eng.) (ICT Engineer), (Ass Mechanical Engineer)

Narrative description of Project: The site is located thirty (25) kilometers from the Ferry. The project consists of 104 bangalows, and 58 double storey houses. The power will be distributed through underground cable. The main sources of water is boreholes which will be pumped to elevated tanks and distributed to the constructed house by gravity systerm . There are road construction ongoing works with expectation of a clear tarmac road reaching the site. The site is enclosed by two access roads leading to Changani Beach on the Western side and Amani beach on the Eastern side. (Caption 01). Description of actual services provided by your Staff:

• Designing and supervision of Electrical system 104 bungalows and 58 double storages houses and structured cabling and security installations

• Design and supervision of Mechanical system for 104 bungalows and 58 double storages houses, design of fire detection , alarm system, plumbing and drainage

• Design of the conference centres and solar water heating system.

3B. FIRM’S REFERENCES Relevant Services Carried Out in the Last Five Years

That Best Illustrate Qualifications

Firm’s Name: MES Engineering consultancy Limited Consulting

Authorized Signature:

Assignment Name: Tanzania National Re Insurance Corporation (TANRE)

Country: United Republic Of Tanzania

Location within Country: DAR ES SALAAM Professional staff Provided by Your Firm/Entity/(Profiles):Electrical, Mechanical Engineers & ICT Engineers

Name of Client: Tanzania National Re Insurance Corporation (TANRE)

No of Staff: 5

Address: Longido Street Plot No. 406 Upanga – Dar es Salaam

No of Staff – Months; Duration of Assignment: : 36 Months

Start Date (Month/Year): March 2012

Completion Date (Month/Year): Dec 2015

Approx. Value of Services (in Current Tshs or US$): TSh 18 Billion

Name of Associated Consultans, If Any: M/S Arqes Africa Architects And Interior Designers Ltd

No of Months of Professional Staff provided by Associated Consultants: 18

Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed Eng. Gervas. Gervas Eng. Elivs. Ngowi Eng. W. Chiwawa Isaac Chanzi Edson Ruangisa

(Team Leader service), (Mechanical Eng.) (Electrical Eng.) (ICT Engineer), (Ass Mechanical Engineer)

Narrative description of Project: A multi-storey building (16 levels), two levels of basement for car parking, ground and other 13 floors with overall approximate gross floor area of 10,000 square meters. Associated external works, parking area, walkways, soft landscaping and boundary wall. Associated building engineering and services installations that is, Electrical, Air-conditioning and Mechanical Ventilation, Structured Cabling, Lifts, Security and Plumbing and drainage system. In particular, electrical installation shall comprise inter alia supply, installation, testing and commissioning of distribution transformer, prime rated generator, LV switchboard, panel boards, distribution boards and cabling. Others include cable management systems, modern high efficacy lights, switching accessories and power outlets

Description of actual services provided by your Staff: • Designing and supervision of Electrical system and structured cabling and security installations • Design and supervision of Mechanical system, design of fire detection , alarm system, plumbing and

drainage • Design if lifts and Air conditioning

3B. FIRM’S REFERENCES Relevant Services Carried Out in the Last Five Years

That Best Illustrate Qualifications

Firm’s Name: MES Engineering consultancy Limited Consulting

Authorized Signature:

Assignment Name: Proposed Construction Of Parrot Hotel On Plot No. 48 Block 21 Kaloleni Arusha

Country: United Republic of Tanzania

Location within Country: Arusha City Professional staff Provided by Your Firm/Entity/(Profiles): Design Eng Electrical Engineers, mechanical Engineers ICT Engineers

Name of Client: Parrot HOTEL No. of Staff: 3

Address: ARUSHA

No. of Staff-Months, Duration of Assignment: on going

Start Date (Month/Year): March 2009

Completion Date (Month/Year): on going

Approx. Value of Services

TZS 20 BILLION Name of Associated Consultants, If Any: M/S Y&P Architects limited

No. of Months of Professional Staff Provided by Associated Consultants:- 3

Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed Eng. Gervas. Gervas Eng. Elivs. Ngowi Eng. W. Chiwawa Isaac Chanzi Edson Ruangisa

(Team Leader service), (Mechanical Eng.) (Electrical Eng.) (ICT Engineer), (Ass Mechanical Engineer)

Narrative description of Project: 126 rooms 15floors 3 Stars Hotel building is located on Plot No 48 Block 21 Kaloleni Arusha, the scope of the project include Designing and construction supervision of Electrical system, fire detection and alarm system, lift, Plumbing and drainage, Air conditioning, structured cabling, IPTV, music and security installations. The building meets all the requirements of British Standards and UK Building Regulations as well as of the rigorous developer’s specification.

Description of actual services provided by your Staff: • Detailed engineering design and Supervision of building construction for electrical services which includes

power, lighting and IPTV, music and security installations • Detailed engineering design and Supervision of building construction for mechanical services includes

Plumbing and drainage, Air conditioning and fire detection and alarm systems. • Supervision of building services installations. Commissioning of all services

3B. FIRM’S REFERENCES Relevant Services Carried Out in the Last Five Years

That Best Illustrate Qualifications

Firm’s Name: MES Engineering consultancy Limited Consulting

Authorized Signature:

Assignment Name: Mnazi Bay and Songosongo Natural Gas Processing Plats

Country: United Republic Of Tanzania

Location within Country: Amani Beach-Mtwara

Professional staff Provided by Your Firm/Entity/(Profiles):Electrical, Mechanical Engineers & ICT Engineers

Name of Client: TPDC and China Petroleum Engineering Company Limited

No of Staff: 3

Address: Manazi bay Gas field Camp

No of Staff – Months; Duration of Assignment: : 2Months

Start Date (Month/Year): March 2012

Completion Date (Month/Year): on going

Approx. Value of Services (in Current Tshs or US$): TSh 5 Billion

Name of Associated Consultans, If Any: China Petroleum Engineering Company Limited

No of Months of Professional Staff provided by Associated Consultants:

Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed Eng. Gervas. Gervas Eng. Elivs. Ngowi Eng. Sakina Mohamed

(Team Leader service), (Mechanical Eng.) (Electrical Eng.)

Narrative description of Project: The site is located thirty (30) kilometers from the Ferry. The main road is tarmacked apart from five (5) km from the site. There are road construction ongoing works with expectation of a clear tarmac road reaching the site. The site is enclosed by two access roads leading to Changani Beach on the Western side and Amani beach on the Eastern side. Each site has 16 staff houses and include reaction area and dinning buildings. Water to the proposed buildings is from disallination process then pumped to the elevated tanks. The sorces of power to these houses are from diesel generators Description of actual services provided by your Staff: • Detailed engineering design and Supervision of building construction for electrical services which includes

power, lighting and IPTV, music and security installations • Detailed engineering design and Supervision of building construction for mechanical services includes

Plumbing and drainage, Air conditioning and fire detection and alarm systems.

3B. FIRM’S REFERENCES Relevant Services Carried Out in the Last Five Years

That Best Illustrate Qualifications

Firm’s Name: MES Engineering consultancy Limited Consulting

Authorized Signature:

Assignment Name: The Proposed apartments on Plot 1207 Masaki Msasani peninsula for Transcargo limited

Country: United Republic Of Tanzania

Location within Country: Dar es salaam regional

Professional staff Provided by Your Firm/Entity/(Profiles):Electrical, Mechanical Engineers & ICT Engineers

Name of Client: Transcargo limited

No of Staff: 5

Address: P.o.Box: 40920 dar es salaam

No of Staff – Months; Duration of Assignment: : 18 Months

Start Date (Month/Year): March 2008

Completion Date (Month/Year): on going

Approx. Value of Services (in Current Tshs or US$): TSh 15 Billion

Name of Associated Consultans, If Any: Tharan Associates, P.O.Box:1008 dar es salaam

No of Months of Professional Staff provided by Associated Consultants: 18 Months

Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed Eng. Gervas. Gervas Eng. Elivs. Ngowi Eng. Sakina Mohamed Isaac Chanzi Edson Ruangisa

(Team Leader service), (Mechanical Eng.) (Electrical Eng.) (ICT Engineer), (Ass Mechanical Engineer)

Narrative description of Project: The project is located along Plot No. 1207 Yacht Club Road Msasani Peninsular Dar Es Salaam. It consists of five storeys (G+Mz+6) and is intended for both commercial and residential use. There are apartments and business areas. Description of actual services provided by your Staff:

• The project shall consist of a dedicated transformer, 11/0.4kV 200kVA and a diesel powered generator of the same capacity. Each apartment will have its own meter and distribution board.

• Lighting will be by modern compact fluorescent lights. • Air-conditioners will be split units. • The installation shall also include telephone, data and security systems.

3B. FIRM’S REFERENCES Relevant Services Carried Out in the Last Five Years

That Best Illustrate Qualifications

Firm’s Name: MES Engineering consultancy Limited Consulting

Authorized Signature:

Assignment Name: Proposed 50MW Diesel power plant

Country: United Republic of Tanzania

Location within Country: Njiro Arusha Professional staff provided by Your Firm/Entity/ (Profiles): Design Eng Electrical Engineers, mechanical Engineers ICT Engineers

Name of Client: Symbion Power (T) Ltd No. of Staff: 2 Address: DAR ES SALAAM

No. of Staff-Months, Duration of Assignment: 6Month

Start Date (Month/Year): 2012

Completion date (Month/Year): COMPLETED

Approx. Value of Services

TZS 100 BILLION

Name of Associated Consultants, If Any:

No. of Months of Professional Staff Provided by Associated Consultants:

Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed

Eng. Gervas. Gervas Eng. Elivs. Ngowi

(Team Leader service), (Mechanical Eng.)

Narrative description of Project:

50 MW of diesel-fired temporary generators at installed at nyiro Arusha to provides power to the greater Arusha community.

Description of actual services provided by your Staff: • Detailed engineering design and Supervision of building construction. • Supervision of building services installations. Commissioning of all services

3B. FIRM’S REFERENCES Relevant Services Carried Out in the Last Five Years

That Best Illustrate Qualifications

Firm’s Name: MES Engineering consultancy Limited Consulting

Authorized Signature:

Assignment Name: Proposed Construction of For VETA at SONGEA RUVUMA

Country: United Republic of Tanzania

Location within Country: SONGEA RUVUMA REGIONAL

Professional staff provided by Your Firm/Entity/ (Profiles): Design Eng Electrical Engineers, mechanical Engineers ICT Engineers

Name of Client:

No. of Staff: 5

Address: SONGEA RUVUMA REGIONAL

No. of Staff-Months, Duration of Assignment: 6Month

Start Date (Month/Year): 2011

Completion date (Month/Year): COMPLETED

Approx. Value of Services

TZS 450 MILLION Name of Associated Consultants, If Any:

Sky Architects Consultants No. of Months of Professional Staff Provided by Associated Consultants:

Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed

Eng. Gervas. Gervas Eng. Elivs. Ngowi Eng. W. Chiwawa Isaac Chanzi Edson Ruangisa

(Team Leader service), (Mechanical Eng.) (Electrical Eng.) (ICT Engineer), (Ass Mechanical Engineer)

Narrative description of Project: The Vocational Educational and Training Authority (VETA)- VETA songea is implementing a project in which it is undergoing new construction building by constructing a number of structures: Construction of buildings include computer class rooms and, Library and Computer laboratory,the building services include Sewerage system and storm water system Installation of services i.e. electrical and mechanical The Consultant was required to provide design and supervision services of the project. The aim is to provide assistance to the Client in designing works and ensuring that the construction works are carried out in accordance to standard requirements Description of actual services provided by your Staff: - Feasibility study, Prepare detailed design for building services and Preparation of bidding documents - Supervision of construction, Supervision of building services installations and Commissioning of all services

3B. FIRM’S REFERENCES Relevant Services Carried Out in the Last Five Years

That Best Illustrate Qualifications

Firm’s Name: MES Engineering consultancy Limited Consulting

Authorized Signature:

Assignment Name: Proposed Interior Design Of Azania Bank Limited- Arusha Branch

Country: United Republic of Tanzania

Location within Country: Arusha City Professional staff Provided by Your Firm/Entity/(Profiles): Electrical & Mechanical Engineers

Name of Client: AZANIA BANK LIMITED

No. of Staff: 3

Address: DAR ES SALAAM No. of Staff-Months, Duration of Assignment: NINE WEEKS

Start Date (Month/Year): OCTOBER 2011

Completion date (Month/Year): FEBRUARY 2012

Approx. Value of Services

TZS 300 MILLION

Name of Associated Consultants, If Any:

No. of Months of Professional Staff Provided by Associated Consultants:

Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed

Eng. Gervas. Gervas Eng. Elivs. Ngowi

(Team Leader service), (Mechanical Eng.)

Narrative description of Project: As part of their country wide modernization plan Azania Bank Ltd are carried out a major refurbishment of their Arusha Branch. The modernization includes complete new interiors, new IT backbones, the replacement for the electrical systems, replacement of the air conditioning systems and new security. On completion the branch met international retail standards.

Description of actual services provided by your Staff: • Designing of Electrical system, fire detection and alarm system and structured

cabling and security installations • Designing of plumbing and drainage • Designing of air conditioning, • Supervision of building services installations. Commissioning of all services

3B. FIRM’S REFERENCES Relevant Services Carried Out in the Last Five Years

That Best Illustrate Qualifications

Firm’s Name: MES Engineering consultancy Limited Consulting

Authorized Signature:

Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed Eng. Gervas. Gervas Eng. Elivs. Ngowi

(Team Leader service), (Mechanical Eng.)

Assignment Name: Proposed Remodelling of Azania Bank Limited- Moshi Branch

Country: United Republic of Tanzania

Location within Country: MOSHI URBAN

Professional staff Provided by Your Firm/Entity/(Profiles): Electrical & Mechanical Engineers

Name of Client: AZANIA BANK LIMITED No. of Staff: 5 Address: DAR ES SALAAM

No. of Staff-Months, Duration of Assignment: NINE WEEKS

Start Date (Month/Year): OCTOBER 2011

Completion date (Month/Year): FEB, 2012

Approx. Value of Services

TZS 200 MILLION

Name of Associated Consultants, If Any:

No. of Months of Professional Staff Provided by Associated Consultants

Narrative description of Project: As part of their country wide modernization plan Azania Bank Ltd are carried out a major refurbishment of their Moshi Branch in Kilimanjaro. The modernization included complete new interiors, new IT backbones, the replacement for the electrical systems, replacement of the air conditioning systems and new security. On completion the branch met international retail standards.

Description of actual services provided by your Staff: • Designing of Electrical system, fire detection and alarm system and structured

cabling and security installations • Designing of plumbing and drainage • Designing of air conditioning, • Supervision of building services installations. Commissioning of all services

3B. FIRM’S REFERENCES Relevant Services Carried Out in the Last Five Years

That Best Illustrate Qualifications

Firm’s Name: MES Engineering consultancy Limited Consulting

Authorized Signature:

Assignment Name: Proposed Rehabilitation NIDA Data

Centre Country: United Republic of

Tanzania Location within Country: DAR ES SALAAM CITY

Professional staff Provided by Your Firm/Entity/(Profiles):Electrical Engineers

Name of Client: National Identifications Authority No. of Staff:2 Address: DAR ES SALAAM

No. of Staff-Months, Duration of Assignment:3

Start Date (Month/Year): OCT, 2011

Completion date (Month/Year):MAY 2012

Approx. Value of Services

TZS 1 BILLION Name of Associated Consultants, If Any:

No. of Months of Professional Staff Provided by Associated Consultants:

- Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed

Eng. Gervas. Gervas Eng. W. Chiwawa Isaac Chanzi

(Team Leader service), (Electrical Eng.) (ICT Engineer),

Narrative description of Project: Centre Data Centre, printing and sorting unit for National Identities Authority (NIDA) is implementing a project which will be office building: Construction of buildings structures namely, Library and Computer Block,office, the services offered include Sewerage system and storm water system Installation of services i.e. electrical and mechanical The Consultant was required to provide design and supervision services of the project. The aim is to provide assistance to the Client in designing works and ensuring that the construction works are carried out in accordance to standard requirements

Description of actual services provided by your Staff: • Designing of Electrical system, fire detection and alarm system and structured

cabling and security installations • Designing of plumbing and drainage • Designing of air conditioning, • Supervision of building services installations. Commissioning of all services

3B. FIRM’S REFERENCES Relevant Services Carried Out in the Last Five Years

That Best Illustrate Qualifications

Firm’s Name: MES Engineering consultancy Limited Consulting

Authorized Signature:

Assignment Name: Proposed Praia Hotel Country: United Republic of

Tanzania

Location within Country: Mtwara Municipality Professional staff Provided by Your Firm/Entity/(Profiles): Electrical & Mechanical Engineers

Name of Client: Praia Hotel Limited No. of Staff: 5 Address: MTWARA

No. of Staff-Months, Duration of Assignment: 8Months

Start Date (Month/Year): 2012

Completion date (Month/Year): OCTOBER 2012

Approx. Value of Services

TZS 750 MILLION Name of Associated Consultants, If Any:

No. of Months of Professional Staff Provided by Associated Consultants:

- Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed

Eng. Gervas. Gervas Eng. Elivs. Ngowi Eng. W. Chiwawa Isaac Chanzi Edson Ruangisa

(Team Leader service), (Mechanical Eng.) (Electrical Eng.) (ICT Engineer), (Ass Mechanical Engineer)

Narrative description of Project 36 room hotel accommodation, service block and recreation facilities, viz: gym, swimming pool,

Description of actual services provided by your Staff: • Designing of Electrical system, fire detection and alarm system and structured

cabling and security installations • Designing of plumbing and drainage • Building services co-ordination and supervision. • Supervision of construction. • Commissioning of all services.