3B. FIRM’S REFERENCES Relevant Services Carried Out in the Last Five Years
That Best Illustrate Qualifications
Firm’s Name: MES Engineering consultancy Limited Consulting
Authorized Signature:
Assignment Name: The Proposed Design And Construction Supervision o f AVIC Town-Phase 1
Country: United Republic Of Tanzania
Location within Country: Armani Beach Dar Es Salaam
Professional staff Provided by Your Firm/Entity/(Profiles):Electrical, Mechanical Engineers & ICT Engineers
Name of Client: AVIC Town
No of Staff: 5
Address: Longido Street Plot No. 406 Upanga – Dar es Salaam
No of Staff – Months; Duration of Assignment: : on going
Start Date (Month/Year): March 2014
Completion Date (Month/Year): on going
Approx. Value of Services (in Current Tshs or US$): TSh 150 Billion
Name of Associated Consultans, If Any: Space- in- Space Architects Ltd
No of Months of Professional Staff provided by Associated Consultants: 3
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed Eng. Gervas. Gervas Eng. Elivs. Ngowi Eng. Sakina Mohamed Isaac Chanzi Mohamedy Sakila
(Team Leader service), (Mechanical Eng.) (Electrical Eng.) (ICT Engineer), (Ass Mechanical Engineer)
Narrative description of Project: The site is located thirty (25) kilometers from the Ferry. The project consists of 104 bangalows, and 58 double storey houses. The power will be distributed through underground cable. The main sources of water is boreholes which will be pumped to elevated tanks and distributed to the constructed house by gravity systerm . There are road construction ongoing works with expectation of a clear tarmac road reaching the site. The site is enclosed by two access roads leading to Changani Beach on the Western side and Amani beach on the Eastern side. (Caption 01). Description of actual services provided by your Staff:
• Designing and supervision of Electrical system 104 bungalows and 58 double storages houses and structured cabling and security installations
• Design and supervision of Mechanical system for 104 bungalows and 58 double storages houses, design of fire detection , alarm system, plumbing and drainage
• Design of the conference centres and solar water heating system.
3B. FIRM’S REFERENCES Relevant Services Carried Out in the Last Five Years
That Best Illustrate Qualifications
Firm’s Name: MES Engineering consultancy Limited Consulting
Authorized Signature:
Assignment Name: Tanzania National Re Insurance Corporation (TANRE)
Country: United Republic Of Tanzania
Location within Country: DAR ES SALAAM Professional staff Provided by Your Firm/Entity/(Profiles):Electrical, Mechanical Engineers & ICT Engineers
Name of Client: Tanzania National Re Insurance Corporation (TANRE)
No of Staff: 5
Address: Longido Street Plot No. 406 Upanga – Dar es Salaam
No of Staff – Months; Duration of Assignment: : 36 Months
Start Date (Month/Year): March 2012
Completion Date (Month/Year): Dec 2015
Approx. Value of Services (in Current Tshs or US$): TSh 18 Billion
Name of Associated Consultans, If Any: M/S Arqes Africa Architects And Interior Designers Ltd
No of Months of Professional Staff provided by Associated Consultants: 18
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed Eng. Gervas. Gervas Eng. Elivs. Ngowi Eng. W. Chiwawa Isaac Chanzi Edson Ruangisa
(Team Leader service), (Mechanical Eng.) (Electrical Eng.) (ICT Engineer), (Ass Mechanical Engineer)
Narrative description of Project: A multi-storey building (16 levels), two levels of basement for car parking, ground and other 13 floors with overall approximate gross floor area of 10,000 square meters. Associated external works, parking area, walkways, soft landscaping and boundary wall. Associated building engineering and services installations that is, Electrical, Air-conditioning and Mechanical Ventilation, Structured Cabling, Lifts, Security and Plumbing and drainage system. In particular, electrical installation shall comprise inter alia supply, installation, testing and commissioning of distribution transformer, prime rated generator, LV switchboard, panel boards, distribution boards and cabling. Others include cable management systems, modern high efficacy lights, switching accessories and power outlets
Description of actual services provided by your Staff: • Designing and supervision of Electrical system and structured cabling and security installations • Design and supervision of Mechanical system, design of fire detection , alarm system, plumbing and
drainage • Design if lifts and Air conditioning
3B. FIRM’S REFERENCES Relevant Services Carried Out in the Last Five Years
That Best Illustrate Qualifications
Firm’s Name: MES Engineering consultancy Limited Consulting
Authorized Signature:
Assignment Name: Proposed Construction Of Parrot Hotel On Plot No. 48 Block 21 Kaloleni Arusha
Country: United Republic of Tanzania
Location within Country: Arusha City Professional staff Provided by Your Firm/Entity/(Profiles): Design Eng Electrical Engineers, mechanical Engineers ICT Engineers
Name of Client: Parrot HOTEL No. of Staff: 3
Address: ARUSHA
No. of Staff-Months, Duration of Assignment: on going
Start Date (Month/Year): March 2009
Completion Date (Month/Year): on going
Approx. Value of Services
TZS 20 BILLION Name of Associated Consultants, If Any: M/S Y&P Architects limited
No. of Months of Professional Staff Provided by Associated Consultants:- 3
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed Eng. Gervas. Gervas Eng. Elivs. Ngowi Eng. W. Chiwawa Isaac Chanzi Edson Ruangisa
(Team Leader service), (Mechanical Eng.) (Electrical Eng.) (ICT Engineer), (Ass Mechanical Engineer)
Narrative description of Project: 126 rooms 15floors 3 Stars Hotel building is located on Plot No 48 Block 21 Kaloleni Arusha, the scope of the project include Designing and construction supervision of Electrical system, fire detection and alarm system, lift, Plumbing and drainage, Air conditioning, structured cabling, IPTV, music and security installations. The building meets all the requirements of British Standards and UK Building Regulations as well as of the rigorous developer’s specification.
Description of actual services provided by your Staff: • Detailed engineering design and Supervision of building construction for electrical services which includes
power, lighting and IPTV, music and security installations • Detailed engineering design and Supervision of building construction for mechanical services includes
Plumbing and drainage, Air conditioning and fire detection and alarm systems. • Supervision of building services installations. Commissioning of all services
3B. FIRM’S REFERENCES Relevant Services Carried Out in the Last Five Years
That Best Illustrate Qualifications
Firm’s Name: MES Engineering consultancy Limited Consulting
Authorized Signature:
Assignment Name: Mnazi Bay and Songosongo Natural Gas Processing Plats
Country: United Republic Of Tanzania
Location within Country: Amani Beach-Mtwara
Professional staff Provided by Your Firm/Entity/(Profiles):Electrical, Mechanical Engineers & ICT Engineers
Name of Client: TPDC and China Petroleum Engineering Company Limited
No of Staff: 3
Address: Manazi bay Gas field Camp
No of Staff – Months; Duration of Assignment: : 2Months
Start Date (Month/Year): March 2012
Completion Date (Month/Year): on going
Approx. Value of Services (in Current Tshs or US$): TSh 5 Billion
Name of Associated Consultans, If Any: China Petroleum Engineering Company Limited
No of Months of Professional Staff provided by Associated Consultants:
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed Eng. Gervas. Gervas Eng. Elivs. Ngowi Eng. Sakina Mohamed
(Team Leader service), (Mechanical Eng.) (Electrical Eng.)
Narrative description of Project: The site is located thirty (30) kilometers from the Ferry. The main road is tarmacked apart from five (5) km from the site. There are road construction ongoing works with expectation of a clear tarmac road reaching the site. The site is enclosed by two access roads leading to Changani Beach on the Western side and Amani beach on the Eastern side. Each site has 16 staff houses and include reaction area and dinning buildings. Water to the proposed buildings is from disallination process then pumped to the elevated tanks. The sorces of power to these houses are from diesel generators Description of actual services provided by your Staff: • Detailed engineering design and Supervision of building construction for electrical services which includes
power, lighting and IPTV, music and security installations • Detailed engineering design and Supervision of building construction for mechanical services includes
Plumbing and drainage, Air conditioning and fire detection and alarm systems.
3B. FIRM’S REFERENCES Relevant Services Carried Out in the Last Five Years
That Best Illustrate Qualifications
Firm’s Name: MES Engineering consultancy Limited Consulting
Authorized Signature:
Assignment Name: The Proposed apartments on Plot 1207 Masaki Msasani peninsula for Transcargo limited
Country: United Republic Of Tanzania
Location within Country: Dar es salaam regional
Professional staff Provided by Your Firm/Entity/(Profiles):Electrical, Mechanical Engineers & ICT Engineers
Name of Client: Transcargo limited
No of Staff: 5
Address: P.o.Box: 40920 dar es salaam
No of Staff – Months; Duration of Assignment: : 18 Months
Start Date (Month/Year): March 2008
Completion Date (Month/Year): on going
Approx. Value of Services (in Current Tshs or US$): TSh 15 Billion
Name of Associated Consultans, If Any: Tharan Associates, P.O.Box:1008 dar es salaam
No of Months of Professional Staff provided by Associated Consultants: 18 Months
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed Eng. Gervas. Gervas Eng. Elivs. Ngowi Eng. Sakina Mohamed Isaac Chanzi Edson Ruangisa
(Team Leader service), (Mechanical Eng.) (Electrical Eng.) (ICT Engineer), (Ass Mechanical Engineer)
Narrative description of Project: The project is located along Plot No. 1207 Yacht Club Road Msasani Peninsular Dar Es Salaam. It consists of five storeys (G+Mz+6) and is intended for both commercial and residential use. There are apartments and business areas. Description of actual services provided by your Staff:
• The project shall consist of a dedicated transformer, 11/0.4kV 200kVA and a diesel powered generator of the same capacity. Each apartment will have its own meter and distribution board.
• Lighting will be by modern compact fluorescent lights. • Air-conditioners will be split units. • The installation shall also include telephone, data and security systems.
3B. FIRM’S REFERENCES Relevant Services Carried Out in the Last Five Years
That Best Illustrate Qualifications
Firm’s Name: MES Engineering consultancy Limited Consulting
Authorized Signature:
Assignment Name: Proposed 50MW Diesel power plant
Country: United Republic of Tanzania
Location within Country: Njiro Arusha Professional staff provided by Your Firm/Entity/ (Profiles): Design Eng Electrical Engineers, mechanical Engineers ICT Engineers
Name of Client: Symbion Power (T) Ltd No. of Staff: 2 Address: DAR ES SALAAM
No. of Staff-Months, Duration of Assignment: 6Month
Start Date (Month/Year): 2012
Completion date (Month/Year): COMPLETED
Approx. Value of Services
TZS 100 BILLION
Name of Associated Consultants, If Any:
No. of Months of Professional Staff Provided by Associated Consultants:
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed
Eng. Gervas. Gervas Eng. Elivs. Ngowi
(Team Leader service), (Mechanical Eng.)
Narrative description of Project:
50 MW of diesel-fired temporary generators at installed at nyiro Arusha to provides power to the greater Arusha community.
Description of actual services provided by your Staff: • Detailed engineering design and Supervision of building construction. • Supervision of building services installations. Commissioning of all services
3B. FIRM’S REFERENCES Relevant Services Carried Out in the Last Five Years
That Best Illustrate Qualifications
Firm’s Name: MES Engineering consultancy Limited Consulting
Authorized Signature:
Assignment Name: Proposed Construction of For VETA at SONGEA RUVUMA
Country: United Republic of Tanzania
Location within Country: SONGEA RUVUMA REGIONAL
Professional staff provided by Your Firm/Entity/ (Profiles): Design Eng Electrical Engineers, mechanical Engineers ICT Engineers
Name of Client:
No. of Staff: 5
Address: SONGEA RUVUMA REGIONAL
No. of Staff-Months, Duration of Assignment: 6Month
Start Date (Month/Year): 2011
Completion date (Month/Year): COMPLETED
Approx. Value of Services
TZS 450 MILLION Name of Associated Consultants, If Any:
Sky Architects Consultants No. of Months of Professional Staff Provided by Associated Consultants:
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed
Eng. Gervas. Gervas Eng. Elivs. Ngowi Eng. W. Chiwawa Isaac Chanzi Edson Ruangisa
(Team Leader service), (Mechanical Eng.) (Electrical Eng.) (ICT Engineer), (Ass Mechanical Engineer)
Narrative description of Project: The Vocational Educational and Training Authority (VETA)- VETA songea is implementing a project in which it is undergoing new construction building by constructing a number of structures: Construction of buildings include computer class rooms and, Library and Computer laboratory,the building services include Sewerage system and storm water system Installation of services i.e. electrical and mechanical The Consultant was required to provide design and supervision services of the project. The aim is to provide assistance to the Client in designing works and ensuring that the construction works are carried out in accordance to standard requirements Description of actual services provided by your Staff: - Feasibility study, Prepare detailed design for building services and Preparation of bidding documents - Supervision of construction, Supervision of building services installations and Commissioning of all services
3B. FIRM’S REFERENCES Relevant Services Carried Out in the Last Five Years
That Best Illustrate Qualifications
Firm’s Name: MES Engineering consultancy Limited Consulting
Authorized Signature:
Assignment Name: Proposed Interior Design Of Azania Bank Limited- Arusha Branch
Country: United Republic of Tanzania
Location within Country: Arusha City Professional staff Provided by Your Firm/Entity/(Profiles): Electrical & Mechanical Engineers
Name of Client: AZANIA BANK LIMITED
No. of Staff: 3
Address: DAR ES SALAAM No. of Staff-Months, Duration of Assignment: NINE WEEKS
Start Date (Month/Year): OCTOBER 2011
Completion date (Month/Year): FEBRUARY 2012
Approx. Value of Services
TZS 300 MILLION
Name of Associated Consultants, If Any:
No. of Months of Professional Staff Provided by Associated Consultants:
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed
Eng. Gervas. Gervas Eng. Elivs. Ngowi
(Team Leader service), (Mechanical Eng.)
Narrative description of Project: As part of their country wide modernization plan Azania Bank Ltd are carried out a major refurbishment of their Arusha Branch. The modernization includes complete new interiors, new IT backbones, the replacement for the electrical systems, replacement of the air conditioning systems and new security. On completion the branch met international retail standards.
Description of actual services provided by your Staff: • Designing of Electrical system, fire detection and alarm system and structured
cabling and security installations • Designing of plumbing and drainage • Designing of air conditioning, • Supervision of building services installations. Commissioning of all services
3B. FIRM’S REFERENCES Relevant Services Carried Out in the Last Five Years
That Best Illustrate Qualifications
Firm’s Name: MES Engineering consultancy Limited Consulting
Authorized Signature:
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed Eng. Gervas. Gervas Eng. Elivs. Ngowi
(Team Leader service), (Mechanical Eng.)
Assignment Name: Proposed Remodelling of Azania Bank Limited- Moshi Branch
Country: United Republic of Tanzania
Location within Country: MOSHI URBAN
Professional staff Provided by Your Firm/Entity/(Profiles): Electrical & Mechanical Engineers
Name of Client: AZANIA BANK LIMITED No. of Staff: 5 Address: DAR ES SALAAM
No. of Staff-Months, Duration of Assignment: NINE WEEKS
Start Date (Month/Year): OCTOBER 2011
Completion date (Month/Year): FEB, 2012
Approx. Value of Services
TZS 200 MILLION
Name of Associated Consultants, If Any:
No. of Months of Professional Staff Provided by Associated Consultants
Narrative description of Project: As part of their country wide modernization plan Azania Bank Ltd are carried out a major refurbishment of their Moshi Branch in Kilimanjaro. The modernization included complete new interiors, new IT backbones, the replacement for the electrical systems, replacement of the air conditioning systems and new security. On completion the branch met international retail standards.
Description of actual services provided by your Staff: • Designing of Electrical system, fire detection and alarm system and structured
cabling and security installations • Designing of plumbing and drainage • Designing of air conditioning, • Supervision of building services installations. Commissioning of all services
3B. FIRM’S REFERENCES Relevant Services Carried Out in the Last Five Years
That Best Illustrate Qualifications
Firm’s Name: MES Engineering consultancy Limited Consulting
Authorized Signature:
Assignment Name: Proposed Rehabilitation NIDA Data
Centre Country: United Republic of
Tanzania Location within Country: DAR ES SALAAM CITY
Professional staff Provided by Your Firm/Entity/(Profiles):Electrical Engineers
Name of Client: National Identifications Authority No. of Staff:2 Address: DAR ES SALAAM
No. of Staff-Months, Duration of Assignment:3
Start Date (Month/Year): OCT, 2011
Completion date (Month/Year):MAY 2012
Approx. Value of Services
TZS 1 BILLION Name of Associated Consultants, If Any:
No. of Months of Professional Staff Provided by Associated Consultants:
- Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed
Eng. Gervas. Gervas Eng. W. Chiwawa Isaac Chanzi
(Team Leader service), (Electrical Eng.) (ICT Engineer),
Narrative description of Project: Centre Data Centre, printing and sorting unit for National Identities Authority (NIDA) is implementing a project which will be office building: Construction of buildings structures namely, Library and Computer Block,office, the services offered include Sewerage system and storm water system Installation of services i.e. electrical and mechanical The Consultant was required to provide design and supervision services of the project. The aim is to provide assistance to the Client in designing works and ensuring that the construction works are carried out in accordance to standard requirements
Description of actual services provided by your Staff: • Designing of Electrical system, fire detection and alarm system and structured
cabling and security installations • Designing of plumbing and drainage • Designing of air conditioning, • Supervision of building services installations. Commissioning of all services
3B. FIRM’S REFERENCES Relevant Services Carried Out in the Last Five Years
That Best Illustrate Qualifications
Firm’s Name: MES Engineering consultancy Limited Consulting
Authorized Signature:
Assignment Name: Proposed Praia Hotel Country: United Republic of
Tanzania
Location within Country: Mtwara Municipality Professional staff Provided by Your Firm/Entity/(Profiles): Electrical & Mechanical Engineers
Name of Client: Praia Hotel Limited No. of Staff: 5 Address: MTWARA
No. of Staff-Months, Duration of Assignment: 8Months
Start Date (Month/Year): 2012
Completion date (Month/Year): OCTOBER 2012
Approx. Value of Services
TZS 750 MILLION Name of Associated Consultants, If Any:
No. of Months of Professional Staff Provided by Associated Consultants:
- Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and Functions Performed
Eng. Gervas. Gervas Eng. Elivs. Ngowi Eng. W. Chiwawa Isaac Chanzi Edson Ruangisa
(Team Leader service), (Mechanical Eng.) (Electrical Eng.) (ICT Engineer), (Ass Mechanical Engineer)
Narrative description of Project 36 room hotel accommodation, service block and recreation facilities, viz: gym, swimming pool,
Description of actual services provided by your Staff: • Designing of Electrical system, fire detection and alarm system and structured
cabling and security installations • Designing of plumbing and drainage • Building services co-ordination and supervision. • Supervision of construction. • Commissioning of all services.