2.307 TITLE: Electrical Lock Out Permit
2.307.1 INTRODUCTION
This Electrical Loc"o#t permit system is de$eloped to carry o#t maintenance %o&s on e'#ipment(hich re'#ire positi$e electrical isolation o) the e'#ipment. This permit is e*ec#ted &et(een theprod#ction+operation department and the electrical department.
e)ore handin o$er the system )or maintenance it sho#ld &e positi$ely isolated electrically to ens#resa)ety o) the persons (ho (o#ld &e ta"in #p the %o&. The )ollo(in electrical loc"o#t permit system
has &een de$eloped )or this p#rpose.
2.307.2 SCOPE
The scope incl#des all Electrical Loc" o#t permits acti$ities (ithin the comple*
2.307.3 RESPONSIILIT!
All Line manaers are responsi&le to ed#cate employees and contractors reardin this #ideline
2.3!. PROCEDURE
Prepared &y/ 0PP
1nterated anaement System
HSEFP4CE56E A76AL
Pae / 8 o) !
Appro$ed &y/ 60C e$.7o
/ 8/ 8++288
Prepared &y/ 0PP
1nterated anaement System
HSEF
P4CE56E A76AL
Pae / 8 o) !
Appro$ed &y/ 60C e$.
7o
/ 8
/ 8++288
Prepared &y/ 0PP
1nterated anaement System
HSEF
P4CE56E A76AL
Pae / 8 o) !
Appro$ed &y/ 60C e$.
7o
/ 8
/ 8++288
-
8/13/2019 2.307-Eleck Permit Procedure
2/14
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
2.307.".1 Permit I#itiatio#:
The electrical loc"o#t permit is initiated &y chie) operator + shi)t enineer o) 4peration. This
permit is in d#plicate. Chie) operator + enineer a)ter disc#ssion (ith electrical department a&o#tcriticality o) the %o&, (ill sin $ectio#%&o) the Electrical Loc"o#t permit and also )ill #p the details
9e'#ipment ta no : electrical loc" o#t permit no; in the 5aner Tas.
The 5aner Ta has three sections-
-
8/13/2019 2.307-Eleck Permit Procedure
3/14
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
2.307.".3 Certiicatio# o /o$iti)e i$olatio#
The electrical department (hich is the Permit iss#in a#thority, (ill )ill #p : sin the
$ectio#%o) the permit and also sin the 5aner Tas C : . S#&se'#ent to the positi$e isolation,
theTa' -(ill &e installed on the panel or on the de$ice )or isolation &y the electrical department.The d#plicate copy o) the permit shall &e retained &y electrical department and the oriinal copy
alon (ith Da#'er Ta' C- (ill &e handed o$er to the operation.
2.307."." E#or$eme#t o te /o$iti)e i$olatio#
As a mar" o) endorsement o) the positi$e isolation, the speci)ic n#m&er o) Electrical Loc"o#tPermit (ill &e (ritten on all the three tas. F#rther, (hile iss#in cold + hot permit to maintenance,
the Loc"o#t permit + Ta n#m&er shall &e mentioned in the cold + hot permit as (ell as the Da#'erTa' C-(ill &e stapled to the Field Permit.
2.307.". S/ecial i#$tructio# 4 a# /recautio#$
The electrical department may stip#late additional sa)ety preca#tions or other special instr#ctions
&e)ore iss#in the (or" permit.
2.307.".5 6o E8ecutio#:
Prepared &y/ 0PP
1nterated anaement System
HSEFP4CE56E A76AL
Pae / 3 o) !
Appro$ed &y/ 60C e$.7o
/ 8/ 8++288
Prepared &y/ 0PP
1nterated anaement System
HSEF
P4CE56E A76AL
Pae / 3 o) !
Appro$ed &y/ 60C e$.
7o
/ 8
/ 8++288
Prepared &y/ 0PP
1nterated anaement System
HSEF
P4CE56E A76AL
Pae / 3 o) !
Appro$ed &y/ 60C e$.
7o
/ 8
/ 8++288
-
8/13/2019 2.307-Eleck Permit Procedure
4/14
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
5#rin the e*ec#tion o) the %o&, the cold + hot permit 9(ith the 5aner ta-C stapled on it;
(ill &e (ith the e*ec#tin aency. The oriinal reen copy o) the Electrical Loc"o#t Permit (ill &eat the control room o) the concerned area and the d#plicate (hite copy shall &e retained &y the
electrical department as oo" copy.
2.307.".7 6o com/letio# 4 a#i#' ack 4 Taki#' o)er
A)ter the %o& is completed in all respects and ho#se"eepin done, the cold + hot permit 9(iththe 5aner ta-C stapled on it; (ill &e ret#rned &y the e*ec#tin aency to operation. Chie) 4perator
+ 4perational Enineer (ill sin $ectio#$% Co) the Elect Loc"o#t Permit as a to"en o) handin &ac"
and ret#rn the permit alon (ith Da#'er Ta' C-to the electrical department. A)ter this step is o$er,the %o& is considered complete and the electrical system (hich (as #nder maintenance is ready )or
re-commissionin. The 1ss#in a#thority ens#res to restore all connected interloc"s, remo$es the
Da#'er Ta' -and sins the Sectio#%Do) the Permit.
A)ter eneri@in the main s(itch, the )irst copy o) the permit is ret#rned to 4peration. A)ter
recei$in the permit (ith the section-5 sined &y electrical, 4peration "no(s that the e'#ipment is
eneri@ed )rom the s#&station. 4nly a)ter recei$in this copy, operation remo$es the Da#'er Ta'%&-)rom the local s(itch.
2.307.".9 Ca#cellatio# o Permit uri#' o e8ecutio#
The permit iss#er has the preroati$e to cancel the permit (itho#t notice, d#rin e*ec#tion,
&ased on de$elopment o) certain emerency (hich renders %o& e*ec#tion #nsa)e.
Prepared &y/ 0PP
1nterated anaement System
HSEFP4CE56E A76AL
Pae / o) !
Appro$ed &y/ 60C e$.7o
/ 8/ 8++288
Prepared &y/ 0PP
1nterated anaement System
HSEF
P4CE56E A76AL
Pae / o) !
Appro$ed &y/ 60C e$.
7o
/ 8
/ 8++288
Prepared &y/ 0PP
1nterated anaement System
HSEF
P4CE56E A76AL
Pae / o) !
Appro$ed &y/ 60C e$.
7o
/ 8
/ 8++288
-
8/13/2019 2.307-Eleck Permit Procedure
5/14
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
2.3!.. Stora'e o /ermit
The permit is stored )or one month &e)ore destroyin. 1n case o) any accident, the permit
sho#ld &e preser$ed and sent to sa)ety department )or records and )or re)erence o) stat#torya#thorities, i) re'#ired.
Prepared &y/ 0PP
1nterated anaement System
HSEFP4CE56E A76AL
Pae / > o) !
Appro$ed &y/ 60C e$.7o
/ 8/ 8++288
Prepared &y/ 0PP
1nterated anaement System
HSEF
P4CE56E A76AL
Pae / > o) !
Appro$ed &y/ 60C e$.
7o
/ 8
/ 8++288
Prepared &y/ 0PP
1nterated anaement System
HSEF
P4CE56E A76AL
Pae / > o) !
Appro$ed &y/ 60C e$.
7o
/ 8
/ 8++288
-
8/13/2019 2.307-Eleck Permit Procedure
6/14
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
Prepared &y/ 0PP
1nterated anaement System
HSEFP4CE56E A76AL
Pae / B o) !
Appro$ed &y/ 60C e$.7o
/ 8/ 8++288
Prepared &y/ 0PP
1nterated anaement System
HSEF
P4CE56E A76AL
Pae / B o) !
Appro$ed &y/ 60C e$.
7o
/ 8
/ 8++288
Prepared &y/ 0PP
1nterated anaement System
HSEF
P4CE56E A76AL
Pae / B o) !
Appro$ed &y/ 60C e$.
7o
/ 8
/ 8++288
-
8/13/2019 2.307-Eleck Permit Procedure
7/14
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
Prepared &y/ 0PP
1nterated anaement System
HSEFP4CE56E A76AL
Pae / ! o) !
Appro$ed &y/ 60C e$.7o
/ 8/ 8++288
Prepared &y/ 0PP
1nterated anaement System
HSEF
P4CE56E A76AL
Pae / ! o) !
Appro$ed &y/ 60C e$.
7o
/ 8
/ 8++288
Prepared &y/ 0PP
1nterated anaement System
HSEF
P4CE56E A76AL
Pae / ! o) !
Appro$ed &y/ 60C e$.
7o
/ 8
/ 8++288
-
8/13/2019 2.307-Eleck Permit Procedure
8/14
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
Format 7o/ EPCL-HSEF-.3!, e$/8, 5ate/ 8..288
ELECT1CAL L4C0 46T PE1T
Sr 7o/5ATE
Prepared &y/ 0PP
1nterated anaement System
HSEFP4CE56E A76AL
Pae / D o) !
Appro$ed &y/ 60C e$.7o
/ 8/ 8++288
Prepared &y/ 0PP
1nterated anaement System
HSEF
P4CE56E A76AL
Pae / D o) !
Appro$ed &y/ 60C e$.
7o
/ 8
/ 8++288
Prepared &y/ 0PP
1nterated anaement System
HSEF
P4CE56E A76AL
Pae / D o) !
Appro$ed &y/ 60C e$.
7o
/ 8
/ 8++288
-
8/13/2019 2.307-Eleck Permit Procedure
9/14
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
PLA7TSECT147 + AEA .. .SH1FT...
A.E'#ipment on (hich sh#tdo(n is re'#ired 9E'#ipment Ta no;/
...
eason )or
Sh#tdo(n...........................
...
5#ration/ F4/ 5ateTime/To/ 5ateTime/...
7o o&%ection )rom operation )or ta"in sh#tdo(n o) the e'#ipment Yes + 7o
9P#t tic";
5aner Ta-
-
8/13/2019 2.307-Eleck Permit Procedure
10/14
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
3 remo$ed
ain &rea"er rac"ed
o#t in sa)e position
>
Any padloc"in done
B
Earthin done
!
Ca#tion oard +
5aner Ta- Placed
1TE YES 7
D
All concerned
interloc"ed
e'#ipment isolated
1) YES mention n#m&er o)e'#ipment and + or any remar"s
8.
2.
3.
.
>.
1 declare that the e'#ipment mentioned a&o$e is sa)e to (or" and the same (ill not &e made ali$e )or
operation #ntil this permit is cancelled &y the Aency ta"in the sh#tdo(n.
Prepared &y/ 0PP
1nterated anaement System
HSEFP4CE56E A76AL
Pae / 8 o) !
Appro$ed &y/ 60C e$.7o
/ 8/ 8++288
Prepared &y/ 0PP
1nterated anaement System
HSEF
P4CE56E A76AL
Pae / 8 o) !
Appro$ed &y/ 60C e$.
7o
/ 8
/ 8++288
Prepared &y/ 0PP
1nterated anaement System
HSEF
P4CE56E A76AL
Pae / 8 o) !
Appro$ed &y/ 60C e$.
7o
/ 8
/ 8++288
-
8/13/2019 2.307-Eleck Permit Procedure
11/14
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
SAFETY Eleme Petrochemicals Company Ltd, PHC EPCL-HSEF-2.3!
7ame : Sinat#re o) the A#thori@ed electrical Sinatory /
7ame/ Sinat#re/ 5ate/ Time
/
C. 9i; 1 declare that the (or" has &een completedI men : material ha$e &een remo$ed )rom theplace o) (or". 4peration has no o&%ection in startin the e'#ipment and no other 40PE1T has &een iss#ed on this : connected interloc"ed e'#ipment
9ii; 1 here&y ret#rn the Elect Loc"o#t Permit alon (ith 5aner Ta
-
8/13/2019 2.307-Eleck Permit Procedure
12/14
-
8/13/2019 2.307-Eleck Permit Procedure
13/14
SAFETYEleme Petrochemicals Company Ltd,
PHCEPCL-HSEF-2.3!
-----------------------------------------------------------------------------------------------------------------------
-------------
7ote/ Ta
-
8/13/2019 2.307-Eleck Permit Procedure
14/14
SAFETYEleme Petrochemicals Company Ltd,
PHCEPCL-HSEF-2.3!
2.307. RE;ERENCE
JHSE policy
2.307.5 RECORDS
Filled (or" permit )orms.