GAZ DE FRANCE ESS
Mod 115An alternative view
Phil Broom
Gaz de France ESS
18 April 2023
GAZ DE FRANCE ESS
Measurement Issues and incentives in the monthly read sector
Potential Measuremen
t Issue
Applicable to
monthly read sector
Incentives
LDZ Off-take Metering
No LSPs are reconciled on actual throughput, residual energy is correctly allocated to SSPs. RG 126 to resolve issue
System Leakage
No Leakage costs are borne by all Users. New shrinkage arrangements in place for DNs under 07/08 price control. Incentive for DNs to reduce leakage
End User Theft
No Minimal evidence of theft in I&C market, shippers have incentive to detect and claim back costs.
Unregistered Sites
No No evidence of unregistered sites in I&C market. Business customers, more than others, want to be billed accurately. Transporter records error
Supply Point Metering
No Frequency and volume in I&C market leads to early detection and resolution. Businesses keen to manage energy budget
Supplier Inputs
e.g. AQ Review
process
No Strong incentives on monthly read suppliers to submit good data and deem accurately. Risk averse behaviour key for I&C contracts. Mod 640 has increased incentive have accurate Aqs and lower unreconciled energy.
Deeming Algorithms
No Monthly read meters have exceptional read performance and 4 month must read process
18 April 2023
GAZ DE FRANCE ESS
Monthly Read Performance – Shipper A
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
January-06 February-06
March-06 April-06 May-06 June-06 July-06 August-06 September-06
October-06 November-06
December-06
January-07
Annual Average 98 %Must Reads 3-4 per month
18 April 2023
GAZ DE FRANCE ESS
Monthly Read Performance – Shipper B
Month Monthly Reads Requested % Success
Jul 98.3% 99.3%
Aug 98.8% 99.0%
Sep 99.0% 98.7%
Oct 98.0% 99.2%
Nov 98.3% 99.5%
Dec 98.9% 99.1%
18 April 2023
GAZ DE FRANCE ESS
Monthly read read performance shipper C
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
January-06 February-06 March-06 April-06 May-06 June-06 July-06 August-06 September-06
October-06 November-06 December-06 January-07
18 April 2023
GAZ DE FRANCE ESS
Must Read Performance – Shipper C
Days Since Meters (NDM - Monthly) Last Reconciled - 5 Jan 07
0
500
1000
1500
2000
2500
3000
No. ofMeters
No. of Meters 2384 324 68 28 24 14 9 3 3 5 3 0 6
0 - 30 31 - 60 61 - 90 91 - 120 121 - 150 151 - 180 181 - 210 211 - 240 241 270 271 - 300 301 - 330 331 -360 >361
18 April 2023
GAZ DE FRANCE ESS
Must Read Performance – Shipper C
Days Since Meters (NDM - Non Monthly) Last Rec - 5 Jan 07
0
10
20
30
40
50
60
70
80
90
No. ofMeters
No. of Meters 83 53 50 33 30 30 22 13 2 6 4 2 13
0 - 30 31 - 60 61 - 90 91 - 120 121 - 150 151 - 180 181 - 210 211 - 240 241 270 271 - 300 301 - 330 331 -360 >361
18 April 2023
GAZ DE FRANCE ESS
Pricing Options
Transportation rates should reflect actual rates to align with objectives of transporter’s charging methodology
• “Compliance with the charging methodology results in charges which reflect the costs incurred by the licensee in it’s transportation business”
• “..properly takes account of developments in the transportation business”
• “facilitates effective competition between gas shippers and suppliers”
Simple and efficient to administer for non-monthly portfolio – only 2 rates apply (<73,200 and 73,200 to 732,000)
Should not be a penalty rate as per mod 640 – suppliers do not have control over many cost factors for unreconciled energy
18 April 2023
GAZ DE FRANCE ESS
Conclusions – basis of an alternative to mod115
Monthly read sites create immaterial contribution to unreconciled energy costs as demonstrated by increased visibility and control
Monthly read meters should be excluded from unreconciled energy smear charges
Transportation rate should reflect actual rates to be consistent with transporter’s charging methodology
Implementation timescales should allow time for building into forward customer contracts i.e. no earlier than October 07