gaz integral
TRANSCRIPT
GAZ INTEGRAL
CAPABILITIES FOR GAS TREATMENT FACILITIES IN ROMANIA. WORKING WITH ROMANIAN SUPPLIERS.
GAZ INTEGRAL Filippo ROSSATI Tel. +33 6 07 61 23 56 Tel. + 40 755 07 00 55 Tel. + 33 1 41 20 92 92
2
GAS TREATMENT AND CONDITIONING
PROCESSES FOR SOUR GASES
Separation Compression Dehydration Sweetening (H2S, CO2) LPG recovery & HC dew point control:
• Joule-Thompson Expansion (Auto-Refrigeration) • Silica Gel Adsorption • Mechanical Refrigeration (Propane, Ammonia) • Lean Oil Adsorption • Deep Cut (Cryogenic) LPG Recovery: Turbo-Expander
processes • Ethane extraction • Cascade Refrigeration
Contaminants removal (Tar, NH3, HCl, Hg…) Liquids Fractionation & Distillation:
• Fractionation: Methane, propane, butane…. • LPG, NGL Products • Stabilization
Sweetening: Amine, Fixed Bed, Caustic, LPG/NGL SRU (Sulphur Recovery Units): modified Claus
processes SRU Tail Gas treatments Sulphur degassing Sulphur solidification Sulferox® : “authorised licensor” from Shell – OIP Shell Paques® ATS Production (Ammonium Thiosulfate) AS Production (Ammonium Sulfate) Sour water stripper: LP and double stripper
Company Presentation
3
TURNKEY PLANTS Process development Basic engineering / FEED / FEL Detail engineering Procurement, inspection Construction / construction supervision Commissioning / start up services Surveys and audits Plant operation and maintenance
CONTRACTING SERVICES
4
Engineering services (basic, feeds, EPCM) : Reimbursable or LS Process Design Packages Feeds FEED with contract conversion to LSTK
EPC on a Target Price basis LSTK (Lump Sum Turn Key)
TYPES OF CONTRACTS
REGENERATION
INCINERATION
SULPHUR
STACK
SALES GAS
C3
C4
CRUDE SALES CRUDE RAW GAS
TYPICAL NATURAL GAS TREATMENT FACILITY
SULPHUR RECOVERY
SULPHUR HANDLING
TAIL GAS TREATING
SALES GAS COMPRESSION
OFF GASES
NGL RECOVERY DEW POINT CONTROL
ACID GAS
REMOVAL
REGENERATION
DEHYDRATION
PRIMARY SEPARATION
METERING
NGL FRACTIONATION
NGL TREATING COS/AMINE/RSH
PROPANE DRYING
5
6
PROJECT QUALITY REQUIREMENTS
Owner specific requirements: - Project technical and commercial specifications - Design standards – Engineering practices - Works standards
- HSE policy LGI’s policy and standards (ISO 9001)
E.U. Legal requirements compliance : - PED
- ATEX - .....
7
PROJECT QUALITY REQUIREMENTS
Romanian Legal requirements compliance : For permitting :
Urbanism certificate application / Certificat de Urbanism (CU) - Studies : > Environmental impact study > Risk assessment study > Topographical study > Geological study Building permits documentation / Autorizare de constructie
8
PROJECT QUALITY REQUIREMENTS (Example)
Documents for permitting:
Accord unic (documents required by CU) > Water management > Fire fighting system / Scenariu de siguranta la foc > Natural Gas approvals > Solid & Liquid Waste management (Slops, domestics) > Water sewerage > Heating & Power Supplier > Telephony > Municipality transportation > Health and veterinary approval / sanatatea populatiei > Civilian Defense / apararea civila > Environmental approval / aviz de mediu > Others permits and approvals specified by governmental authority
Approvals for construction by: > ISCIR > MPLAT > others
PROJECT GOALS
TOTAL QUALITY:
“Zero injury”
“Project on schedule”
Quality in design, construction and works
Results in:
– Successful start-up
– Process performances achieved
– Common success for Contractor & Owner
– On budget
9
THE CHALLENGE
Find an organisation to fulfil the project goals
Especially: on time, on budget for the contractor
Maximize local content to reduce costs
10
11
GI SRL Bucharest
LGI SAS Paris
Process design Conceptual Engineering Procurement Typical 10% contract value
AN ANSWER: TYPICAL ORGANIZATION
Coordination Detail Engineering Local Procurement Subcontracting Local activities Typical 90% contract value
CLIENT
12
ORGANIZATION ADVANTAGES
Local forces allow for :
Contract execution near site
Costs savings for owner
Use of local sub-contractors to maximum extent
13
SUBCONTRACTING: Engineering & Supplies-Works
Engineering: • Piping • Civil • Structures • Electricals • Instrumentation
Supplies - Works: • Vessels / Heat exchangers • Steel structure • Civil works • Piping • Insulation • Electricity / Instrumentation • Scaffolding / Painting • Refractory • Complete skids
EFFECTIVE SUBCONTRACTING FOR:
Typical Project Organisation - EPC
Represented by:
Project Director: LGI
QA/QC: LGI / RO
Schedule / cost control: LGI
Process Developpement: LGI
Procurement / expediting: LGI / RO
Inspection: LGI / RO
Project engineers: LGI / RO
14
Site Director: LGI
QHSE: RO
Schedule / cost control: RO
Inspection: LGI / RO
Technical control: RO
Precommissioning / commissioning: RO / LGI
TYPICAL SITE ORGANISATION - EPC
15
16
Men hours presented below are related to site work activities (LGI personnel and subcontractors)
0
5
10
15
20
25
30
35
40
45
50
0
20000
40000
60000
80000
100000
120000
140000
160000
180000
200000
1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2011 2010 2012 2013
TOTAL Men-Hours yearly basis
TRIR
Projects from 1998 to mid 2013
Total number of menhours
LGI’s menhours Subcontractor’s menhours
TRIR* of all Projects**
Recordable Events
TOTAL 1 583 350 259 850 1 323 500 0,63 1
SITE WORK & HSE RESULTS OVER THE LAST 15 YEARS
*TRIR (Total Recorded Incident Rate) = (Fatalities + PDC + LTI + RWC + MT) x106/ Total Men-Hours (Menhours : Menhours Worked; PDC : Permanent Disability ; LTI : Lost Time Injury; RWC : Restricted Work Capacity; MT : Medical Treatment off site (i.e. not first Aid)) ** Client’s records
Erection Petrobrazi
Skids Manufacturing Romania
17
ACHIEVED BENEFITS Romanian Petrobrazi case: • High local subcontracting level: - Equipment > 50% - Erection ~ 95% • 90% of contract value is Romanian (case Petrobrazi) • Taxation in Romania • Creation of 3 x win situation: GI - local industry – state
Middle East case (skids manufacturing only) • Export case
• Equipment: > 50% • Skids: 100%
18
ACHIEVED BENEFITS TRANSFER OF KNOW-HOW IN: Organisation • Schedule control • Work organization HSE
• Quality • Safety
SUB-SUPPLIERS HAVE BEEN ALWAYS: • Professionals • With excellent working attitude and work culture • With learning will
CONCLUSION: Excellent experience for building the future with Romanian partners.
19
Client : OMV PETROM Type : SWS + SRU + TGT
Process : LGI
Application : Refinery
Capacity : 1 x 35 t/day
Site : Romania
LGI scope : Lump Sum Turn Key
20
Client : OMV PETROM 3D Model
21
By courtesy of OMV Petrom
22
Client: Middle East Type: sulphur recovery Application: Refinery Capacity: 24 t/day Process: LGI Site: ND Contract value: ND Type of contract: LSTK Skids: YES Skid manufacturing: Romania Site works: Included Romania: - all equipment - all skids
23
SULPHUR RECOVERY UNIT – MIDDLE EAST – 3D MODEL OF SKID ASSEMBLIES
24
Furnace Skid
Skid weight: 150 tn
SULPHUR RECOVERY UNIT – MIDDLE EAST – 3D MODEL OF SKID ASSEMBLIES
SKID MANUFACTURING & PRE-ASSEMBLY OPERATIONS
25
SULPHUR RECOVERY UNIT – ROMANIAN WORKSHOP
SULPHUR RECOVERY UNIT – ROMANIAN WORKSHOP SKID MANUFACTURING & PRE-ASSEMBLY OPERATIONS
26
SKID MANUFACTURING & PRE-ASSEMBLY OPERATIONS
27
SULPHUR RECOVERY UNIT – MIDDLE EAST