2018 SHOPP FISCAL YEARS

2018-19 through 2021-22

STATE HIGHWAY OPERATION AND PROTECTION PROGRAM

Prepared by the CALIFORNIA DEPARTMENT OF TRANSPORTATION

In accordance with Government Code section 14526.5

CALIFORNIA STATE TRANSPORTATION AGENCY

Adopted by the California Transportation Commission

March 22, 2018

Edmund G. Brown Jr. Governor, State of California

Brian Annis Secretary, California State Transportation Agency

Laurie Berman Director, California Department of Transportation

California Department of Transportation

2018 SHOPP i

EXECUTIVE SUMMARY

The 2018 State Highway Operation and Protection Program (SHOPP) is the State Highway System’s “fix-it-first” program that funds the repair and preservation, emergency repairs, safety improvements, and some highway operational improvements on the State Highway System (SHS). By continuously repairing and rehabilitating the SHS, the SHOPP protects the enormous investment that has been made over many decades to create and manage the approximately 50,000 lane-mile SHS. The SHS includes statutorily designated state-owned roads, highways (including the Interstate system) and bridges (including associated bicycle and pedestrian facilities) and their supporting infrastructure such as culverts, transportation management systems (TMS), safety roadside rest areas, and maintenance stations. The SHOPP also funds mandated project categories such as retrofitting existing SHS facilities to comply with the Americans with Disabilities Act and storm water control requirements. The SHOPP includes funding reservations for projects such as emergency repairs and safety where specific project funding needs cannot be anticipated prior to actual incidents and for particular needs that have a set amount of annual funding. All projects funded by the SHOPP are limited to capital improvements that do not add capacity (no new highway lanes) to the SHS, though some new auxiliary lanes are eligible for SHOPP funding. Revenues for the SHOPP are generated by federal and state gas taxes and are fiscally constrained by the State Transportation Improvement Program Fund Estimate (Fund Estimate) that is produced by California Department of Transportation (Caltrans) and adopted by the California Transportation Commission (Commission). For the 2018 SHOPP, Caltrans will implement $17.96 billion in projects over four years, covering Fiscal Years 2018-19 through 2021-22. A four-year summary of SHOPP investments is provided in Table 2. A more detailed summary is available within the full SHOPP document in Exhibit A and the full listing of projects in Exhibit F. Consistent with Senate Bill 486 (Chapter 917, Statutes of 2014), Caltrans submit ted the proposed program of projects to the Commission on January 31, 2018 for Commission review and adoption. The Commission adopted the 2018 SHOPP at their meeting on March 22, 2018. The adopted SHOPP is due for submittal by the Commission to the Governor and the Legislature no later than April 1, 2018. Senate Bill 486 (SB 486) requires that Caltrans invest SHOPP funds in accordance with the approved Transportation Asset Management Plan (TAMP). Similarly, federal transportation po l i c i es are implementing performance based funding criteria and performance targets focused on specific asset classes. The 2018 SHOPP has transitioned to performance driven asset management. For the 2018 SHOPP, the Commission approved four asset classes for the first phase of this transition period: pavement, bridge, culverts and TMS. These asset classes are highlighted in this document and are summarized below in Figure 1.

California Department of Transportation

2018 SHOPP ii

Figure 1 - 2018 SHOPP Performance Measures

5,576 Lane-miles of pavement improved

494 Bridges rehabilitated

4,334 Culverts rehabilitated

5,638 field elements addressed

With the enactment of Senate Bill 1 (SB 1) (Road Repair and Accountability Act of 2017), additional funding has been made available for transportation investments across the state, including maintenance and repair of highways, local roads, bridges, and transit systems, and to also address the state's most congested corridors and to improve the movement of freight. For the SHOPP, $6.4 billion of programming capacity has been added to the four-year 2018 funding cycle due to SB 1 to help achieve the performance measures identified in Figure 1. For the SHOPP, SB 1 directs Caltrans to focus new highway repair revenue on four primary highway asset classes: pavement, bridge, culverts and TMS. Moreover, as indicated in the 2017 Highway System Management Plan (SHSMP), SB 1 funds both the SHOPP and Maintenance Program expenditures in perpetuity. There is no sunset date for SB 1. Table 1 outlines the ten-year goals to be achieved for the highway system for pavement, bridge, culverts and TMS asset classes.

Table 1 - End of Plan Condition Estimates

Asset Class Projected End of Plan Condition Relative to Current Pavement Achieve a pavement pothole and cracking Level of Service of 90

percent or higher by 2027.

Bridges Not less than 98.5 percent of bridge area to be in good or fair condition by 202. Fix not less than an additional 500 bridges by 2027

Culverts Not less than 90 percent of culvert length to be in good or fair condition by 2027.

Transportation Management Systems (TMS)

Not less than 90 percent of TMS element to be in good condition by 2027.

In addition to addressing fix-it-first needs, safety, emergencies, and mandates, SHOPP projects often provide opportunities to address other vital State priorities such as the reduction of transportation related greenhouse gas (GHG) emissions, implementation of Complete Streets elements such as pedestrian and bicycle facilities, and enhancements to wildlife connectivity and fish passages. These are co-benefits to the primary purpose of the fix-it-first focus of the SHOPP. Such benefits are different from project impact mitigation that is required through the National Environmental Protection Act

California Department of Transportation

Proposed 2018 SHOPP iii

(NEPA) and the California Environmental Quality Act (CEQA.) These additional project attributes go beyond NEPA and CEQA requirements by actively incorporating additional State priorities identified in statute, executive orders, and policies into the scope of SHOPP projects, as appropriate. For example, the scoping of a pavement rehabilitation project is an excellent opportunity to evaluate whether the project can also meet pedestrian and bicycle needs, and if appropriate, to include those elements into the project scope early in the project development process. The 2018 SHOPP was prepared by Caltrans in accordance with Government Code section 14526.5, Streets and Highways Code section 164.6, and the strategies outlined in Caltrans’ Policy for Management of the SHOPP and CTC SHOPP Guidelines. The 2018 SHOPP is the culmination of a multi-year development cycle that began with the identification of SHS rehabilitation needs and priorities for the preparation of the 2017 State Highway System Management Plan (SHSMP), which has both a needs based funding estimate and a fiscally constrained funding estimate. The 2018 SHOPP Project List is also consistent with the 2018 Transportation Asset Management Plan (TAMP) that Caltrans prepared per state and federal requirements. The 2018 TAMP identifies at a broad level the maintenance and capital projects needed to achieve asset performance targets for pavement, bridge, culverts and TMS elements over a ten-year period ending in the year 2027. The TAMP addresses both the SHS and the federal National Highway System. Not all of the SHS is included in the National Highway System and some of the facilities included in the National Highway System are local roads not on the SHS. The SHOPP only includes projects located on the SHS. The 2018 TAMP is scheduled for consideration and approval at the January 2018 Commission meeting. An additional component of the SHOPP is a funding program referred to as the Minor Program. For the four years of the 2018 SHOPP, the Minor Program will provide $600 million to Caltrans to implement relatively low cost (less than $ 1.25 million) capital projects that are SHOPP eligible. These funds enable Caltrans to quickly address small-scale needs that are beyond the scope of what the Caltrans Maintenance Program can address but of a scale that does not necessitate an extensive project development process that is required for more costly and complex capital projects. A Minor Program of projects is proposed by Caltrans on an annual basis for Commission approval and the Minor Program funding is included within the SHOPP.

 

 

This page left blank intentionally

California Department of Transportation

TABLE OF CONTENTS INTRODUCTION ................................................................................................................................................. 1

SHOPP PROCESS ................................................................................................................................................ 1

CONSISTENCY WITH THE TRANSPORTATION ASSET MANAGEMENT ......................................... 2

2018 SHOPP COMPARISON TO STATE HIGHWAY SYSTEM MANAGEMENT PLAN ..................... 5

SHOPP DEVELOPMENT AND PLANNING CYCLES ................................................................................. 5

SHOPP FUNDING ................................................................................................................................................ 6

CAPITAL OUTLAY AND CAPITAL OUTLAY SUPPORT ......................................................................... 6

INNOVATION AND SUSTAINABILITY ......................................................................................................... 8

LONG LEAD AND CONTINGENCY PROGRAMMING .............................................................................. 9

COMPLETE STREETS – MEETING THE NEEDS OF ALL MODES ..................................................... 10

RESERVATIONS ................................................................................................................................................ 10

REGIONAL TRANSPORTATION PLANNING AGENCY COORDINATION ....................................... 10

PROJECT LISTINGS ......................................................................................................................................... 12

DESCRIPTION OF EXHIBITS ........................................................................................................................ 12

EXHIBIT A: 2018 SHOPP Funding Summary (Fiscal Years 2018-19 through 2021-22) ...................... 13

EXHIBIT B: California Government Code section 14526 ......................................................................... 15

EXHIBIT C: Abbreviations and Acronyms ................................................................................................. 18

EXHIBIT D: 2018 SHOPP Regional Transportation Planning Agency Comments ............................... 19

EXHIBIT E: Policy for Management of the SHOPP .................................................................................. 20

EXHIBIT F: 2018 SHOPP County Listing of Projects ............................................................................... 21

EXHIBIT G: 2018 SHOPP Long Lead Projects .......................................................................................... 22

EXHIBIT H: Pre 2018 SHOPP projects ....................................................................................................... 23

EXHIBIT I: Northern and Southern SHOPP Hearing Public Comments ............................................... 24

EXHIBIT J: Commission Adoption of the 2018 SHOPP Program Resolution G-18-13 ........................ 25

This page left blank intentionally

California Department of Transportation

2018 SHOPP 1

INTRODUCTION

The 2018 State Highway Operation and Protection Program (SHOPP) was prepared in accordance with Government Code section 14526.5 (Exhibit B), Streets and Highways Code section 164.6, Senate Bill 486 (Chapter 917, Statutes of 2014), Senate Bill 1 (SB 1) (Chapter 5, Statutes of 2017), Interim California Transportation Commission (Commission) SHOPP Guidelines, the 2017 State Highway System Management Plan (SHSMP), the 2018 Transportation Asset Management Plan (TAMP), and the strategies outlined in the California Department of Transportation’s (Caltrans) Policy for Management of the SHOPP (Exhibit E). The 2018 SHOPP also addresses related statutes, executive orders, and policies focusing on the reduction of transportation related greenhouse gas emissions, complete streets, wildlife habitat connectivity, and other topics. All statutory requirements were addressed in the development of the 2018 SHOPP. The SHOPP is the State’s “fix-it-first” funding mechanism for the rehabilitation and reconstruction of all state highways and bridges, including Interstate highways; the supporting infrastructure for those facilities such as culverts, traffic operations systems, safety roadside rest areas, and maintenance stations; and most importantly, to address safety and emergency repair needs. The 2018 SHOPP is a four-year program of projects that addresses these needs for fiscal years 2018-19 through 2021-22. SHOPP projects are prohibited from adding additional roadway or highway lanes, though specified auxiliary lanes are eligible for SHOPP funding.

SHOPP PROCESS

The SHOPP portfolio of projects is updated every two years, carrying forward projects programmed in the last two years of the preceding SHOPP and making those last two years of projects the first two years of projects in the new SHOPP as illustrated in Figure 2 below. New projects are programmed in the year Caltrans estimates the projects can be delivered. All projects have a project initiation document (PID) identifying the project’s scope, performance measures, estimated capital and support costs, and delivery schedule.

Figure 2 - Relationship between 2016 and 2018 SHOPP Cycles

2016-17 2017-18 2018-19 2019-20 2020-21 2021-22

2016 SHOPP Year 1

Projects Year 2

Projects Year 3

Projects Year 4

Projects

↓ ↓

2018 SHOPP Year 1 Projects

Year 2 Projects

Year 3 Projects

Year 4 Projects

California Department of Transportation

2018 SHOPP 2

The SHOPP programming cycle has four major elements:

• First, the SHSMP is updated by Caltrans every two years to describe and quantify the rehabilitation and reconstruction needs on the SHS for a ten-year period. The SHSMP has previously been referred to as the Ten-Year SHOPP Plan. The SHSMP is developed by Caltrans and delivered to the Commission for approval by January 31st of each odd-numbered year.

• Second, the TAMP presents the existing inventory and condition of current state highway infrastructure, asset performance targets, financial plans, investment strategies, a risk mitigation plan, life-cycle planning documentation and identified areas of improvement.

• Third, the programming cycle’s fiscal capacity is developed by Caltrans and approved by the Commission to issue the State Transportation Improvement Program Fund Estimate (Fund Estimate) that identifies how much funding is forecast to be available each year for the four-year estimate period of the SHOPP. The Commission-adopted 2018 Fund Estimate provides a total available programming capacity of approximately $4.3 billion per year for the 2018 SHOPP four-year period1.

• And fourth, is the identification of a four-year program of capital projects that respond to the needs identified in the SHSMP, are within the fiscal constraints identified in the Fund Estimate and are selected to achieve the asset performance targets identified in the adopted TAMP. This set of projects constitutes the four-year SHOPP.

Caltrans is required to provide a draft of the SHOPP to Regional Transportation Planning Agencies for their review and comment prior to Caltrans submitting the proposed SHOPP to the Commission. The Commission reviews the submitted SHOPP, holds at least two hearings and may request clarifications or modifications to the document or program of projects. The Commission ultimately adopts the SHOPP upon a finding of consistency with the TAMP and then submits the adopted SHOPP to the Governor and the Legislature by April 1st of even numbered years. Caltrans develops and implements the projects identified in the adopted SHOPP consistent with the scope, schedule and cost of the respective programming documents.

CONSISTENCY WITH THE TRANSPORTATION ASSET MANAGEMENT

The Adopted 2018 SHOPP contains approximately 1,000 projects that cover the four fiscal years 2018-2019 through 2021-2022. Approximately 450 projects, with a dollar value of over $12 billion, specifically address the above referenced four asset classes that enable the Department to make progress in meeting the Commission-adopted and Senate Bill 1 (SB 1) required performance targets for the four asset classes by the year 2027. An analysis was conducted, which included these projects, to establish the approved TAMP benchmarks and to also verify that they are fully consistent with the TAMP. The consistency between the TAMP and the SHOPP is further ensured through a strategic performance management framework implemented by the Department in 2017 as described below.

1 2018 State Transportation Improvement Program Fund Estimate, adopted by the California Transportation Commission, August 2017

California Department of Transportation

2018 SHOPP 3

The 2018 SHOPP was built on the performance-based asset management framework established in the SHSMP and the TAMP2. These plans established a strategic approach for achieving performance targets for specific asset classes adopted by the Commission for the SHOPP. The core asset classes of pavement, bridge, culvert and transportation management systems (TMS) have the following specific ten-year performance targets established in SB 1 and the TAMP to ensure accountability for the use of SHOPP funding.

• Pavement – Not less than 98 percent of pavement to be in good or fair condition by 2027

• Pavement – Achieve a pavement pothole and cracking Level of Service of 90 percent or higher by 2027

• Bridges – Not less than 98.5 percent of bridge area to be in good or fair condition by 2027

• Bridges – Fix not less than an additional 500 bridges by 2027

• Culverts – Not less than 90 percent of culvert length to be in good or fair condition by 2027

• TMS Elements – Not less than 90 percent of TMS element to be in good condition by 2027

The performance targets established by SB 1 and adopted by the Commission in the TAMP, under provisions of Senate Bill 486 (SB 486), command a significant investment level that drives the 2018 SHOPP project composition excluding projects for safety, emergency repair and mandated programs. The SHSMP and TAMP include performance gap analyses that quantify the performance gap between existing conditions and established TAMP performance targets. The performance gap analysis is used to evaluate the trade-offs in performance between competing investment levels and asset classes at a statewide level. The resulting statewide investment plan is presented in the 2017 SHSMP for the SHOPP. The results from the augmented funding provided by SB1 are reflected in the 2017 SHSMP investment plan and 2018 TAMP. The statewide investment plan specifies expected performance outcomes produced by the funding investments using average unit costs associated with each asset class. The funding allocation methodology has changed from the past to provide greater flexibility to combine various assets into a single project, effectively breaking down the historic silo-based funding approach. This funding change facilitates multi-objective corridor type projects that are expected to be more efficient to deliver and less disruptive to the traveling public. The Statewide Performance Plan provided the Department with an asset based roadmap, which strongly influenced the selection of projects for the 2018 SHOPP. Caltrans is responsible for defining individual projects over the period that in aggregate achieve the identified performance within the target budget. The aggregate accomplishments of individual projects relative to ongoing asset deterioration determines the degree of change in condition from measured baseline levels. If project

2 For more information about federal asset management plan guidelines, please visit:

https://www.ecfr.gov/cgi-bin/text-idx?SID=a22e4878440eab0b5b001d9c8c0a778b&mc=true&node=pt23.1.515&rgn=div5

California Department of Transportation

2018 SHOPP 4

accomplishments exceed ongoing deterioration then conditions will improve. During the project portfolio development process, Caltrans incorporates input from stakeholders, subject matter experts and analysis from individual asset managers. The resulting project portfolios are then reviewed to ensure that they accomplish the identified performance goals in the TAMP Performance Plan and are within the established target budgets. The asset management framework defined above ensures that projects entering into formal project development planning are consistent with the defined performance targets and reflect a needs-based allocation of funding defined in the TAMP. The 2018 SHOPP reflects a transition to performance based asset management strategies. The project composition in the 2018 SHOPP includes a majority of projects that are performance driven in accordance with the TAMP and projects that pre-date the formalized asset management approach. The projects in the 2018 SHOPP were strongly influenced by this asset based planning process which is in alignment with the achievement of the ten-year performance targets. Collectively the four asset classes represent approximately 70 percent of the total 2018 SHOPP project investment. This investment resulted in project level accomplishments that are included in the benchmark analysis and which make progress toward the 10 year performance targets established by the Commission. The benchmark analysis presented during the March 2018 Commission meeting demonstrates that the project accomplishments for the 2018 SHOPP and planned future project portfolios will achieve the desired performance targets. It is through this strategic process that the Department has confidence that the 2018 SHOPP is fully consistent with the TAMP.

California Department of Transportation

2018 SHOPP 5

2018 SHOPP COMPARISON TO STATE HIGHWAY SYSTEM MANAGEMENT PLAN

Table 2 summarizes 2018 SHOPP projects and planned reservations against the 2017 SHSMP. A detailed summary of the 2018 SHOPP, by fiscal year, is shown in Exhibit B.

Table 2 - Comparison of 2018 SHOPP Programming to the 2017 SHSMP

Fiscal Years 2018-19 through 2021-22

Each project in the 2018 SHOPP contains a primary project performance measure. This performance measure represents the primary purpose of the project. Performance measures range from lane-miles of distressed pavement restored for roadway projects to collisions reduced for safety projects. These performance measures are reported in the project listing. Figure 1 in the Executive Summary reports and summarizes the positive impacts the 2018 SHOPP projects will have on the transportation system.

SHOPP DEVELOPMENT AND PLANNING CYCLES

Connected and closely correlated with the SHOPP development cycle is the Planning cycle. Planning is an essential project pre-programming activity whose end product is a Project Initiation Document (PID) for each project prior to inclusion in the SHOPP. The PID identifies the scope, schedule and cost for each capital project and is the basis for determining the amount of funding being requested for each project in the SHOPP. Every project included in the 2018 SHOPP has a completed, approved PID. The selection of projects for PID development is closely tied to the needs identified in the SHSMP and guided by the performance targets documented in the TAMP.

Program Categories

2018 SHOPPProjects

&Reservations(in Millions)

40% of10-yr

Constrained2017 SHSMP*

(in Millions)Primary Assets

Pavement * $ 4,827 $ 7,458 Bridge $ 3,103 $ 2,889 Culverts $ 928 $ 927 TMS $ 798 $ 698

Supplementary Assets $ 748 $ 632 Project Objectives

Major Damage Restoration

1,451$ $ 1,082

Collision Reduction 4,087$ $ 2,027 Mandates 643$ $ 451 Mobility 367$ $ 156 Roadside Preservation 107$ $ 129 Protective Betterments 125$ $ 57 Multiple Objective 136$ $ 6

Minor Program 600$ $ 600 Long Lead (New) 40$

Total 17,960$ $ 17,114

California Department of Transportation

2018 SHOPP 6

Senate Bill 4863 required significant changes to the SHOPP and the associated responsibilities of Caltrans and the Commission in developing and approving the SHOPP. Senate Bill 486 required the development and implementation of a robust asset management plan, the inclusion of capital and support budget information for each project in the SHOPP, and the projected delivery milestones by project component. The legislation modified the role of the Commission in approving the SHOPP, increasing the Commission’s level of commitment to the SHOPP by upgrading its responsibility to not just approve the SHOPP, but to adopt the SHOPP. Adopting the SHOPP resulted in a higher level of engagement in all aspects of the SHOPP that in the past had been largely handled directly by Caltrans and reported to the Commission in aggregate reporting documents. The Commission is essentially now a co-owner of the SHOPP, though Caltrans retains full responsibility for the development, delivery and construction of the projects included in the SHOPP. The Commission, in consultation and coordination with Caltrans, is reviewing and updating resolutions, guidelines, and processes to fully implement the Commission’s increased responsibilities under the provisions of SB 486 and SB 1.

SHOPP FUNDING

The State Highway Account (SHA), Federal Trust Fund (FTF) and Road Maintenance and Rehabilitation Account (RMRA) are the sole funding sources for the SHOPP. Senate Bill 14 provides the first significant, stable, and on-going increase in state transportation funding in more than two decades. In providing this funding, the Legislature has provided additional funding to, and increased the Commission’s role in a number of existing programs, and created new programs for the Commission to oversee as described below. SB 1 provides for the deposit of various taxes and fees into the RMRA. Senate Bill 1 replaces the price-based excise tax with the traditional excise tax, effective 2019-20 with annual adjustments for inflation beginning July 1, 2020. SHOPP Guidelines have been adopted to ensure the accountability and transparency outlined in SB 1. Performance measures were incorporated into the CTC SHOPP Guidelines to promote efficiency, accountability, and performance from each dollar invested.

CAPITAL OUTLAY AND CAPITAL OUTLAY SUPPORT

Prior to SB 1, the Commission allocated construction capital for the purposes of construction and of right-of-way purchase costs only. Capital Outlay Support (COS) includes Project Approval and Environmental Document (PA&ED), Plans, Specifications, and Estimate (PS&E), permits, construction and right-of-way engineering, contract administration, and similar costs. Essentially, COS represents staff time associated with the development, delivery, and oversight of construction projects. Effective July 1, 2017, Government Code 14526.5 (g) mandates that SHOPP projects request individual allocations by component from the Commission for environmental analysis and project report (PA&ED), design (PS&E), right-of-way support, construction support, and construction capital phases for each programmed project. Project Objectives are projects that do not fall within the primary or supplementary assets such as safety, emergency, mandates and mobility. 3 For more information about SB 486, please visit: http://leginfo.legislature.ca.gov/faces/billNavClient.xhtml?bill_id=201320140SB486 4 For more information about SB 1, please visit: http://leginfo.legislature.ca.gov/faces/billNavClient.xhtml?bill_id=201720180SB1

California Department of Transportation

2018 SHOPP 7

Figure 3 – Percent of Projects in Asset Management Classes

Pavement36%

Bridge26%

Drainage3% TMS

5%

Supplementary Asset

4%

Project Objectives26%

Primary Assets 70%

California Department of Transportation

2018 SHOPP 8

Figure 4 – 2018 SHOPP Distributed Among Project Components

INNOVATION AND SUSTAINABILITY

Senate Bill 1 established new provisions for sustainability and innovation on SHOPP projects. These new provisions, Streets and Highways Code section 2030 subdivision (c)-(f), require Caltrans to use advanced construction technologies and material recycling techniques, and to include technology and communications systems to accommodate zero-emission and autonomous vehicles, wherever feasible and cost effective. In addition, the provisions require Caltrans, wherever feasible, in all projects funded by SB 1, to ensure that transportation assets are protected and will be better adapted to future extreme weather and other climate impacts, as well as to include Complete Streets elements that improve safety for all users. In addressing these provisions from SB 1, Caltrans is building off of many activities already in practice to utilize sustainable approaches and innovative processes on SHOPP projects. Below are some of the current sustainability and innovation activities underway through SHOPP projects.

• Incorporating recycled materials into asphalt and concrete mixes to extend the life of pavement and reduce the emissions generated in manufacturing the materials, including the pilot use of Environmental Product Declarations to evaluate emissions from construction materials and current research on limestone constituents in pavement mixes.

Construction Capital

61%

Right of Way Capital

4%

Project Report and Environmental

Document7%

Design12%

Right of Way Support

2%

Construction Management and

Engineering Support

13%

California Department of Transportation

2018 SHOPP 9

• Recycling pavement on the job site, to minimize greenhouse gas emissions (GHG) from trucking materials to and from the job site and to eliminate waste.

• Using reflective sign sheeting to eliminate the need for lighting.

• Specifying Light Emitting Diode (LED) traffic signals and highway lighting, which can reduce energy consumption by up to 50 percent.

• Deploying SMART Irrigation Controllers to tailor water usage for landscaping based on weather conditions in order to conserve water.

• Using recycled water for roadside landscape watering where possible.

• Designing projects with functional landscaping features that collect storm water and reduce urban heat island effects.

• Installation of electric vehicle fast-charging stations at Caltrans-owned sites.

• Updating the project development process to track progress toward designing projects that include pedestrian and bicycle facilities.

• Some facility improvements that reduce the energy, water, and materials consumed in Caltrans’ buildings and operations.

LONG LEAD AND CONTINGENCY PROGRAMMING

Long Lead and Contingency projects help ensure that the State fully utilizes its available federal transportation funding. On June 15, 2000, Commission resolution G-00-13 provided Caltrans with a means to commence project delivery efforts on SHOPP Long Lead projects, which require more than four years to develop due to complex environmental and preliminary engineering work. The Commission further authorized Caltrans to program Contingency projects for preliminary engineering development only, when appropriate, thus creating projects that address performance goals without committing SHOPP resources to construction capital and support prematurely, before the resources are actually needed. This enables the maximum currently available capital funding to be dedicated to projects that are ready for construction rather than having funding held aside for years as complex projects get ready for construction. The 2018 SHOPP contains 27 contingency projects, valued at $3.0 billion, as shown in Exhibit F. A shovel-ready contingency project can quickly be proposed for funding should additional transportation revenues be provided, or to replace a project that is delayed or otherwise reduced in cost, making funding available within the fiscally constrained Fund Estimate period. The 2018 SHOPP contains 29 Long Lead projects, valued at $2.3 billion. These projects require complex environmental and preliminary engineering work, taking more than four-years to complete as shown in Exhibit G.

California Department of Transportation

2018 SHOPP 10

COMPLETE STREETS – MEETING THE NEEDS OF ALL MODES

Caltrans incorporates its Complete Streets policy into practice in all project phases from transportation planning to asset management and project delivery. Caltrans uses a Complete Streets approach to design projects from the user’s perspective, taking into consideration a facility’s condition and surrounding destinations. This comprehensive process requires the multi-disciplinary Project Nomination Scoping Teams to identify and evaluate solutions for various transportation needs and to incorporate resulting and appropriate SHOPP eligible components into the SHOPP project scope.

RESERVATIONS

The 2018 SHOPP includes reservations that fund both Capital Outlay and Capital Outlay Support that are based on historical expenditures for emergency repairs, safety projects, and other unforeseen immediate needs. These needs occur between programming cycles and these reservations allow Caltrans to bring the projects to the Commission for amendment into the SHOPP between bi-annual programming cycles.

REGIONAL TRANSPORTATION PLANNING AGENCY COORDINATION

In 2013, the Self-Help Counties Coalition suggested enhanced communication and coordination in the SHOPP program development process. Specifically, the focus was on earlier information regarding what SHOPP projects are being proposed, programmed, and ultimately delivered. Caltrans developed three specific action steps to enhance earlier communications, covering planning, programming and delivery. These steps are in addition to statutory requirements that direct Caltrans to provide the draft SHOPP to transportation agencies for an opportunity to review and comment.

• Planning Process: Caltrans will present the SHSMP to the Regional Transportation Planning Agencies (RTPA) at an RTPA meeting so these stakeholders are aware of both the overall statewide needs and the estimated funding levels. Caltrans Districts will share their two-year PID work plan list of projects that will be candidates for the next SHOPP programming cycle. This is the opportunity to coordinate proposed SHOPP projects with regionally-funded projects in order to synchronize timeframes, maximize benefits, and minimize impacts to the traveling public.

• Programming Process: In the summer of odd years, Caltrans will present information to RTPAs concerning the timing and framework for development of the upcoming SHOPP. Districts should share with the regions which projects they will be submitting as candidate projects for the upcoming SHOPP. This is a second opportunity to coordinate and confer with local partners to synchronize timeframes, maximize benefits and minimize impacts to the traveling public. The Division of Transportation Programming will circulate the proposed four-year program of projects to the RTPAs for review and comment. In addition, the Programming Division Chief will present the proposed four‐year program at the RTPA meeting. Comments received will be incorporated into the final SHOPP programming document.

California Department of Transportation

2018 SHOPP 11

• Status Updates: Districts will update the RTPA’s on a quarterly or semi‐annual basis on (1) the list and status of PID projects being developed as well as, (2) the status of funded SHOPP projects currently in delivery. At a minimum, Districts will provide a summary‐level status of project delivery on all currently programmed SHOPP projects semiannually.

In December 2017, the draft 2018 SHOPP was provided to regional transportation partners. Eight agencies commented. Caltrans will further expand its SHOPP engagement efforts as it develops the 2019 SHSMP and the subsequent 2020 SHOPP. Formal comments received regarding the draft 2018 SHOPP and Caltrans responses are provided in Exhibit D.

California Department of Transportation

2018 SHOPP 12

PROJECT LISTINGS

2018 SHOPP projects are listed by County in Exhibit F. Projects are sorted into the following eight categories for each county:

1. Major Damage Restoration

2. Collision Reduction

3. Mandates

4. Bridge Preservation

5. Roadway Preservation

6. Mobility

7. Roadside Preservation

8. Facilities

DESCRIPTION OF EXHIBITS

Exhibit A: 2018 SHOPP Funding Summary Exhibit B: California Government Code section 14526 Exhibit C: Abbreviations and Acronyms Exhibit D: 2018 SHOPP Regional Transportation Planning Agency Comments

Comments Received and Caltrans Responses Exhibit E: Policy for Management of the SHOPP

Interim SHOPP Guidelines

Exhibit F: 2018 SHOPP County Listing of Projects Exhibit G: 2018 SHOPP Long Lead Projects

List of projects Caltrans will begin environmental work on now to deliver projects in subsequent SHOPP cycles.

Exhibit H: Pre-2018 SHOPP Projects

Projects allocated in prior SHOPP documents that have not achieved final acceptance. Exhibit I: Northern and Southern SHOPP Hearing Public Comments Exhibit J: Commission Adoption of the 2018 SHOPP Program Resolution G-18-13

California Department of Transportation 

2018 SHOPP     13

EXHIBIT A: 2018 SHOPP Funding Summary (Fiscal Years 2018-19 through 2021-22)

Note: The SHOPP is developed in millions and rounded for this table. Numbers may not add due to rounding.

Program Funding 2018-19 2019-20 2020-21 2021-22 Total2018 Fund Estimate $ 2,600 $ 2,700 $ 2,800 $ 2,900 $ 11,000 New SHOPP Capacity (RMRA) $ 1,600 $ 1,600 $ 1,600 $ 1,600 $ 6,400 ER Reimbursement $ 140 $ 140 $ 140 $ 140 $ 560 Programmed 2018-19 2019-20 2020-21 2021-22 TotalPavement $ 1,354 $ 822 $ 556 $ 1,077 $ 3,808 Bridge $ 566 $ 932 $ 454 $ 886 $ 2,838 Culverts $ 62 $ 211 $ 95 $ 140 $ 508 TMS $ 183 $ 254 $ 230 $ 132 $ 798 Supplementary Assets $ 195 $ 136 $ 91 $ 326 $ 748

Major Damage Restoration $ 37 $ 214 $ 108 $ 59 $ 418 Collision Reduction $ 865 $ 1,193 $ 309 $ 582 $ 2,950 Mandates $ 113 $ 116 $ 97 $ 269 $ 595 Mobility $ 50 $ 103 $ 23 $ 190 $ 367 Roadside Preservation $ 33 $ 14 $ 53 $ 7 $ 107 Protective Betterments $ 31 $ 22 $ 24 $ 48 $ 125 Multiple Objective $ 5 $ 5 $ 21 $ 105 $ 136

Subtotal $ 3,494 $ 4,022 $ 2,060 $ 3,822 $ 13,398 Reserved 2018-19 2019-20 2020-21 2021-22 TotalPavement $ - $ - $ 998 $ 21 $ 1,019 Bridge $ 41 $ 41 $ 141 $ 41 $ 264 Culverts $ - $ - $ 400 $ 20 $ 420 TMS $ - $ - $ - $ - $ - Supplementary Assets $ - $ - $ - $ - $ -

Major Damage Restoration $ 385 $ 169 $ 240 $ 240 $ 1,034 Collision Reduction $ 218 $ 47 $ 539 $ 333 $ 1,137 Mandates $ 12 $ 12 $ 12 $ 12 $ 48 Mobility $ - $ - $ - $ - $ - Roadside Preservation $ - $ - $ - $ 1 $ 1 Protective Betterments $ - $ - $ - $ - $ - Multiple Objective $ - $ - $ - $ - $ -

Subtotal $ 656 $ 269 $ 2,330 $ 668 $ 3,923 Programmed and Reserved 2018-19 2019-20 2020-21 2021-22 TotalPavement $ 1,354 $ 822 $ 1,554 $ 1,098 $ 4,827 Bridge $ 607 $ 973 $ 596 $ 927 $ 3,103 Culverts $ 62 $ 211 $ 495 $ 160 $ 928 TMS $ 183 $ 254 $ 230 $ 132 $ 798 Supplementary Assets $ 195 $ 136 $ 91 $ 326 $ 748

Major Damage Restoration $ 422 $ 383 $ 348 $ 299 $ 1,451 Collision Reduction $ 1,083 $ 1,240 $ 848 $ 916 $ 4,087 Mandates $ 125 $ 128 $ 109 $ 281 $ 643 Mobility $ 50 $ 103 $ 23 $ 190 $ 367 Roadside Preservation $ 33 $ 14 $ 53 $ 8 $ 108 Protective Betterments $ 31 $ 22 $ 24 $ 48 $ 125 Multiple Objective $ 5 $ 5 $ 21 $ 105 $ 136

Minor Program Reservation $ 150 $ 150 $ 150 $ 150 $ 600 Long Lead (New) $ 40 $ - $ - $ - $ 40 Total $ 4,340 $ 4,440 $ 4,540 $ 4,640 $ 17,960

California Department of Transportation 

2018 SHOPP     14

State Highway Operation and Protection Program Fund Reservations

The following reservations are being held to allow funding to achieve anticipated needs that will require action, but where specific projects have not yet been defined.

Major Damage Restoration:

Reservations are for unforeseen Major Damage Restoration (201.130) projects and Permanent Restoration (201.131) projects.

Collision Reduction:

Reservations are for Safety Improvement (201.010) projects.

Mandates:

Reservations are for Relinquishment (201.160) projects to transfer ownership of state highways primarily serving local jurisdictions to those local jurisdictions, Rail Road Grade Crossing Program (201.325) projects as prioritized by the Public Utilities Commission, Hazardous Waste Mitigation (201.330) projects not associated with a programmed State Highway Operation and Protection Program (SHOPP) or State Transportation Improvement Program (STIP) projects.

Bridge Preservation:

Reservations are for Bridge Preservation (201.119) projects to minimize the need for future bridge rehabilitation.

Roadside Preservation:

Reservations are for Surface Mining and Reclamation Act obligations.

Minor Program:

An annual reservation is held for the Minor program. The SHOPP Minor Program is an annual program to address short-term low cost project needs. In developing their annual portfolio of minor projects, each Caltrans District sets priorities and selects projects appropriate to the region’s needs.   

Primary Assets

A reservation has been established to address performance shortfalls in targeted regions for pavement performance, TMS detector health, culvert conditions and bridge health. Criteria for the prioritization and selection of these projects which will rehabilitate/replace poor condition culverts, pavement condition and bridge health.

California Department of Transportation

2018 SHOPP 15

EXHIBIT B: California Government Code section 14526

CHAPTER 2. Duties [14520 – 14534.1] (Chapter 2 added by Stats. 1977, Ch. 1106.) 14526.5. (a) Based on the asset management plan prepared and approved pursuant to Section 14526.4, the department shall prepare a state highway operation and protection program for the expenditure of transportation funds for major capital improvements that are necessary to preserve and protect the state highway system. Projects included in the program shall be limited to improvements relative to the maintenance, safety, operation, and rehabilitation of state highways and bridges that do not add a new traffic lane to the system.

(b) The program shall include projects that are expected to be advertised prior to July 1 of the year following submission of the program, but which have not yet been funded. The program shall include those projects for which construction is to begin within four fiscal years, starting July 1 of the year following the year the program is submitted.

(c) (1) The department, at a minimum, shall specify, for each project in the state highway operation and protection program, the capital and support budget, as applicable, for each of the following project phases:

(A) Project approval and environmental documents, support only.

(B) Plans, specifications, and estimates, support only.

(C) Rights-of-way.

(D) Construction.

(2) The department shall specify, for each project in the state highway operation and protection program, a projected delivery date for each of the following components:

(A) Project approval and environmental document completion.

(B) Plans, specifications, and estimates completion.

(C) Right-of-way certification.

(D) Start of construction.

(d) The department shall submit its proposed program to the commission not later than January 31 of each even-numbered year. Prior to submitting its proposed program, the department shall make a draft of its proposed program available to transportation planning agencies for review and comment and shall include the comments in its submittal to the commission. The department shall provide the commission with detailed information for all programmed projects on cost, scope, schedule, and performance metrics as determined by the commission.

(e) The commission shall review the proposed program relative to its overall adequacy, consistency with the asset management plan prepared and approved pursuant to Section 14526.4 and funding priorities established in Section 167 of the Streets and Highways Code, the level of annual funding

California Department of Transportation

2018 SHOPP 16

needed to implement the program, and the impact of those expenditures on the state transportation improvement program. The commission shall adopt the program and submit it to the Legislature and the Governor not later than April 1 of each even-numbered year. The commission may decline to adopt the program if the commission determines that the program is not sufficiently consistent with the asset management plan prepared and approved pursuant to Section 14526.4.

(f) As part of the commission’s review of the program required pursuant to subdivision (a), the commission shall hold at least one hearing in northern California and one hearing in southern California regarding the proposed program.

(g) On or after July 1, 2017, to provide sufficient and transparent oversight of the department’s capital outlay support resources composed of both state staff and contractors, the commission shall be required to allocate the department’s capital outlay support resources by project phase, including preconstruction. Through this action, the commission will provide public transparency for the department’s budget estimates, increasing assurance that the annual budget forecast is reasonable. The commission shall develop guidelines, in consultation with the department, to implement this subdivision. Guidelines adopted by the commission to implement this subdivision shall be exempt from the Administrative Procedure Act (Chapter 3.5 (commencing with Section 11340) of Part 1).

(h) Beginning July 1, 2017, for a project that experiences increases in capital or support costs above the amounts in the commission’s allocation pursuant to subdivision (g), the commission shall establish a threshold for requiring a supplemental project allocation. The commission’s guidelines adopted pursuant to subdivision (g) shall also establish the threshold that the commission determines is necessary to ensure efficiency and may provide exceptions as necessary so that projects are not unnecessarily delayed.

(i) The department, for each project requiring a supplemental project allocation pursuant to subdivision

(h), shall submit a request to the commission for its approval.

(j) Expenditures for these projects shall not be subject to Sections 188 and 188.8 of the Streets and Highways Code.

(Amended by Stats. 2017, Ch. 5, Sec. 6. Effective April 28, 2017.)

14526.7. (a) The department shall incorporate the performance targets in subdivision (n) of Section 1 of the act adding this section into the asset management plan adopted by the commission and targets adopted by the commission pursuant to Sections 14526.4 and 14526.5. The asset management plan shall also include targets adopted by the commission in consultation with the department for each asset class included in subdivision (n) of Section 1 of the act adding this section to measure the degree to which progress was made towards achieving the overall 2027 targets. Targets may be modified by the commission as needed to conform to federal regulation on performance measures and the completion of the department’s asset management plan. Nothing in this section precludes the commission from adopting additional targets and performance measures pursuant to paragraph (1) of subdivision (c) of Section 14526.4.

California Department of Transportation

2018 SHOPP 17

(b) As specified by guidelines adopted by the commission, the department shall report to the commission on its progress toward meeting the targets and performance measures established for state highways pursuant to subdivision (n) of Section 1 of the act adding this section and paragraph (1) of subdivision (c) of Section 14526.4.

(Added by Stats. 2017, Ch. 5, Sec. 7. Effective April 28, 2017.)

 

 

This page left blank intentionally

California Department of Transportation

2018 SHOPP 18

EXHIBIT C: Abbreviations and Acronyms

ADA Americans with Disabilities Act Caltrans California Department of Transportation COS Capital Outlay Support CEQA California Environmental Quality Act Commission or CTC California Transportation Commission FTF Federal Highway Trust Fund Fund Estimate State Transportation Improvement Program Fund Estimate GHG Greenhouse Gas LED Light Emitting Diode NEPA National Environmental Protection Act PA&ED Project Approval and Environmental Document - Environmental PID Project Initiation Document

Proposition 1B Highway Safety, Traffic Reduction, Air Quality, and Port Security Bond Act of 2006

PS&E Plans, Specifications, and Estimate R/W Right-of-Way RMRA Road Maintenance and Rehabilitation Account RTPA Regional Transportation Planning Agency SB 1 Senate Bill 1 SB 486 Senate Bill 486 SHA State Highway Account SHOPP State Highway Operation and Protection Program SHS State Highway System SHSMP State Highway System Management Plan STIP State Transportation Improvement Program TAMP Transportation Asset Management Plan TMS Transportation Management System

 

 

This page left blank intentionally

California Department of Transportation

2018 SHOPP 19

EXHIBIT D: 2018 SHOPP Regional Transportation Planning Agency Comments

AGENCY COMMENTING PAGE NUMBER

Calaveras Council of Governments 1

City of West Sacramento 5

Contra Costa Transportation Authority 6

Del Norte Local Transportation Commission 11

Metropolitan Transportation Commission 13

Orange County Transportation Authority 18

Pechanga Indian Reservation – Temecula Band of Luiseño Mission Indians 23

Yolo County Board of Supervisors 27

2018 State Highway Operations and Protection Program Public Comments

2018 State Highway Operations and Protection Program Public Comments

2018 State Highway Operations and Protection Program Public Comments

2018 State Highway Operations and Protection Program Public Comments

Caltrans Response to Calaveras Council Governments

Thank you for your response to Caltrans' request for comments on the Draft 2018 SHOPP Project List. The project Wagon Trail project located in Calaveras County on State Route 4, PM 29.2/29.4 near Murphy, from Pennsylvania Gulch Road to Main Street/Lawrence Street (EA 10-0W870) is proposed 2018 SHOPP project. District 10 will continue to work closely with Calaveras Council of Governments through the project development process.

2018 State Highway Operations and Protection Program Public Comments

Comments submitted via online survey

What is your first and last name? Denix Anbiah

What is your email address? [email protected]

What is your phone number? (Optional) (916) 617-4850

Please indicate the Agency you represent. City of West Sacramento

2018 State Highway Operations and Protection Program Public Comments

Thank you for the opportunity to comment on the Draft 2018 SHOPP List of Projects. We appreciate Caltrans' commitment to rehabilitating and improving the State Highway System routes in Yolo County. We particularly appreciate the Draft 2018 SHOPP Project List that includes approximately $4 billion in projects for fiscal years 2018-2019 through 2021-2022. We understand that these projects will address safety, emergency, mandates, and fix-it-first needs. However, we are concerned that the rehabilitation for Interstate 80 (I-80) and US 50 (EA 03-4F650K) was not included in the Draft 2018 SHOPP Project List. The Pavement Condition Survey for this section of road shows major distress and an unacceptable ride. I-80 and US 50 serve as major trade, commute and tourism routes for Yolo County and the Greater Sacramento Region. Also, I-80, being on the National Freight System, provides critical access to the Port of Oakland, the Port of West Sacramento, and serves as an important link for people and goods from the San Francisco Bay Area all the way to the East Coast. Also it is important to note that Yolo County Transportation District (YCTD) in partnership with Caltrans has applied to FHWA for the federal INFRA grant to do the HOV project within the same project limits. Combining these projects saves a significant amount of money for the tax payers and minimizes the interruption to the traffic. We therefore urgently request that Caltrans reconsider its position on this important project.

Caltrans Response to City of West Sacramento

The Yolo County pavement rehabilitation project (03‐4F650) described as “In and near West Sacramento, from east of Mace Boulevard to Sacramento River Bridge; also on Route 50, from Route 80 to Jefferson Boulevard Overcrossing (PM 0.0/2.5). Rehabilitate pavement by placing Continuous Reinforced Concrete, rehabilitate bridge decks, median widening at three locations, upgrade bridge railings, and construct an auxiliary lane.” This project is incorporated into the 2018 SHOPP as a Long Lead project.

2018 State Highway Operations and Protection Program Public Comments

2018 State Highway Operations and Protection Program Public Comments

2018 State Highway Operations and Protection Program Public Comments

2018 State Highway Operations and Protection Program Public Comments

2018 State Highway Operations and Protection Program Public Comments

Caltrans Response to Contra Costa Transportation Authority:

Thank you for your letter on the Draft 2018 State Highway Operation and Protection Program (SHOPP) for the transportation improvements in Contra Costa County.

The SHOPP is fiscally constrained program that prioritize and funds projects that protect, preserve and rehabilitate State Highway System infrastructure to meet safety, emergency, mandates, and fix-it-first needs. Furthermore, the projects funded in SHOPP do not add capacity as new lanes.

The Contra Costa bridge project (04‐22913) described as “Near Martinez, at Grayson Creek Bridge No. 28-0066 R/L. Replace bridges by Financial Contribution Only to Contra Costa Transportation Authority.” is incorporated into the 2018 SHOPP and proposed for programming in FY 2018-19.

As individual SHOPP projects are developed, we will continue to work with you to consider opportunities to integrate your proposed improvements if feasible.

Caltrans appreciates your feedback and will continue to collaborate with CCTA to deliver transportation improvements in Contra Costa County.

2018 State Highway Operations and Protection Program Public Comments

2018 State Highway Operations and Protection Program Public Comments

Caltrans Response to Del Norte Local Transportation Commission:

Thank you for your letter dated January 1, 2018, in which you requested that Caltrans program an improvement at US 101, SR 199 and Elk Valley Cross Road. Caltrans District 1 Traffic has evaluated collisions at this intersection and has been working with your commission to resolve issues. The following improvements have been recently constructed or evaluated at SR 199 and Elk Valley Cross Road:

1. Installed a Radar Feedback “45 mph” approaching Elk Valley Cross Road from SR 199. 2. Installed new roadway surface, restriped, adjusted optical speed bars and checked all

signs. 3. Evaluated SR 199 and Elk Valley Cross Road twice in 2017 for signal warrant analysis. 4. Considered reconfiguration of SR 199 and Elk Valley Cross Road/ Kings Valley Cross

Road. 5. On US 101 at Elk Valley Crossing, replaced some missing signs and checked the area.

We contacted the California Highway Patrol to check the recent collision history which appears to be trending downward following our adjustments to the intersection. Caltrans continuously monitors collision history on all our highways and appreciates local feedback. We will soon send an investigator to the intersections at peak hour volumes to monitor driver behavior in traversing the intersections.

2018 State Highway Operations and Protection Program Public Comments

2018 State Highway Operations and Protection Program Public Comments

2018 State Highway Operations and Protection Program Public Comments

2018 State Highway Operations and Protection Program Public Comments

2018 State Highway Operations and Protection Program Public Comments

Caltrans Response to Metropolitan Transportation Commission: Thank you for your comments on the Draft 2018 SHOPP Project List. Caltrans welcomes our partnership with MTC to deliver transportation improvements and values your feedback in our efforts to protect, preserve and rehabilitate State Highway System infrastructure to meet safety, emergency, mandates, and fix-it-first needs in the Bay Area.

2018 State Highway Operations and Protection Program Public Comments

2018 State Highway Operations and Protection Program Public Comments

2018 State Highway Operations and Protection Program Public Comments

2018 State Highway Operations and Protection Program Public Comments

Caltrans Response to Orange County Transportation Authority: Caltrans values the partnership with Orange County Transportation Authority (OCTA) in the development of projects and programs. Caltrans and OCTA have indeed worked closely over the years to ensure that proposed and ongoing projects include OCTA’s input. For the development of the draft 2018 SHOPP document, Caltrans staff has communicated with different groups within OCTA through multiple avenues. District 12 Planning Division emailed the 2018 Project Initiation Document (PID) Work plan to OCTA in June 2017, well in advance of project nomination for the draft 2018 SHOPP program. Caltrans and OCTA hold regularly scheduled joint project status meetings and management coordination meetings where draft 2018 SHOPP projects, among other topics, were discussed. Moreover, Caltrans discussed and presented the draft 10 year list of SHOPP projects to the OCTA Executive staff at an August 3, 2017 meeting, for their review and comment, and to discuss regional strategies related to SB1 projects programming. These meetings may not have included representatives of all of OCTA’s various divisions present. We look forward to streamlining our communications so that all groups within OCTA and Caltrans District 12 are included. The current version of the draft 2018 SHOPP includes $497 million worth of projects for Orange County. In addition, as discussed with OCTA staff, there are opportunities to add projects throughout the SHOPP programming cycle, specifically in the areas safety or emergency, funded through a set-aside reservation fund for these projects. This may also be the case for projects that address one or more of the four major asset classes namely, Pavement Rehabilitation, Bridge Preservation, Culverts and Transportation Management Systems. It is important to note that the SHOPP is a statewide funding program that addresses maintenance and operational needs without reference to District or County boundaries, and funds projects that address system performance needs throughout the state. Caltrans recognizes that Measure funded projects add capacity to the State Highway System (SHS), as administered by OCTA. All projects implemented on the SHS are required to meet Caltrans Standards, including long life pavement and updated safety standards. Nonetheless, projects that add capacity result in an increase in asset inventory to Caltrans, which in turn result in increased maintenance needs that will require future SHOPP investments. It is important that both agencies work collaboratively together to improve the transportation system within Orange County and to improve the communication path within the different groups within each agency. Please see the attached chart for responses on specific projects highlighted in OCTA’s letter.

2018 State Highway Operations and Protection Program Public Comments

2018 State Highway Operations and Protection Program Public Comments

2018 State Highway Operations and Protection Program Public Comments

2018 State Highway Operations and Protection Program Public Comments

Caltrans Response to Pechanga Band of Luiseno Indians Thank you for your response to Caltrans' request for comments on the Draft 2018 SHOPP Project List. Please note that Tribal consultation is part of Caltrans’ standard operating procedure for cultural resources compliance pursuant to both Section 106 of the National Historic Preservation Act (Section 106) and CEQA during Caltrans’ Project Approval and Environmental Document (PA&ED) process. In addition, the Native American Heritage Commission and consulting Tribes are also invited to comment on Caltrans’ environmental documents. As you may know, Caltrans folds its Native American Consultation responsibilities under Section 106 and CEQA (including AB-52) into a single consultation process. Projects that qualify as a CEQA CE are not required to meet the timeframes for consultation established under AB-52, but still follow Caltrans consultation process referred to above. The Pechanga Band of Luiseno Indians has requested that to the extent that the projects identified below require environmental compliance with the California Environmental Quality Act, that the Tribe be involved in the entire CEQA environmental review process. In fact, Caltrans has already initiated consultation on several of the listed projects and will continue to consult with the Tribe as requested. The Tribe has identified the following projects for which additional information is being requested: 1C850; 1G670; 1G870; 1C590; 1C660; IF690; 1Fl 41; and 1E770. The current status of the listed projects is as follows: 1C850 RIV 74 WIDEN LANES, ADD SHOULDERS & RUMBLE STRIPS Caltrans initiated Native American Consultation in February 2017 and is ongoing. As of January 2018, the Tribe has requested monitoring and will be monitoring during archaeological testing. 1G670 RIV 79 CONSTRUCT PAVED SHOULDERS AND WIDEN EXISTING CULVERTS Caltrans Cultural Studies began work on this project in December 2017. Formal consultation will be initiated with the Tribe in early 2018. 1G870 RIV 215 INSTALL AN OUTER SEPARATION BARRIER Caltrans processed this project in November 2017 as a Screened Undertaking under our 2014 Programmatic Agreement. The project’s scope of work was minor and within public ROW located between I-15 and Antelope Road. Typically, Caltrans does not initiate formal Native American consultation on projects that qualify as a Categorical Exemption / Categorical Exclusion (CE/CE) with a minor scope of work. Additional information can be provided if requested. 1C590 RIV 74 SOURCE CONTROL IN LAKE ELSINORE Caltrans Cultural Studies began work on this project in September 2017 and it is currently in the PA&ED process. Formal consultation will be initiated with the Tribe in early 2018.

2018 State Highway Operations and Protection Program Public Comments

1C660 RIV 215 SEDIMENT STABILIZATION, EROSION CONTROL Caltrans Cultural Studies began work on this project in September 2017 and it is currently in the PA&ED process. Formal consultation will be initiated with the Tribe in early 2018. 1F690 RIV-79 NEAR TEMECULA MILL & OVERLAY Caltrans Cultural Studies began work on this project in May 2017 and it is currently in the PA&ED process. Formal consultation was initiated January 8, 2018 and is on-going. 1F141 I-15 TEMECULA LANE REPLACEMENT Caltrans initiated Native American Consultation in March 2017 with follow-ups in July and September 2017. As of January 2018, the Tribe has not responded. 1E770 RIV 74 SLOPE STABILIZATION Caltrans processed this project in August 2017 as a Screened Undertaking under our 2014 Programmatic Agreement. The project’s scope of work was minor and within Caltrans ROW located just west of Lake Elsinore. Typically, Caltrans does not initiate formal Native American consultation on projects that qualify as a Categorical Exemption / Categorical Exclusion (CE/CE) with a minor scope of work. Additional information can be provided if requested.

2018 State Highway Operations and Protection Program Public Comments

Comments submitted via online survey

What is your first and last name? Don Saylor

What is your email address? [email protected]

What is your phone number? (Optional) 530-757-5557

Please indicate the Agency you represent. Yolo County Board of Supervisors

2018 State Highway Operations and Protection Program Public Comments Thank you for the opportunity to comment on the Draft 2018 SHOPP List of Projects. I serve as a Yolo County Supervisor representing District 2 and as a Board Member of the Yolo County Transportation District, the Sacramento Area Council of Governments, Capitol Corridor Joint Powers Board, and the Yolo-Solano Air Quality Management District. Through these roles I am aware of the comprehensive transportation-related needs of the Sacramento region. The rehabilitation for Interstate 80 (I-80) and US 50 (EA 03-4F650K) project addresses one of the most critical unaddressed corridors in our region. As other projects have moved forward, this segment has continued to be overlooked.

We appreciate California Department of Transportation’s (Caltrans) commitment to rehabilitating and improving the State Highway System routes in Yolo County. We particularly appreciate the Draft 2018 SHOPP Project List that includes approximately $4 billion in projects for fiscal years 2018-2019 through 2021-2022. We understand that these projects will address safety, emergency, mandates, and fix-it-first needs. However, we are concerned that the rehabilitation for Interstate 80 (I-80) and US 50 (EA 03-4F650K) was not included in the Draft 2018 SHOPP Project List. The Pavement Condition Survey for this section of road shows major distress and an unacceptable ride. I-80 and US 50 serve as major trade, commute and tourism routes for Yolo County and the Greater Sacramento Region. Also, I-80, being on the National Freight System, provides critical access to the Port of Oakland, the Port of West Sacramento, and serves as an important link for people and goods from the San Francisco Bay Area all the way to the East Coast. We therefore urgently request that Caltrans reconsider its position on this important project.

Caltrans Response to Yolo County The Yolo County pavement rehabilitation project (03‐4F650) described as “In and near West Sacramento, from east of Mace Boulevard to Sacramento River Bridge; also on Route 50, from Route 80 to Jefferson Boulevard Overcrossing (PM 0.0/2.5). Rehabilitate pavement by placing Continuous Reinforced Concrete, rehabilitate bridge decks, median widening at three locations, upgrade bridge railings, and construct an auxiliary lane.” This project is incorporated into the 2018 SHOPP as a Long Lead project.

California Department of Transportation

2018 SHOPP 20

EXHIBIT E: Policy for Management of the SHOPP

Interim SHOPP Guidelines

California Transportation Commission Page ii Interim SHOPP Guidelines (Revision Date: June 16, 2017)

CALIFORNIA TRANSPORTATION COMMISSION

INTERIM STATE HIGHWAY OPERATION AND PROTECTION PROGRAM GUIDELINES

Table of Contents I. INTRODUCTION/OVERVIEW ....................................................................................... 1

1. Commission Mission ........................................................................................................... 1 2. Purpose ................................................................................................................................. 1 3. Guidelines Objectives .......................................................................................................... 2 4. Definitions and Acronyms ................................................................................................... 2 5. Statutory Authority .............................................................................................................. 3 6. Applicability of Interim SHOPP Guidelines........................................................................ 3 7. Compliance with Federal and State Requirements .............................................................. 3 8. Delegation of Authority ....................................................................................................... 3 9. Amendments to the Guidelines ............................................................................................ 3

II. SHOPP-RELATED DOCUMENTS SUBJECT TO COMMISSION ACTION ............. 4

10. Transportation Asset Management Plan .......................................................................... 4 11. Ten-Year SHOPP Plan ..................................................................................................... 4 12. Five-Year Maintenance Plan ............................................................................................ 4

III. SHOPP FUNDING ............................................................................................................ 4

13. Biennial STIP Fund Estimate ........................................................................................... 4 14. State-Only Funding .......................................................................................................... 5 15. Joint State and Local Funding .......................................................................................... 5 16. Advance Mitigation Program ........................................................................................... 5 17. GARVEE Bonding ........................................................................................................... 5

IV. SHOPP DOCUMENT ...................................................................................................... 6

18. General ............................................................................................................................. 6 19. TAMP (Phase I) Four Approved Asset Classes ............................................................... 6 20. SHOPP Preparation .......................................................................................................... 6 21. Display of Project Scope, Budget, Schedule, and Performance Measure ........................ 6 22. Database ........................................................................................................................... 7 23. SHOPP Submittal ............................................................................................................. 7 24. Adoption ........................................................................................................................... 7

V. SHOPP PROJECTS ............................................................................................................ 8

25. Eligibility .......................................................................................................................... 8 26. Project Budget .................................................................................................................. 8 27. Project Delivery Dates ..................................................................................................... 8 28. Project Scope .................................................................................................................... 9

VI. PROGRAMMING PROJECTS ...................................................................................... 9

29. Project Study Reports ....................................................................................................... 9 30. Project Selections ............................................................................................................. 9

California Transportation Commission Page iii Interim SHOPP Guidelines (Revision Date: June 16, 2017)

31. Programming Project Components Sequentially ............................................................. 9 32. Safety Projects ................................................................................................................ 10 33. Emergency Condition Response Projects ...................................................................... 10 34. Minor Projects ................................................................................................................ 10 35. Multi-Modal Corridor Projects....................................................................................... 10 36. Completion of Environmental Process ........................................................................... 10 37. Programming Combined SHOPP and Non-SHOPP Projects ........................................ 11 38. Programming Escalations ............................................................................................... 11 39. Allocation for Support and Construction ....................................................................... 11

VII. CALTRANS’ MANAGEMENT OF THE SHOPP ..................................................... 12

40. Scope, Cost, Schedule .................................................................................................... 12 41. Criteria for Measuring Performance and Cost-Effectiveness ........................................ 12 42. Allocation of Funds ........................................................................................................ 12 43. Timely Use of Funds for Support ................................................................................... 14 44. Timely Use of Funds for Construction ........................................................................... 15 45. Timely Use of Funds – Extension .................................................................................. 15 46. Management of Contingency and Long-Lead Projects .................................................. 16 47. Management of Reservation Projects ............................................................................. 16 48. Management of Minor Projects ...................................................................................... 16

VIII. CHANGE MANAGEMENT ...................................................................................... 16

49. Introduction .................................................................................................................... 16 50. Managing Within the Commission’s Delegated Authority ............................................ 16 51. Changes to Two-Year Cycle SHOPP Document ........................................................... 16

IX. SHOPP DELIVERY ....................................................................................................... 17

52. Goals............................................................................................................................... 17 53. Changes via Commission Amendment .......................................................................... 17 54. Project Delivery.............................................................................................................. 17 55. Delivery Deadline Extensions ........................................................................................ 17

X. SHOPP DEVELOPMENT SCHEDULE AND PROCEDURES ................................. 17

56. SHOPP Development Schedule ..................................................................................... 17 XI. REPORTING AND ACCOUNTABILITY .................................................................. 18

57. Report on Targets and Performance Measures .............................................................. 18 58. Report on Completed SHOPP Project ............................................................................ 18 59. Efficiencies ..................................................................................................................... 19 60. Accountability Reporting ............................................................................................... 19

XII. APPENDICES ................................................................................................................. 19

Appendix A: List of Acronyms................................................................................................ 19 Appendix B: Statutory References ........................................................................................... 19 Appendix C: Commission Resolutions and Delegations ......................................................... 19 Appendix D: March 26, 2015 Commission Action Regarding Asset Management Plan ........ 19

California Transportation Commission Page 1 Interim SHOPP Guidelines (Revision Date: June 16, 2017)

CALIFORNIA TRANSPORTATION COMMISSION INTERIM

STATE HIGHWAY OPERATION AND PROTECTION PROGRAM GUIDELINES

I. INTRODUCTION/OVERVIEW 1. Commission Mission

The Commission is an independent public agency dedicated to ensuring a safe, financially sustainable, world-class multimodal transportation system that reduces congestion, improves the environment, and facilitates economic development through the efficient movement of people and goods.

2. Purpose

These guidelines describe the policy, standards, criteria and procedures for the development, adoption, and management of the State Highway Operation and Protection Program (SHOPP) by the California Transportation Commission (Commission). With respect to the SHOPP, governing law requires that the Commission:

Advise and assist the California State Transportation Agency Secretary and the Legislature in formulating and evaluating state policies and plans for state transportation programs.

Develop SHOPP guidelines in consultation with the California Department of Transportation (Caltrans).

Receive the Caltrans proposed SHOPP not later than January 31 of each even-numbered year.

Review the proposed SHOPP relative to its overall adequacy, Transportation Asset Management Plan (TAMP) consistency, compliance with applicable law, level of annual funding for implementation, and impact of expenditures on the State Transportation Improvement Program (STIP).

Hold hearings in the North and South prior to adopting the SHOPP. Adopt the SHOPP and submit to the Legislature and Governor by April 1 of each even

numbered year. Decline to adopt the SHOPP if not sufficiently consistent with the asset management

plan. Allocate Caltrans’ capital outlay support resources by project phase to provide public

transparency for Caltrans budget estimates. Establish a threshold for requiring supplemental project allocations to ensure efficiency

but not to unnecessarily delay projects. Approve amendments to the SHOPP proposed by Caltrans. Review and approve the TAMP for purposes of assessing the health and condition of

the state highway system. Adopt targets and performance measures that reflect state transportation goals and

objectives for purposes of effectively applying the state’s limited resources in the SHOPP.

California Transportation Commission Page 2 Interim SHOPP Guidelines (Revision Date: June 16, 2017)

Adopt the biennial five-year fund estimate of state and federal funds expected to be available for the SHOPP.

Program and/or allocate state funds for capital projects, consistent with the SHOPP guidelines.

Adopt guidelines for the development of regional transportation plans and the California Transportation Plan (CTP).

Receive annual Caltrans reports relative to the expenditures made with road maintenance and rehabilitation funds including the progress made and achievement of the Senate Bill 1 (SB 1) specified 2027 performance goals and Commission adopted targets.

Evaluate annually Caltrans’ effectiveness in reducing deferred maintenance and improving road conditions as demonstrated by progress made in achieving the 2027 performance goals and Commission adopted targets. Include any findings in its annual report to the Legislature.

Make recommendations for improvement and withhold future project allocations if determined that funds were not appropriately spent.

3. Guidelines Objectives

These guidelines were developed and adopted with the following basic objectives:

a. Consistent with the TAMP, Ten-Year SHOPP Plan, and Five-Year Maintenance Plan, develop and manage the SHOPP as a resource management document.

b. Facilitate transportation decision making by those who are closest to the transportation problems.

c. Recognize that, although Caltrans is the owner-operator of the state highway system, the regional agencies have the lead responsibility for resolving urban congestion problems, including those on state highways.

d. Facilitate cooperative programming and funding ventures between Caltrans and local agencies including the regional transportation agencies.

e. Recognize regional and statewide goals and objectives in the rehabilitation and operation of the state-owned highway transportation system.

f. Emphasize partnerships between Caltrans and regional agencies in making investment decisions addressing the most critical corridor needs, regardless of mode choice.

g. Accelerate project delivery, to ensure efficient use of funds, and to address deferred maintenance on the state highway system.

h. Establish allocation thresholds that the Commission determines are necessary to ensure efficiency and provide exceptions as necessary so that projects are not unnecessarily delayed.

i. The Commission intends to carry out these objectives through these Interim Guidelines, stressing accountability, flexibility, and simplicity.

4. Definitions and Acronyms

Definitions for certain capitalized terms used in the Interim SHOPP Guidelines are contained in the referenced section. Acronyms used in the Interim SHOPP Guidelines are included in Appendix A.

California Transportation Commission Page 3 Interim SHOPP Guidelines (Revision Date: June 16, 2017)

5. Statutory Authority

The Interim SHOPP Guidelines were developed and adopted consistent with (Appendix B):

a. Governor’s Executive Orders, where applicable. b. Government Code Sections 14526.4, 14526.6; 14526.5, 14526.7. c. Streets and Highways Code Sections 164.6 and 167. d. Public Resources Code Section 21102 e. The Road Repair and Accountability Act of 2017 (SB 1) Chapter 5, Statutes of 2017); f. Commission Resolutions including, but not limited to: G-00-13, G-06-13, G-05-16,

G-11-16, and G-12-16. g. Commission approved actions specific to the Asset Management Plan on March 26,

2015 (Tab 26) regarding four asset classes. h. Current best management practices including those related to the STIP and its

authorities in accordance with Government Code Section 14530.1. i. Compliance with all Federal and State requirements.

6. Applicability of Interim SHOPP Guidelines

The Interim SHOPP Guidelines apply to projects programmed in the SHOPP. The Interim SHOPP Guidelines do not apply to transportation programming requirements specified in federal Transportation Improvement Programs (TIP) and the federal STIP required by federal statutes. Generally, all projects receiving federal transportation funds must be programmed in a federal TIP (for projects in urbanized regions) and also in a federal STIP. Metropolitan Planning Organizations are responsible for developing and adopting federal TIPs and Caltrans is responsible for preparing the federal STIP. The requirements for federal TIPs and the federal STIP are specified in federal statutes (Title 23 USC) and federal regulations (23 CFR part 450).

7. Compliance with Federal and State Requirements

Caltrans shall comply with all Federal and State requirements.

8. Delegation of Authority

As of the date of these Interim SHOPP Guidelines, the Commission has taken formal action to delegate (Appendix C) certain authorities to Caltrans:

Resolution G-05-16: Sub-allocation and Adjustment of Minor Capital Construction Projects.

Resolution G-06-13: Allocation of Funds for Safety Projects. Resolution G-11-16: Funding Emergency Condition Response Projects. Resolution G-12-16: Adjustment and Modification of Project Allocations and

Descriptions.

9. Amendments to the Guidelines

The Commission may amend the adopted SHOPP guidelines after first giving notice of the proposed amendment and conducting at least one public hearing.

California Transportation Commission Page 4 Interim SHOPP Guidelines (Revision Date: June 16, 2017)

II. SHOPP-RELATED DOCUMENTS SUBJECT TO COMMISSION ACTION 10. Transportation Asset Management Plan

Pursuant to Government Code Section 14526.4, Caltrans in consultation with the Commission shall prepare a robust Asset Management Plan (TAMP) to guide selection of projects for the SHOPP. Caltrans may prepare the TAMP in phases, the first phase to be implemented with the 2016 SHOPP. The complete TAMP is due no later than the 2020 SHOPP. The Commission reviews and approves the TAMP and adopts targets and performance measures reflecting state transportation goals and objectives. The TAMP is a strategic and systemic process of operating, maintaining, and upgrading physical assets effectively through their lifecycle by focusing on business and engineering practices for resource allocation and utilization based on well-defined objectives. Pursuant to Section 14526.7(a), Caltrans shall incorporate the performance targets adopted by the Commission pursuant to Government Code Sections 14526.4 and 14526.5. On March 26, 2015, the Commission approved four asset classes for the first phase of the TAMP that included: pavement, bridge, culverts, and Intelligent Transportation System (ITS) components.

Notwithstanding the foregoing, SB 1 states the Legislature’s intent that Caltrans meet the following preliminary performance outcomes for additional state highway investments by the end of 2027, in accordance with applicable state and federal standards:

Not less than 98 percent of pavement on the state highway system in good or fair condition. Not less than 90 percent level of service achieved for maintenance of potholes, spalls, and

cracks. Not less than 90 percent of culverts in good or fair condition. Not less than 90 percent of the transportation management system units in good condition. Fix not less than an additional 500 bridges.

11. Ten-Year SHOPP Plan

Pursuant to Streets and Highways Code Section 164.6(a), Caltrans shall prepare a ten-year state rehabilitation plan for the rehabilitation and reconstruction, or combination thereof, to be included in the SHOPP, of all state highways and bridges owned by the state. This plan is hereafter referred to as “Ten-Year SHOPP Plan.”

12. Five-Year Maintenance Plan

Pursuant to Streets and Highway Code Section 164.6(b), Caltrans shall prepare a five-year maintenance plan that addresses the maintenance needs of the state highway system. This plan is hereafter referred to as “Five-Year Maintenance Plan.”

III. SHOPP FUNDING 13. Biennial STIP Fund Estimate

By July 15 of each odd numbered year, Caltrans shall submit to the Commission a proposed fund estimate for the following five-year STIP period which also includes proposed program funding levels for the SHOPP. The Commission shall adopt the STIP Fund Estimate by August 15 of that same year. The assumptions on which the STIP Fund Estimate is based shall be determined by the Commission in consultation with Caltrans, regional agencies, and county transportation commissions.

California Transportation Commission Page 5 Interim SHOPP Guidelines (Revision Date: June 16, 2017)

14. State-Only Funding

The Commission will assume that all projects will be qualified for federal transportation funding unless Caltrans designates otherwise. Whenever Caltrans designates a project to be programmed for state-only (non-Federal) funding, it will explain the reason for this designation. Projects programmed without a state-only designation and later proposed for state-only funding allocations will be subject to Caltrans recommendation for exception to federal funding prior to the Commission’s fund allocation. Caltrans is updating its federal funding policy due to the passage of SB 1 and will submit the updated policy for future Commission action.

15. Joint State and Local Funding

If Caltrans and a local or regional agency agree, they may, if consistent with all applicable laws and regulations, recommend that a new project or a project cost increase be jointly funded from state and local funds and execute a cooperative agreement to reflect the agreed participations.

16. Advance Mitigation Program

Pursuant to Article 2.5(b) of Chapter 4 of Division 1 of the Streets and Highway Code, beginning in fiscal year 2017-18 and for a period of four years, Caltrans shall set aside no less than thirty million dollars ($30,000,000) annually for the Advance Mitigation Program from the annual appropriations for the STIP and SHOPP for the planning and implementation of projects in the Advance Mitigation Program. The Advance Mitigation Program was created to enhance communications between the Caltrans and stakeholders to protect natural resources through project mitigation, to meet or exceed applicable environmental requirements, to accelerate project delivery, and to fully mitigate environmental impacts from transportation infrastructure projects. The annual Budget Act and subsequent legislation may establish additional provisions and requirements for the Advanced Mitigation Program.

17. GARVEE Bonding

If the fund estimate projects the availability of federal funding for the SHOPP, the Commission may, by SHOPP amendment, select SHOPP eligible projects proposed for accelerated construction through GARVEE bonding. The Commission will select projects for GARVEE bonding that rehabilitate and/or improve operation of corridors and gateways for interregional travel and goods movement, especially projects that promote economic development and projects that are too large to be programmed within the SHOPP on a pay-as-you-go basis. The Commission’s expectation is that, generally, these will be projects that require bond proceeds exceeding $25 million.

Each bond will be structured for debt service payments over a term of not more than 12 years. In designating projects for bonding and scheduling bond sales, the Commission will give consideration to the overall annual debt service limit of 15 percent of Federal revenues.

GARVEE bonds cover only the federally-funded portion of a project’s cost (generally 88½ percent). GARVEE bonding in California is structured so that the state’s future federal transportation apportionments cover all debt service payments. This requires that the entire non-federal portion of project cost (including costs of issuance and interest) be provided at the time of construction on a pay-as-you-go basis. The Commission’s policy is that the non-federal portion of project costs will be programmed within the current SHOPP capacity. Although local funds may be applied to the non-federal share, the ability of a local agency to contribute its funding to a SHOPP project will not be a major criterion in the selection of SHOPP projects for GARVEE bonding.

California Transportation Commission Page 6 Interim SHOPP Guidelines (Revision Date: June 16, 2017)

IV. SHOPP DOCUMENT 18. General

The SHOPP is a biennial program adopted no later than April 1 of each even numbered year. Consistent with the Biennial STIP Fund Estimate, discussed in Section 13, each SHOPP will cover a two-year period and add two new years of programming capacity.

19. TAMP (Phase I) Four Approved Asset Classes

Pursuant to the Commission’s Approved Action in March 26, 2015 (Tab 26) (attached as reference) and consistent with the TAMP, each SHOPP document shall include pavement, bridge, culvert, and ITS projects and specify their corresponding performance measures for each year of the SHOPP for the first phase of the TAMP transition. Subject to the review and approval of the Commission, the SHOPP shall include other assets and specify their respective performance measures once Caltrans addresses them in the future TAMP phase(s).

20. SHOPP Preparation

Pursuant to Government Code Section 14526.5(a), and consistent with the TAMP, Caltrans shall prepare a four-year SHOPP for the expenditure of transportation funds for major capital improvements needed to preserve and protect the state highway system. Consistent with the TAMP, Ten-Year SHOPP Plan, and Five-Year Maintenance Plan, each new SHOPP shall include projects carried forward from the previous SHOPP plus new projects and reserves that are expected to be advertised prior to July 1 of the year of adoption, but for which the Commission has not yet allocated funds. The total amount programmed in each fiscal year of the SHOPP shall not exceed the amount specified in the STIP Fund Estimate.

21. Display of Project Scope, Budget, Schedule, and Performance Measure

The SHOPP document shall include the following information for each project:

a. The project title, including a brief description of the project location and limits (community name, corridor, street name, etc.), and a phrase describing the type and scope of the project.

b. A unique project identification number (e.g. PPNO, EA, Project ID) provided by Caltrans.

c. For projects on the state highway system, the route number and post-mile (or post-kilometer) limits.

d. Support and capital budgets for project approval and environmental document (PA&ED), plans, specifications, and estimates (PS&E), right-of-way (support and capital), and construction (support and capital) including the source and amounts of non-SHOPP funds, if any, committed to the project.

e. Any appropriate funding restriction or designation, including projects requiring state-only funding, or projects requiring federal funds.

f. Project delivery date for PA&ED completion, PS&E completion, Right-of-Way certification, and commencement of construction (construction contract awarded).

g. Planned performance measure(s) for each project. h. Description based on quantified and qualitative information to document transparently

and in plain language how the SHOPP is consistent with the Commission approved TAMP.

California Transportation Commission Page 7 Interim SHOPP Guidelines (Revision Date: June 16, 2017)

22. Database

Caltrans is responsible for maintaining an electronic database record of the adopted SHOPP documents and Commission actions that amend the SHOPP. The current data base is known as the California Transportation Improvement Program System (CTIPS).

Consistent with this database, Caltrans shall develop and maintain a transparent system to display in plain language each SHOPP project’s support and capital budget, schedule, scope, expected performance benefits and updates thereof to enhance communication among the districts and headquarters, to ensure efficient management of the entire portfolio, and to provide public transparency.

23. SHOPP Submittal

Pursuant to Government Code Section 14526.5(d), Caltrans shall submit the proposed SHOPP, to the Commission no later than January 31 of each even year. Caltrans shall provide the Commission with detailed information for all projects including, but not limited to, cost, scope, schedule, and performance metrics. The four-year SHOPP document will describe in plain language its overall adequacy and consistency with the Ten-Year SHOPP Plan, Five-Year Maintenance Plan, as well as the Commission approved TAMP, funding priorities established in Streets and Highways Code Section 167, the level of annual funding needed to implement the program, and the impact of those expenditures on the STIP. Prior to submitting its proposed program, Caltrans shall make a draft of the proposed SHOPP available to transportation planning agencies for review and comment and shall include the comments in its submittal to the Commission.

24. Adoption

Pursuant to Government Code Section 14526.5(e), the Commission shall review each two-year cycle SHOPP document relative to its overall adequacy and consistency with the TAMP prepared and approved pursuant to Government Code Section 14526.4 and funding priorities established in Streets and Highway Code Section 167, the level of annual funding needed to implement the program, and the impact of those expenditures on the state transportation improvement program. Not later than April 1 of each even numbered year the Commission shall adopt each two-year SHOPP document and submit it to the Legislature and to the Governor. The Commission may decline to adopt the SHOPP if the Commission determines that the program is inadequate or it is not sufficiently consistent with the Ten-Year SHOPP Plan, Five-Year Maintenance Plan, and TAMP prepared and approved pursuant to Government Code Section 14526.6.

Pursuant to Government Code Section 14526.5 (f), as part of the Commission’s review, the Commission shall hold at least one hearing in northern California and one hearing in southern California regarding the proposed program.

Each two-year cycle SHOPP shall be a statement of the Commission’s intent for allocation and expenditure of funds for the following four years as well as a resource management document to assist in the planning and utilization of transportation resources in a cost-effective manner. Each adopted SHOPP shall remain in effect until a new SHOPP is adopted.

Caltrans will publish the SHOPP record within 75 days of the SHOPP adoption and make copies available to the Commission. To facilitate development, analysis and management of the SHOPP, Caltrans will provide the Commission appropriate access to the SHOPP database.

California Transportation Commission Page 8 Interim SHOPP Guidelines (Revision Date: June 16, 2017)

Projects allocated for construction in prior SHOPP documents but which have not achieved final acceptance are incorporated by reference and are a part of the newly adopted SHOPP until final acceptance is achieved and a final report of actual expenditures against Commission allocations is provided to the Commission.

V. SHOPP PROJECTS 25. Eligibility

Projects eligible for SHOPP funds include major capital improvements that are necessary to preserve and protect the state highway system. Projects included in the program shall be limited to improvements relative to the maintenance, safety, operation, and rehabilitation of state highways and bridges that do not add a new traffic lane to the system, and to advance mitigation projects. Streets and Highways Code Section 2030 (b)(1)(D) states that complete street components, including active transportation purposes, pedestrian and bicycle safety projects, transit facilities, and drainage and storm water capture projects are SHOPP-eligible in conjunction with any other allowable project. Examples of operation improvement projects include, but are not limited to the following:

Auxiliary lanes for merging or weaving between adjacent interchanges. Intersection modifications including traffic signals. Slow vehicle lanes on conventional highways and four lane freeways. Curve and vertical alignment corrections. Two-way left turn lanes. Channelization. Turnouts. Chain control and truck brake inspection sites. Shoulder widening. Traffic Management Systems. Traffic Management Centers. Multimodal corridor projects.

26. Project Budget

For each project in the SHOPP, Caltrans shall identify each phase of a project and include the specified budget. Pursuant to Government Code Section 14526.5(c)(1), Caltrans, at a minimum, shall specify, for each project in the SHOPP (where applicable), the capital and the support budget for each of the following project phases:

a. PA&ED (only consists of support); b. PS&E (only consists of support); c. Right-of-way (support and capital); and d. Construction (support and capital).

27. Project Delivery Dates

Each phase of a project must have a specified schedule. Pursuant to Government Code Section 14526.5(c)(2), Caltrans shall specify a projected delivery date for each of the following components:

a. PA&ED completion; b. PS&E completion;

California Transportation Commission Page 9 Interim SHOPP Guidelines (Revision Date: June 16, 2017)

c. Right-of-way certification; and d. Start of Construction.

28. Project Scope

The specified scope of each eligible SHOPP project, must be consistent with the TAMP.

VI. PROGRAMMING PROJECTS 29. Project Study Reports

A new project may not be programmed in the SHOPP without a complete project study report (PSR) to define and justify the project scope, cost, schedule, and expected benefits including performance goals/benefits. A PSR or equivalent (such as a Project Initiation Document (PID)) is a report that meets the standards of the Commission’s PSR guidelines. Though a PSR (or PID may focus on the project components proposed for programming, it must provide at least a preliminary estimate of costs for all components. The PSR, or PSR equivalent, or Project Report must be submitted, or a link may be provided to view the document electronically. Each PSR needs to account for known risks that might impact the project budget, scope, schedule, and achievement of performance goals/targets from initiation through construction completion.

30. Project Selections

Consistent with the TAMP, Ten-Year SHOPP Plan, and Five-Year Maintenance Plan, Caltrans shall establish a transparent selection process to select quality eligible projects for each two-year cycle SHOPP document. In particular, each project’s planned performance measures for achievement of goals and targets must be identified consistent with the TAMP.

31. Programming Project Components Sequentially

Caltrans may not begin project development work on SHOPP projects until the project is programmed in the SHOPP document. Pursuant to Commission Resolution G-00-13 and consistent with similar programming practices prescribed for STIP projects, project components may be programmed sequentially. The Commission encourages sequential programming of SHOPP components when needed to develop a shelf of work that can be released as appropriate. These projects, also known as “contingency projects,” must be SHOPP eligible.

A SHOPP eligible project may be programmed for environmental work only. The Commission recognizes a particular benefit in programming projects for environmental work only, since project costs and particularly project scheduling often cannot be determined with meaningful accuracy until environmental studies have been completed. The premature programming of post-environmental components can needlessly tie up SHOPP programming resources while other transportation needs go unmet. These projects, also known as “long lead projects,” must be SHOPP eligible.

The Commission will program a project component only if it makes a determination that the component itself is fully funded, either from SHOPP funds or from other committed funds. The Commission will regard non-SHOPP funds as committed when the local agency with discretionary authority over the funds has made its commitment to the project by ordinance or resolution and has entered into a cooperative agreement with Caltrans.

When applicable for federal formula funds, including RSTP, CMAQ, the commitment may be by Federal TIP adoption.

California Transportation Commission Page 10 Interim SHOPP Guidelines (Revision Date: June 16, 2017)

A project that is programmed prior to receiving federal approval for construction must receive the federal approval for construction prior to construction allocation.

32. Safety Projects

Pursuant to Commission Resolution G-06-13 Caltrans may allocate up to 120 percent of the programmed construction funds to SHOPP safety projects (Appendix C). Caltrans shall bring forward for Commission consideration any safety project with a construction allocation greater than 120 percent of the programmed amount.

33. Emergency Condition Response Projects

Pursuant to Commission Resolution G-11-16 Caltrans is authorized to allocate funds for emergency condition response projects (Appendix C) and associated right-of-way acquisition from appropriate state and federal fund sources to immediately perform emergency work on state-owned transportation facilities and property or related work in adjacent areas, with the understanding that these allocations will be reported to the Commission at its next meeting. Further Caltrans is authorized to allocate funds to follow-up permanent restoration projects associated with and that immediately follow an emergency condition response project, with the understanding that these allocations will be identified and reported to the Commission as “follow-up permanent restoration” projects at its next meeting.

34. Minor Projects

Pursuant to Commission Resolution G-05-16 (Appendix C), the Commission delegated authority to Caltrans for sub-allocations and/or adjustment authority to streamline and help in the management of minor projects. The minor reserve in the SHOPP is for SHOPP-eligible projects only. The Commission will not allocate funds from the SHOPP minor program for capacity-increasing projects, including stand-alone bicycle and pedestrian facilities, sound walls, and enhancements, and mitigation for STIP projects.

35. Multi-Modal Corridor Projects

SHOPP eligible Multi-Modal Corridor projects may be programmed in the SHOPP when consistent with the TAMP, Ten-Year SHOPP Plan, and Five-Year Maintenance Plan. A corridor is defined as a largely linear geographic band defined by existing and forecasted travel patterns involving both people and goods. The corridor serves a particular travel market or markets affected by similar transportation needs and mobility issues. It includes various modes that provide similar or complementary transportation functions, including cross-mode connections.

36. Completion of Environmental Process

The Commission may program funding for project right-of-way or construction only if it makes a determination that Caltrans will complete the environmental process and can proceed with right-of-way acquisition or construction within the four-year period of the SHOPP. Pursuant to Public Resources Code Section 21102, the Commission may not allocate funds for design, right-of-way, or construction prior to documentation of environmental clearance under the California Environmental Quality Act for projects that require a negative declaration, mitigated negative declaration or environmental impact report, for projects that are categorically cleared a Caltrans determination of categorical exemption is acceptable. As a matter of policy, the Commission will not allocate funds for design, right-of-way, or construction of a federally funded project prior to documentation and/or determination as appropriate of environmental clearance under the National

California Transportation Commission Page 11 Interim SHOPP Guidelines (Revision Date: June 16, 2017)

Environmental Policy Act. Exceptions to this policy may be made in instances where federal law allows for the acquisition of right-of-way prior to completion of National Environmental Policy Act review.

When project design, right-of-way or construction are programmed before Caltrans completes the environmental process, updated cost estimates shall be submitted in the SHOPP cycle following completion of the environmental process. Cost estimates for project components that are programmed and that have not been allocated shall be updated, as needed, based on the most current cost information during every SHOPP cycle. Only cost estimates approved by the Caltrans Director or by a person authorized by Caltrans’ Director to approve cost estimates for programming will be used.

37. Programming Combined SHOPP and Non-SHOPP Projects

Where a project or project component is to be programmed and funded from both SHOPP and non-SHOPP sources, the project description shall indicate whether the programming commitment is for a particular dollar amount, a particular percentage of total project cost, or a particular element or item of work. All SHOPP projects must be expended proportionally, except as otherwise approved by the Commission. The Commission must approve non-proportional spending for the initial expenditure of SHOPP funds before other non-SHOPP resources. For projects funded from both SHOPP and non-SHOPP sources and where the Commission has approved non-proportional spending allowing for the expenditure of SHOPP funds before other funds (sometimes referred to as sequential spending), the project is not eligible for an increase (supplemental) allocation under the authority delegated to Caltrans by Commission Resolution G-12-16 until all other non-SHOPP funds committed to the project have been expended.

38. Programming Escalations

Caltrans is responsible to apply escalations when recommending projects to the Commission for programming. The amount programmed for each project component shall be escalated to the mid-point of the duration of each component. The standard escalation rate for the SHOPP shall be the rate specified in the last Commission adopted Fund Estimate for the SHOPP. Caltrans may elect to use alternative escalation factors for right-of-way or other project support phases as it deems appropriate.

All project costs recommended by Caltrans for programming are to be recommended on the basis of their fully escalated (inflated) costs. All SHOPP project programming shall therefore be at costs escalated to the year in which project delivery is proposed. Cost estimates for project components that are programmed and that have not been allocated shall be updated, as needed, based on the most current cost information during every SHOPP cycle.

39. Allocation for Support and Construction

a. General. Beginning July 1, 2017, for a project that experiences increases in capital or support costs above the amounts in the Commission’s allocation for SHOPP projects, the Commission shall establish a threshold for requiring a supplemental project allocation. The Commission’s adopted Interim SHOPP Guidelines shall establish the threshold that the Commission determines is necessary to ensure efficiency and may provide exceptions as necessary so that projects are not unnecessarily delayed. Consistent with the Interim SHOPP Guidelines, Caltrans shall, for each project

California Transportation Commission Page 12 Interim SHOPP Guidelines (Revision Date: June 16, 2017)

requiring a supplemental project allocation, submit a request to the Commission for its approval.

b. Construction. The costs programmed and allocated for Caltrans construction projects are to be based on the engineer’s final estimate presented to the Commission for an allocation vote. For allocation requests equal to or greater than 120% of the programmed amount, a Commission allocation is required.

c. Support. The costs programmed and allocated for Caltrans support for the following project components/phases, including but not limited to, PA&ED, PS&E, right-of-way, and construction, is the amount identified and presented to the Commission for allocation vote. For allocation requests equal to or greater than 120% of the programmed amount, a Commission allocation is required.

d. No adjustment will be made by Caltrans beyond the authority delegated by Commission Resolution G-12-16. To encourage accurate estimates, the Commission will consider SHOPP amendments for project development only upon completion of the project development phase and when the change in the total project development costs exceed the G-12-16 authority.

VII. CALTRANS’ MANAGEMENT OF THE SHOPP 40. Scope, Cost, Schedule

Caltrans is responsible to manage the entire SHOPP portfolio of projects to meet the state’s transportation needs and ensure that each project is delivered within scope, budget, and on schedule consistent with the TAMP, Ten-Year SHOPP Plan, and Five-Year Maintenance Plan.

41. Criteria for Measuring Performance and Cost-Effectiveness

Consistent with the TAMP, Ten-Year SHOPP Plan, and Five-Year Maintenance Plan, Caltrans is responsible for developing performance measures, objectives, and priorities that include consideration of the overall performance of the transportation system consistent with federal and state planning requirements. Pursuant to Government Code Section 14526.4(c), in connection with the TAMP, the Commission reviews and approves the TAMP and adopts targets and performance measures reflecting the state transportation goals and objectives. The Commission expects that Caltrans will develop procedures to measure and ensure cost effectiveness in achieving the targets outlined by SB 1 in addition to the Commission adopted targets.

42. Allocation of Funds

Pursuant to Government Code Section 14526.5(g), on or after July 1, 2017, to provide sufficient and transparent oversight of Caltrans’s capital outlay support resources composed of both state staff and contractors, the Commission is required to allocate Caltrans’s capital outlay support resources by project phase, including preconstruction. Through this action, the Commission will provide public transparency for Caltrans’s budget estimates, increasing assurance that the annual budget forecast is reasonable. The following applies to the Commission’s allocations effective July 1, 2017:

a. The Commission allocates the programmed support and construction funds for all projects listed in the SHOPP. This establishes the original allocation budget for each component.

b. During each two-year cycle, the Commission will consider allocation of funds for a programmed project or programmed component when it receives an allocation request

California Transportation Commission Page 13 Interim SHOPP Guidelines (Revision Date: June 16, 2017)

and recommendation from Caltrans. The Commission will only consider an allocation of construction and/or construction support funds to projects that are ready to advertise.

c. For ready to advertise projects, the Commission expects Caltrans to certify that a project’s PS&E is complete, environmental and right-of-way clearances are secured, and all necessary permits and agreements (including railroad construction and maintenance) are executed.

d. Projects not ready for advertisement will not be placed on the Commission’s agenda for allocation approval.

e. Unless otherwise approved by the Commission in accordance with Sections 43 and 44 (Timely Use of Funds), all construction allocations are valid for six months from the date of allocation unless the Commission approves an extension (Sections 44 and 45, Timely Use of Funds).

f. Unless otherwise approved by the Commission in accordance with Sections 43 and 44 (Timely Use of Funds), all allocations for support are valid for six months from the date of allocation unless the Commission approves an extension (Sections 43 and 44, Timely Use of Funds).

g. All allocations will be made in units of $1,000, and all allocation requests shall therefore be in units of $1,000. The request will include a determination of the availability of funding and a recommendation on the source of funding. The recommendation on the source of funding shall include the amounts by fund account, i.e., State Highway Account, Public Transportation Account, or Federal Trust Fund, as well as the fund type within the account including type of federal funds. Caltrans’ recommendation to the Commission for state only funding of a project will be made in accordance with Caltrans’s current policy for exceptions to federal funding. The final determination of fund type available for a project will be made in the Commission’s allocation of funds to the project. The Commission will approve the allocation only if the funds are available and are necessary to implement the project as programmed in the SHOPP.

h. In compliance with Public Resources Code Section 21102, the Commission may not allocate funds, other than funds appropriated in the Budget Act or projects involving only feasibility or planning studies for possible future actions construction prior to documentation of environmental clearance under the California Environmental Quality Act for projects that require a negative declaration, mitigated negative declaration or environmental impact report, for projects that are categorically cleared a Caltrans determination of categorical exemption is acceptable. As a matter of policy, the Commission will not allocate funds for design, right-of-way, or construction of a federally funded project prior to documentation and/or determination as appropriate of environmental clearance under the National Environmental Policy Act. Exceptions to this policy may be made in instances where federal law allows for the acquisition of right-of-way prior to completion of National Environmental Policy Act review.

i. Each project’s programmed phase must be allocated on time as scheduled. Scheduled fiscal year allocations must be completed no later than June of each year.

j. All funds allocated are subject to the timely use of funds provision as described in Sections 43 and 44 (Timely Use of Funds) of these guidelines.

k. Projects using design-build or design-sequencing procurement shall be identified at the time of allocation. If the procurement strategy is changed at a later date, the project

California Transportation Commission Page 14 Interim SHOPP Guidelines (Revision Date: June 16, 2017)

shall be amended accordingly. The allocation may be a combined amount to include design, right-of-way, and construction support and construction.

l. Projects using the Construction Management/General Contractor (CM/GC) delivery method should be identified at the time of programming. If a CM/GC delivery strategy is determined at a later date, the project shall be amended accordingly. During the design phase, the CM/GC contract costs are considered design phase expenditures. Upon award of the construction contract, expenditures will be reported as construction phase expenditures. The project will be programmed and allocated in the same manner as projects utilizing design-bid-build delivery, although flexibility in schedule, scope and cost may be requested and approved consistent with allocation and programming capacity, and timely use of funds rules.

m. If a project or project component is ready for implementation earlier than the fiscal year that it is programmed in the SHOPP, Caltrans may request an allocation in advance of the programmed year. The Commission may make an allocation in advance of the programmed year if it finds that the allocation will not delay availability of funding for other projects.

43. Timely Use of Funds for Support

The following requirements apply to timely use of funds allocated by the Commission for SHOPP project support costs:

a. Funds that are programmed for Caltrans’ support costs are available for allocation only until the end of the fiscal year identified in the SHOPP. Whenever programmed funds are not allocated within this deadline, the project is considered a failed project and will be deleted from the SHOPP, unless Caltrans requests a time extension that is approved by the Commission before the end of the fiscal year.

b. Funds allocated for construction support must initiate expenditure within 6 months of the date of allocation unless the Commission approves an extension as provided in Section 45.

c. After the Commission’s allocation for support, Caltrans has up to 36 months to complete the scope of work specific to that project component/phase. At the time of fund allocation, the Commission may extend the deadline for completion of work and the liquidation of funds if necessary to accommodate the proposed expenditure plan for the project. For the purpose of this section, the construction support phase is deemed to end when the construction contract is accepted.

d. Whenever allocated funds have not initiated expenditure within 6 months of the date of allocation all unencumbered, or unexpended funds from the allocation will be rescinded for that project.

e. Caltrans will provide a report at each Commission meeting on projects which have not started expending allocated support funds within six months of the date of the Commission’s allocation.

f. The Commission will not amend the SHOPP to delete or change the program year of the funding for any project component programmed in the current fiscal year or earlier except to reprogram funds from a construction project to later mitigation work required for that project, including landscaping or mitigation. The Commission will consider the amendment only if it is proposed concurrently with an allocation of funds

California Transportation Commission Page 15 Interim SHOPP Guidelines (Revision Date: June 16, 2017)

programmed for the project in the current fiscal year. These two types of amendments are adjustments that may be incorporated into the Commission’s allocation action.

44. Timely Use of Funds for Construction

The following requirements apply to timely use of funds allocated by the Commission for SHOPP projects:

a. Funds programmed for Caltrans’ construction costs are available for allocation only until the end of the fiscal year identified in the SHOPP. Whenever programmed funds are not allocated within this deadline, the project is considered a failed project and will be deleted from the SHOPP, unless the Commission approves a time extension.

b. Funds allocated for construction must be encumbered by the award of a construction contract within 6 months of the date of allocation unless the Commission approves an extension as described below. Projects will be deleted from the SHOPP if funds are not encumbered within approved deadlines.

c. After the award of the construction contract, Caltrans has up to 36 months to complete (accept) the construction contract. At the time of fund allocation, the Commission may extend the deadline for completion of work and the liquidation of funds if necessary to accommodate the proposed expenditure plan for the project.

d. Whenever allocated funds are not encumbered by the award of a construction contract or expended within the deadlines specified in Section 44, all unencumbered, or unexpended funds from the allocation will be rescinded for that project.

e. Caltrans will provide a report at each Commission meeting on projects which have not been awarded within six months of the date of the Commission’s allocation.

f. The provisions for the timely use of funds above related to construction apply to Caltrans’s project capital costs, except Caltrans’s right-of-way capital costs, which the Commission allocates annually on a lump sum basis rather than by project. The annual right of way capital allocation will be the same amount programmed for the current fiscal year.

g. The Commission will not amend the SHOPP to delete or change the program year of the funding for any project component programmed in the current fiscal year or earlier except to reprogram funds from a construction project to later mitigation work required for that project, including landscaping or mitigation. The Commission will consider the amendment only if it is proposed concurrently with an allocation of funds programmed for the project in the current fiscal year. These two types of amendments are adjustments that may be incorporated into the Commission’s allocation action.

45. Timely Use of Funds – Extension

a. Where a programmed project or project component will not be ready for allocation as programmed in the current fiscal year, Caltrans shall request an extension of the allocation deadline. In the event where a programmed project or project component is not ready for allocation as programmed in the current fiscal year, Caltrans is prohibited from submitting a SHOPP amendment.

b. The Commission may extend the deadlines for allocation of funds, for award of a construction contract, for expenditures of funds, or for contract completion no more

California Transportation Commission Page 16 Interim SHOPP Guidelines (Revision Date: June 16, 2017)

than one time and only if it finds that an unforeseen and extraordinary circumstance beyond the control of Caltrans has occurred that justifies the extension. The extension will not exceed the period of delay directly attributed to the extraordinary circumstance and will in no event be for more than 20 months.

46. Management of Contingency and Long-Lead Projects

Commission Resolution G-00-13 was approved in June 2000 to provide Caltrans with a means to develop SHOPP projects that require periods longer than the four-year SHOPP time frame to develop. Caltrans has established procedures for SHOPP Long Lead projects (Appendix C). Subject to the approval of the Commission, Long Lead projects shall be programmed in the SHOPP and will be subject to the same delivery, management, and reporting requirements as all other SHOPP projects in the Commission adopted program.

47. Management of Reservation Projects

Reservations established at Commission SHOPP adoption are managed on a fiscal year basis, where projects approved by the Commission for amendment in the SHOPP reduce the reservation amount. An increase or decrease to a reservation amount between programming cycles requires Commission action.

48. Management of Minor Projects

Minor projects are managed on a fiscal year basis within a financially constrained annual minor program reservation. Caltrans is responsible for managing within the Commission approved annual minor reservation and assuring that all minor projects are awarded within the approved reservation by the conclusion of each fiscal year.

VIII. CHANGE MANAGEMENT 49. Introduction

During the project development process, changes to a programmed project might be necessary to update project components and to realign a project to meet its objectives and goals. Caltrans is responsible to adjust and manage project programming changes efficiently. Depending on the circumstance, Caltrans has a number of options available that include: managing each SHOPP project within its delegated authority or allocation, updating the programmed cost during each two-year cycle SHOPP document, project amendments off cycle upon completion of PA&ED and PS&E, and Supplemental Funds Request.

50. Managing Within the Commission’s Delegated Authority

Pursuant to the Commission Resolution G-12-16, attached in Appendix C, the Caltrans Director is delegated authority to increase the Commission approved project component values within pre-established thresholds.

51. Changes to Two-Year Cycle SHOPP Document

Every two years any project component listed in the SHOPP can be updated and right sized consistent with the TAMP and its most current estimate as long as that component has not received a Commission allocation of funds. Once allocated, the component must be managed by Caltrans within the Resolution G-12-16 parameters. Any project component that has expended its allocation plus its G-12-16 authority must receive a supplemental allocation of funds from the Commission. Caltrans is responsible to implement a change management process to manage and

California Transportation Commission Page 17 Interim SHOPP Guidelines (Revision Date: June 16, 2017)

document the SHOPP cycle changes internally. These SHOPP cycle changes must be identified, documented, and finalized by January of each even year. A Commission action is required to accept the programming recommendations and adopt the SHOPP document.

IX. SHOPP DELIVERY 52. Goals

It is the Commission’s goal that programmed SHOPP projects be delivered as programmed in the SHOPP document. Project delivery means allocation of funds for the programmed project or project component. With the exception to SHOPP amendments approved pursuant to Section 54 (Changes via Commission Amendment), the Commission expects that Caltrans will endeavor to deliver on all projects programmed in the SHOPP.

53. Changes via Commission Amendment

Any programmed unallocated project component may be updated off cycle via a Caltrans amendment request. With the exception of updates necessary at the end of PAED or PS&E, only updates for unforeseen and extraordinary circumstances beyond the reasonable control of Caltrans will be considered. A Commission action to amend the project is needed. The Commission encourages Caltrans and Commission staff, to streamline the amendment process and enhance accountability.

54. Project Delivery

It is a Commission policy that all transportation funds programmed be allocated, awarded, and expended in a timely manner to ensure projects are delivered as promised, public benefits are timely recognized, the accumulation of excessive fund balances as well as lapsing federal funds are avoided and performance from each dollar invested to improve California’s transportation system is tracked and reported.

55. Delivery Deadline Extensions

The Commission may extend a delivery deadline, as described in Section 56, upon the request of Caltrans. No deadline may be extended more than once. However, there are separate deadlines for allocation, for award of a contract, for expenditures for project development or right-of-way, and for project completion, and each project component has its own deadlines. The Commission may consider the extension of each of these deadlines separately.

The Commission may grant a deadline extension only if it finds that an unforeseen and extraordinary circumstance beyond the control of Caltrans has occurred that justifies the extension. The extension will not exceed the period of delay directly attributable to the extraordinary circumstance and will in no event be for more than 20 months.

All requests for project delivery deadline extensions shall be submitted in accordance with Commission Meeting deadlines. The extension request should describe the specific circumstance that justifies the extension and identifies the delay directly attributable to that circumstance. Caltrans will forward extension requests to the Commission for action.

X. SHOPP DEVELOPMENT SCHEDULE AND PROCEDURES 56. SHOPP Development Schedule

The following schedule lists the major milestones for the development and adoption of the SHOPP:

California Transportation Commission Page 18 Interim SHOPP Guidelines (Revision Date: June 16, 2017)

Caltrans submits the proposed Ten-Year SHOPP Plan and TAMP

By January 31 of odd numbered years.

Commission reviews and comment on the Ten-Year SHOPP plan and TAMP

By May 1 of odd numbered years

Caltrans presents Draft Fund Estimate to the Commission

By July 15 of odd numbered years

Commission adopts Fund Estimate By August 15 of odd numbered years Caltrans to share initial draft of proposed SHOPP By December of odd numbered year Caltrans submits proposed SHOPP

By January 31 of even numbered years

Hearing in Northern California February of even numbered years Hearing in Southern California March of even numbered years Commission Adopts SHOPP and Submits to Legislature and Governor

By April 1 of even numbered years

XI. REPORTING AND ACCOUNTABILITY 57. Report on Targets and Performance Measures

Pursuant to Government Code Section 14526.7(b), Caltrans shall report to the Commission on its progress toward meeting the targets and performance measures consistent with the TAMP and 2027 targets set forth in SB 1. Caltrans will provide the Commission with quarterly status reports on its project delivery by November 15, February 15, May 15, and August 15 of each FY. The report shall include:

a. A list of completed projects by phase showing planned and actual performance measures including progress made towards achieving the Commission approved targets and 2027 targets set forth in SB 1.

b. A summary, by phase and fund type, of the funds programmed, allocated, and expended at the time the construction contract was accepted.

c. For projects with a total project cost of less than $50 million and a total SHOPP programmed amount (in right-of-way and/or construction) of less than $15 million, the information may be aggregated.

d. For projects with a total cost of $50 million or greater or a total SHOPP programmed amount (in right-of-way and/or construction) of $15 million or greater, each report shall also include a discussion of the project benefits that were anticipated prior to construction compared to an estimate of the actual benefits achieved.

e. The Commission staff, in consultation with Caltrans, shall develop a format and content requirement for the reports.

58. Report on Completed SHOPP Project

Pursuant to Government Code Section 14526.6 Caltrans shall report to the Commission quarterly, for projects which complete construction in the previous quarter, for all major state highway operation and protection program projects. Caltrans shall report to the Commission on the approved capital and support budgets compared to expenditures at construction contract acceptance for all projects in the SHOPP. Caltrans shall develop, in consultation with the Commission, a plain language performance report to increase transparency and accountability of the SHOPP.

59. Efficiencies

Pursuant to Streets and Highways Code section 2032.5(d), Caltrans shall implement efficiency measures with the goal to generate at least one hundred million dollars ($100,000,000) per year in savings to invest in maintenance and rehabilitation of the state highway system. These savings shall be reported to the Commission.

60. Accountability Reporting

Pursuant to Streets and Highways Code section 2032.5(a), Caltrans and the Commission shall implement the accountability and evaluation reporting:

a. For each fiscal year in which Caltrans receives an allocation of SHOPP funds, Caltrans shall submit documentation to the Commission that includes a description and the location of each completed project, the amount of funds expended on the project, the completion date, the project’s estimated useful life, and the project’s expected performance benefits.

b. Caltrans shall report quarterly and more often as requested by the Commission on the progress it has made in achieving the 2027 targets/goals set forth in SB 1 and the Commission’s adopted targets.

c. Annually, the Commission shall evaluate the effectiveness of Caltrans in reducing deferred maintenance and improving road conditions on the state highway system, as demonstrated by the progress made in achieving 2027 targets/goals set forth in SB 1 and the Commission’s adopted targets.

d. The Commission may make recommendations for improvement and may withhold future project allocations if it determines program funds are not being appropriately spent.

e. The Commission shall annually include any findings in its annual report to the Legislature pursuant to Government Code Section 14535.

f. Consistent with the approved Transportation Asset Management Plan (TAMP) and statutes, Caltrans shall develop a ten-year performance baseline plan for each asset, including intermediate annual benchmarks, against which the Commission will evaluate progress reported by Caltrans towards achieving both the 2027 asset performance targets and goals set forth in SB 1 and the Commission-approved performance targets in the TAMP. Caltrans shall bring forward recommendations for benchmarks to the Commission at the December 6-7, 2017 Commission meeting for approval and annually thereafter.

XII. APPENDICES Appendix A: List of Acronyms Appendix B: Statutory References Appendix C: Commission Resolutions and Delegations Appendix D: March 26, 2015 Commission Action Regarding Asset Management Plan

California Transportation Commission Page 19 Interim SHOPP Guidelines (Revision Date: June 16, 2017)

California Transportation Commission Page 20 Interim SHOPP Guidelines (Revision Date: June 16, 2017)

APPENDIX A LIST OF ACRONYMS

CEQA ......................... California Environmental Quality Act (State) CMAQ ........................ Congestion Mitigation and Air Quality Program (Federal) Commission ............... California Transportation Commission CTP ............................ California Transportation Plan FSTIP ......................... Federal State Transportation Improvement Program (Federal) FTIP ........................... Federal Transportation Improvement Program (Federal) FY .............................. Fiscal Year ITIP ............................ Interregional Transportation Improvement Program (State) ITS .............................. Intelligent Transportation Systems NEPA ......................... National Environmental Policy Act (Federal) PA&ED ...................... Project Approval and Environmental Document PID ............................. Project Initiation Document PPNO .......................... Planning Program Number PSR ............................ Project Study Report PS&E .......................... Plans, Specifications, and Estimate SHOPP ....................... State Highway Operation and Protection Program SHS ............................ State Highway System STIP ........................... State Transportation Improvement Program TIP .............................. Transportation Improvement Program

California Transportation Commission Page 21 Interim SHOPP Guidelines (Revision Date: June 16, 2017)

APPENDIX B STATUTORY REFERENCES

The Interim SHOPP Guidelines were developed and adopted consistent with:

a. Governor’s Executive Orders, where applicable. b. Government Code Sections 14526.4, 14526.6; 14526.5, 14526.7. c. Streets and Highways Code Sections 164.6 and 167. d. Public Resources Code Section 21102 e. The Road Repair and Accountability Act of 2017 (SB 1) Chapter 5, Statutes of 2017); f. Commission Resolutions including, but not limited to: G-00-13, G-06-13, G-05-05, G-16-

11, and G-16-12. g. Commission approved actions specific to the Asset Management Plan on March 26, 2015

(Tab 26) regarding four asset classes. h. Current best management practices including those related to the STIP and its authorities

in accordance with Government Code Section 14530.1. i. Compliance with all Federal and State requirements.

 

 

This page left blank intentionally

California Department of Transportation 

2018 SHOPP     21

EXHIBIT F: 2018 SHOPP County Listing of Projects

County Page No. County Page No.

Alameda F - 1 Orange F - 142

Alpine F - 13 Placer F - 156

Amador F - 14 Plumas F - 159

Butte F - 15 Riverside F - 161

Calaveras F - 19 Sacramento F - 171

Colusa F - 21 San Benito F - 180

Contra Costa F - 22 San Bernardino F - 181

Del Norte F - 26 San Diego F - 193

El Dorado F - 29 San Francisco F - 206

Fresno F - 32 San Joaquin F - 209

Glenn F - 37 San Luis Obispo F - 218

Humboldt F - 39 San Mateo F - 222

Imperial F - 49 Santa Barbara F - 227

Inyo F - 51 Santa Clara F - 233

Kern F - 52 Santa Cruz F - 240

Kings F - 59 Shasta F - 244

Lake F - 61 Sierra F - 247

Lassen F - 64 Siskiyou F - 248

Los Angeles F - 66 Solano F - 251

Madera F - 105 Sonoma F - 254

Marin F - 107 Stanislaus F - 259

Mariposa F - 110 Sutter F - 262

Mendocino F - 112 Tehama F - 263

Merced F - 119 Trinity F - 267

Modoc F - 123 Tulare F - 271

Mono F - 124 Tuolumne F - 275

Monterey F - 126 Ventura F - 277

Napa F - 133 Yolo F - 284

Nevada F - 137 Yuba F - 287

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Alameda

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONIn Berkeley and Albany, from Route 13 to eastof El Cerrito Separation. Install median safetylighting and replace median concrete barrier.1488S

3J700 $25

Subtotal: $14,612

2019-20 $2,750$100

$2,625

$8,225Total Project Cost: $22,837

04150001834/1/20204/1/20202/1/2019PA&ED:

RTL:R/W Cert:

11/30/2020Begin Con:

04-Alameda-80 Prior18-1918-1919-20

201.010185 Collision(s) reducedPerformance Measure

Program Code

$2,750PA&ED:PS&E:

R/W Sup:

Carryover

4.5/R7.6

Con Sup:

Safety Improvements

$14,587Const:R/W:

9

15

13

Senate:

Assembly:

Congress:

9

15

13Congress

Assembly

Senate

In Fremont, from north end of DumbartonBridge to south of the Toll Plaza. Install outerseparation barrier between route and frontageroad.

1493F

4J750 $3,280

Subtotal: $18,840

2019-20 $2,500$240

$2,500

$7,240Total Project Cost: $26,080

04160000054/1/20203/1/2020

9/30/2018PA&ED:

RTL:R/W Cert:

12/7/2020Begin Con:

04-Alameda-84 Prior18-1918-1919-20

201.01023 Collision(s) reducedPerformance Measure

Program Code

$2,000PA&ED:PS&E:

R/W Sup:

Carryover

R0.7/R3.1

Con Sup:

Safety Improvements

$15,560Const:R/W:

10

20, 25

15, 17

Senate:

Assembly:

Congress:

10

20, 25

15, 17Congress

Assembly

Senate

In Fremont, from Route 238 (MissionBoulevard) to Route 680. Widen shoulders,install traffic signals and upgrade barriers.0076B

2A332 $2,000

Subtotal: $21,500

2018-19 $2,800$500

$4,000

$18,300Total Project Cost: $39,800

04140000394/16/20192/1/2019

10/30/2017PA&ED:

RTL:R/W Cert:

12/8/2019Begin Con:

04-Alameda-84 PriorPriorPrior18-19

201.01090 Collision(s) reducedPerformance Measure

Program Code

$11,000PA&ED:PS&E:

R/W Sup:

Carryover

10.8/18.0

Con Sup:

Safety Improvements

$19,500Const:R/W:

10

18, 20

11, 13

Senate:

Assembly:

Congress:

10

18, 20

11, 13Congress

Assembly

Senate

Near Livermore, from Flynn Road to Grant LineRoad. Install safety lighting and establishelectrical service connection. 1495F

0K680 $493

Subtotal: $4,704

2019-20 $806$104$962

$2,834Total Project Cost: $7,538

04160001256/1/20205/1/20206/1/2019PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

04-Alameda-580 Prior19-2019-2019-20

201.01065 Collision(s) reducedPerformance Measure

Program Code

$962PA&ED:PS&E:

R/W Sup:

Carryover

R1.3/R6.0

Con Sup:

Safety Improvements

$4,211Const:R/W:

7

13, 16

15

Senate:

Assembly:

Congress:

7

13, 16

15Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 1 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Alameda

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In San Leandro, at the southbound Route880/238 Connector offramp to WashingtonAvenue. Reconstruct and signalize offramp.1491G

4J730 $150

Subtotal: $3,595

2019-20 $1,250$125

$1,250

$3,825Total Project Cost: $7,420

04160000015/4/20202/4/20207/2/2018PA&ED:

RTL:R/W Cert:

11/2/2020Begin Con:

04-Alameda-880 Prior18-1918-1919-20

201.01074 Collision(s) reducedPerformance Measure

Program Code

$1,200PA&ED:PS&E:

R/W Sup:

Carryover

20.9

Con Sup:

Safety Improvements

$3,445Const:R/W:

9

18

13

Senate:

Assembly:

Congress:

9

18

13Congress

Assembly

Senate

In Alameda County, on Routes 80, 84, and 880at various locations; also in Contra CostaCounty on Routes 24 and 680 at variouslocations. Install High Friction SurfaceTreatment (HFST) at spot locations to enhancewet pavement conditions.

1481B

1J780 $10

Subtotal: $6,321

2020-21 $1,274$104

$1,534

$4,030Total Project Cost: $10,351

04140003576/1/20213/1/2021

10/1/2019PA&ED:

RTL:R/W Cert:

2/1/2022Begin Con:

04-Alameda-Var 18-1919-2019-2021-22

201.01524 Collision(s) reducedPerformance Measure

Program Code

$1,118PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

$6,311Const:R/W:

7, 9, 10

14, 15, 16,20

11, 13, 15

Senate:

Assembly:

Congress:

7, 9, 10

14, 15, 16,20

11, 13, 15Congress

Assembly

Senate

In Alameda County, on Routes 13, 24, 580, 680,and 880 at various locations; also in ContraCosta County, on Routes 4, 24, 80, 160, and 680at various locations. Install Rectangular RapidFlashing Beacons (RRFBs) to enhancepedestrian safety at ramp termini anduncontrolled pedestrian crossings.

1492F

0K120 $290

Subtotal: $8,527

2021-22 $1,145$229

$1,345

$3,980Total Project Cost: $12,507

04160000545/5/20223/1/20226/1/2020PA&ED:

RTL:R/W Cert:

11/2/2022Begin Con:

04-Alameda-13 18-1919-2020-2121-22

201.01580 Collision(s) reducedPerformance Measure

Program Code

$1,261PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

$8,237Const:R/W:

3, 7, 9, 10

11, 14, 15,16, 18, 20,259, 11, 13,15, 17

Senate:

Assembly:

Congress:

3, 7, 9, 10

11, 14, 15,16, 18, 20,

25

9, 11, 13,15, 17

Congress

Assembly

Senate

In various cities, on Routes 13, 61, and 123 atvarious locations; also in Contra Costa County,on Route 123, at Eureka Avenue. Crosswalksafety enhancements.

0488Q

0J470 $840

Subtotal: $5,130

2019-20 $1,393$200$800

$3,181Total Project Cost: $8,311

041400000312/31/201911/1/20193/19/2018PA&ED:

RTL:R/W Cert:

6/1/2020Begin Con:

04-Alameda-13 PriorPriorPrior19-20

201.01533 Collision(s) reducedPerformance Measure

Program Code

$788PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Collision Severity Reduction

$4,290Const:R/W:

9

15, 18

11, 13

Senate:

Assembly:

Congress:

9

15, 18

11, 13Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 2 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Alameda

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In various cities, on various routes, at variouslocations. Crosswalk safety enhancements.

1487Q

3J110 $50

Subtotal: $4,090

2018-19 $1,000$214$572

$2,572Total Project Cost: $6,662

04150000885/1/20194/1/20191/3/2018PA&ED:

RTL:R/W Cert:

12/30/2019Begin Con:

04-Alameda-13 Prior18-1918-1918-19

201.01538 Collision(s) reducedPerformance Measure

Program Code

$786PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Collision Severity Reduction

$4,040Const:R/W:

7, 9, 10

15, 16, 18,20, 25

13, 15, 17

Senate:

Assembly:

Congress:

7, 9, 10

15, 16, 18,20, 25

13, 15, 17Congress

Assembly

Senate

In Oakland, San Leandro, Hayward andFremont, on Routes 84, 92, 112, 185 and 238 atvarious locations. Crosswalk safetyenhancements.

0448R

1J600 $150

Subtotal: $2,953

2018-19 $657$23

$453

$1,586Total Project Cost: $4,539

04140002874/5/2019

1/15/20199/26/2017PA&ED:

RTL:R/W Cert:

12/2/2019Begin Con:

04-Alameda-84 PriorPriorPrior18-19

201.01527 Collision(s) reducedPerformance Measure

Program Code

$453PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Collision Severity Reduction

$2,803Const:R/W:

9, 10

18, 20

13, 15

Senate:

Assembly:

Congress:

9, 10

18, 20

13, 15Congress

Assembly

Senate

In Oakland, San Leandro, Hayward, Union Cityand Fremont on Routes 185, 238, and 262 atvarious locations. Crosswalk safetyenhancements.

1487P

3J190 $10

Subtotal: $3,531

2018-19 $740$66

$830

$2,186Total Project Cost: $5,717

04150000995/1/20194/1/2019

2/15/2018PA&ED:

RTL:R/W Cert:

12/13/2019Begin Con:

04-Alameda-185 Prior18-1918-1918-19

201.015231 Collision(s) reducedPerformance Measure

Program Code

$550PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Collision Severity Reduction

$3,521Const:R/W:

9, 10

18, 20, 25

13, 15, 17

Senate:

Assembly:

Congress:

9, 10

18, 20, 25

13, 15, 17Congress

Assembly

Senate

In various cities, on Routes 580, 680, 880, and980 at various locations. Enhance pedestriansafety by installing Accessible PedestrianSignals (APS) systems and countdown timersand upgrading crosswalk markings.

1487M

3J130 $20

Subtotal: $6,088

2021-22 $940$130

$1,030

$3,040Total Project Cost: $9,128

04150000907/15/20217/1/20214/1/2020PA&ED:

RTL:R/W Cert:

1/19/2022Begin Con:

04-Alameda-580 18-1919-2019-2021-22

201.015264 Collision(s) reducedPerformance Measure

Program Code

$940PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

$6,068Const:R/W:

7, 9, 10

15, 16, 18,20, 25

13, 15, 17

Senate:

Assembly:

Congress:

7, 9, 10

15, 16, 18,20, 25

13, 15, 17Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 3 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Alameda

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Alameda County, on Routes 580 and 680 atvarious locations; also in Contra Costa County,on Routes 160 and 680 at various locations. Install concrete barrier to shield structurecolumn from errant vehicles and upgradeexisting guardrails to current standards.

1495E

0K650 $70

Subtotal: $3,226

2020-21 $800$166$800

$2,266Total Project Cost: $5,492

04160001236/1/20213/1/20212/2/2020PA&ED:

RTL:R/W Cert:

12/8/2021Begin Con:

04-Alameda-580 18-1919-2019-2020-21

201.01515 Collision(s) reducedPerformance Measure

Program Code

$500PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

$3,156Const:R/W:

7

14, 16

11, 15

Senate:

Assembly:

Congress:

7

14, 16

11, 15Congress

Assembly

Senate

In Alameda and Contra Costa Counties, onvarious routes, at various locations. Upgradeadvance warning signs to make standard.1496A

0K770 $108

Subtotal: $2,746

2021-22 $700$10

$700

$2,110Total Project Cost: $4,856

04160001376/30/20216/1/20216/1/2020PA&ED:

RTL:R/W Cert:

2/1/2022Begin Con:

04-Alameda-580 18-1919-2019-2021-22

201.01531 Collision(s) reducedPerformance Measure

Program Code

$700PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

$2,638Const:R/W:

7, 9, 10

14, 15, 16,18, 20

11, 13, 15

Senate:

Assembly:

Congress:

7, 9, 10

14, 15, 16,18, 20

11, 13, 15Congress

Assembly

Senate

In and near Livermore, from San JoaquinCounty line to 0.7 mile west of Greenville Road.Highway worker safety improvements.1494D

4J940 $183

Subtotal: $2,180

2021-22 $400$75

$525

$1,625Total Project Cost: $3,805

04160000251/15/202211/1/20214/1/2020PA&ED:

RTL:R/W Cert:

5/1/2022Begin Con:

04-Alameda-580 18-1919-2019-2021-22

201.23514 Location(s)Performance Measure

Program Code

$625PA&ED:PS&E:

R/W Sup:

New

0.1/R9.0

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$1,997Const:R/W:

7

16

15

Senate:

Assembly:

Congress:

7

16

15Congress

Assembly

Senate

In Fremont, from north of Auto Mall Parkwayto south of Fremont Boulevard at variouslocations. Highway worker safetyimprovements.

1483N

2J810 $10

Subtotal: $4,928

2018-19 $880$44

$880

$2,464Total Project Cost: $7,392

04150000086/3/2019

5/23/20196/7/2018PA&ED:

RTL:R/W Cert:

12/20/2019Begin Con:

04-Alameda-880 Prior18-1918-1918-19

201.23583 Location(s)Performance Measure

Program Code

$660PA&ED:PS&E:

R/W Sup:

Carryover

4.8/11.3

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$4,918Const:R/W:

10

20, 25

15, 17

Senate:

Assembly:

Congress:

10

20, 25

15, 17Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 4 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Alameda

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Oakland, from south of 5th Avenue to northof 7th Street. Pave narrow strips andmiscellaneous areas, construct MaintenanceVehicle Pullouts (MVPs) and upgrade crashcushions to reduce maintenance work andenhance highway worker safety.

1452N

2K820 $5

Subtotal: $2,175

2020-21 $350$100$450

$1,400Total Project Cost: $3,575

04170000352/1/20211/1/20219/1/2019PA&ED:

RTL:R/W Cert:

8/1/2021Begin Con:

04-Alameda-880 18-1919-2019-2020-21

201.23520 Location(s)Performance Measure

Program Code

$500PA&ED:PS&E:

R/W Sup:

New

30.2/R33.6

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,170Const:R/W:

9

15, 18, 20

13

Senate:

Assembly:

Congress:

9

15, 18, 20

13Congress

Assembly

Senate

MANDATESIn Oakland, Union City, and Fremont, and onRoute 80 in Berkeley (PM 4.7) at various locations; also in Santa Clara County, inMilpitas at PM 8.9. Construct permanent BestManagement Practices (BMPs) to achieve Statewide National Pollutant Discharge Eliminating System (NPDES) permitcompliance units (CUs) for trash capture.

1453D

4J980 $25

Subtotal: $5,826

2020-21 $800$26

$1,000

$2,886Total Project Cost: $8,712

04160000366/1/20215/1/20213/1/2020PA&ED:

RTL:R/W Cert:

2/1/2022Begin Con:

04-Alameda-880 18-1919-2020-2121-22

201.33560 Acre(s) treated/pollutantPerformance Measure

Program Code

$1,060PA&ED:PS&E:

R/W Sup:

New

R0.9/24.8

Con Sup:

Storm Water Mitigation

$5,801Const:R/W:

9, 10

15, 18, 20

13, 15, 17

Senate:

Assembly:

Congress:

9, 10

15, 18, 20

13, 15, 17Congress

Assembly

Senate

In Hayward, from A Street to Rose Street (PM0.39 to 0.90); also in Oakland, from 55thAvenue to 50th Avenue (PM 9.75 to 10.09).Upgrade curb ramps, driveways, and sidewalksto make compliant with American withDisabilities Act (ADA) Standards.

0434J

2G740 $195

Subtotal: $5,212

2021-22 $950$95

$950

$2,695Total Project Cost: $7,907

04000212156/1/20222/1/20226/1/2020PA&ED:

RTL:R/W Cert:

12/1/2022Begin Con:

04-Alameda-185 18-1919-2019-2021-22

201.36131 Curb ramp(s)Performance Measure

Program Code

$700PA&ED:PS&E:

R/W Sup:

New

0.4/10.1

Con Sup:

Americans with Disabilities Act New Curb Ramps

$5,017Const:R/W:

9

18

15

Senate:

Assembly:

Congress:

9

18

15Congress

Assembly

Senate

In Oakland and Berkeley, from Hiller Drive toClaremont Avenue at various locations.Upgrade American with Disabilities Act (ADA)facilities.

0144A

2G660 $200

Subtotal: $2,873

2018-19 $740$140$580

$2,330Total Project Cost: $5,203

04000211036/3/2019

5/20/20192/14/2018PA&ED:

RTL:R/W Cert:

12/2/2019Begin Con:

04-Alameda-13 PriorPriorPrior18-19

201.37836 Curb ramp(s)Performance Measure

Program Code

$870PA&ED:PS&E:

R/W Sup:

Carryover

T9.8/10.8

Con Sup:

Americans with Disabilities Act PedestrianInfrastructure

$2,673Const:R/W:

9

18

13

Senate:

Assembly:

Congress:

9

18

13Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 5 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Alameda

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Berkeley, from Claremont Avenue to west ofShattuck Avenue. Upgrade curb ramps andrepair sidewalks to meet American withDisabilities Act (ADA) Standards.

0124M

2G460 $120

Subtotal: $1,509

2019-20 $543$75

$423

$1,660Total Project Cost: $3,169

040002085911/1/2019

10/25/20197/11/2018PA&ED:

RTL:R/W Cert:

4/24/2020Begin Con:

04-Alameda-13 Prior18-1918-1919-20

201.37847 Curb ramp(s)Performance Measure

Program Code

$619PA&ED:PS&E:

R/W Sup:

Carryover

10.8/12.1

Con Sup:

Americans with Disabilities Act PedestrianInfrastructure

$1,389Const:R/W:

9

18

13

Senate:

Assembly:

Congress:

9

18

13Congress

Assembly

Senate

In Berkeley, from Shattuck Avenue to 7thStreet. Upgrade curb ramps and sidewalks.

0124L

2G482 $125

Subtotal: $3,625

2018-19 $1,000$200$793

$2,448Total Project Cost: $6,073

04150003627/31/20187/2/20182/1/2016PA&ED:

RTL:R/W Cert:

3/29/2019Begin Con:

04-Alameda-13 PriorPriorPrior18-19

201.37834 Structure(s)Performance Measure

Program Code

$455PA&ED:PS&E:

R/W Sup:

Carryover

12.1/13.4

Con Sup:

Americans with Disabilities Act PedestrianInfrastructure

$3,500Const:R/W:

9

18

15

Senate:

Assembly:

Congress:

9

18

15Congress

Assembly

Senate

In Oakland and San Leandro, from Plaza Driveto 55th Avenue; also in Contra Costa County, inEl Cerrito on Route 123 (PM 0.18/0.29) and inPleasant Hill on Route 680 (PM 16.85), atvarious locations. Reinstall and/or upgradeexisting curb ramps and sidewalks to Americanwith Disabilities Act (ADA) Standards.

0091P

1G910 $50

Subtotal: $2,302

2019-20 $655$102$450

$1,653Total Project Cost: $3,955

04000205828/1/20197/1/20193/1/2018PA&ED:

RTL:R/W Cert:

2/28/2020Begin Con:

04-Alameda-185 PriorPriorPrior19-20

201.37866 Curb ramp(s)Performance Measure

Program Code

$446PA&ED:PS&E:

R/W Sup:

Carryover

3.3/9.8

Con Sup:

Americans with Disabilities Act PedestrianInfrastructure

$2,252Const:R/W:

7, 9

14, 15, 18

11, 13

Senate:

Assembly:

Congress:

7, 9

14, 15, 18

11, 13Congress

Assembly

Senate

BRIDGE PRESERVATIONIn Fremont, at Alameda Creek Bridge No. 33-36. Replace bridge.

0084B

16030 $275

Subtotal: $24,275

2018-19 $6,000$299

$5,000

$17,799Total Project Cost: $42,074

04000004294/1/20193/1/2019

9/25/2017PA&ED:

RTL:R/W Cert:

12/8/2019Begin Con:

04-Alameda-84 PriorPriorPrior18-19

201.1101 Bridge(s)Performance Measure

Program Code

$6,500PA&ED:PS&E:

R/W Sup:

Carryover

13.0/13.6

Con Sup:

Bridge Major Rehabilitation

$24,000Const:R/W:

10

20

13

Senate:

Assembly:

Congress:

10

20

13Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 6 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Alameda

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Livermore, near Greenville Road atGreenville Overhead Bridge No. 33-0121R.Rehabilitate westbound structure.0480J

0J520 $140

Subtotal: $6,119

2019-20 $900$120

$1,000

$2,620Total Project Cost: $8,739

041400000910/1/20199/2/2019

1/15/2018PA&ED:

RTL:R/W Cert:

2/3/2020Begin Con:

04-Alameda-580 Prior18-1918-1919-20

201.1101 Bridge(s)Performance Measure

Program Code

$600PA&ED:PS&E:

R/W Sup:

Carryover

R8.0

Con Sup:

Bridge Major Rehabilitation

$5,979Const:R/W:

7

16

15

Senate:

Assembly:

Congress:

7

16

15Congress

Assembly

Senate

In Oakland, at Foothill BoulevardUndercrossing No. 33-0334K. Bridge deckrehabilitation.1494K

0K470

Subtotal: $360

2019-20 $398$21

$212

$631Total Project Cost: $991

04160000911/31/2020

12/31/20195/27/2017PA&ED:

RTL:R/W Cert:

8/31/2020Begin Con:

04-Alameda-580PriorPrior19-20

201.1101 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R35.0

Con Sup:

Bridge Major Rehabilitation

$360Const:R/W:

9, 10

18

13

Senate:

Assembly:

Congress:

9, 10

18

13Congress

Assembly

Senate

In Fremont, from 0.5 mile south to 0.5 milenorth of Patterson Slough Bridge No. 33-0250(PM 11.8). Bridge rehabilitation.0480A

0J530 $427

Subtotal: $12,211

2019-20 $1,980$704

$2,420

$7,304Total Project Cost: $19,515

04140000106/1/2020

5/13/20205/22/2019PA&ED:

RTL:R/W Cert:

2/10/2021Begin Con:

04-Alameda-880 Prior19-2019-2019-20

201.1101 Bridge(s)Performance Measure

Program Code

$2,200PA&ED:PS&E:

R/W Sup:

Carryover

11.3/12.3

Con Sup:

Bridge Major Rehabilitation

$11,784Const:R/W:

7

16, 20

15

Senate:

Assembly:

Congress:

7

16, 20

15Congress

Assembly

Senate

Near Sunol, at Arroyo De La Laguna BridgeNo. 33-0043. Replace/rehabilitate bridge forscour mitigation, bridge rail upgrade, andseismic retrofit.

0481M

0J550 $500

Subtotal: $13,500

2021-22 $3,600$250

$3,600

$9,313Total Project Cost: $22,813

04140000124/1/20223/1/20223/1/2020PA&ED:

RTL:R/W Cert:

12/7/2022Begin Con:

04-Alameda-84 Prior19-2019-2021-22

201.1111 Bridge(s)Performance Measure

Program Code

$1,863PA&ED:PS&E:

R/W Sup:

Carryover

17.0/17.4

Con Sup:

Bridge Scour Mitigation

$13,000Const:R/W:

7

20

15

Senate:

Assembly:

Congress:

7

20

15Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 7 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Alameda

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Hayward, San Leandro, and Oakland, atTennyson Road Overcrossing (OC) No. 33-0236(PM 15.65), Washington Avenue OC No. 33-0166 (PM 20.82), and Damon SloughSouthboud onramp No. 33-0142K (PM 26.53);also on Route 77 in Oakland, at San LeandroOC No. 33-0284 (PM 0.29). Upgrade bridgerails, replace joint seals.

1450C

2K170 $25

Subtotal: $10,325

2021-22 $1,500$250

$2,200

$4,750Total Project Cost: $15,075

04160003781/21/2022

12/17/20213/16/2020PA&ED:

RTL:R/W Cert:

9/26/2022Begin Con:

04-Alameda-880 18-1919-2019-2021-22

201.1122123.0 Linear feetPerformance Measure

Program Code

$800PA&ED:PS&E:

R/W Sup:

New

15.6/26.5

Con Sup:

Bridge Rail Replacement and Upgrade

$10,300Const:R/W:

9, 10

18, 20

13, 15

Senate:

Assembly:

Congress:

9, 10

18, 20

13, 15Congress

Assembly

Senate

In Oakland, at East Creek Slough Bridge No. 33-0143. Mitigate eroded channel side-slope tidalscour and replace bridge approach slabs.1483D

2J760 $100

Subtotal: $2,407

2021-22 $850$160

$1,170

$3,180Total Project Cost: $5,587

04150000051/15/2022

12/15/20216/15/2020PA&ED:

RTL:R/W Cert:

8/15/2022Begin Con:

04-Alameda-880 Prior20-2120-2121-22

201.1191 Bridge(s)Performance Measure

Program Code

$1,000PA&ED:PS&E:

R/W Sup:

Carryover

27.2

Con Sup:

Bridge Preventative Maintenance

$2,307Const:R/W:

9

15, 18

13

Senate:

Assembly:

Congress:

9

15, 18

13Congress

Assembly

Senate

In Oakland, at the Routes 80/580/680MacArthur Maze Bridge No. 33-0061R, 33-0061L, 33-0061L and 33-0611. Establishstandard vertical clearance.

ACCELERATED BRIDGE (PA&ED Only)

1460R

4K810 $500

Subtotal: $105,989

2019-20 $7,800$260

$7,800

$22,460Total Project Cost: $128,449

04170003636/1/20205/2/2020

11/18/2019PA&ED:

RTL:R/W Cert:

2/1/2021Begin Con:

04-Alameda-80 Prior19-2019-2019-20

201.3224 Bridge(s)Performance Measure

Program Code

$6,600PA&ED:* PS&E:

* R/W Sup:

Carryover

* Con Sup:

Trans Permit Requirements for Bridges

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

$105,489* Const:* R/W:

9

18

13

Senate:

Assembly:

Congress:

9

18

13Congress

Assembly

Senate

In Berkeley, at University Avenue OvercrossingNo. 33-0023. Establish standard verticalclearance.

ACCELERATED BRIDGE (PA&ED Only)

1452H

2K830 $35

Subtotal: $27,713

2019-20 $3,000$300

$5,400

$12,080Total Project Cost: $39,793

04170000306/1/20205/1/20205/3/2019PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

04-Alameda-80 Prior19-2019-2019-20

201.3221 Bridge(s)Performance Measure

Program Code

$3,380PA&ED:* PS&E:

* R/W Sup:

Carryover

5.8

* Con Sup:

Trans Permit Requirements for Bridges

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

$27,678* Const:* R/W:

3, 9

14, 15

13

Senate:

Assembly:

Congress:

3, 9

14, 15

13Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 8 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Alameda

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

ROADWAY PRESERVATIONIn the city of Alameda, from Broadway/EncinalAvenue to Sherman Street. Pavementrehabilitation, upgrade Americans withDisabilities Act (ADA) curb ramps, andimprove crosswalks.

1452J

2K710 $5

Subtotal: $4,879

2020-21 $1,200$22

$1,500

$3,942Total Project Cost: $8,821

04170000135/1/20213/1/20212/1/2020PA&ED:

RTL:R/W Cert:

11/1/2021Begin Con:

04-Alameda-61 Prior19-2019-2020-21

201.1215.6 Lane mile(s)Performance Measure

Program Code

$1,220PA&ED:PS&E:

R/W Sup:

Carryover

19.8/21.2

Con Sup:

Pavement Rehabilitation (CAPM)

$4,874Const:R/W:

9

18

13

Senate:

Assembly:

Congress:

9

18

13Congress

Assembly

Senate

In Fremont, from Route 880 (PM 6.922) toRoute 238. Rehabilitate pavement and upgradecurb ramps to make Americans with DisabilitiesAct (ADA) compliant.

1454C

2K690 $173

Subtotal: $13,047

2021-22 $2,340$780

$2,080

$7,280Total Project Cost: $20,327

04170000092/1/2022

12/1/20214/1/2020PA&ED:

RTL:R/W Cert:

9/1/2022Begin Con:

04-Alameda-84 18-1919-2019-2021-22

201.12112.0 Lane mile(s)Performance Measure

Program Code

$2,080PA&ED:PS&E:

R/W Sup:

New

6.9/10.8

Con Sup:

Pavement Rehabilitation (CAPM)

$12,874Const:R/W:

10

20

15

Senate:

Assembly:

Congress:

10

20

15Congress

Assembly

Senate

In and near Hayward and San Leandro, from AStreet to Davis Street. Rehabilitate pavementand upgrade curb ramps to Americans withDisabilities Act (ADA) Standards.

1494C

0K490 $40

Subtotal: $14,968

2021-22 $2,093$375

$2,405

$6,290Total Project Cost: $21,258

04160000948/2/20217/1/2021

12/1/2019PA&ED:

RTL:R/W Cert:

2/23/2022Begin Con:

04-Alameda-185 18-1919-2020-2121-22

201.12124.1 Lane mile(s)Performance Measure

Program Code

$1,417PA&ED:PS&E:

R/W Sup:

New

0.4/5.7

Con Sup:

Pavement Rehabilitation (CAPM)

$14,928Const:R/W:

9

18

13

Senate:

Assembly:

Congress:

9

18

13Congress

Assembly

Senate

In Fremont, from Santa Clara County line tonorth of Fremont Boulevard Overcrossing. Cold plane pavement, overlay with RubberizedHot Mix Asphalt (RHMA-G) and Open GradedFriction Course (OGFC), upgrade Americanswith Disabilities Act (ADA) curb ramps,upgrade metal beam guardrail, and replace loopdetectors.

1454G

2K700 $50

Subtotal: $57,216

2021-22 $5,000$620

$5,400

$14,020Total Project Cost: $71,236

041700001011/1/20219/1/20213/2/2020PA&ED:

RTL:R/W Cert:

6/4/2022Begin Con:

04-Alameda-880 18-1919-2019-2021-22

201.12190.2 Lane mile(s)Performance Measure

Program Code

$3,000PA&ED:PS&E:

R/W Sup:

New

R0.0/11.8

Con Sup:

Pavement Rehabilitation (CAPM)

$57,166Const:R/W:

10

20, 25

15, 17

Senate:

Assembly:

Congress:

10

20, 25

15, 17Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 9 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Alameda

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Livermore, from San Joaquin county lineto east of Greenville overcrossing; also on Route 205 (PM 0.0/1.0) from San Joaquin county line to Midway Road undercrossing.Environmental mitigation for EA 3G590.

8315X

3G59C $2,100

Subtotal: $2,100

2018-19$150

$150Total Project Cost: $2,250

04160001579/30/20187/18/20189/15/2014PA&ED:

RTL:R/W Cert:

2/28/2019Begin Con:

04-Alameda-580

Prior

201.1220.0 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/7.8

Con Sup:

Roadway Rehabilitation (2R)

Const:R/W:

7

15

10

Senate:

Assembly:

Congress:

7

15

10Congress

Assembly

Senate

In and near Pleasanton and Dublin, from northof Route 84 to Alcosta Boulevard. Roadwayrehabilitation.

(G13 Contingency)

0481P

0J620 $75

Subtotal: $109,928

2019-20 $7,150$1,500

$16,400

$32,200Total Project Cost: $142,128

04140000196/1/20206/1/20203/1/2019PA&ED:

RTL:R/W Cert:

3/30/2021Begin Con:

04-Alameda-680 Prior18-1918-1919-20

201.12263.0 Lane mile(s)Performance Measure

Program Code

$7,150PA&ED:PS&E:

R/W Sup:

Carryover

R12.4/R21.9

* Con Sup:

Roadway Rehabilitation (2R)

* Const, * Con Sup phase(s) are NOT authorized

$109,853* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

7

16, 20

15

Senate:

Assembly:

Congress:

7

16, 20

15Congress

Assembly

Senate

MOBILITYIn various counties, on various routes at variouslocations. Restore non-operationalTransportation Management System (TMS)field elements by use of on-call Task Orderservice contracts.

1464M

0P380 $10

Subtotal: $16,000

2019-20 $1,340$10

$3,000

$4,800Total Project Cost: $20,800

041700043112/30/20198/15/20194/15/2019PA&ED:

RTL:R/W Cert:

8/1/2020Begin Con:

04-Alameda-Var Prior18-1918-1919-20

201.315800 Field element(s)Performance Measure

Program Code

$450PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

$15,990Const:R/W:

2, 3, 7, 9,10, 11, 13,15, 172, 4, 10, 11,14, 15, 16,17, 182, 3, 5, 9,11, 12, 13,14, 15, 17

Senate:

Assembly:

Congress:

2, 3, 7, 9,10, 11, 13,

15, 17

2, 4, 10, 11,14, 15, 16,

17, 18

2, 3, 5, 9,11, 12, 13,14, 15, 17

Congress

Assembly

Senate

In Emeryville and Oakland, from SanFrancisco-Oakland Bay Bridge Toll Plaza tonorth of Powell Street; also in Oakland, onRoutes 580 and 880, at various locations.Upgrade/replace Transportation ManagementSystem (TMS) elements.

1483H

2J830 $12

Subtotal: $5,147

2019-20 $760$260

$1,044

$2,824Total Project Cost: $7,971

04150000065/1/20204/1/20203/1/2019PA&ED:

RTL:R/W Cert:

12/24/2020Begin Con:

04-Alameda-80 Prior18-1918-1919-20

201.31529 Field element(s)Performance Measure

Program Code

$760PA&ED:PS&E:

R/W Sup:

Carryover

1.9/4.0

Con Sup:

Transportation Management Systems

$5,135Const:R/W:

9

18

13

Senate:

Assembly:

Congress:

9

18

13Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 10 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Alameda

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Oakland and San Leandro, fromRoute 238 to Route 80. Install and upgradeTransportation Management System (TMS)elements.

1487A

3J050 $10

Subtotal: $17,980

2019-20 $2,700$50

$3,600

$9,050Total Project Cost: $27,030

04150000756/15/20204/16/202010/1/2018PA&ED:

RTL:R/W Cert:

11/16/2020Begin Con:

04-Alameda-580 Prior18-1918-1919-20

201.31589 Field element(s)Performance Measure

Program Code

$2,700PA&ED:PS&E:

R/W Sup:

Carryover

R30.8/46.5

Con Sup:

Transportation Management Systems

$17,970Const:R/W:

9, 10

18, 20

13, 15

Senate:

Assembly:

Congress:

9, 10

18, 20

13, 15Congress

Assembly

Senate

In and near Fremont, Pleasanton, and Dublin,from 0.3 mile south of Scott Creek Road to 0.3mile north of Alcosta Boulevard. Install rampmeters, ramp High Occupancy Vehicle (HOV) bypass lanes, and Traffic Operations Systems(TOS).

1463D

4G113 $800

Subtotal: $29,100

2018-19 $5,600$100

$5,600

$11,300Total Project Cost: $40,400

04140003056/15/20186/15/2018

11/16/2016PA&ED:

RTL:R/W Cert:

1/28/2019Begin Con:

04-Alameda-680PriorPrior18-19

201.31546 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

M0.0/R21.9

Con Sup:

Transportation Management Systems

$28,300Const:R/W:

7, 10

16, 20, 25

15, 17

Senate:

Assembly:

Congress:

7, 10

16, 20, 25

15, 17Congress

Assembly

Senate

In Oakland, at the District 4 TransportationManagement Center (TMC). Upgrade orreplace legacy TMC hardware components andrelated software by service contract to improvereliability and functionality.

1464L

0P370 $10

Subtotal: $2,580

2019-20 $392$10

$262

$774Total Project Cost: $3,354

041700043012/1/20199/1/2019

10/1/2018PA&ED:

RTL:R/W Cert:

11/1/2020Begin Con:

04-Alameda-980 Prior18-1918-1919-20

201.3151 Field element(s)Performance Measure

Program Code

$110PA&ED:PS&E:

R/W Sup:

Carryover

1.2

Con Sup:

Transportation Management Systems

$2,570Const:R/W:

9

18

13

Senate:

Assembly:

Congress:

9

18

13Congress

Assembly

Senate

In Hayward, at 500 feet north of IndustrialParkway West. Install weigh-in-motion systemin both directions.1482G

2J320 $5

Subtotal: $4,490

2018-19 $1,121$63

$1,121

$2,305Total Project Cost: $6,795

04140004884/26/2019

12/28/20186/29/2015PA&ED:

RTL:R/W Cert:

11/29/2019Begin Con:

04-Alameda-880PriorPrior18-19

201.3212 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

14.7

Con Sup:

Weigh Stations

$4,485Const:R/W:

10

20

15

Senate:

Assembly:

Congress:

10

20

15Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 11 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Alameda

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

ROADSIDE PRESERVATIONIn Oakland, from north of Redwood Road tonorth of La Salle Avenue; also on Route 238 inSan Leandro, from Hesperian Boulevard toRoute 880 (PM 16.3/16.7); and in SolanoCounty on Route 80 in Vallejo, at RedwoodParkway (PM 4.0 to PM 4.5). Highwayplanting and irrigation system rehabilitation.

1453H

2K790 $5

Subtotal: $2,535

2020-21 $420$50

$510

$1,580Total Project Cost: $4,115

04170000231/15/2021

11/15/202010/15/2019PA&ED:

RTL:R/W Cert:

8/15/2021Begin Con:

04-Alameda-13 18-1919-2019-2020-21

201.2104.5 Acre(s)Performance Measure

Program Code

$600PA&ED:PS&E:

R/W Sup:

New

6.0/7.8

Con Sup:

Highway Planting Restoration

$2,530Const:R/W:

3, 9

14, 15, 18,20

5, 13

Senate:

Assembly:

Congress:

3, 9

14, 15, 18,20

5, 13Congress

Assembly

Senate

FACILITIESIn Oakland, at the Caltrans District 4headquarters office building, 111 GrandAvenue. Rehabilitate the existing thirteenbuilding elevators with new systems to extendservice life, increase efficiency, and correctperformance failures.

1462A

4K980 $0

Subtotal: $4,728

2019-20 $325$0

$710

$1,295Total Project Cost: $6,023

04170003832/27/20202/28/20203/30/2019PA&ED:

RTL:R/W Cert:

6/3/2020Begin Con:

04-Alameda- 18-1919-20

19-20

201.3531 Location(s)Performance Measure

Program Code

$260PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Office Facilities

$4,728Const:R/W:

10

18

13

Senate:

Assembly:

Congress:

10

18

13Congress

Assembly

Senate

MULTIPLE OBJECTIVEIn Oakland, at the District 4 TransportationManagement Center (TMC). Upgrade orreplace legacy TMC software applications andinterface components, and related systemdevices by service contract.

1499J

1K670

Subtotal: $3,687

2019-20 $553$12

$431

$1,107Total Project Cost: $4,794

041600028412/1/20199/1/2019

10/1/2018PA&ED:

RTL:R/W Cert:

11/1/2020Begin Con:

04-Alameda-980 Prior18-1918-1919-20

201.9991 Location(s)Performance Measure

Program Code

$111PA&ED:PS&E:

R/W Sup:

Carryover

1.2

Con Sup:

MULTIPLE OBJECTIVE

$3,687Const:R/W:

9

18

13

Senate:

Assembly:

Congress:

9

18

13Congress

Assembly

Senate

CountyAlameda

PA&ED:PS&E:

R/W Sup:Con Sup:

$13,706$614,071

R/W:

Subtotal: $627,777

Const:$73,744$82,095$9,434

$98,317

$263,590

Total (Capital + Support): $891,367

Sorted by: Disctrict, County, Route and Post MilesPage 12 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Alpine($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

BRIDGE PRESERVATIONNear Markleeville, on Routes 4, 88, and 89 atvarious locations. Bridge rail upgrade on fourbridges.3134

0X750 $313

Subtotal: $5,764

2019-20 $1,460$110

$1,484

$3,550Total Project Cost: $9,314

10130000094/17/20202/10/20207/2/2018PA&ED:

RTL:R/W Cert:

9/8/2020Begin Con:

10-Alpine-88 Prior19-2019-2019-20

201.112550.0 Linear feetPerformance Measure

Program Code

$496PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Rail Replacement and Upgrade

$5,451Const:R/W:

1

4

3

Senate:

Assembly:

Congress:

1

4

3Congress

Assembly

Senate

ROADWAY PRESERVATIONIn Alpine County on Routes 4, 88, and 89 atvarious locations. Rehabilitate culverts.

3142

0S680 $71

Subtotal: $3,390

2019-20 $1,176$359$851

$3,256Total Project Cost: $6,646

10140001001/2/2020

10/13/20197/2/2018PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

10-Alpine-4 Prior18-1918-1919-20

201.15119 Culvert(s) (ea)Performance Measure

Program Code

$870PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Drainage System Restoration

$3,319Const:R/W:

1

4

3

Senate:

Assembly:

Congress:

1

4

3Congress

Assembly

Senate

In Alpine County on Routes 4, 88 and 207; alsoin Amador County on Routes 16 and 49; also inTuolumne County on Route 108; at variouslocations. Rehabilitate culverts.

3138

0S750 $269

Subtotal: $4,559

2019-20 $1,043$317$762

$2,820Total Project Cost: $7,379

10140000991/15/202012/1/20197/2/2018PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

10-Alpine-88 Prior18-1918-1919-20

201.15136 Culvert(s) (ea)Performance Measure

Program Code

$698PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Drainage System Restoration

$4,290Const:R/W:

1

4

3

Senate:

Assembly:

Congress:

1

4

3Congress

Assembly

Senate

CountyAlpine

PA&ED:PS&E:

R/W Sup:Con Sup:

$653$13,060

R/W:

Subtotal: $13,713

Const:$2,064$3,679

$786$3,097

$9,626

Total (Capital + Support): $23,339

Sorted by: Disctrict, County, Route and Post MilesPage 13 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Amador

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONNear Jackson, from 0.5 mile east of Route 104to 5.5 miles west of Kirkwood Meadows Roadat various locations. Upgrade guardrail to makestandard.

3199

1C360 $10

Subtotal: $2,623

2020-21 $851$0

$711

$2,098Total Project Cost: $4,721

10160001364/15/20214/1/20217/1/2020PA&ED:

RTL:R/W Cert:

11/1/2021Begin Con:

10-Amador-88 18-1920-21

20-21

201.01569 Collision(s) reducedPerformance Measure

Program Code

$536PA&ED:PS&E:

R/W Sup:

New

7.9/R65.8

Con Sup:

Collision Severity Reduction

$2,613Const:R/W:

1

4, 10

3, 4

Senate:

Assembly:

Congress:

1

4, 10

3, 4Congress

Assembly

Senate

BRIDGE PRESERVATIONNear Jackson, at Mokelumne River Bridge No.26-0012. Upgrade bridge rails and widenshoulders.3219

0X752 $185

Subtotal: $4,099

2021-22 $2,010$135

$2,055

$5,790Total Project Cost: $9,889

10170000045/2/2022

4/28/20226/30/2020PA&ED:

RTL:R/W Cert:

12/27/2022Begin Con:

10-Amador-49 18-1920-2120-2121-22

201.112810.0 Linear feetPerformance Measure

Program Code

$1,590PA&ED:PS&E:

R/W Sup:

New

0.0

Con Sup:

Bridge Rail Replacement and Upgrade

$3,914Const:R/W:

1

4, 10

3, 4

Senate:

Assembly:

Congress:

1

4, 10

3, 4Congress

Assembly

Senate

ROADWAY PRESERVATIONIn Amador County, on Route 88 and inTuolumne County of Routes 120,108 and 49, atvarious locations. Rehabilitate culverts.3119

1C690 $26

Subtotal: $2,354

2018-19 $448$65

$616

$1,379Total Project Cost: $3,733

10150000041/2/2019

12/1/20183/1/2018PA&ED:

RTL:R/W Cert:

8/15/2019Begin Con:

10-Amador-88 PriorPriorPrior18-19

201.15135 Culvert(s) (ea)Performance Measure

Program Code

$250PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Drainage System Restoration

$2,328Const:R/W:

1, 12

4, 25

4

Senate:

Assembly:

Congress:

1, 12

4, 25

4Congress

Assembly

Senate

CountyAmador

PA&ED:PS&E:

R/W Sup:Con Sup:

$221$8,855

R/W:

Subtotal: $9,076

Const:$2,376$3,309

$200$3,382

$9,267

Total (Capital + Support): $18,343

Sorted by: Disctrict, County, Route and Post MilesPage 14 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Butte($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MAJOR DAMAGE RESTORATIONNear Paradise, from 0.8 mile west to 0.2 mileeast of Shady Rest Area. Restore and repairdamaged roadway by raising the existingvertical alignment by approximately 5 feet andprotecting the embankment against futureflooding with Rock Slope Protection (RSP) or aretaining structure.

2293

3H540 $2,120

Subtotal: $45,966

2020-21 $4,200$400

$6,600

$12,900Total Project Cost: $58,866

031800001212/5/2020

11/10/202010/11/2019PA&ED:

RTL:R/W Cert:

6/5/2021Begin Con:

03-Butte-70 Prior19-2019-2020-21

201.1311 Location(s)Performance Measure

Program Code

$1,700PA&ED:PS&E:

R/W Sup:

Carryover

46.0/47.0

Con Sup:

Permanent Restoration

$43,846Const:R/W:

4

1

1

Senate:

Assembly:

Congress:

4

1

1Congress

Assembly

Senate

COLLISION REDUCTIONIn Chico, from West Sacramento Avenue (East)to West Sacramento Avenue (West). Constructtwo roundabouts.2114

2H240 $1,789

Subtotal: $4,121

2019-20 $663$756$565

$2,634Total Project Cost: $6,755

03170000843/1/20202/1/20209/3/2018PA&ED:

RTL:R/W Cert:

7/30/2020Begin Con:

03-Butte-32 Prior18-1918-1919-20

201.01058 Collision(s) reducedPerformance Measure

Program Code

$650PA&ED:PS&E:

R/W Sup:

Carryover

7.6/7.9

Con Sup:

Safety Improvements

$2,332Const:R/W:

1

3

4

Senate:

Assembly:

Congress:

1

3

4Congress

Assembly

Senate

Near Oroville, from Yuba County Line to southof East Gridley Road/Stimpson Road; also, inYuba County on Route 70 from PM 25.7 to PM25.8. Widen for two-way left-turn lane andstandard shoulders.

2296

3H930 $3,218

Subtotal: $31,968

2021-22 $3,000$2,500$3,200

$12,100Total Project Cost: $44,068

031800010210/15/202110/1/20214/1/2020PA&ED:

RTL:R/W Cert:

6/17/2022Begin Con:

03-Butte-70 Prior19-2019-2021-22

201.01035 Collision(s) reducedPerformance Measure

Program Code

$3,400PA&ED:PS&E:

R/W Sup:

Carryover

0.0/3.8

Con Sup:

Safety Improvements

$28,750Const:R/W:

4

3

1, 3

Senate:

Assembly:

Congress:

4

3

1, 3Congress

Assembly

Senate

Near Oroville, from 0.3 mile north of Cox Laneto south of Palermo Road. Widen for two-wayleft-turn lane and standard shoulders, andprovide a roadside clear recovery zone.

2295

3H720 $3,220

Subtotal: $28,570

2019-20 $2,180$1,590$3,540

$8,290Total Project Cost: $36,860

03180000546/1/2019

5/15/20197/18/2018PA&ED:

RTL:R/W Cert:

12/1/2019Begin Con:

03-Butte-70 Prior18-1918-1919-20

201.01035 Collision(s) reducedPerformance Measure

Program Code

$980PA&ED:PS&E:

R/W Sup:

Carryover

5.6/8.8

Con Sup:

Safety Improvements

$25,350Const:R/W:

4

3

1

Senate:

Assembly:

Congress:

4

3

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 15 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Butte($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Oroville, from south of Palermo Road tonorth of Ophir Road. Widen for two-way left-turn lane and standard shoulders, and provide aroadside clear recovery zone.

2294

3H710 $480

Subtotal: $23,610

2019-20 $2,240$2,320$3,700

$9,110Total Project Cost: $32,720

03180000531/2/2019

12/1/20187/18/2018PA&ED:

RTL:R/W Cert:

7/1/2019Begin Con:

03-Butte-70 Prior18-1918-1919-20

201.01058 Collision(s) reducedPerformance Measure

Program Code

$850PA&ED:PS&E:

R/W Sup:

Carryover

8.8/11.8

Con Sup:

Safety Improvements

$23,130Const:R/W:

4

3

1

Senate:

Assembly:

Congress:

4

3

1Congress

Assembly

Senate

In and near Oroville, from Foothill Boulevard tothe Gold Country Casino entrance. Constructtwo-way left-turn lane and widen shoulders.2635

2H630 $1,645

Subtotal: $15,720

2019-20 $1,769$2,023$1,913

$6,632Total Project Cost: $22,352

03170001663/20/20203/5/2020

12/1/2018PA&ED:

RTL:R/W Cert:

9/15/2020Begin Con:

03-Butte-162 Prior18-1918-1919-20

201.01050 Collision(s) reducedPerformance Measure

Program Code

$927PA&ED:PS&E:

R/W Sup:

Carryover

18.4/19.9

Con Sup:

Safety Improvements

$14,075Const:R/W:

4

3

1

Senate:

Assembly:

Congress:

4

3

1Congress

Assembly

Senate

MANDATESIn Chico, from Walnut Street to Poplar Street.Upgrade Americans with Disabilities Act (ADA) facilities.2112

4F800

Subtotal: $2,900

2018-19 $650$375$935

$2,365Total Project Cost: $5,265

03140002888/25/20188/1/2018

10/2/2017PA&ED:

RTL:R/W Cert:

4/1/2019Begin Con:

03-Butte-32 PriorPriorPrior18-19

201.36134 Curb ramp(s)Performance Measure

Program Code

$405PA&ED:PS&E:

R/W Sup:

Carryover

R8.8/9.5

Con Sup:

Americans with Disabilities Act New Curb Ramps

$2,900Const:R/W:

4

3

1

Senate:

Assembly:

Congress:

4

3

1Congress

Assembly

Senate

BRIDGE PRESERVATIONNear Richvale, at Cottonwood Creek Bridge No.12-0120, from 0.3 mile south to 0.5 mile northof Nelson Avenue. Replace and realign scour-critical bridge.

2425

0F290 $590

Subtotal: $7,404

2019-20 $1,390$270

$2,200

$4,560Total Project Cost: $11,964

031400010110/15/201910/1/20195/1/2018PA&ED:

RTL:R/W Cert:

5/15/2020Begin Con:

03-Butte-99 PriorPriorPrior19-20

201.1111 Bridge(s)Performance Measure

Program Code

$700PA&ED:PS&E:

R/W Sup:

Carryover

14.9/15.7

Con Sup:

Bridge Scour Mitigation

$6,814Const:R/W:

4

3

1

Senate:

Assembly:

Congress:

4

3

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 16 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Butte($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Chico, from north of Route 162 tonorth of Broyles Road. Bridge rail upgrade atsix locations.2433

0H330 $363

Subtotal: $5,598

2019-20 $1,230$160

$1,425

$3,425Total Project Cost: $9,023

03150001458/15/20198/15/20192/1/2018PA&ED:

RTL:R/W Cert:

4/1/2020Begin Con:

03-Butte-99 PriorPriorPrior19-20

201.112999.0 Linear feetPerformance Measure

Program Code

$610PA&ED:PS&E:

R/W Sup:

Carryover

13.3/45.9

Con Sup:

Bridge Rail Replacement and Upgrade

$5,235Const:R/W:

4

3

1

Senate:

Assembly:

Congress:

4

3

1Congress

Assembly

Senate

ROADWAY PRESERVATIONNear Pulga, from 3.0 miles west of Coal CanyonRoad to Plumas County line at variouslocations. Drainage system restoration.3588

0H560 $290

Subtotal: $2,815

2019-20 $760$1,060

$850

$3,450Total Project Cost: $6,265

021500005110/11/2019

9/4/20199/1/2018PA&ED:

RTL:R/W Cert:

2/13/2020Begin Con:

02-Butte-70 Prior18-1918-1919-20

201.15125 Culvert(s) (ea)Performance Measure

Program Code

$780PA&ED:PS&E:

R/W Sup:

Carryover

22.0/48.0

Con Sup:

Drainage System Restoration

$2,525Const:R/W:

4

1, 3

1

Senate:

Assembly:

Congress:

4

1, 3

1Congress

Assembly

Senate

MOBILITYIn and near Chico, from Estates Drive to GarnerLane. Install Intelligent Transportation System(ITS) elements.2437

1H860 $35

Subtotal: $8,505

2020-21 $1,177$41

$1,352

$3,131Total Project Cost: $11,636

03170000108/1/20207/2/20207/2/2019PA&ED:

RTL:R/W Cert:

1/2/2021Begin Con:

03-Butte-99 Prior19-2019-2020-21

201.3159.4 Mile(s) of cablePerformance Measure

Program Code

$561PA&ED:PS&E:

R/W Sup:

Carryover

28.3/T37.8

Con Sup:

Transportation Management Systems

$8,470Const:R/W:

4

3

1

Senate:

Assembly:

Congress:

4

3

1Congress

Assembly

Senate

ROADSIDE PRESERVATIONIn Butte County, on Route 70 at approximately7.0 miles south of Oroville; also in ColusaCounty on Route 20 at approximately 4.0 mileseast of Colusa. Advance mitigation creditpurchases for future SHOPP construction projects expected to impact sensitive habitats.

2438

2H140 $1,764

Subtotal: $1,764

2019-20 $16$61

$130Total Project Cost: $1,894

0317000067

10/1/20218/1/2019PA&ED:

RTL:R/W Cert:

10/15/2021Begin Con:

03-Butte-70 Prior19-2019-20

201.2402 Location(s)Performance Measure

Program Code

$53PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Roadside Enhancement

Const:R/W:

4

3, 4

1, 3

Senate:

Assembly:

Congress:

4

3, 4

1, 3Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 17 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Butte($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

CountyButte

PA&ED:PS&E:

R/W Sup:Con Sup:

$15,514$163,427

R/W:

Subtotal: $178,941

Const:$11,616$19,275$11,556$26,280

$68,727

Total (Capital + Support): $247,668

Sorted by: Disctrict, County, Route and Post MilesPage 18 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Calaveras

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MAJOR DAMAGE RESTORATIONNear Mokelumne Hill and West Point, atvarious locations from 5.4 miles west of RidgeRoad to the Amador County line. Stabilize failing and eroded slopes.

3132

0V480 $1,817

Subtotal: $12,365

2021-22 $1,978$31

$3,242

$6,574Total Project Cost: $18,939

10130002646/1/20226/1/20228/1/2020PA&ED:

RTL:R/W Cert:

1/2/2023Begin Con:

10-Calaveras-26 18-1920-2120-2121-22

201.13126 Location(s)Performance Measure

Program Code

$1,323PA&ED:PS&E:

R/W Sup:

New

21.4/38.3

Con Sup:

Permanent Restoration

$10,548Const:R/W:

1

4

4

Senate:

Assembly:

Congress:

1

4

4Congress

Assembly

Senate

COLLISION REDUCTIONIn Calaveras and Amador Counties, on Routes 4and 26 at various locations. Install centerlineand edge-line rumble strips.3220

1F740 $5

Subtotal: $2,305

2018-19 $840$5

$640

$1,545Total Project Cost: $3,850

10170000428/31/20187/16/2018

11/28/2017PA&ED:

RTL:R/W Cert:

3/5/2019Begin Con:

10-Calaveras-4 PriorPriorPrior18-19

201.01024 Collision(s) reducedPerformance Measure

Program Code

$60PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Safety Improvements

$2,300Const:R/W:

1, 6

4, 10

3, 4

Senate:

Assembly:

Congress:

1, 6

4, 10

3, 4Congress

Assembly

Senate

BRIDGE PRESERVATIONNear Angels Camp, at West Branch CherokeeCreek Bridge No. 30-0036. Replace bridge.

3255

1H500 $278

Subtotal: $2,278

2021-22 $1,392$103

$1,241

$3,341Total Project Cost: $5,619

10170001548/11/20212/4/20218/6/2019PA&ED:

RTL:R/W Cert:

2/28/2022Begin Con:

10-Calaveras-4 Prior19-2019-2021-22

201.1101 Bridge(s)Performance Measure

Program Code

$605PA&ED:PS&E:

R/W Sup:

Carryover

16.1

Con Sup:

Bridge Major Rehabilitation

$2,000Const:R/W:

1

25

3

Senate:

Assembly:

Congress:

1

25

3Congress

Assembly

Senate

Near West Point, at South Fork MokelumneRiver Bridge No. 30-0022 (PM 30.0), and atNorth Fork Mokelumne River Bridge No. 30-0049 (PM 38.3); also on Route 4 in AngelsCamp, at Angels Creek Bridge No. 30-0008(PM R21.4). Upgrade bridge railing at threestructures, also seismic retrofit at one location.

3247

0X751 $8

Subtotal: $4,544

2021-22 $1,604$60

$1,540

$3,961Total Project Cost: $8,505

10150001288/2/20215/3/20218/3/2020PA&ED:

RTL:R/W Cert:

1/3/2022Begin Con:

10-Calaveras-26 18-1920-2120-2121-22

201.112808.0 Linear feetPerformance Measure

Program Code

$757PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Bridge Rail Replacement and Upgrade

$4,536Const:R/W:

1

25

3

Senate:

Assembly:

Congress:

1

25

3Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 19 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Calaveras

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MOBILITYNear Murphys, from Pennsylvania Gulch Roadto Main Street/Lawrence Street. Trafficoperational improvements.3245

0W870 $10

Subtotal: $2,171

2020-21 $1,306$30

$772

$2,632Total Project Cost: $4,803

10170000061/20/20219/21/20209/25/2019PA&ED:

RTL:R/W Cert:

7/19/2021Begin Con:

10-Calaveras-4 18-1919-2019-2020-21

201.31041.4 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

$524PA&ED:PS&E:

R/W Sup:

New

29.2/29.4

Con Sup:

Operational Improvements

$2,161Const:R/W:

1

4

4

Senate:

Assembly:

Congress:

1

4

4Congress

Assembly

Senate

MULTIPLE OBJECTIVENear Copperopolis and Angels Camp, from 2.0miles east of Main Street to Stallion Way.Realign roadwayroadway, implement safetyfeatures by improving shoulder width, andrehabilitate culverts.

3067A

0E531

Subtotal:

2020-21

$10,325

$10,325Total Project Cost: $10,325

10180001647/31/20207/1/2020

1/10/2017PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

10-Calaveras-4

20-21

201.99912.2 Centerline mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R10.3/16.4

Con Sup:

MULTIPLE OBJECTIVE

Const:R/W:

1

25

3

Senate:

Assembly:

Congress:

1

25

3Congress

Assembly

Senate

CountyCalaveras

PA&ED:PS&E:

R/W Sup:Con Sup:

$2,118$21,545

R/W:

Subtotal: $23,663

Const:$3,269$7,120

$229$17,760

$28,378

Total (Capital + Support): $52,041

Sorted by: Disctrict, County, Route and Post MilesPage 20 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Colusa($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONNear Colusa, from Niagara Avenue to 0.3 milewest of Steidlmayer Road. Widen shoulders to8 feet to provide adequate recoverable space forerrant vehicles.

2951

0H650 $4,700

Subtotal: $10,600

2021-22 $1,120$580

$1,460

$4,020Total Project Cost: $14,620

03160000034/1/20224/1/20227/2/2020PA&ED:

RTL:R/W Cert:

9/1/2022Begin Con:

03-Colusa-20 18-1920-2120-2121-22

201.01579 Collision(s) reducedPerformance Measure

Program Code

$860PA&ED:PS&E:

R/W Sup:

New

34.8/36.5

Con Sup:

Collision Severity Reduction

$5,900Const:R/W:

4

3, 4

3

Senate:

Assembly:

Congress:

4

3, 4

3Congress

Assembly

Senate

Near Maxwell, at the Maxwell Safety RoadsideRest Area. Upgrade water and wastewatersystems to current standards.2793

4F430 $16

Subtotal: $3,896

2018-19 $460$30

$810

$1,720Total Project Cost: $5,616

03140001621/2/2019

12/1/20182/1/2018PA&ED:

RTL:R/W Cert:

6/1/2019Begin Con:

03-Colusa-5 PriorPriorPrior18-19

201.2351 Location(s)Performance Measure

Program Code

$420PA&ED:PS&E:

R/W Sup:

Carryover

R24.3

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$3,880Const:R/W:

4

3

3

Senate:

Assembly:

Congress:

4

3

3Congress

Assembly

Senate

CountyColusa

PA&ED:PS&E:

R/W Sup:Con Sup:

$4,716$9,780

R/W:

Subtotal: $14,496

Const:$1,280$1,580

$610$2,270

$5,740

Total (Capital + Support): $20,236

Sorted by: Disctrict, County, Route and Post MilesPage 21 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Contra Costa

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONIn Orinda and Lafayette, from east of theCaldecott Tunnel to east of Camino Pablo and atAcalanes Road (PM R4.2/R4.99); also inOakland on Route 13, at Redwood Road (PM5.2/5.5). Install safety lighting and upgrademedian barrier.

1418C

1J990 $313

Subtotal: $5,363

2018-19 $725$64

$760

$2,285Total Project Cost: $7,648

04140004116/17/20195/20/20195/1/2018PA&ED:

RTL:R/W Cert:

3/10/2020Begin Con:

04-Contra Costa-24 Prior18-1918-1918-19

201.01065 Collision(s) reducedPerformance Measure

Program Code

$736PA&ED:PS&E:

R/W Sup:

Carryover

1.0/R2.5

Con Sup:

Safety Improvements

$5,050Const:R/W:

7, 9

15, 16

11, 13

Senate:

Assembly:

Congress:

7, 9

15, 16

11, 13Congress

Assembly

Senate

In various cities, from Alameda County line to0.6 mile west of Solano County line; also inAlameda County in Albany, from 0.4 mile westto the Contra Costa County line (PM R7.6/8.0).Install lighting and upgrade concrete barrier.

1497F

0K160 $254

Subtotal: $52,875

2021-22 $6,869$1,374$7,327

$22,439Total Project Cost: $75,314

04160000444/1/20221/1/2022

10/1/2020PA&ED:

RTL:R/W Cert:

10/1/2022Begin Con:

04-Contra Costa-80 Prior20-2120-2121-22

201.010460 Collision(s) reducedPerformance Measure

Program Code

$6,869PA&ED:PS&E:

R/W Sup:

Carryover

0.0/13.5

Con Sup:

Safety Improvements

$52,621Const:R/W:

7, 9

11, 14

5

Senate:

Assembly:

Congress:

7, 9

11, 14

5Congress

Assembly

Senate

In Contra Costa County, on Routes 4, 24, 80,123, 242, 580, and 680 at various locations.Install Accessible Pedestrian Signals (APS)systems and pedestrian countdown timers, andrefresh crosswalk markings with high-visibilitystriping to enhance pedestrian safety.

1487N

3J140 $20

Subtotal: $7,507

2021-22 $1,108$80

$1,400

$3,696Total Project Cost: $11,203

04150000918/1/20216/1/20211/1/2020PA&ED:

RTL:R/W Cert:

3/1/2022Begin Con:

04-Contra Costa-4 18-1919-2019-2021-22

201.015333 Collision(s) reducedPerformance Measure

Program Code

$1,108PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

$7,487Const:R/W:

7, 9

14, 15

11

Senate:

Assembly:

Congress:

7, 9

14, 15

11Congress

Assembly

Senate

In and near Hercules, Martinez, and Concord, atvarious locations from Route 80 to 0.3 mile eastof Bailey Road. Upgrade guardrail to makestandard.

0481U

0J480 $10

Subtotal: $12,410

2021-22 $1,400$52

$1,500

$3,952Total Project Cost: $16,362

041400000410/1/20216/1/20212/3/2020PA&ED:

RTL:R/W Cert:

4/1/2022Begin Con:

04-Contra Costa-4 19-2019-2020-2121-22

201.015225 Collision(s) reducedPerformance Measure

Program Code

$1,000PA&ED:PS&E:

R/W Sup:

New

0.0/R20.4

Con Sup:

Collision Severity Reduction

$12,400Const:R/W:

7

14

11

Senate:

Assembly:

Congress:

7

14

11Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 22 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Contra Costa

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Antioch and Brentwood, from 0.6mile east of Route 160 to Old River Bridge.Construct and modify Maintenance VehiclePullouts (MVPs) to improve highway workersafety.

1492H

4J950 $72

Subtotal: $1,306

2021-22 $663$40

$530

$2,161Total Project Cost: $3,467

04160000263/1/20222/1/2022

11/1/2020PA&ED:

RTL:R/W Cert:

10/1/2022Begin Con:

04-Contra Costa-4 18-1920-2121-2221-22

201.23515 Location(s)Performance Measure

Program Code

$928PA&ED:PS&E:

R/W Sup:

New

R31.0/48.2

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$1,234Const:R/W:

3, 7

11, 14, 15

5, 11

Senate:

Assembly:

Congress:

3, 7

11, 14, 15

5, 11Congress

Assembly

Senate

In various cities from the Alameda County lineto the Solano County line; also on Route 242,580, and 680 at various locations. Constructmaintenance worker safety improvements

1483P

2J820 $5

Subtotal: $2,635

2019-20 $637$5

$692

$1,789Total Project Cost: $4,424

04150000098/30/20198/9/20191/2/2018PA&ED:

RTL:R/W Cert:

3/24/2020Begin Con:

04-Contra Costa-80 PriorPriorPrior19-20

201.23527 Location(s)Performance Measure

Program Code

$455PA&ED:PS&E:

R/W Sup:

Carryover

0.0/14.1

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,630Const:R/W:

3, 7, 9

14, 15, 16

5, 11

Senate:

Assembly:

Congress:

3, 7, 9

14, 15, 16

5, 11Congress

Assembly

Senate

BRIDGE PRESERVATIONIn Richmond, at Stege Drain Bridge No. 28-0091. Bridge rehabilitation.

1482Q

2J720 $5

Subtotal: $5,833

2019-20 $876$117$876

$2,569Total Project Cost: $8,402

04150000164/20/20208/1/2019

11/30/2018PA&ED:

RTL:R/W Cert:

10/12/2020Begin Con:

04-Contra Costa-580 Prior18-1918-1919-20

201.1101 Bridge(s)Performance Measure

Program Code

$700PA&ED:PS&E:

R/W Sup:

Carryover

1.2

Con Sup:

Bridge Major Rehabilitation

$5,828Const:R/W:

9

15

11

Senate:

Assembly:

Congress:

9

15

11Congress

Assembly

Senate

Near Martinez, at Grayson Creek Bridge No. 28-0066 R/L. Replace bridges by Financial Contribution Only (FCO) to Contra Costa Transportation Authority.

0298X

22913

Subtotal: $20,500

2018-19 $100

$100Total Project Cost: $20,600

04180002987/13/20187/6/2018

2/19/2009PA&ED:

RTL:R/W Cert:

12/31/2018Begin Con:

04-Contra Costa-418-19

201.1112 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R12.9

Con Sup:

Bridge Scour Mitigation

$20,500Const:R/W:

7

14

11

Senate:

Assembly:

Congress:

7

14

11Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 23 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Contra Costa

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Orinda, at St. Stephens Drive OvercrossingNo. 28-0111. Seismic retrofit.

1493A

4J840 $38

Subtotal: $2,105

2021-22 $1,175$175$375

$2,650Total Project Cost: $4,755

04160000272/21/20221/4/2022

4/13/2020PA&ED:

RTL:R/W Cert:

12/22/2022Begin Con:

04-Contra Costa-24 18-1919-2019-2021-22

201.1131 Bridge(s)Performance Measure

Program Code

$925PA&ED:PS&E:

R/W Sup:

New

R3.5

Con Sup:

Bridge Seismic Restoration

$2,067Const:R/W:

9

15

13

Senate:

Assembly:

Congress:

9

15

13Congress

Assembly

Senate

ROADWAY PRESERVATIONIn and near Concord and Pittsburg, from Route242 to Loveridge Road. Rehabilitate pavement,upgrade curb ramps to make Americans withDisabilities Act (ADA) compliant and upgradeguardrail to make standard.

1462R

2K720 $93

Subtotal: $55,374

2021-22 $6,400$780

$8,320

$18,220Total Project Cost: $73,594

04170000146/1/20223/1/20226/1/2020PA&ED:

RTL:R/W Cert:

12/1/2022Begin Con:

04-Contra Costa-4 18-1920-2120-2121-22

201.12195.0 Lane mile(s)Performance Measure

Program Code

$2,720PA&ED:PS&E:

R/W Sup:

New

R14.3/24.3

Con Sup:

Pavement Rehabilitation (CAPM)

$55,281Const:R/W:

7

11

5

Senate:

Assembly:

Congress:

7

11

5Congress

Assembly

Senate

In Concord, from Route 680 to Route 4.Pavement rehabilitation.

0269H

26980 $15

Subtotal: $11,789

2019-20 $1,210$110

$1,430

$3,740Total Project Cost: $15,529

04120001596/30/20203/4/2020

6/29/2018PA&ED:

RTL:R/W Cert:

12/18/2020Begin Con:

04-Contra Costa-242 Prior18-1918-1919-20

201.12120.4 Lane mile(s)Performance Measure

Program Code

$990PA&ED:PS&E:

R/W Sup:

Carryover

R0.0/R3.4

Con Sup:

Pavement Rehabilitation (CAPM)

$11,774Const:R/W:

7

14

11

Senate:

Assembly:

Congress:

7

14

11Congress

Assembly

Senate

In and near Hercules, Rodeo, and Crocket, fromRoute 4 to the Carquinez Bridge. Roadwayrehabilitation.

(G13 Contingency)

1487E

3J070 $28

Subtotal: $61,345

2021-22 $4,624$206

$7,501

$15,414Total Project Cost: $76,759

04150000772/1/2022

12/1/20214/1/2020PA&ED:

RTL:R/W Cert:

11/15/2022Begin Con:

04-Contra Costa-80 Prior19-2019-2021-22

201.12221.9 Lane mile(s)Performance Measure

Program Code

$3,083PA&ED:PS&E:

R/W Sup:

Carryover

10.1/13.5

* Con Sup:

Roadway Rehabilitation (2R)

* Const, * Con Sup phase(s) are NOT authorized

$61,317* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

3, 9

14, 15

5

Senate:

Assembly:

Congress:

3, 9

14, 15

5Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 24 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Contra Costa

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

CountyContra Costa

PA&ED:PS&E:

R/W Sup:Con Sup:

$853$238,189

R/W:

Subtotal: $239,042

Const:$19,514$25,787$3,003

$30,711

$79,015

Total (Capital + Support): $318,057

Sorted by: Disctrict, County, Route and Post MilesPage 25 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Del Norte

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MAJOR DAMAGE RESTORATIONNear Crescent City, at 0.2 mile north of CushingCreek Viaduct. Restore roadway to pre-slidecondition.1122

0G210 $18

Subtotal: $10,166

2019-20 $2,276$116

$3,974

$7,854Total Project Cost: $18,020

01160001373/1/2020

2/15/202012/1/2018PA&ED:

RTL:R/W Cert:

11/15/2020Begin Con:

01-Del Norte-101 Prior18-1918-1919-20

201.1311 Location(s)Performance Measure

Program Code

$1,488PA&ED:PS&E:

R/W Sup:

Carryover

21.2

Con Sup:

Permanent Restoration

$10,148Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

COLLISION REDUCTIONNear Gasquet, from 0.7 to 0.3 mile south ofHardscrabble Creek Bridge. Install High Friction Surface Treatment (HFST), signs,guardrail, and centerline rumble strip.

1121

0G130 $25

Subtotal: $1,595

2019-20 $507$93

$393

$1,395Total Project Cost: $2,990

01160001281/13/2020

12/16/201912/1/2018PA&ED:

RTL:R/W Cert:

6/6/2020Begin Con:

01-Del Norte-199 Prior18-1918-1919-20

201.01020 Collision(s) reducedPerformance Measure

Program Code

$402PA&ED:PS&E:

R/W Sup:

Carryover

10.2/10.7

Con Sup:

Safety Improvements

$1,570Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

MANDATESIn and near Crescent City, from south of ElkValley Road to north of WilsonAvenue/Burtschell Street. Upgrade Americanswith Disabilities Act (ADA) facilities andconstruct traffic calming measures to improveoperations and safety for non-motorized users.

1095

0C660 $621

Subtotal: $4,961

2019-20 $595$1,234

$530

$3,028Total Project Cost: $7,989

01130000236/22/20206/5/2020

6/15/2018PA&ED:

RTL:R/W Cert:

10/30/2020Begin Con:

01-Del Norte-101 Prior19-2019-2019-20

201.36187 Curb ramp(s)Performance Measure

Program Code

$669PA&ED:PS&E:

R/W Sup:

Carryover

25.6/27.3

Con Sup:

Americans with Disabilities Act New Curb Ramps

$4,340Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

BRIDGE PRESERVATIONNear Crescent City from 0.2 mile north of theSmith River Overflow Bridge. Replace bridge.

0100V

43640 $3,900

Subtotal: $54,348

2020-21 $4,200$650

$12,250

$28,042Total Project Cost: $82,390

01000001934/19/20213/19/202112/1/2019PA&ED:

RTL:R/W Cert:

12/10/2021Begin Con:

01-Del Norte-101 Prior18-19Prior20-21

201.1101 Bridge(s)Performance Measure

Program Code

$10,942PA&ED:PS&E:

R/W Sup:

Carryover

36.1

Con Sup:

Bridge Major Rehabilitation

$50,448Const:R/W:

4

1

1

Senate:

Assembly:

Congress:

4

1

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 26 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Del Norte

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near the Smith River community, at DominieCreek. Replace box culvert with new bridgeand remediate fish passage barrier. 1113

0F310 $151

Subtotal: $6,003

2019-20 $1,141$154

$1,643

$4,006Total Project Cost: $10,009

01150001081/17/20201/3/2020

1/15/2019PA&ED:

RTL:R/W Cert:

7/22/2020Begin Con:

01-Del Norte-101 Prior18-1918-1919-20

201.1101 Bridge(s)Performance Measure

Program Code

$1,068PA&ED:PS&E:

R/W Sup:

Carryover

39.8

Con Sup:

Bridge Major Rehabilitation

$5,852Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Near Klamath, at Panther Creek Bridge No. 01-0025 and at Hunter Creek Bridge No. 01-0003.Seismic retrofit.1072

0B090 $5,589

Subtotal: $19,345

2018-19 $3,720$373

$3,282

$9,534Total Project Cost: $28,879

01000204446/3/20197/1/20197/1/2018PA&ED:

RTL:R/W Cert:

6/15/2020Begin Con:

01-Del Norte-101 Prior18-1918-1918-19

201.1132 Bridge(s)Performance Measure

Program Code

$2,159PA&ED:PS&E:

R/W Sup:

Carryover

8.2/8.7

Con Sup:

Bridge Seismic Restoration

$13,756Const:R/W:

4

1

1

Senate:

Assembly:

Congress:

4

1

1Congress

Assembly

Senate

ROADWAY PRESERVATIONIn Del Norte County, at various locations fromnorth of Elk Valley Cross Road to south of theOregon State line. Culvert rehabilitation andfish passage.

1055

48800 $166

Subtotal: $5,164

2019-20 $1,135$82

$1,221

$3,538Total Project Cost: $8,702

01140000743/1/20202/1/20201/1/2019PA&ED:

RTL:R/W Cert:

8/1/2020Begin Con:

01-Del Norte-199 Prior18-1918-1919-20

201.15118 Culvert(s) (ea)Performance Measure

Program Code

$1,100PA&ED:PS&E:

R/W Sup:

Carryover

1.1/36.3

Con Sup:

Drainage System Restoration

$4,998Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Near the Oregon State line, from 0.1 mile to 0.5mile north of Collier Safety Roadside Rest Area(SRRA). Upgrade lighting and power controlsystem at the Randolph Collier Tunnel No. 01-0049.

1115

0F430

Subtotal: $2,082

2020-21 $1,213$86

$949

$2,603Total Project Cost: $4,685

01160000058/1/20207/1/20204/1/2019PA&ED:

RTL:R/W Cert:

1/1/2021Begin Con:

01-Del Norte-199 18-1918-1918-1920-21

201.170158 Lighting fixture(s)Performance Measure

Program Code

$355PA&ED:PS&E:

R/W Sup:

New

33.5/33.9

Con Sup:

Signs and Lighting Rehabilitation

$2,082Const:R/W:

2

2

1

Senate:

Assembly:

Congress:

2

2

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 27 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Del Norte

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MOBILITYIn Klamath, from 0.2 mile south to 0.3 milenorth of Ehlers Way. Extend the left turnpocket, install acceleration lane for left turns,and extend acceleration lane for right turns atthe intersection of Ehlers Way and Route 101.

1110

0F240 $446

Subtotal: $2,027

2021-22 $847$15

$649

$2,208Total Project Cost: $4,235

011500009411/1/202110/1/202110/1/2020PA&ED:

RTL:R/W Cert:

6/1/2022Begin Con:

01-Del Norte-101 18-1920-2120-2121-22

201.310.2 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

$697PA&ED:PS&E:

R/W Sup:

New

R5.1/R5.6

Con Sup:

Operational Improvements

$1,581Const:R/W:

2

2

1

Senate:

Assembly:

Congress:

2

2

1Congress

Assembly

Senate

FACILITIESNear Gasquet, at the Idlewild MaintenanceStation. Construct new office space building,and rehabilitate water system and septic system.1117

0F760 $20

Subtotal: $3,980

2021-22 $1,565$43

$2,038

$4,207Total Project Cost: $8,187

01160000608/1/20217/1/20214/1/2020PA&ED:

RTL:R/W Cert:

2/1/2022Begin Con:

01-Del Norte-199 18-1919-2019-2021-22

201.3521 Location(s)Performance Measure

Program Code

$561PA&ED:PS&E:

R/W Sup:

New

28.1

Con Sup:

Maintenance Facilities

$3,960Const:R/W:

2

2

1

Senate:

Assembly:

Congress:

2

2

1Congress

Assembly

Senate

CountyDel Norte

PA&ED:PS&E:

R/W Sup:Con Sup:

$10,936$98,735

R/W:

Subtotal: $109,671

Const:$19,441$17,199$2,846

$26,929

$66,415

Total (Capital + Support): $176,086

Sorted by: Disctrict, County, Route and Post MilesPage 28 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List El Dorado

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MAJOR DAMAGE RESTORATIONNear Pollock Pines, east of Sly Park Road.Permanently restore roadway by mitigating theprogression of recurring roadway slipout.3326

3H450 $230

Subtotal: $12,530

2019-20 $2,360$80

$2,600

$5,880Total Project Cost: $18,410

031800000110/15/201910/1/20191/4/2019PA&ED:

RTL:R/W Cert:

5/15/2020Begin Con:

03-El Dorado-50 Prior18-1918-1919-20

201.1311 Location(s)Performance Measure

Program Code

$840PA&ED:PS&E:

R/W Sup:

Carryover

33.8/34.0

Con Sup:

Permanent Restoration

$12,300Const:R/W:

1

5

4

Senate:

Assembly:

Congress:

1

5

4Congress

Assembly

Senate

Near Placerville, at 1.1 miles north of the SouthFork American River Bridge (PM 22.8/22.9);also at 2.5 miles north of the South ForkAmerican River Bridge (PM 24.2/24.3).Restore embankment slope slipouts.

3631

1H600 $13

Subtotal: $6,055

2018-19 $1,201$106

$1,144

$3,490Total Project Cost: $9,545

03160001882/28/20192/1/20197/1/2018PA&ED:

RTL:R/W Cert:

9/15/2019Begin Con:

03-El Dorado-193 Prior18-1918-1918-19

201.1312 Location(s)Performance Measure

Program Code

$1,039PA&ED:PS&E:

R/W Sup:

Carryover

22.8/24.3

Con Sup:

Permanent Restoration

$6,042Const:R/W:

4

5

1

Senate:

Assembly:

Congress:

4

5

1Congress

Assembly

Senate

COLLISION REDUCTIONIn Cameron Park, at Cameron Park Drive.Improve sight distance and upgrade curb ramps.

3316

1H440 $83

Subtotal: $1,283

2018-19 $530$9

$450

$1,139Total Project Cost: $2,422

031600015310/1/201810/1/201812/1/2017PA&ED:

RTL:R/W Cert:

5/1/2019Begin Con:

03-El Dorado-50 PriorPriorPrior18-19

201.01016 Collision(s) reducedPerformance Measure

Program Code

$150PA&ED:PS&E:

R/W Sup:

Carryover

6.5

Con Sup:

Safety Improvements

$1,200Const:R/W:

1

6

4

Senate:

Assembly:

Congress:

1

6

4Congress

Assembly

Senate

Near Placerville and Camino, from 0.2 milewest of Still Meadows Road to 0.4 mile east ofUpper Carson Road. Install median barrier,widen shoulders, constructacceleration/deceleration lane, construct anundercrossing, and construct access to theundercrossing from local roads.

3290

4E620 $3,000

Subtotal: $35,000

2018-19 $3,500$1,200$5,800

$13,000Total Project Cost: $48,000

03140000395/1/20195/1/20192/2/2018PA&ED:

RTL:R/W Cert:

9/1/2019Begin Con:

03-El Dorado-50 PriorPriorPrior18-19

201.010117 Collision(s) reducedPerformance Measure

Program Code

$2,500PA&ED:PS&E:

R/W Sup:

Carryover

21.9/24.5

Con Sup:

Safety Improvements

$32,000Const:R/W:

1

5

4

Senate:

Assembly:

Congress:

1

5

4Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 29 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List El Dorado

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Yolo, Sacramento and El Dorado Counties, inand near the cities of West Sacramento,Sacramento, Rancho Cordova, Folsom, andPlacerville, from Route 80 to Route 89 atvarious locations. Upgrade guardrail to makestandard.

3318

1H870 $5

Subtotal: $2,005

2020-21 $461$129$570

$1,431Total Project Cost: $3,436

031700001110/1/20209/1/20208/1/2019PA&ED:

RTL:R/W Cert:

4/1/2021Begin Con:

03-El Dorado-50 18-1919-2019-2021-22

201.01520 Collision(s) reducedPerformance Measure

Program Code

$271PA&ED:PS&E:

R/W Sup:

New

0.0/70.6

Con Sup:

Collision Severity Reduction

$2,000Const:R/W:

1

5, 6

4

Senate:

Assembly:

Congress:

1

5, 6

4Congress

Assembly

Senate

In El Dorado County, from the SacramentoCounty line to east of Stateline Avenue.Upgrade guard rail to current standards.3311

0H500 $16

Subtotal: $3,466

2018-19 $360$55

$475

$1,040Total Project Cost: $4,506

031500020010/1/201810/1/20184/11/2017PA&ED:

RTL:R/W Cert:

4/1/2019Begin Con:

03-El Dorado-50 PriorPriorPrior18-19

201.0155 Collision(s) reducedPerformance Measure

Program Code

$150PA&ED:PS&E:

R/W Sup:

Carryover

0.0/80.4

Con Sup:

Collision Severity Reduction

$3,450Const:R/W:

1

5, 6

4

Senate:

Assembly:

Congress:

1

5, 6

4Congress

Assembly

Senate

In El Dorado, Butte, Placer, Sacramento, Sutter,and Yolo Counties, on Routes 50, 65, 70, 80, 89, and 99 at various locations. Upgrade crashcushions and sand barrel arrays to make moredurable.

3313

0H680 $10

Subtotal: $2,610

2020-21 $170$30

$460

$750Total Project Cost: $3,360

031600001010/1/202010/1/20207/1/2019PA&ED:

RTL:R/W Cert:

4/1/2021Begin Con:

03-El Dorado-50 18-1919-2019-2020-21

201.01520 Collision(s) reducedPerformance Measure

Program Code

$90PA&ED:PS&E:

R/W Sup:

New

R11.0/R31.6

Con Sup:

Collision Severity Reduction

$2,600Const:R/W:

1

5

4

Senate:

Assembly:

Congress:

1

5

4Congress

Assembly

Senate

BRIDGE PRESERVATIONNear Pollock Pines, at Sawmill UndercrossingNo. 25-0041; also at Sly Park Road (PM R30.17/R31.3). Replace bridge, restoreculverts, and add highway lighting.

6923

0H341 $53

Subtotal: $8,903

2019-20 $690$11

$1,660

$2,591Total Project Cost: $11,494

03170001529/1/2019

8/15/201911/15/2017PA&ED:

RTL:R/W Cert:

12/15/2019Begin Con:

03-El Dorado-50 PriorPriorPrior19-20

201.1101 Bridge(s)Performance Measure

Program Code

$230PA&ED:PS&E:

R/W Sup:

Carryover

R27.9/R29.8

Con Sup:

Bridge Major Rehabilitation

$8,850Const:R/W:

6

7, 9

6, 7

Senate:

Assembly:

Congress:

6

7, 9

6, 7Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 30 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List El Dorado

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

ROADWAY PRESERVATIONNear Cameron Park and Shingle Springs, fromeast of Silva Valley Parkway to west of ElDorado Road. Rehabilitate culverts.3315

1H040 $180

Subtotal: $4,080

2021-22 $570$540$940

$2,680Total Project Cost: $6,760

03160000502/1/20222/1/20222/1/2020PA&ED:

RTL:R/W Cert:

8/1/2022Begin Con:

03-El Dorado-50 18-1919-2019-2021-22

201.15128 Culvert(s) (ea)Performance Measure

Program Code

$630PA&ED:PS&E:

R/W Sup:

New

R2.7/R13.8

Con Sup:

Drainage System Restoration

$3,900Const:R/W:

1

5, 6

4

Senate:

Assembly:

Congress:

1

5, 6

4Congress

Assembly

Senate

In and near Placerville, from west of El DoradoRoad to 0.1 mile east of Braeburn Lane.Rehabilitate deteriorated culverts and provideaccess for wildlife crossing the route.

3317

1H800 $930

Subtotal: $5,430

2021-22 $890$180

$1,440

$2,800Total Project Cost: $8,230

03170000038/15/20218/1/20215/1/2020PA&ED:

RTL:R/W Cert:

12/15/2021Begin Con:

03-El Dorado-50 18-1919-2019-2021-22

201.15136 Culvert(s) (ea)Performance Measure

Program Code

$290PA&ED:PS&E:

R/W Sup:

New

R13.7/22.5

Con Sup:

Drainage System Restoration

$4,500Const:R/W:

1

5

4

Senate:

Assembly:

Congress:

1

5

4Congress

Assembly

Senate

MOBILITYIn El Dorado County, from the SacramentoCounty line to east of Stateline Avenue.Upgrade new Transportation ManagementSystem (TMS) elements.

3312

0H520 $150

Subtotal: $9,300

2019-20 $1,000$580

$1,620

$3,700Total Project Cost: $13,000

03150002022/1/2020

1/15/20209/1/2017PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

03-El Dorado-50 PriorPriorPrior19-20

201.31551 Field element(s)Performance Measure

Program Code

$500PA&ED:PS&E:

R/W Sup:

Carryover

0.0/80.4

Con Sup:

Transportation Management Systems

$9,150Const:R/W:

1, 6

5, 6

4, 6, 7

Senate:

Assembly:

Congress:

1, 6

5, 6

4, 6, 7Congress

Assembly

Senate

CountyEl Dorado

PA&ED:PS&E:

R/W Sup:Con Sup:

$4,670$85,992

R/W:

Subtotal: $90,662

Const:$6,690

$11,732$2,920

$17,159

$38,501

Total (Capital + Support): $129,163

Sorted by: Disctrict, County, Route and Post MilesPage 31 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Fresno($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONNear Selma, from Kings County line to EastMountain View Avenue. Construct rumblestrips and update pavement delineation.6886

0V980

Subtotal: $1,026

2018-19 $750$22

$202

$974Total Project Cost: $2,000

06170000829/17/20188/1/2018

6/26/2017PA&ED:

RTL:R/W Cert:

3/15/2019Begin Con:

06-Fresno-43PriorPrior18-19

201.01016 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.0/7.3

Con Sup:

Safety Improvements

$1,026Const:R/W:

14, 16

31, 34

23

Senate:

Assembly:

Congress:

14, 16

31, 34

23Congress

Assembly

Senate

In Fresno County, between Shepherd Avenueand Lockwood Lane and Lodge Road Park andRide and Tollhouse/Auberry Roads. Constructcenterline rumble strip.

6866

0V320 $1

Subtotal: $743

2018-19 $635$1

$404

$1,260Total Project Cost: $2,003

06160001369/10/20189/3/2018

2/15/2018PA&ED:

RTL:R/W Cert:

1/10/2019Begin Con:

06-Fresno-168 PriorPriorPrior18-19

201.01026 Collision(s) reducedPerformance Measure

Program Code

$220PA&ED:PS&E:

R/W Sup:

Carryover

11.7/R36.2

Con Sup:

Safety Improvements

$742Const:R/W:

8

23

4, 22

Senate:

Assembly:

Congress:

8

23

4, 22Congress

Assembly

Senate

Near Coalinga and Kettleman City, at theCoalinga-Avenal Safety Roadside Rest Area(SRRA) from Kings County line to QuistUndercrossing; also in Kings County, from 0.2mile south of Avenal Cutoff Road to FresnoCounty line (PM 26.4/26.7). Repair aging waterand wastewater systems.

6736

0T230 $102

Subtotal: $4,452

2018-19 $783$4

$1,000

$1,909Total Project Cost: $6,361

06150000401/11/201911/5/201810/2/2017PA&ED:

RTL:R/W Cert:

7/1/2019Begin Con:

06-Fresno-5 PriorPriorPrior18-19

201.2352 Location(s)Performance Measure

Program Code

$122PA&ED:PS&E:

R/W Sup:

Carryover

0.0/1.7

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$4,350Const:R/W:

16

31

21

Senate:

Assembly:

Congress:

16

31

21Congress

Assembly

Senate

MANDATESIn Firebaugh, from south of Morris Kyle Driveto Clyde Fannon Drive. Construct continuousaccessible pedestrian path to comply withAmericans with Disabilities Act (ADA)Standards.

6747

0T250 $616

Subtotal: $2,701

2018-19 $780$240$475

$1,716Total Project Cost: $4,417

06150000434/1/2019

3/29/20196/9/2017PA&ED:

RTL:R/W Cert:

10/15/2019Begin Con:

06-Fresno-33 PriorPriorPrior18-19

201.36119 Curb ramp(s)Performance Measure

Program Code

$221PA&ED:PS&E:

R/W Sup:

Carryover

69.3/70.9

Con Sup:

Americans with Disabilities Act New Curb Ramps

$2,085Const:R/W:

16

31

21

Senate:

Assembly:

Congress:

16

31

21Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 32 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Fresno($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

BRIDGE PRESERVATIONNear Mendota, at Tumey Gulch Bridge No. 42-0246L/R. Replace bridge.

6725

0S830 $79

Subtotal: $10,977

2019-20 $1,900$4

$2,800

$5,554Total Project Cost: $16,531

06150000462/3/20201/3/2020

7/31/2018PA&ED:

RTL:R/W Cert:

7/3/2020Begin Con:

06-Fresno-5 Prior18-1918-1919-20

201.1102 Bridge(s)Performance Measure

Program Code

$850PA&ED:PS&E:

R/W Sup:

Carryover

44.4/45.4

Con Sup:

Bridge Major Rehabilitation

$10,898Const:R/W:

16

31

21

Senate:

Assembly:

Congress:

16

31

21Congress

Assembly

Senate

Near Squaw Valley, at Mill Creek Bridge No.42-0080; also near Cedar Grove, at South ForkKings River Bridge No. 42-0024 (PM 130.1).Bridge rail upgrade.

6766

0Q900 $4

Subtotal: $3,157

2018-19 $923$10

$814

$2,227Total Project Cost: $5,384

06140000472/25/20191/21/20191/15/2018PA&ED:

RTL:R/W Cert:

9/2/2019Begin Con:

06-Fresno-180 PriorPriorPrior18-19

201.112535.0 Linear feetPerformance Measure

Program Code

$480PA&ED:PS&E:

R/W Sup:

Carryover

92.2

Con Sup:

Bridge Rail Replacement and Upgrade

$3,153Const:R/W:

14

23

22

Senate:

Assembly:

Congress:

14

23

22Congress

Assembly

Senate

In Fresno County, at Colony Main Canal BridgeNo. 42-0031, Helm Canal Bridge No. 42-0033 and Poso Canal Bridge No. 42-0034; also in Kern County, on Route 58 at Main Drain CanalBridge No. 50-0013. Repair erosion, clean andencase piers in concrete.

6773

0U000 $375

Subtotal: $2,157

2020-21 $893$334$805

$2,570Total Project Cost: $4,727

06150002962/1/20211/1/2021

10/1/2019PA&ED:

RTL:R/W Cert:

7/15/2021Begin Con:

06-Fresno-33 Prior19-2019-2020-21

201.1194 Bridge(s)Performance Measure

Program Code

$538PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Preventative Maintenance

$1,782Const:R/W:

12, 16

31, 32

21

Senate:

Assembly:

Congress:

12, 16

31, 32

21Congress

Assembly

Senate

In Fresno, at the South Fresno Viaduct No. 42-0226L/R. Replace failed joint seals andrehabilitate worn bridge decks with polyesterconcrete overlay.

6771

0U160 $291

Subtotal: $7,341

2018-19 $750$20

$1,574

$2,581Total Project Cost: $9,922

06150003109/1/20187/1/2018

9/29/2017PA&ED:

RTL:R/W Cert:

2/15/2019Begin Con:

06-Fresno-41 PriorPriorPrior18-19

201.1192 Bridge(s)Performance Measure

Program Code

$237PA&ED:PS&E:

R/W Sup:

Carryover

R22.0/R22.6

Con Sup:

Bridge Preventative Maintenance

$7,050Const:R/W:

14

31

16

Senate:

Assembly:

Congress:

14

31

16Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 33 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Fresno($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

ROADWAY PRESERVATIONIn and near Selma and Fowler, from 0.1 south ofRose Avenue Undercrossing to Merced StreetUndercrossing. Replace pavement withContinuous Reinforced Concrete Pavement (CRCP). Update curb ramps to meet currentAmericans with Disabilities Act (ADA)Standards.

(G13 Contingency)

6800

0U420 $56

Subtotal: $86,056

2019-20 $2,000$24

$11,000

$13,869Total Project Cost: $99,925

06160000041/24/2020

12/13/201912/3/2018PA&ED:

RTL:R/W Cert:

9/2/2020Begin Con:

06-Fresno-99 Prior18-1918-1919-20

201.12032.4 Lane mile(s)Performance Measure

Program Code

$845PA&ED:PS&E:

R/W Sup:

Carryover

R5.7/11.1

* Con Sup:

Roadway Rehabilitation (3R)

* Const, * Con Sup phase(s) are NOT authorized

$86,000* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

14, 16

31

21

Senate:

Assembly:

Congress:

14, 16

31

21Congress

Assembly

Senate

Near Prather, from Sample Road to Oak CreekRoad. Upgrade barrier railing, cold planepavement, place Hot Mix Asphalt (HMA) andRubberized Hot Mix Asphalt (RHMA)pavement.

6809

0U450 $5

Subtotal: $5,005

2019-20 $1,230$1

$1,140

$3,121Total Project Cost: $8,126

06150002983/26/20203/13/20202/15/2019PA&ED:

RTL:R/W Cert:

9/18/2020Begin Con:

06-Fresno-168 Prior18-1918-1919-20

201.12114.6 Lane mile(s)Performance Measure

Program Code

$750PA&ED:PS&E:

R/W Sup:

Carryover

18.6/T25.5

Con Sup:

Pavement Rehabilitation (CAPM)

$5,000Const:R/W:

14

23

16

Senate:

Assembly:

Congress:

14

23

16Congress

Assembly

Senate

In and near Kingsburg, from Route 201 to southof Second Street. Roadway rehabilitation.

6727

0S460 $375

Subtotal: $40,226

2018-19 $1,496$43

$5,000

$7,116Total Project Cost: $47,342

061500003811/6/201810/4/20188/3/2017PA&ED:

RTL:R/W Cert:

6/4/2019Begin Con:

06-Fresno-99 PriorPriorPrior18-19

201.12216.2 Lane mile(s)Performance Measure

Program Code

$577PA&ED:PS&E:

R/W Sup:

Carryover

R0.9/R5.0

Con Sup:

Roadway Rehabilitation (2R)

$39,851Const:R/W:

14

31

21

Senate:

Assembly:

Congress:

14

31

21Congress

Assembly

Senate

In Fresno County, at various locations; also inKern County, on Route 119 at various locations.Replace damaged drainage systems. 6802

0R110 $165

Subtotal: $1,371

2018-19 $1,184$463$454

$2,101Total Project Cost: $3,472

06140000304/1/20193/1/2019

5/22/2017PA&ED:

RTL:R/W Cert:

10/14/2019Begin Con:

06-Fresno-198PriorPrior18-19

201.1517 Culvert(s) (ea)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R14.5/R18.2

Con Sup:

Drainage System Restoration

$1,206Const:R/W:

14, 16

31, 34

23

Senate:

Assembly:

Congress:

14, 16

31, 34

23Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 34 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Fresno($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MOBILITYNear Fresno, from the northbound AshlanAvenue onramp to the northbound ShawAvenue offramp. Construct northboundauxiliary lane and add an additional lane to theShaw Avenue offramp.

6879

0W170 $7

Subtotal: $14,707

2021-22 $2,400$150

$4,400

$8,250Total Project Cost: $22,957

06170001038/23/20217/23/2021

11/15/2019PA&ED:

RTL:R/W Cert:

2/18/2022Begin Con:

06-Fresno-41 18-1919-2019-2021-22

201.310163 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

$1,300PA&ED:PS&E:

R/W Sup:

New

R27.6/R28.3

Con Sup:

Operational Improvements

$14,700Const:R/W:

8

23

16

Senate:

Assembly:

Congress:

8

23

16Congress

Assembly

Senate

In and near the city of Fresno, from 0.1 milesouth of North Avenue to the Madera Countyline; also on Route 99 (PM 19.36 to PM 21.9),Route 168 (PM R0.2L/R to PM R9.7), andRoute 180 (PM R58.55 to PM R59.85).Replace and upgrade existing communicationelements for the Traffic Management System(TMS).

6881

0V780 $30

Subtotal: $16,040

2020-21 $1,809$165

$1,791

$4,384Total Project Cost: $20,424

06160002343/1/20211/4/2021

12/1/2018PA&ED:

RTL:R/W Cert:

8/16/2021Begin Con:

06-Fresno-41 Prior18-1918-1920-21

201.31589 Field element(s)Performance Measure

Program Code

$619PA&ED:PS&E:

R/W Sup:

Carryover

R20.0/33.4

Con Sup:

Transportation Management Systems

$16,010Const:R/W:

14, 16

31, 34

23

Senate:

Assembly:

Congress:

14, 16

31, 34

23Congress

Assembly

Senate

In Fresno County, on Routes 99, 41, 168, and180 at various locations; also in Madera County,on Route 99 at various locations. Repair vehicledetection systems.

6883

0V930 $119

Subtotal: $3,155

2019-20 $1,017$450

$1,056

$3,323Total Project Cost: $6,478

061700006712/16/201912/2/20199/3/2018PA&ED:

RTL:R/W Cert:

6/1/2020Begin Con:

06-Fresno-99 Prior18-1918-1919-20

201.31520 Field element(s)Performance Measure

Program Code

$800PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

$3,036Const:R/W:

14, 16

31, 34

23

Senate:

Assembly:

Congress:

14, 16

31, 34

23Congress

Assembly

Senate

ROADSIDE PRESERVATIONIn the city of Fresno, from 0.1 mile south ofJensen Avenue Overcrossing to AlluvialAvenue Undercrossing. Replace irrigationsystem with a water efficient system.

6888

0V750 $1

Subtotal: $1,577

2019-20 $552$1

$460

$1,013Total Project Cost: $2,590

06160002098/7/20197/1/20192/7/2017PA&ED:

RTL:R/W Cert:

2/28/2020Begin Con:

06-Fresno-4118-1918-1919-20

201.210214 Acre(s)Performance Measure

Program Code

$0PA&ED:PS&E:

R/W Sup:

New

R21.0/R31.0

Con Sup:

Highway Planting Restoration

$1,576Const:R/W:

8

31

16

Senate:

Assembly:

Congress:

8

31

16Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 35 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Fresno($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Fresno and Clovis, at various locationsbetween Route 180/168 Separation andShepherd Avenue. Replace black potable waterirrigation valves with purple scrubber valves forrecycled irrigation water.

6851

0U760 $2

Subtotal: $1,451

2020-21 $524$2

$370

$898Total Project Cost: $2,349

06160000347/10/20206/1/2020

9/30/2018PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

06-Fresno-168 18-1919-2019-2020-21

201.21030 Acre(s)Performance Measure

Program Code

$2PA&ED:PS&E:

R/W Sup:

New

R0.0/R11.7

Con Sup:

Highway Planting Restoration

$1,449Const:R/W:

8, 14

23, 31

16, 22

Senate:

Assembly:

Congress:

8, 14

23, 31

16, 22Congress

Assembly

Senate

CountyFresno

PA&ED:PS&E:

R/W Sup:Con Sup:

$2,228$199,914

R/W:

Subtotal: $202,142

Const:$7,561

$19,626$1,934

$33,745

$62,866

Total (Capital + Support): $265,008

Sorted by: Disctrict, County, Route and Post MilesPage 36 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Glenn($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONIn and near Willows and Orland, from north ofCounty Road 68 to north of County Road 7.Pave beyond the gore areas, install vegetationcontrol under guardrail, construct MaintenanceVehicle Pullouts (MVPs), and trim trees andshrubs to improve highway worker safety.

3709

3F500 $10

Subtotal: $2,010

2020-21 $420$80

$540

$1,320Total Project Cost: $3,330

03130000198/1/20207/2/20207/1/2019PA&ED:

RTL:R/W Cert:

2/15/2021Begin Con:

03-Glenn-5 18-1919-2019-2020-21

201.23550 Location(s)Performance Measure

Program Code

$280PA&ED:PS&E:

R/W Sup:

New

R3.2/R27.9

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,000Const:R/W:

4

3

3

Senate:

Assembly:

Congress:

4

3

3Congress

Assembly

Senate

Near Willows, at the Willows Safety RoadsideRest Area (SRRA). Upgrade potable water andwastewater systems.3710

4F420 $20

Subtotal: $4,120

2019-20 $550$60

$1,180

$2,330Total Project Cost: $6,450

03140001617/2/20197/2/2019

10/1/2018PA&ED:

RTL:R/W Cert:

2/15/2020Begin Con:

03-Glenn-5 Prior18-1918-1919-20

201.2351 Location(s)Performance Measure

Program Code

$540PA&ED:PS&E:

R/W Sup:

Carryover

R14.6

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$4,100Const:R/W:

4

3

3

Senate:

Assembly:

Congress:

4

3

3Congress

Assembly

Senate

MANDATESIn Orland, from Route 5 to Woodward Avenue.Upgrade pedestrian infrastructure to meetAmericans with Disabilities Act (ADA)requirements.

3788

4F810 $88

Subtotal: $788

2019-20 $405$465$260

$1,370Total Project Cost: $2,158

031400029110/1/20199/1/20194/1/2018PA&ED:

RTL:R/W Cert:

4/1/2020Begin Con:

03-Glenn-32 PriorPriorPrior19-20

201.361113 Curb ramp(s)Performance Measure

Program Code

$240PA&ED:PS&E:

R/W Sup:

Carryover

L0.0/0.8

Con Sup:

Americans with Disabilities Act New Curb Ramps

$700Const:R/W:

4

3

1

Senate:

Assembly:

Congress:

4

3

1Congress

Assembly

Senate

BRIDGE PRESERVATIONAt Butte City, from Route 45 to 0.1 mile east ofMcDougall Street. Replace truss section onSacramento River Bridge No. 11-0017 over theriver channel and reconstruct east side roadwayto conform with new structure. (PA&ED Only)

2633

3F060 $4,000

Subtotal: $38,000

2021-22 $5,500$1,000$4,000

$16,000Total Project Cost: $54,000

031200005210/15/2021

9/1/20218/1/2019PA&ED:

RTL:R/W Cert:

4/1/2022Begin Con:

03-Glenn-162 Prior19-2019-2021-22

201.1131 Bridge(s)Performance Measure

Program Code

$5,500PA&ED:* PS&E:

* R/W Sup:

New

76.3/78.6

* Con Sup:

Bridge Seismic Restoration

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

$34,000* Const:* R/W:

4

2

2

Senate:

Assembly:

Congress:

4

2

2Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 37 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Glenn($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

CountyGlenn

PA&ED:PS&E:

R/W Sup:Con Sup:

$4,118$40,800

R/W:

Subtotal: $44,918

Const:$6,560$6,875$1,605$5,980

$21,020

Total (Capital + Support): $65,938

Sorted by: Disctrict, County, Route and Post MilesPage 38 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Humboldt

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONNear Carlotta, from 0.1 mile east of RiversidePark Road to 0.4 mile east of Riverside ParkRoad. Curve correction.2415

0F160 $309

Subtotal: $2,549

2019-20 $904$174$537

$2,525Total Project Cost: $5,074

01150000761/15/20201/1/2020

1/15/2019PA&ED:

RTL:R/W Cert:

7/1/2020Begin Con:

01-Humboldt-36 Prior18-1918-1919-20

201.01020 Collision(s) reducedPerformance Measure

Program Code

$910PA&ED:PS&E:

R/W Sup:

Carryover

10.5/10.8

Con Sup:

Safety Improvements

$2,240Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

In Eureka, from Sixth Street to south of XStreet. Improve curve and signs, construct bulb-outs, upgrade curb ramps, apply microsurfacing,and refresh pavement delineation.

2481

0H200 $493

Subtotal: $6,056

2021-22 $1,080$717

$1,421

$4,483Total Project Cost: $10,539

01170001288/1/2021

7/14/20211/21/2020PA&ED:

RTL:R/W Cert:

12/22/2021Begin Con:

01-Humboldt-101 Prior19-2019-2021-22

201.010413 Collision(s) reducedPerformance Measure

Program Code

$1,265PA&ED:PS&E:

R/W Sup:

Carryover

77.9/79.5

Con Sup:

Safety Improvements

$5,563Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

In Eureka, on 4th Street from Broadway to YStreet. Restripe to add traffic and bicycle lanes,construct pedestrian bulb-outs and Americanswith Disabilities Act (ADA) ramps, and installor modify signals.

2393

0E680 $360

Subtotal: $6,614

2018-19 $690$362

$1,236

$3,402Total Project Cost: $10,016

01140001236/15/20196/1/20197/1/2018PA&ED:

RTL:R/W Cert:

1/23/2020Begin Con:

01-Humboldt-101 Prior18-1918-1918-19

201.010503 Collision(s) reducedPerformance Measure

Program Code

$1,114PA&ED:PS&E:

R/W Sup:

Carryover

78.1/79.6

Con Sup:

Safety Improvements

$6,254Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

In and near Arcata, between West End Road andSchool Road at four locations. Construct shoulder rumble strip, upgrade guardrail, construct guardrail slope retaining wall, andplace High Friction Surface Treatment (HFST).

7024

0G510

Subtotal: $1,301

2019-20 $582$90

$616

$1,682Total Project Cost: $2,983

011700001311/1/201911/1/20194/1/2019PA&ED:

RTL:R/W Cert:

4/1/2020Begin Con:

01-Humboldt-101 Prior18-1918-1919-20

201.01030 Collision(s) reducedPerformance Measure

Program Code

$394PA&ED:PS&E:

R/W Sup:

Carryover

87.8/R91.5

Con Sup:

Safety Improvements

$1,301Const:R/W:

2

2

1

Senate:

Assembly:

Congress:

2

2

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 39 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Humboldt

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Blue Lake, from 2.2 miles east of SimpsonRoad to 3.2 miles east of Simpson Road. Widenshoulders, and install rumble strips andguardrailing.

2435

0F690

Subtotal: $1,386

2019-20 $697$9

$642

$1,846Total Project Cost: $3,232

01160000457/1/20197/1/20199/1/2018PA&ED:

RTL:R/W Cert:

12/1/2019Begin Con:

01-Humboldt-299 Prior18-1918-1919-20

201.01013 Collision(s) reducedPerformance Measure

Program Code

$498PA&ED:PS&E:

R/W Sup:

Carryover

R14.7/R15.7

Con Sup:

Safety Improvements

$1,386Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Near Willow Creek, from 1.5 mile east of EastBair Road to 0.4 mile west of Cedar Creek Road, at various locations. Widen shoulders.2427

0F460 $127

Subtotal: $7,013

2019-20 $864$21

$921

$2,792Total Project Cost: $9,805

01160000108/1/20198/1/20198/1/2018PA&ED:

RTL:R/W Cert:

12/1/2019Begin Con:

01-Humboldt-299 Prior18-1918-1919-20

201.01040 Collision(s) reducedPerformance Measure

Program Code

$986PA&ED:PS&E:

R/W Sup:

Carryover

20.5/30.2

Con Sup:

Safety Improvements

$6,886Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Near Willow Creek, from 0.1 mile east of CedarCreek Road to 1.1 miles west of Route 96. Widen shoulders, place High Friction SurfaceTreatment (HFST), install rumble strips, guardrail, and cable net drapery.

2426

0F470 $19

Subtotal: $11,407

2019-20 $1,668$45

$2,518

$5,871Total Project Cost: $17,278

01160000118/1/20197/1/20197/1/2018PA&ED:

RTL:R/W Cert:

1/1/2020Begin Con:

01-Humboldt-299 Prior18-1918-1919-20

201.010118 Collision(s) reducedPerformance Measure

Program Code

$1,640PA&ED:PS&E:

R/W Sup:

Carryover

30.7/37.7

Con Sup:

Safety Improvements

$11,388Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Near Willow Creek, from 0.1 mile west ofWillow Way to Panther Road. Widenshoulders, upgrade Americans with DisabilitiesAct (ADA) curb ramps, and install a bus turn-out.

2434

0F680 $211

Subtotal: $2,805

2019-20 $1,306$238

$1,103

$3,755Total Project Cost: $6,560

01160000446/1/20206/1/20209/1/2019PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

01-Humboldt-299 Prior19-2019-2019-20

201.01018 Collision(s) reducedPerformance Measure

Program Code

$1,108PA&ED:PS&E:

R/W Sup:

Carryover

38.9/39.5

Con Sup:

Safety Improvements

$2,594Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 40 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Humboldt

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Fortuna, from Route 101 to River BarRoad. Shoulder widening.

2379

0E010 $2,727

Subtotal: $9,914

2019-20 $886$592$955

$3,343Total Project Cost: $13,257

01130000903/1/20202/1/20209/1/2018PA&ED:

RTL:R/W Cert:

9/15/2020Begin Con:

01-Humboldt-36 Prior18-1918-1919-20

201.01523 Collision(s) reducedPerformance Measure

Program Code

$910PA&ED:PS&E:

R/W Sup:

Carryover

0.1/1.6

Con Sup:

Collision Severity Reduction

$7,187Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Near Eureka, from PMs 80.0 to 87.8. Upgrademetal beam guardrail.

2375

0C970 $800

Subtotal: $7,107

2018-19 $300$48

$1,750

$2,608Total Project Cost: $9,715

011300009410/15/201810/1/20181/10/2017PA&ED:

RTL:R/W Cert:

6/20/2019Begin Con:

01-Humboldt-101 PriorPriorPrior18-19

201.01530 Collision(s) reducedPerformance Measure

Program Code

$510PA&ED:PS&E:

R/W Sup:

Carryover

80.8/87.8

Con Sup:

Collision Severity Reduction

$6,307Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

In and near Arcata, from Saint Louis RoadOvercrossing to 0.7 mile north of Giuntoli LaneOvercrossing. Install guardrail and upgrade endtreatments, place longitudinal drainage system,pave the median, reconstruct thrie-beam barrier,and construct a Class I bike path.

2460

0G580 $346

Subtotal: $5,907

2021-22 $1,066$104

$1,649

$3,715Total Project Cost: $9,622

01170000238/1/2021

7/15/20213/1/2020PA&ED:

RTL:R/W Cert:

3/13/2022Begin Con:

01-Humboldt-101 18-1919-2019-2021-22

201.01548 Collision(s) reducedPerformance Measure

Program Code

$896PA&ED:PS&E:

R/W Sup:

New

87.5/89.5

Con Sup:

Collision Severity Reduction

$5,561Const:R/W:

2

2

1

Senate:

Assembly:

Congress:

2

2

1Congress

Assembly

Senate

In Arcata, at Route 299. Realign ramp curve.

2397

0E650 $600

Subtotal: $3,820

2019-20 $662$164$613

$2,340Total Project Cost: $6,160

01140001171/1/2020

12/1/20199/1/2018PA&ED:

RTL:R/W Cert:

5/1/2020Begin Con:

01-Humboldt-101 Prior18-1918-1919-20

201.01524 Collision(s) reducedPerformance Measure

Program Code

$901PA&ED:PS&E:

R/W Sup:

Carryover

88.2/88.3

Con Sup:

Collision Severity Reduction

$3,220Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 41 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Humboldt

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Fortuna, from 0.5 mile south ofRoute 36 to 0.4 mile south of Hookton Road.Remove vegetated strips in median area toimprove highway worker safety.

2461

0G610 $912

Subtotal: $8,209

2021-22 $879$175

$1,256

$3,109Total Project Cost: $11,318

01170000272/1/2022

1/15/20223/1/2020PA&ED:

RTL:R/W Cert:

8/22/2022Begin Con:

01-Humboldt-101 18-1919-2019-2021-22

201.235172 Location(s)Performance Measure

Program Code

$799PA&ED:PS&E:

R/W Sup:

New

57.1/67.8

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$7,297Const:R/W:

2

2

1

Senate:

Assembly:

Congress:

2

2

1Congress

Assembly

Senate

MANDATESNear Bridgeville, at 0.2 mile east of GoldenGate Drive. Construct erosion control BestManagement Practices (BMPs) measures toachieve Statewide National Pollutant DischargeEliminating System (NPDES) permitcompliance unit (CU) credits that will stabilizethe adjacent roadway slope erosion and reducestorm water sediment discharge to the impairedVan Duzen River.

2366

0C150 $152

Subtotal: $2,326

2021-22 $873$334

$1,452

$3,385Total Project Cost: $5,711

011300001610/1/20219/1/20219/1/2020PA&ED:

RTL:R/W Cert:

4/1/2022Begin Con:

01-Humboldt-36 18-1920-2120-2121-22

201.3355.5 Acre(s) treated/pollutantPerformance Measure

Program Code

$726PA&ED:PS&E:

R/W Sup:

New

21.5

Con Sup:

Storm Water Mitigation

$2,174Const:R/W:

2

2

1

Senate:

Assembly:

Congress:

2

2

1Congress

Assembly

Senate

Near Phillipsville, at 0.7 mile south of MapleHills Road. Replace existing Fish Creekconcrete box culvert with a bridge to eliminatefish passage barrier and decrease sediment loadsto achieve compliance unit (CU) credits towardsStatewide National Pollutant DischargeEliminating System (NPDES) permit mandategoals. Five million in funds from AB 95 aredesignated for this project.

2403

0E790 $34

Subtotal: $10,612

2021-22 $1,863$173

$2,909

$6,687Total Project Cost: $17,299

01150000213/14/20222/14/20223/1/2021PA&ED:

RTL:R/W Cert:

8/1/2022Begin Con:

01-Humboldt-254 18-1920-2120-2121-22

201.33579 Acre(s) treated/pollutantPerformance Measure

Program Code

$1,742PA&ED:PS&E:

R/W Sup:

New

4.2

Con Sup:

Storm Water Mitigation

$10,578Const:R/W:

2

2

1

Senate:

Assembly:

Congress:

2

2

1Congress

Assembly

Senate

Near Blue Lake, from north of Simpson Road tonorth of Chezem Road at various locations. Install erosion control Storm Water Mitigationmeasures at three locations.

2378

0E030 $19

Subtotal: $3,027

2019-20 $880$89

$648

$2,042Total Project Cost: $5,069

01130000998/1/20197/1/20192/1/2018PA&ED:

RTL:R/W Cert:

1/1/2020Begin Con:

01-Humboldt-299 PriorPriorPrior19-20

201.33514.3 Acre(s) treated/pollutantPerformance Measure

Program Code

$425PA&ED:PS&E:

R/W Sup:

Carryover

R16.1/R16.4

Con Sup:

Storm Water Mitigation

$3,008Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 42 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Humboldt

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Eureka, from Wabash Avenue to CommercialStreet. Upgrade curb ramps, driveways, andsidewalk, and add Accessible Pedestrian Signals(APS) upgrades to make compliant withAmericans with Disabilities Act (ADA)Standards; also install fiber opticcommunications connection from traffic signalsto the Caltrans district office.

2456

0G420 $180

Subtotal: $4,685

2021-22 $965$979

$1,079

$4,112Total Project Cost: $8,797

01160001869/1/2021

8/15/202112/1/2019PA&ED:

RTL:R/W Cert:

4/26/2022Begin Con:

01-Humboldt-101 18-1919-2019-2021-22

201.36127 Curb ramp(s)Performance Measure

Program Code

$1,089PA&ED:PS&E:

R/W Sup:

New

77.3/78.1

Con Sup:

Americans with Disabilities Act New Curb Ramps

$4,505Const:R/W:

2

2

1

Senate:

Assembly:

Congress:

2

2

1Congress

Assembly

Senate

In Eureka, from north of Herrick AvenueOvercrossing to south of the Eureka SloughBridge. Upgrade curb ramps, sidewalks, andsignal push-buttons to Americans withDisabilities Act (ADA) Standards.

2346

0B620 $695

Subtotal: $6,284

2019-20 $921$644$660

$2,687Total Project Cost: $8,971

01120001563/1/2020

2/15/202011/1/2018PA&ED:

RTL:R/W Cert:

6/20/2020Begin Con:

01-Humboldt-101 Prior18-1918-1919-20

201.37850 Curb ramp(s)Performance Measure

Program Code

$462PA&ED:PS&E:

R/W Sup:

Carryover

75.3/77.6

Con Sup:

Americans with Disabilities Act PedestrianInfrastructure

$5,589Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

BRIDGE PRESERVATIONNear Orick, at 0.2 mile south of Lost Man CreekBridge. Remove fish passage barrier.

2447

0F960 $1,523

Subtotal: $6,442

2018-19 $644$193

$1,933

$3,736Total Project Cost: $10,178

01160001093/15/20193/1/20193/1/2018PA&ED:

RTL:R/W Cert:

10/15/2019Begin Con:

01-Humboldt-101 PriorPriorPrior18-19

201.1101 Bridge(s)Performance Measure

Program Code

$966PA&ED:PS&E:

R/W Sup:

Carryover

124.5

Con Sup:

Bridge Major Rehabilitation

$4,919Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Near Bridgeville, at Hely Creek Bridge (No. 04-0092), Little Larabee Creek Bridge (No. 04-0102) (PM 25.3), and Butte Creek Bridge (No.04-0116). Upgrade bridge rails and widen atone bridge, and replace two bridges.

2363

0C500 $874

Subtotal: $16,230

2019-20 $3,646$268

$4,325

$11,186Total Project Cost: $27,416

01120002924/1/20203/1/20203/1/2019PA&ED:

RTL:R/W Cert:

8/30/2020Begin Con:

01-Humboldt-36 Prior19-2019-2019-20

201.112905.5 Linear feetPerformance Measure

Program Code

$2,947PA&ED:PS&E:

R/W Sup:

Carryover

11.3/34.6

Con Sup:

Bridge Rail Replacement and Upgrade

$15,356Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 43 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Humboldt

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Weitchpec and Orleans, at Aikens CreekBridge No. 04-0059 (PM 28.07), Bluff CreekBridge No. 04-0063 (PM 28.27), Bluff CreekBridge No. 04-0225 (PM R28.91), and SlateCreek Bridge No. 04-0061 (PM 29.92); also onRoute 169 at Rube Creek Bridge No. 04-0215(PM 27.57). Upgrade bridge rails at fivelocations and also strengthen for truck permitload capacity at two locations.

2449

0G140 $278

Subtotal: $10,764

2021-22 $2,127$110

$2,242

$5,529Total Project Cost: $16,293

011600012912/15/202110/5/20214/1/2020PA&ED:

RTL:R/W Cert:

12/1/2022Begin Con:

01-Humboldt-96 18-1919-2019-2021-22

201.1122508.0 Linear feetPerformance Measure

Program Code

$1,050PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Bridge Rail Replacement and Upgrade

$10,486Const:R/W:

2

2

1

Senate:

Assembly:

Congress:

2

2

1Congress

Assembly

Senate

Near Eureka, at various locations from 0.2 milessouth of Eureka Slough Bridge to 0.2 milesnorth of Gannon Slough Bridge. Upgrade bridgerails and replace bridge.

2376

0E000 $287

Subtotal: $8,598

2018-19 $1,514$63

$2,000

$5,057Total Project Cost: $13,655

01130000914/1/2019

3/15/20191/10/2017PA&ED:

RTL:R/W Cert:

11/21/2019Begin Con:

01-Humboldt-101 PriorPriorPrior18-19

201.112582.0 Linear feetPerformance Measure

Program Code

$1,480PA&ED:PS&E:

R/W Sup:

Carryover

79.8/84.7

Con Sup:

Bridge Rail Replacement and Upgrade

$8,311Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

In Humboldt County, on Routes 96 and 101 atvarious locations. Seismic retrofit three bridges.

2302

0A120 $1,089

Subtotal: $7,260

2019-20 $1,856$171

$1,948

$5,394Total Project Cost: $12,654

01130001092/15/20202/1/20202/1/2019PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

01-Humboldt-96 PriorPrior18-1919-20

201.1133 Bridge(s)Performance Measure

Program Code

$1,419PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Seismic Restoration

$6,171Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Near Myers Flat, at South Fork Eel RiverBridge No. 04-0123. Seismic retrofit.

2301

0A110 $80

Subtotal: $9,803

2020-21 $2,072$218

$2,267

$9,198Total Project Cost: $19,001

01120002111/1/20201/1/20209/1/2018PA&ED:

RTL:R/W Cert:

7/1/2020Begin Con:

01-Humboldt-101 Prior18-1918-1920-21

201.1131 Bridge(s)Performance Measure

Program Code

$4,641PA&ED:PS&E:

R/W Sup:

Carryover

27.7

Con Sup:

Bridge Seismic Restoration

$9,723Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 44 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Humboldt

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Eureka, at the Eureka Slough Bridge No. 04-0022L. Seismic retrofit.

2417

0F200 $3,837

Subtotal: $7,532

2019-20 $1,574$75

$1,206

$3,564Total Project Cost: $11,096

01150000883/1/20202/1/20202/1/2019PA&ED:

RTL:R/W Cert:

10/3/2020Begin Con:

01-Humboldt-101 Prior18-1918-1919-20

201.1131 Bridge(s)Performance Measure

Program Code

$709PA&ED:PS&E:

R/W Sup:

Carryover

79.5/80.2

Con Sup:

Bridge Seismic Restoration

$3,695Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Near Bridgeville, at Van Duzen River BridgeNo. 04-0284 (PM 17.94) and Van Duzen RiverBridge No. 04-0293 (PM R23.91); also onRoute 211 near Ferndale at Salt River BridgeNo. 04-131 (PM R75.15), in Lake County onRoute 29 near Lakeport at Hill Road EastOvercrossing No. 14-0039 (PM R43.75), and inMendocino County on Route 101 near Longvaleat Long Valley Creek Rest Area Bridge No. 10-0240Y (PM 61.82). Apply polyester concreteoverlay or methacrylate treatment to bridgedecks.

2429

0F500 $3

Subtotal: $1,483

2021-22 $757$42

$772

$1,839Total Project Cost: $3,322

01160000149/8/2021

7/20/20215/15/2020PA&ED:

RTL:R/W Cert:

4/11/2022Begin Con:

01-Humboldt-36 18-1919-2019-2021-22

201.1195 Bridge(s)Performance Measure

Program Code

$268PA&ED:PS&E:

R/W Sup:

New

17.9/R23.9

Con Sup:

Bridge Preventative Maintenance

$1,480Const:R/W:

2

2

1

Senate:

Assembly:

Congress:

2

2

1Congress

Assembly

Senate

In Humboldt County, at South Fork Eel RiverBridge and Separation No. 04-0065, South ForkEel River Bridge No. 04-0076 (PM 35.5), andArcata Overhead No. 04-0079R. Strengthenthree bridge structures.

2400

0E770 $1,359

Subtotal: $11,468

2018-19 $1,355$65

$2,102

$4,532Total Project Cost: $16,000

01150000096/1/20196/1/20199/1/2018PA&ED:

RTL:R/W Cert:

11/14/2019Begin Con:

01-Humboldt-101 Prior18-1918-1918-19

201.3223 Bridge(s)Performance Measure

Program Code

$1,010PA&ED:PS&E:

R/W Sup:

Carryover

R17.9/87.8

Con Sup:

Trans Permit Requirements for Bridges

$10,109Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Near Arcata, from 1.5 miles east to 2.0 mileseast of Route 101 at the Route 200/299Separation No. 04-0184. Establish standard vertical clearance.

2430

0F530 $31

Subtotal: $4,059

2019-20 $857$26

$1,124

$2,571Total Project Cost: $6,630

01160000183/3/20202/4/20208/1/2019PA&ED:

RTL:R/W Cert:

8/4/2020Begin Con:

01-Humboldt-299 18-1919-2019-2019-20

201.3221 Bridge(s)Performance Measure

Program Code

$564PA&ED:PS&E:

R/W Sup:

New

R1.5/R2.0

Con Sup:

Trans Permit Requirements for Bridges

$4,028Const:R/W:

2

2

1

Senate:

Assembly:

Congress:

2

2

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 45 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Humboldt

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

ROADWAY PRESERVATIONNear Redcrest, from Englewood ParkUndercrossing to Eel River Bridge andOverhead. Pavement rehabilitation.2422

0F360 $6

Subtotal: $14,521

2018-19 $680$85

$1,518

$2,862Total Project Cost: $17,383

01150001152/1/20192/1/20194/1/2018PA&ED:

RTL:R/W Cert:

8/1/2019Begin Con:

01-Humboldt-101 PriorPriorPrior18-19

201.12136.8 Lane mile(s)Performance Measure

Program Code

$579PA&ED:PS&E:

R/W Sup:

Carryover

R39.2/R48.3

Con Sup:

Pavement Rehabilitation (CAPM)

$14,515Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

In Eureka, on 4th Street from Broadway toEureka Slough Bridge; also on 5th street from OStreet to Eureka Slough Bridge. Pavementrehabilitation.

2380

0E040 $21

Subtotal: $3,156

2018-19 $167$104$725

$1,103Total Project Cost: $4,259

01130001003/15/20193/1/20195/1/2018PA&ED:

RTL:R/W Cert:

10/3/2019Begin Con:

01-Humboldt-101 Prior18-1918-1918-19

201.1217.0 Lane mile(s)Performance Measure

Program Code

$107PA&ED:PS&E:

R/W Sup:

Carryover

78.0/79.8

Con Sup:

Pavement Rehabilitation (CAPM)

$3,135Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Near Trinidad, from 1.3 miles south of SchoolRoad to 0.4 mile north of Big Lagoon Bridge.Pavement rehabilitation. 2439

0F820 $12

Subtotal: $45,367

2020-21 $561$84

$4,287

$5,264Total Project Cost: $50,631

011600006711/15/202011/1/20208/1/2019PA&ED:

RTL:R/W Cert:

6/1/2021Begin Con:

01-Humboldt-101 Prior19-2019-2020-21

201.12177.7 Lane mile(s)Performance Measure

Program Code

$332PA&ED:PS&E:

R/W Sup:

Carryover

R90.1/109.6

Con Sup:

Pavement Rehabilitation (CAPM)

$45,355Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

In and near Eureka, from south of FieldsLanding Overhead to north of Herrick AvenueOvercrossing. Roadway rehabilitation.

(G13 Contingency)

2382

0C570 $366

Subtotal: $31,609

2019-20 $1,258$52

$6,696

$8,652Total Project Cost: $40,261

01130000092/1/2020

1/15/202010/15/2018PA&ED:

RTL:R/W Cert:

7/6/2020Begin Con:

01-Humboldt-101 Prior18-1918-1919-20

201.12221.1 Lane mile(s)Performance Measure

Program Code

$646PA&ED:PS&E:

R/W Sup:

Carryover

69.9/75.2

* Con Sup:

Roadway Rehabilitation (2R)

* Const, * Con Sup phase(s) are NOT authorized

$31,243* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 46 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Humboldt

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Garberville, from north of Redwood Driveto 1.3 miles south of Myers Flat; also inMendocino County, on Route 271 near Piercy, from 0.5 mile north of Confusion Hill to 0.5mile north of Route 101 Separation (PM 16.1 to20.0). Rehabilitate or replace drainage culverts.

7002

48770 $403

Subtotal: $3,209

2020-21 $866$309$909

$2,962Total Project Cost: $6,171

01140000713/1/20213/1/20213/1/2020PA&ED:

RTL:R/W Cert:

8/1/2021Begin Con:

01-Humboldt-101 Prior19-2019-2020-21

201.15138 Culvert(s) (ea)Performance Measure

Program Code

$878PA&ED:PS&E:

R/W Sup:

Carryover

R11.8/26.7

Con Sup:

Drainage System Restoration

$2,806Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Near Miranda, from 2.3 miles south of MirandaPost Office to 0.9 mile south of Bear CreekBridge. Upgrade drainage systems.2270

40950 $305

Subtotal: $1,758

2018-19 $838$151$403

$1,905Total Project Cost: $3,663

010000015812/1/201812/1/20189/29/2017PA&ED:

RTL:R/W Cert:

7/1/2019Begin Con:

01-Humboldt-254 PriorPriorPrior18-19

201.1517 Culvert(s) (ea)Performance Measure

Program Code

$513PA&ED:PS&E:

R/W Sup:

Carryover

6.8/42.1

Con Sup:

Drainage System Restoration

$1,453Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Near Blue Lake and Willow Creek, from 0.1mile east of Route 200 to 0.5 mile east of BoiseCreek Campground. Rehabilitate drainageculverts.

2433

0F620 $920

Subtotal: $5,188

2021-22 $958$77

$1,615

$3,554Total Project Cost: $8,742

01160000358/1/20218/1/20215/1/2020PA&ED:

RTL:R/W Cert:

2/1/2022Begin Con:

01-Humboldt-299 Prior20-2120-2121-22

201.15124 Culvert(s) (ea)Performance Measure

Program Code

$904PA&ED:PS&E:

R/W Sup:

Carryover

R1.9/37.8

Con Sup:

Drainage System Restoration

$4,268Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

MOBILITYIn and near Eureka and Arcata, from south ofCole Avenue to north of Route 255.Operational improvements.2418

0F220 $665

Subtotal: $9,182

2018-19 $667$114

$1,650

$2,845Total Project Cost: $12,027

01150000922/15/20192/1/2019

1/10/2017PA&ED:

RTL:R/W Cert:

10/3/2019Begin Con:

01-Humboldt-101 PriorPriorPrior18-19

201.31098.2 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

$414PA&ED:PS&E:

R/W Sup:

Carryover

79.9/86.1

Con Sup:

Operational Improvements

$8,517Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 47 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Humboldt

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Arcata, from north of Route 299/Route 101 Connector to 0.2 mile south of Guintoli LaneOvercrossing. Construct auxiliary lane toimprove merging movements.

2424

0E890 $15

Subtotal: $4,113

2021-22 $1,329$90

$1,546

$3,973Total Project Cost: $8,086

011500004311/1/202111/1/202110/1/2020PA&ED:

RTL:R/W Cert:

5/1/2022Begin Con:

01-Humboldt-101 18-1918-1920-2121-22

201.31036 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

$1,008PA&ED:PS&E:

R/W Sup:

New

88.3/88.6

Con Sup:

Operational Improvements

$4,098Const:R/W:

2

2

1

Senate:

Assembly:

Congress:

2

2

1Congress

Assembly

Senate

FACILITIESIn Eureka, at the District 1 Materials Laboratorylocated at the District Office complex (1726Albee Street). Replace District 1 MaterialsLaboratory (L5731) at alternative site to addresshealth, safety, accessibility, and operationaldeficiencies.

2355

0C110 $1,388

Subtotal: $5,672

2020-21 $1,380$567

$1,702

$4,783Total Project Cost: $10,455

01120002299/4/20207/1/20204/1/2019PA&ED:

RTL:R/W Cert:

2/1/2021Begin Con:

01-Humboldt-101 18-1918-1918-1920-21

201.3541 Location(s)Performance Measure

Program Code

$1,134PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Materials Labs

$4,284Const:R/W:

2

2

1

Senate:

Assembly:

Congress:

2

2

1Congress

Assembly

Senate

CountyHumboldt

PA&ED:PS&E:

R/W Sup:Con Sup:

$21,446$286,990

R/W:

Subtotal: $308,436

Const:$37,944$42,192$7,822

$62,935

$150,893

Total (Capital + Support): $459,329

Sorted by: Disctrict, County, Route and Post MilesPage 48 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Imperial

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONIn San Diego and Imperial Counties, at variouslocations, on Routes 7, 8, 78, 79, 86, 94, 98,111, 115, 186, and 188. Upgrade and installcurve warning signs.

1201

42500 $0

Subtotal: $1,712

2021-22 $493$0

$462

$1,272Total Project Cost: $2,984

11160000951/13/202212/6/2021

11/16/2020PA&ED:

RTL:R/W Cert:

10/14/2022Begin Con:

11-Imperial-Var 18-1920-21

21-22

201.01535 Collision(s) reducedPerformance Measure

Program Code

$317PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

$1,712Const:R/W:

38, 39, 40

56, 71, 75,76

50, 51, 52

Senate:

Assembly:

Congress:

38, 39, 40

56, 71, 75,76

50, 51, 52Congress

Assembly

Senate

In and near El Centro, at various locations onRoutes 8 and 111. Pave slopes under structures.

1252

41200 $0

Subtotal: $2,070

2021-22 $585$0

$571

$1,541Total Project Cost: $3,611

11120001587/30/20216/11/20218/7/2020PA&ED:

RTL:R/W Cert:

12/30/2021Begin Con:

11-Imperial-8 19-2020-21

21-22

201.23518 Location(s)Performance Measure

Program Code

$385PA&ED:PS&E:

R/W Sup:

New

R32.4/R46.1

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,070Const:R/W:

40

56

51

Senate:

Assembly:

Congress:

40

56

51Congress

Assembly

Senate

MANDATESIn Calexico, from Ollie Avenue to RockwoodAvenue. Construct and upgrade pedestrian curbramps.1240

42780 $0

Subtotal: $2,141

2021-22 $650$0

$661

$1,480Total Project Cost: $3,621

11170000219/3/2021

8/13/20219/23/2019PA&ED:

RTL:R/W Cert:

1/10/2022Begin Con:

11-Imperial-98 18-1919-20

21-22

201.36122 Curb ramp(s)Performance Measure

Program Code

$169PA&ED:PS&E:

R/W Sup:

New

32.1/32.5

Con Sup:

Americans with Disabilities Act New Curb Ramps

$2,141Const:R/W:

40

56

51

Senate:

Assembly:

Congress:

40

56

51Congress

Assembly

Senate

ROADWAY PRESERVATIONIn Imperial County, from west of Midway WellRoad to east of Mitchell Camp Road at variouslocations. Culvert replacement.1283

42050

Subtotal: $687

2019-20 $409

$201

$787Total Project Cost: $1,474

11150000528/26/20197/18/20198/23/2018PA&ED:

RTL:R/W Cert:

4/27/2020Begin Con:

11-Imperial-78 Prior18-19

19-20

201.1516 Culvert(s) (ea)Performance Measure

Program Code

$177PA&ED:PS&E:

R/W Sup:

Carryover

62.3/73.8

Con Sup:

Drainage System Restoration

$687Const:R/W:

40

56

51

Senate:

Assembly:

Congress:

40

56

51Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 49 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Imperial

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Imperial County, from north of Alamo RiverBridge to north of Gonder Road. Culvertreplacement.0602

42060

Subtotal: $417

2019-20 $371

$190

$726Total Project Cost: $1,143

11150000537/8/20196/4/20197/5/2018PA&ED:

RTL:R/W Cert:

3/6/2020Begin Con:

11-Imperial-115 Prior18-19

19-20

201.1514 Culvert(s) (ea)Performance Measure

Program Code

$165PA&ED:PS&E:

R/W Sup:

Carryover

L10.4/19.8

Con Sup:

Drainage System Restoration

$417Const:R/W:

40

56

51

Senate:

Assembly:

Congress:

40

56

51Congress

Assembly

Senate

CountyImperial

PA&ED:PS&E:

R/W Sup:Con Sup:

$0$7,027

R/W:

Subtotal: $7,027

Const:$1,213$2,508

$0$2,085

$5,806

Total (Capital + Support): $12,833

Sorted by: Disctrict, County, Route and Post MilesPage 50 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Inyo

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONIn and near Bishop, from west of Meadow Lane to east of Pioneer Lane. Construct a two-wayleft turn lane.2617

36370 $0

Subtotal: $1,238

2019-20 $545$8

$677

$1,466Total Project Cost: $2,704

091400003011/14/20198/19/2019

10/31/2018PA&ED:

RTL:R/W Cert:

5/20/2020Begin Con:

09-Inyo-168 18-1919-2018-1919-20

201.01510 Collision(s) reducedPerformance Measure

Program Code

$236PA&ED:PS&E:

R/W Sup:

New

16.0/17.7

Con Sup:

Collision Severity Reduction

$1,238Const:R/W:

8

26

8

Senate:

Assembly:

Congress:

8

26

8Congress

Assembly

Senate

ROADWAY PRESERVATIONNear Shoshone, from east of Route 127 toChicago Valley Road. Replace and installculverts.0653

36340 $800

Subtotal: $3,010

2019-20 $620$150$405

$1,580Total Project Cost: $4,590

09150000023/20/20203/1/20207/1/2018PA&ED:

RTL:R/W Cert:

11/1/2020Begin Con:

09-Inyo-178 PriorPriorPrior19-20

201.1513 Culvert(s) (ea)Performance Measure

Program Code

$405PA&ED:PS&E:

R/W Sup:

Carryover

43.4/44.2

Con Sup:

Drainage System Restoration

$2,210Const:R/W:

8

26

8

Senate:

Assembly:

Congress:

8

26

8Congress

Assembly

Senate

ROADSIDE PRESERVATIONNear Cartago, 3.0 miles north of Route 190Junction. Protect, enhance, preserve, andrestore wetland and riparian habitat at CartagoWildlife Area. This work will also serve asadvance mitigation credit purchases for futureSHOPP construction projects.

0661

36490 $31

Subtotal: $1,871

2021-22 $380$100$460

$1,830Total Project Cost: $3,701

091500001811/1/202111/1/20215/1/2020PA&ED:

RTL:R/W Cert:

7/1/2022Begin Con:

09-Inyo-395 18-1919-2019-2021-22

201.24016 Location(s)Performance Measure

Program Code

$890PA&ED:PS&E:

R/W Sup:

New

37.6

Con Sup:

Roadside Enhancement

$1,840Const:R/W:

8

26

8

Senate:

Assembly:

Congress:

8

26

8Congress

Assembly

Senate

CountyInyo

PA&ED:PS&E:

R/W Sup:Con Sup:

$831$5,288

R/W:

Subtotal: $6,119

Const:$1,531$1,545

$258$1,542

$4,876

Total (Capital + Support): $10,995

Sorted by: Disctrict, County, Route and Post MilesPage 51 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Kern($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONIn and near Wasco, from 0.7 mile west ofBrown Material Road to Scofield Avenue.Install centerline and shoulder rumble strips.6865

0W410 $5

Subtotal: $1,314

2018-19 $525$5

$390

$1,295Total Project Cost: $2,609

06170002143/22/20192/2/20197/2/2018PA&ED:

RTL:R/W Cert:

9/26/2019Begin Con:

06-Kern-46 Prior18-1918-1918-19

201.01017 Collision(s) reducedPerformance Measure

Program Code

$375PA&ED:PS&E:

R/W Sup:

Carryover

26.8/47.0

Con Sup:

Safety Improvements

$1,309Const:R/W:

16

32

21

Senate:

Assembly:

Congress:

16

32

21Congress

Assembly

Senate

Near Lamont, from 0.1 mile south to 0.1 milenorth of Sunset Boulevard. Constructroundabout at intersection of Route 184/SunsetBoulevard.

6791

0V280 $950

Subtotal: $4,550

2019-20 $1,300$530$970

$3,900Total Project Cost: $8,450

06160001243/16/20203/2/20208/1/2018PA&ED:

RTL:R/W Cert:

8/1/2020Begin Con:

06-Kern-184 Prior18-1918-1919-20

201.01016 Collision(s) reducedPerformance Measure

Program Code

$1,100PA&ED:PS&E:

R/W Sup:

Carryover

L0.9/L1.1

Con Sup:

Safety Improvements

$3,600Const:R/W:

14

32

21

Senate:

Assembly:

Congress:

14

32

21Congress

Assembly

Senate

In and Near Arvin, at Derby Street. Installtraffic signals.

6709

0S510 $74

Subtotal: $1,470

2018-19 $775$345$530

$1,998Total Project Cost: $3,468

06140001629/1/2018

8/15/20188/10/2015PA&ED:

RTL:R/W Cert:

3/1/2019Begin Con:

06-Kern-223 PriorPriorPrior18-19

201.0106 Collision(s) reducedPerformance Measure

Program Code

$348PA&ED:PS&E:

R/W Sup:

Carryover

21.0/21.3

Con Sup:

Safety Improvements

$1,396Const:R/W:

14, 16

32

21

Senate:

Assembly:

Congress:

14, 16

32

21Congress

Assembly

Senate

In Kern, Mono, Inyo, and San BernardinoCounties, on Routes 14, 89, 108, 120, 127, 168,178, 182, 190, 202, and 395 at various locations.Upgrade guardrails, end treatments, and bridgetransition railings to current standards.

2631

36770 $1

Subtotal: $2,832

2020-21 $570$10

$910

$1,730Total Project Cost: $4,562

091700000110/16/2020

5/1/202011/1/2019PA&ED:

RTL:R/W Cert:

5/15/2021Begin Con:

09-Kern-178 18-1919-2019-2020-21

201.01527 Collision(s) reducedPerformance Measure

Program Code

$240PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

$2,831Const:R/W:

8, 16, 23

5, 23, 26, 33

4, 8, 23

Senate:

Assembly:

Congress:

8, 16, 23

5, 23, 26, 33

4, 8, 23Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 52 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Kern($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Tehachapi, from 0.2 mile west to 0.2 mileeast of Cummings Valley Road East. Constructa left turn lane from southbound Route 202 toCummings Valley Road East.

2620

36720 $933

Subtotal: $2,193

2021-22 $970$620$950

$2,851Total Project Cost: $5,044

09160000168/15/20217/15/20214/1/2019PA&ED:

RTL:R/W Cert:

2/23/2022Begin Con:

09-Kern-202 18-1918-1918-1921-22

201.01539 Collision(s) reducedPerformance Measure

Program Code

$311PA&ED:PS&E:

R/W Sup:

New

R4.7/R5.1

Con Sup:

Collision Severity Reduction

$1,260Const:R/W:

16

34

23

Senate:

Assembly:

Congress:

16

34

23Congress

Assembly

Senate

In Bakersfield, from M Street to east of FairfaxRoad at various locations. Roadside safetyimprovements.3729

0E320

Subtotal: $2,644

2018-19 $587$10

$808

$1,625Total Project Cost: $4,269

06130000379/3/20188/1/20182/7/2017PA&ED:

RTL:R/W Cert:

2/4/2019Begin Con:

06-Kern-178 PriorPriorPrior18-19

201.23561 Location(s)Performance Measure

Program Code

$220PA&ED:PS&E:

R/W Sup:

Carryover

1.7/6.9

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,644Const:R/W:

14

32

21, 23

Senate:

Assembly:

Congress:

14

32

21, 23Congress

Assembly

Senate

MANDATESIn Bakersfield, from 0.2 mile west of H StreetOvercrossing to 0.2 mile east of Cottonwood Road Undercrossing. Upgrade curb ramps tomeet current Americans with Disabilities Act(ADA) Standards.

6757

0T000 $100

Subtotal: $3,326

2020-21 $1,064$865$775

$3,111Total Project Cost: $6,437

06150000031/4/2021

12/2/20201/2/2019PA&ED:

RTL:R/W Cert:

7/1/2021Begin Con:

06-Kern-58 18-1918-1918-1920-21

201.36125 Curb ramp(s)Performance Measure

Program Code

$407PA&ED:PS&E:

R/W Sup:

New

R53.2/R55.6

Con Sup:

Americans with Disabilities Act New Curb Ramps

$3,226Const:R/W:

14, 16

32, 34

21, 23

Senate:

Assembly:

Congress:

14, 16

32, 34

21, 23Congress

Assembly

Senate

In Bakersfield, from Route 204/58 Separation toL street; also on Route 58 (PM R54.2/R54.6). Upgrade curb ramps and Accessible Pedestrian Signals (APS) to meet current Americans with Disabilities Act (ADA) Standards.

6871

0W150 $337

Subtotal: $3,182

2021-22 $1,600$1,486$1,292

$5,483Total Project Cost: $8,665

06170000968/2/2021

7/15/20218/1/2019PA&ED:

RTL:R/W Cert:

1/20/2022Begin Con:

06-Kern-204 18-1919-2019-2021-22

201.36191 Curb ramp(s)Performance Measure

Program Code

$1,105PA&ED:PS&E:

R/W Sup:

New

R0.0/4.6

Con Sup:

Americans with Disabilities Act New Curb Ramps

$2,845Const:R/W:

16

32

23

Senate:

Assembly:

Congress:

16

32

23Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 53 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Kern($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

BRIDGE PRESERVATIONNear Mettler, at California Aqueduct Bridge No.50-0323. Bridge rehabilitation.

6726

0S050 $1,100

Subtotal: $31,100

2020-21 $5,100$600

$6,200

$12,945Total Project Cost: $44,045

06150000473/1/2021

11/15/202012/1/2018PA&ED:

RTL:R/W Cert:

11/15/2021Begin Con:

06-Kern-166 Prior20-2120-2120-21

201.1101 Bridge(s)Performance Measure

Program Code

$1,045PA&ED:PS&E:

R/W Sup:

Carryover

17.3/17.7

Con Sup:

Bridge Major Rehabilitation

$30,000Const:R/W:

16

34

23

Senate:

Assembly:

Congress:

16

34

23Congress

Assembly

Senate

Near the Grapevine, at the California AqueductNo. 50-0321L/R. Improve to standard loadcapacity.6877

0W460 $10

Subtotal: $1,886

2018-19 $430$10

$725

$3,075Total Project Cost: $4,961

06170002258/1/20187/2/20184/2/2018PA&ED:

RTL:R/W Cert:

12/14/2018Begin Con:

06-Kern-5 Prior18-1918-1918-19

201.3222 Bridge(s)Performance Measure

Program Code

$1,910PA&ED:PS&E:

R/W Sup:

Carryover

12.5

Con Sup:

Trans Permit Requirements for Bridges

$1,876Const:R/W:

14, 16

32

21, 23

Senate:

Assembly:

Congress:

14, 16

32

21, 23Congress

Assembly

Senate

Near the Grapevine, from the Route 5/99Separation to 2.1 miles south of Route 166Overcrossing; also on Route 5, at the Route 5/99Separation Bridge No. 50-0240R. Lowerroadway profile to obtain standard verticalclearance.

6876

0W430 $10

Subtotal: $7,805

2018-19 $470$10

$1,500

$3,580Total Project Cost: $11,385

06170002228/1/20187/2/20184/2/2018PA&ED:

RTL:R/W Cert:

12/14/2018Begin Con:

06-Kern-99 Prior18-1918-1918-19

201.3221 Bridge(s)Performance Measure

Program Code

$1,600PA&ED:PS&E:

R/W Sup:

Carryover

L0.0/0.6

Con Sup:

Trans Permit Requirements for Bridges

$7,795Const:R/W:

14, 16

32

21, 23

Senate:

Assembly:

Congress:

14, 16

32

21, 23Congress

Assembly

Senate

ROADWAY PRESERVATIONNear Bakersfield, from south of Hickory Laneto north of Brundage Lane. Upgrade Americanswith Disabilities Act (ADA) curb ramps, installbike lanes, cold plane pavement, place Hot MixAsphalt (HMA) and Rubberized Hot MixAsphalt (RHMA) pavement.

6803

0U290 $2,230

Subtotal: $19,930

2021-22 $3,175$2,630$3,750

$11,980Total Project Cost: $31,910

06160000018/16/20218/1/2021

10/1/2019PA&ED:

RTL:R/W Cert:

2/1/2022Begin Con:

06-Kern-184 Prior19-2019-2021-22

201.12018.5 Lane mile(s)Performance Measure

Program Code

$2,425PA&ED:PS&E:

R/W Sup:

Carryover

0.8/8.2

Con Sup:

Roadway Rehabilitation (3R)

$17,700Const:R/W:

14

32

21

Senate:

Assembly:

Congress:

14

32

21Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 54 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Kern($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Bakersfield, from 0.2 mile south ofEdison Highway to Route 178. Upgrade Americans with Disabilities Act (ADA) curbsand barrier railing, widen shoulders, cold planepavement, place Hot Mix Asphalt (HMA) andRubberized Hot Mix Asphalt (RHMA)pavement to rehabilitate roadway.

6798

0U430 $350

Subtotal: $7,950

2020-21 $1,520$50

$1,600

$4,190Total Project Cost: $12,140

061600003310/2/20209/9/20201/2/2019PA&ED:

RTL:R/W Cert:

4/11/2021Begin Con:

06-Kern-184 Prior18-1918-1920-21

201.12011.0 Lane mile(s)Performance Measure

Program Code

$1,020PA&ED:PS&E:

R/W Sup:

Carryover

8.1/12.1

Con Sup:

Roadway Rehabilitation (3R)

$7,600Const:R/W:

14, 16

32, 34

21, 23

Senate:

Assembly:

Congress:

14, 16

32, 34

21, 23Congress

Assembly

Senate

Near Bakersfield, from Route 119 to south ofNoriega Road; also on Route 119, from EnosLane to Route 5 (PM 18.1/19.8). Pavementrehabilitation.

6755

0U100 $23

Subtotal: $12,723

2019-20 $435$81

$650

$1,616Total Project Cost: $14,339

06150002114/1/20203/2/20208/1/2018PA&ED:

RTL:R/W Cert:

11/1/2020Begin Con:

06-Kern-43 Prior18-1918-1919-20

201.12122.2 Lane mile(s)Performance Measure

Program Code

$450PA&ED:PS&E:

R/W Sup:

Carryover

0.1/9.3

Con Sup:

Pavement Rehabilitation (CAPM)

$12,700Const:R/W:

16, 18

32, 34

21, 23

Senate:

Assembly:

Congress:

16, 18

32, 34

21, 23Congress

Assembly

Senate

In and near Wasco, from Magnolia Avenue toRoute 43 South. Upgrade Americans withDisabilities Act (ADA) curb ramps, cold planepavement, place Hot Mix Asphalt (HMA) andRubberized Hot Mix Asphalt (RHMA)pavement.

6810

0U480 $90

Subtotal: $4,690

2019-20 $950$360$900

$2,920Total Project Cost: $7,610

06150002995/1/20204/3/2020

7/19/2018PA&ED:

RTL:R/W Cert:

10/29/2020Begin Con:

06-Kern-46 Prior18-1918-1919-20

201.1216.3 Lane mile(s)Performance Measure

Program Code

$710PA&ED:PS&E:

R/W Sup:

Carryover

49.0/50.9

Con Sup:

Pavement Rehabilitation (CAPM)

$4,600Const:R/W:

14

32

21

Senate:

Assembly:

Congress:

14

32

21Congress

Assembly

Senate

In and near Bakersfield, from Route 43 to 0.1mile west of Allen Road. Pavementrehabilitation.6756

0U110 $350

Subtotal: $8,850

2021-22 $1,200$250

$1,900

$4,750Total Project Cost: $13,600

06150002123/1/20221/1/2022

10/1/2020PA&ED:

RTL:R/W Cert:

9/1/2022Begin Con:

06-Kern-58 18-1920-2121-2221-22

201.12112.2 Lane mile(s)Performance Measure

Program Code

$1,400PA&ED:PS&E:

R/W Sup:

New

39.9/46.0

Con Sup:

Pavement Rehabilitation (CAPM)

$8,500Const:R/W:

16

34

23

Senate:

Assembly:

Congress:

16

34

23Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 55 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Kern($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Bakersfield, from F Street to Route 99. Coldplane pavement, place Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt (RHMA) pavement.

6889

0U490 $10

Subtotal: $3,300

2019-20 $740$65

$550

$1,805Total Project Cost: $5,105

061600000212/10/201911/15/20198/13/2018PA&ED:

RTL:R/W Cert:

6/15/2020Begin Con:

06-Kern-204 Prior18-1918-1919-20

201.1214.7 Lane mile(s)Performance Measure

Program Code

$450PA&ED:PS&E:

R/W Sup:

Carryover

5.1/6.7

Con Sup:

Pavement Rehabilitation (CAPM)

$3,290Const:R/W:

16

34

23

Senate:

Assembly:

Congress:

16

34

23Congress

Assembly

Senate

Near Kettleman City, from 0.34 mile south ofTwisselman Road Overcrossing to KingsCounty line. Cold plane pavement, repairconcrete pavement panels, place Hot MixAsphalt (HMA) and Rubberized Hot MixAsphalt (RHMA) pavement to rehabilitateroadway.

6820

0U470 $65

Subtotal: $21,565

2019-20 $1,200$25

$1,900

$3,565Total Project Cost: $25,130

061500030110/4/20199/6/20198/3/2018PA&ED:

RTL:R/W Cert:

4/12/2020Begin Con:

06-Kern-5 Prior18-1918-1919-20

201.12221.0 Lane mile(s)Performance Measure

Program Code

$440PA&ED:PS&E:

R/W Sup:

Carryover

82.0/87.0

Con Sup:

Roadway Rehabilitation (2R)

$21,500Const:R/W:

14

32

21

Senate:

Assembly:

Congress:

14

32

21Congress

Assembly

Senate

In Rosamond and Mojave, from 0.5 mile southof Dawn Road Overcrossing (OC) to 0.5 milenorth of Silver Queen Road OC. Rehabilitatelanes and ramps by replacing slabs and grindinglane 1, construct Continuous ReinforcedConcrete Pavement (CRCP) lane 2, cold planeand overlay ramps with Rubberized Hot MixAsphalt (RHMA-G). Replace guardrail, construct rumble strip, replace signs usingretroreflective sheeting, and refresh pavementdelineation.

(G13 Contingency)

2633

36740 $22

Subtotal: $40,537

2019-20 $1,460$190

$3,010

$5,030Total Project Cost: $45,567

09160000251/23/20201/3/20207/2/2018PA&ED:

RTL:R/W Cert:

10/15/2020Begin Con:

09-Kern-14 Prior18-1918-1919-20

201.12227.6 Lane mile(s)Performance Measure

Program Code

$370PA&ED:PS&E:

R/W Sup:

Carryover

R5.7/R12.6

* Con Sup:

Roadway Rehabilitation (2R)

* Const, * Con Sup phase(s) are NOT authorized

$40,515* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

16

36

23

Senate:

Assembly:

Congress:

16

36

23Congress

Assembly

Senate

In and near Bakersfield, from Route 5 to 0.3mile north of Old US 99 Overcrossing. Roadway rehabilitation. 6731

0T200 $120

Subtotal: $48,120

2018-19 $1,600$100

$5,200

$8,060Total Project Cost: $56,180

06150000355/1/2018

1/15/20189/22/2017PA&ED:

RTL:R/W Cert:

1/15/2019Begin Con:

06-Kern-99 PriorPriorPrior18-19

201.12233.0 Lane mile(s)Performance Measure

Program Code

$1,160PA&ED:PS&E:

R/W Sup:

Carryover

0.0/11.2

Con Sup:

Roadway Rehabilitation (2R)

$48,000Const:R/W:

14, 16

32

21

Senate:

Assembly:

Congress:

14, 16

32

21Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 56 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Kern($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Bakersfield, from 0.5 mile south ofOld US 99 Overcrossing to 0.1 mile north ofWhite Lane. Rehabilitate pavement.

(G13 Contingency)

6681

0Q920 $30

Subtotal: $45,470

2019-20 $2,300$20

$4,800

$7,820Total Project Cost: $53,290

06140000103/2/20201/1/20203/1/2018PA&ED:

RTL:R/W Cert:

8/1/2020Begin Con:

06-Kern-99 PriorPriorPrior19-20

201.12241.4 Lane mile(s)Performance Measure

Program Code

$700PA&ED:PS&E:

R/W Sup:

Carryover

10.4/21.2

* Con Sup:

Roadway Rehabilitation (2R)

* Const, * Con Sup phase(s) are NOT authorized

$45,440* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

14, 16

34

21, 23

Senate:

Assembly:

Congress:

14, 16

34

21, 23Congress

Assembly

Senate

In Kern and Kings Counties, on Route 99, 198and 204 at various locations. Upgrade existingpumps and control systems at eleven pumpingplants.

6796

0U240 $122

Subtotal: $5,202

2019-20 $2,190$610

$2,150

$5,600Total Project Cost: $10,802

061500029411/20/201911/8/20197/13/2018PA&ED:

RTL:R/W Cert:

5/11/2020Begin Con:

06-Kern-Var Prior18-1918-1919-20

201.15111 Culvert(s) (ea)Performance Measure

Program Code

$650PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Drainage System Restoration

$5,080Const:R/W:

14, 16

32, 34

21, 23

Senate:

Assembly:

Congress:

14, 16

32, 34

21, 23Congress

Assembly

Senate

Near Lebec, from north Lebec Road to south ofGrapevine Road. Rehabilitate drainage systems.

6749

0Q820 $150

Subtotal: $5,250

2018-19 $670$100$690

$1,835Total Project Cost: $7,085

06130002433/30/20192/1/20194/1/2018PA&ED:

RTL:R/W Cert:

11/1/2019Begin Con:

06-Kern-5 PriorPriorPrior18-19

201.1515 Culvert(s) (ea)Performance Measure

Program Code

$375PA&ED:PS&E:

R/W Sup:

Carryover

5.6/8.8

Con Sup:

Drainage System Restoration

$5,100Const:R/W:

14, 16

32, 34

23

Senate:

Assembly:

Congress:

14, 16

32, 34

23Congress

Assembly

Senate

In Kern County, from 2.4 miles north of FortTejon Overcrossing to 1.2 miles south ofGrapevine Undercrossing at four locations.Repair reinforced concrete box culverts.

6884

0W160 $132

Subtotal: $8,294

2019-20 $2,173$29

$2,763

$5,920Total Project Cost: $14,214

06170000973/1/20202/1/20203/1/2019PA&ED:

RTL:R/W Cert:

9/16/2020Begin Con:

06-Kern-5 Prior18-1918-1919-20

201.1514 Culvert(s) (ea)Performance Measure

Program Code

$955PA&ED:PS&E:

R/W Sup:

Carryover

R7.5/R9.0

Con Sup:

Drainage System Restoration

$8,162Const:R/W:

14, 16

31, 34

23

Senate:

Assembly:

Congress:

14, 16

31, 34

23Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 57 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Kern($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

ROADSIDE PRESERVATIONIn Bakersfield, from Planz Road to north of California Avenue. Upgrade irrigation systemto improve water efficiency.6735

0T280 $1

Subtotal: $1,157

2018-19 $200$3

$180

$424Total Project Cost: $1,581

06150000522/7/2019

12/1/20186/22/2017PA&ED:

RTL:R/W Cert:

7/1/2019Begin Con:

06-Kern-99 PriorPriorPrior18-19

201.21012.4 Acre(s)Performance Measure

Program Code

$41PA&ED:PS&E:

R/W Sup:

Carryover

21.6/24.7

Con Sup:

Highway Planting Restoration

$1,156Const:R/W:

16

34

23

Senate:

Assembly:

Congress:

16

34

23Congress

Assembly

Senate

FACILITIESIn Tehachapi, at the Tehachapi MaintenanceStation near Routes 58 and 202 at 320 WestTehachapi Boulevard. Construct a newTehachapi Maintenance Station at existing oralternative site to replace the old, undersizedfacility that is in constant need of repairs.

2634

36750 $1,001

Subtotal: $9,868

2021-22 $2,630$432

$2,778

$6,770Total Project Cost: $16,638

09160000326/24/20226/23/20226/4/2020PA&ED:

RTL:R/W Cert:

1/4/2023Begin Con:

09-Kern- 18-1921-2220-2121-22

201.3521 Location(s)Performance Measure

Program Code

$930PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Maintenance Facilities

$8,867Const:R/W:

23

34

16

Senate:

Assembly:

Congress:

23

34

16Congress

Assembly

Senate

CountyKern

PA&ED:PS&E:

R/W Sup:Con Sup:

$8,216$296,992

R/W:

Subtotal: $305,208

Const:$20,737$35,834$9,436

$47,871

$113,878

Total (Capital + Support): $419,086

Sorted by: Disctrict, County, Route and Post MilesPage 58 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Kings($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MAJOR DAMAGE RESTORATIONIn Kings and Tulare Counties, on Routes 63,99,137, 198 and 216. Repair and replace stolenand damaged electrical systems and protectelectrical and irrigation facilities. The work isrequired to restore incident management,emergency readiness, mobility, functionality,and operation efficiency.

6797

0U300 $130

Subtotal: $15,130

2019-20 $1,880$1,000$1,850

$5,370Total Project Cost: $20,500

061600002710/1/20199/5/2019

11/1/2017PA&ED:

RTL:R/W Cert:

4/8/2020Begin Con:

06-Kings-VAR PriorPriorPrior19-20

201.131296 Location(s)Performance Measure

Program Code

$640PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Permanent Restoration

$15,000Const:R/W:

16, 18

26, 32

21

Senate:

Assembly:

Congress:

16, 18

26, 32

21Congress

Assembly

Senate

COLLISION REDUCTIONIn and near Lemoore and Hanford, from Route41 to 10th Avenue Undercrossing. Pave areasbeyond gore and bridge slopes.6737

0T290 $13

Subtotal: $4,713

2018-19 $950$40

$600

$1,940Total Project Cost: $6,653

06150000537/3/20187/2/2018

1/24/2017PA&ED:

RTL:R/W Cert:

2/4/2019Begin Con:

06-Kings-198 PriorPriorPrior18-19

201.23547 Location(s)Performance Measure

Program Code

$350PA&ED:PS&E:

R/W Sup:

Carryover

8.3/R19.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$4,700Const:R/W:

14

32

21

Senate:

Assembly:

Congress:

14

32

21Congress

Assembly

Senate

Near Hanford, from 0.4 mile east of 10thAvenue Overcrossing to 1.5 miles east of Route43/198 Separation. Upgrade gore areas,construct Maintenance Vehicle Pullouts (MVPs)and slope paving at bridges.

6799

0U790 $3

Subtotal: $3,793

2020-21 $770$35

$540

$1,855Total Project Cost: $5,648

06160000378/24/20207/1/2020

10/1/2019PA&ED:

RTL:R/W Cert:

2/15/2021Begin Con:

06-Kings-198 18-1919-2019-2020-21

201.23515 Location(s)Performance Measure

Program Code

$510PA&ED:PS&E:

R/W Sup:

New

R19.4/22.5

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$3,790Const:R/W:

14

32

21

Senate:

Assembly:

Congress:

14

32

21Congress

Assembly

Senate

BRIDGE PRESERVATIONIn and near Stratford, from 22nd Street to LaurelAvenue at the Kings River Bridge No. 45-0007.Replace 73 year old bridge due to extensivesuperstructure and substructure distress andsusceptibility to liquefaction.

6873

0V110 $94

Subtotal: $21,494

2021-22 $2,700$400

$6,400

$11,800Total Project Cost: $33,294

061600020810/1/20219/1/20214/2/2020PA&ED:

RTL:R/W Cert:

5/11/2022Begin Con:

06-Kings-41 Prior19-2019-2021-22

201.1101 Bridge(s)Performance Measure

Program Code

$2,300PA&ED:PS&E:

R/W Sup:

Carryover

30.6/33.0

Con Sup:

Bridge Major Rehabilitation

$21,400Const:R/W:

14

32

21

Senate:

Assembly:

Congress:

14

32

21Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 59 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Kings($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

ROADSIDE PRESERVATIONIn and near Hanford, from 0.3 mile west of 12thAvenue to 0.5 mile east of Route 43/198Separation. Electrical upgrade of boosterpumps, replace irrigation mainline, valves andvalve wiring.

6815

0V820 $7

Subtotal: $1,557

2020-21 $590$22

$520

$1,402Total Project Cost: $2,959

06170000108/7/20207/3/20207/5/2019PA&ED:

RTL:R/W Cert:

2/1/2021Begin Con:

06-Kings-198 18-1919-2019-2020-21

201.21017.9 Acre(s)Performance Measure

Program Code

$270PA&ED:PS&E:

R/W Sup:

New

R16.6/R21.5

Con Sup:

Highway Planting Restoration

$1,550Const:R/W:

14

32

21

Senate:

Assembly:

Congress:

14

32

21Congress

Assembly

Senate

CountyKings

PA&ED:PS&E:

R/W Sup:Con Sup:

$247$46,440

R/W:

Subtotal: $46,687

Const:$4,070$6,890$1,497$9,910

$22,367

Total (Capital + Support): $69,054

Sorted by: Disctrict, County, Route and Post MilesPage 60 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Lake

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONNear Upper Lake, from 0.4 mile west to 0.2mile east of Witter Springs Road. Curveimprovement, shoulder widening, and add left-turn pocket and rumble strips.

4647

0G330 $234

Subtotal: $7,675

2019-20 $1,877$144

$1,870

$5,354Total Project Cost: $13,029

01160001704/15/20204/1/20204/8/2019PA&ED:

RTL:R/W Cert:

12/3/2020Begin Con:

01-Lake-20 Prior18-1918-1919-20

201.01014 Collision(s) reducedPerformance Measure

Program Code

$1,463PA&ED:PS&E:

R/W Sup:

Carryover

5.1/5.7

Con Sup:

Safety Improvements

$7,441Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Near Lower Lake, at various locations. Widenfor truck climbing lanes and shoulders.

3203

0E730 $459

Subtotal: $6,105

2019-20 $1,216$62

$2,039

$4,672Total Project Cost: $10,777

011500000410/15/20199/26/201910/1/2018PA&ED:

RTL:R/W Cert:

2/5/2020Begin Con:

01-Lake-29 Prior18-1918-1919-20

201.01045 Collision(s) reducedPerformance Measure

Program Code

$1,355PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Safety Improvements

$5,646Const:R/W:

2

4

5

Senate:

Assembly:

Congress:

2

4

5Congress

Assembly

Senate

Near Lower Lake, from north of Spruce GroveRoad to south of Hofacker Lane. Widenshoulders.3102

0E720 $502

Subtotal: $9,315

2019-20 $1,119$88

$2,464

$4,951Total Project Cost: $14,266

011500000310/15/201910/1/201910/1/2018PA&ED:

RTL:R/W Cert:

4/15/2020Begin Con:

01-Lake-29 Prior18-1918-1919-20

201.01018 Collision(s) reducedPerformance Measure

Program Code

$1,280PA&ED:PS&E:

R/W Sup:

Carryover

12.8/14.4

Con Sup:

Safety Improvements

$8,813Const:R/W:

2

4

5

Senate:

Assembly:

Congress:

2

4

5Congress

Assembly

Senate

Near Kelseyville, from north of Route 29/281Junction to north of Route 29/175 Junction.Improve road condition.3099

29811 $9,777

Subtotal: $48,355

2018-19 $4,638$1,920$7,137

$17,695Total Project Cost: $66,050

01140000431/15/2019

12/15/201811/30/2016PA&ED:

RTL:R/W Cert:

8/3/2019Begin Con:

01-Lake-29 PriorPriorPrior18-19

201.01083 Collision(s) reducedPerformance Measure

Program Code

$4,000PA&ED:PS&E:

R/W Sup:

Carryover

28.5/31.6

Con Sup:

Safety Improvements

$38,578Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 61 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Lake

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Lake and Mendocino Counties on variousroutes at various locations. Upgrade guardrail,end treatments, and transition railings to currentstandards and install vegetation controlmeasures.

7018

0E850 $12

Subtotal: $3,242

2018-19 $812$81

$1,076

$2,711Total Project Cost: $5,953

01150000373/1/2019

2/15/20197/13/2018PA&ED:

RTL:R/W Cert:

9/2/2019Begin Con:

01-Lake-20 Prior18-1918-1918-19

201.015174 Collision(s) reducedPerformance Measure

Program Code

$742PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Collision Severity Reduction

$3,230Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

BRIDGE PRESERVATIONNear Upper Lake, at Bachelor Creek Bridge No.14-0001. Replace multi-plate steel culvertbridge with precast concrete box culverts andwingwalls.

3107

0F490 $21

Subtotal: $3,351

2020-21 $708$14

$595

$1,894Total Project Cost: $5,245

01160000137/15/20206/24/2019

12/26/2018PA&ED:

RTL:R/W Cert:

12/17/2020Begin Con:

01-Lake-20 Prior18-1918-1920-21

201.1101 Bridge(s)Performance Measure

Program Code

$577PA&ED:PS&E:

R/W Sup:

Carryover

5.8

Con Sup:

Bridge Major Rehabilitation

$3,330Const:R/W:

2

4

3

Senate:

Assembly:

Congress:

2

4

3Congress

Assembly

Senate

In Lake County, on Routes 20, 29 and 175 atvarious locations. Replace and upgrade bridgerails on five bridges. 3098

0E080 $263

Subtotal: $5,884

2019-20 $1,136$324

$1,601

$4,004Total Project Cost: $9,888

01130001228/15/20197/1/20191/1/2019PA&ED:

RTL:R/W Cert:

1/1/2020Begin Con:

01-Lake-20 Prior18-1918-1919-20

201.112853.0 Linear feetPerformance Measure

Program Code

$943PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Rail Replacement and Upgrade

$5,621Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

MOBILITYIn Lake and Mendocino Counties, on Routes 20,29, 101, 175, and 281 at various locations.Upgrade the existing TransportationManagement System (TMS) elements toimprove traffic monitoring and datatransmission.

7017

0E830 $30

Subtotal: $2,117

2020-21 $852$50

$1,021

$2,510Total Project Cost: $4,627

01150000348/1/2020

6/25/20207/1/2019PA&ED:

RTL:R/W Cert:

12/17/2020Begin Con:

01-Lake-29 Prior19-2019-2020-21

201.31521 Field element(s)Performance Measure

Program Code

$587PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

$2,087Const:R/W:

2

2, 4

2, 3, 5

Senate:

Assembly:

Congress:

2

2, 4

2, 3, 5Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 62 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Lake

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Lake County, on Routes 20, 29, 53, and 175at various locations. Upgrade the existingTransportation Management System (TMS) elements to improve traffic monitoring and datatransmission.

3104

0E820 $39

Subtotal: $2,162

2020-21 $844$186

$1,073

$2,721Total Project Cost: $4,883

01150000338/1/2020

6/25/20207/1/2019PA&ED:

RTL:R/W Cert:

12/17/2020Begin Con:

01-Lake-53 Prior19-2019-2020-21

201.31530 Field element(s)Performance Measure

Program Code

$618PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

$2,123Const:R/W:

2

4

3, 5

Senate:

Assembly:

Congress:

2

4

3, 5Congress

Assembly

Senate

MULTIPLE OBJECTIVENear Clearlake Oaks, at the Clearlake OaksMaintenance Station. Transportationinfrastructure improvement for zero-emissionvehicle charging.

(PA&ED Only)

3112

0G700 $6

Subtotal: $367

2018-19 $150$32

$133

$545Total Project Cost: $912

01170000511/15/2019

12/24/20186/17/2018PA&ED:

RTL:R/W Cert:

5/15/2019Begin Con:

01-Lake-20 Prior18-1918-1918-19

201.9991 Location(s)Performance Measure

Program Code

$230PA&ED:* PS&E:

* R/W Sup:

Carryover

28.4

* Con Sup:

MULTIPLE OBJECTIVE

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

$361* Const:* R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

CountyLake

PA&ED:PS&E:

R/W Sup:Con Sup:

$11,343$77,230

R/W:

Subtotal: $88,573

Const:$11,795$13,352$2,901

$19,009

$47,057

Total (Capital + Support): $135,630

Sorted by: Disctrict, County, Route and Post MilesPage 63 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Lassen($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONNear Susanville, from 0.3 mile west to 0.4 mileeast of Big Springs Road. Curve improvement.

3609

1H440 $104

Subtotal: $3,000

2018-19 $645$187$859

$2,175Total Project Cost: $5,175

02160000057/5/2018

6/15/20188/1/2017PA&ED:

RTL:R/W Cert:

10/23/2018Begin Con:

02-Lassen-44 PriorPriorPrior18-19

201.01016 Collision(s) reducedPerformance Measure

Program Code

$484PA&ED:PS&E:

R/W Sup:

Carryover

31.9/32.6

Con Sup:

Safety Improvements

$2,896Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

BRIDGE PRESERVATIONNear Westwood, at Goodrich Creek Bridge No.07-0048. Replace bridge.

3512

4F560 $45

Subtotal: $3,656

2019-20 $1,280$60

$1,419

$4,259Total Project Cost: $7,915

02130000068/14/20198/1/20195/1/2018PA&ED:

RTL:R/W Cert:

1/24/2020Begin Con:

02-Lassen-36 PriorPriorPrior19-20

201.1101 Bridge(s)Performance Measure

Program Code

$1,500PA&ED:PS&E:

R/W Sup:

Carryover

7.2/7.4

Con Sup:

Bridge Major Rehabilitation

$3,611Const:R/W:

1

3

4

Senate:

Assembly:

Congress:

1

3

4Congress

Assembly

Senate

ROADWAY PRESERVATIONNear Westwood, from 1.2 miles west ofGoodrich Creek Bridge to 1.3 miles west ofWillard Creek Road. Rehabilitate roadway.3468

4E460 $1,302

Subtotal: $24,091

2019-20 $1,600$340

$2,173

$5,763Total Project Cost: $29,854

02000202878/14/20198/1/20195/1/2018PA&ED:

RTL:R/W Cert:

1/24/2020Begin Con:

02-Lassen-36 PriorPriorPrior19-20

201.12020.9 Lane mile(s)Performance Measure

Program Code

$1,650PA&ED:PS&E:

R/W Sup:

Carryover

6.1/14.3

Con Sup:

Roadway Rehabilitation (3R)

$22,789Const:R/W:

1

1

1, 4

Senate:

Assembly:

Congress:

1

1

1, 4Congress

Assembly

Senate

Near Adin, from west of Boyd Hill LookoutRoad to Butte Creek Bridge; also in ModocCounty from Ash Creek Bridge to east of County Road 87 (PM 0.0/0.5 and PM 1.0/1.8).Roadway rehabilitation.

3467

4E450 $281

Subtotal: $14,598

2019-20 $1,330$280

$2,150

$5,300Total Project Cost: $19,898

02000202862/21/20201/17/20201/17/2019PA&ED:

RTL:R/W Cert:

8/25/2020Begin Con:

02-Lassen-299 Prior18-1918-1919-20

201.12016.8 Lane mile(s)Performance Measure

Program Code

$1,540PA&ED:PS&E:

R/W Sup:

Carryover

18.5/25.6

Con Sup:

Roadway Rehabilitation (3R)

$14,317Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 64 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Lassen($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

FACILITIESNear Adin, at the Adin Maintenance Station(L5701). Construct new facility.

3600

1H110 $20

Subtotal: $12,870

2018-19 $2,650$40

$3,200

$6,150Total Project Cost: $19,020

02150001063/15/20197/13/20189/29/2017PA&ED:

RTL:R/W Cert:

10/15/2019Begin Con:

02-Lassen-299 PriorPriorPrior18-19

201.3521 Location(s)Performance Measure

Program Code

$260PA&ED:PS&E:

R/W Sup:

Carryover

25.6

Con Sup:

Maintenance Facilities

$12,850Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

CountyLassen

PA&ED:PS&E:

R/W Sup:Con Sup:

$1,752$56,463

R/W:

Subtotal: $58,215

Const:$5,434$7,505

$907$9,801

$23,647

Total (Capital + Support): $81,862

Sorted by: Disctrict, County, Route and Post MilesPage 65 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MAJOR DAMAGE RESTORATIONIn Malibu, south of Big Rock Drive. Shorelineembankment restoration by installing RockSlope Protection (RSP) armament.5059

4X970 $4,900

Subtotal: $8,200

2021-22 $2,400$950

$2,750

$7,700Total Project Cost: $15,900

071600033512/13/202111/5/20219/5/2019PA&ED:

RTL:R/W Cert:

8/1/2022Begin Con:

07-Los Angeles-1 Prior19-2019-2021-22

201.1311 Location(s)Performance Measure

Program Code

$1,600PA&ED:PS&E:

R/W Sup:

Carryover

42.5

Con Sup:

Permanent Restoration

$3,300Const:R/W:

27

50

33

Senate:

Assembly:

Congress:

27

50

33Congress

Assembly

Senate

COLLISION REDUCTIONIn Long Beach, at Atlantic Avenue. Installprotected left-turn signal phases for northboundand southbound movements, and upgrade signalpoles, mast arms, and hardware.

5239

33980 $87

Subtotal: $529

2019-20 $1,040$16

$728

$1,784Total Project Cost: $2,313

07170001609/1/20197/1/2019

11/20/2017PA&ED:

RTL:R/W Cert:

7/1/2020Begin Con:

07-Los Angeles-1PriorPrior19-20

201.01032 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

6.0

Con Sup:

Safety Improvements

$442Const:R/W:

33

70

47

Senate:

Assembly:

Congress:

33

70

47Congress

Assembly

Senate

In the City of Los Angeles, at the westboundRoute 10 connector to southbound Route 5.Apply High Friction Surface Treatment (HFST)and upgrade lighting.

5153

33270 $10

Subtotal: $2,610

2018-19 $1,152$15

$1,095

$2,477Total Project Cost: $5,087

07160002903/29/20192/19/20192/27/2018PA&ED:

RTL:R/W Cert:

3/2/2020Begin Con:

07-Los Angeles-5 PriorPriorPrior18-19

201.01062 Collision(s) reducedPerformance Measure

Program Code

$215PA&ED:PS&E:

R/W Sup:

Carryover

18.3

Con Sup:

Safety Improvements

$2,600Const:R/W:

24

53

34

Senate:

Assembly:

Congress:

24

53

34Congress

Assembly

Senate

Near Culver City, from Arlington Avenue toBroadway Street. Replace raised islands onmainline and collector-distributor roads withconcrete barrier (Type 60) and install new lightsfrom Arlington Avenue to Hoover Street (PMR12.3/14.2). Also install high mast LEDlighting at Route 10/110 Interchange.

5152

33260 $63

Subtotal: $18,457

2019-20 $3,888$276

$3,544

$9,099Total Project Cost: $27,556

07160002873/18/20202/4/20209/4/2018PA&ED:

RTL:R/W Cert:

5/19/2021Begin Con:

07-Los Angeles-10 Prior18-1918-1919-20

201.010404 Collision(s) reducedPerformance Measure

Program Code

$1,391PA&ED:PS&E:

R/W Sup:

Carryover

R12.3/R15.5

Con Sup:

Safety Improvements

$18,394Const:R/W:

24, 30

53, 54

34, 37

Senate:

Assembly:

Congress:

24, 30

53, 54

34, 37Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 66 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In the city of Los Angeles, at the northboundRoute 110 connector to eastbound Route 91.Apply High Friction Bauxite Surface Treatment(HFBST), install high visibility thermoplasticlane and edge lines and upgrade guardrail tocurrent standards.

5084

33160 $10

Subtotal: $1,595

2018-19 $558$13

$756

$1,631Total Project Cost: $3,226

07160002339/20/20187/13/2018

12/20/2017PA&ED:

RTL:R/W Cert:

7/1/2019Begin Con:

07-Los Angeles-110 PriorPriorPrior18-19

201.01030 Collision(s) reducedPerformance Measure

Program Code

$304PA&ED:PS&E:

R/W Sup:

Carryover

9.7

Con Sup:

Safety Improvements

$1,585Const:R/W:

35

64

43

Senate:

Assembly:

Congress:

35

64

43Congress

Assembly

Senate

In the city of Los Angeles and South Pasadena,between Figueroa Street and Orange GroveAvenue. Convert outside lane to a dynamiclane/shoulder that can switch between the twodepending on prevailing traffic conditions. Thiswill require Dynamic Message Signs (DMS)monitored by the Transportation ManagementCenter (TMC).

5083

33150 $4,982

Subtotal: $30,266

2019-20 $3,735$1,318$5,390

$13,278Total Project Cost: $43,544

07160002316/1/2020

5/15/202012/18/2018PA&ED:

RTL:R/W Cert:

2/26/2021Begin Con:

07-Los Angeles-110 Prior18-1918-1919-20

201.010504 Collision(s) reducedPerformance Measure

Program Code

$2,835PA&ED:PS&E:

R/W Sup:

Carryover

25.8/30.6

Con Sup:

Safety Improvements

$25,284Const:R/W:

24, 25

41, 51

27, 34

Senate:

Assembly:

Congress:

24, 25

41, 51

27, 34Congress

Assembly

Senate

In Highland Park and South Pasadena, fromsouth of Avenue 60 to north of Avenue of 64.Place High Friction Surface Treatment (HFST).5037

32660 $11

Subtotal: $2,070

2018-19 $1,265$15

$885

$2,765Total Project Cost: $4,835

071600011710/1/20188/17/20181/22/2018PA&ED:

RTL:R/W Cert:

8/1/2019Begin Con:

07-Los Angeles-110 PriorPriorPrior18-19

201.010436 Collision(s) reducedPerformance Measure

Program Code

$600PA&ED:PS&E:

R/W Sup:

Carryover

28.7/29.4

Con Sup:

Safety Improvements

$2,059Const:R/W:

24

51

34

Senate:

Assembly:

Congress:

24

51

34Congress

Assembly

Senate

In Palmdale, at the intersection of Avenue R-8.Upgrade traffic signal system, curb ramps andinstall drainage inlets.5155

33290 $141

Subtotal: $1,029

2019-20 $988$140$711

$2,168Total Project Cost: $3,197

07160002978/2/2019

6/19/20198/10/2018PA&ED:

RTL:R/W Cert:

3/11/2020Begin Con:

07-Los Angeles-138 Prior18-1918-1919-20

201.01017 Collision(s) reducedPerformance Measure

Program Code

$329PA&ED:PS&E:

R/W Sup:

Carryover

49.5

Con Sup:

Safety Improvements

$888Const:R/W:

21

36

25

Senate:

Assembly:

Congress:

21

36

25Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 67 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Irwindale, at the Route 605 northbound rampto westbound Live Oak Avenue. Realign andwiden ramp, construct retaining wall, installconcrete barrier and replace guardrail.

4963

31880 $1,077

Subtotal: $4,597

2019-20 $1,232$276

$1,340

$2,848Total Project Cost: $7,445

07160000014/8/2020

2/18/20206/29/2016PA&ED:

RTL:R/W Cert:

7/7/2020Begin Con:

07-Los Angeles-605PriorPrior19-20

201.010203 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

23.4/23.6

Con Sup:

Safety Improvements

$3,520Const:R/W:

32

48

22

Senate:

Assembly:

Congress:

32

48

22Congress

Assembly

Senate

In Los Angeles and Ventura Counties, onvarious routes and locations. Upgrade andinstall new curve warning signs.4969

31930 $10

Subtotal: $2,100

2020-21 $1,571$12

$878

$3,055Total Project Cost: $5,155

071600002210/1/20209/1/2020

7/15/2019PA&ED:

RTL:R/W Cert:

7/30/2021Begin Con:

07-Los Angeles-Var 18-1919-2019-2020-21

201.01520 Collision(s) reducedPerformance Measure

Program Code

$594PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

$2,090Const:R/W:

24, 32

51, 53, 57,58

32, 38, 40

Senate:

Assembly:

Congress:

24, 32

51, 53, 57,58

32, 38, 40Congress

Assembly

Senate

In Long Beach, at Lakewood Boulevard (Route19) and Los Alamitos Traffic Circle. Installpavement delineation, overhead guide signs andassociated roadway improvements.

4632

29910 $11

Subtotal: $2,337

2018-19 $1,028$20

$607

$2,133Total Project Cost: $4,470

07130003023/29/20192/28/20197/10/2018PA&ED:

RTL:R/W Cert:

12/18/2019Begin Con:

07-Los Angeles-1 Prior18-1918-1918-19

201.01559 Collision(s) reducedPerformance Measure

Program Code

$478PA&ED:PS&E:

R/W Sup:

Carryover

3.5

Con Sup:

Collision Severity Reduction

$2,326Const:R/W:

33

70

47

Senate:

Assembly:

Congress:

33

70

47Congress

Assembly

Senate

In Los Angeles County, in Angeles NationalForest, from 0.3 mile east of Bay Tree Road to0.7 mile west of Big Pines Highway at variouslocations. Upgrade existing guardrail and installnew guardrail, and install stormwater TreatmentBest Management Practices (BMPs).

5151

33250 $28

Subtotal: $16,535

2020-21 $2,670$20

$2,600

$6,310Total Project Cost: $22,845

07160002703/20/20211/20/20217/15/2019PA&ED:

RTL:R/W Cert:

9/28/2021Begin Con:

07-Los Angeles-2 18-1919-2019-2020-21

201.015129 Collision(s) reducedPerformance Measure

Program Code

$1,020PA&ED:PS&E:

R/W Sup:

New

26.7/79.2

Con Sup:

Collision Severity Reduction

$16,507Const:R/W:

25

36, 41, 43

27

Senate:

Assembly:

Congress:

25

36, 41, 43

27Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 68 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In the cities of Monterey Park, Rosemead, andEl Monte, from 0.7 mile west of South FremontAvenue Undercrossing to 0.5 mile east ofDurfee Avenue Undercrossing. Upgradetwenty-seven overhead sign posts, associatedpedestals, and concrete barriers to currentstandards to reduce the potential snagging forout of control vehicles.

5077

33030 $200

Subtotal: $4,246

2021-22 $1,820$531

$1,945

$4,931Total Project Cost: $9,177

071600021312/31/202110/29/20218/30/2019PA&ED:

RTL:R/W Cert:

8/1/2022Begin Con:

07-Los Angeles-10 18-1919-2019-2021-22

201.01563 Collision(s) reducedPerformance Measure

Program Code

$635PA&ED:PS&E:

R/W Sup:

New

21.6/31.0

Con Sup:

Collision Severity Reduction

$4,046Const:R/W:

22, 24

48, 49, 51

27, 32, 34

Senate:

Assembly:

Congress:

22, 24

48, 49, 51

27, 32, 34Congress

Assembly

Senate

Near Azusa, from 0.9 mile north of North ForkSan Gabriel Bridge No. 53-2245 to 0.2 milenorth of Crystal Lake Road (PM T32.1 to 38.4).Upgrade guardrail and end treatments to currentstandards.

5046

32760 $20

Subtotal: $4,210

2020-21 $1,893$10

$1,284

$3,673Total Project Cost: $7,883

07160001322/5/2021

12/17/20204/12/2019PA&ED:

RTL:R/W Cert:

10/8/2021Begin Con:

07-Los Angeles-39 18-1918-1920-2120-21

201.01540 Collision(s) reducedPerformance Measure

Program Code

$486PA&ED:PS&E:

R/W Sup:

New

32.2/38.4

Con Sup:

Collision Severity Reduction

$4,190Const:R/W:

25

41

27

Senate:

Assembly:

Congress:

25

41

27Congress

Assembly

Senate

In the cities of Compton, Paramount andBellflower; also on Route 105 (PMR0.50/R18.14), Route 110 (PM 1.23/R11.89)and Route 405 (PM 0.27/28.51). Constructshoulder rumble strips ground-in indentationswhere right shoulder is less than 4 feet.

4968

31920 $10

Subtotal: $2,310

2020-21 $400$30

$550

$1,136Total Project Cost: $3,446

071600002012/1/202011/1/20202/28/2019PA&ED:

RTL:R/W Cert:

7/30/2021Begin Con:

07-Los Angeles-91 18-1919-2019-2020-21

201.015372 Collision(s) reducedPerformance Measure

Program Code

$156PA&ED:PS&E:

R/W Sup:

New

6.3/18.1

Con Sup:

Collision Severity Reduction

$2,300Const:R/W:

32, 33, 34,35

58, 63, 64,66, 70

38, 43, 44,47, 48

Senate:

Assembly:

Congress:

32, 33, 34,35

58, 63, 64,66, 70

38, 43, 44,47, 48

Congress

Assembly

Senate

In the city of Los Angeles, from HighlandAvenue to south of Parkway Calabasas.Upgrade median concrete barrier to meet thecurrent standards.

4709

30370 $27

Subtotal: $35,327

2018-19 $4,800$27

$6,000

$11,377Total Project Cost: $46,704

07140000356/14/20195/15/2019

12/29/2017PA&ED:

RTL:R/W Cert:

8/13/2020Begin Con:

07-Los Angeles-101 PriorPriorPrior18-19

201.01560 Collision(s) reducedPerformance Measure

Program Code

$550PA&ED:PS&E:

R/W Sup:

Carryover

7.7/27.7

Con Sup:

Collision Severity Reduction

$35,300Const:R/W:

18, 27

45, 46

30

Senate:

Assembly:

Congress:

18, 27

45, 46

30Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 69 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In the city of Los Angeles, from Vernon Avenueto Route 101. Upgrade Metal Beam Guardrail toMidwest Guardrail System, end treatments, andcrash attenuators.

4785

30910 $25

Subtotal: $4,545

2018-19 $2,280$45

$1,357

$3,988Total Project Cost: $8,533

07140002643/21/2019

10/15/20187/2/2018PA&ED:

RTL:R/W Cert:

8/30/2019Begin Con:

07-Los Angeles-110 Prior18-1918-1918-19

201.01513 Collision(s) reducedPerformance Measure

Program Code

$306PA&ED:PS&E:

R/W Sup:

Carryover

18.8/23.8

Con Sup:

Collision Severity Reduction

$4,520Const:R/W:

24, 30

53, 59

34, 37

Senate:

Assembly:

Congress:

24, 30

53, 59

34, 37Congress

Assembly

Senate

In San Fernando and Sylmar, from PacoimaWash to Balboa Boulevard. Construct Maintenance Vehicle Pullouts (MVPs), accessroads and gates, relocate irrigation facilities,pave beyond gore and under guardrail.

4975

31990 $31

Subtotal: $2,619

2020-21 $1,322$16

$1,140

$2,973Total Project Cost: $5,592

07160000281/29/2021

12/31/20208/30/2019PA&ED:

RTL:R/W Cert:

8/31/2021Begin Con:

07-Los Angeles-5 18-1919-2019-2020-21

201.23582 Location(s)Performance Measure

Program Code

$495PA&ED:PS&E:

R/W Sup:

New

39.2/R44.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,588Const:R/W:

18

39

29, 30

Senate:

Assembly:

Congress:

18

39

29, 30Congress

Assembly

Senate

In the cities of Los Angeles and Santa Monica,from Route 1/10 separation bridge to west ofCrenshaw Boulevard. Roadside safety improvements.

4715

30420 $30

Subtotal: $5,494

2018-19 $1,560$48

$1,100

$2,808Total Project Cost: $8,302

07140000553/1/20192/1/2019

12/29/2017PA&ED:

RTL:R/W Cert:

11/1/2019Begin Con:

07-Los Angeles-10 PriorPriorPrior18-19

201.235214 Location(s)Performance Measure

Program Code

$100PA&ED:PS&E:

R/W Sup:

Carryover

R2.1/R11.1

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$5,464Const:R/W:

26, 30

50, 53, 54

33, 34, 37

Senate:

Assembly:

Congress:

26, 30

50, 53, 54

33, 34, 37Congress

Assembly

Senate

In the city of Los Angeles, from Route 5 to westof Route 710. Roadside safety improvements.

4716

30430 $30

Subtotal: $2,583

2018-19 $1,100$34

$1,060

$2,333Total Project Cost: $4,916

07140000583/1/20192/1/20193/1/2018PA&ED:

RTL:R/W Cert:

9/30/2019Begin Con:

07-Los Angeles-10 PriorPriorPrior18-19

201.235106 Location(s)Performance Measure

Program Code

$139PA&ED:PS&E:

R/W Sup:

Carryover

18.3/21.1

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,553Const:R/W:

24

51

34

Senate:

Assembly:

Congress:

24

51

34Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 70 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Santa Clarita, from Route 5 toCanyon Park Boulevard. Construct roadsidesafety improvements.4809

31080 $30

Subtotal: $3,182

2018-19 $1,100$48

$1,400

$2,666Total Project Cost: $5,848

07150000073/1/20192/1/2019

12/1/2017PA&ED:

RTL:R/W Cert:

11/27/2019Begin Con:

07-Los Angeles-14 PriorPriorPrior18-19

201.235102 Location(s)Performance Measure

Program Code

$118PA&ED:PS&E:

R/W Sup:

Carryover

R24.8/R31.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$3,152Const:R/W:

21

38

25

Senate:

Assembly:

Congress:

21

38

25Congress

Assembly

Senate

In and near Santa Clarita, from Canyon ParkBoulevard to Spring Canyon RoadUndercrossing. Place vegetation control underguardrail, minor concrete beyond gore, slopepave beneath abutments, rock blanket at narrowareas, cable mesh drapery systems and installsign post sleeves beyond gore.

4976

32000 $19

Subtotal: $3,082

2020-21 $1,047$55

$954

$2,515Total Project Cost: $5,597

071600002912/15/202011/30/2020

4/1/2019PA&ED:

RTL:R/W Cert:

8/15/2021Begin Con:

07-Los Angeles-14 18-1918-1918-1920-21

201.23572 Location(s)Performance Measure

Program Code

$459PA&ED:PS&E:

R/W Sup:

New

R31.4/36.5

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$3,063Const:R/W:

21

36, 38

25

Senate:

Assembly:

Congress:

21

36, 38

25Congress

Assembly

Senate

In and near Lancaster, from Vincent RampUndercrossing to Avenue K 8 Overcrossing.Roadside safety improvements.4811

31110 $30

Subtotal: $3,287

2019-20 $1,200$48

$1,430

$2,796Total Project Cost: $6,083

071500000610/1/20198/30/20192/1/2018PA&ED:

RTL:R/W Cert:

7/1/2020Begin Con:

07-Los Angeles-14 PriorPriorPrior19-20

201.23592 Location(s)Performance Measure

Program Code

$118PA&ED:PS&E:

R/W Sup:

Carryover

R54.6/R66.2

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$3,257Const:R/W:

21

36

25

Senate:

Assembly:

Congress:

21

36

25Congress

Assembly

Senate

Near Glenview, from Entrado Drive toWoodland Crest Drive. Enhance highwayworker safety by installing weed control underexisting guardrail.

4652

29960

Subtotal: $1,100

2018-19 $700$10

$389

$1,200Total Project Cost: $2,300

07130003145/18/20173/9/2017

6/29/2015PA&ED:

RTL:R/W Cert:

12/7/2018Begin Con:

07-Los Angeles-27 PriorPriorPrior18-19

201.23512 Location(s)Performance Measure

Program Code

$101PA&ED:PS&E:

R/W Sup:

Carryover

7.9/10.1

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$1,100Const:R/W:

26

50

33

Senate:

Assembly:

Congress:

26

50

33Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 71 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Diamond Bar, from Orange Countyline to 0.1 mile west of Hospital Overcrossing.Construct Maintenance Vehicle Pullouts(MVPs), pave beyond gore areas and constructbiofiltration swales.

5023

32480 $15

Subtotal: $2,900

2021-22 $585$22

$666

$1,456Total Project Cost: $4,356

071600007810/21/20219/22/20214/21/2020PA&ED:

RTL:R/W Cert:

5/2/2022Begin Con:

07-Los Angeles-57 18-1919-2021-2221-22

201.23523 Location(s)Performance Measure

Program Code

$183PA&ED:PS&E:

R/W Sup:

New

R0.0/5.5

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,885Const:R/W:

20, 29

20, 29

35, 39

Senate:

Assembly:

Congress:

20, 29

20, 29

35, 39Congress

Assembly

Senate

In San Dimas and Glendora, from Route 10 toRoute 210. Roadside safety improvements.

4706

30180 $30

Subtotal: $2,798

2018-19 $1,200$48

$1,150

$2,498Total Project Cost: $5,296

07140000323/1/20192/1/2019

1/19/2018PA&ED:

RTL:R/W Cert:

11/27/2019Begin Con:

07-Los Angeles-57 PriorPriorPrior18-19

201.23555 Location(s)Performance Measure

Program Code

$100PA&ED:PS&E:

R/W Sup:

Carryover

R7.7/R11.8

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,768Const:R/W:

25

41, 48

32

Senate:

Assembly:

Congress:

25

41, 48

32Congress

Assembly

Senate

In Long Beach, Bellflower and Cerritos, from0.2 mile west of Downey AvenueUndercrossing to 0.2 mile east of San GabrielRiver Bridge. Roadside safety improvements.

4714

30410 $90

Subtotal: $3,691

2018-19 $1,720$48

$1,320

$3,187Total Project Cost: $6,878

07140000573/1/20192/1/2019

12/29/2017PA&ED:

RTL:R/W Cert:

11/1/2019Begin Con:

07-Los Angeles-91 PriorPriorPrior18-19

201.23523 Location(s)Performance Measure

Program Code

$99PA&ED:PS&E:

R/W Sup:

Carryover

R13.9/R16.6

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$3,601Const:R/W:

32, 33

58, 63

38, 44

Senate:

Assembly:

Congress:

32, 33

58, 63

38, 44Congress

Assembly

Senate

In the city of Los Angeles, from Wilton PlaceOvercrossing to Barham BoulevardOvercrossing. Place minor concrete at narrowpaving areas and slopes, pave areas beyond gore, replace fencing and gates, install sign postsleeves and construct Maintenance VehiclePullouts (MVPs).

5072

32960 $15

Subtotal: $3,200

2021-22 $1,520$20

$1,465

$3,523Total Project Cost: $6,723

071600020312/1/202111/1/20218/15/2020PA&ED:

RTL:R/W Cert:

8/1/2022Begin Con:

07-Los Angeles-101 18-1920-2120-2121-22

201.235142 Location(s)Performance Measure

Program Code

$518PA&ED:PS&E:

R/W Sup:

New

R6.2/R9.2

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$3,185Const:R/W:

24, 26

43, 46, 50

28

Senate:

Assembly:

Congress:

24, 26

43, 46, 50

28Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 72 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Downey, from Garfield Avenue toeast of Woodruff Avenue. Roadside safetyimprovements.4893

31640 $30

Subtotal: $1,331

2019-20 $900$30

$705

$1,760Total Project Cost: $3,091

071500020912/6/2019

11/20/20199/7/2018PA&ED:

RTL:R/W Cert:

6/5/2020Begin Con:

07-Los Angeles-105 Prior18-1918-1919-20

201.23581 Location(s)Performance Measure

Program Code

$125PA&ED:PS&E:

R/W Sup:

Carryover

R14.1/R17.2

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$1,301Const:R/W:

32, 33

58, 63

40

Senate:

Assembly:

Congress:

32, 33

58, 63

40Congress

Assembly

Senate

In and near Carson, from West Anaheim Streetto E 228th Street. Construct Maintenance Vehicle Pullouts (MVPs), rock blankets, accessroads fences/gates, stairways to access slopes,relocate controller cabinets and signs.

5214

33650 $42

Subtotal: $2,170

2021-22 $1,701$46

$1,129

$3,606Total Project Cost: $5,776

07160004017/30/20217/15/2021

11/30/2019PA&ED:

RTL:R/W Cert:

3/30/2022Begin Con:

07-Los Angeles-110 18-1919-2019-2021-22

201.23538 Location(s)Performance Measure

Program Code

$730PA&ED:PS&E:

R/W Sup:

New

3.5/6.0

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,128Const:R/W:

30, 35

64, 66

33, 43, 44

Senate:

Assembly:

Congress:

30, 35

64, 66

33, 43, 44Congress

Assembly

Senate

In the city of Los Angeles, from ExpositionBoulevard to Temple Street. Pave beyond gore,slope paving under structures, constructMaintenance Vehicle Pullouts (MVPs), upgradeend treatment to Smart cushion crash attenuatorand place vegetation control under guardrail.

4973

31970 $9

Subtotal: $2,436

2020-21 $1,460$93

$964

$3,029Total Project Cost: $5,465

07160000263/18/20211/26/2021

12/24/2019PA&ED:

RTL:R/W Cert:

12/22/2021Begin Con:

07-Los Angeles-110 18-1919-2019-2020-21

201.23576 Location(s)Performance Measure

Program Code

$512PA&ED:PS&E:

R/W Sup:

New

20.0/23.6

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,427Const:R/W:

24, 30

51, 52, 59,64

34, 37, 43

Senate:

Assembly:

Congress:

24, 30

51, 52, 59,64

34, 37, 43Congress

Assembly

Senate

In the cities of Granada Hills and Porter Ranch,from 700 feet west of Tampa Avenue toWoodley Avenue. Construct MaintenanceVehicle Pullouts (MVPs), pave beyond gore, repave side slopes, relocate irrigation controller,and provide access gates.

5216

33680 $163

Subtotal: $2,832

2021-22 $1,677$53

$1,513

$3,902Total Project Cost: $6,734

071700001412/1/202110/1/20219/1/2020PA&ED:

RTL:R/W Cert:

7/1/2022Begin Con:

07-Los Angeles-118 19-2020-2120-2121-22

201.23530 Location(s)Performance Measure

Program Code

$659PA&ED:PS&E:

R/W Sup:

New

R4.5/R9.1

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,669Const:R/W:

18, 27

38, 39

25, 29, 30

Senate:

Assembly:

Congress:

18, 27

38, 39

25, 29, 30Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 73 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Mission Hills, from Woodley Avenue toRoute 405. Pave areas beyond gore, installaccess gates, construct maintenance vehicle andshoulder pullouts, upgrade and relocateirrigation systems.

4808

31070 $20

Subtotal: $2,674

2018-19 $1,058$20

$1,027

$2,223Total Project Cost: $4,897

071500000411/28/20189/28/20186/27/2017PA&ED:

RTL:R/W Cert:

5/20/2019Begin Con:

07-Los Angeles-118 PriorPriorPrior18-19

201.23530 Location(s)Performance Measure

Program Code

$118PA&ED:PS&E:

R/W Sup:

Carryover

R9.0/R10.1

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,654Const:R/W:

18

38, 39

30

Senate:

Assembly:

Congress:

18

38, 39

30Congress

Assembly

Senate

In the cities of Los Angeles and NorthHollywood, from 170/134 Junction to OxnardStreet Undercrossing. Construct MaintenanceVehicle Pullouts (MVPs), access trail, minorconcrete beyond gore and along ramps, rock blanket at ramps, install fencing and gates,vandal resistant pedestrian Undercrossing enclosures.

5073

32970 $41

Subtotal: $3,303

2021-22 $1,313$34

$1,025

$2,898Total Project Cost: $6,201

071600020412/1/202111/1/20218/15/2020PA&ED:

RTL:R/W Cert:

8/1/2022Begin Con:

07-Los Angeles-170 18-1920-2120-2121-22

201.23584 Location(s)Performance Measure

Program Code

$526PA&ED:PS&E:

R/W Sup:

New

R14.5/R16.6

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$3,262Const:R/W:

18

39, 46

29

Senate:

Assembly:

Congress:

18

39, 46

29Congress

Assembly

Senate

In Pasadena, at the Route 134/210/710Interchange. Roadside safety improvements.

4810

31100 $30

Subtotal: $3,000

2019-20 $950$30

$990

$2,088Total Project Cost: $5,088

071500000510/21/20199/23/20193/16/2018PA&ED:

RTL:R/W Cert:

5/4/2020Begin Con:

07-Los Angeles-210 PriorPriorPrior19-20

201.23553 Location(s)Performance Measure

Program Code

$118PA&ED:PS&E:

R/W Sup:

Carryover

R24.6/R25.3

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,970Const:R/W:

25

41

27

Senate:

Assembly:

Congress:

25

41

27Congress

Assembly

Senate

In Pasadena, Arcadia and Monrovia, from Route710 to Huntington Drive. Roadside safetyimprovements.4708

30360 $30

Subtotal: $2,654

2018-19 $854$31

$850

$1,879Total Project Cost: $4,533

07140000313/1/20192/1/2019

12/1/2017PA&ED:

RTL:R/W Cert:

9/30/2019Begin Con:

07-Los Angeles-210 PriorPriorPrior18-19

201.23547 Location(s)Performance Measure

Program Code

$144PA&ED:PS&E:

R/W Sup:

Carryover

R25.0/R32.8

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,624Const:R/W:

22, 25

41, 49

27, 32

Senate:

Assembly:

Congress:

22, 25

41, 49

27, 32Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 74 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In the cities of Monrovia, Duarte, Irwindale,Azusa and Glendora, from Huntington Drive toRoute 57. Roadside safety improvements.4707

30190 $30

Subtotal: $5,518

2018-19 $1,270$26

$1,252

$2,768Total Project Cost: $8,286

071400003012/3/201811/1/20186/20/2017PA&ED:

RTL:R/W Cert:

5/17/2019Begin Con:

07-Los Angeles-210 PriorPriorPrior18-19

201.23544 Location(s)Performance Measure

Program Code

$220PA&ED:PS&E:

R/W Sup:

Carryover

R32.8/R44.7

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$5,488Const:R/W:

22, 25

41, 48

27, 32

Senate:

Assembly:

Congress:

22, 25

41, 48

27, 32Congress

Assembly

Senate

In Long Beach and Carson, from the Route710/405 Interchange to Route 110/405Interchange. Construct access roads, pavearound gore areas, construct MaintenanceVehicle Pullouts (MVPs), minor/patternedconcrete paving on slopes, upgrade guardrailand end treatment, vegetation managementcontrol.

5000

32180 $23

Subtotal: $2,290

2021-22 $1,500$60

$1,200

$3,200Total Project Cost: $5,490

07160000529/3/2021

7/14/20211/6/2020PA&ED:

RTL:R/W Cert:

1/7/2022Begin Con:

07-Los Angeles-405 18-1920-2120-2121-22

201.23530 Location(s)Performance Measure

Program Code

$440PA&ED:PS&E:

R/W Sup:

New

7.0/12.9

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,267Const:R/W:

33, 35

64, 70

44, 47

Senate:

Assembly:

Congress:

33, 35

64, 70

44, 47Congress

Assembly

Senate

In various cities, from 405/110 Junction to northof 405/105 Junction. Construct Maintenance Vehicle Pullouts (MVPs), access road, rockblanket at islands and between ramps andupgrade irrigation systems.

5227

33870 $29

Subtotal: $3,835

2021-22 $1,420$102

$1,311

$3,355Total Project Cost: $7,190

07170000639/1/20218/2/20218/1/2019PA&ED:

RTL:R/W Cert:

3/1/2022Begin Con:

07-Los Angeles-405 18-1920-2120-2121-22

201.23561 Location(s)Performance Measure

Program Code

$522PA&ED:PS&E:

R/W Sup:

New

12.9/R21.5

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$3,806Const:R/W:

26, 35

62, 64, 66

33, 43, 44

Senate:

Assembly:

Congress:

26, 35

62, 64, 66

33, 43, 44Congress

Assembly

Senate

In and near Lakewood, from Los AngelesCounty line to 183rd Street. ConstructMaintenance Vehicle Pullouts (MVPs), anchorassemblies for sign post sleeves, access roads,cable railing, and gates.

5229

33890 $20

Subtotal: $1,814

2021-22 $1,219$42

$926

$2,685Total Project Cost: $4,499

07170000741/26/2022

11/11/20219/11/2020PA&ED:

RTL:R/W Cert:

9/1/2022Begin Con:

07-Los Angeles-605 18-1920-2120-2121-22

201.23546 Location(s)Performance Measure

Program Code

$498PA&ED:PS&E:

R/W Sup:

New

R0.0/R4.3

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$1,794Const:R/W:

32, 34

58, 63, 70

38, 47

Senate:

Assembly:

Congress:

32, 34

58, 63, 70

38, 47Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 75 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Industry, from south of Route 60 toValley Boulevard. Roadside safetyimprovements.4713

30400

Subtotal: $2,779

2018-19 $900$60

$1,283

$2,411Total Project Cost: $5,190

07140000568/15/20187/2/20186/5/2017PA&ED:

RTL:R/W Cert:

8/1/2019Begin Con:

07-Los Angeles-605 PriorPriorPrior18-19

201.23560 Location(s)Performance Measure

Program Code

$168PA&ED:PS&E:

R/W Sup:

Carryover

R17.0/R19.5

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,779Const:R/W:

22

57

38

Senate:

Assembly:

Congress:

22

57

38Congress

Assembly

Senate

In the cities of South Gate, Bell Gardens andCommerce, from 800 feet north of RosecransAvenue to Atlantic Boulevard. ConstructMaintenance Vehicle Pullouts (MVPs), pavenarrow and gore areas, install fences/gates.

5078

33050 $10

Subtotal: $2,378

2021-22 $1,578$12

$1,253

$3,456Total Project Cost: $5,834

071600021410/1/20219/1/2021

7/15/2019PA&ED:

RTL:R/W Cert:

5/1/2022Begin Con:

07-Los Angeles-710 18-1919-2019-2021-22

201.23536 Location(s)Performance Measure

Program Code

$613PA&ED:PS&E:

R/W Sup:

New

R15.1/21.9

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,368Const:R/W:

32, 33

53, 58, 63

40, 44

Senate:

Assembly:

Congress:

32, 33

53, 58, 63

40, 44Congress

Assembly

Senate

MANDATESIn and near South El Monte, on RosemeadBoulevard (SR-164) from Gallatin Road to RushStreet. Relinquishment Financial ContributionOnly (FCO) to the county of Los Angeles.

5193

33470

Subtotal: $1,500

2018-19

Total Project Cost: $1,500

07160003455/16/20181/30/20186/27/2017PA&ED:

RTL:R/W Cert:

4/30/2018Begin Con:

07-Los Angeles-164

201.1602.6 Centerline mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

1.4/4.0

Con Sup:

Relinquishments

$1,500Const:R/W:

22, 32

57

38

Senate:

Assembly:

Congress:

22, 32

57

38Congress

Assembly

Senate

In Los Angeles and Ventura Counties, onvarious routes, at various locations. Stabilizesoil and erosion control.4913

31770 $85

Subtotal: $1,630

2019-20 $1,310$70

$772

$2,552Total Project Cost: $4,182

07150002619/30/20198/15/20197/16/2018PA&ED:

RTL:R/W Cert:

3/30/2020Begin Con:

07-Los Angeles-1 Prior18-1918-1919-20

201.335.9 Acre(s) treated/pollutantPerformance Measure

Program Code

$400PA&ED:PS&E:

R/W Sup:

Carryover

8.3/9.9

Con Sup:

Storm Water Mitigation

$1,545Const:R/W:

19, 24, 33

37, 51, 70

26, 34, 44

Senate:

Assembly:

Congress:

19, 24, 33

37, 51, 70

26, 34, 44Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 76 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In various cities, from Calle Mayor to VenturaCounty line; also on Routes 23 and 27, atvarious locations. Construct storm watertreatment Best Management Practices (BMPs).

4722

30490 $427

Subtotal: $5,167

2018-19 $1,961$62

$1,691

$4,514Total Project Cost: $9,681

07140000863/29/20192/20/20193/30/2018PA&ED:

RTL:R/W Cert:

10/31/2019Begin Con:

07-Los Angeles-1 PriorPriorPrior18-19

201.33524 Acre(s) treated/pollutantPerformance Measure

Program Code

$800PA&ED:PS&E:

R/W Sup:

Carryover

17.4/62.8

Con Sup:

Storm Water Mitigation

$4,740Const:R/W:

26, 27

50, 60, 66

33

Senate:

Assembly:

Congress:

26, 27

50, 60, 66

33Congress

Assembly

Senate

In Los Angeles County, in various cities onroutes 60, 66, 164 and 210 at various locations.Construct and install storm water treatment BestManagement Practices (BMPs).

4420

28830 $50

Subtotal: $6,840

2019-20 $2,447$95

$2,200

$5,737Total Project Cost: $12,577

070002102412/13/201911/27/20199/28/2018PA&ED:

RTL:R/W Cert:

9/30/2020Begin Con:

07-Los Angeles-2 Prior18-1918-1919-20

201.33548.4 Acre(s) treated/pollutantPerformance Measure

Program Code

$995PA&ED:PS&E:

R/W Sup:

Carryover

13.1/14.3

Con Sup:

Storm Water Mitigation

$6,790Const:R/W:

22, 24, 25

41, 48, 49,51, 57

22, 28, 38

Senate:

Assembly:

Congress:

22, 24, 25

41, 48, 49,51, 57

22, 28, 38Congress

Assembly

Senate

In the city of Los Angeles, from Bundy DriveUndercrossing to Sepulveda BoulevardUndercrossing; also on Route 405 fromOlympic Boulevard to National BoulevardUndercrossing (PM 29.1/30.8). Install irrigationsystem and plant vegetation to stabilize soil.

5091

33200 $10

Subtotal: $1,291

2021-22 $1,054$16

$1,028

$2,595Total Project Cost: $3,886

071600025411/1/20219/1/20213/1/2020PA&ED:

RTL:R/W Cert:

11/1/2022Begin Con:

07-Los Angeles-10 18-1919-2019-2021-22

201.33538.5 Acre(s) treated/pollutantPerformance Measure

Program Code

$497PA&ED:PS&E:

R/W Sup:

New

R4.5/R5.6

Con Sup:

Storm Water Mitigation

$1,281Const:R/W:

26, 30

54

37

Senate:

Assembly:

Congress:

26, 30

54

37Congress

Assembly

Senate

In the cities of Los Angeles, Alhambra, ElMonte, Monterey Park and Rosemead, fromCentral Avenue to Cogswell Road; also onRoute 405, from Cherry Avenue to SouthAlameda Street (PM 4.8/8.5). Construct stormwater treatment Best Management Practices(BMPs).

3923

26080 $480

Subtotal: $24,480

2019-20 $3,305$578

$5,500

$12,383Total Project Cost: $36,863

07120001043/12/20202/12/2020

11/30/2018PA&ED:

RTL:R/W Cert:

8/24/2020Begin Con:

07-Los Angeles-10 Prior18-1918-1919-20

201.33533 Acre(s) treated/pollutantPerformance Measure

Program Code

$3,000PA&ED:PS&E:

R/W Sup:

Carryover

16.6/30.1

Con Sup:

Storm Water Mitigation

$24,000Const:R/W:

22, 24, 33

48, 49, 51,53, 70

27, 32, 34,47

Senate:

Assembly:

Congress:

22, 24, 33

48, 49, 51,53, 70

27, 32, 34,47

Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 77 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Claremont and Pomona, from east of N.Orange Grove Avenue Undercrossing to east ofS. Indian Hill Boulevard Undercrossing; also onRoute 71, from north of 9th Street to south ofRoute 60/71 Interchange (PM 1.9/4.7).Construct permanent treatment BestManagement Practices (BMPs).

4971

31950 $94

Subtotal: $10,294

2020-21 $2,100$200

$3,400

$7,800Total Project Cost: $18,094

071600002412/1/202010/1/20207/1/2019PA&ED:

RTL:R/W Cert:

8/1/2021Begin Con:

07-Los Angeles-10 18-1919-2019-2020-21

201.33540.8 Acre(s) treated/pollutantPerformance Measure

Program Code

$2,100PA&ED:PS&E:

R/W Sup:

New

46.0/48.0

Con Sup:

Storm Water Mitigation

$10,200Const:R/W:

20

52

35

Senate:

Assembly:

Congress:

20

52

35Congress

Assembly

Senate

In and near South El Monte, Industry, HaciendaHeights, and Rowland Heights, from Peck Roadto Nogales Street. Construct and installstormwater quality Best Management Practices(BMPs).

4980

32040 $102

Subtotal: $10,270

2020-21 $2,999$28

$2,064

$6,498Total Project Cost: $16,768

07160000403/22/20211/14/20217/20/2019PA&ED:

RTL:R/W Cert:

10/10/2021Begin Con:

07-Los Angeles-60 18-1919-2020-2121-22

201.33552.5 Acre(s) treated/pollutantPerformance Measure

Program Code

$1,407PA&ED:PS&E:

R/W Sup:

New

11.0/20.0

Con Sup:

Storm Water Mitigation

$10,168Const:R/W:

22, 29, 32

55, 57

32, 38, 39

Senate:

Assembly:

Congress:

22, 29, 32

55, 57

32, 38, 39Congress

Assembly

Senate

In and near Diamond Bar, from Fullerton Roadto Diamond Bar Boulevard. Construct andinstall stormwater treatment Best ManagementPractices (BMPs) including biofiltrationswales/strips and Gross Solids Removal Devices(GSRDs).

5025

32500 $28

Subtotal: $5,243

2020-21 $2,094$27

$2,188

$5,344Total Project Cost: $10,587

07160000807/14/20206/15/20207/15/2019PA&ED:

RTL:R/W Cert:

1/14/2021Begin Con:

07-Los Angeles-60 18-1919-2019-2020-21

201.33539.4 Acre(s) treated/pollutantPerformance Measure

Program Code

$1,035PA&ED:PS&E:

R/W Sup:

New

20.0/R26.0

Con Sup:

Storm Water Mitigation

$5,215Const:R/W:

29

55, 57

32, 39

Senate:

Assembly:

Congress:

29

55, 57

32, 39Congress

Assembly

Senate

In and near Pomona, from Phillips Ranch Roadto Reservoir Street. Construct and installstormwater treatment Best ManagementPractices (BMPs) including biofiltrationswales/strips, detention basin and media filters.

5011

32330 $15

Subtotal: $6,093

2020-21 $2,865$90

$2,380

$6,535Total Project Cost: $12,628

07160000632/18/2021

12/17/20209/6/2019PA&ED:

RTL:R/W Cert:

8/15/2021Begin Con:

07-Los Angeles-60 18-1919-2019-2020-21

201.33518.5 Acre(s) treated/pollutantPerformance Measure

Program Code

$1,200PA&ED:PS&E:

R/W Sup:

New

R28.0/R30.4

Con Sup:

Storm Water Mitigation

$6,078Const:R/W:

20

52

35

Senate:

Assembly:

Congress:

20

52

35Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 78 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In the city of Los Angeles, from Routes5/10/60/101 Interchange to Figueroa Street.Plant vegetation an install supporting irrigationsystem to stabilize soil.

4977

32010 $30

Subtotal: $2,680

2021-22 $1,010$50

$1,000

$2,480Total Project Cost: $5,160

07160000309/1/2021

7/15/20211/1/2019PA&ED:

RTL:R/W Cert:

3/1/2022Begin Con:

07-Los Angeles-101 18-1919-2019-2021-22

201.33519.5 Acre(s) treated/pollutantPerformance Measure

Program Code

$420PA&ED:PS&E:

R/W Sup:

New

S0.0/1.5

Con Sup:

Storm Water Mitigation

$2,650Const:R/W:

24

51, 53

34

Senate:

Assembly:

Congress:

24

51, 53

34Congress

Assembly

Senate

In the city of Los Angeles, from BeaudryAvenue to 0.1 mile south of N. Gower Street.Stabilize soil and erosion control.4814

31140 $30

Subtotal: $4,498

2018-19 $1,200$48

$1,043

$2,601Total Project Cost: $7,099

07150000103/1/20192/1/2019

12/1/2017PA&ED:

RTL:R/W Cert:

12/31/2019Begin Con:

07-Los Angeles-101 PriorPriorPrior18-19

201.33550 Acre(s) treated/pollutantPerformance Measure

Program Code

$310PA&ED:PS&E:

R/W Sup:

Carryover

1.7/6.8

Con Sup:

Storm Water Mitigation

$4,468Const:R/W:

24

43, 51

28, 34

Senate:

Assembly:

Congress:

24

43, 51

28, 34Congress

Assembly

Senate

In Willowbrook and Lynwood, from MainStreet to Mona Boulevard. Storm watermitigation including planting of vegetation andthe installation of irrigation systems.

4908

31740 $30

Subtotal: $2,795

2018-19 $890$50

$1,250

$2,340Total Project Cost: $5,135

07150002412/1/2019

1/15/20198/2/2017PA&ED:

RTL:R/W Cert:

8/14/2019Begin Con:

07-Los Angeles-105 PriorPriorPrior18-19

201.33517.5 Acre(s) treated/pollutantPerformance Measure

Program Code

$150PA&ED:PS&E:

R/W Sup:

Carryover

R7.8/R10.3

Con Sup:

Storm Water Mitigation

$2,765Const:R/W:

30, 33, 35

63, 64

43, 44

Senate:

Assembly:

Congress:

30, 33, 35

63, 64

43, 44Congress

Assembly

Senate

In the cities of Los Angeles and Carson, from LStreet to 223rd Street. Construct storm watertreatment Best Management Practices.4174

27610 $65

Subtotal: $9,965

2018-19 $1,568$300

$1,900

$4,708Total Project Cost: $14,673

07000005253/29/20193/1/2019

3/15/2018PA&ED:

RTL:R/W Cert:

6/25/2019Begin Con:

07-Los Angeles-110 PriorPriorPrior18-19

201.33529.6 Acre(s) treated/pollutantPerformance Measure

Program Code

$940PA&ED:PS&E:

R/W Sup:

Carryover

3.8/6.5

Con Sup:

Storm Water Mitigation

$9,900Const:R/W:

35

64, 66

43, 44

Senate:

Assembly:

Congress:

35

64, 66

43, 44Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 79 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In the city of Los Angeles, from 120th Street to3rd Street at various locations. Construct grosssolid removal devices, biofiltration devices anddetention basin.

3279

23830 $10

Subtotal: $11,010

2018-19 $1,855$30

$2,234

$4,859Total Project Cost: $15,869

07140000812/1/2019

12/31/20183/15/2018PA&ED:

RTL:R/W Cert:

8/30/2019Begin Con:

07-Los Angeles-110 PriorPriorPrior18-19

201.33530.8 Acre(s) treated/pollutantPerformance Measure

Program Code

$740PA&ED:PS&E:

R/W Sup:

Carryover

13.4/23.1

Con Sup:

Storm Water Mitigation

$11,000Const:R/W:

24, 30, 35

53, 59, 64

34, 37, 40,43

Senate:

Assembly:

Congress:

24, 30, 35

53, 59, 64

34, 37, 40,43

Congress

Assembly

Senate

In the cities of Granada Hills and Porter Ranch,from Topango Canyon Boulevard to Sepulveda Boulevard. Construct and install stormwatertreatment Best Management Practices (BMPs)including biofiltration swales/strips, detentionbasin, media filters and a Gross Solids RemovalDevices (GSRDs).

5027

32530 $55

Subtotal: $8,000

2020-21 $3,300$170

$3,300

$8,370Total Project Cost: $16,370

07160000832/18/2021

12/17/20207/1/2019PA&ED:

RTL:R/W Cert:

9/1/2021Begin Con:

07-Los Angeles-118 18-1919-2019-2020-21

201.33525.3 Acre(s) treated/pollutantPerformance Measure

Program Code

$1,600PA&ED:PS&E:

R/W Sup:

New

R1.5/R10.2

Con Sup:

Storm Water Mitigation

$7,945Const:R/W:

18, 27

38, 39

25, 29, 30

Senate:

Assembly:

Congress:

18, 27

38, 39

25, 29, 30Congress

Assembly

Senate

In the city of Los Angeles, from Arleta Avenueto Route 210. Construct stormwater treatmentBest Management Practices (BMPs).5001

32200 $300

Subtotal: $12,050

2021-22 $4,000$250

$3,500

$9,750Total Project Cost: $21,800

071600005312/10/202110/15/2021

7/1/2020PA&ED:

RTL:R/W Cert:

6/24/2022Begin Con:

07-Los Angeles-118 18-1920-2120-2121-22

201.33520 Acre(s) treated/pollutantPerformance Measure

Program Code

$2,000PA&ED:PS&E:

R/W Sup:

New

R11.0/R14.0

Con Sup:

Storm Water Mitigation

$11,750Const:R/W:

18, 25

39

28, 29

Senate:

Assembly:

Congress:

18, 25

39

28, 29Congress

Assembly

Senate

In and near Burbank, from Bob Hope Drive toVictory Boulevard/Riverside Drive. Stabilizesoil and erosion control.4816

31160 $30

Subtotal: $2,348

2019-20 $1,050$48

$1,100

$2,318Total Project Cost: $4,666

071500001111/1/201910/1/20192/1/2018PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

07-Los Angeles-134 PriorPriorPrior19-20

201.33512.5 Acre(s) treated/pollutantPerformance Measure

Program Code

$120PA&ED:PS&E:

R/W Sup:

Carryover

2.6/4.8

Con Sup:

Storm Water Mitigation

$2,318Const:R/W:

25

43

28

Senate:

Assembly:

Congress:

25

43

28Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 80 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Sylmar, San Fernando and Sunland, fromRoute 5 to Wheatland Avenue. Construct stormwater treatment Best Management Practices(BMPs) to reduce Trash Total Maximum DailyLoad (TMDL).

3884

25940 $106

Subtotal: $15,106

2018-19 $3,600$100

$3,000

$7,400Total Project Cost: $22,506

07140001043/28/20192/15/20193/15/2018PA&ED:

RTL:R/W Cert:

1/6/2020Begin Con:

07-Los Angeles-210 PriorPriorPrior18-19

201.33533 Acre(s) treated/pollutantPerformance Measure

Program Code

$700PA&ED:PS&E:

R/W Sup:

Carryover

R0.0/R9.7

Con Sup:

Storm Water Mitigation

$15,000Const:R/W:

18, 25

39, 43

28, 29

Senate:

Assembly:

Congress:

18, 25

39, 43

28, 29Congress

Assembly

Senate

In the cities of Monrovia, Duarte, Irwindale andAzusa, from Myrtle Avenue to Azusa Avenue. Stabilize soil and erosion control.4705

30170 $30

Subtotal: $3,692

2019-20 $1,175$30

$1,054

$2,403Total Project Cost: $6,095

071400003310/1/20199/16/20193/1/2018PA&ED:

RTL:R/W Cert:

4/6/2020Begin Con:

07-Los Angeles-210 PriorPriorPrior19-20

201.33518.3 Acre(s) treated/pollutantPerformance Measure

Program Code

$144PA&ED:PS&E:

R/W Sup:

Carryover

R33.7/R39.8

Con Sup:

Storm Water Mitigation

$3,662Const:R/W:

22, 25

41, 48

32

Senate:

Assembly:

Congress:

22, 25

41, 48

32Congress

Assembly

Senate

In and near Azusa, from 0.1 mile east ofHighland Avenue Undercrossing to S. CitrusAvenue Overcrossing. Construct and installstormwater treatment Best ManagementPractices (BMPs) including biofiltration swalesand Austin Vault Sand Filters.

5009

32310 $37

Subtotal: $10,082

2021-22 $2,836$189

$3,098

$8,013Total Project Cost: $18,095

07160000619/30/20218/5/2021

12/30/2019PA&ED:

RTL:R/W Cert:

4/15/2022Begin Con:

07-Los Angeles-210 18-1919-2019-2021-22

201.33540 Acre(s) treated/pollutantPerformance Measure

Program Code

$1,890PA&ED:PS&E:

R/W Sup:

New

R36.0/R40.6

Con Sup:

Storm Water Mitigation

$10,045Const:R/W:

22, 25

48

32

Senate:

Assembly:

Congress:

22, 25

48

32Congress

Assembly

Senate

In Glendora, at various locations from 0.2 mileeast of S. Barranca Avenue Overcrossing to 0.1mile west of Amelia Avenue Undercrossing.Construct and install various stormwatertreatment Best Management Practices (BMPs)including biofiltration swales/strips/trenches,infiltration basins and vault sand filters.

5005

32260 $61

Subtotal: $7,210

2021-22 $2,729$242

$2,730

$7,276Total Project Cost: $14,486

071600005710/29/2021

9/6/20211/30/2020PA&ED:

RTL:R/W Cert:

5/16/2022Begin Con:

07-Los Angeles-210 18-1919-2019-2021-22

201.33542.2 Acre(s) treated/pollutantPerformance Measure

Program Code

$1,575PA&ED:PS&E:

R/W Sup:

New

R41.3/R44.6

Con Sup:

Storm Water Mitigation

$7,149Const:R/W:

25

48

27, 32

Senate:

Assembly:

Congress:

25

48

27, 32Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 81 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near La Verne, at various locations from0.4 mile east of S Lone Hill AvenueUndercrossing to 0.2 mile west of Base LineRoad Overcrossing. Construct stormwatertreatment Best Management Practices (BMPs)including Gross Solids Removal Devices(GSRDs), biofiltration swales/strips andinfiltration trenches.

5068

32850 $69

Subtotal: $7,559

2021-22 $2,601$160

$2,800

$7,461Total Project Cost: $15,020

07160001788/30/20217/5/2021

11/29/2019PA&ED:

RTL:R/W Cert:

3/15/2022Begin Con:

07-Los Angeles-210 18-1919-2019-2021-22

201.33543.5 Acre(s) treated/pollutantPerformance Measure

Program Code

$1,900PA&ED:PS&E:

R/W Sup:

New

R44.7/R52.1

Con Sup:

Storm Water Mitigation

$7,490Const:R/W:

25

41, 48

27, 32

Senate:

Assembly:

Congress:

25

41, 48

27, 32Congress

Assembly

Senate

In the cities of Los Angeles, Van Nuys, and SanFernando, from Burbank Boulevard to Route5/405 Separation. Plant vegetation, installirrigation, concrete paving, rock blankets andmats.

4978

32020 $30

Subtotal: $3,930

2020-21 $1,590$30

$1,122

$3,352Total Project Cost: $7,282

07160000311/15/2021

11/30/20207/30/2019PA&ED:

RTL:R/W Cert:

8/15/2021Begin Con:

07-Los Angeles-405 18-1919-2020-2120-21

201.33541 Acre(s) treated/pollutantPerformance Measure

Program Code

$610PA&ED:PS&E:

R/W Sup:

New

40.1/48.6

Con Sup:

Storm Water Mitigation

$3,900Const:R/W:

18, 27

38, 39, 45,46

29, 30

Senate:

Assembly:

Congress:

18, 27

38, 39, 45,46

29, 30Congress

Assembly

Senate

In the cities of Los Alamitos, Cerritos,Lakewood, Bellflower and Norwalk, fromOrange County line to Route 5. Constructstormwater treatment Best ManagementPractices (BMPs) including biofiltrationswales/strips, detention basin, MaintenanceVehicle Pullouts (MVPs) and install infiltrationdevices.

4997

32150 $20

Subtotal: $15,070

2021-22 $3,255$25

$3,556

$8,286Total Project Cost: $23,356

07160000481/31/2022

12/30/20219/1/2020PA&ED:

RTL:R/W Cert:

8/31/2022Begin Con:

07-Los Angeles-605 18-1920-2120-2121-22

201.33570.6 Acre(s) treated/pollutantPerformance Measure

Program Code

$1,450PA&ED:PS&E:

R/W Sup:

New

R0.0/R9.6

Con Sup:

Storm Water Mitigation

$15,050Const:R/W:

32, 34

57, 58, 63,70

38, 40, 47

Senate:

Assembly:

Congress:

32, 34

57, 58, 63,70

38, 40, 47Congress

Assembly

Senate

In and near Santa Fe Springs, from Santa AnaFreeway Undercrossing to 0.1 mile north ofRose Hills Road Overcrossing. Installstormwater treatment Best ManagementPractices (BMPs).

5212

33610 $72

Subtotal: $8,705

2021-22 $3,402$202

$2,969

$8,166Total Project Cost: $16,871

071600039311/30/202110/5/20212/27/2020PA&ED:

RTL:R/W Cert:

6/15/2022Begin Con:

07-Los Angeles-605 18-1919-2019-2021-22

201.33539.9 Acre(s) treated/pollutantPerformance Measure

Program Code

$1,593PA&ED:PS&E:

R/W Sup:

New

R9.6/R15.7

Con Sup:

Storm Water Mitigation

$8,633Const:R/W:

22, 32

57, 58

32, 38

Senate:

Assembly:

Congress:

22, 32

57, 58

32, 38Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 82 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near El Monte, at various locations, from 0.1mile south of Peck Road Overcrossing to 0.1mile north of Valley Boulevard Undercrossing.Construct and install stormwater treatment BestManagement Practices (BMPs) includingbiofiltration swales/strips, linear radial GrossSolids Removal Devices (GSRDs), infiltrationbasins and an Austin Vault Sand Filter.

5234

33930 $96

Subtotal: $12,997

2021-22 $4,550$202

$3,320

$9,572Total Project Cost: $22,569

071700014312/30/202111/5/20213/30/2020PA&ED:

RTL:R/W Cert:

8/15/2022Begin Con:

07-Los Angeles-605 18-1919-2019-2021-22

201.33554.8 Acre(s) treated/pollutantPerformance Measure

Program Code

$1,500PA&ED:PS&E:

R/W Sup:

New

R16.5/R19.5

Con Sup:

Storm Water Mitigation

$12,901Const:R/W:

22, 32

48, 57

32, 38

Senate:

Assembly:

Congress:

22, 32

48, 57

32, 38Congress

Assembly

Senate

Near El Monte, from 0.2 mile south of Route 10to 0.2 mile north of Route 210. Construct andinstall stormwater treatment Best ManagementPractices (BMPs) including biofiltrationswales/strips, Gross Solids Removal Devices(GSRDs) and a Design Pollution PreventionInfiltration Area.

5236

33940 $89

Subtotal: $15,276

2021-22 $3,971$237

$4,308

$10,092Total Project Cost: $25,368

07170001441/31/202212/6/20214/30/2020PA&ED:

RTL:R/W Cert:

8/15/2022Begin Con:

07-Los Angeles-605 18-1919-2019-2021-22

201.33552.2 Acre(s) treated/pollutantPerformance Measure

Program Code

$1,576PA&ED:PS&E:

R/W Sup:

New

R20.0/R26.0

Con Sup:

Storm Water Mitigation

$15,187Const:R/W:

22

48

32

Senate:

Assembly:

Congress:

22

48

32Congress

Assembly

Senate

In East Los Angeles, from Route 5 to north ofFloral Drive; also on Route 60 (PM R2.9/R3.8),from west of Marina Avenue PedestrianOvercrossing to Mednick Avenue. Stabilize soiland erosion control.

4717

30440 $30

Subtotal: $3,455

2018-19 $910$63

$1,138

$2,165Total Project Cost: $5,620

07140000618/1/20187/9/2018

6/30/2017PA&ED:

RTL:R/W Cert:

2/8/2019Begin Con:

07-Los Angeles-710 PriorPriorPrior18-19

201.33546.4 Acre(s) treated/pollutantPerformance Measure

Program Code

$54PA&ED:PS&E:

R/W Sup:

Carryover

23.3/25.6

Con Sup:

Storm Water Mitigation

$3,425Const:R/W:

24

51

40

Senate:

Assembly:

Congress:

24

51

40Congress

Assembly

Senate

In the city of Los Angeles, from 3rd Street toRoute 10 Interchange. Install irrigation systemsand plant vegetation to stabilize soil.5089

33180 $16

Subtotal: $3,436

2021-22 $1,250$50

$1,250

$3,150Total Project Cost: $6,586

071600025211/23/20219/21/20215/12/2020PA&ED:

RTL:R/W Cert:

5/6/2022Begin Con:

07-Los Angeles-710 18-1920-2120-2121-22

201.33534.2 Acre(s) treated/pollutantPerformance Measure

Program Code

$600PA&ED:PS&E:

R/W Sup:

New

24.4/26.7

Con Sup:

Storm Water Mitigation

$3,420Const:R/W:

22, 24, 32

49, 51, 58

27, 40

Senate:

Assembly:

Congress:

22, 24, 32

49, 51, 58

27, 40Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 83 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In La Verne and Pomona, from Baseline Roadto Towne Avenue. Construct and upgrade curbramps and sidewalks to comply with Americanswith Disabilities Act (ADA) Standards.

4744

30650 $700

Subtotal: $3,600

2018-19 $2,500$300

$2,000

$5,553Total Project Cost: $9,153

07140001774/12/20193/12/20197/2/2018PA&ED:

RTL:R/W Cert:

9/24/2019Begin Con:

07-Los Angeles-66 PriorPriorPrior18-19

201.36167 Curb ramp(s)Performance Measure

Program Code

$753PA&ED:PS&E:

R/W Sup:

Carryover

0.0/3.2

Con Sup:

Americans with Disabilities Act New Curb Ramps

$2,900Const:R/W:

20, 25

41, 52

27, 32

Senate:

Assembly:

Congress:

20, 25

41, 52

27, 32Congress

Assembly

Senate

In Whittier, from Valley Home Avenue toEsperanza Avenue. Construct and upgrade curbramps, sidewalks, driveways, pedestrian pathways, Class III bikeway lanes, AccessiblePedestrian Signals (APS) and push buttons tomeet current Americans with Disabilities Act(ADA) Standards.

5158

33310 $1,000

Subtotal: $6,781

2021-22 $4,000$4,600$2,200

$11,700Total Project Cost: $18,481

07160002993/17/20223/2/2022

2/28/2020PA&ED:

RTL:R/W Cert:

11/7/2022Begin Con:

07-Los Angeles-72 18-1920-2120-2121-22

201.361170 Curb ramp(s)Performance Measure

Program Code

$900PA&ED:PS&E:

R/W Sup:

New

0.0/6.8

Con Sup:

Americans with Disabilities Act New Curb Ramps

$5,781Const:R/W:

32

57

38

Senate:

Assembly:

Congress:

32

57

38Congress

Assembly

Senate

In Torrance, from Route 1 to Redondo BeachBoulevard. Construct curb ramps and reconstruct driveways/sidewalks to meetAmericans with Disabilities Act (ADA)Standards.

4749

30700 $1,055

Subtotal: $5,601

2018-19 $2,553$1,223$2,508

$7,245Total Project Cost: $12,846

07140001983/19/20192/15/20192/8/2018PA&ED:

RTL:R/W Cert:

10/1/2019Begin Con:

07-Los Angeles-107 PriorPriorPrior18-19

201.361107 Curb ramp(s)Performance Measure

Program Code

$961PA&ED:PS&E:

R/W Sup:

Carryover

0.0/4.8

Con Sup:

Americans with Disabilities Act New Curb Ramps

$4,546Const:R/W:

26, 35

62, 66

33, 43

Senate:

Assembly:

Congress:

26, 35

62, 66

33, 43Congress

Assembly

Senate

In Palmdale, from Route 14 Junction (South) toAvenue T. Upgrade curb ramps, traffic signalsand sidewalks to meet current standards.5185

33370 $703

Subtotal: $9,088

2021-22 $3,795$1,401$3,225

$9,116Total Project Cost: $18,204

07160003162/18/2022

12/20/202112/20/2019PA&ED:

RTL:R/W Cert:

10/4/2022Begin Con:

07-Los Angeles-138 18-1919-2019-2021-22

201.36166 Curb ramp(s)Performance Measure

Program Code

$695PA&ED:PS&E:

R/W Sup:

New

43.4/51.4

Con Sup:

Americans with Disabilities Act New Curb Ramps

$8,385Const:R/W:

21

36

25

Senate:

Assembly:

Congress:

21

36

25Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 84 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In the cities of Wittier, South Monte andRosemead, from Gallatin Road to RudellUnderpass. Upgrade curb ramps, sidewalks andpathways to meet current Americans with Disabilities Act (ADA) Standards.

4982

32080 $952

Subtotal: $6,755

2021-22 $3,150$916

$2,714

$7,814Total Project Cost: $14,569

071600004210/28/20219/29/20219/25/2019PA&ED:

RTL:R/W Cert:

4/25/2022Begin Con:

07-Los Angeles-164 18-1919-2020-2121-22

201.36176 Curb ramp(s)Performance Measure

Program Code

$1,034PA&ED:PS&E:

R/W Sup:

New

1.4/6.9

Con Sup:

Americans with Disabilities Act New Curb Ramps

$5,803Const:R/W:

22, 32

49, 57

27, 32, 38

Senate:

Assembly:

Congress:

22, 32

49, 57

27, 32, 38Congress

Assembly

Senate

In La Crescenta and La Canada Flintridge, fromwest of Sunland Boulevard to Baseline Road,near the San Bernardino County line.Reconstruct curb ramps to meet Americans withDisabilities Act (ADA) Standards, installAccessible Pedestrian Signals (APS), relocatepull boxes and traffic signal poles.

4985

32680 $4,098

Subtotal: $8,578

2021-22 $7,000$2,450$7,000

$17,850Total Project Cost: $26,428

07160001198/30/20217/30/202112/1/2019PA&ED:

RTL:R/W Cert:

3/1/2022Begin Con:

07-Los Angeles-210 18-1921-2221-2221-22

201.361264 Curb ramp(s)Performance Measure

Program Code

$1,400PA&ED:PS&E:

R/W Sup:

New

R9.7/R51.9

Con Sup:

Americans with Disabilities Act New Curb Ramps

$4,480Const:R/W:

22, 25

39, 41, 43,48, 49

27, 28, 32

Senate:

Assembly:

Congress:

22, 25

39, 41, 43,48, 49

27, 28, 32Congress

Assembly

Senate

In the cities of Rancho Palos Verdes, Lomitaand Los Angeles, from W 25th Street to WCarson Street at various locations. Upgrade curbramps, sidewalks and driveways to meetAmericans with Disabilities Act (ADA)Standards.

4743

30660 $2,300

Subtotal: $6,800

2018-19 $3,500$750

$3,500

$8,837Total Project Cost: $15,637

07140001783/8/2019

2/15/20197/2/2018PA&ED:

RTL:R/W Cert:

9/20/2019Begin Con:

07-Los Angeles-213 PriorPriorPrior18-19

201.361188 Curb ramp(s)Performance Measure

Program Code

$1,087PA&ED:PS&E:

R/W Sup:

Carryover

0.0/8.0

Con Sup:

Americans with Disabilities Act New Curb Ramps

$4,500Const:R/W:

26, 35

66, 70

33, 43

Senate:

Assembly:

Congress:

26, 35

66, 70

33, 43Congress

Assembly

Senate

BRIDGE PRESERVATIONIn Malibu, from Guernsey Avenue to TrancasCanyon Road/Broad Beach Road. Replace bridge.4498

29140 $30,000

Subtotal: $41,628

2018-19 $2,123$740

$3,100

$8,305Total Project Cost: $49,933

07120000946/28/2019

10/15/20186/30/2017PA&ED:

RTL:R/W Cert:

1/15/2020Begin Con:

07-Los Angeles-1 PriorPriorPrior18-19

201.1101 Bridge(s)Performance Measure

Program Code

$2,342PA&ED:PS&E:

R/W Sup:

Carryover

56.5/56.9

Con Sup:

Bridge Major Rehabilitation

$11,628Const:R/W:

27

50

33

Senate:

Assembly:

Congress:

27

50

33Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 85 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In El Monte, at Rio Hondo Busway Bridge No.53-2637. Replace bridge deck.

4902

31680 $15

Subtotal: $2,568

2019-20 $1,346$27

$1,627

$3,550Total Project Cost: $6,118

071500022012/30/201911/27/20199/28/2018PA&ED:

RTL:R/W Cert:

7/10/2020Begin Con:

07-Los Angeles-10S Prior18-1918-1919-20

201.1101 Bridge(s)Performance Measure

Program Code

$550PA&ED:PS&E:

R/W Sup:

Carryover

28.3

Con Sup:

Bridge Major Rehabilitation

$2,553Const:R/W:

22

48

32

Senate:

Assembly:

Congress:

22

48

32Congress

Assembly

Senate

In Long Beach, at the eastbound Route 91 tonorthbound Route 710 Connector Bridge No. 53-2241G over connector from northbound Route710 to eastbound Route 91. Lower profile ofconnector to achieve standard vertical clearance

4967

31910 $40

Subtotal: $3,270

2020-21 $2,468$43

$2,073

$5,494Total Project Cost: $8,764

07160000173/15/20212/15/2021

10/15/2019PA&ED:

RTL:R/W Cert:

4/15/2022Begin Con:

07-Los Angeles-91 18-1919-2019-2020-21

201.1101 Bridge(s)Performance Measure

Program Code

$910PA&ED:PS&E:

R/W Sup:

New

R11.8

Con Sup:

Bridge Major Rehabilitation

$3,230Const:R/W:

35

64

44

Senate:

Assembly:

Congress:

35

64

44Congress

Assembly

Senate

Near Encino, at Encino PedestrianOvercrossing. Replace pedestrian overcrossing.

4915

31790 $1,067

Subtotal: $7,752

2018-19 $3,205$500

$1,361

$6,099Total Project Cost: $13,851

07150002773/21/20192/21/20193/26/2018PA&ED:

RTL:R/W Cert:

9/19/2019Begin Con:

07-Los Angeles-101 PriorPriorPrior18-19

201.1101 Bridge(s)Performance Measure

Program Code

$1,033PA&ED:PS&E:

R/W Sup:

Carryover

20.0

Con Sup:

Bridge Major Rehabilitation

$6,685Const:R/W:

27

45

30

Senate:

Assembly:

Congress:

27

45

30Congress

Assembly

Senate

In the city of Los Angeles, at the Union PacificOverhead No. 53-2626. Replace the bridgedeck with composite reinforced concrete.5004

32250 $1,730

Subtotal: $14,208

2021-22 $3,482$376

$4,228

$8,755Total Project Cost: $22,963

07160000561/30/2022

12/31/202111/12/2019PA&ED:

RTL:R/W Cert:

8/28/2022Begin Con:

07-Los Angeles-103 18-1919-2018-1921-22

201.1101 Bridge(s)Performance Measure

Program Code

$669PA&ED:PS&E:

R/W Sup:

New

0.1

Con Sup:

Bridge Major Rehabilitation

$12,478Const:R/W:

35

70

44

Senate:

Assembly:

Congress:

35

70

44Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 86 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Irwindale, on the San Gabriel River BridgeNo. 53-1867. Reconstruct hinge diaphragms athinge 4 and hinge 6, upgrade bridge railing andreinstall electroliers.

5026

32520 $596

Subtotal: $19,293

2020-21 $3,665$444

$4,244

$9,414Total Project Cost: $28,707

07160000821/6/2021

11/6/202010/4/2019PA&ED:

RTL:R/W Cert:

10/28/2021Begin Con:

07-Los Angeles-210 18-1919-2019-2020-21

201.1101 Bridge(s)Performance Measure

Program Code

$1,061PA&ED:PS&E:

R/W Sup:

New

R36.8

Con Sup:

Bridge Major Rehabilitation

$18,697Const:R/W:

22, 25

48

32

Senate:

Assembly:

Congress:

22, 25

48

32Congress

Assembly

Senate

Near Azusa, at the North Fork San GabrielRiver Bridge No. 53-2245. Replace bridge.

5298

34340 $10

Subtotal: $11,752

2018-19 $1,930$20

$4,476

$6,426Total Project Cost: $18,178

071800001811/1/20189/3/2018

9/20/2017PA&ED:

RTL:R/W Cert:

8/1/2019Begin Con:

07-Los Angeles-3918-1918-1918-19

201.1111 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R31.2

Con Sup:

Bridge Scour Mitigation

$11,742Const:R/W:

25

41

27

Senate:

Assembly:

Congress:

25

41

27Congress

Assembly

Senate

In Long Beach, at the San Gabriel River BridgeNo. 53-1185 and SB LA-605 to NB I-405connector Bridge No. 53-1737H; also in OrangeCounty on I-405 at the SB 405 to NB 605connector Bridge No. 55-0413F; 12-Ora-405-PM 24.1. Retrofit scour critical bridges topreserve the structural integrity of the bridgesby enlarging and deepening pile cap, addingCast in Drilled Hole (CIDH) piles andreinforcing the area with Rock Slope Protection(RSP).

4984

32100 $254

Subtotal: $16,085

2021-22 $6,840$300

$5,840

$15,120Total Project Cost: $31,205

07160000443/20/20222/16/20229/15/2019PA&ED:

RTL:R/W Cert:

11/4/2022Begin Con:

07-Los Angeles-405 Prior19-2019-2021-22

201.1113 Bridge(s)Performance Measure

Program Code

$2,140PA&ED:PS&E:

R/W Sup:

Carryover

0.0

Con Sup:

Bridge Scour Mitigation

$15,831Const:R/W:

34

70

47

Senate:

Assembly:

Congress:

34

70

47Congress

Assembly

Senate

In the city of Los Angeles, at the 5th StreetOvercrossing No. 53-0685 and 6th StreetOvercrossing No. 53-0746. Upgrade bridgerailing.

5002

32230 $30

Subtotal: $3,550

2020-21 $1,673$30

$1,632

$3,800Total Project Cost: $7,350

07160000548/26/20207/15/20202/21/2019PA&ED:

RTL:R/W Cert:

4/1/2021Begin Con:

07-Los Angeles-110 18-1919-2019-2020-21

201.1121565.0 Linear feetPerformance Measure

Program Code

$465PA&ED:PS&E:

R/W Sup:

New

22.8

Con Sup:

Bridge Rail Replacement and Upgrade

$3,520Const:R/W:

24

53

34

Senate:

Assembly:

Congress:

24

53

34Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 87 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Pasadena, at the Arroyo Seco Bridge No. 53-0166. Replace/upgrade bridge railing.

5003

32240 $2,530

Subtotal: $7,950

2021-22 $2,500$200

$2,860

$6,860Total Project Cost: $14,810

071600005512/30/20217/15/20219/20/2019PA&ED:

RTL:R/W Cert:

2/26/2022Begin Con:

07-Los Angeles-134 18-1921-2221-2221-22

201.1123434.0 Linear feetPerformance Measure

Program Code

$1,300PA&ED:PS&E:

R/W Sup:

New

R12.6

Con Sup:

Bridge Rail Replacement and Upgrade

$5,420Const:R/W:

25

41

28

Senate:

Assembly:

Congress:

25

41

28Congress

Assembly

Senate

Near Kern County line, at the Tejon PassOvercrossing No. 53-1779. Seismic retrofit ofbridge, widen bridge abutments, add steel casingto bent columns, retrofit bent foundation and install micro piles.

5032

32590 $50

Subtotal: $1,850

2021-22 $1,500$400

$1,500

$4,100Total Project Cost: $5,950

07160000917/15/20216/15/202110/1/2019PA&ED:

RTL:R/W Cert:

1/5/2022Begin Con:

07-Los Angeles-5 18-1920-2120-2121-22

201.1131 Bridge(s)Performance Measure

Program Code

$700PA&ED:PS&E:

R/W Sup:

New

R87.4

Con Sup:

Bridge Seismic Restoration

$1,800Const:R/W:

21

36

25

Senate:

Assembly:

Congress:

21

36

25Congress

Assembly

Senate

In Compton, at Compton Creek BridgeOverhead and offramp No. 53-2235 and No. 53-2237S and Artesia-Santa Fe Undercrossing No.53-2238K; also in Long Beach, on Routes 710and 110, at Harbor Scenic Drive Overhead No.53-2934 (PM 6.0) and Gaffy Street Bridge No.53-0397Y (PM R0.8). Bridge seismic retrofitand bridge rail upgrade.

4704

30160 $50

Subtotal: $10,762

2019-20 $3,500$150

$3,500

$9,410Total Project Cost: $20,172

07140000243/30/20202/28/20208/30/2018PA&ED:

RTL:R/W Cert:

12/30/2020Begin Con:

07-Los Angeles-91 Prior18-1918-1919-20

201.1135 Bridge(s)Performance Measure

Program Code

$2,260PA&ED:PS&E:

R/W Sup:

Carryover

R10.2/R10.4

Con Sup:

Bridge Seismic Restoration

$10,712Const:R/W:

33, 35

64, 70

44, 47

Senate:

Assembly:

Congress:

33, 35

64, 70

44, 47Congress

Assembly

Senate

In Pasadena, at Orange Grove Boulevard-E134/134 Overcrossing No. 53-2269S; also onRoute 710, at Union Street Overcrossing No. 53-2537 (PM R32.5). Bridge seismic retrofit andbridge rail upgrade.

4591

29180 $20

Subtotal: $5,380

2018-19 $2,400$63

$2,000

$4,463Total Project Cost: $9,843

071200009611/2/20187/31/20187/3/2017PA&ED:

RTL:R/W Cert:

12/27/2019Begin Con:

07-Los Angeles-134PriorPrior18-19

201.1132 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R13.1

Con Sup:

Bridge Seismic Restoration

$5,360Const:R/W:

25

41

27

Senate:

Assembly:

Congress:

25

41

27Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 88 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Palmdale, Azusa and Pomona, at theCalifornia Aqueduct Bridge No. 53-2174; alsoon Route 39, at the San Gabriel River BridgeNo. 53-0113 (PM 17.81) and Route 71 at theRidgeway Street Undercrossing Bridge No. 53-2052 (PM R0.92). Seismic retrofit, barrierreplacement, paint San Gabriel River Bridge.

5035

32620 $101

Subtotal: $19,430

2021-22 $4,549$488

$5,686

$12,095Total Project Cost: $31,525

071600011310/3/20218/7/20218/1/2019PA&ED:

RTL:R/W Cert:

6/10/2022Begin Con:

07-Los Angeles-138 18-1919-2019-2021-22

201.1133 Bridge(s)Performance Measure

Program Code

$1,372PA&ED:PS&E:

R/W Sup:

New

70.3

Con Sup:

Bridge Seismic Restoration

$19,329Const:R/W:

22

48

32

Senate:

Assembly:

Congress:

22

48

32Congress

Assembly

Senate

In Los Angeles County, on Routes 210, 405 and605 at various locations. Bridge seismic retrofitand bridge rail upgrade at five locations.4788

30930 $130

Subtotal: $6,525

2019-20 $1,137$20

$1,600

$2,982Total Project Cost: $9,507

071400028111/19/20198/30/20199/22/2017PA&ED:

RTL:R/W Cert:

4/10/2020Begin Con:

07-Los Angeles-210 PriorPriorPrior19-20

201.1135 Bridge(s)Performance Measure

Program Code

$225PA&ED:PS&E:

R/W Sup:

Carryover

R38.6/R38.9

Con Sup:

Bridge Seismic Restoration

$6,395Const:R/W:

22, 26

48, 50

32, 33

Senate:

Assembly:

Congress:

22, 26

48, 50

32, 33Congress

Assembly

Senate

In the city of Los Angeles, at WilmingtonOverhead No. 53-0352. Paint and repair bridgedeck.4729

30560 $245

Subtotal: $4,128

2019-20 $1,237$203$826

$2,571Total Project Cost: $6,699

07140001023/24/20202/14/20207/11/2018PA&ED:

RTL:R/W Cert:

5/4/2020Begin Con:

07-Los Angeles-1 Prior18-1918-1919-20

201.1191 Bridge(s)Performance Measure

Program Code

$305PA&ED:PS&E:

R/W Sup:

Carryover

9.9

Con Sup:

Bridge Preventative Maintenance

$3,883Const:R/W:

35

64

44

Senate:

Assembly:

Congress:

35

64

44Congress

Assembly

Senate

In the city of Los Angeles, at Sun ValleyOverhead No. 53-1134. Paint bridge and replacedeck drain systems.4853

31420 $49

Subtotal: $7,249

2019-20 $1,200$200

$1,800

$3,700Total Project Cost: $10,949

07150001168/20/20197/10/2019

10/31/2017PA&ED:

RTL:R/W Cert:

1/17/2020Begin Con:

07-Los Angeles-5 PriorPriorPrior19-20

201.1191 Bridge(s)Performance Measure

Program Code

$500PA&ED:PS&E:

R/W Sup:

Carryover

34.6

Con Sup:

Bridge Preventative Maintenance

$7,200Const:R/W:

18

39

29

Senate:

Assembly:

Congress:

18

39

29Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 89 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In the city of El Monte, from Baldwin AvenueOvercrossing to Route 605 at Rio Hondo BridgeNo. 53-657, East El Monte Overhead No. 53-0867 and San Gabriel River Bridge No. 53-109L/R. Replace overhang joints with reinforced concrete closure pours.

5067

32830 $1,262

Subtotal: $9,402

2021-22 $3,927$915

$3,526

$9,181Total Project Cost: $18,583

07160001752/1/20221/3/2022

10/1/2019PA&ED:

RTL:R/W Cert:

9/25/2022Begin Con:

07-Los Angeles-10 18-1919-2019-2021-22

201.1193 Bridge(s)Performance Measure

Program Code

$813PA&ED:PS&E:

R/W Sup:

New

28.2/31.0

Con Sup:

Bridge Preventative Maintenance

$8,140Const:R/W:

22

48, 49

32

Senate:

Assembly:

Congress:

22

48, 49

32Congress

Assembly

Senate

In El Monte, at Peck Road Undercrossing No.53-0661. Paint steel portion of bridge forpreventative maintenance to preserve and extendthe life of bridge.

5070

32870 $10

Subtotal: $1,642

2021-22 $550$25

$522

$1,238Total Project Cost: $2,880

07160001822/17/20221/12/20226/1/2019PA&ED:

RTL:R/W Cert:

9/23/2022Begin Con:

07-Los Angeles-10 Prior19-2019-2021-22

201.1191 Bridge(s)Performance Measure

Program Code

$141PA&ED:PS&E:

R/W Sup:

Carryover

29.4

Con Sup:

Bridge Preventative Maintenance

$1,632Const:R/W:

22

48

32

Senate:

Assembly:

Congress:

22

48

32Congress

Assembly

Senate

In the city of South Gate, at ParamountBoulevard Overcrossing No. 53-2425; also inthe city of Downey, at Ardis Avenue Overcrossing No. 53-2572. Remove and installnew joint assemblies, apply waterproof coating,replace joint seals and apply methacrylate toArdis Avenue Overcrossing deck.

5069

32860 $27

Subtotal: $1,367

2020-21 $891$26

$1,022

$2,198Total Project Cost: $3,565

071600018012/1/202010/1/20208/1/2019PA&ED:

RTL:R/W Cert:

7/30/2021Begin Con:

07-Los Angeles-105 18-1919-2019-2020-21

201.1192 Bridge(s)Performance Measure

Program Code

$259PA&ED:PS&E:

R/W Sup:

New

R14.6/R16.4

Con Sup:

Bridge Preventative Maintenance

$1,340Const:R/W:

32, 33

58, 63

40, 44

Senate:

Assembly:

Congress:

32, 33

58, 63

40, 44Congress

Assembly

Senate

In Carson, at Dolores Yard Overhead No. 53-1168. Upgrade bridge drainage system.

4721

30480 $395

Subtotal: $1,969

2019-20 $525$203$351

$1,380Total Project Cost: $3,349

07140000843/30/20202/14/20207/18/2018PA&ED:

RTL:R/W Cert:

1/6/2020Begin Con:

07-Los Angeles-405 Prior18-1918-1919-20

201.1191 Bridge(s)Performance Measure

Program Code

$301PA&ED:PS&E:

R/W Sup:

Carryover

8.8

Con Sup:

Bridge Preventative Maintenance

$1,574Const:R/W:

35

64

44

Senate:

Assembly:

Congress:

35

64

44Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 90 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Los Angeles County, at various locations.Establish standard vertical clearance.

ACCELERATED BRIDGE (PA&ED Only)5281

34210 $152,980

Subtotal: $374,370

2019-20 $41,760$10,980$61,790

$130,170Total Project Cost: $504,540

07170002443/30/20202/28/20204/18/2019PA&ED:

RTL:R/W Cert:

10/30/2020Begin Con:

07-Los Angeles-5 Prior19-2019-2019-20

201.32212 Bridge(s)Performance Measure

Program Code

$15,640PA&ED:* PS&E:

* R/W Sup:

Carryover

27.0/66.5

* Con Sup:

Trans Permit Requirements for Bridges

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

$221,390* Const:* R/W:

16, 18, 21,25, 27

32, 34, 36,38, 39, 46

23, 25, 28,29

Senate:

Assembly:

Congress:

16, 18, 21,25, 27

32, 34, 36,38, 39, 46

23, 25, 28,29

Congress

Assembly

Senate

In the city of Los Angeles, at the NormandieAvenue Undercrossing Bridge No. 53-1565.Strengthen girders with epoxy andreinforcement steel.

4966

31900 $22

Subtotal: $2,275

2021-22 $1,493$5

$1,188

$3,194Total Project Cost: $5,469

071600001610/21/20219/22/20217/15/2020PA&ED:

RTL:R/W Cert:

5/22/2022Begin Con:

07-Los Angeles-10 18-1920-2120-2121-22

201.3221 Bridge(s)Performance Measure

Program Code

$508PA&ED:PS&E:

R/W Sup:

New

R13.3

Con Sup:

Trans Permit Requirements for Bridges

$2,253Const:R/W:

24

53

34, 37

Senate:

Assembly:

Congress:

24

53

34, 37Congress

Assembly

Senate

In the City of Industry at Hacienda BoulevardUndercrossing (UC) No. 53-1789 (PM 15.93),Stemson Avenue UC No. 53-1784 (PM 16.30),Azusa Avenue Overcrossing No. 53-1785 (PM17.97) and Fullerton Road UC No. 53-1786(PM 19.46). Improve freight corridor movementby modifying and replacing bridges to meetvertical clearance and load carrying capacitystandards.

ACCELERATED BRIDGE (PA&ED Only)

5297

34330 $1,000

Subtotal: $38,600

2020-21 $3,984$500

$8,466

$16,270Total Project Cost: $54,870

07180000096/30/20205/29/2020

10/31/2019PA&ED:

RTL:R/W Cert:

7/30/2021Begin Con:

07-Los Angeles-60 Prior20-2120-2120-21

201.3224 Bridge(s)Performance Measure

Program Code

$3,320PA&ED:* PS&E:

* R/W Sup:

Carryover

15.9/19.5

* Con Sup:

Trans Permit Requirements for Bridges

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

$37,600* Const:* R/W:

22, 32

57

32, 39

Senate:

Assembly:

Congress:

22, 32

57

32, 39Congress

Assembly

Senate

ROADWAY PRESERVATIONIn Baldwin Park and West Covina, from Route605 to Citrus Avenue. Rehabilitate roadway.

(G13 Contingency)4712

30390 $147

Subtotal: $60,643

2019-20 $8,385$23

$8,444

$17,842Total Project Cost: $78,485

071400004411/19/20198/30/20192/14/2018PA&ED:

RTL:R/W Cert:

5/7/2020Begin Con:

07-Los Angeles-10 Prior18-1918-1919-20

201.12050.4 Lane mile(s)Performance Measure

Program Code

$990PA&ED:PS&E:

R/W Sup:

Carryover

31.2/37.2

* Con Sup:

Roadway Rehabilitation (3R)

* Const, * Con Sup phase(s) are NOT authorized

$60,496* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

22

48

32

Senate:

Assembly:

Congress:

22

48

32Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 91 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Redondo Beach, from OrangeCounty line to south of Topaz Street. UpgradeAmericans with Disabilities Act (ADA) curb ramps, upgrade metal beam guardrail, coldplane pavement, and place Hot Mix Asphalt(HMA) and Rubberized Hot Mix Asphalt(RHMA) pavement to rehabilitate pavement.

4998

32160 $1,554

Subtotal: $39,774

2021-22 $4,886$920

$7,684

$15,170Total Project Cost: $54,944

07160000493/30/20222/26/2022

12/15/2018PA&ED:

RTL:R/W Cert:

11/6/2022Begin Con:

07-Los Angeles-1 Prior18-1918-1921-22

201.12199.4 Lane mile(s)Performance Measure

Program Code

$1,680PA&ED:PS&E:

R/W Sup:

Carryover

0.0/19.0

Con Sup:

Pavement Rehabilitation (CAPM)

$38,220Const:R/W:

26, 33, 34,35

64, 66, 70

33, 43, 44,47

Senate:

Assembly:

Congress:

26, 33, 34,35

64, 66, 70

33, 43, 44,47

Congress

Assembly

Senate

In and near Redondo Beach, from Topaz Streetto Dewey Street. Upgrade Americans withDisabilities Act (ADA) curb ramps and metalbeam guardrail, repair concrete pavement,replace asphalt concrete pavement with PortlandCement Concrete (PCC) at intersections, coldplane pavement, and place Hot Mix Asphalt(HMA) and Rubberized Hot Mix Asphalt(RHMA) pavement to rehabilitate pavement.

5034

32580 $1,900

Subtotal: $47,800

2021-22 $6,770$780

$8,770

$18,280Total Project Cost: $66,080

07160000903/30/20222/26/2022

12/15/2018PA&ED:

RTL:R/W Cert:

12/1/2022Begin Con:

07-Los Angeles-1 Prior18-1918-1921-22

201.121104.9 Lane mile(s)Performance Measure

Program Code

$1,960PA&ED:PS&E:

R/W Sup:

Carryover

19.0/33.3

Con Sup:

Pavement Rehabilitation (CAPM)

$45,900Const:R/W:

26

62, 66

33, 37, 43

Senate:

Assembly:

Congress:

26

62, 66

33, 37, 43Congress

Assembly

Senate

In and near the city of Los Angeles, fromCentinela Avenue to Cotner Avenue, North LaBrea Avenue to North Oxford Avenue and North Hollywood Boulevard to AllesandroStreet. Cold plane and overlay pavement,upgrade curb ramps, reconstruct curb and gutter,construct bus pads and replace traffic signals atseveral locations.

5184

33360 $38

Subtotal: $19,848

2021-22 $5,000$160

$5,000

$12,060Total Project Cost: $31,908

07160003133/1/20221/5/20227/1/2020PA&ED:

RTL:R/W Cert:

12/1/2022Begin Con:

07-Los Angeles-2 18-1920-2120-2121-22

201.12117.6 Lane mile(s)Performance Measure

Program Code

$1,900PA&ED:PS&E:

R/W Sup:

New

2.3/14.2

Con Sup:

Pavement Rehabilitation (CAPM)

$19,810Const:R/W:

24, 26, 30

43, 50, 51,53, 54

28, 37

Senate:

Assembly:

Congress:

24, 26, 30

43, 50, 51,53, 54

28, 37Congress

Assembly

Senate

Near Castaic and Valencia, from 0.2 mile northof Lake Hughes Road Undercrossing to 0.7 milesouth of Vista Del Lago Road Overcrossing.Cold plane pavement and place Rubberized HotMix Asphalt concrete (RHMA), repair drainagesystems, and perform upgrades to overheadsigns, drainage curbs and guardrail.

5013

32340 $250

Subtotal: $43,330

2020-21 $6,000$250

$7,200

$13,550Total Project Cost: $56,880

07160000641/29/2021

12/30/202010/30/2019PA&ED:

RTL:R/W Cert:

4/1/2021Begin Con:

07-Los Angeles-5 Prior19-2019-2020-21

201.121112.0 Lane mile(s)Performance Measure

Program Code

$100PA&ED:PS&E:

R/W Sup:

Carryover

R59.7/R73.7

Con Sup:

Pavement Rehabilitation (CAPM)

$43,080Const:R/W:

21

36, 38

25

Senate:

Assembly:

Congress:

21

36, 38

25Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 92 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Long Beach, from Route 1 to San GabrielUndercrossing. Cold plane pavement andoverlay with Rubberized Hot Mixed Asphalt -Type G (RHMA-G), upgrade curb ramps tocurrent Americans with Disabilities Act (ADA)Standards, install guardrail and construct buspads.

5022

32440 $126

Subtotal: $4,502

2020-21 $2,523$12

$1,967

$5,172Total Project Cost: $9,674

071600007712/15/202011/5/20209/15/2019PA&ED:

RTL:R/W Cert:

9/5/2021Begin Con:

07-Los Angeles-22 18-1919-2019-2020-21

201.1217.4 Lane mile(s)Performance Measure

Program Code

$670PA&ED:PS&E:

R/W Sup:

New

0.0/1.5

Con Sup:

Pavement Rehabilitation (CAPM)

$4,376Const:R/W:

34

70

47

Senate:

Assembly:

Congress:

34

70

47Congress

Assembly

Senate

In and near Canoga Park, from Pacific CoastHighway to Entrada Road; also near WoodlandCrest Drive to near Devonshire Street (PM10.11/18.62). Cold plane and overlay asphaltpavement, repair damaged structural andupgrade curb ramps to meet Americans withDisabilities Act (ADA) Standards.

5007

32290 $499

Subtotal: $31,049

2021-22 $4,405$576

$5,540

$12,114Total Project Cost: $43,163

071600005910/21/20219/21/20213/28/2020PA&ED:

RTL:R/W Cert:

7/1/2022Begin Con:

07-Los Angeles-27 18-1920-2120-2121-22

201.12153.5 Lane mile(s)Performance Measure

Program Code

$1,593PA&ED:PS&E:

R/W Sup:

New

0.0/4.7

Con Sup:

Pavement Rehabilitation (CAPM)

$30,550Const:R/W:

26, 27

38, 45, 50

30, 33

Senate:

Assembly:

Congress:

26, 27

38, 45, 50

30, 33Congress

Assembly

Senate

In the cities of Los Angeles, Calabasas andAgoura Hills, from Route 170 to Kanan Road.Rehabilitate pavement, construct and upgradeAmericans with Disabilities Act (ADA) curbramps.

4770

30750 $2,389

Subtotal: $12,384

2019-20 $2,224$124

$1,607

$4,325Total Project Cost: $16,709

07140002173/19/2020

12/19/20193/26/2018PA&ED:

RTL:R/W Cert:

8/20/2020Begin Con:

07-Los Angeles-101 PriorPriorPrior19-20

201.1210.1 Lane mile(s)Performance Measure

Program Code

$370PA&ED:PS&E:

R/W Sup:

Carryover

11.8/35.3

Con Sup:

Pavement Rehabilitation (CAPM)

$9,995Const:R/W:

18, 27

44, 45, 46,50

30, 33

Senate:

Assembly:

Congress:

18, 27

44, 45, 46,50

30, 33Congress

Assembly

Senate

In Torrance, from Route 1 to Redondo BeachBoulevard. Pavement rehabilitation.

4818

31180

Subtotal: $10,900

2018-19 $1,289$100

$1,744

$3,270Total Project Cost: $14,170

07150000143/19/20192/15/2019

10/11/2016PA&ED:

RTL:R/W Cert:

10/1/2019Begin Con:

07-Los Angeles-107 PriorPriorPrior18-19

201.12136.2 Lane mile(s)Performance Measure

Program Code

$137PA&ED:PS&E:

R/W Sup:

Carryover

0.0/4.8

Con Sup:

Pavement Rehabilitation (CAPM)

$10,900Const:R/W:

26, 35

66

33, 43

Senate:

Assembly:

Congress:

26, 35

66

33, 43Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 93 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In the cities of Los Angeles, Burbank, Glendaleand Pasadena, from Route 170 to Route 210.Rehabilitate pavement, upgrade guardrail andAmericans with Disabilities Act (ADA) curbramps to current standards.

4817

31170 $376

Subtotal: $34,410

2018-19 $3,800$254

$5,735

$10,762Total Project Cost: $45,172

071500001312/28/201810/3/2018

12/15/2017PA&ED:

RTL:R/W Cert:

5/23/2019Begin Con:

07-Los Angeles-134 PriorPriorPrior18-19

201.121112.0 Lane mile(s)Performance Measure

Program Code

$973PA&ED:PS&E:

R/W Sup:

Carryover

0.0/R13.3

Con Sup:

Pavement Rehabilitation (CAPM)

$34,034Const:R/W:

18, 24, 25

43, 46

28, 30, 34

Senate:

Assembly:

Congress:

18, 24, 25

43, 46

28, 30, 34Congress

Assembly

Senate

Near Gorman and Lancaster, from Route 5 toRoute 14. Rehabilitate pavement.

4804

31040 $128

Subtotal: $22,007

2018-19 $1,810$22

$2,115

$4,457Total Project Cost: $26,464

071500000112/14/201810/12/20182/10/2017PA&ED:

RTL:R/W Cert:

12/10/2020Begin Con:

07-Los Angeles-138 PriorPriorPrior18-19

201.12177.0 Lane mile(s)Performance Measure

Program Code

$510PA&ED:PS&E:

R/W Sup:

Carryover

0.0/36.9

Con Sup:

Pavement Rehabilitation (CAPM)

$21,879Const:R/W:

21

36

23, 25

Senate:

Assembly:

Congress:

21

36

23, 25Congress

Assembly

Senate

In the cities of Irwindale and Baldwin Park,from Route 10 Interchange to the end of thefreeway at Route 210. Grind mainlinepavement and replace damaged stabs withJointed Plain Concrete Pavement (JPCP) rapidstrength concrete and/or Individual Precast SlabReplacement (IPSR), cold plane and overlaymedian, shoulders, ramps with Hot Mix Asphalt(HMA), construct additional lane on southboundArrow Highway offramp/modify signal, installand upgrade guardrail.

5029

32550 $2,721

Subtotal: $19,131

2021-22 $6,856$138

$6,242

$14,611Total Project Cost: $33,742

071600008511/8/20218/9/2021

12/1/2018PA&ED:

RTL:R/W Cert:

9/6/2022Begin Con:

07-Los Angeles-605 Prior19-2019-2021-22

201.12139.5 Lane mile(s)Performance Measure

Program Code

$1,375PA&ED:PS&E:

R/W Sup:

Carryover

20.2/26.0

Con Sup:

Pavement Rehabilitation (CAPM)

$16,410Const:R/W:

22

48

32

Senate:

Assembly:

Congress:

22

48

32Congress

Assembly

Senate

In San Fernando, from Route 118 to Route 210.Rehabilitate roadway.

(G13 Contingency)4805

30970 $120

Subtotal: $41,720

2019-20 $5,710$150

$7,421

$14,294Total Project Cost: $56,014

071400030011/27/20199/27/20198/1/2018PA&ED:

RTL:R/W Cert:

6/10/2020Begin Con:

07-Los Angeles-5 PriorPriorPrior19-20

201.12246.5 Lane mile(s)Performance Measure

Program Code

$1,013PA&ED:PS&E:

R/W Sup:

Carryover

39.2/R43.8

* Con Sup:

Roadway Rehabilitation (2R)

* Const, * Con Sup phase(s) are NOT authorized

$41,600* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

18

39

29

Senate:

Assembly:

Congress:

18

39

29Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 94 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Palmdale and Lancaster, from Avenue P-8 tothe Kern County line. Replace distressedlanes/shoulders, cold plane and overlay ramps,upgrade guardrail, dikes, sign panels, curb ramps and traffic loop detectors.

4887

31600 $210

Subtotal: $142,870

2020-21 $21,200$280

$25,800

$50,280Total Project Cost: $193,150

071500019411/6/20209/2/2020

4/11/2019PA&ED:

RTL:R/W Cert:

2/24/2021Begin Con:

07-Los Angeles-14 18-1918-1918-1920-21

201.12282.4 Lane mile(s)Performance Measure

Program Code

$3,000PA&ED:PS&E:

R/W Sup:

New

R60.7/R77.0

Con Sup:

Roadway Rehabilitation (2R)

$142,660Const:R/W:

21

36

23, 25

Senate:

Assembly:

Congress:

21

36

23, 25Congress

Assembly

Senate

In and near Diamond Bar, from the OrangeCounty line to Route 60. Pavementrehabilitation.4718

30450 $70

Subtotal: $75,990

2018-19 $9,900$10

$13,000

$22,910Total Project Cost: $98,900

07140000676/10/20194/10/20197/26/2017PA&ED:

RTL:R/W Cert:

2/15/2020Begin Con:

07-Los Angeles-57PriorPrior18-19

201.12244.5 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R0.0/R4.5

Con Sup:

Roadway Rehabilitation (2R)

$75,920Const:R/W:

29

55

39

Senate:

Assembly:

Congress:

29

55

39Congress

Assembly

Senate

In the city of Los Angeles, from Route 5 toNorth Wheatland Avenue. Rehabilitateroadway.4801

30960 $490

Subtotal: $120,490

2018-19 $6,000$500

$16,500

$23,500Total Project Cost: $143,990

07140002993/28/20192/15/20199/29/2017PA&ED:

RTL:R/W Cert:

1/6/2020Begin Con:

07-Los Angeles-210 PriorPriorPrior18-19

201.12251.7 Lane mile(s)Performance Measure

Program Code

$500PA&ED:PS&E:

R/W Sup:

Carryover

R0.0/R9.7

Con Sup:

Roadway Rehabilitation (2R)

$120,000Const:R/W:

18

39

29

Senate:

Assembly:

Congress:

18

39

29Congress

Assembly

Senate

In various cities, from Orange County line toTelegraph Road. Replace structural section onlanes 3 and 4 and other damaged concrete slabson other lanes. Cold plane and overlay Rubberized Hot Mix Asphalt (RHMA-G) onright shoulders and apply High Friction SurfaceTreatment (HFST) onramps and connectors.

(G13 Contingency)

4979

32030 $25

Subtotal: $99,835

2021-22 $9,290$150

$24,620

$36,020Total Project Cost: $135,855

07160000332/15/2022

10/15/20212/15/2019PA&ED:

RTL:R/W Cert:

11/15/2022Begin Con:

07-Los Angeles-605 Prior18-1918-1921-22

201.122104.0 Lane mile(s)Performance Measure

Program Code

$1,960PA&ED:PS&E:

R/W Sup:

Carryover

R0.0/R10.2

* Con Sup:

Roadway Rehabilitation (2R)

* Const, * Con Sup phase(s) are NOT authorized

$99,810* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

32, 34

57, 58, 63,70

38, 40, 47

Senate:

Assembly:

Congress:

32, 34

57, 58, 63,70

38, 40, 47Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 95 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Santa Clarita, from 1.1 mile north of PlaceritaCanyon Road to 0.2 mile south of GoldenValley Road. Regrade slopes, constructdrainage ditches and install erosion controlsystem.

5237

33960 $36

Subtotal: $24,636

2021-22 $2,720$49

$3,750

$7,609Total Project Cost: $32,245

07170001571/1/2022

11/1/20213/1/2020PA&ED:

RTL:R/W Cert:

11/1/2022Begin Con:

07-Los Angeles-14 18-1919-2019-2021-22

201.1501 Location(s)Performance Measure

Program Code

$1,090PA&ED:PS&E:

R/W Sup:

New

R29.2/R29.4

Con Sup:

Roadway Protective Betterments

$24,600Const:R/W:

21

38

25

Senate:

Assembly:

Congress:

21

38

25Congress

Assembly

Senate

In the cities of Los Angeles and Malibu, fromsouth of Tenescal Canyon Road to VenturaCounty line; also in Ventura County, from LosAngeles County line to Tonga Street (PM0.0/0.9). Rehabilitate culverts.

4846

31350 $8,200

Subtotal: $16,100

2020-21 $3,250$1,850$2,750

$9,800Total Project Cost: $25,900

07150000904/1/20207/2/2020

4/30/2018PA&ED:

RTL:R/W Cert:

8/3/2020Begin Con:

07-Los Angeles-1 Prior20-2120-2120-21

201.15119 Culvert(s) (ea)Performance Measure

Program Code

$1,950PA&ED:PS&E:

R/W Sup:

Carryover

37.7/62.8

Con Sup:

Drainage System Restoration

$7,900Const:R/W:

27

50

26, 33

Senate:

Assembly:

Congress:

27

50

26, 33Congress

Assembly

Senate

In the cities of Los Angeles, Hollywood, LongBeach and Signal Hill from Simons Underpassto Eastern Avenue; on Routes 101, 405 and 710at various locations. Replace 9 pump plants.

4910

31750 $10

Subtotal: $4,813

2018-19 $1,038$30

$1,500

$2,928Total Project Cost: $7,741

07150002461/30/2019

12/31/201812/1/2017PA&ED:

RTL:R/W Cert:

8/14/2019Begin Con:

07-Los Angeles-5 PriorPriorPrior18-19

201.1519 Culvert(s) (ea)Performance Measure

Program Code

$360PA&ED:PS&E:

R/W Sup:

Carryover

11.0/13.9

Con Sup:

Drainage System Restoration

$4,803Const:R/W:

24, 32, 33

43, 51, 58,70

28, 34, 40,47

Senate:

Assembly:

Congress:

24, 32, 33

43, 51, 58,70

28, 34, 40,47

Congress

Assembly

Senate

In various cities, on Route 5 (PM 19.75/35.99),Route 10 (PM 22.32/23.88), Route 91 (PMR11.80), Route 605 (PM R14.07) and Route 710(PM 18.7/21.01). Replace pumps withsubmersible pumps.

5024

32490 $14

Subtotal: $5,960

2020-21 $1,075$73

$1,110

$2,512Total Project Cost: $8,472

07160000792/28/20211/1/2021

12/1/2019PA&ED:

RTL:R/W Cert:

11/30/2021Begin Con:

07-Los Angeles-5 18-1919-2020-2120-21

201.15115 Culvert(s) (ea)Performance Measure

Program Code

$254PA&ED:PS&E:

R/W Sup:

New

19.8/36.0

Con Sup:

Drainage System Restoration

$5,946Const:R/W:

18, 24, 25

39, 43, 51

28, 29, 34

Senate:

Assembly:

Congress:

18, 24, 25

39, 43, 51

28, 29, 34Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 96 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In the city of Los Angeles, on the northboundconnector at the Route 5/110 Separation.Replace compromised 18 inch ReinforcedConcrete Culvert (RCP).

5223

33800 $10

Subtotal: $1,664

2019-20 $2,548$123

$2,462

$5,842Total Project Cost: $7,506

071700005310/1/20199/1/2019

7/15/2018PA&ED:

RTL:R/W Cert:

5/1/2020Begin Con:

07-Los Angeles-5 Prior18-1918-1919-20

201.1511 Culvert(s) (ea)Performance Measure

Program Code

$709PA&ED:PS&E:

R/W Sup:

Carryover

20.8

Con Sup:

Drainage System Restoration

$1,654Const:R/W:

24

51

34

Senate:

Assembly:

Congress:

24

51

34Congress

Assembly

Senate

Near Pyramid Lake, 4.4 miles north of TemplinHighway. Remove and replace two sections ofdamaged reinforced concrete pipe.4847

31360 $20

Subtotal: $1,404

2018-19 $350$20

$970

$1,520Total Project Cost: $2,924

07150000929/10/20187/31/20186/1/2017PA&ED:

RTL:R/W Cert:

3/25/2019Begin Con:

07-Los Angeles-5 PriorPriorPrior18-19

201.1511 Culvert(s) (ea)Performance Measure

Program Code

$180PA&ED:PS&E:

R/W Sup:

Carryover

R70.4

Con Sup:

Drainage System Restoration

$1,384Const:R/W:

21

36

25

Senate:

Assembly:

Congress:

21

36

25Congress

Assembly

Senate

In the City of Santa Clarita, near southboundofframp to Sierra Highway. Replace damageddrainage system that includes seventeenculverts.

5219

33760 $10

Subtotal: $2,729

2019-20 $1,881$23

$1,262

$3,722Total Project Cost: $6,451

071700003610/1/20199/3/2019

7/13/2018PA&ED:

RTL:R/W Cert:

5/1/2020Begin Con:

07-Los Angeles-14 Prior18-1918-1919-20

201.1511 Culvert(s) (ea)Performance Measure

Program Code

$556PA&ED:PS&E:

R/W Sup:

Carryover

28.9

Con Sup:

Drainage System Restoration

$2,719Const:R/W:

21

38

25

Senate:

Assembly:

Congress:

21

38

25Congress

Assembly

Senate

In Long Beach, at Henry Ford Avenue offramp.Construct larger pump plant facility includingreplacing undersized pumps.5043

32730 $1,646

Subtotal: $24,239

2020-21 $2,586$420

$3,954

$8,158Total Project Cost: $32,397

07160001263/30/20211/15/2021

12/31/2019PA&ED:

RTL:R/W Cert:

10/1/2021Begin Con:

07-Los Angeles-103 18-1919-2019-2020-21

201.1512 Culvert(s) (ea)Performance Measure

Program Code

$1,198PA&ED:PS&E:

R/W Sup:

New

0.1/0.1

Con Sup:

Drainage System Restoration

$22,593Const:R/W:

35

70

44

Senate:

Assembly:

Congress:

35

70

44Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 97 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Gardena, south of Redondo BeachBoulevard. Replace culvert.

4849

31380 $50

Subtotal: $2,870

2018-19 $1,325$20

$1,200

$2,655Total Project Cost: $5,525

07150000953/29/20192/28/20191/17/2018PA&ED:

RTL:R/W Cert:

3/13/2020Begin Con:

07-Los Angeles-110 PriorPriorPrior18-19

201.1511 Culvert(s) (ea)Performance Measure

Program Code

$110PA&ED:PS&E:

R/W Sup:

Carryover

11.0

Con Sup:

Drainage System Restoration

$2,820Const:R/W:

35

64

43

Senate:

Assembly:

Congress:

35

64

43Congress

Assembly

Senate

In Glendale, from east of Concord StreetOvercrossing to west of Chevy Chase DriveUndercrossing at three locations. Restoreculvert systems.

4848

31370 $10

Subtotal: $1,820

2018-19 $1,200$50

$1,175

$2,625Total Project Cost: $4,445

07150000939/10/20187/31/2018

10/19/2017PA&ED:

RTL:R/W Cert:

3/25/2019Begin Con:

07-Los Angeles-134 PriorPriorPrior18-19

201.1513 Culvert(s) (ea)Performance Measure

Program Code

$200PA&ED:PS&E:

R/W Sup:

Carryover

R6.3/R8.2

Con Sup:

Drainage System Restoration

$1,810Const:R/W:

25

43

28

Senate:

Assembly:

Congress:

25

43

28Congress

Assembly

Senate

In Rancho Palos Verdes, from CaddingtonDrive to Peninsula Verde Drive. Replace twodamaged drainage systems.3734

25310 $260

Subtotal: $1,922

2019-20 $923$310$423

$1,890Total Project Cost: $3,812

07000004573/30/20202/28/20208/17/2018PA&ED:

RTL:R/W Cert:

10/31/2019Begin Con:

07-Los Angeles-213 PriorPrior18-1919-20

201.1513 Culvert(s) (ea)Performance Measure

Program Code

$234PA&ED:PS&E:

R/W Sup:

Carryover

2.7/3.9

Con Sup:

Drainage System Restoration

$1,662Const:R/W:

26, 35

66, 70

33

Senate:

Assembly:

Congress:

26, 35

66, 70

33Congress

Assembly

Senate

In the cities of Los Angeles and Monterey Park,from Olympic Boulevard to Ramona Boulevard.Rehabilitate culverts. 4845

31340 $50

Subtotal: $1,257

2018-19 $155$47

$205

$507Total Project Cost: $1,764

07150000894/30/20191/11/20196/30/2017PA&ED:

RTL:R/W Cert:

9/30/2019Begin Con:

07-Los Angeles-710 PriorPriorPrior18-19

201.15136 Culvert(s) (ea)Performance Measure

Program Code

$100PA&ED:PS&E:

R/W Sup:

Carryover

23.6/26.3

Con Sup:

Drainage System Restoration

$1,207Const:R/W:

22, 24

49, 51

27, 40

Senate:

Assembly:

Congress:

22, 24

49, 51

27, 40Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 98 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Santa Monica, at McClure Tunnel Bridge No.53-0008. Enhance safety lighting inside tunnel.

4903

31690 $15

Subtotal: $5,195

2018-19 $592$50

$1,903

$2,695Total Project Cost: $7,890

071500022711/30/201810/9/20186/30/2017PA&ED:

RTL:R/W Cert:

6/14/2019Begin Con:

07-Los Angeles-1 PriorPriorPrior18-19

201.170150 Lighting fixture(s)Performance Measure

Program Code

$150PA&ED:PS&E:

R/W Sup:

Carryover

35.1/35.4

Con Sup:

Signs and Lighting Rehabilitation

$5,180Const:R/W:

26

50

33

Senate:

Assembly:

Congress:

26

50

33Congress

Assembly

Senate

In Los Angeles County, from 4th StreetOvercrossing to San Bernardino County line.Replace sign panels and remove overhead signlighting and catwalks.

5201

33530 $50

Subtotal: $7,873

2020-21 $2,700$60

$1,900

$5,248Total Project Cost: $13,121

071600036310/16/202010/1/20208/23/2019PA&ED:

RTL:R/W Cert:

5/14/2021Begin Con:

07-Los Angeles-10 18-1919-2019-2020-21

201.170599 Sign(s)Performance Measure

Program Code

$588PA&ED:PS&E:

R/W Sup:

New

2.2/48.3

Con Sup:

Signs and Lighting Rehabilitation

$7,823Const:R/W:

20, 22, 24,25, 26, 29

41, 48, 49,50, 51, 52

27, 32, 33,34, 35, 37

Senate:

Assembly:

Congress:

20, 22, 24,25, 26, 29

41, 48, 49,50, 51, 52

27, 32, 33,34, 35, 37

Congress

Assembly

Senate

In various cities, from Route 5 to SanBernardino County line; also on Route 710,from Ocean Boulevard to Valley Boulevard(PM 5.6/T27.4). Replace existing signs withretro-reflective sheeting.

4906

31730 $15

Subtotal: $2,680

2019-20 $1,081$5

$1,156

$2,640Total Project Cost: $5,320

07150002372/28/20201/10/20208/24/2018PA&ED:

RTL:R/W Cert:

1/27/2021Begin Con:

07-Los Angeles-60 Prior18-1918-1919-20

201.17096 Lighting fixture(s)Performance Measure

Program Code

$398PA&ED:PS&E:

R/W Sup:

Carryover

0.0/R30.5

Con Sup:

Signs and Lighting Rehabilitation

$2,665Const:R/W:

22, 24, 29,32, 33, 35

49, 51, 53,55, 57, 63

27, 34, 38,39, 40, 44,47

Senate:

Assembly:

Congress:

22, 24, 29,32, 33, 35

49, 51, 53,55, 57, 63

27, 34, 38,39, 40, 44,

47

Congress

Assembly

Senate

In various cities, from 9th Street/Gaffey Streetto end of freeway. Replace sign panels withretroreflective sheeting ASTM Type XI, removeoverhead lighting and catwalks.

5074

32980 $10

Subtotal: $5,370

2020-21 $2,342$21

$1,573

$4,354Total Project Cost: $9,724

07160002063/18/20211/15/20211/16/2020PA&ED:

RTL:R/W Cert:

10/26/2021Begin Con:

07-Los Angeles-110 18-1919-2019-2020-21

201.170500 Sign(s)Performance Measure

Program Code

$418PA&ED:PS&E:

R/W Sup:

New

0.0/31.9

Con Sup:

Signs and Lighting Rehabilitation

$5,360Const:R/W:

24, 25, 30,35

41, 51, 53,59, 64, 66

27, 33, 34,37, 43, 44

Senate:

Assembly:

Congress:

24, 25, 30,35

41, 51, 53,59, 64, 66

27, 33, 34,37, 43, 44

Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 99 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MOBILITYIn Pasadena and South Pasadena, at the FairOaks Avenue northbound offramp. Widen rampfrom two lanes to four lanes. The city of SouthPasadena will Advertise, Award, andAdminister (AAA) the project constructioncontract.

5196

33520

Subtotal: $1

2021-22 $2,372

$3,772Total Project Cost: $3,773

07160003558/1/2021

6/30/20213/1/2020PA&ED:

RTL:R/W Cert:

4/20/2022Begin Con:

07-Los Angeles-110 18-1920-21

201.31064 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

$1,400PA&ED:PS&E:

R/W Sup:

New

31.0/31.0

Con Sup:

Operational Improvements

$1Const:R/W:

25

41

27

Senate:

Assembly:

Congress:

25

41

27Congress

Assembly

Senate

In the city of Sherman Oaks, at southboundonramp from Ventura Boulevard. Widen theonramp to two lanes plus a High OccupancyVehicle (HOV) lane.

2681

20490 $29

Subtotal: $3,149

2021-22 $1,918$141

$1,343

$4,187Total Project Cost: $7,336

071700002210/21/20219/21/20213/23/2020PA&ED:

RTL:R/W Cert:

7/15/2022Begin Con:

07-Los Angeles-405 18-1920-2120-2121-22

201.31012.5 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

$785PA&ED:PS&E:

R/W Sup:

New

39.1

Con Sup:

Operational Improvements

$3,120Const:R/W:

27

45

30

Senate:

Assembly:

Congress:

27

45

30Congress

Assembly

Senate

In and near Santa Monica, from LincolnBoulevard to McClure Tunnel; also on Route 10(PM 2.1/18.3), Route 2 (PM R18.7), Route 101(PM 11.8), and Route 105 (PM R1.95).Upgrade the existing TransportationManagement System (TMS) elements toimprove traffic monitoring, data transmission,and network connectivity including the LosAngeles Regional Transportation ManagementCenter (LARTMC) and communication hubs atRoute 10, Route 101 and Route 105.

5041

32720 $327

Subtotal: $17,591

2020-21 $3,159$43

$3,284

$7,025Total Project Cost: $24,616

071600012110/15/20208/22/2020

12/15/2018PA&ED:

RTL:R/W Cert:

5/13/2021Begin Con:

07-Los Angeles-1 Prior18-1918-1920-21

201.315129 Field element(s)Performance Measure

Program Code

$539PA&ED:PS&E:

R/W Sup:

Carryover

R34.5/35.2

Con Sup:

Transportation Management Systems

$17,264Const:R/W:

24, 30

53, 54

33, 34, 37

Senate:

Assembly:

Congress:

24, 30

53, 54

33, 34, 37Congress

Assembly

Senate

In and near the city of Los Angeles, from EBRoute 60/5 Separation to Route 605; also onRoute 2 (PM R18.7), Route 5 (PM 6.8), Route10 (PM 18.3), and Route 605 (PM 20.2).Upgrade the existing Transportation Management System (TMS) elements to improve traffic monitoring, data transmission,and network connectivity including the LosAngeles Regional Transportation ManagementCenter (LARTMC) on Route 2, Route 5, Route10, and Route 605.

5040

32710 $153

Subtotal: $6,827

2020-21 $1,028$45

$1,450

$2,553Total Project Cost: $9,380

071600012010/21/20208/21/20206/15/2018PA&ED:

RTL:R/W Cert:

5/22/2021Begin Con:

07-Los Angeles-60 Prior19-2019-2020-21

201.31562 Field element(s)Performance Measure

Program Code

$30PA&ED:PS&E:

R/W Sup:

Carryover

R0.6/11.8

Con Sup:

Transportation Management Systems

$6,674Const:R/W:

22, 24, 32

49, 51, 53,57, 58

27, 34, 38,40

Senate:

Assembly:

Congress:

22, 24, 32

49, 51, 53,57, 58

27, 34, 38,40

Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 100 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Carson, from Route 110 to OrangeCounty line; also on Route 2 (PM R18.7), Route5 (PM 6.8), Route 405 (PM 21.1). Upgrade theexisting Transportation Management System(TMS) elements to improve traffic monitoring,data transmission, and network connectivityincluding the various communication hubs onRoute 2, Route 5, and Route 405.

5226

33860 $590

Subtotal: $11,441

2021-22 $2,630$150

$2,237

$5,528Total Project Cost: $16,969

07170000601/3/20228/3/2021

12/12/2018PA&ED:

RTL:R/W Cert:

8/1/2022Begin Con:

07-Los Angeles-91 Prior18-1918-1921-22

201.31568 Field element(s)Performance Measure

Program Code

$511PA&ED:PS&E:

R/W Sup:

Carryover

R6.1/R20.7

Con Sup:

Transportation Management Systems

$10,851Const:R/W:

32, 33, 35

58, 63, 64

38, 44

Senate:

Assembly:

Congress:

32, 33, 35

58, 63, 64

38, 44Congress

Assembly

Senate

In various ciites, from Routes 5/10 to Route405, Route 2 at Route 134 (PM R18.7) andRoute 10 at Route 5/10 (PM 18.3). Upgrade Transportation Management System (TMS) elements including Closed Circuit Television(CCTV) cameras, Ramp Metering Systems(RMS), Vehicle Detection Stations (VDS),Highway Advisory Radio (HAR), ChangeableMessage Signs (CMS) and the communicationsystem network.

5221

33780 $13

Subtotal: $9,731

2021-22 $3,008$162

$1,863

$5,471Total Project Cost: $15,202

07170000541/3/20229/3/2021

7/15/2018PA&ED:

RTL:R/W Cert:

8/1/2022Begin Con:

07-Los Angeles-101 Prior18-1918-1921-22

201.31598 Field element(s)Performance Measure

Program Code

$438PA&ED:PS&E:

R/W Sup:

Carryover

0.0/R17.1

Con Sup:

Transportation Management Systems

$9,718Const:R/W:

18, 24, 26

43, 46, 50,51, 53

28, 29, 30,34

Senate:

Assembly:

Congress:

18, 24, 26

43, 46, 50,51, 53

28, 29, 30,34

Congress

Assembly

Senate

In the cities of San Pedro, Carson, Gardena andLos Angeles, from Gaffey Street to Route 5;also on Route 2 at the TransportationManagement Center (TMC) Building (PM18.7), Route 5 at Route 10 Interchange (PM16.9) and Route 405 at Route 105 Interchange(PM 21.3). Upgrade and completion ofTransportation Management System (TMS).

4830

31200 $702

Subtotal: $29,702

2018-19 $3,720$105

$5,000

$8,845Total Project Cost: $38,547

07150000512/20/20197/13/2018

11/30/2017PA&ED:

RTL:R/W Cert:

8/15/2019Begin Con:

07-Los Angeles-110 PriorPriorPrior18-19

201.315219 Field element(s)Performance Measure

Program Code

$20PA&ED:PS&E:

R/W Sup:

Carryover

0.7/25.7

Con Sup:

Transportation Management Systems

$29,000Const:R/W:

24, 30, 35

51, 53, 59,64, 70

33, 34, 37,43

Senate:

Assembly:

Congress:

24, 30, 35

51, 53, 59,64, 70

33, 34, 37,43

Congress

Assembly

Senate

In the cities of Los Angeles, Wilmington, andCarson, from Gaffey Street to Route 405; alsoon Route 210 (PM R0.0/R35.8), Route 605 (PM19.9/26.0), Route 710 (PM 5.0/9.4) and Route 2(PM R18.7). Install wireless Bluetooth™detection system to monitor travel time.

5188

33500 $10

Subtotal: $1,383

2020-21 $200

$300

$540Total Project Cost: $1,923

071600034610/21/20207/21/2020

12/28/2018PA&ED:

RTL:R/W Cert:

4/22/2021Begin Con:

07-Los Angeles-110 Prior18-19

20-21

201.31576 Field element(s) Performance Measure

Program Code

$40PA&ED:PS&E:

R/W Sup:

Carryover

R0.7/8.8

Con Sup:

Transportation Management Systems

$1,373Const:R/W:

35

70

44

Senate:

Assembly:

Congress:

35

70

44Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 101 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In the city of Los Angeles, from Route 170 toRoutes 210/710; also on Route 2 at Route 134(PM R18.7), on Route 10 at Routes 5/10 (PM18.3), and on Route 101 near Pleasant ValleyRoad (PM 11.8). Upgrade TransportationManagement System (TMS) elements includingClosed Circuit Television (CCTV) cameras,Ramp Metering Systems (RMS), Vehicle Detection Stations (VDS), Highway AdvisoryRadio (HAR), Changeable Message Signs (CMS) and the communication system network.

5222

33790 $13

Subtotal: $7,572

2021-22 $2,840$154

$1,953

$5,401Total Project Cost: $12,973

07170000521/3/20228/3/2021

7/15/2018PA&ED:

RTL:R/W Cert:

8/1/2022Begin Con:

07-Los Angeles-134 Prior18-1918-1921-22

201.31569 Field element(s)Performance Measure

Program Code

$454PA&ED:PS&E:

R/W Sup:

Carryover

0.0/R13.3

Con Sup:

Transportation Management Systems

$7,559Const:R/W:

18, 24, 25

41, 43, 46,51

27, 28, 29,30, 34

Senate:

Assembly:

Congress:

18, 24, 25

41, 43, 46,51

27, 28, 29,30, 34

Congress

Assembly

Senate

In various cities, from Orange County line toRoute 210; also on Route 2 at the TransportationManagement Center (TMC) (PM R18.7) andRoute 5 (PM 6.8). Upgrade TransportationManagement System (TMS).

4819

31190

Subtotal: $10,562

2018-19 $2,299$2

$2,490

$4,811Total Project Cost: $15,373

07150000163/5/20192/1/20196/9/2015PA&ED:

RTL:R/W Cert:

2/27/2020Begin Con:

07-Los Angeles-605 PriorPriorPrior18-19

201.315115 Field element(s)Performance Measure

Program Code

$20PA&ED:PS&E:

R/W Sup:

Carryover

R0.0/26.0

Con Sup:

Transportation Management Systems

$10,562Const:R/W:

22, 24, 32,34

48, 51, 57,58, 70

32, 34, 38,40, 47

Senate:

Assembly:

Congress:

22, 24, 32,34

48, 51, 57,58, 70

32, 34, 38,40, 47

Congress

Assembly

Senate

In Santa Clarita, from 0.4 mile north of RyeCanyon Road to 1.4 miles south of Route 5/126Interchange. Replace office structure andinspection enclosure and upgrade floor slab lighting with LED lighting.

5071

32880 $10

Subtotal: $860

2020-21 $2,000$20

$1,200

$3,770Total Project Cost: $4,630

07160001838/20/20202/20/20209/15/2019PA&ED:

RTL:R/W Cert:

5/15/2021Begin Con:

07-Los Angeles-5 18-1919-2019-2020-21

201.3211 Location(s)Performance Measure

Program Code

$550PA&ED:PS&E:

R/W Sup:

New

R54.4/R54.8

Con Sup:

Weigh Stations

$850Const:R/W:

21

38

25

Senate:

Assembly:

Congress:

21

38

25Congress

Assembly

Senate

In Van Nuys, near Saticoy Street. Replace andinstall Weigh-in-Motion (WIM) system.

4724

30510

Subtotal: $2,195

2018-19 $983$12

$890

$2,413Total Project Cost: $4,608

07140000971/4/2019

12/7/201812/1/2017PA&ED:

RTL:R/W Cert:

8/12/2019Begin Con:

07-Los Angeles-405 PriorPriorPrior18-19

201.3211 Location(s)Performance Measure

Program Code

$528PA&ED:PS&E:

R/W Sup:

Carryover

42.9

Con Sup:

Weigh Stations

$2,195Const:R/W:

18

46

29

Senate:

Assembly:

Congress:

18

46

29Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 102 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

ROADSIDE PRESERVATIONIn La Crescenta and La Canada Flintridge, from Lowell Avenue to Arroyo Boulevard. Restoreexisting irrigation to functionality, upgraderemaining older irrigation controllers to webconnect "smart controllers."

5080

33070 $10

Subtotal: $3,538

2020-21 $1,077$20

$1,383

$2,855Total Project Cost: $6,393

071600021712/18/202010/14/20209/16/2019PA&ED:

RTL:R/W Cert:

8/20/2021Begin Con:

07-Los Angeles-210 18-1919-2019-2020-21

201.21022 Acre(s)Performance Measure

Program Code

$375PA&ED:PS&E:

R/W Sup:

New

15.6/22.6

Con Sup:

Highway Planting Restoration

$3,528Const:R/W:

22, 25

41, 48

27, 32

Senate:

Assembly:

Congress:

22, 25

41, 48

27, 32Congress

Assembly

Senate

FACILITIESIn the city of Los Angeles, at the CaltransDistrict 7 headquarters office building, 100 S.Main Street. Repair damaged roof.5287

34240

Subtotal: $2,300

2018-19 $450$10

$450

$910Total Project Cost: $3,210

07170002778/15/20187/15/20186/29/2017PA&ED:

RTL:R/W Cert:

12/15/2018Begin Con:

07-Los Angeles-10118-1918-1918-19

201.3531 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Office Facilities

$2,300Const:R/W:

Senate:

Assembly:

Congress:Congress

Assembly

Senate

In the city of Los Angeles, at the CaltransDistrict 7 headquarters office building, 100 S.Main Street. Replace and upgrade three hotwater heater (boilers) units.

5379

34400

Subtotal: $770

2018-19 $50

$100

$150Total Project Cost: $920

07180000428/30/20188/30/2018

10/25/2017PA&ED:

RTL:R/W Cert:

2/28/2019Begin Con:

07-Los Angeles-10118-19

18-19

201.3531 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Office Facilities

$770Const:R/W:

24

53

34

Senate:

Assembly:

Congress:

24

53

34Congress

Assembly

Senate

MULTIPLE OBJECTIVEIn Kern County, at the Tejon Safety RoadsideRest Area (SRRA) (PM 0.8). Install concretepavement solar panels along the rest areashoulders.

5159

33320 $61

Subtotal: $2,800

2020-21 $340$20

$340

$1,200Total Project Cost: $4,000

07160003019/2/20208/3/20206/3/2019PA&ED:

RTL:R/W Cert:

5/1/2021Begin Con:

07-Los Angeles-5 18-1919-2019-2020-21

201.9991 Location(s)Performance Measure

Program Code

$500PA&ED:PS&E:

R/W Sup:

New

0.8

Con Sup:

MULTIPLE OBJECTIVE

$2,739Const:R/W:

21

36

23, 25

Senate:

Assembly:

Congress:

21

36

23, 25Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 103 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Los Angeles

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near the city of Los Angeles, fromDitman Avenue southbound offramp to Route134; also on Route 2 (PM R18.7) and Route 101(PM 11.8). Multi-objective Asset Managementproject that includes widening and extendingdeceleration length on the IndianaStreet/Calzona Street southbound offramp,upgrade guardrail and (TransportationManagement System (TMS), construct highwayworker safety features.

5157

33300 $147

Subtotal: $17,074

2021-22 $2,800$25

$4,100

$7,575Total Project Cost: $24,649

07160002982/28/20221/31/20228/9/2019PA&ED:

RTL:R/W Cert:

9/30/2022Begin Con:

07-Los Angeles-5 18-1919-2019-2021-22

201.999101 Location(s)Performance Measure

Program Code

$650PA&ED:PS&E:

R/W Sup:

New

14.7/26.9

Con Sup:

MULTIPLE OBJECTIVE

$16,927Const:R/W:

24, 25

43, 51, 53

28, 34, 40

Senate:

Assembly:

Congress:

24, 25

43, 51, 53

28, 34, 40Congress

Assembly

Senate

CountyLos Angeles

PA&ED:PS&E:

R/W Sup:Con Sup:

$241,841$1,929,663

R/W:

Subtotal: $2,171,504

Const:$128,338$417,522$45,399

$480,247

$1,071,506

Total (Capital + Support): $3,243,010

Sorted by: Disctrict, County, Route and Post MilesPage 104 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Madera($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

BRIDGE PRESERVATIONNear the city of Madera, at Cottonwood CreekBridge No. 41-065R, No. 41-0065L and No. 41-0065S. Replace bridges to mitigate corrosionby chloride latent concrete.

6857

0V120 $137

Subtotal: $24,637

2021-22 $3,200$100

$6,100

$11,800Total Project Cost: $36,437

06160002077/26/20217/7/20217/1/2020PA&ED:

RTL:R/W Cert:

3/2/2022Begin Con:

06-Madera-99 Prior20-2120-2121-22

201.1103 Bridge(s)Performance Measure

Program Code

$2,400PA&ED:PS&E:

R/W Sup:

Carryover

R7.0/R7.5

Con Sup:

Bridge Major Rehabilitation

$24,500Const:R/W:

12

5

16

Senate:

Assembly:

Congress:

12

5

16Congress

Assembly

Senate

Near the city of Madera, at South GatewayDrive Overcrossing No. 41-0046K. Replacebridge railing, grind deck, and place reinforcedPortland Cement Concrete (PCC) to rehabilitatebridge.

6887

0U170 $30

Subtotal: $2,730

2019-20 $1,600$1

$1,300

$3,851Total Project Cost: $6,581

06160002065/1/20204/2/2020

3/15/2019PA&ED:

RTL:R/W Cert:

10/28/2020Begin Con:

06-Madera-99 Prior18-1918-1919-20

201.1101 Bridge(s)Performance Measure

Program Code

$950PA&ED:PS&E:

R/W Sup:

Carryover

9.7

Con Sup:

Bridge Major Rehabilitation

$2,700Const:R/W:

14

5

16

Senate:

Assembly:

Congress:

14

5

16Congress

Assembly

Senate

ROADWAY PRESERVATIONNear Fresno, from north of Avenue 15 to southof Route 145. Roadway rehabilitation.Additional $22,000 from Local/Privatecontribution.

6708

0R210 $3,160

Subtotal: $13,344

2019-20 $2,390$1,296$2,722

$8,871Total Project Cost: $22,215

06140000583/1/20202/1/20209/1/2019PA&ED:

RTL:R/W Cert:

10/1/2020Begin Con:

06-Madera-41 Prior19-2019-2019-20

201.12021.6 Lane mile(s)Performance Measure

Program Code

$2,463PA&ED:PS&E:

R/W Sup:

Carryover

6.3/9.2

Con Sup:

Roadway Rehabilitation (3R)

$10,184Const:R/W:

14

5

4

Senate:

Assembly:

Congress:

14

5

4Congress

Assembly

Senate

In and near Madera, from Avenue 12Overcrossing to 0.9 mile north of Avenue 17Overcrossing. Additonal $13M from other contribution for the construction of one newlane in each direction. Roadway rehabilitation.

5335A

47090

Subtotal: $53,000

2018-19 $1,500

$7,500

$9,000Total Project Cost: $62,000

06000009736/1/20185/1/2018

8/14/2015PA&ED:

RTL:R/W Cert:

11/1/2019Begin Con:

06-Madera-9918-19

18-19

201.12023.0 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R7.5/15.1

Con Sup:

Roadway Rehabilitation (3R)

$53,000Const:R/W:

12

29

19

Senate:

Assembly:

Congress:

12

29

19Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 105 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Madera($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Madera, from 0.3 mile north ofAvenue 16 Overcrossing to 0.9 mile north ofAvenue 20 Overcrossing. Rehabilitate pavementon mainline and ramps.

6789

0U520 $27

Subtotal: $11,237

2018-19 $1,118$19

$1,379

$2,516Total Project Cost: $13,753

06160000031/23/201912/1/20185/11/2016PA&ED:

RTL:R/W Cert:

7/15/2019Begin Con:

06-Madera-99PriorPrior18-19

201.12126.0 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

13.1/19.6

Con Sup:

Pavement Rehabilitation (CAPM)

$11,210Const:R/W:

14

5

16

Senate:

Assembly:

Congress:

14

5

16Congress

Assembly

Senate

In and near Chowchilla, from Route 152 to theMerced County line. Roadway rehabilitation.

6732

0T210 $30

Subtotal: $17,030

2018-19 $1,885$30

$2,507

$4,921Total Project Cost: $21,951

06150000373/23/20182/1/20183/1/2017PA&ED:

RTL:R/W Cert:

3/1/2019Begin Con:

06-Madera-99 PriorPriorPrior18-19

201.12226.0 Lane mile(s)Performance Measure

Program Code

$499PA&ED:PS&E:

R/W Sup:

Carryover

22.7/29.4

Con Sup:

Roadway Rehabilitation (2R)

$17,000Const:R/W:

14

5

16

Senate:

Assembly:

Congress:

14

5

16Congress

Assembly

Senate

ROADSIDE PRESERVATIONIn various counties, on various routes. Establishmitigation bank for future Caltrans projects inDistricts 6 and 10 to protect the California TigerSalamander.

6750

0U020

Subtotal: $1,800

2018-19 $130$5

$60

$200Total Project Cost: $2,000

06150001761/2/2019

12/3/20188/25/2017PA&ED:

RTL:R/W Cert:

9/1/2019Begin Con:

06-Madera-Var PriorPriorPrior18-19

201.2405 Location(s)Performance Measure

Program Code

$5PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Roadside Enhancement

$1,800Const:R/W:

12, 14

5

16

Senate:

Assembly:

Congress:

12, 14

5

16Congress

Assembly

Senate

CountyMadera

PA&ED:PS&E:

R/W Sup:Con Sup:

$3,384$120,394

R/W:

Subtotal: $123,778

Const:$6,317

$11,823$1,451

$21,568

$41,159

Total (Capital + Support): $164,937

Sorted by: Disctrict, County, Route and Post MilesPage 106 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Marin($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MAJOR DAMAGE RESTORATIONNear Sausalito, at 0.1 mile south of AlexanderAvenue. Restore damaged drainage systems.

1492J

4J420 $13

Subtotal: $922

2019-20 $850$100$850

$2,637Total Project Cost: $3,559

04150003444/1/20202/1/20201/1/2019PA&ED:

RTL:R/W Cert:

7/8/2020Begin Con:

04-Marin-101 Prior18-1918-1919-20

201.1312 Location(s)Performance Measure

Program Code

$837PA&ED:PS&E:

R/W Sup:

Carryover

0.2

Con Sup:

Permanent Restoration

$909Const:R/W:

3

10

2

Senate:

Assembly:

Congress:

3

10

2Congress

Assembly

Senate

COLLISION REDUCTIONIn San Rafael, at Route 580; and in SonomaCounty in Santa Rosa from PM 19.7 to PM 20.7; in Solano County on Route 37 in Vallejofrom PM R9.4 to PM R10.4 and on Route 80 inand near Vallejo and Fairfield from PM 6.5 to17.5; also in Napa County, on Route 29 in andnear the cities of Napa and Yountville from PM11.0 to 21.0. Upgrade fencing to reducemaintenance worker exposure.

1452K

2K810 $100

Subtotal: $3,242

2021-22 $550$100$550

$1,750Total Project Cost: $4,992

04170000284/15/20221/15/20226/1/2020PA&ED:

RTL:R/W Cert:

10/15/2022Begin Con:

04-Marin-101 18-1919-2019-2021-22

201.23541 Location(s)Performance Measure

Program Code

$550PA&ED:PS&E:

R/W Sup:

New

9.4/10.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$3,142Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

MANDATESIn San Rafael, at Manuel T Freitas Parkway.Upgrade curb ramps, sidewalk, and otherfacilities to make compliant with Americanswith Disabilities Act (ADA) Standards.

1495K

0K800 $125

Subtotal: $2,364

2021-22 $850$120$850

$2,120Total Project Cost: $4,484

04160001415/2/20221/3/20226/1/2020PA&ED:

RTL:R/W Cert:

11/15/2022Begin Con:

04-Marin-101 18-1919-2019-2021-22

201.3618 Curb ramp(s)Performance Measure

Program Code

$300PA&ED:PS&E:

R/W Sup:

New

13.7

Con Sup:

Americans with Disabilities Act New Curb Ramps

$2,239Const:R/W:

2

10

2

Senate:

Assembly:

Congress:

2

10

2Congress

Assembly

Senate

In and near Tiburon, at BlackfieldDrive/Greenwood Cove Drive. Intersectionimprovements to make compliant with theAmericans with Disabilities Act (ADA)including removal of traffic islands, upgradingcurb ramps and sidewalk, installing new trafficsignals, and installing Accessible PedestrianSignals (APS) pushbuttons and countdowntimers.

1491A

4J450 $55

Subtotal: $1,543

2019-20 $409$220$450

$1,479Total Project Cost: $3,022

04150003506/30/20205/1/2020

11/1/2018PA&ED:

RTL:R/W Cert:

12/9/2020Begin Con:

04-Marin-131 18-1918-1918-1919-20

201.3617 Curb ramp(s)Performance Measure

Program Code

$400PA&ED:PS&E:

R/W Sup:

New

R0.9

Con Sup:

Americans with Disabilities Act New Curb Ramps

$1,488Const:R/W:

2

10

2

Senate:

Assembly:

Congress:

2

10

2Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 107 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Marin($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Almonte, near Route 101 offramp to Route 1;also from Coyote Creek to Flamingo Road.Upgrade pedestrian facilities.0434H

2G690 $842

Subtotal: $2,818

2018-19 $1,000$300$850

$2,660Total Project Cost: $5,478

040002121111/16/201810/31/20186/16/2017PA&ED:

RTL:R/W Cert:

5/1/2019Begin Con:

04-Marin-1 PriorPriorPrior18-19

201.37828 Structure(s)Performance Measure

Program Code

$510PA&ED:PS&E:

R/W Sup:

Carryover

0.0/0.8

Con Sup:

Americans with Disabilities Act PedestrianInfrastructure

$1,976Const:R/W:

3

6

6

Senate:

Assembly:

Congress:

3

6

6Congress

Assembly

Senate

BRIDGE PRESERVATIONNear Point Reyes Station, at Lagunitas CreekBridge No. 27-0023. Replace bridge.

0756K

0G642 $6,500

Subtotal: $18,052

2020-21 $2,850$750

$2,500

$10,287Total Project Cost: $28,339

04130003508/3/2020

7/24/20206/1/2018PA&ED:

RTL:R/W Cert:

2/8/2021Begin Con:

04-Marin-1 Prior18-1918-1920-21

201.1131 Bridge(s)Performance Measure

Program Code

$4,187PA&ED:PS&E:

R/W Sup:

Carryover

28.5

Con Sup:

Bridge Seismic Restoration

$11,552Const:R/W:

2, 3

1, 6

6

Senate:

Assembly:

Congress:

2, 3

1, 6

6Congress

Assembly

Senate

Near Point Reyes Station, at Millerton GulchBridge No. 27-0114. Repair damagedembankment and construct retaining wall.0480C

0J570 $450

Subtotal: $4,470

2018-19 $1,080$180$830

$3,710Total Project Cost: $8,180

04140000146/21/20196/7/2019

12/1/2017PA&ED:

RTL:R/W Cert:

2/4/2020Begin Con:

04-Marin-1 PriorPriorPrior18-19

201.1191 Bridge(s)Performance Measure

Program Code

$1,620PA&ED:PS&E:

R/W Sup:

Carryover

33.4

Con Sup:

Bridge Preventative Maintenance

$4,020Const:R/W:

2

10

2

Senate:

Assembly:

Congress:

2

10

2Congress

Assembly

Senate

In San Rafael, at Irwin Creek Bridge No. 27-0097. Rehabilitate corrugated metal archculvert bridge and adjoining deteriorated culvertstructures.

1493K

0K510 $944

Subtotal: $2,847

2021-22 $880$215$610

$2,805Total Project Cost: $5,652

04160000966/1/20225/1/20228/1/2020PA&ED:

RTL:R/W Cert:

9/15/2022Begin Con:

04-Marin-101 Prior20-2120-2121-22

201.1191 Bridge(s)Performance Measure

Program Code

$1,100PA&ED:PS&E:

R/W Sup:

Carryover

11.3

Con Sup:

Bridge Preventative Maintenance

$1,903Const:R/W:

2

10

2

Senate:

Assembly:

Congress:

2

10

2Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 108 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Marin($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

ROADWAY PRESERVATIONNear Point Reyes Station and Olema, fromOlema Creek Bridge to north of Cypress Road;also near Tomales, from south of Tomales-Petaluma Road to south of Valley Ford Road (PM 45.0/50.5). Pavement rehabilitation.

1480A

1J960 $517

Subtotal: $14,300

2019-20 $1,254$66

$1,540

$4,180Total Project Cost: $18,480

04140004031/9/2020

12/2/201910/1/2018PA&ED:

RTL:R/W Cert:

7/9/2020Begin Con:

04-Marin-1 Prior18-1918-1919-20

201.12127.8 Lane mile(s)Performance Measure

Program Code

$1,320PA&ED:PS&E:

R/W Sup:

Carryover

22.8/31.2

Con Sup:

Pavement Rehabilitation (CAPM)

$13,783Const:R/W:

3

6

6

Senate:

Assembly:

Congress:

3

6

6Congress

Assembly

Senate

MOBILITYIn and near Sausalito, Corte Madera, andLarkspur, from north of Golden Gate Bridge to0.3 mile north of Sir Francis Drake Boulevard.Install ramp metering and Traffic OperationsSystem (TOS) elements.

0334J

15161 $110

Subtotal: $9,810

2018-19 $1,500$50

$1,600

$3,150Total Project Cost: $12,960

04140004466/1/20185/1/20185/7/2014PA&ED:

RTL:R/W Cert:

1/16/2019Begin Con:

04-Marin-101PriorPrior18-19

201.31511 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.3/9.0

Con Sup:

Transportation Management Systems

$9,700Const:R/W:

2

10

2

Senate:

Assembly:

Congress:

2

10

2Congress

Assembly

Senate

CountyMarin

PA&ED:PS&E:

R/W Sup:Con Sup:

$9,656$50,712

R/W:

Subtotal: $60,368

Const:$10,824$11,223$2,101

$10,630

$34,778

Total (Capital + Support): $95,146

Sorted by: Disctrict, County, Route and Post MilesPage 109 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Mariposa

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONIn the community of Mariposa, from Route 49to 12th Street. Improve pedestrian accessfacilities to reduce collision severity.3131

0Y600 $159

Subtotal: $1,709

2019-20 $528$411$390

$1,625Total Project Cost: $3,334

10130002449/19/20198/16/20194/13/2018PA&ED:

RTL:R/W Cert:

3/18/2020Begin Con:

10-Mariposa-140 Prior18-1918-1919-20

201.01524 Collision(s) reducedPerformance Measure

Program Code

$296PA&ED:PS&E:

R/W Sup:

Carryover

21.2/21.8

Con Sup:

Collision Severity Reduction

$1,550Const:R/W:

14

25

19

Senate:

Assembly:

Congress:

14

25

19Congress

Assembly

Senate

MANDATESIn the Mariposa community, from 3rd Street to7th street. Upgrade pedestrian facilities to makecompliant with the Americans with Disabilities Act (ADA) Standards.

3151

0Y590 $55

Subtotal: $1,381

2021-22 $626$453$592

$2,410Total Project Cost: $3,791

10130002405/1/2022

4/15/20224/15/2020PA&ED:

RTL:R/W Cert:

11/15/2022Begin Con:

10-Mariposa-140 18-1919-2019-2021-22

201.3618 Curb ramp(s)Performance Measure

Program Code

$739PA&ED:PS&E:

R/W Sup:

New

21.2/21.4

Con Sup:

Americans with Disabilities Act New Curb Ramps

$1,326Const:R/W:

14

25

19

Senate:

Assembly:

Congress:

14

25

19Congress

Assembly

Senate

ROADWAY PRESERVATIONNear the community of Mariposa, from MaderaCounty line to the south junction with Route140. Pavement rehabilitation. 3233

1C040 $7

Subtotal: $16,204

2019-20 $1,032$9

$2,150

$3,594Total Project Cost: $19,798

10170000342/18/202010/1/201910/9/2018PA&ED:

RTL:R/W Cert:

9/27/2020Begin Con:

10-Mariposa-49 Prior18-1918-1919-20

201.12134.6 Lane mile(s)Performance Measure

Program Code

$403PA&ED:PS&E:

R/W Sup:

Carryover

0.3/18.5

Con Sup:

Pavement Rehabilitation (CAPM)

$16,197Const:R/W:

1

4

4

Senate:

Assembly:

Congress:

1

4

4Congress

Assembly

Senate

In and near the Mariposa community, from 1.7miles east of Catheys Valley Park to the northRoute 49 Junction. Rehabilitate pavement andupgrade Americans with Disabilities Act (ADA)ramps.

3252

0Y770 $1,989

Subtotal: $19,352

2021-22 $1,095$416

$1,689

$4,225Total Project Cost: $23,577

10150000086/1/20225/1/20222/1/2020PA&ED:

RTL:R/W Cert:

12/1/2022Begin Con:

10-Mariposa-140 18-1919-2019-2021-22

201.12126.5 Lane mile(s)Performance Measure

Program Code

$1,025PA&ED:PS&E:

R/W Sup:

New

12.0/22.0

Con Sup:

Pavement Rehabilitation (CAPM)

$17,363Const:R/W:

14

25

19

Senate:

Assembly:

Congress:

14

25

19Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 110 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Mariposa

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near the Mariposa community and El Portal,from East Whitlock Road to Yosemite NationalPark entrance. Pavement rehabilitation.3167

0Y780 $162

Subtotal: $23,927

2021-22 $1,900$30

$2,330

$5,160Total Project Cost: $29,087

101600002510/1/20219/1/20215/1/2020PA&ED:

RTL:R/W Cert:

4/15/2022Begin Con:

10-Mariposa-140 18-1919-2019-2021-22

201.12154.8 Lane mile(s)Performance Measure

Program Code

$900PA&ED:PS&E:

R/W Sup:

New

25.3/51.8

Con Sup:

Pavement Rehabilitation (CAPM)

$23,765Const:R/W:

14

25

19

Senate:

Assembly:

Congress:

14

25

19Congress

Assembly

Senate

Near Briceburg, at 2.1 miles west of Bull CreekRoad. Repair slope slipout and erosion damageat large culvert pipe outlet. 3194

0Y340 $40

Subtotal: $1,890

2020-21 $955$155$925

$2,035Total Project Cost: $3,925

10140001829/30/20208/30/20207/29/2016PA&ED:

RTL:R/W Cert:

4/30/2021Begin Con:

10-Mariposa-14018-1918-1920-21

201.1501 Location(s)Performance Measure

Program Code

$0PA&ED:PS&E:

R/W Sup:

New

32.2

Con Sup:

Roadway Protective Betterments

$1,850Const:R/W:

14

25

19

Senate:

Assembly:

Congress:

14

25

19Congress

Assembly

Senate

Near Fish Camp, from south of MiamiMountain Road to south of Yosemite NationalPark boundary; also in Madera County (PMD0.639/D1.841). Rehabilitate culverts.

3158

1E770 $16

Subtotal: $1,909

2018-19 $929$84

$905

$2,353Total Project Cost: $4,262

101500011312/4/201812/3/2018

10/27/2017PA&ED:

RTL:R/W Cert:

7/1/2019Begin Con:

10-Mariposa-41 PriorPriorPrior18-19

201.15120 Culvert(s) (ea)Performance Measure

Program Code

$435PA&ED:PS&E:

R/W Sup:

Carryover

0.1/4.9

Con Sup:

Drainage System Restoration

$1,893Const:R/W:

14

5

4

Senate:

Assembly:

Congress:

14

5

4Congress

Assembly

Senate

CountyMariposa

PA&ED:PS&E:

R/W Sup:Con Sup:

$2,428$63,944

R/W:

Subtotal: $66,372

Const:$3,798$7,065$1,558$8,981

$21,402

Total (Capital + Support): $87,774

Sorted by: Disctrict, County, Route and Post MilesPage 111 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Mendocino

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MAJOR DAMAGE RESTORATIONNear Dos Rios, from 1.4 to 1.7 miles east ofRodeo Creek Bridge. Construct soldier pilewalls and drainage galleries.4553

0B530 $355

Subtotal: $7,985

2018-19 $1,650$170

$1,700

$5,580Total Project Cost: $13,565

01140000356/30/20196/15/20197/1/2018PA&ED:

RTL:R/W Cert:

12/1/2019Begin Con:

01-Mendocino-162 Prior18-1918-1918-19

201.1311 Location(s)Performance Measure

Program Code

$2,060PA&ED:PS&E:

R/W Sup:

Carryover

11.5/11.8

Con Sup:

Permanent Restoration

$7,630Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

COLLISION REDUCTIONNear Gualala, from 0.4 mile north of HavensNeck Drive to 0.5 mile south of Iverson Road.Widen shoulders and install edge-line rumblestrips and guardrail.

4630

0F710 $433

Subtotal: $952

2019-20 $978$472$728

$3,118Total Project Cost: $4,070

01160000473/1/2020

2/15/20201/11/2019PA&ED:

RTL:R/W Cert:

9/15/2020Begin Con:

01-Mendocino-1 Prior18-1918-1919-20

201.0106 Collision(s) reducedPerformance Measure

Program Code

$940PA&ED:PS&E:

R/W Sup:

Carryover

6.5/9.5

Con Sup:

Safety Improvements

$519Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Near Albion, from 1.5 miles north of Route 128to 0.1 mile south of Navarro Ridge Road. Widen for standard shoulders and install rumblestrips and guardrail.

4578

0C550 $462

Subtotal: $2,164

2019-20 $326$223$608

$1,779Total Project Cost: $3,943

01120003003/13/20202/28/2020

12/14/2018PA&ED:

RTL:R/W Cert:

8/14/2020Begin Con:

01-Mendocino-1 Prior18-1918-1919-20

201.01016 Collision(s) reducedPerformance Measure

Program Code

$622PA&ED:PS&E:

R/W Sup:

Carryover

41.8/42.3

Con Sup:

Safety Improvements

$1,702Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Near Fort Bragg, from 0.03 mile south to 0.07mile north of Abalobadiah Creek. Curveimprovement and shoulder widening.4639

0G060 $263

Subtotal: $2,254

2019-20 $1,094$190$783

$2,941Total Project Cost: $5,195

01160001203/1/2020

2/15/20203/8/2019PA&ED:

RTL:R/W Cert:

8/1/2020Begin Con:

01-Mendocino-1 Prior18-1918-1919-20

201.01016 Collision(s) reducedPerformance Measure

Program Code

$874PA&ED:PS&E:

R/W Sup:

Carryover

71.2/71.4

Con Sup:

Safety Improvements

$1,991Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 112 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Mendocino

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Fort Bragg, from 0.34 mile west of Road200A to 0.13 mile west of Road 200A. Improvecurve, install center and edge-line rumble strips,and install guardrail.

4613

0E860 $103

Subtotal: $2,258

2018-19 $1,117$129

$1,225

$3,253Total Project Cost: $5,511

01150000386/25/20196/11/20199/14/2018PA&ED:

RTL:R/W Cert:

11/14/2019Begin Con:

01-Mendocino-20 Prior18-1918-1918-19

201.01024 Collision(s) reducedPerformance Measure

Program Code

$782PA&ED:PS&E:

R/W Sup:

Carryover

16.9/17.2

Con Sup:

Safety Improvements

$2,155Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Near Willits, from 1.0 mile to 0.8 mile west ofThree Chop Road. Widen eastbound shoulders, construct guard railing, place High Friction Surface Treatment (HFST), and extend anexisting culvert.

4650

0G430 $17

Subtotal: $1,320

2019-20 $843$175$718

$2,339Total Project Cost: $3,659

01160001883/15/20203/1/20202/1/2019PA&ED:

RTL:R/W Cert:

8/15/2020Begin Con:

01-Mendocino-20 Prior18-1918-1919-20

201.0108 Collision(s) reducedPerformance Measure

Program Code

$603PA&ED:PS&E:

R/W Sup:

Carryover

24.7/24.9

Con Sup:

Safety Improvements

$1,303Const:R/W:

2

2

1

Senate:

Assembly:

Congress:

2

2

1Congress

Assembly

Senate

Near Dos Rios, from 1.0 mile east of the MiddleWay to 1.3 miles east of the Middle Way. Increase safety by improving roadway crossslope at curve, installing High Friction SurfaceTreatment (HFST), and installing an underdrainsystem.

4652

0G480 $6

Subtotal: $1,048

2018-19 $672$123$723

$2,071Total Project Cost: $3,119

011700000912/15/201812/1/20184/1/2018PA&ED:

RTL:R/W Cert:

5/15/2019Begin Con:

01-Mendocino-162 PriorPriorPrior18-19

201.01014 Collision(s) reducedPerformance Measure

Program Code

$553PA&ED:PS&E:

R/W Sup:

Carryover

17.4/17.8

Con Sup:

Safety Improvements

$1,042Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

In Mendocino, Lake, Del Norte, and HumboldtCounties on Routes 1, 20, 29, 96, 101, 128, 162,169, 175, 199, 253, 254, 271, 281, and 299, atvarious locations. Replace curve warning signs to make standard.

7022

0G050 $9

Subtotal: $2,331

2019-20 $1,067$58

$986

$2,524Total Project Cost: $4,855

01160001189/1/20199/1/20192/1/2019PA&ED:

RTL:R/W Cert:

1/1/2020Begin Con:

01-Mendocino-Var 18-1918-1918-1919-20

201.01530 Collision(s) reducedPerformance Measure

Program Code

$413PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

$2,322Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 113 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Mendocino

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Laytonville, at Moss Cove SafetyRoadside Rest Area (SRRA); also at IrvineLodge SRRA (PM 61.8) and Empire CampSRRA (PM 82.5). Upgrade potable andwastewater systems.

4574

0C450 $3

Subtotal: $6,325

2019-20 $2,260$46

$1,232

$3,903Total Project Cost: $10,228

01120002856/15/20206/1/20204/1/2018PA&ED:

RTL:R/W Cert:

10/1/2020Begin Con:

01-Mendocino-101 PriorPriorPrior19-20

201.2353 Location(s)Performance Measure

Program Code

$365PA&ED:PS&E:

R/W Sup:

Carryover

58.9/82.5

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$6,322Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

MANDATESIn Fort Bragg, from Route 20 to Pudding CreekBridge. Construct Americans with DisabilitiesAct (ADA) compliant curb ramps and sidewalk,add high visibility signing and striping atcrosswalks, construct retaining walls, andupgrade drainage.

4546

0B220 $256

Subtotal: $4,474

2020-21 $1,246$511

$1,588

$4,095Total Project Cost: $8,569

011200011012/1/2020

11/15/20209/1/2019PA&ED:

RTL:R/W Cert:

7/1/2021Begin Con:

01-Mendocino-1 18-1919-2019-2020-21

201.37868 Structure(s)Performance Measure

Program Code

$750PA&ED:PS&E:

R/W Sup:

New

59.8/62.1

Con Sup:

Americans with Disabilities Act PedestrianInfrastructure

$4,218Const:R/W:

2

2

1

Senate:

Assembly:

Congress:

2

2

1Congress

Assembly

Senate

BRIDGE PRESERVATIONNear Albion, from 2.2 miles north of Route 128Junction to 0.2 mile north of Salmon Creek Bridge No. 10-0134. Bridge replacement.

(G13 Contingency)

4491

40140 $6,324

Subtotal: $43,099

2019-20 $5,593$810

$6,290

$18,493Total Project Cost: $61,592

01000001552/14/20201/31/2020

11/15/2018PA&ED:

RTL:R/W Cert:

3/1/2020Begin Con:

01-Mendocino-1 Prior18-1918-1919-20

201.1101 Bridge(s)Performance Measure

Program Code

$5,800PA&ED:PS&E:

R/W Sup:

Carryover

42.4/43.3

* Con Sup:

Bridge Major Rehabilitation

* Const, * Con Sup phase(s) are NOT authorized

$36,775* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Near Albion, from 3.0 miles north of Route 128Junction to 0.2 mile north of Albion RiverBridge No. 10-0136. Bridge replacement.

(G13 Contingency)

4490

40110 $7,748

Subtotal: $61,447

2019-20 $5,220$828

$5,950

$17,498Total Project Cost: $78,945

01000001546/30/20203/13/20205/17/2019PA&ED:

RTL:R/W Cert:

12/15/2020Begin Con:

01-Mendocino-1 Prior19-2019-2019-20

201.1101 Bridge(s)Performance Measure

Program Code

$5,500PA&ED:PS&E:

R/W Sup:

Carryover

43.3/44.2

* Con Sup:

Bridge Major Rehabilitation

* Const, * Con Sup phase(s) are NOT authorized

$53,699* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 114 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Mendocino

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Ukiah, from east of Route 101 to east ofRoad 144 at Russian River Bridge andOverhead No. 10-0182. Rehabilitate bridgedeck.

4587

0E090 $250

Subtotal: $26,082

2019-20 $3,129$260

$7,824

$13,300Total Project Cost: $39,382

01130001233/1/2020

2/15/20202/15/2019PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

01-Mendocino-20 Prior18-1918-1919-20

201.1102 Bridge(s)Performance Measure

Program Code

$2,087PA&ED:PS&E:

R/W Sup:

Carryover

33.3/34.4

Con Sup:

Bridge Major Rehabilitation

$25,832Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Near Piercy, from 0.7 mile north of Routes271/101 Separation Bridge No. 10-0217 to 0.4mile south of Sidehill Viaduct No. 10-0100.Mitigation planting and monitoring for EA0A840.

4710

0A841

Subtotal: $205

2020-21

$172

$172Total Project Cost: $377

01180001307/15/20204/15/20184/27/2017PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

01-Mendocino-271

20-21

201.1100 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

17.7/18.0

Con Sup:

Bridge Major Rehabilitation

$205Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

In and near Fort Bragg, at Little River BridgeNo. 10-0178, at Jack Peters Bridge No. 10-0150and at Pudding Creek Bridge No. 10-0158.Upgrade and replace barrier rails and bridgereplacement.

4507

43480 $1,099

Subtotal: $16,749

2019-20 $2,825$341

$3,650

$10,622Total Project Cost: $27,371

01000006723/6/2020

2/28/202012/14/2018PA&ED:

RTL:R/W Cert:

9/4/2020Begin Con:

01-Mendocino-1 Prior18-1918-1919-20

201.1121463.0 Linear feetPerformance Measure

Program Code

$3,806PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Rail Replacement and Upgrade

$15,650Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Near Fort Bragg, at Elk Creek Bridge No. 10-0120. Replace and upgrade bridge rails.

4588

0E110 $333

Subtotal: $7,658

2019-20 $1,445$191

$1,759

$4,758Total Project Cost: $12,416

01130001253/12/20212/26/20219/13/2019PA&ED:

RTL:R/W Cert:

8/27/2021Begin Con:

01-Mendocino-1 Prior19-2019-2019-20

201.112321.5 Linear feetPerformance Measure

Program Code

$1,363PA&ED:PS&E:

R/W Sup:

Carryover

31.4

Con Sup:

Bridge Rail Replacement and Upgrade

$7,325Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 115 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Mendocino

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near the Mendocino community, at RussianGulch Bridge No. 10-0151 (PM 52.64).Replace or upgrade bridge to address bridge railstandards, functionality, structural integrity, andprovide access for pedestrians and bicycles.

4636

43481 $7,128

Subtotal: $41,237

2021-22 $2,808$396

$13,142

$18,983Total Project Cost: $60,220

01160001013/18/20223/4/2022

8/14/2020PA&ED:

RTL:R/W Cert:

10/14/2022Begin Con:

01-Mendocino-1 18-1920-2120-2121-22

201.1121134.0 Linear feetPerformance Measure

Program Code

$2,637PA&ED:PS&E:

R/W Sup:

New

R52.4/R52.9

Con Sup:

Bridge Rail Replacement and Upgrade

$34,109Const:R/W:

2

2

1

Senate:

Assembly:

Congress:

2

2

1Congress

Assembly

Senate

Near Fort Bragg, at Hare Creek Bridge No. 10-0175. Upgrade bridge rails and widen to makestandard.4588B

0E111 $474

Subtotal: $12,926

2021-22 $2,979$183

$3,498

$9,430Total Project Cost: $22,356

01150001095/1/20224/1/2022

10/1/2020PA&ED:

RTL:R/W Cert:

12/1/2022Begin Con:

01-Mendocino-1 18-1920-2120-2121-22

201.112868.0 Linear feetPerformance Measure

Program Code

$2,770PA&ED:PS&E:

R/W Sup:

New

59.7

Con Sup:

Bridge Rail Replacement and Upgrade

$12,452Const:R/W:

2

2

1

Senate:

Assembly:

Congress:

2

2

1Congress

Assembly

Senate

Near Piercy, at South Fork Eel River Bridge No.10-0218 (PM R106.57); also in Humboldt County (PM T0.0 to T0.1). Seismic bridgeretrofit, bridge rail upgrade, restripe for widershoulders and bicycle access, and upgrade deckdrainage.

4627

0F510 $26

Subtotal: $3,631

2021-22 $1,028$248

$1,278

$3,293Total Project Cost: $6,924

01160000151/15/20221/1/2022

10/1/2020PA&ED:

RTL:R/W Cert:

6/1/2022Begin Con:

01-Mendocino-101 18-1920-2120-2121-22

201.1131 Bridge(s)Performance Measure

Program Code

$739PA&ED:PS&E:

R/W Sup:

New

R106.4/T106.8

Con Sup:

Bridge Seismic Restoration

$3,605Const:R/W:

2

2

1

Senate:

Assembly:

Congress:

2

2

1Congress

Assembly

Senate

Near Longvale, from 8.2 miles to 8.3 miles eastof Route 101 at Eel River Bridge No. 10-0236.Bridge seismic retrofit.4692

0A131 $618

Subtotal: $7,001

2021-22 $1,295$127

$4,179

$6,338Total Project Cost: $13,339

01170002231/15/2022

12/30/202110/1/2020PA&ED:

RTL:R/W Cert:

6/1/2022Begin Con:

01-Mendocino-162 18-1920-2120-2121-22

201.1131 Bridge(s)Performance Measure

Program Code

$737PA&ED:PS&E:

R/W Sup:

New

8.2

Con Sup:

Bridge Seismic Restoration

$6,383Const:R/W:

2

2

1

Senate:

Assembly:

Congress:

2

2

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 116 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Mendocino

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

ROADWAY PRESERVATIONIn and near Point Arena, from Sonoma Countyline to 0.1 mile south of Mill Street. Pavementrehabilitation.4626

0F440 $15

Subtotal: $12,600

2019-20 $704$85

$2,590

$4,002Total Project Cost: $16,602

011600000810/1/20199/17/201912/1/2018PA&ED:

RTL:R/W Cert:

3/15/2020Begin Con:

01-Mendocino-1 Prior18-1918-1919-20

201.12131.4 Lane mile(s)Performance Measure

Program Code

$623PA&ED:PS&E:

R/W Sup:

Carryover

0.0/15.0

Con Sup:

Pavement Rehabilitation (CAPM)

$12,585Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

In and near Fort Bragg, from Pudding CreekBridge to 0.6 mile north of Wages CreekBridge. Pavement rehabilitation.0154T

36270 $1

Subtotal: $13,583

2018-19 $501$36

$657

$1,530Total Project Cost: $15,113

01160000315/15/20195/1/20199/1/2018PA&ED:

RTL:R/W Cert:

10/1/2019Begin Con:

01-Mendocino-1 Prior18-1918-1918-19

201.12132.9 Lane mile(s)Performance Measure

Program Code

$336PA&ED:PS&E:

R/W Sup:

Carryover

62.1/78.9

Con Sup:

Pavement Rehabilitation (CAPM)

$13,582Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

Near Hopland, from 0.7 mile south of GeysersRoad to Hopland Overhead. Pavementrehabilitation.4442

46630 $1

Subtotal: $13,290

2018-19 $635$4

$1,724

$2,725Total Project Cost: $16,015

01160000245/15/20195/1/20199/1/2018PA&ED:

RTL:R/W Cert:

10/1/2019Begin Con:

01-Mendocino-101 Prior18-1918-1918-19

201.12136.2 Lane mile(s)Performance Measure

Program Code

$362PA&ED:PS&E:

R/W Sup:

Carryover

R0.1/R9.6

Con Sup:

Pavement Rehabilitation (CAPM)

$13,289Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

Near Albion, at Navarro Ridge Road. Improvedrainage, repair erosion, widen shoulders, andrepair roadway.4616

0E940 $168

Subtotal: $1,270

2019-20 $405$67

$370

$1,257Total Project Cost: $2,527

01150000483/13/20202/28/2020

12/14/2018PA&ED:

RTL:R/W Cert:

8/1/2020Begin Con:

01-Mendocino-1 Prior18-1918-1919-20

201.1501 Location(s)Performance Measure

Program Code

$415PA&ED:PS&E:

R/W Sup:

Carryover

42.3/42.5

Con Sup:

Roadway Protective Betterments

$1,102Const:R/W:

2

1

1

Senate:

Assembly:

Congress:

2

1

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 117 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Mendocino

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

ROADSIDE PRESERVATIONNear Point Arena and Fort Bragg, from 0.6 milenorth of Haven Neck Drive to 0.1 mile north ofSouth Fork Cotteneva Creek Bridge. Advancemitigation credit purchases (14 credits) forfuture SHOPP construction projects expected toimpact wetlands.

4693

0H440 $8,820

Subtotal: $8,820

2018-19 $1,700$7

$1,764Total Project Cost: $10,584

01170002227/1/20193/1/2019

4/15/2018PA&ED:

RTL:R/W Cert:

10/1/2019Begin Con:

01-Mendocino-1 PriorPriorPrior

201.2407 Location(s)Performance Measure

Program Code

$57PA&ED:PS&E:

R/W Sup:

Carryover

6.8/87.9

Con Sup:

Roadside Enhancement

Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

Near Manchester and Fort Bragg, from GarciaRiver Bridge to 0.1 mile north of AbalobadiahCreek. Advance mitigation credit purchases (7credits) for future SHOPP construction projectsexpected to impact sensitive streams.

4699

0H441 $4,410

Subtotal: $4,410

2018-19 $850$3

$882Total Project Cost: $5,292

01180000776/15/20198/1/2019

4/15/2018PA&ED:

RTL:R/W Cert:

10/15/2019Begin Con:

01-Mendocino-1 PriorPriorPrior

201.2404 Location(s)Performance Measure

Program Code

$29PA&ED:PS&E:

R/W Sup:

Carryover

18.5/71.4

Con Sup:

Roadside Enhancement

Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

CountyMendocino

PA&ED:PS&E:

R/W Sup:Con Sup:

$39,322$265,797

R/W:

Subtotal: $305,119

Const:$35,223$42,370$5,683

$63,374

$146,650

Total (Capital + Support): $451,769

Sorted by: Disctrict, County, Route and Post MilesPage 118 of 290 Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Merced($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONNear the city of Merced at various locations,from Route 5 to 6 miles east of the city ofMerced. Upgrade metal beam guardrails3018

0Y110 $794

Subtotal: $5,128

2019-20 $1,168$280

$1,187

$4,077Total Project Cost: $9,205

101300010811/15/201911/1/2019

11/17/2017PA&ED:

RTL:R/W Cert:

5/29/2020Begin Con:

10-Merced-140 PriorPriorPrior19-20

201.01549 Collision(s) reducedPerformance Measure

Program Code

$1,442PA&ED:PS&E:

R/W Sup:

Carryover

0.0/42.1

Con Sup:

Collision Severity Reduction

$4,334Const:R/W:

12

17

18

Senate:

Assembly:

Congress:

12

17

18Congress

Assembly

Senate

In and near the cities of Gustine and Merced,from Outside Canal Bridge No. 39-0055 to 1.3miles west of Mariposa County line, at variouslocations. Replace bridge approach guardrail ontwo bridges and removal of obstructions fromclear recovery zone at eleven locations.

3074

0Y130 $355

Subtotal: $4,580

2021-22 $769$252

$1,172

$3,472Total Project Cost: $8,052

10130002432/1/2022

11/15/202111/1/2019PA&ED:

RTL:R/W Cert:

8/1/2022Begin Con:

10-Merced-140 Prior20-2120-2121-22

201.01539 Collision(s) reducedPerformance Measure

Program Code

$1,279PA&ED:PS&E:

R/W Sup:

New

2.3/49.0

Con Sup:

Collision Severity Reduction

$4,225Const:R/W:

12

26

18

Senate:

Assembly:

Congress:

12

26

18Congress

Assembly

Senate

In and near Los Banos, from 0.3 mile east ofRoute 5 to 0.2 mile west of Route 59. Upgradeguardrail to make standard. 3740

1C370 $13

Subtotal: $2,611

2020-21 $939$12

$745

$2,346Total Project Cost: $4,957

10170000435/4/2021

8/26/20202/7/2020PA&ED:

RTL:R/W Cert:

11/30/2021Begin Con:

10-Merced-152 18-1919-2019-2020-21

201.01525 Collision(s) reducedPerformance Measure

Program Code

$650PA&ED:PS&E:

R/W Sup:

New

14.1/R40.7

Con Sup:

Collision Severity Reduction

$2,598Const:R/W:

12

17

18

Senate:

Assembly:

Congress:

12

17

18Congress

Assembly

Senate

MANDATESIn Los Banos, from 0.3 mile south of Route 152to Dove Street at various locations. UpgradeAmericans with Disabilities Act (ADA)facilities.

3149

0X520 $1,280

Subtotal: $2,248

2019-20 $477$1,280

$505

$2,609Total Project Cost: $4,857

10130000024/20/20203/16/20207/5/2017PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

10-Merced-165 PriorPriorPrior19-20

201.361100 Curb ramp(s)Performance Measure

Program Code

$347PA&ED:PS&E:

R/W Sup:

Carryover

8.5/10.6

Con Sup:

Americans with Disabilities Act New Curb Ramps

$968Const:R/W:

12

17

18

Senate:

Assembly:

Congress:

12

17

18Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 119 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Merced($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

BRIDGE PRESERVATIONIn Merced County, on Routes 152, 140, and 59at various locations. Seismic retrofit and bridgerail upgrade of seven bridges. 3122

0G830 $416

Subtotal: $6,946

2019-20 $649$19

$1,984

$3,634Total Project Cost: $10,580

10120003162/21/20202/7/20201/2/2019PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

10-Merced-152 Prior18-1918-1919-20

201.1137 Bridge(s)Performance Measure

Program Code

$982PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Seismic Restoration

$6,530Const:R/W:

12

17, 26

18

Senate:

Assembly:

Congress:

12

17, 26

18Congress

Assembly

Senate

In Merced, San Joaquin, Mariposa andStanislaus Counties, on various routes at variouslocations. Scour mitigation and preventative structural maintenance measures at thirteenbridges.

3102

1C810 $1,894

Subtotal: $3,994

2020-21 $950$542

$1,100

$3,411Total Project Cost: $7,405

101500003812/18/202012/1/20207/2/2018PA&ED:

RTL:R/W Cert:

7/23/2021Begin Con:

10-Merced-5 Prior18-1918-1920-21

201.11913 Bridge(s)Performance Measure

Program Code

$819PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Preventative Maintenance

$2,100Const:R/W:

5, 12, 14

17, 26

11, 18

Senate:

Assembly:

Congress:

5, 12, 14

17, 26

11, 18Congress

Assembly

Senate

ROADWAY PRESERVATIONIn and near the city of Merced, from south ofChilds Avenue to south of Franklin Road. Roadway rehabilitation.

(G13 Contingency)

3089

1C170 $95

Subtotal: $46,095

2019-20 $3,700$122

$12,400

$17,822Total Project Cost: $63,917

10140001445/15/20204/15/20204/2/2018PA&ED:

RTL:R/W Cert:

11/13/2020Begin Con:

10-Merced-99 PriorPriorPrior19-20

201.12219.6 Lane mile(s)Performance Measure

Program Code

$1,600PA&ED:PS&E:

R/W Sup:

Carryover

R12.7/17.6

* Con Sup:

Roadway Rehabilitation (2R)

* Const, * Con Sup phase(s) are NOT authorized

$46,000* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

12

17

18

Senate:

Assembly:

Congress:

12

17

18Congress

Assembly

Senate

In and near Atwater, from 0.4 mile south ofBuhach Road to south of Westside Boulevard.Roadway rehabilitation. 5431

3A720 $3,369

Subtotal: $63,969

2018-19 $5,200$677

$10,000

$17,850Total Project Cost: $81,819

10130002596/21/20196/14/201911/3/2017PA&ED:

RTL:R/W Cert:

2/14/2020Begin Con:

10-Merced-99 Prior18-1918-1918-19

201.12216.8 Lane mile(s)Performance Measure

Program Code

$1,973PA&ED:PS&E:

R/W Sup:

Carryover

20.1/24.3

Con Sup:

Roadway Rehabilitation (2R)

$60,600Const:R/W:

12

26

18

Senate:

Assembly:

Congress:

12

26

18Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 120 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Merced($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Merced County on Routes 152, 59, and 99and in San Joaquin County on Routes 5 and 12,at various locations. Rehabilitate culverts.3139

0S120 $151

Subtotal: $1,919

2019-20 $743$124$765

$2,254Total Project Cost: $4,173

10150000055/1/20194/1/20196/4/2018PA&ED:

RTL:R/W Cert:

1/3/2020Begin Con:

10-Merced-152 Prior18-1918-1919-20

201.15116 Culvert(s) (ea)Performance Measure

Program Code

$622PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Drainage System Restoration

$1,768Const:R/W:

5, 12

17

11, 18

Senate:

Assembly:

Congress:

5, 12

17

11, 18Congress

Assembly

Senate

MOBILITYNear Los Banos, at Route 33 Interchange; alsoon Route 5 (PM 6.3) at Route 165 Interchange.Improve the truck turn radius. 3214

0T680 $274

Subtotal: $2,490

2021-22 $850$64

$630

$2,039Total Project Cost: $4,529

101700000512/1/2021

11/15/20215/15/2020PA&ED:

RTL:R/W Cert:

6/15/2022Begin Con:

10-Merced-152 18-1919-2019-2021-22

201.31048 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

$495PA&ED:PS&E:

R/W Sup:

New

11.3

Con Sup:

Operational Improvements

$2,216Const:R/W:

12

17

18

Senate:

Assembly:

Congress:

12

17

18Congress

Assembly

Senate

ROADSIDE PRESERVATIONNear Los Banos and Firebaugh, at the John"Chuck" Erreca Safety Roadside Rest Area(SRRA). Upgrade northbound and southboundSRRA facilities.

3215

1C790 $5

Subtotal: $16,705

2021-22 $2,970$10

$3,150

$7,055Total Project Cost: $23,760

10160000468/2/2021

1/15/20218/12/2019PA&ED:

RTL:R/W Cert:

2/11/2022Begin Con:

10-Merced-5 18-1919-2019-2021-22

201.2502 Location(s)Performance Measure

Program Code

$925PA&ED:PS&E:

R/W Sup:

New

0.4/0.8

Con Sup:

Safety Roadside Rest Area Restoration

$16,700Const:R/W:

12

17

18

Senate:

Assembly:

Congress:

12

17

18Congress

Assembly

Senate

MULTIPLE OBJECTIVEAt northbound and southbound John "Chuck"Erreca Safety Roadside Rest Area (SRRA) andin San Joaquin County on Route 99 at LodiPark-and-Ride lot. Transportation infrastructureimprovement for zero-emission vehiclecharging.

3209A

1G721 $4

Subtotal: $1,609

2018-19 $284$9

$302

$595Total Project Cost: $2,204

101800006710/1/20189/4/2018

1/30/2018PA&ED:

RTL:R/W Cert:

4/8/2019Begin Con:

10-Merced-518-1918-1918-19

201.9993 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

0.4/0.9

Con Sup:

MULTIPLE OBJECTIVE

$1,605Const:R/W:

12

26

18

Senate:

Assembly:

Congress:

12

26

18Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 121 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Merced($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

CountyMerced

PA&ED:PS&E:

R/W Sup:Con Sup:

$8,650$149,644

R/W:

Subtotal: $158,294

Const:$11,134$18,699$3,391

$33,940

$67,164

Total (Capital + Support): $225,458

Sorted by: Disctrict, County, Route and Post MilesPage 122 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Modoc($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONNear Cedarville, from 0.6 mile west of CedarPass Ski Tow Road to Cedar Pass Ski TowRoad. Curve improvement.3607

1H330 $15

Subtotal: $3,229

2018-19 $680$90

$840

$2,190Total Project Cost: $5,419

02150001506/4/20185/4/2018

9/19/2017PA&ED:

RTL:R/W Cert:

9/18/2018Begin Con:

02-Modoc-299 PriorPriorPrior18-19

201.01018 Collision(s) reducedPerformance Measure

Program Code

$580PA&ED:PS&E:

R/W Sup:

Carryover

51.9/52.5

Con Sup:

Safety Improvements

$3,214Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

CountyModoc

PA&ED:PS&E:

R/W Sup:Con Sup:

$15$3,214

R/W:

Subtotal: $3,229

Const:$580$680$90

$840

$2,190

Total (Capital + Support): $5,419

Sorted by: Disctrict, County, Route and Post MilesPage 123 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Mono($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONNear Tom’s place, from 2.4 miles south ofLower Rock Creek Road to 0.3 mile north ofLower Rock Creek Road. Widen shoulders,flatten slopes, install ground in rumble strips,reconstruct and install guardrail.

0662

36070 $368

Subtotal: $14,108

2020-21 $2,037$485

$2,799

$6,243Total Project Cost: $20,351

09140000036/30/20206/30/20208/27/2018PA&ED:

RTL:R/W Cert:

10/7/2020Begin Con:

09-Mono-395 Prior18-1918-1920-21

201.01533 Collision(s) reducedPerformance Measure

Program Code

$922PA&ED:PS&E:

R/W Sup:

New

6.9/9.6

Con Sup:

Collision Severity Reduction

$13,740Const:R/W:

8

5

8

Senate:

Assembly:

Congress:

8

5

8Congress

Assembly

Senate

Near Lee Vining, from Route 167 Junction to0.2 mile north of Conway Ranch Road. Widenshoulders, install shoulder rumble strip, correctcompound curve, and improve chain controlarea.

2624

36640 $506

Subtotal: $5,996

2021-22 $830$590

$1,440

$3,380Total Project Cost: $9,376

09160000064/1/20224/1/20224/1/2020PA&ED:

RTL:R/W Cert:

10/1/2022Begin Con:

09-Mono-395 18-1919-2019-2021-22

201.01560 Collision(s) reducedPerformance Measure

Program Code

$520PA&ED:PS&E:

R/W Sup:

New

58.2/60.2

Con Sup:

Collision Severity Reduction

$5,490Const:R/W:

8

5

8

Senate:

Assembly:

Congress:

8

5

8Congress

Assembly

Senate

Near Bridgeport, from north of Devils GateSummit to Burcham Flat Road. Widen shoulders and add rumble strip.2600

34940 $1,299

Subtotal: $8,651

2018-19 $1,280$350

$1,729

$5,529Total Project Cost: $14,180

091200003310/31/201810/31/2018

5/3/2017PA&ED:

RTL:R/W Cert:

4/29/2019Begin Con:

09-Mono-395 PriorPriorPrior18-19

201.01550 Collision(s) reducedPerformance Measure

Program Code

$2,170PA&ED:PS&E:

R/W Sup:

Carryover

88.4/91.6

Con Sup:

Collision Severity Reduction

$7,352Const:R/W:

18

25

25

Senate:

Assembly:

Congress:

18

25

25Congress

Assembly

Senate

In Mono County, on Route 395 at variouslocations; also in Mono County, on Route 6 atapproximately 7.0 miles north of Bishop (PM7.0). Improve the chain control turnouts bywidening and lengthening the pavement area,install lighting, improve signage, construct amedian cross-over, and construct two new chaincontrol turnouts.

2616

36660 $5

Subtotal: $5,715

2020-21 $300$10

$740

$1,310Total Project Cost: $7,025

09160000082/1/2021

12/1/202011/1/2019PA&ED:

RTL:R/W Cert:

8/1/2021Begin Con:

09-Mono-395 18-1919-2019-2020-21

201.23513 Location(s)Performance Measure

Program Code

$260PA&ED:PS&E:

R/W Sup:

New

R2.2/R69.9

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$5,710Const:R/W:

8

5

8

Senate:

Assembly:

Congress:

8

5

8Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 124 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Mono($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

ROADSIDE PRESERVATIONIn Mono County, at various locations. Advancemitigation banking credits.

2621

36670 $600

Subtotal: $2,900

2019-20 $200$100$150

$650Total Project Cost: $3,550

09160000096/26/20205/15/20202/15/2019PA&ED:

RTL:R/W Cert:

12/15/2020Begin Con:

09-Mono-395 Prior18-1918-1919-20

201.24011 Location(s)Performance Measure

Program Code

$200PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Roadside Enhancement

$2,300Const:R/W:

8

5

8

Senate:

Assembly:

Congress:

8

5

8Congress

Assembly

Senate

CountyMono

PA&ED:PS&E:

R/W Sup:Con Sup:

$2,778$34,592

R/W:

Subtotal: $37,370

Const:$4,072$4,647$1,535$6,858

$17,112

Total (Capital + Support): $54,482

Sorted by: Disctrict, County, Route and Post MilesPage 125 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Monterey

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONIn Monterey, Santa Cruz and San BenitoCounties, on various routes at various locations.Replace and install advance curve warningsigns.

2595

1G310 $48

Subtotal: $1,900

2018-19 $1,044$35

$552

$2,385Total Project Cost: $4,285

05140001405/1/2019

4/29/20197/3/2018PA&ED:

RTL:R/W Cert:

10/11/2019Begin Con:

05-Monterey-Var Prior18-1918-1918-19

201.0151107 Collision(s) reducedPerformance Measure

Program Code

$754PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Collision Severity Reduction

$1,852Const:R/W:

12, 17

29, 30

18, 20

Senate:

Assembly:

Congress:

12, 17

29, 30

18, 20Congress

Assembly

Senate

In and near King City, from 0.1 mile south ofBroadway Street to 0.1 mile north of BroadwayStreet and from Jolon Road to 0.2 mile north ofJolon Road. Landscape mitigation.

2312Y

0T991

Subtotal: $816

2019-20 $344

$483

$827Total Project Cost: $1,643

05160001254/24/20209/9/2019

1/29/2015PA&ED:

RTL:R/W Cert:

11/30/2020Begin Con:

05-Monterey-10118-19

19-20

201.0150 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R41.5/49.8

Con Sup:

Collision Severity Reduction

$816Const:R/W:

15

28

17

Senate:

Assembly:

Congress:

15

28

17Congress

Assembly

Senate

In and near Salinas, from 0.1 mile north of EastMarket Street to 0.1 mile south of SherwoodDrive. Lengthen the onramp to improve merging conflicts.

2635

1H050 $5

Subtotal: $4,755

2021-22 $1,900$190

$2,000

$4,790Total Project Cost: $9,545

05160000188/6/2021

4/23/20217/1/2019PA&ED:

RTL:R/W Cert:

2/23/2022Begin Con:

05-Monterey-101 18-1919-2019-2021-22

201.0153 Collision(s) reducedPerformance Measure

Program Code

$700PA&ED:PS&E:

R/W Sup:

New

87.4/87.8

Con Sup:

Collision Severity Reduction

$4,750Const:R/W:

17

29

20

Senate:

Assembly:

Congress:

17

29

20Congress

Assembly

Senate

Near Bradley, at Camp Roberts Safety RoadsideRest Area (SRRA). Upgrade northbound andsouthbound SRRA facilities.2633

1H020 $6

Subtotal: $4,879

2019-20 $1,763$29

$1,240

$3,032Total Project Cost: $7,911

05160000134/1/2020

12/2/20196/15/2017PA&ED:

RTL:R/W Cert:

11/12/2020Begin Con:

05-Monterey-10118-1918-1919-20

201.2354 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$4,873Const:R/W:

17

30

20

Senate:

Assembly:

Congress:

17

30

20Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 126 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Monterey

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Monterey and San Benito counties from northof North Gonzalez Overcrossing to the SantaClara County line. Roadside safetyimprovements.

2571

1F900 $456

Subtotal: $4,824

2019-20 $1,216$175

$1,355

$3,461Total Project Cost: $8,285

051400007312/24/201912/10/20194/13/2018PA&ED:

RTL:R/W Cert:

6/15/2020Begin Con:

05-Monterey-101 PriorPriorPrior19-20

201.23552 Location(s)Performance Measure

Program Code

$715PA&ED:PS&E:

R/W Sup:

Carryover

73.0/96.8

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$4,368Const:R/W:

12, 17

29, 30

19, 20

Senate:

Assembly:

Congress:

12, 17

29, 30

19, 20Congress

Assembly

Senate

MANDATESIn Pacific Grove, from 17 Mile Drive toCongress Avenue. Construct Americans withDisabilities Act (ADA) compliant pathwayalong eastbound Route 68, upgrade curb rampsand sidewalk to meet ADA Standards. Relocatestreetlight pole and signs, remove and replanttrees.

2647

1H220 $20

Subtotal: $775

2021-22 $790$48

$586

$1,737Total Project Cost: $2,512

05160000418/2/20214/1/20217/1/2019PA&ED:

RTL:R/W Cert:

2/22/2022Begin Con:

05-Monterey-68 18-1919-2019-2021-22

201.3618 Curb ramp(s)Performance Measure

Program Code

$313PA&ED:PS&E:

R/W Sup:

New

0.5/0.8

Con Sup:

Americans with Disabilities Act New Curb Ramps

$755Const:R/W:

17

29

20

Senate:

Assembly:

Congress:

17

29

20Congress

Assembly

Senate

In Seaside, from El Monte Road to FremontBoulevard. Construct new sidewalks/upgradepedestrian pathway and construct/upgrade curbramps to meet current standards.

2648

1H230 $356

Subtotal: $1,478

2021-22 $1,269$1,016

$547

$3,462Total Project Cost: $4,940

051600004210/1/20217/1/20217/1/2019PA&ED:

RTL:R/W Cert:

4/22/2022Begin Con:

05-Monterey-218 18-1919-2019-2021-22

201.3617 Curb ramp(s)Performance Measure

Program Code

$630PA&ED:PS&E:

R/W Sup:

New

R0.2/L0.9

Con Sup:

Americans with Disabilities Act New Curb Ramps

$1,122Const:R/W:

17

29

20

Senate:

Assembly:

Congress:

17

29

20Congress

Assembly

Senate

BRIDGE PRESERVATIONNear Carmel-By-The Sea, at Garrapata CreekNo. 44-0018. Rehabilitate bridge to extend theservice life and mitigate corrosion by applyingElectrochemical Chloride Extraction (ECE)process and waterproofing to the structure.

2654

1H460

Subtotal: $7,400

2020-21 $1,500$90

$2,100

$4,390Total Project Cost: $11,790

05160000771/8/2021

9/15/20204/18/2019PA&ED:

RTL:R/W Cert:

7/12/2021Begin Con:

05-Monterey-1 Prior18-1918-1920-21

201.1101 Bridge(s)Performance Measure

Program Code

$700PA&ED:PS&E:

R/W Sup:

Carryover

63.0

Con Sup:

Bridge Major Rehabilitation

$7,400Const:R/W:

17

29

20

Senate:

Assembly:

Congress:

17

29

20Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 127 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Monterey

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Soledad, from Route 146 to Front Street atthe North Soledad Overhead No. 44-91R.Rehabilitate bridge.9700

0F970 $1,578

Subtotal: $8,936

2019-20 $2,006$58

$1,535

$3,633Total Project Cost: $12,569

051300001711/1/20197/1/20199/2/2014PA&ED:

RTL:R/W Cert:

5/27/2020Begin Con:

05-Monterey-101 PriorPriorPrior19-20

201.1101 Bridge(s)Performance Measure

Program Code

$34PA&ED:PS&E:

R/W Sup:

Carryover

62.1/63.2

Con Sup:

Bridge Major Rehabilitation

$7,358Const:R/W:

12

30

20

Senate:

Assembly:

Congress:

12

30

20Congress

Assembly

Senate

Near Big Sur, at the Castro Canon Bridge No.44-0035. Upgrade bridge railing and approachrailings to meet current standards.2656

1H490 $41

Subtotal: $1,646

2020-21 $1,345$141$762

$2,856Total Project Cost: $4,502

05160000814/1/2021

12/1/202010/1/2019PA&ED:

RTL:R/W Cert:

12/1/2021Begin Con:

05-Monterey-1 18-1919-2019-2020-21

201.112542.0 Linear feetPerformance Measure

Program Code

$608PA&ED:PS&E:

R/W Sup:

New

43.1/43.1

Con Sup:

Bridge Rail Replacement and Upgrade

$1,605Const:R/W:

17

30

20

Senate:

Assembly:

Congress:

17

30

20Congress

Assembly

Senate

Near Castroville, from Route 183 to CastrovilleBoulevard. Upgrade bridge railing and widenoverhead.0900A

0A090 $467

Subtotal: $5,517

2019-20 $1,800$130

$1,340

$3,340Total Project Cost: $8,857

051300002811/22/2019

7/5/20199/2/2014PA&ED:

RTL:R/W Cert:

5/27/2020Begin Con:

05-Monterey-156 PriorPriorPrior19-20

201.112392.0 Linear feetPerformance Measure

Program Code

$70PA&ED:PS&E:

R/W Sup:

Carryover

R1.1/R2.1

Con Sup:

Bridge Rail Replacement and Upgrade

$5,050Const:R/W:

17

29

20

Senate:

Assembly:

Congress:

17

29

20Congress

Assembly

Senate

Near Paso Robles, at San Antonio River BridgeNo 44-0141L/R. Bridge seismic restoration.

2565

1F820 $841

Subtotal: $8,575

2019-20 $1,800$15

$2,236

$5,580Total Project Cost: $14,155

05140000644/29/20202/11/20209/7/2018PA&ED:

RTL:R/W Cert:

12/30/2020Begin Con:

05-Monterey-101 Prior18-1918-1919-20

201.1132 Bridge(s)Performance Measure

Program Code

$1,529PA&ED:PS&E:

R/W Sup:

Carryover

R6.7

Con Sup:

Bridge Seismic Restoration

$7,734Const:R/W:

17

30

20

Senate:

Assembly:

Congress:

17

30

20Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 128 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Monterey

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

ROADWAY PRESERVATIONIn and near Big Sur and Carmel, from TorreCanyon Bridge to San Luis Avenue. Pavementrehabilitation.2534

1F680 $31

Subtotal: $24,366

2018-19 $1,427$41

$2,828

$5,154Total Project Cost: $29,520

05140000466/11/20195/28/20195/31/2018PA&ED:

RTL:R/W Cert:

1/2/2020Begin Con:

05-Monterey-1 Prior18-1918-1918-19

201.12172.1 Lane mile(s)Performance Measure

Program Code

$858PA&ED:PS&E:

R/W Sup:

Carryover

39.8/74.6

Con Sup:

Pavement Rehabilitation (CAPM)

$24,335Const:R/W:

17

29, 30

20

Senate:

Assembly:

Congress:

17

29, 30

20Congress

Assembly

Senate

In and near Pacific Grove, from Forest Avenueto Route 1. Upgrade Americans withDisabilities Act (ADA) curb ramps, cold planepavement and place Rubberized Hot MixAsphalt (RHMA) pavement.

2631

1H000 $70

Subtotal: $8,066

2020-21 $1,638$312

$1,675

$4,107Total Project Cost: $12,173

051600001112/11/202010/26/20202/26/2019PA&ED:

RTL:R/W Cert:

7/15/2021Begin Con:

05-Monterey-68 Prior18-1918-1920-21

201.1216.5 Lane mile(s)Performance Measure

Program Code

$482PA&ED:PS&E:

R/W Sup:

Carryover

1.1/L4.3

Con Sup:

Pavement Rehabilitation (CAPM)

$7,996Const:R/W:

17

29

20

Senate:

Assembly:

Congress:

17

29

20Congress

Assembly

Senate

In and near Salinas, from north of NorthGonzales Overcrossing to East Market Street.Pavement rehabilitation. 2540

1F700 $70

Subtotal: $19,470

2018-19 $2,100$90

$2,300

$4,490Total Project Cost: $23,960

051400005510/29/2018

4/4/20186/30/2016PA&ED:

RTL:R/W Cert:

5/8/2019Begin Con:

05-Monterey-101PriorPrior18-19

201.12154.0 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

73.8/87.3

Con Sup:

Pavement Rehabilitation (CAPM)

$19,400Const:R/W:

12

30

20

Senate:

Assembly:

Congress:

12

30

20Congress

Assembly

Senate

Near King City, from south of Paris ValleyRoad Overcrossing to Rancho Undercrossing.Roadway rehabilitation.2546

1F740

Subtotal: $26,950

2018-19 $1,820$42

$3,490

$5,363Total Project Cost: $32,313

051400004912/7/20188/1/20187/1/2014PA&ED:

RTL:R/W Cert:

6/22/2020Begin Con:

05-Monterey-101 PriorPriorPrior18-19

201.12210.5 Lane mile(s)Performance Measure

Program Code

$11PA&ED:PS&E:

R/W Sup:

Carryover

R28.0/R30.6

Con Sup:

Roadway Rehabilitation (2R)

$26,950Const:R/W:

17

30

20

Senate:

Assembly:

Congress:

17

30

20Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 129 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Monterey

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Salinas, from 0.4 mile south of EspinosaRoad Undercrossing to San Benito County line.Reconstruct embankment, widen shoulders,improve drainage systems, upgrade barrierrailing, cold plane pavement, place RubberizedHot Mix Asphalt (RHMA) pavement and placeHot Mix Asphalt (HMA) to rehabilitateroadway.

(G13 Contingency)

2679

1H690 $393

Subtotal: $104,393

2021-22 $6,300$1,300

$12,600

$24,700Total Project Cost: $129,093

05160001408/3/2021

5/12/20219/3/2019PA&ED:

RTL:R/W Cert:

2/25/2022Begin Con:

05-Monterey-101 Prior19-2019-2021-22

201.12249.0 Lane mile(s)Performance Measure

Program Code

$4,500PA&ED:PS&E:

R/W Sup:

Carryover

R91.5/101.3

* Con Sup:

Roadway Rehabilitation (2R)

* Const, * Con Sup phase(s) are NOT authorized

$104,000* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

17

29

20

Senate:

Assembly:

Congress:

17

29

20Congress

Assembly

Senate

Near Lucia, at 0.6 mile south of Limekiln CreekBridge. Replace culvert.

2230

0Q500 $23

Subtotal: $1,550

2019-20 $1,124$113$575

$2,748Total Project Cost: $4,298

05000202882/3/2020

10/28/201910/1/2018PA&ED:

RTL:R/W Cert:

6/1/2020Begin Con:

05-Monterey-1 Prior18-1918-1919-20

201.1511 Culvert(s) (ea)Performance Measure

Program Code

$936PA&ED:PS&E:

R/W Sup:

Carryover

20.4

Con Sup:

Drainage System Restoration

$1,527Const:R/W:

17

30

20

Senate:

Assembly:

Congress:

17

30

20Congress

Assembly

Senate

In Monterey and Santa Cruz Counties, onvarious Routes and locations. Replace overheadsigns.2634

1H040

Subtotal: $1,680

2019-20 $1,000$38

$537

$1,575Total Project Cost: $3,255

051600001511/22/2019

7/2/20196/9/2016PA&ED:

RTL:R/W Cert:

6/17/2020Begin Con:

05-Monterey-Var18-1918-1919-20

201.17062 Sign(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Signs and Lighting Rehabilitation

$1,680Const:R/W:

17

29

20

Senate:

Assembly:

Congress:

17

29

20Congress

Assembly

Senate

MOBILITYIn various counties, on various routes and atvarious locations. Replace and upgrade existingdetection field elements for the TrafficManagement System (TMS).

2735

1H990 $21

Subtotal: $3,221

2019-20 $1,160$20

$465

$2,230Total Project Cost: $5,451

05170000474/1/20201/3/20209/5/2018PA&ED:

RTL:R/W Cert:

11/6/2020Begin Con:

05-Monterey-Var Prior18-1918-1919-20

201.31578 Field element(s)Performance Measure

Program Code

$585PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

$3,200Const:R/W:

12, 17, 19

29, 30, 35,37

24

Senate:

Assembly:

Congress:

12, 17, 19

29, 30, 35,37

24Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 130 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Monterey

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Salinas, from 0.4 mile north ofAirport Boulevard Overcrossing to 0.3 milesouth of San Miguel Canyon RoadOvercrossing. Install vehicle detection systems,Changeable Message Signs (CMS), cameras,and a vehicle pullout.

0064Q

0N200 $9

Subtotal: $1,509

2018-19 $1,000$45

$420

$1,725Total Project Cost: $3,234

05160000164/15/20191/11/20197/16/2018PA&ED:

RTL:R/W Cert:

9/16/2019Begin Con:

05-Monterey-101 Prior18-1918-1918-19

201.31511 Field element(s)Performance Measure

Program Code

$260PA&ED:PS&E:

R/W Sup:

Carryover

86.0/95.8

Con Sup:

Transportation Management Systems

$1,500Const:R/W:

17

29

20

Senate:

Assembly:

Congress:

17

29

20Congress

Assembly

Senate

ROADSIDE PRESERVATIONIn Santa Barbara, San Luis Obispo, Montereyand San Benito Counties, at various locations.Advance mitigation banking credits.2704

1H970 $2,919

Subtotal: $2,919

2018-19 $140$80

$220Total Project Cost: $3,139

0517000040

6/9/2017PA&ED:

RTL:R/W Cert:

Begin Con:

05-Monterey-VarPriorPrior

201.2403 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Roadside Enhancement

Const:R/W:

12, 17, 19

30, 35

20, 24

Senate:

Assembly:

Congress:

12, 17, 19

30, 35

20, 24Congress

Assembly

Senate

MULTIPLE OBJECTIVEAt Camp Roberts Safety Roadside Rest Areas;also in San Luis Obispo County on Route 46 atShandon Safety Roadside Rest Area (SRRA)(PM 49.5). Transportation infrastructureimprovement for zero-emission vehiclecharging.

(PA&ED, PS&E, R/W Sup Only)

2705

1J040 $5

Subtotal: $1,215

2018-19 $480$18

$715

$1,213Total Project Cost: $2,428

051700005411/1/2018

10/24/20181/31/2017PA&ED:

RTL:R/W Cert:

3/20/2019Begin Con:

05-Monterey-101PriorPrior18-19

201.9993 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R3.1/R5.2

* Con Sup:

MULTIPLE OBJECTIVE

* Const, * R/W, * Con Sup phase(s) are NOT authorized

$1,210* Const:* R/W:

17

30, 35

20, 24

Senate:

Assembly:

Congress:

17

30, 35

20, 24Congress

Assembly

Senate

In Castroville from Del Monte Avenue toWashington Street, a multi-objective AssetManagement Pilot Project. RehabilitatePavement, repair bridge, construct stormdrainage system improvements, constructIntelligent Transportation System (ITS)elements, improve pedestrian, bicycle, andAmerican with Disabilities Act (ADA) facilities.

2678

1H650 $2,300

Subtotal: $15,600

2021-22 $3,000$6,600$3,200

$15,400Total Project Cost: $31,000

05160001184/15/20224/14/20223/5/2020PA&ED:

RTL:R/W Cert:

10/26/2022Begin Con:

05-Monterey-183 18-1919-2019-2021-22

201.9991 Location(s)Performance Measure

Program Code

$2,600PA&ED:PS&E:

R/W Sup:

New

R8.4/R9.8

Con Sup:

MULTIPLE OBJECTIVE

$13,300Const:R/W:

17

29

20

Senate:

Assembly:

Congress:

17

29

20Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 131 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Monterey

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

CountyMonterey

PA&ED:PS&E:

R/W Sup:Con Sup:

$9,659$252,781

R/W:

Subtotal: $262,440

Const:$16,285$37,966$10,626$43,541

$108,418

Total (Capital + Support): $370,858

Sorted by: Disctrict, County, Route and Post MilesPage 132 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Napa($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONIn Napa, at northbound ramps and 1st Street.Construct roundabout.

1488P

2J100 $0

Subtotal: $4,500

2018-19 $250

$2,200

$2,450Total Project Cost: $6,950

04140004264/15/20184/15/20187/18/2016PA&ED:

RTL:R/W Cert:

2/22/2019Begin Con:

04-Napa-29Prior

18-19

201.01048 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

11.4

Con Sup:

Safety Improvements

$4,500Const:R/W:

2

7

1

Senate:

Assembly:

Congress:

2

7

1Congress

Assembly

Senate

Near Napa, at Huichica Creek (PM 0.75).Roadway widening.

0775G

4G210 $1,852

Subtotal: $14,099

2019-20 $1,530$90

$3,000

$6,370Total Project Cost: $20,469

041200031010/4/201910/4/20193/30/2018PA&ED:

RTL:R/W Cert:

7/17/2020Begin Con:

04-Napa-121 PriorPriorPrior19-20

201.0100 Collision(s) reducedPerformance Measure

Program Code

$1,750PA&ED:PS&E:

R/W Sup:

Carryover

0.5/1.0

Con Sup:

Safety Improvements

$12,247Const:R/W:

2

7

1

Senate:

Assembly:

Congress:

2

7

1Congress

Assembly

Senate

Near Napa, at Huichica Creek (PM 0.75).Mitigation planting, monitoring and reportingfor EA 04-4G210.0775H

4G21A

Subtotal: $1,000

2021-22

$900

$900Total Project Cost: $1,900

04180002176/29/20226/29/20223/30/2018PA&ED:

RTL:R/W Cert:

12/8/2022Begin Con:

04-Napa-121

21-22

201.0100 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.5/1.0

Con Sup:

Safety Improvements

$1,000Const:R/W:

2

7

1

Senate:

Assembly:

Congress:

2

7

1Congress

Assembly

Senate

MANDATESNear Calistoga, at 0.3 mile south of Bothe-NapaValley State Park entrance at Ritchie CreekBridge No. 21-0057. Replace bridge andprovide financial contributions to improve fishpassage barriers at the site and within theadjacent State Park for compliance unit creditstowards Statewide National Pollutant DischargeEliminating System (NPDES) permit mandategoals.

1464K

4J990 $590

Subtotal: $8,156

2021-22 $1,300$167

$1,300

$4,587Total Project Cost: $12,743

04160000376/1/20225/1/2022

10/1/2020PA&ED:

RTL:R/W Cert:

11/1/2022Begin Con:

04-Napa-29 18-1920-2120-2121-22

201.33570 Acre(s) treated/pollutantPerformance Measure

Program Code

$1,820PA&ED:PS&E:

R/W Sup:

New

33.1

Con Sup:

Storm Water Mitigation

$7,566Const:R/W:

3

4

5

Senate:

Assembly:

Congress:

3

4

5Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 133 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Napa($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near the cities of American Canyon andNapa, from Kimberly Drive to SalvadorAvenue. Upgrade curb ramps and pedestrianpush buttons, and install new sidewalk to makefacilities compliant with Americans withDisabilities Act (ADA) requirements.

1496E

0K000 $80

Subtotal: $1,069

2021-22 $276$92

$203

$846Total Project Cost: $1,915

04160000401/2/2022

10/1/20213/1/2020PA&ED:

RTL:R/W Cert:

7/1/2022Begin Con:

04-Napa-29 18-1920-2118-1921-22

201.36127 Curb ramp(s)Performance Measure

Program Code

$275PA&ED:PS&E:

R/W Sup:

New

0.2/14.6

Con Sup:

Americans with Disabilities Act New Curb Ramps

$989Const:R/W:

3

4

5

Senate:

Assembly:

Congress:

3

4

5Congress

Assembly

Senate

BRIDGE PRESERVATIONNear Napa, at Capell Creek Bridge No. 21-0064. Bridge rehabilitation.

1489K

4J210 $225

Subtotal: $2,665

2019-20 $735$100$735

$2,060Total Project Cost: $4,725

04150002884/15/20203/1/20209/1/2018PA&ED:

RTL:R/W Cert:

10/30/2020Begin Con:

04-Napa-121 Prior18-1918-1919-20

201.1101 Bridge(s)Performance Measure

Program Code

$490PA&ED:PS&E:

R/W Sup:

Carryover

18.6

Con Sup:

Bridge Major Rehabilitation

$2,440Const:R/W:

3

4

5

Senate:

Assembly:

Congress:

3

4

5Congress

Assembly

Senate

Near Rutherford, at Hopper Slough Bridge No.20-0019. Replace bridge.

1451C

4J830 $1,514

Subtotal: $9,378

2021-22 $1,988$206

$2,014

$6,282Total Project Cost: $15,660

04160000385/2/20224/4/2022

10/1/2020PA&ED:

RTL:R/W Cert:

12/1/2022Begin Con:

04-Napa-128 18-1920-2119-2021-22

201.1101 Bridge(s)Performance Measure

Program Code

$2,074PA&ED:PS&E:

R/W Sup:

New

5.1

Con Sup:

Bridge Major Rehabilitation

$7,864Const:R/W:

3

4

5

Senate:

Assembly:

Congress:

3

4

5Congress

Assembly

Senate

In Calistoga, at Napa River Bridge No. 21-0018.Environmental mitigation and plantestablishment for bridge replacement project.0587M

3G64A $85

Subtotal: $585

2018-19 $640$400$150

$1,190Total Project Cost: $1,775

04160003496/28/20196/14/20192/9/2015PA&ED:

RTL:R/W Cert:

12/27/2019Begin Con:

04-Napa-29PriorPrior18-19

201.1111 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

37.0

Con Sup:

Bridge Scour Mitigation

$500Const:R/W:

2

7

1

Senate:

Assembly:

Congress:

2

7

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 134 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Napa($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near the cities of Napa and Yountville, atCraig Creek Bridge No. 21-0048 (PM 14.11), Dry Creek Bridge No. 21-0014 (PM 16.48),Perfume Creek Bridge No. 21-0051 (PM 17.81),and California Drive Undercrossing No. 21-0047 (PM 19.04). Upgrade bridge rails andwiden shoulders to make standard.

1494E

0K630 $295

Subtotal: $7,406

2021-22 $1,200$350

$1,500

$5,650Total Project Cost: $13,056

04160001114/15/20221/31/20226/30/2020PA&ED:

RTL:R/W Cert:

12/15/2022Begin Con:

04-Napa-29 18-1920-2120-2121-22

201.112682.0 Linear feetPerformance Measure

Program Code

$2,600PA&ED:PS&E:

R/W Sup:

New

14.1/19.0

Con Sup:

Bridge Rail Replacement and Upgrade

$7,111Const:R/W:

3

4

5

Senate:

Assembly:

Congress:

3

4

5Congress

Assembly

Senate

In and near Saint Helena and Calistoga, at MillCreek Bridge No. 21-0056, Garnett CreekBranch Bridge No. 21-0111, and No NameCreek Bridge No. 21-0100. Bridge preventivemaintenance.

1482P

2J770 $495

Subtotal: $3,339

2019-20 $710$236$850

$2,696Total Project Cost: $6,035

04150000034/15/20203/1/20209/1/2018PA&ED:

RTL:R/W Cert:

10/30/2020Begin Con:

04-Napa-29 Prior18-1918-1919-20

201.1193 Bridge(s)Performance Measure

Program Code

$900PA&ED:PS&E:

R/W Sup:

Carryover

32.1/42.8

Con Sup:

Bridge Preventative Maintenance

$2,844Const:R/W:

3

4

5

Senate:

Assembly:

Congress:

3

4

5Congress

Assembly

Senate

Near Calistoga, at Garnett Creek Bridge No. 21-0005. Bridge preventative maintenance.

1483E

2J880 $317

Subtotal: $1,417

2019-20 $1,100$330

$1,100

$3,850Total Project Cost: $5,267

04150000214/15/20203/1/20209/1/2018PA&ED:

RTL:R/W Cert:

10/30/2020Begin Con:

04-Napa-29 Prior18-1918-1919-20

201.1191 Bridge(s)Performance Measure

Program Code

$1,320PA&ED:PS&E:

R/W Sup:

Carryover

39.1

Con Sup:

Bridge Preventative Maintenance

$1,100Const:R/W:

3

4

5

Senate:

Assembly:

Congress:

3

4

5Congress

Assembly

Senate

ROADWAY PRESERVATIONIn and near St. Helena and Calistoga, from YorkCreek Bridge to Route 128. Pavementrehabilitation.1490D

4J300 $20

Subtotal: $9,667

2020-21 $1,100$44

$1,100

$3,144Total Project Cost: $12,811

041500032011/2/202010/1/202010/1/2019PA&ED:

RTL:R/W Cert:

6/30/2021Begin Con:

04-Napa-29 Prior19-2019-2020-21

201.12115.2 Lane mile(s)Performance Measure

Program Code

$900PA&ED:PS&E:

R/W Sup:

Carryover

29.3/36.9

Con Sup:

Pavement Rehabilitation (CAPM)

$9,647Const:R/W:

3

4

5

Senate:

Assembly:

Congress:

3

4

5Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 135 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Napa($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In American Canyon, at Rio Del Mar; also nearAmerican Canyon at 0.3 mile south of NorthKelly Road (PM 5.1). Rehabilitate culverts.1453K

4J410 $294

Subtotal: $3,630

2021-22 $786$350$706

$2,928Total Project Cost: $6,558

04150003436/30/20225/2/2022

11/2/2020PA&ED:

RTL:R/W Cert:

1/11/2023Begin Con:

04-Napa-29 Prior20-2120-2121-22

201.1512 Culvert(s) (ea)Performance Measure

Program Code

$1,086PA&ED:PS&E:

R/W Sup:

Carryover

1.7/5.1

Con Sup:

Drainage System Restoration

$3,336Const:R/W:

3

4

5

Senate:

Assembly:

Congress:

3

4

5Congress

Assembly

Senate

CountyNapa

PA&ED:PS&E:

R/W Sup:Con Sup:

$5,767$61,144

R/W:

Subtotal: $66,911

Const:$13,215$11,615$2,365

$15,758

$42,953

Total (Capital + Support): $109,864

Sorted by: Disctrict, County, Route and Post MilesPage 136 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Nevada($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONIn Nevada, El Dorado, Yuba, Placer, and YoloCounties, on Routes 16, 20, 49, 50, 70, and 80 atvarious locations. Construct rumble strips. 4001

4H030 $3

Subtotal: $930

2018-19 $340$40

$400

$890Total Project Cost: $1,820

03180001292/5/20191/4/20197/1/2018PA&ED:

RTL:R/W Cert:

7/5/2019Begin Con:

03-Nevada-20 Prior18-1918-1918-19

201.010117 Collision(s) reducedPerformance Measure

Program Code

$110PA&ED:PS&E:

R/W Sup:

Carryover

25.8/45.7

Con Sup:

Safety Improvements

$927Const:R/W:

1, 4

1, 3, 5

1, 3, 4

Senate:

Assembly:

Congress:

1, 4

1, 3, 5

1, 3, 4Congress

Assembly

Senate

Near Nevada City, from 0.1 mile east of WhiteCloud Campground to 0.9 mile west ofWashington Road. Curve improvement,shoulder widening and improve clear recoveryzone.

3994

0H240 $613

Subtotal: $8,850

2019-20 $976$291

$1,286

$3,649Total Project Cost: $12,499

03150001165/1/20205/1/20202/1/2019PA&ED:

RTL:R/W Cert:

11/1/2020Begin Con:

03-Nevada-20 Prior18-1918-1919-20

201.01046 Collision(s) reducedPerformance Measure

Program Code

$1,096PA&ED:PS&E:

R/W Sup:

Carryover

29.7/30.9

Con Sup:

Safety Improvements

$8,237Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

Near Emigrant Gap, from 0.3 mile west ofExcelsior Point Road to 1.3 mile west ofZeibright Road. Curve improvement and widenshoulders.

4000

2H620 $1,380

Subtotal: $28,860

2019-20 $2,810$410

$3,480

$10,620Total Project Cost: $39,480

03170001655/15/20204/15/20202/1/2019PA&ED:

RTL:R/W Cert:

11/15/2020Begin Con:

03-Nevada-20 Prior18-1918-1919-20

201.01052 Collision(s) reducedPerformance Measure

Program Code

$3,920PA&ED:PS&E:

R/W Sup:

Carryover

37.1/39.8

Con Sup:

Safety Improvements

$27,480Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

Near Rollins Lake, from Maple Way to You BetRoad. Realign roadway curves.

4451

4F370 $2,503

Subtotal: $19,503

2018-19 $2,100$2,300$3,200

$9,300Total Project Cost: $28,803

03140001522/1/20192/1/20199/2/2016PA&ED:

RTL:R/W Cert:

7/1/2019Begin Con:

03-Nevada-174 PriorPriorPrior18-19

201.01072 Collision(s) reducedPerformance Measure

Program Code

$1,700PA&ED:PS&E:

R/W Sup:

Carryover

2.7/4.7

Con Sup:

Safety Improvements

$17,000Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 137 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Nevada($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Truckee, from east of KingvaleUndercrossing to west of Union Mills Bridgeand Overhead. Replace guardrail with concretebarrier.

4288

4F600 $5

Subtotal: $12,313

2018-19 $660$30

$950

$2,050Total Project Cost: $14,363

031400022811/1/2018

10/15/20188/23/2017PA&ED:

RTL:R/W Cert:

4/1/2019Begin Con:

03-Nevada-80 PriorPriorPrior18-19

201.01524 Collision(s) reducedPerformance Measure

Program Code

$410PA&ED:PS&E:

R/W Sup:

Carryover

0.0/20.0

Con Sup:

Collision Severity Reduction

$12,308Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

In and near Truckee, at various locations from1.0 mile east of Donner Lake Undercrossing tothe Sierra County line. Replace guardrail withconcrete barrier at twenty-one locations toreduce maintenance repairs.

4297

1H840 $30

Subtotal: $3,230

2020-21 $180$30

$360

$690Total Project Cost: $3,920

031700000810/15/202010/1/20207/15/2019PA&ED:

RTL:R/W Cert:

4/15/2021Begin Con:

03-Nevada-80 18-1919-2019-2020-21

201.01530 Collision(s) reducedPerformance Measure

Program Code

$120PA&ED:PS&E:

R/W Sup:

New

R10.0/31.7

Con Sup:

Collision Severity Reduction

$3,200Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

MANDATESIn Grass Valley, from Park Street to Route 20.Upgrade pedestrian infrastructure to meetAmericans with Disabilities Act (ADA) requirements.

4450

3F680 $150

Subtotal: $1,810

2020-21 $330$86

$360

$956Total Project Cost: $2,766

03130000473/15/20213/5/20216/1/2018PA&ED:

RTL:R/W Cert:

9/2/2021Begin Con:

03-Nevada-174 PriorPriorPrior20-21

201.36186 Curb ramp(s)Performance Measure

Program Code

$180PA&ED:PS&E:

R/W Sup:

Carryover

9.7/10.1

Con Sup:

Americans with Disabilities Act New Curb Ramps

$1,660Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

ROADWAY PRESERVATIONNear Truckee and Floriston, from 0.2 mile eastof Truckee River Bridge to 0.8 mile west ofFarad Road. Construct measures to address cut-slope erosion and rockfall.

4293

1H010 $90

Subtotal: $11,490

2020-21 $1,150$160

$1,020

$2,900Total Project Cost: $14,390

031600004610/15/20209/15/20208/1/2019PA&ED:

RTL:R/W Cert:

4/1/2021Begin Con:

03-Nevada-80 18-1919-2019-2020-21

201.1501 Location(s)Performance Measure

Program Code

$570PA&ED:PS&E:

R/W Sup:

New

28.3/28.7

Con Sup:

Roadway Protective Betterments

$11,400Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 138 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Nevada($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Truckee, from east of Floriston Road towest of Farad Undercrossing. Stabilize cut-slope.4287

3F250 $200

Subtotal: $9,890

2018-19 $840$110

$1,110

$2,630Total Project Cost: $12,520

03120001335/31/20195/15/20194/1/2018PA&ED:

RTL:R/W Cert:

11/30/2019Begin Con:

03-Nevada-80 PriorPriorPrior18-19

201.1501 Location(s)Performance Measure

Program Code

$570PA&ED:PS&E:

R/W Sup:

Carryover

29.1/29.4

Con Sup:

Roadway Protective Betterments

$9,690Const:R/W:

1

1

4

Senate:

Assembly:

Congress:

1

1

4Congress

Assembly

Senate

Near Truckee and Floriston, from Farad Road to2.17 mile west of Sierra County line. Mitigaterockfall and stabilize cut-slope erosion withdraped mesh and a drainage ditch.

4298

2H000 $90

Subtotal: $3,490

2020-21 $750$280$610

$2,080Total Project Cost: $5,570

031700004410/15/202010/1/20201/2/2019PA&ED:

RTL:R/W Cert:

4/15/2021Begin Con:

03-Nevada-80 18-1918-1918-1920-21

201.1501 Location(s)Performance Measure

Program Code

$440PA&ED:PS&E:

R/W Sup:

New

29.5/29.7

Con Sup:

Roadway Protective Betterments

$3,400Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

Near Truckee and Floriston, from 1.9 miles eastof Farad Road to the Sierra County line. Construct mitigation measures to reducerockfall onto the roadway.

4299

2H690 $30

Subtotal: $6,230

2021-22 $890$120

$1,080

$2,500Total Project Cost: $8,730

031700017210/15/202110/1/20218/1/2019PA&ED:

RTL:R/W Cert:

5/1/2022Begin Con:

03-Nevada-80 18-1919-2019-2021-22

201.1501 Location(s)Performance Measure

Program Code

$410PA&ED:PS&E:

R/W Sup:

New

31.3/31.8

Con Sup:

Roadway Protective Betterments

$6,200Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

Near Higgins Corner, from the Placer Countyline to 0.3 mile north of Lime Kiln Road; also inPlacer County, at PM R8.42 and PM R10.23.Rehabilitate drainage systems.

4124

0H210 $325

Subtotal: $3,582

2021-22 $743$547$607

$2,410Total Project Cost: $5,992

031500011210/15/202110/1/20211/2/2020PA&ED:

RTL:R/W Cert:

4/15/2022Begin Con:

03-Nevada-49 Prior19-2019-2021-22

201.15124 Culvert(s) (ea)Performance Measure

Program Code

$513PA&ED:PS&E:

R/W Sup:

Carryover

0.0/7.5

Con Sup:

Drainage System Restoration

$3,257Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 139 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Nevada($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Grass Valley, from Lime Kiln Roadto Route 20. Rehabilitate culverts.

4123

0H220 $80

Subtotal: $3,050

2018-19 $550$350$590

$1,930Total Project Cost: $4,980

03150001134/30/20194/15/20198/31/2017PA&ED:

RTL:R/W Cert:

10/30/2019Begin Con:

03-Nevada-49 PriorPriorPrior18-19

201.15138 Culvert(s) (ea)Performance Measure

Program Code

$440PA&ED:PS&E:

R/W Sup:

Carryover

7.5/R14.4

Con Sup:

Drainage System Restoration

$2,970Const:R/W:

4

1

1

Senate:

Assembly:

Congress:

4

1

1Congress

Assembly

Senate

MOBILITYNear Nevada City and Emigrant Gap, at west ofPine Needle Way (PM 25.15), and at west ofLast Chance Mine Road (PM 37.05); also inPlacer County, on Route 193 near Newcastle, atvarious locations from PM 6.7 to 8.5.Operational improvements to upgrade orconstruct roadway turnouts at five locations.

3997

0H690 $110

Subtotal: $1,390

2020-21 $280$120$460

$1,030Total Project Cost: $2,420

031600000610/1/20209/1/20207/1/2019PA&ED:

RTL:R/W Cert:

4/1/2021Begin Con:

03-Nevada-20 18-1919-2019-2020-21

201.31020 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

$170PA&ED:PS&E:

R/W Sup:

New

25.1/25.2

Con Sup:

Operational Improvements

$1,280Const:R/W:

1, 4

1, 5, 6

1, 4

Senate:

Assembly:

Congress:

1, 4

1, 5, 6

1, 4Congress

Assembly

Senate

Near Nevada City and Junction House, fromeast of Conservation Road (Washington RidgeRoad) to east of Washington Road. Operationalimprovements to widen for left-turn pockets androadway turnouts.

3996

0H660 $90

Subtotal: $1,990

2020-21 $470$60

$530

$1,400Total Project Cost: $3,390

03160000043/1/20212/1/20212/1/2020PA&ED:

RTL:R/W Cert:

8/1/2021Begin Con:

03-Nevada-20 18-1919-2019-2020-21

201.31020 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

$340PA&ED:PS&E:

R/W Sup:

New

28.0/32.4

Con Sup:

Operational Improvements

$1,900Const:R/W:

4

1

1

Senate:

Assembly:

Congress:

4

1

1Congress

Assembly

Senate

Near Bear Valley and Emigrant Gap, from 2.0miles east of Chalk Bluff Road to 0.2 mile westof Excelsior Point Road. Operationalimprovement to make existing roadway turnoutstandard width with shoulders.

3999

1H810 $20

Subtotal: $1,920

2020-21 $530$140$410

$1,420Total Project Cost: $3,340

031700000510/15/202010/1/202010/1/2019PA&ED:

RTL:R/W Cert:

4/15/2021Begin Con:

03-Nevada-20 18-1919-2019-2020-21

201.31010 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

$340PA&ED:PS&E:

R/W Sup:

New

36.8/37.0

Con Sup:

Operational Improvements

$1,900Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 140 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Nevada($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In various counties on various routes at variouslocations. Repair and install vehicle censuscount stations.4125

0H420 $30

Subtotal: $9,230

2019-20 $1,000$180

$1,800

$3,980Total Project Cost: $13,210

031500016610/1/20199/1/20191/1/2018PA&ED:

RTL:R/W Cert:

4/15/2020Begin Con:

03-Nevada-49 PriorPriorPrior19-20

201.315470 Field element(s)Performance Measure

Program Code

$1,000PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

$9,200Const:R/W:

1, 3, 4, 6

1, 3, 4, 5, 6,7, 8, 9

1, 3, 4, 6, 7

Senate:

Assembly:

Congress:

1, 3, 4, 6

1, 3, 4, 5, 6,7, 8, 9

1, 3, 4, 6, 7Congress

Assembly

Senate

CountyNevada

PA&ED:PS&E:

R/W Sup:Con Sup:

$5,749$122,009

R/W:

Subtotal: $127,758

Const:$12,329$14,599$5,254

$18,253

$50,435

Total (Capital + Support): $178,193

Sorted by: Disctrict, County, Route and Post MilesPage 141 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONIn Huntington Beach, at 6th Street; also in SealBeach at Seal Beach Boulevard (PM 32.7).Modify traffic signals and install additionallighting.

2527

0N850 $172

Subtotal: $1,132

2018-19 $412$750$490

$1,802Total Project Cost: $2,934

12140001166/15/20196/5/2019

1/22/2018PA&ED:

RTL:R/W Cert:

12/11/2019Begin Con:

12-Orange-1 PriorPriorPrior18-19

201.01047 Collision(s) reducedPerformance Measure

Program Code

$150PA&ED:PS&E:

R/W Sup:

Carryover

24.9

Con Sup:

Safety Improvements

$960Const:R/W:

34, 37

72, 74

48

Senate:

Assembly:

Congress:

34, 37

72, 74

48Congress

Assembly

Senate

In Huntington Beach, from Seapoint Street toWarner Avenue at Boisa Chica State Beach.Construct rumble strips and install outerseparation barrier in southbound direction.

2470A

0Q280

Subtotal: $1,148

2019-20 $605

$492

$1,612Total Project Cost: $2,760

12160001201/30/20201/15/2020

12/15/2018PA&ED:

RTL:R/W Cert:

6/1/2020Begin Con:

12-Orange-1 Prior18-19

19-20

201.0102 Collision(s) reducedPerformance Measure

Program Code

$515PA&ED:PS&E:

R/W Sup:

Carryover

27.0/29.9

Con Sup:

Safety Improvements

$1,148Const:R/W:

37

74

38

Senate:

Assembly:

Congress:

37

74

38Congress

Assembly

Senate

In Anaheim, on the northbound HarborBoulevard offramp; also on the southboundHarbor Boulevard onramp. Modify trafficsignal system and apply High Friction SurfaceTreatment (HFST).

2861F

0Q300 $18

Subtotal: $1,450

2018-19 $1,285

$493

$1,778Total Project Cost: $3,228

12160001236/5/20195/3/2019

6/16/2017PA&ED:

RTL:R/W Cert:

11/15/2019Begin Con:

12-Orange-5Prior

18-19

201.01038 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

37.3/37.4

Con Sup:

Safety Improvements

$1,432Const:R/W:

34, 37

68, 69

45, 46

Senate:

Assembly:

Congress:

34, 37

68, 69

45, 46Congress

Assembly

Senate

In Garden Grove, at westbound on ramp fromEuclid Street. Overlay with Open GradedFriction Course (OGFC).2930

0P980

Subtotal: $559

2018-19 $381

$327

$708Total Project Cost: $1,267

12160000708/1/20187/2/2018

6/16/2017PA&ED:

RTL:R/W Cert:

4/3/2019Begin Con:

12-Orange-22Prior

18-19

201.01017 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R6.9

Con Sup:

Safety Improvements

$559Const:R/W:

34

72

47

Senate:

Assembly:

Congress:

34

72

47Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 142 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In the cities of Orange and Santa Ana, fromLewis Street Overcrossing to east of BristolStreet Undercrossing; also on Route 57, fromPM 10.9/11.9. Replace concrete median barrierand add lighting in median.

2981

0P520 $5

Subtotal: $3,820

2019-20 $1,247

$1,257

$3,095Total Project Cost: $6,915

12150001373/2/20202/1/20208/7/2018PA&ED:

RTL:R/W Cert:

11/2/2020Begin Con:

12-Orange-22 Prior18-19

19-20

201.01036 Collision(s) reducedPerformance Measure

Program Code

$591PA&ED:PS&E:

R/W Sup:

Carryover

R9.4/R10.1

Con Sup:

Safety Improvements

$3,815Const:R/W:

34

69

46

Senate:

Assembly:

Congress:

34

69

46Congress

Assembly

Senate

In Huntington Beach, Westminster and GardenGrove, at the intersections of Heil Avenue (PM5.14), MacDonald Street (PM 5.30) and TraskAvenue (PM 8.14); also on Route 90 in Brea atthe intersection of Castlegate Lane/PlacentiaAvenue (PM 5.93). Modify existing signals andlighting and upgrade Americans withDisabilities Act (ADA) facilities to currentstandards.

3167

0P010 $364

Subtotal: $2,864

2018-19 $750$420$820

$2,490Total Project Cost: $5,354

12150000226/7/20196/3/2019

12/5/2017PA&ED:

RTL:R/W Cert:

12/2/2019Begin Con:

12-Orange-39 PriorPriorPrior18-19

201.010141 Collision(s) reducedPerformance Measure

Program Code

$500PA&ED:PS&E:

R/W Sup:

Carryover

5.1/8.1

Con Sup:

Safety Improvements

$2,500Const:R/W:

29, 34, 37

55, 65, 72

39, 47, 48

Senate:

Assembly:

Congress:

29, 34, 37

55, 65, 72

39, 47, 48Congress

Assembly

Senate

In the city of La Habra, at Fashion Square Lane.Modify traffic signal and add lighting.

3279

0Q290 $10

Subtotal: $830

2018-19 $575

$400

$1,160Total Project Cost: $1,990

12160001226/1/20195/1/20198/1/2018PA&ED:

RTL:R/W Cert:

12/1/2019Begin Con:

12-Orange-39 Prior18-19

18-19

201.01025 Collision(s) reducedPerformance Measure

Program Code

$185PA&ED:PS&E:

R/W Sup:

Carryover

19.4

Con Sup:

Safety Improvements

$820Const:R/W:

29

55

39

Senate:

Assembly:

Congress:

29

55

39Congress

Assembly

Senate

In Tustin, on the 4th Street northbound offramp.Modify traffic signals and install additionallighting.3510

0N630 $11

Subtotal: $657

2018-19 $427

$318

$845Total Project Cost: $1,502

12140000733/1/20192/1/2019

12/2/2017PA&ED:

RTL:R/W Cert:

6/11/2019Begin Con:

12-Orange-55 PriorPrior

18-19

201.01011 Collision(s) reducedPerformance Measure

Program Code

$100PA&ED:PS&E:

R/W Sup:

Carryover

10.7

Con Sup:

Safety Improvements

$646Const:R/W:

37

68

45

Senate:

Assembly:

Congress:

37

68

45Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 143 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Laguna Beach, on southbound Route 73,from Route 133 to 0.2 mile north of Route 133.Modify superelevation, install drainage inlets,place Open Graded Asphalt Concrete (OGAC) and place pavement delineation.

4096P

0N840

Subtotal: $980

2018-19 $637

$410

$1,047Total Project Cost: $2,027

121400011512/10/201811/15/20183/21/2017PA&ED:

RTL:R/W Cert:

7/29/2019Begin Con:

12-Orange-73Prior

18-19

201.01057 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

16.8/17.1

Con Sup:

Safety Improvements

$980Const:R/W:

37

74

48

Senate:

Assembly:

Congress:

37

74

48Congress

Assembly

Senate

In Newport Beach, on the Route 73 southboundoff-ramp to MacArthur Boulevard. Widen ramp,install traffic signal and guardrail.4096R

0N860 $388

Subtotal: $7,735

2019-20 $1,500$130

$1,531

$3,661Total Project Cost: $11,396

12140001232/28/20202/3/20203/1/2018PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

12-Orange-73 PriorPriorPrior19-20

201.01082 Collision(s) reducedPerformance Measure

Program Code

$500PA&ED:PS&E:

R/W Sup:

Carryover

24.0

Con Sup:

Safety Improvements

$7,347Const:R/W:

37

74

48

Senate:

Assembly:

Congress:

37

74

48Congress

Assembly

Senate

Near San Juan Capistrano, from east of AntonioParkway/La Pata Avenue to west of Conrockentrance. Landscape and plant establishmentproject.

4124B

0L722 $20

Subtotal: $870

2018-19 $400

$620

$1,020Total Project Cost: $1,890

121400010412/30/2018

8/1/20184/1/2018PA&ED:

RTL:R/W Cert:

9/1/2019Begin Con:

12-Orange-74Prior

18-19

201.0108 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

2.9/5.1

Con Sup:

Safety Improvements

$850Const:R/W:

36

73

49

Senate:

Assembly:

Congress:

36

73

49Congress

Assembly

Senate

In the Cleveland National Forest, from 0.9 milewest of San Juan Fire Station to theOrange/Riverside County line. Super elevationcorrections, shoulder widening, Open GradedAsphalt Concrete (OGAC) overlay and applyHigh Friction Surface Treatment (HFST).

4218

0P030 $719

Subtotal: $36,330

2019-20 $4,826$1,018$7,206

$16,015Total Project Cost: $52,345

12150000246/2/20206/1/2020

10/3/2018PA&ED:

RTL:R/W Cert:

1/4/2021Begin Con:

12-Orange-74 Prior18-1918-1919-20

201.010160 Collision(s) reducedPerformance Measure

Program Code

$2,965PA&ED:PS&E:

R/W Sup:

Carryover

11.5/16.6

Con Sup:

Safety Improvements

$35,611Const:R/W:

36

73

49

Senate:

Assembly:

Congress:

36

73

49Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 144 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Buena Park, on the 91 eastbound connectorfrom northbound Route 39 (Beach Boulevard).Overlay Hot Mix Asphalt (HMA) Open GradedFriction Course (OGFC).

4533A

0Q040

Subtotal: $540

2018-19 $360

$320

$680Total Project Cost: $1,220

121600007810/1/20187/1/2018

6/16/2017PA&ED:

RTL:R/W Cert:

3/1/2019Begin Con:

12-Orange-91Prior

18-19

201.01017 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R2.8

Con Sup:

Safety Improvements

$540Const:R/W:

32

65

39

Senate:

Assembly:

Congress:

32

65

39Congress

Assembly

Senate

In Laguna Beach, at and north of Canyon AcresDrive. Extend the northbound lane reductiontransition.4769

0N870 $536

Subtotal: $1,725

2018-19 $1,100$150$789

$2,039Total Project Cost: $3,764

121400012411/1/201810/1/20181/4/2016PA&ED:

RTL:R/W Cert:

6/19/2019Begin Con:

12-Orange-133PriorPrior18-19

201.01034 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.9/1.2

Con Sup:

Safety Improvements

$1,189Const:R/W:

37

74

48

Senate:

Assembly:

Congress:

37

74

48Congress

Assembly

Senate

In Laguna Beach, from 1,700 feet south to 1,300feet north of El Toro Road. Extend lanes inboth directions.4793

0N060 $1,230

Subtotal: $7,262

2019-20 $1,820$550

$2,109

$5,694Total Project Cost: $12,956

12130000975/22/20204/3/20209/1/2017PA&ED:

RTL:R/W Cert:

2/5/2021Begin Con:

12-Orange-133 PriorPriorPrior19-20

201.01065 Collision(s) reducedPerformance Measure

Program Code

$1,215PA&ED:PS&E:

R/W Sup:

Carryover

3.1/3.6

Con Sup:

Safety Improvements

$6,032Const:R/W:

37

74

48

Senate:

Assembly:

Congress:

37

74

48Congress

Assembly

Senate

In Irvine, from Walnut Road to north ofnorthbound Jamboree Road Overcrossing.Install double thrie-beam barrier to preventcross-median collisions.

4926F

0Q130 $0

Subtotal: $510

2018-19 $412$0

$320

$732Total Project Cost: $1,242

121600009111/15/201811/1/20186/19/2017PA&ED:

RTL:R/W Cert:

7/15/2019Begin Con:

12-Orange-261Prior

18-19

201.0103 Collision(s) reducedPerformance Measure

Program Code

$0PA&ED:PS&E:

R/W Sup:

Carryover

0.0/0.3

Con Sup:

Safety Improvements

$510Const:R/W:

37

68

45

Senate:

Assembly:

Congress:

37

68

45Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 145 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Irvine and Costa Mesa, from Jamboree Roadto Route 73. Replace existing temporary railingwith permanent concrete barrier. 4995A

0P220

Subtotal: $3,170

2018-19 $1,300

$1,200

$2,700Total Project Cost: $5,870

121500005312/3/2018

11/15/20188/31/2017PA&ED:

RTL:R/W Cert:

6/11/2019Begin Con:

12-Orange-405 PriorPrior

18-19

201.0108 Collision(s) reducedPerformance Measure

Program Code

$200PA&ED:PS&E:

R/W Sup:

Carryover

6.9/10.3

Con Sup:

Safety Improvements

$3,170Const:R/W:

37

74

46, 48

Senate:

Assembly:

Congress:

37

74

46, 48Congress

Assembly

Senate

In the cities of San Juan Capistrano, LagunaNigel, Laguna Hills, Aliso Viejo, LagunaBeach, Irvine, Newport Beach, and Costa Mesafrom Route 5 to Route 405. Upgrade highwaysafety features.

4051A

0N720

Subtotal: $16,500

2019-20 $2,600$58

$3,200

$6,588Total Project Cost: $23,088

12140000932/5/2020

1/15/20208/31/2017PA&ED:

RTL:R/W Cert:

9/18/2020Begin Con:

12-Orange-73 PriorPriorPrior19-20

201.015108 Collision(s) reducedPerformance Measure

Program Code

$730PA&ED:PS&E:

R/W Sup:

Carryover

10.0/28.0

Con Sup:

Collision Severity Reduction

$16,500Const:R/W:

36, 37

73, 74

45, 48, 49

Senate:

Assembly:

Congress:

36, 37

73, 74

45, 48, 49Congress

Assembly

Senate

In and near Laguna Beach and Irvine, from ElToro Road to Route 241. Flatten steepembankments, replace and upgrade guardrailand terminal systems, install thrie-beam medianbarrier and replace K-rail with concrete barrier.

4795A

0N660

Subtotal: $9,500

2018-19 $1,943$70

$2,165

$5,008Total Project Cost: $14,508

12140000774/5/2019

3/15/201912/15/2017PA&ED:

RTL:R/W Cert:

9/9/2019Begin Con:

12-Orange-133 PriorPriorPrior18-19

201.01563 Collision(s) reducedPerformance Measure

Program Code

$830PA&ED:PS&E:

R/W Sup:

Carryover

3.4/13.6

Con Sup:

Collision Severity Reduction

$9,500Const:R/W:

37

74

39

Senate:

Assembly:

Congress:

37

74

39Congress

Assembly

Senate

In Santa Ana, from south of 4th Street toBroadway. Roadside safety improvements.

2841

0N510

Subtotal: $1,900

2018-19 $390

$325

$1,000Total Project Cost: $2,900

12140000543/1/20192/1/20194/1/2018PA&ED:

RTL:R/W Cert:

12/1/2019Begin Con:

12-Orange-5 PriorPrior

18-19

201.23536 Location(s)Performance Measure

Program Code

$285PA&ED:PS&E:

R/W Sup:

Carryover

31.0/33.3

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$1,900Const:R/W:

34

68, 69

46

Senate:

Assembly:

Congress:

34

68, 69

46Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 146 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Anaheim, from Santa Ana BridgeNo. 55-0811 to 0.6 mile south of HarborBoulevard Overcrossing. Enhance highwayworker safety by access trails and access gates,relocating facilities away from traffic, andinstalling features to reduce repetitive maintenance activities.

2860N

0P900 $0

Subtotal: $2,000

2020-21 $400$0

$330

$1,000Total Project Cost: $3,000

121600004610/1/20209/1/20208/1/2019PA&ED:

RTL:R/W Cert:

9/1/2021Begin Con:

12-Orange-5 18-1918-19

20-21

201.23540 Location(s)Performance Measure

Program Code

$270PA&ED:PS&E:

R/W Sup:

New

34.5/36.8

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,000Const:R/W:

34

69

46

Senate:

Assembly:

Congress:

34

69

46Congress

Assembly

Senate

In Anaheim, from north of Anaheim Boulevardto Santa Ana Street. Enhance highway workersafety by access trails and access gates,relocating facilities away from traffic, andinstalling features to reduce repetitive maintenance activities.

2861E

0P910 $0

Subtotal: $2,000

2020-21 $400$0

$400

$1,000Total Project Cost: $3,000

12160000472/1/2021

12/1/202012/1/2019PA&ED:

RTL:R/W Cert:

11/1/2021Begin Con:

12-Orange-5 18-1918-19

20-21

201.23540 Location(s)Performance Measure

Program Code

$200PA&ED:PS&E:

R/W Sup:

New

36.8/38.5

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,000Const:R/W:

34

69

46

Senate:

Assembly:

Congress:

34

69

46Congress

Assembly

Senate

In Anaheim, from Santa Ana StreetOvercrossing (OC) to 0.3 mile south ofMagnolia Avenue OC. Enhance highwayworker safety by paving miscellaneous areas,install access gates and relocate irrigationfacilities away from the edge of the road.

2861Z

0P920 $0

Subtotal: $2,000

2021-22 $400$0

$400

$1,000Total Project Cost: $3,000

121600004410/1/20219/1/20218/1/2020PA&ED:

RTL:R/W Cert:

7/1/2022Begin Con:

12-Orange-5 19-2020-21

21-22

201.23540 Location(s)Performance Measure

Program Code

$200PA&ED:PS&E:

R/W Sup:

New

38.5/41.6

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,000Const:R/W:

34

69

46

Senate:

Assembly:

Congress:

34

69

46Congress

Assembly

Senate

In Fullerton and Buena Park, from MagnoliaAvenue to Stanton Avenue; also on Route 91,from Stanton Avenue to Brookhurst Street (PMR2.8/1.2). Enhance highway worker safety byaccess trails and access gates, relocatingfacilities away from traffic, and installingfeatures to reduce repetitive maintenanceactivities.

2862H

0P930 $0

Subtotal: $2,000

2021-22 $400$0

$400

$1,000Total Project Cost: $3,000

12160000454/1/20222/1/20221/1/2021PA&ED:

RTL:R/W Cert:

4/1/2023Begin Con:

12-Orange-5 19-2020-21

21-22

201.23580 Location(s)Performance Measure

Program Code

$200PA&ED:PS&E:

R/W Sup:

New

41.9/43.1

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,000Const:R/W:

34

69

46

Senate:

Assembly:

Congress:

34

69

46Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 147 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In the city of Orange, from La Veta Avenue toRoute 91. Roadside safety improvements.

3535

0N530

Subtotal: $2,000

2019-20 $440

$360

$1,100Total Project Cost: $3,100

12140000563/30/20203/1/20204/1/2019PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

12-Orange-55 Prior18-19

19-20

201.23532 Location(s)Performance Measure

Program Code

$300PA&ED:PS&E:

R/W Sup:

Carryover

13.2/R17.8

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,000Const:R/W:

34

68

45, 46

Senate:

Assembly:

Congress:

34

68

45, 46Congress

Assembly

Senate

In Irvine and Costa Mesa, from Von KarmenAvenue to west of Harbor Boulevard. Roadsidesafety improvements.4999D

0N520

Subtotal: $1,900

2019-20 $390

$325

$1,000Total Project Cost: $2,900

121400005511/30/201910/1/201910/1/2018PA&ED:

RTL:R/W Cert:

8/1/2020Begin Con:

12-Orange-405 Prior18-19

19-20

201.23520 Location(s)Performance Measure

Program Code

$285PA&ED:PS&E:

R/W Sup:

Carryover

7.3/11.8

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$1,900Const:R/W:

34

74

46, 48

Senate:

Assembly:

Congress:

34

74

46, 48Congress

Assembly

Senate

MANDATESIn Newport Beach, from 815 feet south of ReefPoint Drive to 1,850 feet north of CrystalHeights Drive. Restore bioswales. 2322B

0P660 $0

Subtotal: $1,827

2020-21 $628$0

$501

$1,400Total Project Cost: $3,227

12150001587/1/20205/1/20207/1/2019PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

12-Orange-1 18-1919-20

20-21

201.3359 Acre(s) treated/pollutantPerformance Measure

Program Code

$271PA&ED:PS&E:

R/W Sup:

New

12.2/13.3

Con Sup:

Storm Water Mitigation

$1,827Const:R/W:

37

74

48

Senate:

Assembly:

Congress:

37

74

48Congress

Assembly

Senate

In San Juan Capistrano, from El Horno Street tosouth of Junipero Serra Road; also in Irvine,from Route 133 to south of Sand CanyonAvenue (PM 23.2/R23.7). Reconstruct slopesand apply vegetation to control sedimenttransport.

2632A

0P090

Subtotal: $2,729

2019-20 $600$50

$650

$1,700Total Project Cost: $4,429

12150000342/3/2020

12/2/201910/5/2018PA&ED:

RTL:R/W Cert:

11/2/2020Begin Con:

12-Orange-5 Prior18-1918-1919-20

201.3352.5 Acre(s) treated/pollutantPerformance Measure

Program Code

$400PA&ED:PS&E:

R/W Sup:

Carryover

10.1/10.6

Con Sup:

Storm Water Mitigation

$2,729Const:R/W:

36, 37

68, 73, 74

45, 49

Senate:

Assembly:

Congress:

36, 37

68, 73, 74

45, 49Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 148 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Brea, from south of Lambert Roadto Los Angeles County line (PM R22.551).Construct storm water treatment BestManagement Practices (BMPs) in the form ofnew detention basin to reduce Trash TotalMaximum Daily Load (TMDL) to the SanGabriel-Coyote Creek watershed.

3846B

0Q270 $0

Subtotal: $6,797

2021-22 $1,200$0

$1,500

$3,587Total Project Cost: $10,384

12160001173/1/20222/1/20225/1/2020PA&ED:

RTL:R/W Cert:

8/1/2022Begin Con:

12-Orange-57 18-1919-20

21-22

201.33514.9 Acre(s) treated/pollutantPerformance Measure

Program Code

$887PA&ED:PS&E:

R/W Sup:

New

20.8/R22.6

Con Sup:

Storm Water Mitigation

$6,797Const:R/W:

29

55

39

Senate:

Assembly:

Congress:

29

55

39Congress

Assembly

Senate

In Brea, from east of Chino Hills State Parkentrance to east of Olinda Drive. Storm watermitigation.5380A

0N730 $200

Subtotal: $3,600

2019-20 $1,250$380$920

$3,006Total Project Cost: $6,606

12140000956/2/20205/4/2020

10/1/2018PA&ED:

RTL:R/W Cert:

2/1/2021Begin Con:

12-Orange-142 Prior18-1918-1919-20

201.3351.7 Acre(s) treated/pollutantPerformance Measure

Program Code

$456PA&ED:PS&E:

R/W Sup:

Carryover

3.5/4.7

Con Sup:

Storm Water Mitigation

$3,400Const:R/W:

29

55

39

Senate:

Assembly:

Congress:

29

55

39Congress

Assembly

Senate

In Laguna Beach, from 7th Avenue to north ofMoss Street. Upgrade existing curb ramps, sidewalks, and driveways to Americans withDisabilities Act (ADA) Standards.

2255

0P690 $3,121

Subtotal: $5,030

2020-21 $3,399$2,864$3,551

$9,814Total Project Cost: $14,844

121600000310/1/20209/1/2020

11/1/2018PA&ED:

RTL:R/W Cert:

4/1/2021Begin Con:

12-Orange-118-1918-1920-21

201.36156 Curb ramp(s)Performance Measure

Program Code

$0PA&ED:PS&E:

R/W Sup:

New

5.5/7.9

Con Sup:

Americans with Disabilities Act New Curb Ramps

$1,909Const:R/W:

37

74

48

Senate:

Assembly:

Congress:

37

74

48Congress

Assembly

Senate

In San Juan Capistrano, from Route 5 to the SanJuan Capistrano city line. Upgrade pedestrianfacilities to meet current Americans withDisabilities Act (ADA) Standards.

4097C

0M090 $122

Subtotal: $1,742

2018-19 $940$600

$1,128

$2,958Total Project Cost: $4,700

12000203026/15/20196/3/20197/3/2017PA&ED:

RTL:R/W Cert:

3/5/2020Begin Con:

12-Orange-74 PriorPriorPrior18-19

201.36148 Curb ramp(s)Performance Measure

Program Code

$290PA&ED:PS&E:

R/W Sup:

Carryover

0.1/1.8

Con Sup:

Americans with Disabilities Act New Curb Ramps

$1,620Const:R/W:

36

73

49

Senate:

Assembly:

Congress:

36

73

49Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 149 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Laguna Beach, from south of Ruby Street to Ledroit Street. Upgrade pedestrian facilities toAmericans with Disabilities Act standards. 2300

0M820 $2,100

Subtotal: $10,428

2019-20 $1,825$2,715$1,600

$7,365Total Project Cost: $17,793

12140000417/19/20197/5/2019

12/5/2017PA&ED:

RTL:R/W Cert:

2/10/2020Begin Con:

12-Orange-1 PriorPriorPrior19-20

201.378187 Curb ramp(s)Performance Measure

Program Code

$1,225PA&ED:PS&E:

R/W Sup:

Carryover

7.9/10.5

Con Sup:

Americans with Disabilities Act PedestrianInfrastructure

$8,328Const:R/W:

37

74

48

Senate:

Assembly:

Congress:

37

74

48Congress

Assembly

Senate

BRIDGE PRESERVATIONIn Laguna Beach, at Route 133 (BroadwayStreet). Replace bridge.

2293

0M990 $800

Subtotal: $2,350

2019-20 $650$790$600

$2,310Total Project Cost: $4,660

12130000869/12/20199/12/20196/1/2018PA&ED:

RTL:R/W Cert:

11/19/2019Begin Con:

12-Orange-1 PriorPriorPrior19-20

201.1101 Bridge(s)Performance Measure

Program Code

$270PA&ED:PS&E:

R/W Sup:

Carryover

9.3

Con Sup:

Bridge Major Rehabilitation

$1,550Const:R/W:

37

74

48

Senate:

Assembly:

Congress:

37

74

48Congress

Assembly

Senate

In Costa Mesa, at the Route 55/73 ConnectorOvercrossing Bridge No. 55-538F (PM 4.74),Route 91 Carmenita Road PedestrianOvercrossing Bridge No. 55-0473 (PM 0.02)and Route 405 Laguna Canyon RoadOvercrossing Bridge No. 55-0247 (PM 2.20).Seismic restoration.

3450A

0Q390

Subtotal: $15,456

2020-21 $2,279$11

$5,381

$8,719Total Project Cost: $24,175

12170000032/2/2021

1/15/20219/25/2019PA&ED:

RTL:R/W Cert:

9/9/2021Begin Con:

12-Orange-Var 18-1919-2019-2020-21

201.1133 Bridge(s)Performance Measure

Program Code

$1,048PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Bridge Seismic Restoration

$15,456Const:R/W:

32, 34, 37

65, 68, 69,74

38, 45, 48

Senate:

Assembly:

Congress:

32, 34, 37

65, 68, 69,74

38, 45, 48Congress

Assembly

Senate

ROADWAY PRESERVATIONIn Laguna Beach and Newport Beach, from1,000 feet south of Vista Del Sol to Moss Street;also from Ledroit Street to Newport Coast Drive(PM 10.5/14.1). Remove and replace existingpavement with Rubberized Hot Mix Asphalt(RHMA).

2246

0H150 $65

Subtotal: $7,136

2019-20 $3,200$400

$1,739

$5,339Total Project Cost: $12,475

12160000556/1/20205/1/2020

8/30/2005PA&ED:

RTL:R/W Cert:

1/4/2021Begin Con:

12-Orange-1Prior19-2019-20

201.12115.6 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

4.9/5.5

Con Sup:

Pavement Rehabilitation (CAPM)

$7,071Const:R/W:

37

74

48

Senate:

Assembly:

Congress:

37

74

48Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 150 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Laguna Beach, from 7th Street to Moss Street. Remove and replace pavement and withRubberized Hot Mix Asphalt (RHMA).2246A

0H151

Subtotal: $3,206

2020-21

$779

$779Total Project Cost: $3,985

121800005710/1/20209/1/2020

11/1/2018PA&ED:

RTL:R/W Cert:

9/1/2021Begin Con:

12-Orange-1

20-21

201.1219.5 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

5.5/7.9

Con Sup:

Pavement Rehabilitation (CAPM)

$3,206Const:R/W:

37

74

48

Senate:

Assembly:

Congress:

37

74

48Congress

Assembly

Senate

In Laguna Beach, from south of Ruby Street toLedroit Street. Remove and replace pavmentwith Rubberized Hot Mix Asphalt (RHMA).2246B

0H153

Subtotal: $3,473

2019-20

$832

$832Total Project Cost: $4,305

12180000583/1/20202/1/2020

1/31/2018PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

12-Orange-1

19-20

201.12110.8 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

7.9/10.5

Con Sup:

Pavement Rehabilitation (CAPM)

$3,473Const:R/W:

37

74

48

Senate:

Assembly:

Congress:

37

74

48Congress

Assembly

Senate

In Huntington Beach, from Warner Avenue toLos Angeles County line. Upgrade Americanswith Disabilities Act (ADA) curb ramps, coldplane pavement, and place Rubberized Hot MixAsphalt (RHMA) pavement.

2499A

0P590 $111

Subtotal: $8,881

2020-21 $2,932$1,245$2,358

$8,255Total Project Cost: $17,136

12150001495/30/20215/15/20211/5/2019PA&ED:

RTL:R/W Cert:

1/30/2022Begin Con:

12-Orange-1 Prior18-1918-1920-21

201.12114.9 Lane mile(s)Performance Measure

Program Code

$1,720PA&ED:PS&E:

R/W Sup:

Carryover

29.9/33.7

Con Sup:

Pavement Rehabilitation (CAPM)

$8,770Const:R/W:

37

74

46

Senate:

Assembly:

Congress:

37

74

46Congress

Assembly

Senate

In and near Brea, from Harbor Boulevard toRandolph Avenue. Cold plane pavement andplace Rubberized Hot Mix Asphalt (RHMA)pavement.

4337

0P580

Subtotal: $8,208

2019-20 $1,249$129

$2,269

$4,125Total Project Cost: $12,333

12150001481/30/202012/3/201911/1/2018PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

12-Orange-90 Prior18-1918-1919-20

201.12111.7 Lane mile(s)Performance Measure

Program Code

$478PA&ED:PS&E:

R/W Sup:

Carryover

2.6/5.1

Con Sup:

Pavement Rehabilitation (CAPM)

$8,208Const:R/W:

29

55

39

Senate:

Assembly:

Congress:

29

55

39Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 151 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In the city of Anaheim, from west of LakeviewAvenue to Orange/Riverside County line.Pavement rehabilitation.4609B

0N320

Subtotal: $5,750

2018-19 $1,740

$1,740

$3,480Total Project Cost: $9,230

12130001964/1/20193/1/20196/3/2015PA&ED:

RTL:R/W Cert:

9/1/2019Begin Con:

12-Orange-91Prior

18-19

201.12190.0 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R9.8/R18.9

Con Sup:

Pavement Rehabilitation (CAPM)

$5,750Const:R/W:

37

68

39, 45

Senate:

Assembly:

Congress:

37

68

39, 45Congress

Assembly

Senate

In Newport Beach, from north of SuperiorAvenue to 60th Street. Rehabilitate drainagesystem.2403A

0N930 $10

Subtotal: $1,105

2018-19 $400

$400

$1,050Total Project Cost: $2,155

12150000094/2/20192/1/2019

10/20/2017PA&ED:

RTL:R/W Cert:

11/6/2019Begin Con:

12-Orange-1 PriorPrior

18-19

201.15114 Culvert(s) (ea)Performance Measure

Program Code

$250PA&ED:PS&E:

R/W Sup:

Carryover

20.5/20.9

Con Sup:

Drainage System Restoration

$1,095Const:R/W:

37

74

48

Senate:

Assembly:

Congress:

37

74

48Congress

Assembly

Senate

In San Clemente, adjacent to northboundAvenida Pico offramp. Restore hydrauliccapacity of channel by repairing concrete panelsin channel slope and bottom.

2563

0P700 $15

Subtotal: $4,318

2019-20 $963$111

$1,080

$2,606Total Project Cost: $6,924

12160000046/1/20205/1/20203/1/2019PA&ED:

RTL:R/W Cert:

12/11/2020Begin Con:

12-Orange-5 Prior18-1918-1919-20

201.1511 Culvert(s) (ea)Performance Measure

Program Code

$452PA&ED:PS&E:

R/W Sup:

Carryover

3.3

Con Sup:

Drainage System Restoration

$4,303Const:R/W:

36

73

49

Senate:

Assembly:

Congress:

36

73

49Congress

Assembly

Senate

In Garden Grove, at Haster Street westboundofframp. Upgrade drainage system.

2948

0N920 $326

Subtotal: $1,475

2019-20 $410$30

$468

$1,142Total Project Cost: $2,617

12150000105/1/20194/1/20198/1/2017PA&ED:

RTL:R/W Cert:

1/2/2020Begin Con:

12-Orange-22 PriorPriorPrior19-20

201.1518 Culvert(s) (ea)Performance Measure

Program Code

$234PA&ED:PS&E:

R/W Sup:

Carryover

R9.1

Con Sup:

Drainage System Restoration

$1,149Const:R/W:

34

72

47

Senate:

Assembly:

Congress:

34

72

47Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 152 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Buena Park, from Auto Center Drive to CraigAvenue. Rehabilitate drainage systems, installnew inlets, Reinforced Concrete Pipes (RCP)and replace flood damaged sections of curb andgutters.

3230A

0F970 $414

Subtotal: $2,640

2019-20 $870$153$906

$1,929Total Project Cost: $4,569

121200003111/15/201911/1/20196/26/2017PA&ED:

RTL:R/W Cert:

7/15/2020Begin Con:

12-Orange-39PriorPrior19-20

201.15124 Culvert(s) (ea)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

15.2/15.9

Con Sup:

Drainage System Restoration

$2,226Const:R/W:

32

65

39

Senate:

Assembly:

Congress:

32

65

39Congress

Assembly

Senate

In Orange County, from 0.3 mile south of ElToro Road to 0.2 mile north of Route 73/133Interchange. Construct detention basin,reconstruct channel, extend reinforced concretebox and regrade to prevent adverse flow.

4792

0Q360 $1,467

Subtotal: $3,562

2019-20 $1,712$766

$1,188

$4,791Total Project Cost: $8,353

12160001336/15/20204/17/202010/2/2018PA&ED:

RTL:R/W Cert:

1/5/2021Begin Con:

12-Orange-133 Prior18-1918-1919-20

201.1512 Culvert(s) (ea)Performance Measure

Program Code

$1,125PA&ED:PS&E:

R/W Sup:

Carryover

3.1/R4.3

Con Sup:

Drainage System Restoration

$2,095Const:R/W:

37

74

48

Senate:

Assembly:

Congress:

37

74

48Congress

Assembly

Senate

MOBILITYIn the cities of Santa Ana and Tustin, from DyerRoad onramp to Edinger Avenue offramp. Construct northbound auxiliary lane.3483

0G950 $24,500

Subtotal: $37,600

2019-20 $3,500$2,700$2,800

$9,200Total Project Cost: $46,800

12150000456/15/20206/1/2020

9/11/2017PA&ED:

RTL:R/W Cert:

12/23/2020Begin Con:

12-Orange-55 PriorPriorPrior19-20

201.3101153 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

$200PA&ED:PS&E:

R/W Sup:

Carryover

R8.0/R9.2

Con Sup:

Operational Improvements

$13,100Const:R/W:

34

69

46

Senate:

Assembly:

Congress:

34

69

46Congress

Assembly

Senate

In Irvine, from southbound 5/SB 133 Connectorto southbound 133/NB 405 Connector.Construct a new auxiliary lane to improvetraffic flow.

4846

0N890 $253

Subtotal: $15,179

2021-22 $3,224$652

$4,544

$9,923Total Project Cost: $25,102

121400013010/1/20219/1/2021

11/1/2019PA&ED:

RTL:R/W Cert:

3/1/2022Begin Con:

12-Orange-133 18-1919-2019-2021-22

201.310271 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

$1,503PA&ED:PS&E:

R/W Sup:

New

8.5/M9.3

Con Sup:

Operational Improvements

$14,926Const:R/W:

37

74

45

Senate:

Assembly:

Congress:

37

74

45Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 153 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Irvine, from Route 133 to Sand CanyonAvenue; also from Sand Canyon Avenue toUniversity Drive/Jeffery Road. Constructsouthbound auxiliary lanes.

4956A

0H045

Subtotal: $6,000

2018-19

$2,200

$2,200Total Project Cost: $8,200

12120000527/1/20183/1/2018

3/22/2016PA&ED:

RTL:R/W Cert:

12/1/2019Begin Con:

12-Orange-405

18-19

201.3101003 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

2.4/3.9

Con Sup:

Operational Improvements

$6,000Const:R/W:

37

74

45

Senate:

Assembly:

Congress:

37

74

45Congress

Assembly

Senate

At various locations, on various routes. Replaceand upgrade existing field elements for theTraffic Management System (TMS).1203

0Q690 $24

Subtotal: $6,554

2019-20 $2,060

$1,800

$3,860Total Project Cost: $10,414

12170000885/1/20202/1/2020

6/22/2017PA&ED:

RTL:R/W Cert:

1/1/2021Begin Con:

12-Orange-VarPrior

19-20

201.315754 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

$6,530Const:R/W:

29, 32, 34,37

55, 65, 68,69, 72

39, 46, 47

Senate:

Assembly:

Congress:

29, 32, 34,37

55, 65, 68,69, 72

39, 46, 47Congress

Assembly

Senate

In the cities of Orange, Anaheim, Santa Ana,Fullerton and Buena Park, from PM 33.0 to PM43.2; also on Route 57, from PM 10.7 to PM 16.6; also on Route 91, from PM R2.6 to PM R4.1 and PM 0.0 to PM 7.2. Install and modifyIntelligent Transportation System (ITS)elements.

2859B

0P42U

Subtotal: $8,820

2019-20 $2,030$180

$2,030

$5,563Total Project Cost: $14,383

12160000974/10/20204/1/20207/1/2018PA&ED:

RTL:R/W Cert:

1/4/2021Begin Con:

12-Orange-Var Prior18-1918-1919-20

201.31524.8 Field element(s)Performance Measure

Program Code

$1,323PA&ED:PS&E:

R/W Sup:

Carryover

0.0/0.0

Con Sup:

Transportation Management Systems

$8,820Const:R/W:

29, 37

65, 69

39, 46

Senate:

Assembly:

Congress:

29, 37

65, 69

39, 46Congress

Assembly

Senate

In the cities of Newport Beach, HuntingtonBeach and Seal Beach, from Crystal HeightsDrive to First Street. Replace traffic signals,upgrade non-standard curb ramps to meetAmericans with Disabilities Act (ADA)Standards and modify drainage.

2330

0P680 $191

Subtotal: $13,116

2020-21 $4,299$1,244$3,537

$10,971Total Project Cost: $24,087

12160000025/30/20215/15/20211/5/2019PA&ED:

RTL:R/W Cert:

1/30/2022Begin Con:

12-Orange-1 Prior18-1918-1920-21

201.31520 Field element(s)Performance Measure

Program Code

$1,891PA&ED:PS&E:

R/W Sup:

Carryover

13.0/33.6

Con Sup:

Transportation Management Systems

$12,925Const:R/W:

34, 37

72, 74

48

Senate:

Assembly:

Congress:

34, 37

72, 74

48Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 154 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Orange($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Anaheim, from south of Route 22 tosouth of Route 39; also on Route 57 (PM10.7/16.6) and Route 91 (PM R2.6/R4.1 and(PM 0.0/7.2). Create interoperability ofTransportation Management System (TMS) byupgrading Intelligent Transportation System(ITS) elements between Caltrans and localagencies.

2859C

0P670

Subtotal: $13,673

2019-20 $3,650$320

$3,650

$10,000Total Project Cost: $23,673

12150001606/1/20205/1/2020

11/1/2018PA&ED:

RTL:R/W Cert:

2/1/2021Begin Con:

12-Orange-5 Prior18-1918-1919-20

201.315311 Field element(s)Performance Measure

Program Code

$2,380PA&ED:PS&E:

R/W Sup:

Carryover

33.0/43.2

Con Sup:

Transportation Management Systems

$13,673Const:R/W:

29, 32, 34,37

55, 65, 68,69, 72

39, 46, 47

Senate:

Assembly:

Congress:

29, 32, 34,37

55, 65, 68,69, 72

39, 46, 47Congress

Assembly

Senate

In Anaheim, at the Commercial VehicleEnforcement Facility (CVEF) Peralta WeighStation (Eastbound). Rehabilitate and upgradeCVEF.

4642A

0N490

Subtotal: $6,847

2018-19 $1,391$10

$1,332

$3,357Total Project Cost: $10,204

12140000502/1/2019

1/15/20198/1/2017PA&ED:

RTL:R/W Cert:

7/1/2019Begin Con:

12-Orange-91 PriorPriorPrior18-19

201.3211 Location(s)Performance Measure

Program Code

$624PA&ED:PS&E:

R/W Sup:

Carryover

R13.6

Con Sup:

Weigh Stations

$6,847Const:R/W:

37

68

39, 45

Senate:

Assembly:

Congress:

37

68

39, 45Congress

Assembly

Senate

CountyOrange

PA&ED:PS&E:

R/W Sup:Con Sup:

$37,192$281,692

R/W:

Subtotal: $318,884

Const:$27,248$71,801$18,496$78,490

$196,035

Total (Capital + Support): $514,919

Sorted by: Disctrict, County, Route and Post MilesPage 155 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Placer($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONIn Auburn, from 0.3 mile south of LincolnWay/Borland Avenue to Lincoln Way/BorlandAvenue. Realign curves.4785

1H240 $764

Subtotal: $2,461

2019-20 $1,003$306$819

$2,860Total Project Cost: $5,321

03160000775/1/2020

4/15/202012/15/2018PA&ED:

RTL:R/W Cert:

11/1/2020Begin Con:

03-Placer-49 Prior18-1918-1919-20

201.01050 Collision(s) reducedPerformance Measure

Program Code

$732PA&ED:PS&E:

R/W Sup:

Carryover

2.2/2.4

Con Sup:

Safety Improvements

$1,697Const:R/W:

1

5

4

Senate:

Assembly:

Congress:

1

5

4Congress

Assembly

Senate

In and near various cities, at various locations,from 0.3 mile west of Douglas Boulevard to 0.2mile east of Hampshire Rocks Undercrossing. Upgrade guardrail to current standards.

5026

0H720 $0

Subtotal: $2,600

2020-21 $440$120$550

$1,150Total Project Cost: $3,750

03160000088/15/20207/15/20201/15/2019PA&ED:

RTL:R/W Cert:

3/1/2021Begin Con:

03-Placer-80 18-1918-1919-2020-21

201.01521 Collision(s) reducedPerformance Measure

Program Code

$40PA&ED:PS&E:

R/W Sup:

New

1.6/R66.5

Con Sup:

Collision Severity Reduction

$2,600Const:R/W:

1

1, 6

4

Senate:

Assembly:

Congress:

1

1, 6

4Congress

Assembly

Senate

BRIDGE PRESERVATIONIn Placer and Nevada Counties, at variouslocations. Rehabilitate or replace bridges at sixlocations.5097

2F570 $200

Subtotal: $32,400

2019-20 $6,350$485

$6,430

$15,985Total Project Cost: $48,385

03000206155/7/2020

4/20/20202/15/2018PA&ED:

RTL:R/W Cert:

12/15/2020Begin Con:

03-Placer-80 PriorPriorPrior19-20

201.1106 Bridge(s)Performance Measure

Program Code

$2,720PA&ED:PS&E:

R/W Sup:

Carryover

28.7/R63.5

Con Sup:

Bridge Major Rehabilitation

$32,200Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

ROADWAY PRESERVATIONNear Weimar, from west of Applegate Road towest of Weimar Cross Road. Drainage systemrehabilitation.5105

4F250 $70

Subtotal: $3,140

2018-19 $430$140$610

$1,400Total Project Cost: $4,540

031400008610/11/201810/1/201810/2/2017PA&ED:

RTL:R/W Cert:

2/15/2019Begin Con:

03-Placer-80 PriorPriorPrior18-19

201.15126 Culvert(s) (ea)Performance Measure

Program Code

$220PA&ED:PS&E:

R/W Sup:

Carryover

25.9/28.5

Con Sup:

Drainage System Restoration

$3,070Const:R/W:

1

6

1

Senate:

Assembly:

Congress:

1

6

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 156 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Placer($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Colfax, from west of IllinoistownOvercrossing to east of Cape HornUndercrossing. Drainage system rehabilitation.5079

1E050 $150

Subtotal: $3,320

2019-20 $440$140$600

$1,410Total Project Cost: $4,730

030002060012/15/201912/15/2019

9/1/2017PA&ED:

RTL:R/W Cert:

8/5/2020Begin Con:

03-Placer-80 PriorPriorPrior19-20

201.15137 Culvert(s) (ea)Performance Measure

Program Code

$230PA&ED:PS&E:

R/W Sup:

Carryover

31.5/36.9

Con Sup:

Drainage System Restoration

$3,170Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

Near Magra, from Secret Town Overcrossing tothe Gold Run Safety Roadside Rest Area(SRRA). Rehabilitate drainage systems.5114

1H030 $220

Subtotal: $3,289

2020-21 $667$195$806

$2,097Total Project Cost: $5,386

03160000494/20/20214/10/2021

12/15/2019PA&ED:

RTL:R/W Cert:

12/5/2021Begin Con:

03-Placer-80 Prior19-2019-2020-21

201.15132 Culvert(s) (ea)Performance Measure

Program Code

$429PA&ED:PS&E:

R/W Sup:

Carryover

38.3/41.5

Con Sup:

Drainage System Restoration

$3,069Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

MOBILITYIn Roseville, at the Atlantic Street/Eureka Roadwestbound on-ramp. Install ramp meters andwiden ramp for storage capacity.5113

0H460 $270

Subtotal: $6,710

2019-20 $700$130$900

$2,430Total Project Cost: $9,140

03150001744/15/20204/1/2020

6/15/2018PA&ED:

RTL:R/W Cert:

10/15/2020Begin Con:

03-Placer-80 PriorPriorPrior19-20

201.3101542 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

$700PA&ED:PS&E:

R/W Sup:

Carryover

2.8

Con Sup:

Operational Improvements

$6,440Const:R/W:

4

6

4

Senate:

Assembly:

Congress:

4

6

4Congress

Assembly

Senate

In various counties on various routes at variouslocations. Upgrade Extinguishable MessageSigns (EMS) to LED.4291

0H400

Subtotal: $1,600

2019-20 $210$30

$500

$930Total Project Cost: $2,530

03150001648/1/20197/1/20191/1/2018PA&ED:

RTL:R/W Cert:

4/1/2020Begin Con:

03-Placer-80 PriorPriorPrior19-20

201.31562 Field element(s)Performance Measure

Program Code

$190PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

$1,600Const:R/W:

1, 3, 4, 6

1, 3, 4, 5, 6,7, 8, 9

1, 3, 4, 6, 7

Senate:

Assembly:

Congress:

1, 3, 4, 6

1, 3, 4, 5, 6,7, 8, 9

1, 3, 4, 6, 7Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 157 of 290 Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Placer($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

ROADSIDE PRESERVATIONNear Lincoln, on McCourtney Road betweenRiosa Road and Kilaga Springs Road at theCoon Creek Conservation (C4) Ranch.Advance mitigation construction (4 acres) forfuture SHOPP projects expected to impactwetland, riparian and to other waters.

4899

1H530 $64

Subtotal: $1,239

2019-20 $434$7

$306

$1,400Total Project Cost: $2,639

03160001775/15/20205/1/2020

10/15/2019PA&ED:

RTL:R/W Cert:

10/20/2020Begin Con:

03-Placer-65 Prior19-2019-2019-20

201.2401 Location(s)Performance Measure

Program Code

$653PA&ED:PS&E:

R/W Sup:

Carryover

R19.5

Con Sup:

Roadside Enhancement

$1,175Const:R/W:

4

6

4

Senate:

Assembly:

Congress:

4

6

4Congress

Assembly

Senate

CountyPlacer

PA&ED:PS&E:

R/W Sup:Con Sup:

$1,738$55,021

R/W:

Subtotal: $56,759

Const:$5,914

$10,674$1,553

$11,521

$29,662

Total (Capital + Support): $86,421

Sorted by: Disctrict, County, Route and Post MilesPage 158 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Plumas($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONNear Quincy, at various locations from 0.3 milewest of Butterfly Valley Road to 0.2 mile westof Two Rivers Road; also on Route 89 nearGreenville, from 0.9 mile north to 1.4 milesnorth of Wolf Creek Road (PM 25.1/25.3).Upgrade rock fall fence to reduce maintenanceand highway worker exposure.

3639

1H790 $40

Subtotal: $1,800

2020-21 $450$20

$450

$1,270Total Project Cost: $3,070

02160000431/21/2021

12/21/202011/5/2019PA&ED:

RTL:R/W Cert:

6/15/2021Begin Con:

02-Plumas-70 18-1919-2019-2020-21

201.2359 Location(s)Performance Measure

Program Code

$350PA&ED:PS&E:

R/W Sup:

New

36.8/R62.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$1,760Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

ROADWAY PRESERVATIONIn and near Cromberg and Portola, from 0.2mile east of Gill Ranch Road to 0.2 mile west ofBig Grizzly Creek Bridge. Rehabilitateroadway, repair or replace culverts, upgradeguardrail, upgrade bridge railing at HumbugCreek Bridge No. 09-0022, and make pedestrianfacilities American with Disabilities Act (ADA)compliant.

(G13 Contingency)

3619

1H580 $514

Subtotal: $88,564

2021-22 $2,620$1,120$6,810

$14,040Total Project Cost: $102,604

02160000243/28/20222/25/202211/5/2020PA&ED:

RTL:R/W Cert:

9/27/2022Begin Con:

02-Plumas-70 18-1920-2120-2121-22

201.12045.7 Lane mile(s)Performance Measure

Program Code

$3,490PA&ED:PS&E:

R/W Sup:

New

58.4/R78.4

* Con Sup:

Roadway Rehabilitation (3R)

* Const, * Con Sup phase(s) are NOT authorized

$88,050* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

In Plumas and Lassen Counties, near Chilcootfrom west of Summit School Drive Road toRoute 395 (Lassen PM 0.0/3.9). Roadwayrehabilitation.

3599

0H760 $51

Subtotal: $20,598

2018-19 $900$70

$1,440

$3,440Total Project Cost: $24,038

02150000863/28/20192/25/20192/2/2018PA&ED:

RTL:R/W Cert:

8/27/2019Begin Con:

02-Plumas-70 PriorPriorPrior18-19

201.12218.0 Lane mile(s)Performance Measure

Program Code

$1,030PA&ED:PS&E:

R/W Sup:

Carryover

90.3/96.0

Con Sup:

Roadway Rehabilitation (2R)

$20,547Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

In Plumas County, from Butte County line toeast of Moach Road at various locations.Drainage rehabilitation.3587

0H550 $290

Subtotal: $2,815

2019-20 $710$1,090

$920

$3,780Total Project Cost: $6,595

02150000507/11/20196/4/20199/1/2018PA&ED:

RTL:R/W Cert:

2/13/2020Begin Con:

02-Plumas-70 Prior18-1918-1919-20

201.15150 Culvert(s) (ea)Performance Measure

Program Code

$1,060PA&ED:PS&E:

R/W Sup:

Carryover

0.0/70.0

Con Sup:

Drainage System Restoration

$2,525Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 159 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Plumas($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

CountyPlumas

PA&ED:PS&E:

R/W Sup:Con Sup:

$895$112,882

R/W:

Subtotal: $113,777

Const:$5,930$4,680$2,300$9,620

$22,530

Total (Capital + Support): $136,307

Sorted by: Disctrict, County, Route and Post MilesPage 160 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Riverside

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MAJOR DAMAGE RESTORATIONNear Mountain Center, from east of Black Burn Road to east of McCall Park Road. Permanentrestoration of storm damaged culverts anderoded roadway embankment slope.

3010G

1H910 $55

Subtotal: $4,319

2020-21 $1,393$255

$1,342

$4,260Total Project Cost: $8,579

081700016511/15/202010/15/20204/15/2019PA&ED:

RTL:R/W Cert:

7/15/2021Begin Con:

08-Riverside-74 Prior18-1918-1920-21

201.1315 Location(s)Performance Measure

Program Code

$1,270PA&ED:PS&E:

R/W Sup:

Carryover

50.0/59.0

Con Sup:

Permanent Restoration

$4,264Const:R/W:

28

28

36

Senate:

Assembly:

Congress:

28

28

36Congress

Assembly

Senate

Near Blythe, from north of Palo Verde DamRoad to the San Bernardino County line.Restore storm eroded embankments with rockslope protection and replace culverts. Aprevious Emergency Opening EA 08-1F800repaired roadway.

3002U

1G000 $600

Subtotal: $8,770

2019-20 $901$63

$2,462

$4,352Total Project Cost: $13,122

08150001075/1/20202/3/2020

11/1/2018PA&ED:

RTL:R/W Cert:

2/16/2021Begin Con:

08-Riverside-95 Prior18-1918-1919-20

201.13120 Location(s)Performance Measure

Program Code

$926PA&ED:PS&E:

R/W Sup:

Carryover

14.0/36.2

Con Sup:

Permanent Restoration

$8,170Const:R/W:

28

56

36

Senate:

Assembly:

Congress:

28

56

36Congress

Assembly

Senate

COLLISION REDUCTIONIn Moreno Valley, at the Sunnymead Boulevardeastbound onramp. Install traffic signal.

3006X

1H140 $90

Subtotal: $736

2018-19 $546$99

$566

$1,608Total Project Cost: $2,344

08160001622/4/20191/2/20191/2/2018PA&ED:

RTL:R/W Cert:

9/2/2019Begin Con:

08-Riverside-60 PriorPriorPrior18-19

201.01014 Collision(s) reducedPerformance Measure

Program Code

$397PA&ED:PS&E:

R/W Sup:

Carryover

16.6

Con Sup:

Safety Improvements

$646Const:R/W:

31

61

41

Senate:

Assembly:

Congress:

31

61

41Congress

Assembly

Senate

Near Beaumont, from Gilman Springs Road to1.4 miles west of Jack Rabbit Trail. Constructleft and right shoulders for westbound direction.0045G

0Q180 $250

Subtotal: $25,250

2018-19 $1,500$200

$3,700

$7,400Total Project Cost: $32,650

08000202207/2/2018

2/28/20185/2/2016PA&ED:

RTL:R/W Cert:

12/4/2018Begin Con:

08-Riverside-60 PriorPriorPrior18-19

201.010382 Collision(s) reducedPerformance Measure

Program Code

$2,000PA&ED:PS&E:

R/W Sup:

Carryover

22.2/26.6

Con Sup:

Safety Improvements

$25,000Const:R/W:

37

65

41

Senate:

Assembly:

Congress:

37

65

41Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 161 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Riverside

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Lake Elsinore, from the Orange Countyline to Monte Vista Street. Widen for standardlane widths and shoulders and construct ground-in rumble strips.

0050P

1C850 $20

Subtotal: $53,620

2019-20 $2,590$20

$4,985

$11,529Total Project Cost: $65,149

08130000473/26/20202/26/2020

12/20/2018PA&ED:

RTL:R/W Cert:

9/10/2020Begin Con:

08-Riverside-74 Prior18-1918-1919-20

201.010298 Collision(s) reducedPerformance Measure

Program Code

$3,934PA&ED:PS&E:

R/W Sup:

Carryover

0.0/5.8

Con Sup:

Safety Improvements

$53,600Const:R/W:

28

67

42

Senate:

Assembly:

Congress:

28

67

42Congress

Assembly

Senate

Near Temecula, from 3.1 miles north of Route371 to 1.1 miles south of Pauba Road. Construct 8 foot shoulders and rumble strip.3006G

1G670 $1,705

Subtotal: $44,977

2021-22 $4,700$751

$7,700

$18,051Total Project Cost: $63,028

081600004911/19/202110/19/202111/19/2019PA&ED:

RTL:R/W Cert:

8/19/2022Begin Con:

08-Riverside-79 Prior19-2019-2021-22

201.010108 Collision(s) reducedPerformance Measure

Program Code

$4,900PA&ED:PS&E:

R/W Sup:

Carryover

5.4/11.4

Con Sup:

Safety Improvements

$43,272Const:R/W:

28

71

42

Senate:

Assembly:

Congress:

28

71

42Congress

Assembly

Senate

In Murrieta, from 0.2 mile north of ClintonKeith Road Overcrossing to 0.5 mile south ofScott Road Overcrossing. Install concretebarrier at edge of shoulder.

3005N

1G870 $10

Subtotal: $3,000

2018-19 $732$10

$770

$2,112Total Project Cost: $5,112

08160000943/1/20192/1/20193/2/2018PA&ED:

RTL:R/W Cert:

9/5/2019Begin Con:

08-Riverside-215 PriorPriorPrior18-19

201.01023 Collision(s) reducedPerformance Measure

Program Code

$600PA&ED:PS&E:

R/W Sup:

Carryover

R12.7/R15.0

Con Sup:

Safety Improvements

$2,990Const:R/W:

23, 28

67

42

Senate:

Assembly:

Congress:

23, 28

67

42Congress

Assembly

Senate

MANDATESIn and near Lake Elsinore, from 1.7 miles eastof El Cariso Road to Lehr Drive. Stabilizeslopes to decrease sediment transport.3001Y

1C590 $10

Subtotal: $2,928

2018-19 $452$20

$495

$1,277Total Project Cost: $4,205

08120003346/17/20194/15/20197/13/2018PA&ED:

RTL:R/W Cert:

2/18/2020Begin Con:

08-Riverside-74 Prior18-1918-1918-19

201.33512 Acre(s) treated/pollutantPerformance Measure

Program Code

$310PA&ED:PS&E:

R/W Sup:

Carryover

7.0/R14.4

Con Sup:

Storm Water Mitigation

$2,918Const:R/W:

28

67

42

Senate:

Assembly:

Congress:

28

67

42Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 162 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Riverside

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Murrieta and Menifee, from Route 215 tonorth of Scott Road. Stabilize slopes todecrease sediment transport.3002A

1C660 $10

Subtotal: $7,090

2019-20 $1,795$20

$1,209

$4,208Total Project Cost: $11,298

081200034112/11/201910/24/20197/15/2018PA&ED:

RTL:R/W Cert:

8/12/2020Begin Con:

08-Riverside-215 Prior18-1918-1919-20

201.33536 Acre(s) treated/pollutantPerformance Measure

Program Code

$1,184PA&ED:PS&E:

R/W Sup:

Carryover

R9.0/R16.0

Con Sup:

Storm Water Mitigation

$7,080Const:R/W:

23, 28

67

42

Senate:

Assembly:

Congress:

23, 28

67

42Congress

Assembly

Senate

In Hemet, from Warren Avenue to SobobaStreet. Construct and upgrade pedestrianfacilities to current Americans with DisabilityAct (ADA) Standards.

3003P

1F590 $30

Subtotal: $2,783

2019-20 $1,815$467

$1,320

$4,312Total Project Cost: $7,095

08140002563/16/2020

12/20/20194/16/2018PA&ED:

RTL:R/W Cert:

11/17/2020Begin Con:

08-Riverside-74 PriorPriorPrior19-20

201.36193 Curb ramp(s)Performance Measure

Program Code

$710PA&ED:PS&E:

R/W Sup:

Carryover

36.9/43.6

Con Sup:

Americans with Disabilities Act New Curb Ramps

$2,753Const:R/W:

23

42, 67

36

Senate:

Assembly:

Congress:

23

42, 67

36Congress

Assembly

Senate

In Hemet, from East Florida Avenue to EastMenlo Avenue. Construct and upgrade pedestrian facilities to current Americans withDisability Act (ADA) Standards.

3002R

1F600 $1,085

Subtotal: $2,593

2019-20 $900$2,094

$600

$4,044Total Project Cost: $6,637

08140002573/10/20202/18/20204/10/2018PA&ED:

RTL:R/W Cert:

11/10/2020Begin Con:

08-Riverside-79 PriorPriorPrior19-20

201.36185 Curb ramp(s)Performance Measure

Program Code

$450PA&ED:PS&E:

R/W Sup:

Carryover

25.6/26.4

Con Sup:

Americans with Disabilities Act New Curb Ramps

$1,508Const:R/W:

23

42

36

Senate:

Assembly:

Congress:

23

42

36Congress

Assembly

Senate

In Palm Springs, from Gateway Drive to GolfClub Drive. Reconstruct and construct curbramps.3007U

0R302 $2,125

Subtotal: $7,425

2019-20 $1,547$3,339$2,590

$7,476Total Project Cost: $14,901

08170002306/15/20206/12/20206/29/2016PA&ED:

RTL:R/W Cert:

12/14/2020Begin Con:

08-Riverside-111PriorPrior19-20

201.378130 Structure(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

47.3/55.3

Con Sup:

Americans with Disabilities Act PedestrianInfrastructure

$5,300Const:R/W:

28

42

36

Senate:

Assembly:

Congress:

28

42

36Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 163 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Riverside

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

BRIDGE PRESERVATIONNear Palm Springs, at Whitewater River BridgeNo. 56-0004 L/R. Bridge rehabilitation andscour mitigation.3002F

1E570 $20

Subtotal: $12,419

2018-19 $1,645$8

$2,300

$4,906Total Project Cost: $17,325

08140000516/18/20196/3/20195/2/2018PA&ED:

RTL:R/W Cert:

1/21/2020Begin Con:

08-Riverside-10 Prior18-1918-1918-19

201.1102 Bridge(s)Performance Measure

Program Code

$953PA&ED:PS&E:

R/W Sup:

Carryover

27.7

Con Sup:

Bridge Major Rehabilitation

$12,399Const:R/W:

28

42

36

Senate:

Assembly:

Congress:

28

42

36Congress

Assembly

Senate

Near Desert Center, from Krume Ditch to WideDitch. Replace existing Rock Slope Protection(RSP) to prevent further scour damage andpreserve the integrity of twenty-four bridges.

3008N

1H200 $190

Subtotal: $10,630

2021-22 $1,232$259

$3,648

$6,106Total Project Cost: $16,736

08160001773/16/20222/16/20229/23/2020PA&ED:

RTL:R/W Cert:

11/4/2022Begin Con:

08-Riverside-10 18-1920-2120-2121-22

201.11024 Bridge(s)Performance Measure

Program Code

$967PA&ED:PS&E:

R/W Sup:

New

R92.9/R101.1

Con Sup:

Bridge Major Rehabilitation

$10,440Const:R/W:

28

56

36

Senate:

Assembly:

Congress:

28

56

36Congress

Assembly

Senate

Near Desert Center, from Coxcomb Ditch toCopa Ditch. Replace existing Rock SlopeProtection (RSP) to prevent further scourdamage and preserve the structural integrity ofsixteen bridges.

3008M

1H190 $140

Subtotal: $7,496

2021-22 $1,282$217

$2,336

$4,660Total Project Cost: $12,156

08160001743/16/20222/16/20229/23/2020PA&ED:

RTL:R/W Cert:

12/12/2022Begin Con:

08-Riverside-10 18-1920-2120-2121-22

201.11016 Bridge(s)Performance Measure

Program Code

$825PA&ED:PS&E:

R/W Sup:

New

R106.6/R113.8

Con Sup:

Bridge Major Rehabilitation

$7,356Const:R/W:

28

56

36

Senate:

Assembly:

Congress:

28

56

36Congress

Assembly

Senate

Near Blythe, from Rubble Ditch to PalowallaDitch. Replace existing Rock Slope Protection(RSP) to prevent further scour damage andpreserve the structural integrity of eighteenbridges.

3008P

1H210 $131

Subtotal: $8,963

2021-22 $1,442$281

$2,732

$5,393Total Project Cost: $14,356

08160001763/16/20222/16/20229/23/2020PA&ED:

RTL:R/W Cert:

11/16/2022Begin Con:

08-Riverside-10 18-1920-2120-2121-22

201.11018 Bridge(s)Performance Measure

Program Code

$938PA&ED:PS&E:

R/W Sup:

New

R120.7/R142.7

Con Sup:

Bridge Major Rehabilitation

$8,832Const:R/W:

28

56

36

Senate:

Assembly:

Congress:

28

56

36Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 164 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Riverside

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Lake Elsinore, at Morrill Canyon BridgeNo. 56-0169; also near Hemet, at StrawberryCreek Bridge No. 56-0180 (PM 53.4/54.7).Replace structures/upgrade rails.

3005Q

1G470 $653

Subtotal: $7,477

2021-22 $1,295$150

$2,390

$5,525Total Project Cost: $13,002

08160000013/30/20222/28/20222/22/2021PA&ED:

RTL:R/W Cert:

11/30/2022Begin Con:

08-Riverside-74 18-1920-2120-2121-22

201.1102 Bridge(s)Performance Measure

Program Code

$1,690PA&ED:PS&E:

R/W Sup:

New

2.9/3.2

Con Sup:

Bridge Major Rehabilitation

$6,824Const:R/W:

26

67

42

Senate:

Assembly:

Congress:

26

67

42Congress

Assembly

Senate

Near Desert Center, at Palen Ditch Bridge No.56-0040 R/L. Bridge rail replacement.

3002L

1F410 $10

Subtotal: $1,856

2018-19 $342$10

$1,567

$2,058Total Project Cost: $3,914

08140002161/4/2019

12/3/201812/15/2017PA&ED:

RTL:R/W Cert:

11/1/2019Begin Con:

08-Riverside-10 PriorPriorPrior18-19

201.112520.0 Linear feetPerformance Measure

Program Code

$139PA&ED:PS&E:

R/W Sup:

Carryover

R110.5

Con Sup:

Bridge Rail Replacement and Upgrade

$1,846Const:R/W:

28

56

36

Senate:

Assembly:

Congress:

28

56

36Congress

Assembly

Senate

In and near the cities of Lake Elsinore, Perris,Menifee and Hemet, at Leach Canyon ChannelBridge No. 56-0750 and Blue Ridge Wash Bridge No. 56-0257; also on Routes 79 and 371,at Arroyo Seco Bridge No. 56-0189, TemeculaCreek Bridge, and Cahuilla Bridge No. 56-0490.Bridge rail replacement, replace two bridges,and extend one culvert.

3002C

1C680 $50

Subtotal: $6,295

2019-20 $2,700$80

$2,800

$6,085Total Project Cost: $12,380

08120003438/1/20196/3/20194/2/2018PA&ED:

RTL:R/W Cert:

3/2/2020Begin Con:

08-Riverside-74 PriorPriorPrior19-20

201.112800.0 Linear feetPerformance Measure

Program Code

$505PA&ED:PS&E:

R/W Sup:

Carryover

13.2/34.0

Con Sup:

Bridge Rail Replacement and Upgrade

$6,245Const:R/W:

23, 28, 31

42, 61, 67

36, 41, 42

Senate:

Assembly:

Congress:

23, 28, 31

42, 61, 67

36, 41, 42Congress

Assembly

Senate

In Riverside County, on Routes 10 and 91, atvarious locations; also in San Bernardino County, on Routes 10 and 15, at variouslocations. Repair bridge decks.

3002G

1E720 $30

Subtotal: $1,502

2018-19 $660$20

$660

$1,690Total Project Cost: $3,192

08140000878/3/2018

6/20/201810/31/2017PA&ED:

RTL:R/W Cert:

4/30/2019Begin Con:

08-Riverside-10 PriorPriorPrior18-19

201.1197 Bridge(s)Performance Measure

Program Code

$350PA&ED:PS&E:

R/W Sup:

Carryover

R74.1

Con Sup:

Bridge Preventative Maintenance

$1,472Const:R/W:

28

56

36

Senate:

Assembly:

Congress:

28

56

36Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 165 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Riverside

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

ROADWAY PRESERVATIONIn and near Terra Cotta, from Nichols Road tonorth of Glen Ivy. Concrete pavement slabreplacement.3003L

1F142 $10

Subtotal: $20,772

2018-19 $926$10

$3,347

$5,391Total Project Cost: $26,163

08150002325/1/20192/1/2019

11/1/2017PA&ED:

RTL:R/W Cert:

1/15/2020Begin Con:

08-Riverside-15 PriorPriorPrior18-19

201.12157.0 Lane mile(s)Performance Measure

Program Code

$1,108PA&ED:PS&E:

R/W Sup:

Carryover

23.9/33.4

Con Sup:

Pavement Rehabilitation (CAPM)

$20,762Const:R/W:

28, 31

60, 67, 75

41, 42, 50

Senate:

Assembly:

Congress:

28, 31

60, 67, 75

41, 42, 50Congress

Assembly

Senate

In and near Corona, from south of OntarioAvenue to Route 60. Concrete pavement slabreplacement.3003M

1F143 $10

Subtotal: $24,050

2019-20 $930$10

$4,771

$6,733Total Project Cost: $30,783

08150002333/2/20201/3/2020

3/29/2018PA&ED:

RTL:R/W Cert:

1/15/2021Begin Con:

08-Riverside-15 PriorPriorPrior19-20

201.12179.8 Lane mile(s)Performance Measure

Program Code

$1,022PA&ED:PS&E:

R/W Sup:

Carryover

38.2/51.5

Con Sup:

Pavement Rehabilitation (CAPM)

$24,040Const:R/W:

28, 31

60, 67, 75

41, 42, 50

Senate:

Assembly:

Congress:

28, 31

60, 67, 75

41, 42, 50Congress

Assembly

Senate

Near Beaumont, from Gilman Springs Road to1.4 miles west of Jack Rabbit Trail.Rehabilitate pavement.0033N

1C090

Subtotal: $15,000

2018-19

Total Project Cost: $15,000

08120002877/2/2018

2/28/20185/2/2016PA&ED:

RTL:R/W Cert:

12/4/2018Begin Con:

08-Riverside-60

201.12117.6 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

22.1/26.6

Con Sup:

Pavement Rehabilitation (CAPM)

$15,000Const:R/W:

23

42

36

Senate:

Assembly:

Congress:

23

42

36Congress

Assembly

Senate

In and near Yucca Valley and TwentyninePalms, from north of Indian Avenue to UtahTrail; also in San Bernardino County (PM0.0/15.1 and PM 29.3/33.6). Pavementrehabilitation.

(G13 Contingency)

0023C

1E840 $2,209

Subtotal: $37,564

2019-20 $2,800$1,110$4,520

$9,880Total Project Cost: $47,444

08140001133/16/2020

12/16/20196/28/2016PA&ED:

RTL:R/W Cert:

1/15/2021Begin Con:

08-Riverside-62 PriorPriorPrior19-20

201.12185.5 Lane mile(s)Performance Measure

Program Code

$1,450PA&ED:PS&E:

R/W Sup:

Carryover

R6.7/9.2

* Con Sup:

Pavement Rehabilitation (CAPM)

* Const, * Con Sup phase(s) are NOT authorized

$35,355* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

31

56

45

Senate:

Assembly:

Congress:

31

56

45Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 166 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Riverside

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Temecula, from San Diego County line toTemecula city limits. Pavement rehabilitation.

0066Q

1F690 $10

Subtotal: $8,752

2018-19 $560$17

$800

$1,617Total Project Cost: $10,369

08150000165/10/20194/12/20195/15/2018PA&ED:

RTL:R/W Cert:

2/14/2020Begin Con:

08-Riverside-79 Prior18-1918-1918-19

201.12132.5 Lane mile(s)Performance Measure

Program Code

$240PA&ED:PS&E:

R/W Sup:

Carryover

0.0/15.6

Con Sup:

Pavement Rehabilitation (CAPM)

$8,742Const:R/W:

28

71, 75

42, 50

Senate:

Assembly:

Congress:

28

71, 75

42, 50Congress

Assembly

Senate

In and near Coachella, from 0.5 mile east ofCoachella Canal to Hazy Gulch Bridge. Coldplane pavement and overlay with PortlandCement Concrete (PCC). Construct eastboundtruck climbing lane. A one-lane temporarydetour will be constructed in the median fortraffic handling.

(G13 Contingency)

3008A

1C081 $10

Subtotal: $157,010

2021-22 $15,800$90

$22,000

$44,890Total Project Cost: $201,900

08160000865/27/20224/22/20228/28/2020PA&ED:

RTL:R/W Cert:

1/13/2013Begin Con:

08-Riverside-10 Prior20-2120-2121-22

201.12252.4 Lane mile(s)Performance Measure

Program Code

$7,000PA&ED:PS&E:

R/W Sup:

Carryover

R60.9/R74.0

* Con Sup:

Roadway Rehabilitation (2R)

* Const, * Con Sup phase(s) are NOT authorized

$157,000* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

28

56

36

Senate:

Assembly:

Congress:

28

56

36Congress

Assembly

Senate

Near Blythe, from Rice Road/SR-177 to TeedDitch Bridge. Cold plane mainline pavementand overlay with Portland Cement Concrete(PCC). The shoulders and ramps will be milledand overlaid with Hot Mix Asphalt (HMA-A).A two lane temporary detour will be constructedin the median for traffic handling.

(G13 Contingency)

3008Y

1C082 $10

Subtotal: $263,020

2019-20 $21,800$153

$37,500

$76,353Total Project Cost: $339,373

08160000875/29/20204/24/20206/28/2019PA&ED:

RTL:R/W Cert:

1/15/2021Begin Con:

08-Riverside-10 Prior19-2019-2019-20

201.122116.0 Lane mile(s)Performance Measure

Program Code

$16,900PA&ED:PS&E:

R/W Sup:

Carryover

R105.0/R134.0

* Con Sup:

Roadway Rehabilitation (2R)

* Const, * Con Sup phase(s) are NOT authorized

$263,010* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

28

56

36

Senate:

Assembly:

Congress:

28

56

36Congress

Assembly

Senate

In and near Blythe, from Teed Ditch Bridge toArizona State line. Cold plane mainlinepavement and overlay with Portland CementConcrete (PCC). The shoulders and ramps willbe milled and overlaid with Hot Mix Asphalt(HMA-A). A two lane temporary detour will beconstructed in the median for traffic handling.

(G13 Contingency)

3009K

1C083 $10

Subtotal: $207,010

2021-22 $21,000$117

$29,000

$59,117Total Project Cost: $266,127

08160000905/27/20224/22/20228/28/2020PA&ED:

RTL:R/W Cert:

1/10/2023Begin Con:

08-Riverside-10 Prior20-2120-2121-22

201.12290.0 Lane mile(s)Performance Measure

Program Code

$9,000PA&ED:PS&E:

R/W Sup:

Carryover

R134.0/R156.5

* Con Sup:

Roadway Rehabilitation (2R)

* Const, * Con Sup phase(s) are NOT authorized

$207,000* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

28

56

36

Senate:

Assembly:

Congress:

28

56

36Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 167 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Riverside

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Temecula, from Rainbow ValleyBoulevard to Front Street. Rehabilitateroadway.3003K

1F141 $10

Subtotal: $34,900

2019-20 $1,200$10

$5,181

$7,405Total Project Cost: $42,305

08150002312/3/20208/1/20192/1/2018PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

08-Riverside-15 PriorPriorPrior19-20

201.12224.0 Lane mile(s)Performance Measure

Program Code

$1,014PA&ED:PS&E:

R/W Sup:

Carryover

R0.0/3.0

Con Sup:

Roadway Rehabilitation (2R)

$34,890Const:R/W:

28, 31

60, 67, 75

41, 42, 50

Senate:

Assembly:

Congress:

28, 31

60, 67, 75

41, 42, 50Congress

Assembly

Senate

Near Lake Elsinore, at 0.8 mile west of GrandAvenue. Stabilize slope to protect safety oftraveling public.3002J

1E770 $10

Subtotal: $1,092

2018-19 $250$20

$400

$810Total Project Cost: $1,902

08140001028/30/20187/30/2018

10/24/2017PA&ED:

RTL:R/W Cert:

5/1/2019Begin Con:

08-Riverside-74 PriorPriorPrior18-19

201.1501 Location(s)Performance Measure

Program Code

$140PA&ED:PS&E:

R/W Sup:

Carryover

11.0

Con Sup:

Roadway Protective Betterments

$1,082Const:R/W:

28

67

42

Senate:

Assembly:

Congress:

28

67

42Congress

Assembly

Senate

In Riverside County, on Routes 10, 15, 71 and215 at various locations. Replace existing guidesigns with Type XI reflectivity.3005C

1F372 $10

Subtotal: $9,079

2018-19 $722$45

$1,214

$2,314Total Project Cost: $11,393

08150001625/1/20192/1/2019

9/13/2017PA&ED:

RTL:R/W Cert:

12/2/2019Begin Con:

08-Riverside-10 PriorPriorPrior18-19

201.170758 Sign(s)Performance Measure

Program Code

$333PA&ED:PS&E:

R/W Sup:

Carryover

0.0/R156.4

Con Sup:

Signs and Lighting Rehabilitation

$9,069Const:R/W:

20, 28

52, 60, 67

35, 41, 42

Senate:

Assembly:

Congress:

20, 28

52, 60, 67

35, 41, 42Congress

Assembly

Senate

In the cities of Eastvale, Jurupa Valley,Riverside and Moreno Valley, from HamnerAvenue to Gilman Spring Road; also on Route91, from Route 15 to Madison Street. Replaceexisting guide signs with retro-reflectivesheeting.

0022K

1F371 $10

Subtotal: $1,602

2019-20 $260$15

$210

$610Total Project Cost: $2,212

08150001633/2/20209/3/20197/2/2018PA&ED:

RTL:R/W Cert:

11/2/2020Begin Con:

08-Riverside-60 Prior18-1918-1919-20

201.170221 Lighting fixture(s)Performance Measure

Program Code

$125PA&ED:PS&E:

R/W Sup:

Carryover

R0.0/22.3

Con Sup:

Signs and Lighting Rehabilitation

$1,592Const:R/W:

31

60, 61

41

Senate:

Assembly:

Congress:

31

60, 61

41Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 168 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Riverside

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MOBILITYIn the cities from Corona and Riverside, fromRoute 15/91 separator to Adams Streetovercrossing. Convert existing limited accessHOV lanes to continuous access HOV lanes to allow safer ingress and egress movements forHOV.

3005X

1G192 $10

Subtotal: $473

2018-19 $96$10

$162

$301Total Project Cost: $774

08160001942/25/2019

12/28/20183/26/2018PA&ED:

RTL:R/W Cert:

7/29/2019Begin Con:

08-Riverside-91 PriorPriorPrior18-19

201.310126 1,000 vehicle hour(s)/yrPerformance Measure

Program Code

$33PA&ED:PS&E:

R/W Sup:

Carryover

7.4/15.6

Con Sup:

Operational Improvements

$463Const:R/W:

Senate:

Assembly:

Congress:Congress

Assembly

Senate

In Riverside and San Bernardino Counties, onvarious routes and at various locations. Repairand replace vehicle detection equipmentimpacting the operations of the DistrictTransportation Management Center (TMC).

3006W

1H530 $10

Subtotal: $4,270

2018-19 $912$90

$1,274

$2,622Total Project Cost: $6,892

081700007410/15/20189/14/20182/15/2018PA&ED:

RTL:R/W Cert:

6/14/2019Begin Con:

08-Riverside-Var PriorPriorPrior18-19

201.315188 Field element(s)Performance Measure

Program Code

$346PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

$4,260Const:R/W:

16, 20, 23,25, 28, 29,3133, 40, 41,42, 47, 52,55, 56, 608, 31, 35,36, 39, 41,42

Senate:

Assembly:

Congress:

16, 20, 23,25, 28, 29,

31

33, 40, 41,42, 47, 52,55, 56, 60

8, 31, 35,36, 39, 41,

42

Congress

Assembly

Senate

ROADSIDE PRESERVATIONIn Riverside County, on Routes 10, 62, 74, 86,and 111 at various locations. Advance Mitigation. (Financial Contribution Only) 3002Q

1F560 $7,600

Subtotal: $7,600

2018-19$15

$165Total Project Cost: $7,765

08140002494/15/2019

9/14/2017PA&ED:

RTL:R/W Cert:

Begin Con:

08-Riverside-10 Prior

Prior

201.24015 Location(s)Performance Measure

Program Code

$150PA&ED:PS&E:

R/W Sup:

Carryover

6.0/70.0

Con Sup:

Roadside Enhancement

Const:R/W:

23

42

36

Senate:

Assembly:

Congress:

23

42

36Congress

Assembly

Senate

MULTIPLE OBJECTIVEIn and near Hemet, from Winchester Road toFairview Avenue. Multi-objective project torehabilitate pavement, install fiber optic/vehicledetection stations and upgrade curb ramps tomeet Americans with Disabilities Act (ADA)Standards.

3008L

1H060 $1,267

Subtotal: $32,549

2021-22 $5,140$4,530$4,100

$16,770Total Project Cost: $49,319

08160001305/16/20224/15/20229/15/2020PA&ED:

RTL:R/W Cert:

1/17/2023Begin Con:

08-Riverside-74 18-1919-2019-2021-22

201.99949 Centerline mile(s)Performance Measure

Program Code

$3,000PA&ED:PS&E:

R/W Sup:

New

34.3/45.1

Con Sup:

MULTIPLE OBJECTIVE

$31,282Const:R/W:

23, 28

42, 67

36, 42

Senate:

Assembly:

Congress:

23, 28

42, 67

36, 42Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 169 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Riverside

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

CountyRiverside

PA&ED:PS&E:

R/W Sup:Con Sup:

$18,410$1,026,462

R/W:

Subtotal: $1,044,872

Const:$64,909

$101,865$14,605

$160,651

$342,030

Total (Capital + Support): $1,386,902

Sorted by: Disctrict, County, Route and Post MilesPage 170 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Sacramento

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONIn Sacramento, Yolo, Placer, and GlennCounties, on Routes 5, 16, 45, 49, 50, 65, 80,99, 113, and 174 at various locations. Installtraffic operations elements such as queuewarning systems, flashing beacons, and lighting,and modify existing signals to new standards.

3855

4H020 $55

Subtotal: $2,875

2018-19 $400$120$390

$1,240Total Project Cost: $4,115

03180001281/1/2019

12/15/20186/1/2018PA&ED:

RTL:R/W Cert:

4/2/2019Begin Con:

03-Sacramento-Var PriorPriorPrior18-19

201.010125 Collision(s) reducedPerformance Measure

Program Code

$330PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Safety Improvements

$2,820Const:R/W:

1, 3, 4, 6

1, 3, 4, 6, 7,8

1, 3, 4, 6, 7

Senate:

Assembly:

Congress:

1, 3, 4, 6

1, 3, 4, 6, 7,8

1, 3, 4, 6, 7Congress

Assembly

Senate

Near Rio Vista, at Route 160. Intersectionimprovements.

5961

2H640 $6

Subtotal: $2,474

2019-20 $560$100

$1,030

$2,000Total Project Cost: $4,474

031700016712/1/2019

11/15/20198/1/2018PA&ED:

RTL:R/W Cert:

4/5/2020Begin Con:

03-Sacramento-12 Prior18-1918-1919-20

201.01026 Collision(s) reducedPerformance Measure

Program Code

$310PA&ED:PS&E:

R/W Sup:

Carryover

0.4/1.0

Con Sup:

Safety Improvements

$2,468Const:R/W:

3

11

3

Senate:

Assembly:

Congress:

3

11

3Congress

Assembly

Senate

In Sacramento County, on Routes 5, 80, and 99at various locations; also in Yolo County onRoute 80 (PM 0.0/R11.7). Upgrade guard railto current standards.

5850

4F640 $15

Subtotal: $2,295

2018-19 $565$115$295

$1,310Total Project Cost: $3,605

031400023210/1/20189/1/20187/7/2017PA&ED:

RTL:R/W Cert:

5/1/2019Begin Con:

03-Sacramento-5 PriorPriorPrior18-19

201.0158 Collision(s) reducedPerformance Measure

Program Code

$335PA&ED:PS&E:

R/W Sup:

Carryover

0.1/34.6

Con Sup:

Collision Severity Reduction

$2,280Const:R/W:

3, 6

6, 7

3, 6

Senate:

Assembly:

Congress:

3, 6

6, 7

3, 6Congress

Assembly

Senate

Near the city of Sacramento, at the ElkhornSafety Roadside Rest Area (SRRA). Upgradepotable water and wastewater systems.5848

4F580 $4

Subtotal: $3,004

2018-19 $370$50

$810

$1,610Total Project Cost: $4,614

03140001861/18/20191/11/20199/8/2017PA&ED:

RTL:R/W Cert:

7/20/2019Begin Con:

03-Sacramento-5 PriorPriorPrior18-19

201.2351 Location(s)Performance Measure

Program Code

$380PA&ED:PS&E:

R/W Sup:

Carryover

33.7

Con Sup:

Roadside Safety Improvements/ Freeway Maintenance Access

$3,000Const:R/W:

6

9

3

Senate:

Assembly:

Congress:

6

9

3Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 171 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Sacramento

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Sacramento, from Stockton Boulevard toFolsom Boulevard. Construct texturedpavement in narrow areas, pave partial slopes,relocate and reconstruct irrigation system, andinstall plantings and mulch to reducemaintenance and improve highway workersafety.

6246

1H050 $10

Subtotal: $4,010

2020-21 $520$40

$480

$1,210Total Project Cost: $5,220

031600005110/1/20209/15/20207/1/2019PA&ED:

RTL:R/W Cert:

5/1/2021Begin Con:

03-Sacramento-50 18-1919-2019-2020-21

201.23576 Location(s)Performance Measure

Program Code

$170PA&ED:PS&E:

R/W Sup:

New

R0.5/R3.2

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$4,000Const:R/W:

6

7

6

Senate:

Assembly:

Congress:

6

7

6Congress

Assembly

Senate

In the city of Sacramento, from 0.1 mile southof B Street Underpass to 0.4 mile north ofArden Way. Pave areas behind the gore and atnarrow and miscellaneous locations, placevegetation control, and construct MaintenanceVehicle Pullouts (MVPs) to reduce maintenanceand improve highway worker safety.

6413

2H110 $10

Subtotal: $4,010

2021-22 $530$50

$1,120

$1,980Total Project Cost: $5,990

03170000648/1/20217/1/2021

10/1/2020PA&ED:

RTL:R/W Cert:

1/1/2022Begin Con:

03-Sacramento-51 19-2020-2120-2121-22

201.23561 Location(s)Performance Measure

Program Code

$280PA&ED:PS&E:

R/W Sup:

New

1.6/4.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$4,000Const:R/W:

6

7

6

Senate:

Assembly:

Congress:

6

7

6Congress

Assembly

Senate

In and near the city of Sacramento, from DelPaso Park Separation to 0.4 mile north of Route80/244 Separation; also on Route 51 from PM8.3 to 8.6 and Route 244 from PM 0.0 to 0.9.Pave areas behind the gore and at narrow andmiscellaneous locations, place vegetationcontrol, and construct Maintenance VehiclePullouts (MVPs) to reduce maintenance andimprove highway worker safety.

6716

2H150 $0

Subtotal: $3,700

2020-21 $570$10

$1,050

$1,880Total Project Cost: $5,580

03170000684/6/20214/6/2021

6/15/2020PA&ED:

RTL:R/W Cert:

9/30/2021Begin Con:

03-Sacramento-80 19-2019-2020-2120-21

201.23549 Location(s)Performance Measure

Program Code

$250PA&ED:PS&E:

R/W Sup:

New

M9.1/R11.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$3,700Const:R/W:

6

7, 8

6

Senate:

Assembly:

Congress:

6

7, 8

6Congress

Assembly

Senate

In and near Citrus Heights, from 0.4 mile northof the Route 80/244 Separation to the PlacerCounty line. Pave areas behind the gore and atnarrow and miscellaneous locations, placevegetation control, and construct MaintenanceVehicle Pullouts (MVPs) to reduce maintenanceand improve highway worker safety.

6715

2H120 $0

Subtotal: $2,500

2021-22 $500$10

$1,000

$1,770Total Project Cost: $4,270

03170000655/6/2022

4/16/20226/15/2021PA&ED:

RTL:R/W Cert:

9/30/2022Begin Con:

03-Sacramento-80 20-2120-2121-2221-22

201.23567 Location(s)Performance Measure

Program Code

$260PA&ED:PS&E:

R/W Sup:

New

R11.4/18.0

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,500Const:R/W:

6

8

6, 7

Senate:

Assembly:

Congress:

6

8

6, 7Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 172 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Sacramento

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

BRIDGE PRESERVATIONIn and near Rio Vista, at the Sacramento RiverBridge No. 23-0024; also in Solano Countyfrom PM 26.3 to PM 26.4. Rehabilitatemovable bridge electrical and mechanicalsystems and upgrade Americans withDisabilities Act (ADA) facilities.

5960

1H130 $100

Subtotal: $16,500

2021-22 $2,460$20

$3,120

$6,360Total Project Cost: $22,860

03160000597/1/20216/1/20217/1/2019PA&ED:

RTL:R/W Cert:

2/1/2022Begin Con:

03-Sacramento-12 18-1919-2019-2021-22

201.1101 Bridge(s)Performance Measure

Program Code

$760PA&ED:PS&E:

R/W Sup:

New

0.0/0.4

Con Sup:

Bridge Major Rehabilitation

$16,400Const:R/W:

3

11

3

Senate:

Assembly:

Congress:

3

11

3Congress

Assembly

Senate

In the city of Sacramento at the American RiverBridge No.24-0003 from north of B StreetUnderpass to north of Exposition BoulevardOvercrossing. Widen and replace bridge deck.

(G13 Contingency Project)

6402

3F070 $2,000

Subtotal: $125,000

2021-22 $12,000$600

$22,000

$38,940Total Project Cost: $163,940

031200005411/1/202110/1/202111/1/2019PA&ED:

RTL:R/W Cert:

2/15/2022Begin Con:

03-Sacramento-51 Prior19-2019-2021-22

201.1101 Bridge(s)Performance Measure

Program Code

$4,340PA&ED:PS&E:

R/W Sup:

Carryover

2.0/3.5

* Con Sup:

Bridge Major Rehabilitation

* Const, * Con Sup phase(s) are NOT authorized

$123,000* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

6

7

6

Senate:

Assembly:

Congress:

6

7

6Congress

Assembly

Senate

In the city of Sacramento, at 21st AvenueUndercrossing No. 24-0154. Replace bridgedeck.6923B

0H342 $5

Subtotal: $4,565

2019-20 $240$3

$825

$1,278Total Project Cost: $5,843

03170001537/1/20197/1/20192/1/2018PA&ED:

RTL:R/W Cert:

1/15/2020Begin Con:

03-Sacramento-99 PriorPriorPrior19-20

201.1101 Bridge(s)Performance Measure

Program Code

$210PA&ED:PS&E:

R/W Sup:

Carryover

21.9/23.6

Con Sup:

Bridge Major Rehabilitation

$4,560Const:R/W:

6

7, 9

6, 7

Senate:

Assembly:

Congress:

6

7, 9

6, 7Congress

Assembly

Senate

On Route 99, at South Lagoon Creek BridgeNo. 24 -0028L, Lagoon Creek Bridge No. 24-0045L (PM 5.0), and North Lagoon CreekBridge No. 24-0027L (PM 5.1); also on Route160 (PM R44.5) at American River Bridge No.24-0001L. Scour mitigation and bridgereplacement.

6916

3F540 $500

Subtotal: $20,770

2018-19 $2,000$50

$3,100

$6,022Total Project Cost: $26,792

03130001364/1/2019

3/15/201910/1/2017PA&ED:

RTL:R/W Cert:

7/17/2019Begin Con:

03-Sacramento-99 PriorPriorPrior18-19

201.1114 Bridge(s)Performance Measure

Program Code

$872PA&ED:PS&E:

R/W Sup:

Carryover

4.9

Con Sup:

Bridge Scour Mitigation

$20,270Const:R/W:

5

9

9

Senate:

Assembly:

Congress:

5

9

9Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 173 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Sacramento

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near the city of Sacramento, from west ofRio Linda Boulevard Undercrossing (UC) No.24-0203 to east of Winters Street UC No. 24 -0205; also on Route 51 from south of Route51/244, 80 Separation No. 24-0291L to north ofRoute 51/244, 80 Connector No. 24-0293R (PM8.2 to 8.6). Upgrade bridge rails at fourstructures and widen for standard shoulders.

6412

1H910 $6

Subtotal: $20,110

2021-22 $3,000$500

$4,300

$9,100Total Project Cost: $29,210

03170000321/15/20221/3/2022

10/1/2019PA&ED:

RTL:R/W Cert:

5/15/2022Begin Con:

03-Sacramento-80 18-1919-2019-2021-22

201.1124413.0 Linear feetPerformance Measure

Program Code

$1,300PA&ED:PS&E:

R/W Sup:

New

M6.5/M8.8

Con Sup:

Bridge Rail Replacement and Upgrade

$20,104Const:R/W:

6

7, 8

6

Senate:

Assembly:

Congress:

6

7, 8

6Congress

Assembly

Senate

In and near Elk Grove, from 0.3 mile south ofDillard Road Overcrossing to south of GrantLine Road (replace Consumnes River BridgeNo. 24-0020L/R, and Consumnes RiverOverflow Bridge No. 24-0021L/R; upgradebridge rails at Dillard Road Overcrossing No. 24-0163; construct new McConnell Overhead No.24-0048L. Bridge seismic retrofit, bridge scourretrofit, bridge rail replacement, and bridgereplacement.

(G13 Contingency)

6912

0F280 $6,000

Subtotal: $119,000

2019-20 $3,500$600

$14,200

$20,000Total Project Cost: $139,000

03120000695/1/20204/1/20207/1/2019PA&ED:

RTL:R/W Cert:

10/15/2020Begin Con:

03-Sacramento-99 PriorPriorPrior19-20

201.1123178.0 Linear feetPerformance Measure

Program Code

$1,700PA&ED:PS&E:

R/W Sup:

Carryover

7.1/9.4

* Con Sup:

Bridge Rail Replacement and Upgrade

* Const, * Con Sup phase(s) are NOT authorized

$113,000* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

5

10

11

Senate:

Assembly:

Congress:

5

10

11Congress

Assembly

Senate

In the city of Sacramento, at Southbound Route99/5 Connector Overcrossing No. 24-0241F;also, on Route 80 at Longview RampOvercrossing No. 24-0281K (PM M9.15).Seismic retrofit two structures.

6707

4F100

Subtotal: $1,900

2019-20 $759$18

$691

$1,789Total Project Cost: $3,689

031400002412/15/201911/1/20194/1/2018PA&ED:

RTL:R/W Cert:

6/1/2020Begin Con:

03-Sacramento-99 PriorPriorPrior19-20

201.1132 Bridge(s)Performance Measure

Program Code

$321PA&ED:PS&E:

R/W Sup:

Carryover

R32.1

Con Sup:

Bridge Seismic Restoration

$1,900Const:R/W:

6

7

6

Senate:

Assembly:

Congress:

6

7

6Congress

Assembly

Senate

In the city of Sacramento, from the SacramentoRiver Viaduct (Pioneer Bridge) to 4th Street;also on Route 5 from 0.2 mile south of Broadway to S Street (PM 22.15 to 22.91).Clean and paint steel bridge girders withinRoute 5/50 Interchange.

6247

1H100 $20

Subtotal: $16,720

2020-21 $940$10

$3,010

$4,310Total Project Cost: $21,030

03160000562/1/20212/1/20217/1/2019PA&ED:

RTL:R/W Cert:

9/1/2021Begin Con:

03-Sacramento-50 18-1919-2019-2020-21

201.11911 Bridge(s)Performance Measure

Program Code

$350PA&ED:PS&E:

R/W Sup:

New

L0.0/L0.5

Con Sup:

Bridge Preventative Maintenance

$16,700Const:R/W:

6

7

6

Senate:

Assembly:

Congress:

6

7

6Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 174 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Sacramento

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In the city of Sacramento, from 0.5 mile southof Route 50 to Route 80 at South ConnectorUndercrossing No. 24-0267 (PM 22.42) and atAmerican River Viaduct No. 24-0068L/R (PM24.82). Improve to standard truck capacity.

ACCELERATED BRIDGE (PA&ED Only)

5868

3H390 $3,110

Subtotal: $179,810

2021-22 $19,340$2,910

$28,390

$67,420Total Project Cost: $247,230

031700034011/15/202111/1/202112/1/2019PA&ED:

RTL:R/W Cert:

4/15/2022Begin Con:

03-Sacramento-5 Prior21-2221-2221-22

201.3223 Bridge(s)Performance Measure

Program Code

$16,780PA&ED:* PS&E:

* R/W Sup:

Carryover

22.1/26.7

* Con Sup:

Trans Permit Requirements for Bridges

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

$176,700* Const:* R/W:

6

7

6

Senate:

Assembly:

Congress:

6

7

6Congress

Assembly

Senate

ROADWAY PRESERVATIONIn the city of Sacramento, from Route 5 to WattAvenue. Roadway rehabilitation.

(G13 Contingency)6177

0H080 $3,900

Subtotal: $219,900

2019-20 $17,000$1,800

$31,800

$58,400Total Project Cost: $278,300

03150000742/14/20202/3/2020

12/1/2018PA&ED:

RTL:R/W Cert:

8/1/2020Begin Con:

03-Sacramento-50 Prior19-20Prior19-20

201.12056.0 Lane mile(s)Performance Measure

Program Code

$7,800PA&ED:PS&E:

R/W Sup:

Carryover

L0.6/R5.3

* Con Sup:

Roadway Rehabilitation (3R)

* Const, * Con Sup phase(s) are NOT authorized

$216,000* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

6

7

6

Senate:

Assembly:

Congress:

6

7

6Congress

Assembly

Senate

In and near the city of Sacramento, from west ofWest El Camino Avenue to east of Route 244. Pavement rehabilitation.6711

0H470 $25

Subtotal: $10,540

2018-19 $1,110$105

$2,000

$3,765Total Project Cost: $14,305

03150001971/11/2019

12/11/201810/3/2017PA&ED:

RTL:R/W Cert:

7/15/2019Begin Con:

03-Sacramento-80 PriorPriorPrior18-19

201.1210.1 Lane mile(s)Performance Measure

Program Code

$550PA&ED:PS&E:

R/W Sup:

Carryover

M1.2/R11.3

Con Sup:

Pavement Rehabilitation (CAPM)

$10,515Const:R/W:

6

7

6

Senate:

Assembly:

Congress:

6

7

6Congress

Assembly

Senate

Near the city of Sacramento, from 0.2 mile eastof Longview Drive to 0.4 mile east of MadisonAvenue. Pavement rehabilitation.6714

1H190 $100

Subtotal: $14,100

2021-22 $1,500$80

$2,500

$4,130Total Project Cost: $18,230

031600006510/15/20219/20/20218/1/2019PA&ED:

RTL:R/W Cert:

4/1/2022Begin Con:

03-Sacramento-80 Prior19-2019-2021-22

201.12135.6 Lane mile(s)Performance Measure

Program Code

$50PA&ED:PS&E:

R/W Sup:

Carryover

M9.6/12.9

Con Sup:

Pavement Rehabilitation (CAPM)

$14,000Const:R/W:

6

8

6

Senate:

Assembly:

Congress:

6

8

6Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 175 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Sacramento

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Galt, from the San Joaquin County line toSimmerhorn Road; also in the cities of ElkGrove and Sacramento, from 0.7 mile south ofElk Grove Boulevard to Martin Luther King Jr.Boulevard (PM 11.9/21.5). Pavementrehabilitation.

6924

0H480 $22

Subtotal: $38,782

2018-19 $1,700$80

$3,600

$6,230Total Project Cost: $45,012

031500019811/16/201811/1/20185/15/2017PA&ED:

RTL:R/W Cert:

3/1/2019Begin Con:

03-Sacramento-99 PriorPriorPrior18-19

201.12167.8 Lane mile(s)Performance Measure

Program Code

$850PA&ED:PS&E:

R/W Sup:

Carryover

0.2/1.6

Con Sup:

Pavement Rehabilitation (CAPM)

$38,760Const:R/W:

6

9

7

Senate:

Assembly:

Congress:

6

9

7Congress

Assembly

Senate

MOBILITYIn the city of Sacramento, from 65th Street toeast of Howe Avenue. Construct westboundauxiliary lane.6200

1F190 $6

Subtotal: $3,086

2018-19 $265$4

$420

$844Total Project Cost: $3,930

03000011053/1/20192/1/20195/3/2017PA&ED:

RTL:R/W Cert:

10/1/2019Begin Con:

03-Sacramento-50 PriorPriorPrior18-19

201.31088 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

$155PA&ED:PS&E:

R/W Sup:

Carryover

R2.6/R3.8

Con Sup:

Operational Improvements

$3,080Const:R/W:

6

7

6

Senate:

Assembly:

Congress:

6

7

6Congress

Assembly

Senate

In the city of Sacramento, at Hornet Driveeastbound offramp. Widen ramp, add signaland right-turn lane.6242

0H580 $130

Subtotal: $1,430

2018-19 $450$130$460

$1,290Total Project Cost: $2,720

031500021110/7/201810/1/2018

12/10/2016PA&ED:

RTL:R/W Cert:

4/9/2019Begin Con:

03-Sacramento-50 PriorPriorPrior18-19

201.3102740 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

$250PA&ED:PS&E:

R/W Sup:

Carryover

R3.5

Con Sup:

Operational Improvements

$1,300Const:R/W:

6

7

6

Senate:

Assembly:

Congress:

6

7

6Congress

Assembly

Senate

In and near Rancho Cordova, from BradshawRoad to Mather Field Road. Operationalimprovements that construct auxiliary lanes inboth westbound and eastbound directions.

6197

1F150 $150

Subtotal: $7,400

2020-21 $659$103$940

$2,098Total Project Cost: $9,498

030000110111/15/202011/1/20207/1/2019PA&ED:

RTL:R/W Cert:

5/15/2021Begin Con:

03-Sacramento-50 19-2020-2120-2120-21

201.310450 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

$396PA&ED:PS&E:

R/W Sup:

New

R7.7/R9.5

Con Sup:

Operational Improvements

$7,250Const:R/W:

6

8

7

Senate:

Assembly:

Congress:

6

8

7Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 176 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Sacramento

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In the city of Sacramento, at various locationsand routes at the Route 5/99 InterchangeConnector ramps and the eastbound Route51/160 Interchange Connector ramp. Installconnector ramp meters.

6411

1H850 $20

Subtotal: $3,020

2020-21 $660$20

$1,020

$2,020Total Project Cost: $5,040

03170000098/1/20207/1/20208/1/2019PA&ED:

RTL:R/W Cert:

1/1/2021Begin Con:

03-Sacramento-5 Prior18-1918-1920-21

201.3154 Field element(s)Performance Measure

Program Code

$320PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

$3,000Const:R/W:

6

7

6

Senate:

Assembly:

Congress:

6

7

6Congress

Assembly

Senate

In Placer, Sacramento, and Yolo Counties, onroutes 5, 80, 99, and 113. Replace obsoleteMicrowave Vehicle Detection System (MVDS)elements.

8920

2H700 $15

Subtotal: $1,418

2018-19 $249$22

$507

$926Total Project Cost: $2,344

031700017310/1/20189/15/20184/1/2018PA&ED:

RTL:R/W Cert:

5/5/2019Begin Con:

03-Sacramento-5 PriorPriorPrior18-19

201.31548 Field element(s)Performance Measure

Program Code

$148PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

$1,403Const:R/W:

3, 5, 6

4, 7, 9

3, 6, 7, 9

Senate:

Assembly:

Congress:

3, 5, 6

4, 7, 9

3, 6, 7, 9Congress

Assembly

Senate

In Sacramento, from 1.1 miles south of ElkGrove Boulevard to Route 50. Install fiber opticcable.5846

4F450 $600

Subtotal: $7,200

2018-19 $900$440

$1,500

$3,380Total Project Cost: $10,580

03140001646/30/20174/24/20176/23/2016PA&ED:

RTL:R/W Cert:

6/30/2018Begin Con:

03-Sacramento-5 PriorPriorPrior18-19

201.31513 Mile(s) of cablePerformance Measure

Program Code

$540PA&ED:PS&E:

R/W Sup:

Carryover

9.7/22.7

Con Sup:

Transportation Management Systems

$6,600Const:R/W:

6

9

6

Senate:

Assembly:

Congress:

6

9

6Congress

Assembly

Senate

In and near the cities of Sacramento, RanchoCordova, and Folsom, from Yolo County line toFolsom Boulevard; also in Yolo County in WestSacramento, from Route 80 to SacramentoCounty line (PM 0.0 to 3.156), and on Route 80from Enterprise Boulevard to Route 50 (PM 9.2to R9.552). Install Transportation ManagementSystem (TMS) field elements.

6250

3H330 $200

Subtotal: $38,600

2020-21 $2,700$520

$3,900

$8,060Total Project Cost: $46,660

031700032510/1/20209/15/20203/1/2019PA&ED:

RTL:R/W Cert:

4/1/2021Begin Con:

03-Sacramento-50 18-1918-1918-1920-21

201.315122 Field element(s)Performance Measure

Program Code

$940PA&ED:PS&E:

R/W Sup:

New

L0.0/17.5

Con Sup:

Transportation Management Systems

$38,400Const:R/W:

1, 6

7, 8

6, 7

Senate:

Assembly:

Congress:

1, 6

7, 8

6, 7Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 177 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Sacramento

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Rancho Cordova and Folsom, fromSunrise Boulevard to the county line; also in ElDorado County near El Dorado Hills, from thecounty line to Silva Valley Parkway (PM0.0/1.7). Install fiber optic cable.

6248

1H820 $21

Subtotal: $4,671

2020-21 $950$110

$1,050

$2,350Total Project Cost: $7,021

03170000067/1/2020

6/15/202011/1/2018PA&ED:

RTL:R/W Cert:

11/1/2020Begin Con:

03-Sacramento-50 Prior18-1918-1920-21

201.31512.3 Mile(s) of cablePerformance Measure

Program Code

$240PA&ED:PS&E:

R/W Sup:

Carryover

12.5/23.1

Con Sup:

Transportation Management Systems

$4,650Const:R/W:

1, 6

5, 7

4, 6

Senate:

Assembly:

Congress:

1, 6

5, 7

4, 6Congress

Assembly

Senate

In various counties, on various routes. Repair orreplace damaged inductive loop vehicledetection elements.6717

2H570 $15

Subtotal: $937

2018-19 $211$22

$365

$692Total Project Cost: $1,629

031700015710/1/20189/15/20184/1/2018PA&ED:

RTL:R/W Cert:

5/5/2019Begin Con:

03-Sacramento-80 PriorPriorPrior18-19

201.315300 Field element(s)Performance Measure

Program Code

$94PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

$922Const:R/W:

1, 3, 4, 5, 6

1, 3, 4, 5, 6,7, 8, 9

1, 3, 4, 6, 7,9

Senate:

Assembly:

Congress:

1, 3, 4, 5, 6

1, 3, 4, 5, 6,7, 8, 9

1, 3, 4, 6, 7,9

Congress

Assembly

Senate

In and near the cities of Sacramento and CitrusHeights, from east of the Yolo County line tothe Placer County line; also in Placer County, inthe city of Roseville from the SacramentoCounty line to east of the Sacramento Countyline (PM 0.0/0.7). Install fiber opticcommunication line.

6713

0H540 $50

Subtotal: $12,250

2019-20 $1,200$300

$1,800

$4,500Total Project Cost: $16,750

031500020411/15/201911/1/20193/1/2018PA&ED:

RTL:R/W Cert:

5/15/2020Begin Con:

03-Sacramento-80 PriorPriorPrior19-20

201.31518.4 Mile(s) of cablePerformance Measure

Program Code

$1,200PA&ED:PS&E:

R/W Sup:

Carryover

M0.1/18.0

Con Sup:

Transportation Management Systems

$12,200Const:R/W:

6

7, 8

6, 7

Senate:

Assembly:

Congress:

6

7, 8

6, 7Congress

Assembly

Senate

In and near the cities of Elk Grove andSacramento, from Grant Line Road to Route 50;also on Route 51, from Route 50 to 0.1 milesouth of the Fort Sutter Viaduct (PM 0.0 to 0.1).Install fiber optic cable.

6925

0H670 $100

Subtotal: $9,100

2021-22 $1,000$50

$1,300

$3,050Total Project Cost: $12,150

031600000510/1/20219/1/2021

10/1/2020PA&ED:

RTL:R/W Cert:

5/1/2022Begin Con:

03-Sacramento-99 Prior20-2120-2121-22

201.31514 Mile(s) of cablePerformance Measure

Program Code

$700PA&ED:PS&E:

R/W Sup:

Carryover

10.0/R24.3

Con Sup:

Transportation Management Systems

$9,000Const:R/W:

6

7, 9

6, 7

Senate:

Assembly:

Congress:

6

7, 9

6, 7Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 178 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Sacramento

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Citrus Heights, from east of ElkhornBoulevard/Greenback Lane to west of RiversideAvenue. Upgrade weigh-in-motion (WIM)station and widen the westbound auxiliary laneto the Antelope Truck Scales.

6712

0H530 $50

Subtotal: $3,750

2018-19 $600$100$740

$1,790Total Project Cost: $5,540

03150002033/15/20193/1/20193/1/2018PA&ED:

RTL:R/W Cert:

8/1/2019Begin Con:

03-Sacramento-80 PriorPriorPrior18-19

201.3211 Location(s)Performance Measure

Program Code

$350PA&ED:PS&E:

R/W Sup:

Carryover

15.2/17.0

Con Sup:

Weigh Stations

$3,700Const:R/W:

4

8

6

Senate:

Assembly:

Congress:

4

8

6Congress

Assembly

Senate

ROADSIDE PRESERVATIONIn the city of Sacramento, from south ofBroadway to 0.12 mile south of R Street.Highway planting rehabilitation.5865

2H130 $10

Subtotal: $2,510

2021-22 $520$80

$430

$1,260Total Project Cost: $3,770

03170000668/1/2021

7/25/20218/1/2020PA&ED:

RTL:R/W Cert:

3/5/2022Begin Con:

03-Sacramento-5 19-2020-2120-2121-22

201.21016 Acre(s)Performance Measure

Program Code

$230PA&ED:PS&E:

R/W Sup:

New

22.0/22.9

Con Sup:

Highway Planting Restoration

$2,500Const:R/W:

6

7

6

Senate:

Assembly:

Congress:

6

7

6Congress

Assembly

Senate

CountySacramento

PA&ED:PS&E:

R/W Sup:Con Sup:

$17,255$890,682

R/W:

Subtotal: $907,937

Const:$43,761$79,928$9,172

$140,143

$273,004

Total (Capital + Support): $1,180,941

Sorted by: Disctrict, County, Route and Post MilesPage 179 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Benito

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONNear Pinnacles National Park, from 0.7 milesnorth of San Benito Lateral/Old HernandezRoad to 2.4 miles south of Route 146. Improvecurve and flatten slope.

2697

1H810 $363

Subtotal: $4,628

2019-20 $1,756$345

$1,506

$4,788Total Project Cost: $9,416

05160001644/6/2020

2/19/202011/13/2018PA&ED:

RTL:R/W Cert:

10/28/2020Begin Con:

05-San Benito-25 Prior18-1918-1919-20

201.01014 Collision(s) reducedPerformance Measure

Program Code

$1,181PA&ED:PS&E:

R/W Sup:

Carryover

18.8/19.1

Con Sup:

Safety Improvements

$4,265Const:R/W:

12

30

17

Senate:

Assembly:

Congress:

12

30

17Congress

Assembly

Senate

CountySan Benito

PA&ED:PS&E:

R/W Sup:Con Sup:

$363$4,265

R/W:

Subtotal: $4,628

Const:$1,181$1,756

$345$1,506

$4,788

Total (Capital + Support): $9,416

Sorted by: Disctrict, County, Route and Post MilesPage 180 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Bernardino

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MAJOR DAMAGE RESTORATIONNear Hesperia, from Cleghorn RoadUndercrossing to Route 138 at the southboundCajon Truck Facility. Reconstruct southboundtruck scale that was destroyed by the Blue CutFire.

3006U

1H390 $10

Subtotal: $2,156

2018-19 $488$20

$550

$1,344Total Project Cost: $3,500

081700003210/1/20189/1/20186/1/2018PA&ED:

RTL:R/W Cert:

6/30/2019Begin Con:

08-San Bernardino-15 PriorPriorPrior18-19

201.1311 Location(s)Performance Measure

Program Code

$286PA&ED:PS&E:

R/W Sup:

Carryover

R20.6/R20.9

Con Sup:

Permanent Restoration

$2,146Const:R/W:

23

40

8

Senate:

Assembly:

Congress:

23

40

8Congress

Assembly

Senate

In Victorville, near Palmdale Road (Route 18)and Route 15. Restore vegetation and irrigationsystem due to fire damage.3006T

1H271 $10

Subtotal: $1,071

2018-19 $493$54

$577

$1,330Total Project Cost: $2,401

081700002412/15/201811/15/20184/16/2018PA&ED:

RTL:R/W Cert:

6/18/2019Begin Con:

08-San Bernardino-15 PriorPriorPrior18-19

201.1311 Location(s)Performance Measure

Program Code

$206PA&ED:PS&E:

R/W Sup:

Carryover

40.3/40.7

Con Sup:

Permanent Restoration

$1,061Const:R/W:

21

33

8

Senate:

Assembly:

Congress:

21

33

8Congress

Assembly

Senate

Near Baker, at 1.6 miles south of Afton RoadOvercrossing. Reconstruct eroded earthen dikethat protects the highway from inundation andflooding. The failed section of berm is located750 yards from the southbound 1-15 outsideshoulder.

3005L

1G740 $128

Subtotal: $1,819

2019-20 $540$102$540

$2,182Total Project Cost: $4,001

08160000605/18/20204/15/20206/18/2019PA&ED:

RTL:R/W Cert:

1/4/2021Begin Con:

08-San Bernardino-15 Prior19-2019-2019-20

201.1311 Location(s)Performance Measure

Program Code

$1,000PA&ED:PS&E:

R/W Sup:

Carryover

R110.0

Con Sup:

Permanent Restoration

$1,691Const:R/W:

16

33

8

Senate:

Assembly:

Congress:

16

33

8Congress

Assembly

Senate

In Barstow, at 0.4 mile east of Route 15/40Separation. Reconstruct a damaged section oftrapezoidal channel.3006V

1H400 $10

Subtotal: $6,961

2019-20 $780$20

$975

$2,165Total Project Cost: $9,126

081700003112/27/201911/22/2019

1/4/2019PA&ED:

RTL:R/W Cert:

7/10/2020Begin Con:

08-San Bernardino-40 Prior18-1918-1919-20

201.1311 Location(s)Performance Measure

Program Code

$390PA&ED:PS&E:

R/W Sup:

Carryover

0.4

Con Sup:

Permanent Restoration

$6,951Const:R/W:

16

33

8

Senate:

Assembly:

Congress:

16

33

8Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 181 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Bernardino

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Vidal Junction, from west of Route 95 towest of Parker Dam Road. Restore storm eroded embankments with Rock SlopeProtection (RSP). A previous EmergencyOpening EA 08-1F660 repaired roadway.

3005P

1G010 $107

Subtotal: $8,542

2019-20 $902$76

$1,940

$4,197Total Project Cost: $12,739

08150001065/1/20202/3/2020

11/1/2018PA&ED:

RTL:R/W Cert:

2/16/2021Begin Con:

08-San Bernardino-62 Prior18-1918-1919-20

201.13110 Location(s)Performance Measure

Program Code

$1,279PA&ED:PS&E:

R/W Sup:

Carryover

124.0/142.0

Con Sup:

Permanent Restoration

$8,435Const:R/W:

16

33

8

Senate:

Assembly:

Congress:

16

33

8Congress

Assembly

Senate

Near Cedar Glen, at 0.1 mile south of HospitalRoad. Widen shoulder and replace guard railwith concrete barrier mounted on soldier pilewall.

3006J

1H290 $10

Subtotal: $2,355

2019-20 $1,080$93

$1,376

$3,262Total Project Cost: $5,617

08170000064/15/20203/13/2020

11/15/2018PA&ED:

RTL:R/W Cert:

12/15/2020Begin Con:

08-San Bernardino-173 Prior18-1918-1919-20

201.1311 Location(s)Performance Measure

Program Code

$713PA&ED:PS&E:

R/W Sup:

Carryover

18.7

Con Sup:

Permanent Restoration

$2,345Const:R/W:

22

33

8

Senate:

Assembly:

Congress:

22

33

8Congress

Assembly

Senate

COLLISION REDUCTIONIn Victorville, from Amargosa Road to CobaltRoad. Construct raised curb median.

3006F

1E060 $884

Subtotal: $5,971

2019-20 $1,150$480

$1,050

$3,600Total Project Cost: $9,571

08130001405/1/20204/1/2020

7/30/2018PA&ED:

RTL:R/W Cert:

9/30/2020Begin Con:

08-San Bernardino-18 Prior18-1918-1919-20

201.01025 Collision(s) reducedPerformance Measure

Program Code

$920PA&ED:PS&E:

R/W Sup:

Carryover

97.0/99.5

Con Sup:

Safety Improvements

$5,087Const:R/W:

21

33

8

Senate:

Assembly:

Congress:

21

33

8Congress

Assembly

Senate

In Twentynine Palms, from 0.1 mile west of to0.4 mile east of Utah Trail. Install trafficsignals meeting current Americans withDisabilities Act (ADA) Standards, crosswalksand flashing beacon system.

3005K

1G450 $25

Subtotal: $851

2018-19 $486$42

$590

$1,515Total Project Cost: $2,366

08150002389/14/20188/14/20186/30/2017PA&ED:

RTL:R/W Cert:

4/15/2019Begin Con:

08-San Bernardino-62 PriorPriorPrior18-19

201.01013 Collision(s) reducedPerformance Measure

Program Code

$397PA&ED:PS&E:

R/W Sup:

Carryover

34.1/34.6

Con Sup:

Safety Improvements

$826Const:R/W:

16

42

8

Senate:

Assembly:

Congress:

16

42

8Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 182 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Bernardino

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Needles, from Route 62 to 0.8 mile southof Route 40. Construct ground-in shoulder andcenterline rumble strips.3006H

1F780 $10

Subtotal: $1,400

2019-20 $700$30

$450

$1,830Total Project Cost: $3,230

081500004711/30/201810/30/2018

2/8/2018PA&ED:

RTL:R/W Cert:

5/30/2019Begin Con:

08-San Bernardino-95 PriorPriorPrior19-20

201.01057 Collision(s) reducedPerformance Measure

Program Code

$650PA&ED:PS&E:

R/W Sup:

Carryover

9.6/56.5

Con Sup:

Safety Improvements

$1,390Const:R/W:

16

33

8

Senate:

Assembly:

Congress:

16

33

8Congress

Assembly

Senate

In the city of San Bernardino, from 0.2 milesouth of Orange Show Road/ Auto Center Driveto 0.2 mile north of Inland Center Drive. Lanereconfiguration and pavement widening.

3010E

1H770 $10

Subtotal: $6,458

2019-20 $1,615$31

$1,950

$4,661Total Project Cost: $11,119

08170001324/1/20202/1/2020

1/15/2019PA&ED:

RTL:R/W Cert:

11/25/2020Begin Con:

08-San Bernardino-215 Prior18-1918-1919-20

201.010123 Collision(s) reducedPerformance Measure

Program Code

$1,065PA&ED:PS&E:

R/W Sup:

Carryover

4.8/5.8

Con Sup:

Safety Improvements

$6,448Const:R/W:

20

47

31

Senate:

Assembly:

Congress:

20

47

31Congress

Assembly

Senate

In and near Barstow, from 0.1 mile north ofBoone Road to 0.7 mile south of Rimrock Road.Construct ground-in shoulder and centerlinerumble strips.

3006K

1F770 $10

Subtotal: $1,963

2019-20 $720$60

$550

$1,930Total Project Cost: $3,893

08150000517/30/20187/10/2018

12/15/2017PA&ED:

RTL:R/W Cert:

10/23/2018Begin Con:

08-San Bernardino-247 PriorPriorPrior19-20

201.01065 Collision(s) reducedPerformance Measure

Program Code

$600PA&ED:PS&E:

R/W Sup:

Carryover

20.3/76.8

Con Sup:

Safety Improvements

$1,953Const:R/W:

16

33

8

Senate:

Assembly:

Congress:

16

33

8Congress

Assembly

Senate

Near Barstow, from 0.3 mile south of HarvardRoad to Rasor Road. Regrade and flattenmedian cross slope. 3002E

1C720 $10

Subtotal: $15,068

2019-20 $920$50

$3,160

$5,020Total Project Cost: $20,088

08130000031/30/2020

12/30/201912/20/2017PA&ED:

RTL:R/W Cert:

10/22/2020Begin Con:

08-San Bernardino-15 PriorPriorPrior19-20

201.01587 Collision(s) reducedPerformance Measure

Program Code

$890PA&ED:PS&E:

R/W Sup:

Carryover

R96.1/R124.3

Con Sup:

Collision Severity Reduction

$15,058Const:R/W:

16

33

8

Senate:

Assembly:

Congress:

16

33

8Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 183 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Bernardino

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Barstow, from 1.4 miles east of Fort CadyRoad Overcrossing to Crucero Road Undercrossing. Regrade median cross slopes.3007X

0R170 $2,075

Subtotal: $30,563

2021-22 $1,900$300

$3,300

$8,700Total Project Cost: $39,263

08120000282/28/20221/31/2022

11/30/2020PA&ED:

RTL:R/W Cert:

11/30/2022Begin Con:

08-San Bernardino-40 18-1920-2120-2121-22

201.01575 Collision(s) reducedPerformance Measure

Program Code

$3,200PA&ED:PS&E:

R/W Sup:

New

R25.0/R50.0

Con Sup:

Collision Severity Reduction

$28,488Const:R/W:

16

33

8

Senate:

Assembly:

Congress:

16

33

8Congress

Assembly

Senate

Near Essex, from west of Kelbaker Road toEssex Road. Regrade and flatten median crossslope.3001R

0R150 $5,010

Subtotal: $26,188

2018-19 $2,500$200

$3,200

$8,900Total Project Cost: $35,088

08120000255/31/20194/30/20198/31/2018PA&ED:

RTL:R/W Cert:

1/31/2020Begin Con:

08-San Bernardino-40 Prior18-1918-1918-19

201.015150 Collision(s) reducedPerformance Measure

Program Code

$3,000PA&ED:PS&E:

R/W Sup:

Carryover

R75.0/R100.0

Con Sup:

Collision Severity Reduction

$21,178Const:R/W:

16

33

8

Senate:

Assembly:

Congress:

16

33

8Congress

Assembly

Senate

Near Needles, from Essex Road Overcrossing to4.5 miles east of Homer Wash Bridge. Regrademedian cross slopes.3002W

0R141 $5,006

Subtotal: $30,506

2020-21 $2,500$300

$3,500

$9,600Total Project Cost: $40,106

08150002004/30/20213/31/20213/31/2020PA&ED:

RTL:R/W Cert:

11/30/2021Begin Con:

08-San Bernardino-40 18-1919-2019-2020-21

201.015164 Collision(s) reducedPerformance Measure

Program Code

$3,300PA&ED:PS&E:

R/W Sup:

New

R100.0/R125.0

Con Sup:

Collision Severity Reduction

$25,500Const:R/W:

16

33

8

Senate:

Assembly:

Congress:

16

33

8Congress

Assembly

Senate

In and near Needles, from 4.5 miles east ofHomer Wash to Arizona State line. Regradeand flatten median cross slope.3003J

0R142 $5,006

Subtotal: $24,140

2019-20 $2,300$200

$2,800

$8,200Total Project Cost: $32,340

08150002012/28/20201/31/2020

11/30/2018PA&ED:

RTL:R/W Cert:

11/30/2020Begin Con:

08-San Bernardino-40 Prior18-1918-1919-20

201.01588 Collision(s) reducedPerformance Measure

Program Code

$2,900PA&ED:PS&E:

R/W Sup:

Carryover

R125.0/R154.6

Con Sup:

Collision Severity Reduction

$19,134Const:R/W:

16

33

8

Senate:

Assembly:

Congress:

16

33

8Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 184 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Bernardino

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Loma Linda and Redlands, from RichardsonStreet Overcrossing to 0.1 mile west of WabashAvenue Overcrossing. Roadside safetyimprovements.

3003F

1C29U $10

Subtotal: $7,387

2018-19 $695$30

$860

$1,935Total Project Cost: $9,322

08170002192/1/20199/6/20183/1/2018PA&ED:

RTL:R/W Cert:

8/5/2019Begin Con:

08-San Bernardino-10 PriorPriorPrior18-19

201.235487 Location(s)Performance Measure

Program Code

$350PA&ED:PS&E:

R/W Sup:

Carryover

26.8/34.2

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$7,377Const:R/W:

23

40

31

Senate:

Assembly:

Congress:

23

40

31Congress

Assembly

Senate

In Redlands and Yucaipa, from Wabash Avenueto County line Road. Construct roadside safetyimprovements.3001U

1C300 $7

Subtotal: $1,906

2019-20 $417$43

$362

$1,180Total Project Cost: $3,086

08120002709/19/20198/15/20197/11/2018PA&ED:

RTL:R/W Cert:

6/15/2020Begin Con:

08-San Bernardino-10 Prior18-1918-1919-20

201.235120 Location(s)Performance Measure

Program Code

$358PA&ED:PS&E:

R/W Sup:

Carryover

34.2/R39.1

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$1,899Const:R/W:

23

42

8

Senate:

Assembly:

Congress:

23

42

8Congress

Assembly

Senate

MANDATESAt various locations, from Eagle MountainDrive to Route 38/18 Separation. Sedimentcontrol and stabilization.3008W

0R432 $150

Subtotal: $726

2019-20 $86$50

$200

$336Total Project Cost: $1,062

08170002327/5/2019

3/20/201710/24/2016PA&ED:

RTL:R/W Cert:

3/27/2020Begin Con:

08-San Bernardino-38PriorPrior19-20

201.33527 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

50.4/59.4

Con Sup:

Storm Water Mitigation

$576Const:R/W:

23

33

8

Senate:

Assembly:

Congress:

23

33

8Congress

Assembly

Senate

BRIDGE PRESERVATIONIn Colton, from 0.3 mile south to 0.3 mile northof Washington Avenue Overcrossing No. 54-0530. Replace overcrossing.3002S

1F730 $3,726

Subtotal: $21,597

2019-20 $2,870$296

$1,790

$6,081Total Project Cost: $27,678

08150000342/21/202011/8/201912/1/2017PA&ED:

RTL:R/W Cert:

6/12/2020Begin Con:

08-San Bernardino-215 PriorPriorPrior19-20

201.1101 Bridge(s)Performance Measure

Program Code

$1,125PA&ED:PS&E:

R/W Sup:

Carryover

2.4/3.0

Con Sup:

Bridge Major Rehabilitation

$17,871Const:R/W:

20

47

31

Senate:

Assembly:

Congress:

20

47

31Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 185 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Bernardino

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Needles, at the Halfway Hills Wash BridgeNo. 54-0799L/R. Retrofit bridge footings,replace and expand Rock Slope Protection(RSP) limits.

3008K

1G830 $30

Subtotal: $9,682

2021-22 $1,903$55

$2,538

$5,889Total Project Cost: $15,571

08160000793/15/20222/22/20229/14/2020PA&ED:

RTL:R/W Cert:

11/2/2022Begin Con:

08-San Bernardino-40 18-1920-2120-2121-22

201.1112 Bridge(s)Performance Measure

Program Code

$1,393PA&ED:PS&E:

R/W Sup:

New

101.3

Con Sup:

Bridge Scour Mitigation

$9,652Const:R/W:

16

33

8

Senate:

Assembly:

Congress:

16

33

8Congress

Assembly

Senate

In Victorville, at Mojave River Bridge No. 54-0307; also on Route 10, at Colton OverheadNo. 54-0464R (PM R22.36); and Route 215North/Route 10 East Connector Overhead No.54-0482G (PM 3.72). Various repairs to threebridges.

3006C

1G280 $62

Subtotal: $2,701

2021-22 $780$100$690

$1,890Total Project Cost: $4,591

081500019210/15/20219/17/20213/6/2020PA&ED:

RTL:R/W Cert:

4/29/2022Begin Con:

08-San Bernardino-18 18-1919-2019-2021-22

201.1193 Bridge(s)Performance Measure

Program Code

$320PA&ED:PS&E:

R/W Sup:

New

95.4

Con Sup:

Bridge Preventative Maintenance

$2,639Const:R/W:

21

33

8

Senate:

Assembly:

Congress:

21

33

8Congress

Assembly

Senate

In San Bernardino County, at the Etiwanda SanSevain FCC Br. No. 54-0454L, ColtonOverhead No. 54-0464R; also on Route 60, atRamona Avenue Overcrossing No. 54-0745(PM R1.37). In Riverside County, on Route 10at Highland Springs Avenue Undercrossing No.56-0432 (PM 9.3) and at Eagle Mountain RoadBridge No. 56-0575L/R (PM R102.0). Improvefreight corridor movement by modifying andreplacing bridges to meet vertical clearance andload-carrying capacity standards.

ACCELERATED BRIDGE (PA&ED Only)

3009R

1J210 $1,000

Subtotal: $61,900

2020-21 $6,370$350

$8,000

$20,542Total Project Cost: $82,442

08170002403/10/20212/12/2021

12/11/2019PA&ED:

RTL:R/W Cert:

1/5/2022Begin Con:

08-San Bernardino-10 Prior20-2120-2120-21

201.3226 Bridge(s)Performance Measure

Program Code

$5,822PA&ED:* PS&E:

* R/W Sup:

Carryover

11.6/R22.4

* Con Sup:

Trans Permit Requirements for Bridges

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

$60,900* Const:* R/W:

20, 23

42, 47, 52

31, 35, 36

Senate:

Assembly:

Congress:

20, 23

42, 47, 52

31, 35, 36Congress

Assembly

Senate

ROADWAY PRESERVATIONIn Barstow, from Outlet Center Drive to MojaveRiver Bridge. Rehabilitate pavement.

3003V

0K123 $10

Subtotal: $26,808

2019-20 $1,200$10

$2,100

$3,910Total Project Cost: $30,718

081500024210/2/20198/9/2019

9/14/2017PA&ED:

RTL:R/W Cert:

8/3/2020Begin Con:

08-San Bernardino-15 PriorPriorPrior19-20

201.12164.2 Lane mile(s)Performance Measure

Program Code

$600PA&ED:PS&E:

R/W Sup:

Carryover

64.6/75.3

Con Sup:

Pavement Rehabilitation (CAPM)

$26,798Const:R/W:

21

33

8

Senate:

Assembly:

Congress:

21

33

8Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 186 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Bernardino

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Adelanto, from Route 395 Junctionto Los Angeles County line. Cold planepavement and place Hot Mix Asphalt (HMA)and Rubberized Hot Mix Asphalt (RHMA)pavement.

3007M

1G520 $65

Subtotal: $16,507

2020-21 $1,588$77

$2,366

$4,595Total Project Cost: $21,102

08160000202/16/2021

11/16/20207/15/2019PA&ED:

RTL:R/W Cert:

10/15/2021Begin Con:

08-San Bernardino-18 18-1919-2019-2020-21

201.12137.8 Lane mile(s)Performance Measure

Program Code

$564PA&ED:PS&E:

R/W Sup:

New

100.9/115.9

Con Sup:

Pavement Rehabilitation (CAPM)

$16,442Const:R/W:

21, 23

33, 36

8

Senate:

Assembly:

Congress:

21, 23

33, 36

8Congress

Assembly

Senate

Near Vidal, from 3.8 miles west of Route 95 toArizona State line. Rehabilitate pavement andupgrade guardrail.3004A

1F133 $65

Subtotal: $11,379

2019-20 $515$87

$2,660

$3,662Total Project Cost: $15,041

08160000032/21/20201/7/20205/4/2018PA&ED:

RTL:R/W Cert:

10/26/2020Begin Con:

08-San Bernardino-62 Prior18-1918-1919-20

201.12142.4 Lane mile(s)Performance Measure

Program Code

$400PA&ED:PS&E:

R/W Sup:

Carryover

121.5/142.7

Con Sup:

Pavement Rehabilitation (CAPM)

$11,314Const:R/W:

16

33

8

Senate:

Assembly:

Congress:

16

33

8Congress

Assembly

Senate

Near Needles, from Route 62 to south ofHavasu Lake Road. Rehabilitate pavement.

3002V

1F131 $65

Subtotal: $9,632

2019-20 $320$10

$1,500

$2,280Total Project Cost: $11,912

08150002112/21/20201/7/20205/4/2018PA&ED:

RTL:R/W Cert:

10/26/2020Begin Con:

08-San Bernardino-95 Prior18-1918-1919-20

201.12147.8 Lane mile(s)Performance Measure

Program Code

$450PA&ED:PS&E:

R/W Sup:

Carryover

9.7/33.6

Con Sup:

Pavement Rehabilitation (CAPM)

$9,567Const:R/W:

16

33

8

Senate:

Assembly:

Congress:

16

33

8Congress

Assembly

Senate

Near Needles, from Goffs Road to Nevada Stateline. Rehabilitate pavement.

3003Y

1F132 $65

Subtotal: $4,454

2019-20 $150$10

$690

$1,050Total Project Cost: $5,504

08150002122/21/20201/7/20205/4/2018PA&ED:

RTL:R/W Cert:

10/26/2020Begin Con:

08-San Bernardino-95 Prior18-1918-1919-20

201.12132.0 Lane mile(s)Performance Measure

Program Code

$200PA&ED:PS&E:

R/W Sup:

Carryover

64.5/80.5

Con Sup:

Pavement Rehabilitation (CAPM)

$4,389Const:R/W:

16

33

8

Senate:

Assembly:

Congress:

16

33

8Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 187 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Bernardino

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Fontana and Rialto, from SierraAvenue to Glen Helen Parkway. Rehabilitateroadway.3003T

0K121 $10

Subtotal: $26,083

2019-20 $900$10

$2,850

$4,330Total Project Cost: $30,413

081500024512/2/20199/9/2019

1/10/2018PA&ED:

RTL:R/W Cert:

8/3/2020Begin Con:

08-San Bernardino-15 PriorPriorPrior19-20

201.12216.0 Lane mile(s)Performance Measure

Program Code

$570PA&ED:PS&E:

R/W Sup:

Carryover

12.8/14.8

Con Sup:

Roadway Rehabilitation (2R)

$26,073Const:R/W:

21

33

8

Senate:

Assembly:

Congress:

21

33

8Congress

Assembly

Senate

In Hesperia and Victorville, from Oak Hill Roadto south of Bear Valley Road. Rehabilitate roadway.

(G13 Contingency)

3003U

0K122 $10

Subtotal: $159,039

2019-20 $5,300$210

$11,700

$18,110Total Project Cost: $177,149

08150002442/3/2020

11/4/20193/1/2018PA&ED:

RTL:R/W Cert:

10/29/2020Begin Con:

08-San Bernardino-15 Prior18-1918-1919-20

201.12259.0 Lane mile(s)Performance Measure

Program Code

$900PA&ED:PS&E:

R/W Sup:

Carryover

R28.6/37.5

* Con Sup:

Roadway Rehabilitation (2R)

* Const, * Con Sup phase(s) are NOT authorized

$159,029* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

21

33

8

Senate:

Assembly:

Congress:

21

33

8Congress

Assembly

Senate

Near Smiley Park, from 6.9 miles south ofRunning Spring to 3.4 miles east of Fork CityCreek Bridge. Construct rockfall barrier tostabilize hillside slopes.

3002H

1E780 $30

Subtotal: $2,985

2018-19 $400$20

$600

$1,390Total Project Cost: $4,375

081400010312/3/201811/1/20181/15/2018PA&ED:

RTL:R/W Cert:

6/17/2019Begin Con:

08-San Bernardino-330 PriorPriorPrior18-19

201.1502 Location(s)Performance Measure

Program Code

$370PA&ED:PS&E:

R/W Sup:

Carryover

37.1/39.8

Con Sup:

Roadway Protective Betterments

$2,955Const:R/W:

23

33

8

Senate:

Assembly:

Congress:

23

33

8Congress

Assembly

Senate

In and near Arrowhead, from 48th Street toRoute 138. Repair, reline and replace culverts.

0184C

0G691 $385

Subtotal: $7,570

2021-22 $1,090$1,240$1,059

$4,131Total Project Cost: $11,701

08150001845/2/2022

2/15/20225/1/2020PA&ED:

RTL:R/W Cert:

1/17/2023Begin Con:

08-San Bernardino-18 Prior20-2120-2121-22

201.15163 Culvert(s) (ea)Performance Measure

Program Code

$742PA&ED:PS&E:

R/W Sup:

Carryover

T8.0/R17.8

Con Sup:

Drainage System Restoration

$7,185Const:R/W:

23

36, 40

8

Senate:

Assembly:

Congress:

23

36, 40

8Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 188 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Bernardino

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Big Bear and Lucerne Valley, at variouslocations, from Route 38 at Big Bear Lake Damto Artic Canyon Wash. Reline or replace culverts.

0181J

0G690 $700

Subtotal: $4,807

2021-22 $1,493$2,708$1,417

$6,810Total Project Cost: $11,617

08120001101/18/202212/1/20217/5/2020PA&ED:

RTL:R/W Cert:

7/15/2022Begin Con:

08-San Bernardino-18 18-1920-2120-2121-22

201.15141 Culvert(s) (ea)Performance Measure

Program Code

$1,192PA&ED:PS&E:

R/W Sup:

New

44.3/68.5

Con Sup:

Drainage System Restoration

$4,107Const:R/W:

16, 23

33

8

Senate:

Assembly:

Congress:

16, 23

33

8Congress

Assembly

Senate

Near Big Bear Lake, from Zaca Road to Route18. Replace culverts.

0205C

0G800 $697

Subtotal: $3,094

2019-20 $1,040$1,900

$800

$4,340Total Project Cost: $7,434

08120001113/16/20203/2/2020

10/17/2018PA&ED:

RTL:R/W Cert:

9/15/2020Begin Con:

08-San Bernardino-38 Prior18-1918-1919-20

201.15143 Culvert(s) (ea)Performance Measure

Program Code

$600PA&ED:PS&E:

R/W Sup:

Carryover

47.5/59.4

Con Sup:

Drainage System Restoration

$2,397Const:R/W:

16, 23

33

8

Senate:

Assembly:

Congress:

16, 23

33

8Congress

Assembly

Senate

In Pomona, Chino and Ontario, from Los Angeles County line to Riverside County line.Replace existing signs with retro-reflectivesheeting.

0178P

1F361 $10

Subtotal: $1,281

2019-20 $289$12

$250

$676Total Project Cost: $1,957

08150001603/2/20209/3/20197/2/2018PA&ED:

RTL:R/W Cert:

11/2/2020Begin Con:

08-San Bernardino-60 Prior18-1918-1919-20

201.17068 Sign(s)Performance Measure

Program Code

$125PA&ED:PS&E:

R/W Sup:

Carryover

R0.0/R9.9

Con Sup:

Signs and Lighting Rehabilitation

$1,271Const:R/W:

20

52

35

Senate:

Assembly:

Congress:

20

52

35Congress

Assembly

Senate

In San Bernardino County, on Routes 71, 210,215 and 259 at various locations. Replaceexisting guide signs with Type XI reflectivity.3005A

1F362 $10

Subtotal: $2,079

2018-19 $614$32

$625

$1,572Total Project Cost: $3,651

08160000115/1/20192/1/2019

9/13/2017PA&ED:

RTL:R/W Cert:

12/2/2019Begin Con:

08-San Bernardino-210 PriorPriorPrior18-19

201.170149 Sign(s)Performance Measure

Program Code

$301PA&ED:PS&E:

R/W Sup:

Carryover

R21.7/R33.2

Con Sup:

Signs and Lighting Rehabilitation

$2,069Const:R/W:

16, 20, 21,23, 31

33, 40, 47,52

8, 31, 35, 41

Senate:

Assembly:

Congress:

16, 20, 21,23, 31

33, 40, 47,52

8, 31, 35, 41Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 189 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Bernardino

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MOBILITYIn Ontario, from Haven Avenue to MillikenAvenue/Hamner Avenue. Construct auxiliarylane and widen connector and ramps.3003N

0E33U $710

Subtotal: $21,665

2019-20 $4,170$20

$7,107

$13,997Total Project Cost: $35,662

08170000755/15/20205/1/2020

11/1/2018PA&ED:

RTL:R/W Cert:

3/1/2021Begin Con:

08-San Bernardino-60 Prior18-1918-1919-20

201.3101823.7 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

$2,700PA&ED:PS&E:

R/W Sup:

Carryover

R7.3/R10.0

Con Sup:

Operational Improvements

$20,955Const:R/W:

20

52

35

Senate:

Assembly:

Congress:

20

52

35Congress

Assembly

Senate

In and near Redlands, from Route 210/10Junction to the Riverside County line. Installwireless Vehicle Detection Stations (VDS) pole,Changeable Message Signs (CMS), ClosedCircuit Television (CCTV), Data Node Cabinetand Fiber Optic elements.

3009A

38423 $10

Subtotal: $7,664

2018-19 $1,000$10

$1,600

$2,910Total Project Cost: $10,574

08150001686/3/20195/1/20196/1/2018PA&ED:

RTL:R/W Cert:

11/1/2019Begin Con:

08-San Bernardino-10 Prior18-1918-1918-19

201.31526 Field element(s)Performance Measure

Program Code

$300PA&ED:PS&E:

R/W Sup:

Carryover

29.4/R39.2

Con Sup:

Transportation Management Systems

$7,654Const:R/W:

31

40, 42

41

Senate:

Assembly:

Congress:

31

40, 42

41Congress

Assembly

Senate

Near Chino Hills, from the Los Angeles Countyline to the Riverside County line; also in Riverside County, from San Bernardino Countyline to Route 91 (PM R0.0 to PM R3.0).Replace and upgrade existing communicationelements and install Closed Circuit TelevisionCameras (CCTV) for the Traffic ManagementSystem (TMS).

3009N

0G790 $99

Subtotal: $11,266

2019-20 $1,361$113

$1,657

$3,692Total Project Cost: $14,958

08140001765/1/20201/6/2020

12/3/2018PA&ED:

RTL:R/W Cert:

1/5/2021Begin Con:

08-San Bernardino-71 Prior18-1918-1919-20

201.31531 Field element(s)Performance Measure

Program Code

$561PA&ED:PS&E:

R/W Sup:

Carryover

R0.0/R8.5

Con Sup:

Transportation Management Systems

$11,167Const:R/W:

29

60, 61

42

Senate:

Assembly:

Congress:

29

60, 61

42Congress

Assembly

Senate

In Rancho Cucamonga and Fontana, from EastAvenue to west of Beech Avenue; also on Route15, at Route 210/15 Separation. Install Transportation Management System (TMS)elements.

3003X

1G210 $19

Subtotal: $2,711

2018-19 $390$10

$450

$985Total Project Cost: $3,696

08150001703/15/20192/26/2019

10/27/2017PA&ED:

RTL:R/W Cert:

10/15/2019Begin Con:

08-San Bernardino-210 PriorPriorPrior18-19

201.3154 Field element(s)Performance Measure

Program Code

$135PA&ED:PS&E:

R/W Sup:

Carryover

10.5/12.7

Con Sup:

Transportation Management Systems

$2,692Const:R/W:

20, 23

40, 47

31, 35

Senate:

Assembly:

Congress:

20, 23

40, 47

31, 35Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 190 of 290 Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Bernardino

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near the city of San Bernardino, fromRoute 215/10 Connector to Route 215/15Junction; also on Route 259, from Route259/215 Separation to Route 259/210 Junction.Install wireless Vehicle Detection Stations(VDS), Changeable Message Signs (CMS), Closed Circuit Television (CCTV)

and Fiber Optic elements.

3007S

47642 $10

Subtotal: $9,248

2019-20 $842$37

$1,930

$3,185Total Project Cost: $12,433

08160001866/1/20205/1/20202/1/2019PA&ED:

RTL:R/W Cert:

2/1/2021Begin Con:

08-San Bernardino-215 Prior18-1918-1919-20

201.31532 Field element(s)Performance Measure

Program Code

$376PA&ED:PS&E:

R/W Sup:

Carryover

4.0/17.8

Con Sup:

Transportation Management Systems

$9,238Const:R/W:

20

40, 47

31

Senate:

Assembly:

Congress:

20

40, 47

31Congress

Assembly

Senate

Near Newberry Springs, at 5.6 miles east of FortCady Road Overcrossing. Replace the existingWeigh-in-Motion (WIM) system to meet currentstandards.

3007N

1G550 $11

Subtotal: $2,147

2020-21 $593$32

$664

$1,599Total Project Cost: $3,746

081600003510/1/20209/1/2020

10/1/2019PA&ED:

RTL:R/W Cert:

5/1/2021Begin Con:

08-San Bernardino-40 18-1919-2019-2020-21

201.3211 Location(s)Performance Measure

Program Code

$310PA&ED:PS&E:

R/W Sup:

New

R28.9

Con Sup:

Weigh Stations

$2,136Const:R/W:

16

33

8

Senate:

Assembly:

Congress:

16

33

8Congress

Assembly

Senate

ROADSIDE PRESERVATIONNear Needles, west of Goffs Road at JohnWilkie Safety Roadside Rest Area (SRRA).Reconstruct safety roadside rest areas.0206L

0G860 $10

Subtotal: $5,350

2019-20 $1,940$10

$2,300

$5,650Total Project Cost: $11,000

08140001325/1/2020

1/15/20208/1/2018PA&ED:

RTL:R/W Cert:

2/1/2021Begin Con:

08-San Bernardino-40 Prior18-1918-1919-20

201.2502 Location(s)Performance Measure

Program Code

$1,400PA&ED:PS&E:

R/W Sup:

Carryover

R105.3/R105.6

Con Sup:

Safety Roadside Rest Area Restoration

$5,340Const:R/W:

16

33

8

Senate:

Assembly:

Congress:

16

33

8Congress

Assembly

Senate

FACILITIESIn Fontana, near the southeast quadrant of Route15/210 Interchange. Construct newmaintenance facility (L5758) adjacent to theSouthern Regional Laboratory.

3005R

0R420 $10

Subtotal: $19,810

2021-22 $0$10

$3,600

$5,110Total Project Cost: $24,920

08120000769/5/2021

8/15/20217/15/2019PA&ED:

RTL:R/W Cert:

5/10/2022Begin Con:

08-San Bernardino-15 18-19

19-2021-22

201.3521 Location(s)Performance Measure

Program Code

$1,500PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Maintenance Facilities

$19,800Const:R/W:

20

52

35

Senate:

Assembly:

Congress:

20

52

35Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 191 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Bernardino

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In the city of San Bernardino, at San BernardinoMaintenance Station (L5726) at 175 ClusterStreet. Reconstruct maintenance station.3001P

0K840 $10

Subtotal: $6,680

2018-19 $1,248$42

$1,755

$3,942Total Project Cost: $10,622

08000205633/28/20192/28/2019

10/17/2017PA&ED:

RTL:R/W Cert:

11/21/2019Begin Con:

08-San Bernardino-215 PriorPriorPrior18-19

201.3521 Location(s)Performance Measure

Program Code

$897PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Maintenance Facilities

$6,670Const:R/W:

23

47

31

Senate:

Assembly:

Congress:

23

47

31Congress

Assembly

Senate

MULTIPLE OBJECTIVEAt Clyde V. Kane northbound (NB) andsouthbound (SB) Safety Roadside Rest Areas (SRRA); also at Valley Wells, NB and SBSRRA (PM 161.2). Transportationinfrastructure improvement for zero-emissionvehicle charging.

3007E

1H660 $10

Subtotal: $1,193

2018-19 $415$33

$265

$972Total Project Cost: $2,165

08170001033/18/20192/15/20196/18/2018PA&ED:

RTL:R/W Cert:

9/17/2019Begin Con:

08-San Bernardino-15 Prior18-1918-1918-19

201.9994 Location(s)Performance Measure

Program Code

$259PA&ED:PS&E:

R/W Sup:

Carryover

R107.4

Con Sup:

MULTIPLE OBJECTIVE

$1,183Const:R/W:

16

33

8

Senate:

Assembly:

Congress:

16

33

8Congress

Assembly

Senate

CountySan Bernardino

PA&ED:PS&E:

R/W Sup:Con Sup:

$26,327$609,036

R/W:

Subtotal: $635,363

Const:$45,616$59,053$9,625

$90,893

$205,187

Total (Capital + Support): $840,550

Sorted by: Disctrict, County, Route and Post MilesPage 192 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Diego

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONAt various locations, on Routes 5, 8, 15, 52, 54,56, 67, 75, 76, 78, 94, 125, 163, 805 and 905.Upgrade and install curve warning signs.1200

42490 $0

Subtotal: $2,350

2020-21 $561$0

$497

$1,556Total Project Cost: $3,906

11160000941/15/2021

12/15/202011/18/2019PA&ED:

RTL:R/W Cert:

10/15/2021Begin Con:

11-San Diego-Var 18-1919-20

20-21

201.01530 Collision(s) reducedPerformance Measure

Program Code

$498PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

$2,350Const:R/W:

36, 38, 39

75, 76, 77,78, 79, 80

50, 53

Senate:

Assembly:

Congress:

36, 38, 39

75, 76, 77,78, 79, 80

50, 53Congress

Assembly

Senate

Near Oceanside, from Fallbrook Overhead to1.0 mile south of San Onofre Bridge. Installcable safety barrier.1265

43001 $11

Subtotal: $5,928

2020-21 $917

$988

$2,565Total Project Cost: $8,493

11170001169/9/20208/9/2020

1/22/2019PA&ED:

RTL:R/W Cert:

5/24/2021Begin Con:

11-San Diego-5 18-1918-19

20-21

201.01556 Collision(s) reducedPerformance Measure

Program Code

$660PA&ED:PS&E:

R/W Sup:

New

R55.6/R70.0

Con Sup:

Collision Severity Reduction

$5,917Const:R/W:

38, 40

71, 77

50, 51, 52

Senate:

Assembly:

Congress:

38, 40

71, 77

50, 51, 52Congress

Assembly

Senate

In San Diego County, on Routes 8, 67, 79, and94 at various locations. Widen and grade existing hinges at end treatment platforms andto upgrade guardrails and end treatments tocurrent standards.

1189

42460 $0

Subtotal: $4,552

2020-21 $1,046$0

$824

$2,396Total Project Cost: $6,948

111600007511/20/202010/16/20207/12/2019PA&ED:

RTL:R/W Cert:

5/4/2021Begin Con:

11-San Diego-8 18-1919-20

20-21

201.01543 Collision(s) reducedPerformance Measure

Program Code

$526PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

$4,552Const:R/W:

38, 40

71, 77

50, 51, 52

Senate:

Assembly:

Congress:

38, 40

71, 77

50, 51, 52Congress

Assembly

Senate

In the city of San Diego and Santee, from Route5 to Route 125. Construct rumble strips, enhance pavement delineation and install barrier.

1135

42030

Subtotal: $4,121

2019-20 $1,015

$1,317

$2,810Total Project Cost: $6,931

11150000267/15/20197/2/2019

3/28/2018PA&ED:

RTL:R/W Cert:

3/16/2020Begin Con:

11-San Diego-52 PriorPrior

19-20

201.01590 Collision(s) reducedPerformance Measure

Program Code

$478PA&ED:PS&E:

R/W Sup:

Carryover

0.0/14.8

Con Sup:

Collision Severity Reduction

$4,121Const:R/W:

39

77, 78

50, 52

Senate:

Assembly:

Congress:

39

77, 78

50, 52Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 193 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Diego

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In San Diego County, on various routes atvarious locations. Construct maintenancevehicle pullouts, pave areas beyond the gore,upgrade crash cushions, reduce maintenanceintensive landscaping and relocate irrigationcontrols.

1168

41134 $3

Subtotal: $3,621

2018-19 $1,469$2

$522

$2,402Total Project Cost: $6,023

11150001345/10/20193/29/20195/4/2018PA&ED:

RTL:R/W Cert:

9/20/2019Begin Con:

11-San Diego-VAR Prior18-1918-1918-19

201.23521 Location(s)Performance Measure

Program Code

$409PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$3,618Const:R/W:

38

79

53

Senate:

Assembly:

Congress:

38

79

53Congress

Assembly

Senate

In the city of San Diego, from east of Route 163to east of Route 805; also on Route 805, fromnorth of Adams Avenue to south of Route 8(PM 17.3/17.5). Roadside safety improvements.

1165

41131 $3

Subtotal: $5,212

2018-19 $2,167$3

$770

$3,543Total Project Cost: $8,755

11140001186/7/2019

4/19/20195/18/2018PA&ED:

RTL:R/W Cert:

10/18/2019Begin Con:

11-San Diego-8 Prior18-1918-1918-19

201.23548 Location(s)Performance Measure

Program Code

$603PA&ED:PS&E:

R/W Sup:

Carryover

2.8/5.0

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$5,209Const:R/W:

39

78, 79

53

Senate:

Assembly:

Congress:

39

78, 79

53Congress

Assembly

Senate

In the city of San Diego, from east of Route 805to east of Route 15; also on Route 15 from northof Adams Avenue to north of Route 8 (PMM5.8/R6.3). Roadside safety improvements.

1166

41132 $3

Subtotal: $3,281

2018-19 $1,330$2

$474

$2,177Total Project Cost: $5,458

11150001324/12/20192/14/20194/13/2018PA&ED:

RTL:R/W Cert:

10/18/2019Begin Con:

11-San Diego-8 PriorPriorPrior18-19

201.23525 Location(s)Performance Measure

Program Code

$371PA&ED:PS&E:

R/W Sup:

Carryover

5.0/6.0

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$3,278Const:R/W:

39

78, 79

53

Senate:

Assembly:

Congress:

39

78, 79

53Congress

Assembly

Senate

In the city of San Diego and La Mesa, fromwest of Mission Gorge Road to west of Route125. Roadside safety improvements.1167

41133 $3

Subtotal: $4,962

2019-20 $2,029$3

$721

$3,318Total Project Cost: $8,280

11150001333/6/2020

1/17/20207/27/2018PA&ED:

RTL:R/W Cert:

7/17/2020Begin Con:

11-San Diego-8 Prior18-1918-1919-20

201.23564 Location(s)Performance Measure

Program Code

$565PA&ED:PS&E:

R/W Sup:

Carryover

6.0/12.0

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$4,959Const:R/W:

38, 39

79

53

Senate:

Assembly:

Congress:

38, 39

79

53Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 194 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Diego

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In El Cajon, at various locations, from 0.5 mileeast of Grossmont Boulevard Overcrossing toSecond Street Undercrossing. ConstructMaintenance Vehicle Pullouts (MVPs), pavebeyond gore areas, relocate irrigation controllersand reduce high maintenance landscaping.

1146

41160 $0

Subtotal: $4,740

2020-21 $1,202$0

$1,009

$2,655Total Project Cost: $7,395

11120001451/21/202110/1/20203/13/2019PA&ED:

RTL:R/W Cert:

7/13/2021Begin Con:

11-San Diego-8 18-1918-19

20-21

201.23584 Location(s)Performance Measure

Program Code

$444PA&ED:PS&E:

R/W Sup:

New

13.0/17.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$4,740Const:R/W:

38

79

53

Senate:

Assembly:

Congress:

38

79

53Congress

Assembly

Senate

In and near El Cajon, at various locations, fromGreenfield Drive to 0.4 mile east of Los CochesRoad Undercrossing. Pave beyond gore areas,reduce high maintenance landscaping andrelocate irrigation components.

1250

41210 $0

Subtotal: $1,896

2021-22 $536$0

$448

$1,330Total Project Cost: $3,226

11120001597/16/20215/28/20217/30/2020PA&ED:

RTL:R/W Cert:

1/7/2022Begin Con:

11-San Diego-8 19-2020-21

21-22

201.2355 Location(s)Performance Measure

Program Code

$346PA&ED:PS&E:

R/W Sup:

New

R18.7/R20.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$1,896Const:R/W:

38

71

50

Senate:

Assembly:

Congress:

38

71

50Congress

Assembly

Senate

Near Pine Valley, at Buckman Springs SafetyRoadside Rest Area (SRRA). RehabilitateSRRA sewer and water systems.1085

40910 $20

Subtotal: $3,295

2018-19 $1,251

$1,034

$2,983Total Project Cost: $6,278

11120000436/28/20195/7/2019

3/30/2016PA&ED:

RTL:R/W Cert:

11/26/2019Begin Con:

11-San Diego-8 PriorPrior

18-19

201.2351 Location(s)Performance Measure

Program Code

$698PA&ED:PS&E:

R/W Sup:

Carryover

49.0

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$3,275Const:R/W:

40

78

51

Senate:

Assembly:

Congress:

40

78

51Congress

Assembly

Senate

In the city of San Diego, from 0.1 mile east ofRoute 5 to 0.1 mile east of Convoy Street.Construct Maintenance Vehicle Pullouts (MVPs), pave slopes under bridge structures,pave narrow areas and beyond gores.

1219

41180 $0

Subtotal: $3,296

2020-21 $1,118$0

$539

$2,051Total Project Cost: $5,347

11120001559/30/20208/30/20207/31/2019PA&ED:

RTL:R/W Cert:

7/30/2021Begin Con:

11-San Diego-52 18-1919-20

20-21

201.23528 Location(s)Performance Measure

Program Code

$394PA&ED:PS&E:

R/W Sup:

New

0.4/5.5

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$3,296Const:R/W:

39

77, 78

52

Senate:

Assembly:

Congress:

39

77, 78

52Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 195 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Diego

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In the city of San Diego, from El Camino RealUndercrossing to Route 56/15 Separation. Pavebeyond gore areas, relocate irrigation controlvalve boxes, construct rumble strip.

1251

41190 $0

Subtotal: $2,007

2021-22 $629$0

$429

$1,342Total Project Cost: $3,349

111200015710/8/20218/2/2021

2/11/2020PA&ED:

RTL:R/W Cert:

1/27/2022Begin Con:

11-San Diego-56 19-2020-21

21-22

201.235106 Location(s)Performance Measure

Program Code

$284PA&ED:PS&E:

R/W Sup:

New

0.3/9.7

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,007Const:R/W:

38, 39

77

52

Senate:

Assembly:

Congress:

38, 39

77

52Congress

Assembly

Senate

In the cities of San Diego and Lemon Grove, atvarious locations from 0.2 mile west of 47thStreet Overcrossing to 0.6 mile west of CollegeAvenue Undercrossing. Construct MaintenanceVehicle Pullouts (MVPs), pave areas beyondgore, upgrade guardrail, install concretebarrier/crash cushions, relocate irrigation/electrical equipment and upgrade curbramps to current Americans with DisabilitiesAct (ADA) Standards.

1253

41220 $0

Subtotal: $2,973

2020-21 $901$0

$858

$2,099Total Project Cost: $5,072

11120001601/27/2021

11/22/20208/16/2019PA&ED:

RTL:R/W Cert:

9/17/2021Begin Con:

11-San Diego-94 18-1919-20

20-21

201.23538 Location(s)Performance Measure

Program Code

$340PA&ED:PS&E:

R/W Sup:

New

4.4/7.3

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,973Const:R/W:

38

79

53

Senate:

Assembly:

Congress:

38

79

53Congress

Assembly

Senate

In the cities of Lemon Grove and San Diego,from 0.1 mile south of Elkelton PlaceUndercrossing to Route 94/125 Separation.Construct Maintenance Vehicle Pullouts(MVPs), pave beyond gore areas, replace crashcushions, guardrail with concrete barrier, installaccess gates, relocate irrigation equipment andremove high maintenance landscaping.

1141

41140 $0

Subtotal: $5,074

2020-21 $864$0

$1,660

$2,955Total Project Cost: $8,029

11120001438/20/20207/17/20206/6/2019PA&ED:

RTL:R/W Cert:

5/17/2021Begin Con:

11-San Diego-125 18-1919-20

20-21

201.235103 Location(s)Performance Measure

Program Code

$431PA&ED:PS&E:

R/W Sup:

New

9.6/13.2

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$5,074Const:R/W:

39

77

53

Senate:

Assembly:

Congress:

39

77

53Congress

Assembly

Senate

In the city of San Diego, at various locations,from Linda Vista Road Overcrossing to Route805/52 Separation. Construct MaintenanceVehicle Pullouts (MVPs), install access gates,pave beyond gore areas, reduce highmaintenance landscaping, relocate irrigationcontrols, and upgrade crash cushions.

1142

41150 $50

Subtotal: $6,592

2020-21 $1,033$26

$1,038

$2,550Total Project Cost: $9,142

11120001441/21/20211/8/2021

3/14/2019PA&ED:

RTL:R/W Cert:

7/13/2021Begin Con:

11-San Diego-805 18-1919-2019-2020-21

201.23597 Location(s)Performance Measure

Program Code

$453PA&ED:PS&E:

R/W Sup:

New

20.7/23.5

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$6,542Const:R/W:

39

77, 78

52

Senate:

Assembly:

Congress:

39

77, 78

52Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 196 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Diego

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MANDATESIn Imperial Beach, from Georgia Street to 0.2mile north of Rainbow Drive. Relinquishroadway to Imperial Beach. FinancialContribution Only (FCO).

1204

42040 $0

Subtotal: $5,276

2018-19 $0$0$0

$348Total Project Cost: $5,624

1115000034

9/28/2018PA&ED:

RTL:R/W Cert:

Begin Con:

11-San Diego-75 18-19

201.1601.2 Centerline mile(s)Performance Measure

Program Code

$348PA&ED:PS&E:

R/W Sup:

New

10.0/11.2

Con Sup:

Relinquishments

$5,276Const:R/W:

38

79

53

Senate:

Assembly:

Congress:

38

79

53Congress

Assembly

Senate

In the city of San Diego, from Carmel MountainRoad Undercrossing to 0.05 mile west of Route5/56 Separation. Stabilize existing slopes andlandscaping from further erosion and sedimentdeposition into the Los Penasquitos Lagoon.

1203

42200 $0

Subtotal: $1,533

2020-21 $632$0

$892

$1,807Total Project Cost: $3,340

11150001738/20/20207/16/20208/21/2019PA&ED:

RTL:R/W Cert:

3/4/2021Begin Con:

11-San Diego-5 18-1919-20

20-21

201.33510 Acre(s) treated/pollutantPerformance Measure

Program Code

$283PA&ED:PS&E:

R/W Sup:

New

R31.8/R32.2

Con Sup:

Storm Water Mitigation

$1,533Const:R/W:

39

78

52

Senate:

Assembly:

Congress:

39

78

52Congress

Assembly

Senate

In the city of San Diego, from 0.8 mile to 1.0mile north of Del Mar Heights Road. Repair and enhance detention basin and regrade overflow channel and access road.

1164

41750

Subtotal: $1,875

2019-20 $526

$702

$1,469Total Project Cost: $3,344

11140000289/20/20198/2/2019

7/20/2018PA&ED:

RTL:R/W Cert:

2/14/2020Begin Con:

11-San Diego-5 Prior18-19

19-20

201.33573 Acre(s) treated/pollutantPerformance Measure

Program Code

$241PA&ED:PS&E:

R/W Sup:

Carryover

R34.6/R35.1

Con Sup:

Storm Water Mitigation

$1,875Const:R/W:

39

77

52

Senate:

Assembly:

Congress:

39

77

52Congress

Assembly

Senate

In Oceanside, from 0.8 mile to 0.6 mile west ofCollege Boulevard. Stormwater mitigation andslope erosion repair.1125

41740 $120

Subtotal: $3,667

2018-19 $651$50

$984

$1,961Total Project Cost: $5,628

11140000271/29/2019

12/20/20181/29/2018PA&ED:

RTL:R/W Cert:

9/25/2019Begin Con:

11-San Diego-78 Prior18-1918-1918-19

201.3354.3 Acre(s) treated/pollutantPerformance Measure

Program Code

$276PA&ED:PS&E:

R/W Sup:

Carryover

2.5/2.7

Con Sup:

Storm Water Mitigation

$3,547Const:R/W:

38

76

52

Senate:

Assembly:

Congress:

38

76

52Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 197 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Diego

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In San Diego County, on routes 5, 15, 75 and163 at various locations. Construct and upgradecurb ramps, driveways and sidewalks to complywith Americans with Disabilities Act (ADA) Standards.

1127

41810 $110

Subtotal: $2,876

2019-20 $2,425$101

$1,658

$5,065Total Project Cost: $7,941

11140000561/15/202012/9/20197/6/2018PA&ED:

RTL:R/W Cert:

6/30/2020Begin Con:

11-San Diego-Var Prior18-1918-1919-20

201.361108 Curb ramp(s)Performance Measure

Program Code

$881PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Americans with Disabilities Act New Curb Ramps

$2,766Const:R/W:

39, 40

77, 78, 79,80

51, 52

Senate:

Assembly:

Congress:

39, 40

77, 78, 79,80

51, 52Congress

Assembly

Senate

In the city of San Diego, from Mission CenterRoad to College Avenue. Construct and upgrade pedestrian curb ramps to meetAmericans with Disabilities Act (ADA)Standards. Replaced damaged sidewalk andinstall accessible pedestrian signals.

1227

42710 $25

Subtotal: $1,132

2021-22 $1,148$0

$545

$2,019Total Project Cost: $3,151

111600015411/15/20217/21/20217/15/2020PA&ED:

RTL:R/W Cert:

7/15/2022Begin Con:

11-San Diego-8 19-2020-21

21-22

201.36118 Curb ramp(s)Performance Measure

Program Code

$326PA&ED:PS&E:

R/W Sup:

New

3.0/8.5

Con Sup:

Americans with Disabilities Act New Curb Ramps

$1,107Const:R/W:

38, 39

78, 79

53

Senate:

Assembly:

Congress:

38, 39

78, 79

53Congress

Assembly

Senate

In and near the cities of San Diego and LemonGrove, from 32nd Street Undercrossing toBancroff Drive Undercrossing. Construct andupgrade pedestrian curb ramps and sidewalks tomeet current standards.

1191

42510 $465

Subtotal: $3,125

2020-21 $1,847$714$833

$4,170Total Project Cost: $7,295

11160000778/28/20204/17/20207/1/2019PA&ED:

RTL:R/W Cert:

12/30/2020Begin Con:

11-San Diego-94 18-1919-2019-2020-21

201.36151 Curb ramp(s)Performance Measure

Program Code

$776PA&ED:PS&E:

R/W Sup:

New

2.6/R11.1

Con Sup:

Americans with Disabilities Act New Curb Ramps

$2,660Const:R/W:

38

71, 79

53

Senate:

Assembly:

Congress:

38

71, 79

53Congress

Assembly

Senate

In various cities, from Main Street/Auto ParkDrive Undercrossing to Market Street Overcrossing. Construct and upgrade pedestriancurb ramps to meet Americans with DisabilitiesAct (ADA) Standards. Replace pedestriansignal heads, push buttons and relocate pullboxes, light poles and controller cabinet.

1248

42900 $12

Subtotal: $3,110

2021-22 $1,960$0

$1,189

$3,992Total Project Cost: $7,102

111700004511/15/20217/21/20217/15/2020PA&ED:

RTL:R/W Cert:

7/15/2022Begin Con:

11-San Diego-805 19-2020-21

21-22

201.36149 Curb ramp(s)Performance Measure

Program Code

$843PA&ED:PS&E:

R/W Sup:

New

3.5/13.1

Con Sup:

Americans with Disabilities Act New Curb Ramps

$3,098Const:R/W:

39, 40

79, 80

51, 53

Senate:

Assembly:

Congress:

39, 40

79, 80

51, 53Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 198 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Diego

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

BRIDGE PRESERVATIONIn the city of San Diego, at the east Route 8 tosouth Route 163 Connector Overcrossing No.57-0355G. Bridge rail replacement.1256

26410 $426

Subtotal: $1,867

2020-21 $969$0

$848

$2,191Total Project Cost: $4,058

111600004511/6/2020

10/26/20207/2/2019PA&ED:

RTL:R/W Cert:

3/11/2021Begin Con:

11-San Diego-8 18-1919-20

20-21

201.112318.0 Linear feetPerformance Measure

Program Code

$374PA&ED:PS&E:

R/W Sup:

New

2.2

Con Sup:

Bridge Rail Replacement and Upgrade

$1,441Const:R/W:

39

78

52

Senate:

Assembly:

Congress:

39

78

52Congress

Assembly

Senate

In and near Chula Vista, from 0.2 mile south ofSweetwater River Bridge No. 57-0638R/L toRoute 54. Upgrade bridge rails, widen bridgesto make standard, and repair approach slabs,joint seals, gore pavement, and shoulders.

1280

43018

Subtotal: $18,367

2018-19

$5,023

$5,023Total Project Cost: $23,390

11170002156/15/20186/1/2018

8/31/2017PA&ED:

RTL:R/W Cert:

1/3/2019Begin Con:

11-San Diego-805

18-19

201.1122000.0 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

8.4/8.8

Con Sup:

Bridge Rail Replacement and Upgrade

$18,367Const:R/W:

40

80

51

Senate:

Assembly:

Congress:

40

80

51Congress

Assembly

Senate

In San Diego County, at various locations.Apply methacrylate to bridge decks, replacejoint seals, repair unsound concrete and replaceapproach slabs.

1221

42690

Subtotal: $3,542

2018-19 $663

$733

$1,396Total Project Cost: $4,938

111600014412/7/201812/5/2018

12/15/2016PA&ED:

RTL:R/W Cert:

4/5/2019Begin Con:

11-San Diego-VARPrior

18-19

201.11935 Bridge(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Preventative Maintenance

$3,542Const:R/W:

38, 39, 40

79, 80

53

Senate:

Assembly:

Congress:

38, 39, 40

79, 80

53Congress

Assembly

Senate

ROADWAY PRESERVATIONIn and near National City and Chula Vista, fromRoute 54/5 Separation to the Route 54/125Junction. Rehabilitate flexible and rigid pavement on the traveled way, shoulders, rampsand connectors, upgrade guard rail and dike.

1188

42480 $297

Subtotal: $21,626

2021-22 $2,260$24

$2,513

$5,506Total Project Cost: $27,132

111600006810/20/20218/27/20212/3/2020PA&ED:

RTL:R/W Cert:

5/5/2022Begin Con:

11-San Diego-54 18-1919-2019-2021-22

201.12143.2 Lane mile(s)Performance Measure

Program Code

$709PA&ED:PS&E:

R/W Sup:

New

0.0/6.4

Con Sup:

Pavement Rehabilitation (CAPM)

$21,329Const:R/W:

40

79, 80

51, 53

Senate:

Assembly:

Congress:

40

79, 80

51, 53Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 199 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Diego

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Escondido, from west of NorthBroadway to Teepee Drive. Pavementrehabilitation.1162

41930 $3,136

Subtotal: $20,867

2019-20 $2,790$2,168$2,643

$8,781Total Project Cost: $29,648

11150000421/23/20201/7/2020

7/13/2018PA&ED:

RTL:R/W Cert:

9/2/2020Begin Con:

11-San Diego-78 Prior18-1918-1919-20

201.12113.9 Lane mile(s)Performance Measure

Program Code

$1,180PA&ED:PS&E:

R/W Sup:

Carryover

N17.6/R21.4

Con Sup:

Pavement Rehabilitation (CAPM)

$17,731Const:R/W:

38

75

51

Senate:

Assembly:

Congress:

38

75

51Congress

Assembly

Senate

In the city of San Diego, from Spring Street toRoute 54. Pavement rehabilitation.

1177

42000 $159

Subtotal: $11,471

2019-20 $1,252$10

$1,537

$3,304Total Project Cost: $14,775

111500004111/26/201910/28/20191/19/2018PA&ED:

RTL:R/W Cert:

6/16/2020Begin Con:

11-San Diego-94 PriorPriorPrior19-20

201.12121.2 Lane mile(s)Performance Measure

Program Code

$505PA&ED:PS&E:

R/W Sup:

Carryover

R10.4/14.9

Con Sup:

Pavement Rehabilitation (CAPM)

$11,312Const:R/W:

40

77

52

Senate:

Assembly:

Congress:

40

77

52Congress

Assembly

Senate

Near La Mesa and in Santee, from 0.2 milesouth of Route 125/94 Separation to MissionGorge Road. Rehabilitate pavement by grindingand replacing concrete slabs and cold plane andoverlay shoulders with Rubberized Hot MixAsphalt (RHMA-G).

1257

42380 $252

Subtotal: $34,437

2021-22 $2,541$53

$3,863

$7,840Total Project Cost: $42,277

111600006111/9/20219/30/202112/2/2019PA&ED:

RTL:R/W Cert:

6/8/2022Begin Con:

11-San Diego-125 Prior19-2019-2021-22

201.12149.5 Lane mile(s) Performance Measure

Program Code

$1,383PA&ED:PS&E:

R/W Sup:

Carryover

13.0/22.3

Con Sup:

Pavement Rehabilitation (CAPM)

$34,185Const:R/W:

38

71, 79

53

Senate:

Assembly:

Congress:

38

71, 79

53Congress

Assembly

Senate

Near Alpine, from Viejas Creek Bridge to PineValley Creek Bridge. Grind, remove andreplace Jointed Plain Concrete Pavement (JPCP)lanes, remove and replace asphalt concreteoutside shoulders and cold plane and overlayinside shoulders. Upgrade guardrail, replaceapproach/departure slabs and construct rumblestrips.

1255

42370

Subtotal: $43,768

2021-22 $3,276

$5,479

$9,691Total Project Cost: $53,459

111600005911/3/20219/21/202112/4/2019PA&ED:

RTL:R/W Cert:

3/14/2022Begin Con:

11-San Diego-8 Prior19-20

21-22

201.12222.8 Lane mile(s)Performance Measure

Program Code

$936PA&ED:PS&E:

R/W Sup:

Carryover

R31.8/R41.7

Con Sup:

Roadway Rehabilitation (2R)

$43,768Const:R/W:

40

51

Senate:

Assembly:

Congress:

40

51Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 200 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Diego

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In San Diego County, on various routes atvarious locations. Culvert rehabilitation.

1134

41820 $483

Subtotal: $3,129

2018-19 $988$418$718

$2,692Total Project Cost: $5,821

11140000636/3/2019

5/22/20197/20/2018PA&ED:

RTL:R/W Cert:

10/18/2019Begin Con:

11-San Diego-Var Prior18-1918-1918-19

201.1517 Culvert(s) (ea)Performance Measure

Program Code

$568PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Drainage System Restoration

$2,646Const:R/W:

38

71

50

Senate:

Assembly:

Congress:

38

71

50Congress

Assembly

Senate

In San Diego County, at various locations, from0.5 mile west of Midway Drive Undercrossingto 0.6 mile west of Flinn Springs RoadUndercrossing. Repair, rehabilitate and replaceculvert systems.

1246

42810 $80

Subtotal: $8,447

2019-20 $1,590

$2,020

$4,783Total Project Cost: $13,230

11170000283/30/20202/4/2020

11/26/2018PA&ED:

RTL:R/W Cert:

10/8/2020Begin Con:

11-San Diego-8 Prior18-19

19-20

201.151100 Culvert(s) (ea)Performance Measure

Program Code

$1,173PA&ED:PS&E:

R/W Sup:

Carryover

L0.7/R23.0

Con Sup:

Drainage System Restoration

$8,367Const:R/W:

36

71

50

Senate:

Assembly:

Congress:

36

71

50Congress

Assembly

Senate

In San Diego County, from 0.7 mile west ofFlinn Springs Road Undercrossing to 0.2 mileeast of Crestwood Road Undercrossing.Rehabilitate culverts and energy dissipaters.

1194

42210 $75

Subtotal: $11,848

2019-20 $2,346$519

$2,836

$6,778Total Project Cost: $18,626

11150001787/24/20195/23/20192/2/2018PA&ED:

RTL:R/W Cert:

3/20/2020Begin Con:

11-San Diego-8 PriorPriorPrior19-20

201.15143 Culvert(s) (ea)Performance Measure

Program Code

$1,077PA&ED:PS&E:

R/W Sup:

Carryover

R23.0/R61.3

Con Sup:

Drainage System Restoration

$11,773Const:R/W:

38

71

53

Senate:

Assembly:

Congress:

38

71

53Congress

Assembly

Senate

In San Diego County, at various locations from0.1 mile east of Route 78/5 Separation to Route15/78 Separation. Rehabilitate and replaceculverts including invert paving, joint repairgrouting, Cured-in-Place Pipeliner (CIPP) anddrainage inlet lid repair.

1247

42230 $204

Subtotal: $8,723

2021-22 $1,469$212

$2,047

$4,539Total Project Cost: $13,262

111500018012/10/202112/10/20213/18/2020PA&ED:

RTL:R/W Cert:

6/13/2022Begin Con:

11-San Diego-78 Prior19-2019-2021-22

201.15165 Culvert(s) (ea)Performance Measure

Program Code

$811PA&ED:PS&E:

R/W Sup:

Carryover

0.0/R16.5

Con Sup:

Drainage System Restoration

$8,519Const:R/W:

36, 38

75, 76

49, 50

Senate:

Assembly:

Congress:

36, 38

75, 76

49, 50Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 201 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Diego

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In San Diego County, at various locations onvarious routes. Replace aging roadside signpanels with retroreflective sheeting.1237

42550 $0

Subtotal: $1,962

2019-20 $355$0

$325

$680Total Project Cost: $2,642

111600009711/21/20197/16/20196/30/2016PA&ED:

RTL:R/W Cert:

7/14/2020Begin Con:

11-San Diego-518-19

19-20

201.170936 Sign(s)Performance Measure

Program Code

$0PA&ED:PS&E:

R/W Sup:

New

0.4/72.4

Con Sup:

Signs and Lighting Rehabilitation

$1,962Const:R/W:

36, 39

76, 78, 80

50, 51, 53

Senate:

Assembly:

Congress:

36, 39

76, 78, 80

50, 51, 53Congress

Assembly

Senate

MOBILITYIn the city of San Diego, from north of La JollaVillage Drive to south of Genesee Avenue, onsouthbound. Construct a 0.5 mile auxiliary lane.1136

2T215

Subtotal: $5,000

2018-19 $1,000

$750

$1,750Total Project Cost: $6,750

111400007410/12/2018

7/5/20186/30/2011PA&ED:

RTL:R/W Cert:

1/31/2019Begin Con:

11-San Diego-5Prior

18-19

201.3101271 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R28.6/R29.3

Con Sup:

Operational Improvements

$5,000Const:R/W:

39

78

52

Senate:

Assembly:

Congress:

39

78

52Congress

Assembly

Senate

In Carlsbad, from Palomar Airport Road toCannon Road. Construct auxiliary lane insouthbound direction for operational efficiency.1279

43017 $23

Subtotal: $5,524

2021-22 $1,052$0

$1,243

$2,502Total Project Cost: $8,026

11170002066/30/20213/30/20212/25/2020PA&ED:

RTL:R/W Cert:

2/18/2022Begin Con:

11-San Diego-5 18-1919-20

21-22

201.31077 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

$207PA&ED:PS&E:

R/W Sup:

New

R47.0/R48.0

Con Sup:

Operational Improvements

$5,501Const:R/W:

36

79

49

Senate:

Assembly:

Congress:

36

79

49Congress

Assembly

Senate

In San Diego County, on various routes atvarious locations. Replace Changeable MessageSigns (CMS) panels with Advanced VariableMessage Signs (AVMS) panels.

1171

42070

Subtotal: $4,401

2019-20 $585

$886

$1,471Total Project Cost: $5,872

111500005712/12/201910/14/20196/19/2015PA&ED:

RTL:R/W Cert:

9/4/2020Begin Con:

11-San Diego-VarPrior

19-20

201.31525 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

$4,401Const:R/W:

36, 38, 39,40

71, 75, 76,77, 79

49, 50, 51,52, 53

Senate:

Assembly:

Congress:

36, 38, 39,40

71, 75, 76,77, 79

49, 50, 51,52, 53

Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 202 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Diego

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In San Diego County, on various routes atvarious locations. Replace Changeable MessageSigns (CMS) panels with Advanced VariableMessage Signs (AVMS) panels.

1174

42080

Subtotal: $4,586

2018-19 $585

$886

$1,860Total Project Cost: $6,446

11150000605/25/20182/22/20183/24/2017PA&ED:

RTL:R/W Cert:

1/23/2019Begin Con:

11-San Diego-Var PriorPrior

18-19

201.31525 Field element(s)Performance Measure

Program Code

$389PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

$4,586Const:R/W:

38, 40

75, 77

49, 50, 52,53

Senate:

Assembly:

Congress:

38, 40

75, 77

49, 50, 52,53

Congress

Assembly

Senate

In San Diego County, at various locations.Repair and install Vehicle Detection Station(VDS) elements including Microwave VehicleDetection Systems (MVDS) and loop detectors.

1262

42970

Subtotal: $11,535

2019-20 $2,160

$2,264

$5,335Total Project Cost: $16,870

111700010212/13/201911/15/20198/22/2018PA&ED:

RTL:R/W Cert:

5/15/2020Begin Con:

11-San Diego-Var Prior18-19

19-20

201.315239 Field element(s)Performance Measure

Program Code

$911PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

$11,535Const:R/W:

36, 38, 39,40

75, 76, 77

49, 50, 51,52, 53

Senate:

Assembly:

Congress:

36, 38, 39,40

75, 76, 77

49, 50, 51,52, 53

Congress

Assembly

Senate

In San Diego County, at various locations; alsoon Route 905 (PM 2.5/5.4) and Route 805 (PM0.2/14.0). Install fiber optic communicationlines to improve regional traffic operations andmobility near the United States/Mexico border.

1241

42750 $375

Subtotal: $20,202

2020-21 $1,721$62

$4,404

$7,005Total Project Cost: $27,207

11160001777/3/2020

4/10/20202/8/2019PA&ED:

RTL:R/W Cert:

3/29/2021Begin Con:

11-San Diego-5 Prior18-1918-1920-21

201.31513.8 Mile(s) of cablePerformance Measure

Program Code

$818PA&ED:PS&E:

R/W Sup:

Carryover

R0.3/R15.2

Con Sup:

Transportation Management Systems

$19,827Const:R/W:

39, 40

78, 80

50

Senate:

Assembly:

Congress:

39, 40

78, 80

50Congress

Assembly

Senate

In San Diego County, from 0.6 mile south ofRoute 5/8 Separation to 1.5 miles north of Route5/76 Separation. Install Vehicle DetectionStations (VDS), Changeable Message Signs(CMS), Closed Circuit Television (CCTV),Ramp Metering, Traffic Signal and Fiber OpticNetwork elements.

1281

42560 $3

Subtotal: $19,624

2019-20 $1,497$122

$2,995

$4,614Total Project Cost: $24,238

11160001013/17/20208/2/2019

10/23/2013PA&ED:

RTL:R/W Cert:

6/16/2020Begin Con:

11-San Diego-5PriorPrior19-20

201.315103 Field element(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R19.5/R55.4

Con Sup:

Transportation Management Systems

$19,621Const:R/W:

36, 39

76, 78

52

Senate:

Assembly:

Congress:

36, 39

76, 78

52Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 203 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Diego

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In San Diego County, at various locations.Update Microwave Vehicle Detection System(MVDS) elements for traffic flow monitoringand data collections.

1263

42980

Subtotal: $3,324

2018-19 $865

$654

$1,891Total Project Cost: $5,215

11170001035/8/20193/8/2019

4/18/2018PA&ED:

RTL:R/W Cert:

12/13/2019Begin Con:

11-San Diego-15 PriorPrior

18-19

201.31562 Field element(s)Performance Measure

Program Code

$372PA&ED:PS&E:

R/W Sup:

Carryover

11.5/31.2

Con Sup:

Transportation Management Systems

$3,324Const:R/W:

38, 39

75, 77

52, 53

Senate:

Assembly:

Congress:

38, 39

75, 77

52, 53Congress

Assembly

Senate

ROADSIDE PRESERVATIONIn the city of San Diego, from Camino de laPlaza Overcrossing to Otay River Bridge; alsoon Route 805, from Route 805/5 Separation toSan Ysidro Boulevard Undercrossing. Convertpotable irrigation system to recycled water.

1245

42890 $40

Subtotal: $10,710

2020-21 $1,243$3

$1,361

$2,991Total Project Cost: $13,701

11170000391/8/2021

12/2/20201/9/2020PA&ED:

RTL:R/W Cert:

7/20/2021Begin Con:

11-San Diego-5 18-1919-2019-2020-21

201.210132 Acre(s)Performance Measure

Program Code

$384PA&ED:PS&E:

R/W Sup:

New

R0.3/R5.0

Con Sup:

Highway Planting Restoration

$10,670Const:R/W:

40

80

51

Senate:

Assembly:

Congress:

40

80

51Congress

Assembly

Senate

In the city of San Diego, from Iris StreetOvercrossing to Otay River Bridge. Replacedeteriorated water supply lines and plantlandscaping for erosion control.

1205

41880 $0

Subtotal: $1,320

2020-21 $564$0

$534

$1,402Total Project Cost: $2,722

11140001157/8/20206/3/20207/9/2019PA&ED:

RTL:R/W Cert:

1/19/2021Begin Con:

11-San Diego-5 18-1919-20

20-21

201.2104.6 Acre(s)Performance Measure

Program Code

$304PA&ED:PS&E:

R/W Sup:

New

3.4/5.0

Con Sup:

Highway Planting Restoration

$1,320Const:R/W:

39

78

52

Senate:

Assembly:

Congress:

39

78

52Congress

Assembly

Senate

In the city of San Diego, from San YsidroBoulevard Undercrossing to Otay River Bridge;also on Route 905, from 0.3 mile east of PicadorBoulevard Undercrossing to Caliente AvenueOvercrossing. Convert potable irrigationsystems to recycled water.

1244

42880 $30

Subtotal: $8,250

2020-21 $1,149$3

$1,174

$2,653Total Project Cost: $10,903

111700003810/9/20209/3/2020

10/10/2019PA&ED:

RTL:R/W Cert:

4/23/2021Begin Con:

11-San Diego-805 18-1919-2019-2020-21

201.210139 Acre(s)Performance Measure

Program Code

$327PA&ED:PS&E:

R/W Sup:

New

0.7/3.3

Con Sup:

Highway Planting Restoration

$8,220Const:R/W:

38, 40

79, 80

51, 53

Senate:

Assembly:

Congress:

38, 40

79, 80

51, 53Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 204 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Diego

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Chula Vista, from 0.3 mile south of MainStreet Undercrossing to Palomar StreetOvercrossing. Convert potable irrigationsystems to recycled water.

1243

42870 $20

Subtotal: $4,117

2020-21 $721$3

$888

$1,896Total Project Cost: $6,013

11170000377/10/20206/5/2020

7/11/2019PA&ED:

RTL:R/W Cert:

1/21/2021Begin Con:

11-San Diego-805 18-1919-2019-2020-21

201.21040 Acre(s)Performance Measure

Program Code

$284PA&ED:PS&E:

R/W Sup:

New

3.4/5.1

Con Sup:

Highway Planting Restoration

$4,097Const:R/W:

38, 40

79, 80

51, 53

Senate:

Assembly:

Congress:

38, 40

79, 80

51, 53Congress

Assembly

Senate

MULTIPLE OBJECTIVEIn the city of San Diego, from Sorrento ValleyRoad to Del Mar Heights Road. Constructrumble strips on both shoulders, rehabilitatebike path, install fiber optic cable/Closed CircuitTelevision (CCTV) and rehabilitate 48 inchculvert. Asset Management Pilot Project.

1218

42650 $0

Subtotal: $3,824

2020-21 $1,304$40

$678

$2,493Total Project Cost: $6,317

111600012510/30/202010/13/2021

9/1/2019PA&ED:

RTL:R/W Cert:

4/30/2021Begin Con:

11-San Diego-5 18-1919-2019-2020-21

201.9991 Location(s)Performance Measure

Program Code

$471PA&ED:PS&E:

R/W Sup:

New

R30.2/R34.2

Con Sup:

MULTIPLE OBJECTIVE

$3,824Const:R/W:

39

77

53

Senate:

Assembly:

Congress:

39

77

53Congress

Assembly

Senate

CountySan Diego

PA&ED:PS&E:

R/W Sup:Con Sup:

$6,428$372,537

R/W:

Subtotal: $378,965

Const:$24,657$62,202$4,538

$69,233

$160,630

Total (Capital + Support): $539,595

Sorted by: Disctrict, County, Route and Post MilesPage 205 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Francisco

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONIn the City and County of San Francisco, fromSan Mateo County line to Route 101/80Junction. Overlay existing pavement with opengraded asphalt, groove concrete pavement andupgrade drainage system.

1490F

4J390 $20

Subtotal: $21,990

2019-20 $1,700$30

$3,000

$6,230Total Project Cost: $28,220

04150003406/1/20205/1/2020

10/1/2018PA&ED:

RTL:R/W Cert:

10/1/2020Begin Con:

04-San Francisco-101 Prior18-1918-1919-20

201.010261 Collision(s) reducedPerformance Measure

Program Code

$1,500PA&ED:PS&E:

R/W Sup:

Carryover

0.0/4.2

Con Sup:

Safety Improvements

$21,970Const:R/W:

11

17

12

Senate:

Assembly:

Congress:

11

17

12Congress

Assembly

Senate

In the City and County of San Francisco, onRoutes 1, 35, 80, 101 and 280 at various locations. Crosswalk safety enhancements.1489B

3J890 $5

Subtotal: $5,805

2019-20 $914$91

$914

$2,359Total Project Cost: $8,164

04150002216/15/20204/17/20201/4/2019PA&ED:

RTL:R/W Cert:

2/1/2021Begin Con:

04-San Francisco-1 Prior18-1918-1919-20

201.01555 Collision(s) reducedPerformance Measure

Program Code

$440PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Collision Severity Reduction

$5,800Const:R/W:

11

19

12

Senate:

Assembly:

Congress:

11

19

12Congress

Assembly

Senate

In the City and County of San Francisco, fromBayshore Boulevard Overcrossing (OC) toSouth Van Ness Avenue; also on Route 280,from Monterey Boulevard onramp OC to KingStreet onramp (PM R2.8 to T7.2). Installvandalism-resistant security fence and gates toreduce maintenance repairs and enhancehighway worker safety.

1493G

4J970 $3

Subtotal: $6,199

2020-21 $1,000$95

$1,520

$3,565Total Project Cost: $9,764

04160000486/30/20215/31/2021

11/29/2019PA&ED:

RTL:R/W Cert:

11/30/2021Begin Con:

04-San Francisco-101 18-1919-2019-2020-21

201.23580 Location(s)Performance Measure

Program Code

$950PA&ED:PS&E:

R/W Sup:

New

0.5/R5.2

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$6,196Const:R/W:

11

17

12

Senate:

Assembly:

Congress:

11

17

12Congress

Assembly

Senate

MANDATESIn the city of San Francisco, at Presidio National Park. Water quality improvements.

1067C

1A905 $1,050

Subtotal: $1,835

2019-20 $315$50

$336

$1,721Total Project Cost: $3,556

04140003406/29/20206/15/20203/1/2019PA&ED:

RTL:R/W Cert:

2/10/2021Begin Con:

04-San Francisco-1 Prior18-1918-1919-20

201.3359.6 Acre(s) treated/pollutantPerformance Measure

Program Code

$1,020PA&ED:PS&E:

R/W Sup:

Carryover

6.0

Con Sup:

Storm Water Mitigation

$785Const:R/W:

Senate:

Assembly:

Congress:Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 206 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Francisco

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

BRIDGE PRESERVATIONNear San Francisco, at Alemany CircleUndercrossing No. 34-0033. Rehabilitatebridge.0587D

3G620 $20

Subtotal: $32,420

2018-19 $3,000$20

$3,250

$10,270Total Project Cost: $42,690

04120001415/1/2019

4/15/201911/15/2017PA&ED:

RTL:R/W Cert:

8/26/2019Begin Con:

04-San Francisco-101 PriorPriorPrior18-19

201.1101 Bridge(s)Performance Measure

Program Code

$4,000PA&ED:PS&E:

R/W Sup:

Carryover

2.0

Con Sup:

Bridge Major Rehabilitation

$32,400Const:R/W:

3

13

12

Senate:

Assembly:

Congress:

3

13

12Congress

Assembly

Senate

In the City and County of San Francisco, at theCentral Viaduct No. 34-0077 from south of 17thStreet to S. Van Ness Avenue; also on Route 80,at the Bayshore Viaduct No. 34-0088 fromRoute 101 to 4th Street (PM 3.9/4.8). Paintsuperstructure steel members.

(G13 Contingency)

1483S

2J800 $62

Subtotal: $100,855

2019-20 $9,200$300

$13,000

$25,000Total Project Cost: $125,855

04150000346/1/20205/1/2020

12/1/2018PA&ED:

RTL:R/W Cert:

8/1/2021Begin Con:

04-San Francisco-101 Prior18-1918-1919-20

201.1102 Bridge(s)Performance Measure

Program Code

$2,500PA&ED:PS&E:

R/W Sup:

Carryover

4.1/R5.1

* Con Sup:

Bridge Major Rehabilitation

* Const, * Con Sup phase(s) are NOT authorized

$100,793* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

11

17

8

Senate:

Assembly:

Congress:

11

17

8Congress

Assembly

Senate

In the City and County of San Francisco, atAlemany Circle Undercrossing (UC) No. 34 -0064K, Alemany Circle UC No. 34-0063S andBayshore Boulevard UC No. 34-0047S; also inSan Mateo County in Pacifica, at PalomaAvenue Overcrossing No. 35-0187 (PMR44.21). Upgrade bridge rails.

1450E

2K190 $10

Subtotal: $5,471

2020-21 $1,751$164

$1,805

$4,377Total Project Cost: $9,848

04160003803/1/20211/1/2021

10/1/2019PA&ED:

RTL:R/W Cert:

10/1/2021Begin Con:

04-San Francisco-101 18-1919-2019-2020-21

201.1122249.0 Linear feetPerformance Measure

Program Code

$657PA&ED:PS&E:

R/W Sup:

New

2.0/2.9

Con Sup:

Bridge Rail Replacement and Upgrade

$5,461Const:R/W:

11, 13

17, 19

12, 14

Senate:

Assembly:

Congress:

11, 13

17, 19

12, 14Congress

Assembly

Senate

ROADWAY PRESERVATIONIn the City and County of San Francisco, fromnorth of Lake Street to south of Route 101 at theMcArthur Tunnel. Replace existing lightingsystem with LED lighting system.

1490A

3J300 $5

Subtotal: $4,711

2018-19 $440$25

$850

$1,535Total Project Cost: $6,246

04150001473/1/2019

2/15/20191/17/2018PA&ED:

RTL:R/W Cert:

11/1/2019Begin Con:

04-San Francisco-1 PriorPriorPrior18-19

201.170380 Lighting fixture(s)Performance Measure

Program Code

$220PA&ED:PS&E:

R/W Sup:

Carryover

6.3/6.6

Con Sup:

Signs and Lighting Rehabilitation

$4,706Const:R/W:

11

19

12

Senate:

Assembly:

Congress:

11

19

12Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 207 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Francisco

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

FACILITIESIn the City and County of San Francisco, at theDistrict 4 Materials Laboratory beneath Route101 (325 San Bruno Avenue). Constructpermanent District 4 Materials Lab at alternativestate-owned site to replace obsolete facilityclosed in March 2015 due to unsafe conditions.

1453E

2K950 $255

Subtotal: $12,342

2021-22 $1,820$130

$3,086

$7,246Total Project Cost: $19,588

04170000572/1/2022

12/1/20214/1/2020PA&ED:

RTL:R/W Cert:

9/1/2022Begin Con:

04-San Francisco-101 18-1919-2019-2021-22

201.3541 Location(s)Performance Measure

Program Code

$2,210PA&ED:PS&E:

R/W Sup:

New

4.2

Con Sup:

Materials Labs

$12,087Const:R/W:

11

17

12

Senate:

Assembly:

Congress:

11

17

12Congress

Assembly

Senate

CountySan Francisco

PA&ED:PS&E:

R/W Sup:Con Sup:

$1,430$190,198

R/W:

Subtotal: $191,628

Const:$13,497$20,140

$905$27,761

$62,303

Total (Capital + Support): $253,931

Sorted by: Disctrict, County, Route and Post MilesPage 208 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Joaquin

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONNear Holt, from 0.3 mile west to 0.5 mile east ofMiddle River Bridge. Realign curve, widenshoulders, upgrade guard rail, and installflashing beacons.

3177

1F460 $1,358

Subtotal: $8,693

2019-20 $1,453$274

$2,006

$4,814Total Project Cost: $13,507

10160001396/22/20206/15/202012/3/2018PA&ED:

RTL:R/W Cert:

10/21/2020Begin Con:

10-San Joaquin-4 Prior18-1918-1919-20

201.01050 Collision(s) reducedPerformance Measure

Program Code

$1,081PA&ED:PS&E:

R/W Sup:

Carryover

4.1/4.9

Con Sup:

Safety Improvements

$7,335Const:R/W:

5

15, 17

11

Senate:

Assembly:

Congress:

5

15, 17

11Congress

Assembly

Senate

Near Clements, at Liberty Road. Improveintersection.

3207

1E531 $715

Subtotal: $6,215

2019-20 $1,400$460

$1,200

$3,494Total Project Cost: $9,709

10160000315/29/20205/15/20207/31/2018PA&ED:

RTL:R/W Cert:

11/30/2020Begin Con:

10-San Joaquin-88 Prior18-1918-1919-20

201.01018 Collision(s) reducedPerformance Measure

Program Code

$434PA&ED:PS&E:

R/W Sup:

Carryover

22.1

Con Sup:

Safety Improvements

$5,500Const:R/W:

5

10

11

Senate:

Assembly:

Congress:

5

10

11Congress

Assembly

Senate

In San Joaquin, Stanislaus, and TuolumneCounties, on Routes 4, 5, 99, 120, and 205 atvarious locations. Improve wet roadway surfaceconditions at twelve locations.

3231

1E590

Subtotal: $4,150

2018-19 $642$31

$547

$1,508Total Project Cost: $5,658

10170000145/1/2018

2/16/201810/26/2017PA&ED:

RTL:R/W Cert:

9/30/2018Begin Con:

10-San Joaquin-205 PriorPriorPrior18-19

201.010264 Collision(s) reducedPerformance Measure

Program Code

$288PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Safety Improvements

$4,150Const:R/W:

5, 12, 14

11, 13

4, 9, 10

Senate:

Assembly:

Congress:

5, 12, 14

11, 13

4, 9, 10Congress

Assembly

Senate

In San Joaquin and Stanislaus Counties, onRoute 5 at various locations; also in MercedCounty, on Route 152 at various locations.Install new or upgrade existing safety devices toshield objects from errant vehicles.

3190

1C970 $14

Subtotal: $1,375

2019-20 $1,104$0

$872

$2,421Total Project Cost: $3,796

10160000211/15/2020

12/15/20193/1/2019PA&ED:

RTL:R/W Cert:

7/15/2020Begin Con:

10-San Joaquin-5 18-1918-19

19-20

201.01513 Collision(s) reducedPerformance Measure

Program Code

$445PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

$1,361Const:R/W:

5, 12

17, 25, 26

11, 18

Senate:

Assembly:

Congress:

5, 12

17, 25, 26

11, 18Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 209 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Joaquin

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Stockton, from Garfield Avenue to Route 99at various locations. Highway worker safetyimprovements.3110

0X690 $60

Subtotal: $3,580

2018-19 $740$10

$600

$2,000Total Project Cost: $5,580

10130002411/15/2019

12/15/20188/10/2017PA&ED:

RTL:R/W Cert:

7/22/2019Begin Con:

10-San Joaquin-4 PriorPriorPrior18-19

201.235102 Location(s)Performance Measure

Program Code

$650PA&ED:PS&E:

R/W Sup:

Carryover

R15.7/R19.2

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$3,520Const:R/W:

5

26

11

Senate:

Assembly:

Congress:

5

26

11Congress

Assembly

Senate

In and near Lathrop and Stockton, from south ofLouise Avenue to Charter Way; also from southof Hammer Lane to north of Eight Mile Road(PM 32.3/35.7). Highway worker safetyimprovements.

3112

0X720 $10

Subtotal: $2,780

2018-19 $470$10

$480

$1,160Total Project Cost: $3,940

10130002426/5/2018

5/16/201810/3/2017PA&ED:

RTL:R/W Cert:

1/23/2019Begin Con:

10-San Joaquin-5 PriorPriorPrior18-19

201.23561 Location(s)Performance Measure

Program Code

$200PA&ED:PS&E:

R/W Sup:

Carryover

R16.1/25.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,770Const:R/W:

5

17

11

Senate:

Assembly:

Congress:

5

17

11Congress

Assembly

Senate

In and near Stockton and Lodi, at variouslocations from French Camp Road to KettlemanLane; also at the Route 4 (PM R15.7 to R16.6)and Route 5 (PM 25.8 to 26.6) Interchange. Pave areas behind the gore, slopes, and at narrow locations, and construct access gates andMaintenance Vehicle Pullouts (MVPs) to reducemaintenance and improve highway workersafety.

3237

1C760 $23

Subtotal: $1,945

2020-21 $1,130$15

$790

$2,430Total Project Cost: $4,375

101700001510/15/20208/21/20207/2/2019PA&ED:

RTL:R/W Cert:

4/21/2021Begin Con:

10-San Joaquin-99 18-1919-2019-2020-21

201.23588 Location(s)Performance Measure

Program Code

$495PA&ED:PS&E:

R/W Sup:

New

11.5/29.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$1,922Const:R/W:

5, 12

15, 17, 26

11, 18

Senate:

Assembly:

Congress:

5, 12

15, 17, 26

11, 18Congress

Assembly

Senate

In and near Manteca, from east of McKinleyAvenue to Route 99. Highway worker safetyimprovements.3120

0X710 $11

Subtotal: $3,502

2018-19 $723$9

$808

$1,949Total Project Cost: $5,451

10130002471/29/20191/15/20191/3/2018PA&ED:

RTL:R/W Cert:

7/2/2019Begin Con:

10-San Joaquin-120 PriorPrior18-1918-19

201.23533 Location(s)Performance Measure

Program Code

$409PA&ED:PS&E:

R/W Sup:

Carryover

R2.6/T7.1

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$3,491Const:R/W:

5, 14

26

11

Senate:

Assembly:

Congress:

5, 14

26

11Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 210 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Joaquin

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Tracy, from Hansen Road toParadise Road. Highway worker safetyimprovements.3111

0X700 $33

Subtotal: $3,760

2018-19 $877$10

$861

$1,973Total Project Cost: $5,733

101300024811/1/201810/1/20189/14/2017PA&ED:

RTL:R/W Cert:

5/6/2019Begin Con:

10-San Joaquin-205 PriorPriorPrior18-19

201.23541 Location(s)Performance Measure

Program Code

$225PA&ED:PS&E:

R/W Sup:

Carryover

2.3/R9.7

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$3,727Const:R/W:

5

26

11

Senate:

Assembly:

Congress:

5

26

11Congress

Assembly

Senate

MANDATESIn Lodi, from Stockton Street to Route 99.Upgrade pedestrian facilities to make compliantwith the Americans with Disabilities Act (ADA)Standards.

3254

1G510 $479

Subtotal: $1,329

2021-22 $770$915$560

$2,531Total Project Cost: $3,860

101700001611/1/20219/30/20215/28/2019PA&ED:

RTL:R/W Cert:

5/12/2022Begin Con:

10-San Joaquin-12 18-1918-1918-1921-22

201.36118 Curb ramp(s)Performance Measure

Program Code

$286PA&ED:PS&E:

R/W Sup:

New

17.4/18.1

Con Sup:

Americans with Disabilities Act New Curb Ramps

$850Const:R/W:

5

17

11

Senate:

Assembly:

Congress:

5

17

11Congress

Assembly

Senate

In Ripon, at Main Street Overcrossing; also inLodi at Turner Road Overcrossing (PM 31.6).Upgrade pedestrian facilities to comply withAmericans with Disabilities Act (ADA) requirements.

3156

1C060 $8

Subtotal: $1,561

2018-19 $530$58

$550

$1,235Total Project Cost: $2,796

10140001025/17/20185/1/2018

6/26/2017PA&ED:

RTL:R/W Cert:

1/2/2019Begin Con:

10-San Joaquin-99 PriorPriorPrior18-19

201.36140 Curb ramp(s)Performance Measure

Program Code

$97PA&ED:PS&E:

R/W Sup:

Carryover

0.9

Con Sup:

Americans with Disabilities Act New Curb Ramps

$1,553Const:R/W:

14

25

19

Senate:

Assembly:

Congress:

14

25

19Congress

Assembly

Senate

BRIDGE PRESERVATIONIn Stockton, at the Stockton Channel ViaductNo. 29-0176L/R. Bridge deck rehabilitation atspot locations.3193

1C940 $5

Subtotal: $4,771

2019-20 $1,030$10

$1,950

$3,325Total Project Cost: $8,096

10160000201/3/2020

9/20/20197/13/2018PA&ED:

RTL:R/W Cert:

7/13/2020Begin Con:

10-San Joaquin-5 Prior18-1918-1919-20

201.1102 Bridge(s)Performance Measure

Program Code

$335PA&ED:PS&E:

R/W Sup:

Carryover

26.5

Con Sup:

Bridge Major Rehabilitation

$4,766Const:R/W:

5

17

11

Senate:

Assembly:

Congress:

5

17

11Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 211 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Joaquin

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Stockton, at Route 26/99 Separation No.29-0142 (PM 1.11). Establish standard verticalclearance.3169

1F170 $7

Subtotal: $6,119

2020-21 $1,827$13

$3,221

$5,659Total Project Cost: $11,778

10160000321/15/2021

12/15/20205/1/2019PA&ED:

RTL:R/W Cert:

7/1/2021Begin Con:

10-San Joaquin-26 18-1918-1918-1920-21

201.1101 Bridge(s)Performance Measure

Program Code

$598PA&ED:PS&E:

R/W Sup:

New

1.1

Con Sup:

Bridge Major Rehabilitation

$6,112Const:R/W:

5

10, 17

11

Senate:

Assembly:

Congress:

5

10, 17

11Congress

Assembly

Senate

In San Joaquin County, on Routes 5 and 580and in Stanislaus County on Route 99, atvarious locations. Seismic retrofit of fourbridges.

3118

0P540 $263

Subtotal: $9,021

2019-20 $1,992$73

$1,783

$4,363Total Project Cost: $13,384

101300025111/15/201911/1/2019

10/10/2017PA&ED:

RTL:R/W Cert:

5/6/2020Begin Con:

10-San Joaquin-5 PriorPriorPrior19-20

201.1134 Bridge(s)Performance Measure

Program Code

$515PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Seismic Restoration

$8,758Const:R/W:

12

26

18

Senate:

Assembly:

Congress:

12

26

18Congress

Assembly

Senate

Near Discovery Bay, at Old River Bridge No.29-0045. Upgrade mechanical and electricalequipment on movable bridge.3113

1C800 $2,000

Subtotal: $6,079

2019-20 $1,358$55

$1,319

$3,222Total Project Cost: $9,301

10150000375/4/20204/3/2020

8/15/2018PA&ED:

RTL:R/W Cert:

10/21/2020Begin Con:

10-San Joaquin-4 Prior18-1918-1919-20

201.1191 Bridge(s)Performance Measure

Program Code

$490PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Preventative Maintenance

$4,079Const:R/W:

5

17

11

Senate:

Assembly:

Congress:

5

17

11Congress

Assembly

Senate

In Stockton, at Crosstown Freeway Viaduct No.29-0269. Reconstruct hinge 32 (left and right)and three ramp joint seals.3198

1C860 $115

Subtotal: $3,543

2018-19 $848$37

$631

$2,164Total Project Cost: $5,707

10160000233/15/20193/1/2019

11/15/2017PA&ED:

RTL:R/W Cert:

11/29/2019Begin Con:

10-San Joaquin-4 PriorPriorPrior18-19

201.1191 Bridge(s)Performance Measure

Program Code

$648PA&ED:PS&E:

R/W Sup:

Carryover

R16.6/R17.8

Con Sup:

Bridge Preventative Maintenance

$3,428Const:R/W:

5, 14

26

11, 18

Senate:

Assembly:

Congress:

5, 14

26

11, 18Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 212 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Joaquin

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Terminous, at Little Potato Slough BridgeNo. 29-0101. Replace joint seals and bearingpads using temporary pile supports.3273

1F760 $925

Subtotal: $3,953

2020-21 $905$2

$1,232

$2,692Total Project Cost: $6,645

10170000245/20/20212/17/20217/20/2020PA&ED:

RTL:R/W Cert:

12/15/2021Begin Con:

10-San Joaquin-12 Prior20-2120-2120-21

201.1191 Bridge(s)Performance Measure

Program Code

$553PA&ED:PS&E:

R/W Sup:

Carryover

R4.4

Con Sup:

Bridge Preventative Maintenance

$3,028Const:R/W:

5

17

11

Senate:

Assembly:

Congress:

5

17

11Congress

Assembly

Senate

Near Stockton, at Wilson Way OvercrossingNo. 29-0118C. Remove existing damagedgirder and build new overhang and barrier,resulting in reduced bridge width and increasedvertical clearance.

3206

1C880 $4

Subtotal: $1,174

2018-19 $562$7

$420

$1,161Total Project Cost: $2,335

10160000227/5/20186/5/2018

7/13/2017PA&ED:

RTL:R/W Cert:

11/22/2018Begin Con:

10-San Joaquin-99 PriorPriorPrior18-19

201.1191 Bridge(s)Performance Measure

Program Code

$172PA&ED:PS&E:

R/W Sup:

Carryover

21.7

Con Sup:

Bridge Preventative Maintenance

$1,170Const:R/W:

5, 14

26

11

Senate:

Assembly:

Congress:

5, 14

26

11Congress

Assembly

Senate

In and near Lathrop, at Deuel Overhead No. 29-0262R/L. Improve to standard truck capacity.

3235B

1H342 $440

Subtotal: $8,140

2019-20 $925$70

$1,700

$3,193Total Project Cost: $11,333

10180000782/28/20201/30/2020

12/30/2017PA&ED:

RTL:R/W Cert:

8/26/2020Begin Con:

10-San Joaquin-5 PriorPriorPrior19-20

201.3222 Bridge(s)Performance Measure

Program Code

$498PA&ED:PS&E:

R/W Sup:

Carryover

10.7

Con Sup:

Trans Permit Requirements for Bridges

$7,700Const:R/W:

5

17

11

Senate:

Assembly:

Congress:

5

17

11Congress

Assembly

Senate

In Stockton, at Route 4/99 Separation(Farmington Road) Bridge No. 29-0155.Replace structure to provide standard verticalclearance.

3148

0X310 $115

Subtotal: $5,891

2019-20 $2,092$147

$1,984

$4,896Total Project Cost: $10,787

101300026512/16/201912/2/201911/9/2017PA&ED:

RTL:R/W Cert:

7/1/2020Begin Con:

10-San Joaquin-99 PriorPriorPrior19-20

201.3221 Bridge(s)Performance Measure

Program Code

$673PA&ED:PS&E:

R/W Sup:

Carryover

17.2

Con Sup:

Trans Permit Requirements for Bridges

$5,776Const:R/W:

5, 14

26

11, 18

Senate:

Assembly:

Congress:

5, 14

26

11, 18Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 213 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Joaquin

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

ROADWAY PRESERVATIONIn Stockton, from 0.1 mile east of FresnoAvenue to west of Center Street. Roadwayrehabilitation.3165

1C500 $48

Subtotal: $30,624

2019-20 $2,324$19

$4,589

$7,470Total Project Cost: $38,094

101600002611/10/201910/10/2019

5/7/2018PA&ED:

RTL:R/W Cert:

7/11/2020Begin Con:

10-San Joaquin-4 Prior18-1918-1919-20

201.1229.5 Lane mile(s)Performance Measure

Program Code

$538PA&ED:PS&E:

R/W Sup:

Carryover

T15.5/R16.6

Con Sup:

Roadway Rehabilitation (2R)

$30,576Const:R/W:

5

26

11

Senate:

Assembly:

Congress:

5

26

11Congress

Assembly

Senate

In San Joaquin County, on Routes 4, 5, and 99at various locations. Rehabilitate culverts.

3140

1C200 $71

Subtotal: $3,249

2019-20 $725$199$597

$2,391Total Project Cost: $5,640

10140000986/22/20205/22/20209/4/2018PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

10-San Joaquin-5 Prior18-1918-1919-20

201.15131 Culvert(s) (ea)Performance Measure

Program Code

$870PA&ED:PS&E:

R/W Sup:

Carryover

3.5/49.0

Con Sup:

Drainage System Restoration

$3,178Const:R/W:

5

17

11

Senate:

Assembly:

Congress:

5

17

11Congress

Assembly

Senate

Near Lockeford, from 0.1 mile south of EastJack Tone Road to north of North Tully Roadintersection; also near Kirkwood, in AlpineCounty (PM 0.3/2.4). Replace culverts.

3141

0S740 $335

Subtotal: $3,495

2020-21 $900$290$875

$2,860Total Project Cost: $6,355

101300026012/20/202012/5/202012/3/2018PA&ED:

RTL:R/W Cert:

7/21/2021Begin Con:

10-San Joaquin-88 Prior18-1918-1920-21

201.15130 Culvert(s) (ea)Performance Measure

Program Code

$795PA&ED:PS&E:

R/W Sup:

Carryover

13.5/14.1

Con Sup:

Drainage System Restoration

$3,160Const:R/W:

14

26

11

Senate:

Assembly:

Congress:

14

26

11Congress

Assembly

Senate

In and near Stockton and Lodi, at variouslocations from Eastside Underpass to AcampoRoad; also on Route 4 at the Route 4/5Separation (PM R16.10) and on Route 120 inLathrop at Mossdale Underpass (PM R0.5).Upgrade drainage pump plants.

3229

1E610 $260

Subtotal: $5,429

2021-22 $1,530$59

$1,289

$3,317Total Project Cost: $8,746

10170000221/13/2022

12/13/20219/9/2019PA&ED:

RTL:R/W Cert:

7/5/2022Begin Con:

10-San Joaquin-99 18-1919-2019-2021-22

201.1515 Culvert(s) (ea)Performance Measure

Program Code

$439PA&ED:PS&E:

R/W Sup:

New

19.7/33.6

Con Sup:

Drainage System Restoration

$5,169Const:R/W:

5, 14

26

11

Senate:

Assembly:

Congress:

5, 14

26

11Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 214 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Joaquin

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In San Joaquin County, on Routes 5 and 99, andin Stanislaus County, on Routes 5, at variouslocations. Upgrade sign panels and replaceoverhead sign structures.

3129

1C530 $8

Subtotal: $1,546

2018-19 $889$52

$543

$1,837Total Project Cost: $3,383

101500000212/3/20188/15/20185/16/2017PA&ED:

RTL:R/W Cert:

7/15/2019Begin Con:

10-San Joaquin-5 PriorPriorPrior18-19

201.17023 Lighting fixture(s)Performance Measure

Program Code

$353PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Signs and Lighting Rehabilitation

$1,538Const:R/W:

5

17

11

Senate:

Assembly:

Congress:

5

17

11Congress

Assembly

Senate

MOBILITYNear Linden, from 0.3 mile east of Fine Road to0.1 mile west of Podesta Lane. Widen travel lanes and shoulders to improve the existingconditions for Surface TransportationAssistance Act (STAA) trucks.

3275

0H560 $540

Subtotal: $1,790

2019-20 $425$230$680

$1,335Total Project Cost: $3,125

10130001488/14/20197/3/2019

6/30/2017PA&ED:

RTL:R/W Cert:

2/28/2020Begin Con:

10-San Joaquin-2618-1918-1919-20

201.31034 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

13.1/R13.8

Con Sup:

Operational Improvements

$1,250Const:R/W:

5

17

11

Senate:

Assembly:

Congress:

5

17

11Congress

Assembly

Senate

In Lodi, from south of Route 12 (Victor Road)to south of Turner Road. Realign northboundonramp, increase bridge vertical clearance andconstruct auxiliary lane.

3145

1C280 $92

Subtotal: $11,202

2018-19 $1,417$75

$2,199

$4,601Total Project Cost: $15,803

10140001345/28/20195/17/2019

12/29/2017PA&ED:

RTL:R/W Cert:

1/6/2020Begin Con:

10-San Joaquin-99 PriorPriorPrior18-19

201.310158.2 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

$910PA&ED:PS&E:

R/W Sup:

Carryover

30.9/31.3

Con Sup:

Operational Improvements

$11,110Const:R/W:

5

10

11

Senate:

Assembly:

Congress:

5

10

11Congress

Assembly

Senate

In Stockton, from Route 5 to Route 99. Installramp meters, traffic monitoring systems, ClosedCircuit Television (CCTV), and synchronizeintersection signals with ramp metering.

3274

1F180 $1,269

Subtotal: $38,790

2021-22 $5,813$667

$9,058

$17,715Total Project Cost: $56,505

10160000774/15/20223/15/20229/15/2019PA&ED:

RTL:R/W Cert:

12/1/2022Begin Con:

10-San Joaquin-4 18-1919-2019-2021-22

201.31530 Field element(s)Performance Measure

Program Code

$2,177PA&ED:PS&E:

R/W Sup:

New

R16.0/R19.4

Con Sup:

Transportation Management Systems

$37,521Const:R/W:

5, 14

26

11, 18

Senate:

Assembly:

Congress:

5, 14

26

11, 18Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 215 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Joaquin

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In various counties, on various routes, at variouslocations. Upgrade Transportation ManagementSystem (TMS) elements.3147

1C620 $15

Subtotal: $3,477

2018-19 $881$138$697

$2,049Total Project Cost: $5,526

10150000016/14/20195/7/2019

5/16/2017PA&ED:

RTL:R/W Cert:

12/27/2019Begin Con:

10-San Joaquin-5 PriorPriorPrior18-19

201.31524 Field element(s)Performance Measure

Program Code

$333PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

$3,462Const:R/W:

5

17

11

Senate:

Assembly:

Congress:

5

17

11Congress

Assembly

Senate

In and near Stockton, on Routes 4 (PM14.6/21.2), 5 and 99 (PM 15.8/18.5) at variouslocations. Install Intelligent TransportationSystem (ITS) elements.

3250

1F400 $80

Subtotal: $9,040

2021-22 $2,550$380

$1,805

$5,555Total Project Cost: $14,595

101600005312/22/202111/23/20218/28/2018PA&ED:

RTL:R/W Cert:

7/14/2022Begin Con:

10-San Joaquin-5 Prior18-1918-1921-22

201.31522 Field element(s)Performance Measure

Program Code

$820PA&ED:PS&E:

R/W Sup:

Carryover

R21.4/27.9

Con Sup:

Transportation Management Systems

$8,960Const:R/W:

5, 14

17, 26

11, 18

Senate:

Assembly:

Congress:

5, 14

17, 26

11, 18Congress

Assembly

Senate

In San Joaquin, Merced, and StanislausCounties, on Routes 5, 12, 59, 99, and 152 atvarious locations. Upgrade or replace inefficient and damaged Traffic Monitoring Station (TMS) elements.

3227

1G750 $7

Subtotal: $6,869

2019-20 $1,719$465

$1,310

$4,696Total Project Cost: $11,565

10170000363/16/20202/14/20204/1/2019PA&ED:

RTL:R/W Cert:

9/15/2020Begin Con:

10-San Joaquin-99 Prior18-1918-1919-20

201.315101 Field element(s)Performance Measure

Program Code

$1,202PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

$6,862Const:R/W:

12, 14

10, 17, 25,26

11, 18, 19

Senate:

Assembly:

Congress:

12, 14

10, 17, 25,26

11, 18, 19Congress

Assembly

Senate

In San Joaquin, Amador, Calaveras, Merced,Mariposa, Stanislaus, and Tuolumne Counties,on Routes 4, 5, 26, 33, 49, 59, 88, 99, 104, 108,120, 132, 140, 152 and 205 at various locations.Repair or replace damaged and nonfunctioningTraffic Management System (TMS) elements.

3226

1G990 $33

Subtotal: $2,098

2020-21 $1,191$107

$1,243

$3,173Total Project Cost: $5,271

10170000741/5/2021

11/5/20204/26/2019PA&ED:

RTL:R/W Cert:

7/6/2021Begin Con:

10-San Joaquin-120 Prior18-1918-1920-21

201.31559 Field element(s)Performance Measure

Program Code

$632PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

$2,065Const:R/W:

4, 9, 11, 18,19

1, 8, 12, 14,15

4, 5, 17, 25,26

Senate:

Assembly:

Congress:

4, 9, 11, 18,19

1, 8, 12, 14,15

4, 5, 17, 25,26

Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 216 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Joaquin

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Manteca and Lathrop, from Route 5to Route 99; also on Route 5 at PM R13.34 andon Route 99 at PM 4.56. Install IntelligentTransportation System (ITS) field elements.

3230

1C960 $68

Subtotal: $3,618

2020-21 $1,221$5

$1,121

$2,720Total Project Cost: $6,338

10170000211/29/202112/3/20208/17/2018PA&ED:

RTL:R/W Cert:

9/13/2021Begin Con:

10-San Joaquin-120 Prior18-1918-1920-21

201.31559 Field element(s)Performance Measure

Program Code

$373PA&ED:PS&E:

R/W Sup:

Carryover

R0.6/R6.1

Con Sup:

Transportation Management Systems

$3,550Const:R/W:

5, 14

10, 17, 26

11

Senate:

Assembly:

Congress:

5, 14

10, 17, 26

11Congress

Assembly

Senate

In Tracy, from Byron Road Undercrossing toParadise Road Overcrossing. Install rampmeters and other Intelligent TransportationSystem (ITS) elements.

3146

1C330 $4,830

Subtotal: $18,087

2020-21 $2,512$979

$2,831

$7,379Total Project Cost: $25,466

10140001466/30/20216/15/20218/30/2018PA&ED:

RTL:R/W Cert:

12/20/2021Begin Con:

10-San Joaquin-205 Prior18-1918-1920-21

201.31514 Field element(s)Performance Measure

Program Code

$1,057PA&ED:PS&E:

R/W Sup:

Carryover

R4.5/R9.0

Con Sup:

Transportation Management Systems

$13,257Const:R/W:

12

15

11

Senate:

Assembly:

Congress:

12

15

11Congress

Assembly

Senate

CountySan Joaquin

PA&ED:PS&E:

R/W Sup:Con Sup:

$14,241$212,654

R/W:

Subtotal: $226,895

Const:$19,591$45,475$5,871

$52,351

$123,288

Total (Capital + Support): $350,183

Sorted by: Disctrict, County, Route and Post MilesPage 217 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Luis Obispo

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONNear Paso Robles, at Route 46 West intersectionwith Vineyard Drive. Construct roundabout.

2701

1H930 $47

Subtotal: $5,596

2019-20 $1,895$105

$1,806

$3,806Total Project Cost: $9,402

05170000171/9/2020

10/9/20191/12/2018PA&ED:

RTL:R/W Cert:

8/19/2020Begin Con:

05-San Luis Obispo-46PriorPrior19-20

201.01014 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R17.2/R17.6

Con Sup:

Safety Improvements

$5,549Const:R/W:

17

35

24

Senate:

Assembly:

Congress:

17

35

24Congress

Assembly

Senate

In the city of San Luis Obispo, from north ofMarsh Street Bridge to Broad Street; also inAtascadero on Route 41 from Old Morro Roadto Atascadero Creek Bridge (PM 12.5/13.3).Upgrade highway safety features.

2508

1F370 $7

Subtotal: $3,807

2019-20 $970$92

$843

$2,739Total Project Cost: $6,546

05130001354/1/2020

3/20/20207/3/2018PA&ED:

RTL:R/W Cert:

12/16/2020Begin Con:

05-San Luis Obispo-101 Prior18-1918-1919-20

201.01533 Collision(s) reducedPerformance Measure

Program Code

$834PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Collision Severity Reduction

$3,800Const:R/W:

17

35

24

Senate:

Assembly:

Congress:

17

35

24Congress

Assembly

Senate

In and near Atascadero, from Santa MargaritaCreek to South Paso Robles Overhead. Improveclear recovery and install barrier.2518

1F490 $50

Subtotal: $2,737

2019-20 $1,097$50

$805

$2,347Total Project Cost: $5,084

05140000023/2/2020

11/1/20198/1/2018PA&ED:

RTL:R/W Cert:

7/20/2020Begin Con:

05-San Luis Obispo-101 Prior18-1918-1919-20

201.01529 Collision(s) reducedPerformance Measure

Program Code

$395PA&ED:PS&E:

R/W Sup:

Carryover

36.6/55.7

Con Sup:

Collision Severity Reduction

$2,687Const:R/W:

17

35

24

Senate:

Assembly:

Congress:

17

35

24Congress

Assembly

Senate

MANDATESIn Atascadero, from San Gabriel Road to Route101 Southbound ramps. Improve and constructnew Americans with Disabilities Act (ADA)accessible pedestrian pathways and installAccessible Pedestrian Signals (APS) systems.

2532

1F630 $679

Subtotal: $4,229

2018-19 $1,333$1,082$1,141

$4,383Total Project Cost: $8,612

05140000406/20/20196/20/201910/5/2017PA&ED:

RTL:R/W Cert:

2/20/2020Begin Con:

05-San Luis Obispo-41 PriorPriorPrior18-19

201.361126 Curb ramp(s)Performance Measure

Program Code

$827PA&ED:PS&E:

R/W Sup:

Carryover

14.2/15.9

Con Sup:

Americans with Disabilities Act New Curb Ramps

$3,550Const:R/W:

17

35

24

Senate:

Assembly:

Congress:

17

35

24Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 218 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Luis Obispo

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

BRIDGE PRESERVATIONIn Morro Bay, at Toro Creek Bridge. Replacebridge.

0072

0L721 $906

Subtotal: $6,106

2019-20 $2,300$275

$2,400

$6,399Total Project Cost: $12,505

05150000976/29/20204/17/20206/18/2018PA&ED:

RTL:R/W Cert:

2/4/2021Begin Con:

05-San Luis Obispo-1 Prior18-1918-1919-20

201.1101 Bridge(s)Performance Measure

Program Code

$1,424PA&ED:PS&E:

R/W Sup:

Carryover

32.6

Con Sup:

Bridge Major Rehabilitation

$5,200Const:R/W:

18

33

22

Senate:

Assembly:

Congress:

18

33

22Congress

Assembly

Senate

Near Morro Bay, at Old Creek Bridge No. 05-49-0070R. Replace bridge.

0072A

0L722 $450

Subtotal: $4,650

2019-20 $1,900$200

$1,900

$5,399Total Project Cost: $10,049

05150000984/28/20201/2/2020

11/2/2017PA&ED:

RTL:R/W Cert:

11/13/2020Begin Con:

05-San Luis Obispo-1 PriorPriorPrior19-20

201.1101 Bridge(s)Performance Measure

Program Code

$1,399PA&ED:PS&E:

R/W Sup:

Carryover

34.5

Con Sup:

Bridge Major Rehabilitation

$4,200Const:R/W:

18

33

22

Senate:

Assembly:

Congress:

18

33

22Congress

Assembly

Senate

Near Santa Margarita, at Trout Creek BridgeNo. 05-49-0091. Replace bridge.

0072B

0L723 $308

Subtotal: $6,295

2019-20 $2,500$210

$2,900

$7,029Total Project Cost: $13,324

05150000991/8/2020

12/2/201911/1/2017PA&ED:

RTL:R/W Cert:

8/12/2020Begin Con:

05-San Luis Obispo-58 PriorPriorPrior19-20

201.1101 Bridge(s)Performance Measure

Program Code

$1,419PA&ED:PS&E:

R/W Sup:

Carryover

3.1

Con Sup:

Bridge Major Rehabilitation

$5,987Const:R/W:

18

33

22

Senate:

Assembly:

Congress:

18

33

22Congress

Assembly

Senate

ROADWAY PRESERVATIONIn San Luis Obispo County near Paso Roblesfrom 0.1 mile south to 0.1 mile north of SanMarcos Creek Bridge and from 0.1 mile south to0.1 mile north of South San MiguelUndercrossing. Landscape mitigation.

0040C

0G041

Subtotal: $270

2018-19 $223$28

$479

$730Total Project Cost: $1,000

05150000196/3/2019

3/15/20199/4/2013PA&ED:

RTL:R/W Cert:

11/18/2019Begin Con:

05-San Luis Obispo-101Prior18-1918-19

201.1200.0 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

63.5/65.2

Con Sup:

Roadway Rehabilitation (3R)

$270Const:R/W:

18

33

22

Senate:

Assembly:

Congress:

18

33

22Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 219 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Luis Obispo

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Pismo Beach, from Gracia Way toNorth Pismo (Route 101/Route 1) Separation.Upgrade Americans with Disabilities Act(ADA) curb ramps, cold plane pavement andplace Rubberized Hot Mix Asphalt (RHMA)pavement.

2630

1G980 $303

Subtotal: $8,921

2021-22 $1,751$1,670$1,568

$6,145Total Project Cost: $15,066

05160000094/6/20224/6/20222/1/2019PA&ED:

RTL:R/W Cert:

8/23/2022Begin Con:

05-San Luis Obispo-1 Prior18-1918-1921-22

201.12113.5 Lane mile(s)Performance Measure

Program Code

$1,156PA&ED:PS&E:

R/W Sup:

Carryover

10.0/16.8

Con Sup:

Pavement Rehabilitation (CAPM)

$8,618Const:R/W:

17

35

24

Senate:

Assembly:

Congress:

17

35

24Congress

Assembly

Senate

Near San Simeon, from the Arroyo de la CruzBridge to 0.3 mile north of the Arroyo de laCruz Bridge. Plant propagation.4928X

49284

Subtotal: $140

2018-19 $110

$229

$339Total Project Cost: $479

05170000453/18/201910/1/20188/11/2010PA&ED:

RTL:R/W Cert:

9/25/2019Begin Con:

05-San Luis Obispo-1Prior

18-19

201.1501 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R66.9/R67.2

Con Sup:

Roadway Protective Betterments

$140Const:R/W:

Senate:

Assembly:

Congress:Congress

Assembly

Senate

Near San Simeon, from the Arroyo de la CruzBridge to 0.3 mile north of the Arroyo de laCruz Bridge. Planting, wetland and CaliforniaRed-legged Frog mitigation.

4928Y

49285 $11

Subtotal: $7,475

2019-20 $1,057$56

$2,424

$3,537Total Project Cost: $11,012

05170000467/25/20192/27/20198/11/2010PA&ED:

RTL:R/W Cert:

3/5/2020Begin Con:

05-San Luis Obispo-1PriorPrior19-20

201.1500 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R66.9/R67.2

Con Sup:

Roadway Protective Betterments

$7,464Const:R/W:

17

35

24

Senate:

Assembly:

Congress:

17

35

24Congress

Assembly

Senate

MOBILITYIn San Luis Obispo County, from 0.3 mile northof Reservoir Canyon Road to 0.3 mile north ofNorth Paso Robles Overhead at variouslocations. Install vehicle detection systems,Changeable Message Signs (CMS), cameras,and loop detectors.

4022

0N220 $5

Subtotal: $2,870

2020-21 $1,095$78

$702

$2,255Total Project Cost: $5,125

051600000712/1/20208/3/20202/1/2019PA&ED:

RTL:R/W Cert:

4/1/2022Begin Con:

05-San Luis Obispo-101 Prior18-1918-1920-21

201.315107 Field element(s)Performance Measure

Program Code

$380PA&ED:PS&E:

R/W Sup:

Carryover

31.5/59.1

Con Sup:

Transportation Management Systems

$2,865Const:R/W:

17

35

24

Senate:

Assembly:

Congress:

17

35

24Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 220 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Luis Obispo

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

CountySan Luis Obispo

PA&ED:PS&E:

R/W Sup:Con Sup:

$2,766$50,330

R/W:

Subtotal: $53,096

Const:$7,834

$16,231$3,846

$17,197

$45,108

Total (Capital + Support): $98,204

Sorted by: Disctrict, County, Route and Post MilesPage 221 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Mateo

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MAJOR DAMAGE RESTORATIONNear Half Moon Bay, at 1.1 miles north ofSanta Cruz County line. Repair slope washoutby constructing a soldier pile wall andupgrading the drainage system.

1450H

0K570 $2

Subtotal: $992

2021-22 $400$70

$500

$1,270Total Project Cost: $2,262

04160001057/1/20215/1/2021

12/1/2019PA&ED:

RTL:R/W Cert:

11/1/2021Begin Con:

04-San Mateo-1 18-1919-2019-2021-22

201.1311 Location(s)Performance Measure

Program Code

$300PA&ED:PS&E:

R/W Sup:

New

1.1

Con Sup:

Permanent Restoration

$990Const:R/W:

13

24

18

Senate:

Assembly:

Congress:

13

24

18Congress

Assembly

Senate

In South San Francisco, at 0.1 mile north ofFrancisco Drive. Permanent embankmentrestoration by installing retaining wall anddrainage improvements.

1450J

0K670 $10

Subtotal: $1,600

2020-21 $710$60

$800

$2,070Total Project Cost: $3,670

041600012412/31/2020

6/4/20209/7/2018PA&ED:

RTL:R/W Cert:

8/26/2021Begin Con:

04-San Mateo-82 Prior18-1918-1920-21

201.1311 Location(s)Performance Measure

Program Code

$500PA&ED:PS&E:

R/W Sup:

Carryover

19.8

Con Sup:

Permanent Restoration

$1,590Const:R/W:

8

22

14

Senate:

Assembly:

Congress:

8

22

14Congress

Assembly

Senate

In San Bruno, from Jenevein Avenue to 0.1 milesouth of San Bruno Avenue. Reconstruct failedconcrete ditch and place Rock Slope Protection(RSP) at slope washouts as storm damagepermanent restoration.

1499H

4J080 $168

Subtotal: $1,261

2019-20 $650$78

$390

$1,508Total Project Cost: $2,769

04150002526/1/20204/1/2020

10/1/2018PA&ED:

RTL:R/W Cert:

11/1/2020Begin Con:

04-San Mateo-280 18-1918-1918-1919-20

201.1311 Location(s)Performance Measure

Program Code

$390PA&ED:PS&E:

R/W Sup:

New

R20.3/R20.6

Con Sup:

Permanent Restoration

$1,093Const:R/W:

8

22

14

Senate:

Assembly:

Congress:

8

22

14Congress

Assembly

Senate

COLLISION REDUCTIONNear Burlingame and Hillsborough city limits,at the intersection of Route 82 and FloribundaAvenue. Install left turn signal. 0686

1G020 $1,765

Subtotal: $4,375

2019-20 $1,300$450$700

$5,350Total Project Cost: $9,725

04000020116/15/20206/7/2020

5/15/2019PA&ED:

RTL:R/W Cert:

1/15/2021Begin Con:

04-San Mateo-82 Prior19-2019-2019-20

201.010120 Collision(s) reducedPerformance Measure

Program Code

$2,900PA&ED:PS&E:

R/W Sup:

Carryover

13.7

Con Sup:

Safety Improvements

$2,610Const:R/W:

8

19

12

Senate:

Assembly:

Congress:

8

19

12Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 222 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Mateo

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near various cities, on Routes 1, 35, 82,84, 92, 101, 109, 114, 280, and 380 at variouslocations. Enhance pedestrian safety byupgrading signals with Accessible PedestrianSignals (APS) audible indicators, pushbuttons,and countdown timers, and upgrading crosswalkmarkings.

1491J

0K070 $57

Subtotal: $5,889

2021-22 $1,250$175

$1,250

$3,925Total Project Cost: $9,814

04160000332/1/2022

12/1/20214/1/2020PA&ED:

RTL:R/W Cert:

6/1/2022Begin Con:

04-San Mateo-Var 18-1919-2019-2021-22

201.01563 Collision(s) reducedPerformance Measure

Program Code

$1,250PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

$5,832Const:R/W:

13

22

14, 18

Senate:

Assembly:

Congress:

13

22

14, 18Congress

Assembly

Senate

In and near Woodside, at various locations (alsoSanta Clara County PM 20.4); also in the Cityand County of San Francisco on Route 101 atSan Bruno Avenue off-ramp (PM 1.7). Construct maintenance worker safety improvements.

0481J

0J670 $10

Subtotal: $5,296

2018-19 $880$40

$770

$2,130Total Project Cost: $7,426

04140000241/30/2019

12/18/201810/31/2017PA&ED:

RTL:R/W Cert:

7/1/2019Begin Con:

04-San Mateo-280 PriorPriorPrior18-19

201.23561 Location(s)Performance Measure

Program Code

$440PA&ED:PS&E:

R/W Sup:

Carryover

R0.2/R3.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$5,286Const:R/W:

13

24

14

Senate:

Assembly:

Congress:

13

24

14Congress

Assembly

Senate

MANDATESNear Redwood City, north of Edgewood Road; also on Route 84, from Hildebrand Road tonorth of La Honda Creek Bridge (PM 9.4/10.0).Stabilize soil and erosion control to mitigate forstorm water quality.

1487G

0J720 $204

Subtotal: $2,212

2019-20 $763$77

$564

$2,278Total Project Cost: $4,490

041400003010/1/20199/1/2019

7/30/2018PA&ED:

RTL:R/W Cert:

4/1/2020Begin Con:

04-San Mateo-280 Prior18-1918-1919-20

201.3357.8 Acre(s) treated/pollutantPerformance Measure

Program Code

$874PA&ED:PS&E:

R/W Sup:

Carryover

7.0/7.7

Con Sup:

Storm Water Mitigation

$2,008Const:R/W:

13

24

18

Senate:

Assembly:

Congress:

13

24

18Congress

Assembly

Senate

BRIDGE PRESERVATIONNear Pescadero, at Pescadero Creek Bridge No.35-0028. Upgrade bridge rails and repair approach slabs.1494G

4J870 $260

Subtotal: $4,694

2021-22 $1,000$8

$1,200

$3,408Total Project Cost: $8,102

04160000295/1/20224/1/2022

11/1/2020PA&ED:

RTL:R/W Cert:

12/15/2022Begin Con:

04-San Mateo-1 18-1920-2120-2121-22

201.1101 Bridge(s)Performance Measure

Program Code

$1,200PA&ED:PS&E:

R/W Sup:

New

14.0

Con Sup:

Bridge Major Rehabilitation

$4,434Const:R/W:

13

22

14

Senate:

Assembly:

Congress:

13

22

14Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 223 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Mateo

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Redwood City, at Cordilleras Creek BridgeNo. 35-0019. Replace bridge to restore structural integrity.1483C

2J730 $4,285

Subtotal: $30,855

2021-22 $4,500$1,125$7,500

$17,625Total Project Cost: $48,480

04150000046/30/20226/30/202210/2/2020PA&ED:

RTL:R/W Cert:

1/11/2023Begin Con:

04-San Mateo-101 18-1920-2120-2121-22

201.1101 Bridge(s)Performance Measure

Program Code

$4,500PA&ED:PS&E:

R/W Sup:

New

7.1

Con Sup:

Bridge Major Rehabilitation

$26,570Const:R/W:

13

24

14

Senate:

Assembly:

Congress:

13

24

14Congress

Assembly

Senate

In East Palo Alto, Redwood City, Belmont,Burlingame, Millbrae, South San Francisco, andBrisbane, from University Avenue Overcrossingto Sierra Point offramp separation. Upgradebridge rails at eight structures.

1485K

2J740 $64

Subtotal: $7,812

2021-22 $1,586$130

$1,456

$4,498Total Project Cost: $12,310

04150000103/1/20222/1/20213/1/2020PA&ED:

RTL:R/W Cert:

9/1/2022Begin Con:

04-San Mateo-101 18-1919-2019-2021-22

201.1123706.0 Linear feetPerformance Measure

Program Code

$1,326PA&ED:PS&E:

R/W Sup:

New

0.1/23.4

Con Sup:

Bridge Rail Replacement and Upgrade

$7,748Const:R/W:

13

24

14

Senate:

Assembly:

Congress:

13

24

14Congress

Assembly

Senate

In and near Menlo Park and San Bruno, fromAlpine Road to Route 380 at Alpine RoadUndercrossing No. 35-0009L/R (PM R0.05),Sand Hill Road Overcrossing (OC) (South) No.35-0007 (PM R1.56), Sand Hill Road OC(North) No. 35-0008 (PM R1.62), and Route280/380 Separation No. 35-0217L/R (PMR20.97). Structure seismic retrofit.

1498G

4J850 $262

Subtotal: $7,732

2021-22 $1,000$100

$1,000

$2,700Total Project Cost: $10,432

04160000284/1/20225/1/2022

10/1/2020PA&ED:

RTL:R/W Cert:

10/1/2022Begin Con:

04-San Mateo-280 Prior20-2120-2121-22

201.1136 Bridge(s)Performance Measure

Program Code

$600PA&ED:PS&E:

R/W Sup:

Carryover

R0.0/R21.0

Con Sup:

Bridge Seismic Restoration

$7,470Const:R/W:

13

22

14, 18

Senate:

Assembly:

Congress:

13

22

14, 18Congress

Assembly

Senate

In Half Moon Bay, at the Pilarcitos CreekBridge No. 35-0139L/R; also on Route 84 atSan Gregorio Creek Bridge No. 35-0166 (PM7.55). Retrofit scour critical bridges to preservethe structural integrity of the bridges by reinforcing with Rock Slope Protection (RSP).

1483M

2J790 $343

Subtotal: $2,279

2021-22 $1,040$260

$1,300

$3,850Total Project Cost: $6,129

04150000144/1/20222/1/2022

10/1/2020PA&ED:

RTL:R/W Cert:

11/1/2022Begin Con:

04-San Mateo-1 18-1920-2120-2121-22

201.1193 Bridge(s)Performance Measure

Program Code

$1,250PA&ED:PS&E:

R/W Sup:

New

28.9

Con Sup:

Bridge Preventative Maintenance

$1,936Const:R/W:

13

24

14, 18

Senate:

Assembly:

Congress:

13

24

14, 18Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 224 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Mateo

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

ROADWAY PRESERVATIONNear Pescadero, from Santa Cruz County line tosouth of Bean Hollow Road. Pavementrehabilitation.0622B

0C930 $10

Subtotal: $11,681

2019-20 $1,081$46

$1,081

$3,611Total Project Cost: $15,292

04140000949/1/20196/1/20197/2/2018PA&ED:

RTL:R/W Cert:

1/15/2020Begin Con:

04-San Mateo-1 Prior18-1918-1919-20

201.12121.2 Lane mile(s)Performance Measure

Program Code

$1,403PA&ED:PS&E:

R/W Sup:

Carryover

0.0/10.6

Con Sup:

Pavement Rehabilitation (CAPM)

$11,671Const:R/W:

13

24

18

Senate:

Assembly:

Congress:

13

24

18Congress

Assembly

Senate

In and near Woodside and Redwood City, fromRoute 280 to Route 101. Rehabilitatepavement, make curb ramps and sidewalksAmericans with Disabilities Act (ADA)compliant, and upgrade guardrails to makestandard.

1497A

0K780 $566

Subtotal: $18,791

2021-22 $2,860$39

$3,120

$8,359Total Project Cost: $27,150

04160001384/1/20223/1/20226/1/2020PA&ED:

RTL:R/W Cert:

11/1/2022Begin Con:

04-San Mateo-84 18-1919-2019-2021-22

201.12116.5 Lane mile(s)Performance Measure

Program Code

$2,340PA&ED:PS&E:

R/W Sup:

New

21.5/25.7

Con Sup:

Pavement Rehabilitation (CAPM)

$18,225Const:R/W:

13

24

14

Senate:

Assembly:

Congress:

13

24

14Congress

Assembly

Senate

In the cities of Burlingame, Millbrae, San Brunoand South San Francisco, from Broadway toOyster Point Boulevard. Pavementrehabilitation.

1487J

3J060 $100

Subtotal: $16,600

2019-20 $1,342$132

$1,628

$4,158Total Project Cost: $20,758

041500008011/1/2019

10/15/20194/2/2018PA&ED:

RTL:R/W Cert:

4/29/2020Begin Con:

04-San Mateo-101 PriorPriorPrior19-20

201.12158.6 Lane mile(s)Performance Measure

Program Code

$1,056PA&ED:PS&E:

R/W Sup:

Carryover

16.5/23.0

Con Sup:

Pavement Rehabilitation (CAPM)

$16,500Const:R/W:

11, 13

22

14

Senate:

Assembly:

Congress:

11, 13

22

14Congress

Assembly

Senate

Near Redwood City, San Carlos and Belmont,from Edgewood Road to Route 92 and nearHillsborough at PM R12.7; also in Santa ClaraCounty in and near Mountain View and PaloAlto, at various spot locations (PM 11.6, 12.8,12.9, 18.8). Replace failing culverts and restoredamaged slopes, pavement, and bridgeapproaches at six locations.

0732J

2A970 $13

Subtotal: $16,417

2021-22 $2,000$260

$3,000

$7,060Total Project Cost: $23,477

041200016111/1/202110/1/20212/1/2020PA&ED:

RTL:R/W Cert:

5/1/2022Begin Con:

04-San Mateo-280 18-1919-2019-2021-22

201.15128 Culvert(s) (ea)Performance Measure

Program Code

$1,800PA&ED:PS&E:

R/W Sup:

New

6.7/10.5

Con Sup:

Drainage System Restoration

$16,404Const:R/W:

13, 15

22, 24

14, 18

Senate:

Assembly:

Congress:

13, 15

22, 24

14, 18Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 225 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List San Mateo

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MOBILITYIn and near the cities of Half Moon Bay,Pacifica and Daly City, from south ofMiramontes Point Road to Clarinada AvenueUndercrossing, at various locations. InstallBluetooth Detection Systems and Variable Message Signs (VMS), enable two existing Changeable Message Signs (CMS), modifyAdvanced Transportation Management System(ATMS), and construct Maintenance VehiclePullouts (MVPs) to improve the system performance.

1452A

2K880 $36

Subtotal: $2,444

2021-22 $444$30

$444

$1,348Total Project Cost: $3,792

04170000409/1/20218/1/20214/1/2020PA&ED:

RTL:R/W Cert:

1/15/2022Begin Con:

04-San Mateo-1 18-1919-2020-2121-22

201.31513 Field element(s)Performance Measure

Program Code

$430PA&ED:PS&E:

R/W Sup:

New

26.4/R47.3

Con Sup:

Transportation Management Systems

$2,408Const:R/W:

8, 13

19, 22, 24

14

Senate:

Assembly:

Congress:

8, 13

19, 22, 24

14Congress

Assembly

Senate

CountySan Mateo

PA&ED:PS&E:

R/W Sup:Con Sup:

$8,155$132,775

R/W:

Subtotal: $140,930

Const:$22,559$22,806$3,080

$26,703

$75,148

Total (Capital + Support): $216,078

Sorted by: Disctrict, County, Route and Post MilesPage 226 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Santa Barbara

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONIn Santa Barbara, San Luis Obispo, Monterey,and Santa Cruz Counties on Routes 1, 101, 129,135, 156, and 246 at various locations. InstallAccessible Pedestrian Signals (APS) pushbuttons, Countdown Pedestrian Signals (CPS)heads, pedestrian barricades, and crosswalksignage to improve pedestrian and bicyclesafety.

2628

1G960 $16

Subtotal: $2,248

2020-21 $940$71

$746

$2,636Total Project Cost: $4,884

05160000062/1/20212/1/20214/2/2019PA&ED:

RTL:R/W Cert:

9/15/2021Begin Con:

05-Santa Barbara-Var 18-1918-1918-1920-21

201.01532 Collision(s) reducedPerformance Measure

Program Code

$879PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

$2,232Const:R/W:

17, 19

30, 35, 37

20, 24

Senate:

Assembly:

Congress:

17, 19

30, 35, 37

20, 24Congress

Assembly

Senate

In Santa Barbara and San Luis Obispo Counties,on various routes at various locations. Replaceand install advance curve warning signs.2594

1G300 $48

Subtotal: $2,132

2018-19 $1,125$41

$629

$2,575Total Project Cost: $4,707

05140001386/10/20192/28/20197/9/2018PA&ED:

RTL:R/W Cert:

11/27/2019Begin Con:

05-Santa Barbara-Var Prior18-1918-1918-19

201.0151277 Collision(s) reducedPerformance Measure

Program Code

$780PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Collision Severity Reduction

$2,084Const:R/W:

17, 19

35, 37

24

Senate:

Assembly:

Congress:

17, 19

35, 37

24Congress

Assembly

Senate

In and near Buellton, from Gaviota State ParkEntrance to north of Alisos Canyon Road.Roadside safety improvements. 2460

1E000 $7

Subtotal: $2,585

2019-20 $840$34

$698

$2,092Total Project Cost: $4,677

05130000232/3/2020

10/7/201910/5/2017PA&ED:

RTL:R/W Cert:

7/1/2020Begin Con:

05-Santa Barbara-101 PriorPriorPrior19-20

201.23554 Location(s)Performance Measure

Program Code

$520PA&ED:PS&E:

R/W Sup:

Carryover

46.5/68.9

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,578Const:R/W:

19

35

24

Senate:

Assembly:

Congress:

19

35

24Congress

Assembly

Senate

Near Gaviota, at the Gaviota Safety RoadsideRest Area (SRRA). Upgrade wastewatersystem.2462

1E010 $5

Subtotal: $2,805

2018-19 $1,060$10

$1,180

$2,490Total Project Cost: $5,295

05130000242/1/2019

10/1/20182/22/2016PA&ED:

RTL:R/W Cert:

9/3/2019Begin Con:

05-Santa Barbara-101 PriorPriorPrior18-19

201.2352 Location(s)Performance Measure

Program Code

$240PA&ED:PS&E:

R/W Sup:

Carryover

46.9

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,800Const:R/W:

19

37

24

Senate:

Assembly:

Congress:

19

37

24Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 227 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Santa Barbara

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Santa Barbara and San Luis Obispo (PM0.0/8.4) Counties, from Alisos Canyon Road toLos Berros Road at various locations. Roadsidesafety improvements.

2699

1H850 $25

Subtotal: $2,167

2020-21 $1,123$35

$1,003

$2,875Total Project Cost: $5,042

05170000012/19/2021

10/15/202010/24/2019PA&ED:

RTL:R/W Cert:

9/30/2021Begin Con:

05-Santa Barbara-101 18-1919-2019-2020-21

201.23566 Location(s)Performance Measure

Program Code

$714PA&ED:PS&E:

R/W Sup:

New

68.7/91.0

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,142Const:R/W:

17, 19

35, 37

24

Senate:

Assembly:

Congress:

17, 19

35, 37

24Congress

Assembly

Senate

MANDATESIn the city of Santa Barbara, at Butterfly LanePedestrian Undercrossing. Construct pedestrianramps and sidewalks to comply with Americanswith Disabilities Act (ADA) Standards.

2468

1E040 $970

Subtotal: $3,874

2019-20 $1,875$303

$1,136

$3,384Total Project Cost: $7,258

05130000274/22/2020

12/26/201911/1/2016PA&ED:

RTL:R/W Cert:

11/24/2020Begin Con:

05-Santa Barbara-101 PriorPriorPrior19-20

201.3612 Curb ramp(s)Performance Measure

Program Code

$70PA&ED:PS&E:

R/W Sup:

Carryover

11.0

Con Sup:

Americans with Disabilities Act New Curb Ramps

$2,904Const:R/W:

19

37

24

Senate:

Assembly:

Congress:

19

37

24Congress

Assembly

Senate

BRIDGE PRESERVATIONIn Goleta, at San Jose Creek Bridge No. 51-0163L/R. Replace bridges to maintainstandards of safety and reliability.2649

1H430 $40

Subtotal: $9,280

2021-22 $2,730$70

$3,480

$7,680Total Project Cost: $16,960

051600007310/1/20217/1/2021

4/20/2020PA&ED:

RTL:R/W Cert:

6/15/2022Begin Con:

05-Santa Barbara-101 Prior19-2019-2021-22

201.1102 Bridge(s)Performance Measure

Program Code

$1,400PA&ED:PS&E:

R/W Sup:

Carryover

21.6

Con Sup:

Bridge Major Rehabilitation

$9,240Const:R/W:

19

37

24

Senate:

Assembly:

Congress:

19

37

24Congress

Assembly

Senate

In Los Alamos, at Route 101/135 SeparationNo. 51-0073L/R. Replace bridge decks.

2522

1F500 $100

Subtotal: $7,100

2019-20 $1,800$250

$2,100

$4,800Total Project Cost: $11,900

05140000038/15/20197/15/201912/1/2017PA&ED:

RTL:R/W Cert:

3/16/2020Begin Con:

05-Santa Barbara-101 PriorPriorPrior19-20

201.1102 Bridge(s)Performance Measure

Program Code

$650PA&ED:PS&E:

R/W Sup:

Carryover

70.9

Con Sup:

Bridge Major Rehabilitation

$7,000Const:R/W:

19

37

24

Senate:

Assembly:

Congress:

19

37

24Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 228 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Santa Barbara

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Lake Cachuma, at Cold Spring CanyonBridge No. 51-0037. Install inspection accesssystem below bridge and paint structure.2392

1C420 $50

Subtotal: $19,050

2020-21 $1,500$75

$1,500

$4,175Total Project Cost: $23,225

05120001414/15/2021

12/15/20207/15/2019PA&ED:

RTL:R/W Cert:

11/1/2021Begin Con:

05-Santa Barbara-154 Prior19-2019-2020-21

201.1101 Bridge(s)Performance Measure

Program Code

$1,100PA&ED:PS&E:

R/W Sup:

New

22.9/23.2

Con Sup:

Bridge Major Rehabilitation

$19,000Const:R/W:

19

35

24

Senate:

Assembly:

Congress:

19

35

24Congress

Assembly

Senate

In the city of Santa Barabara, at La Colina RoadUndercrossing (UC) No. 51-0256 (PM R31.82)and at Primavera Road UC No. 51-0257 (PMR32.07). Upgrade bridge railing and reconstructabutment for bridge rehabilitation.

2651

1H450 $3

Subtotal: $6,419

2021-22 $2,135$52

$2,186

$5,301Total Project Cost: $11,720

05160000757/30/20214/15/2021

12/20/2019PA&ED:

RTL:R/W Cert:

1/5/2022Begin Con:

05-Santa Barbara-154 Prior19-2019-2021-22

201.1102 Bridge(s)Performance Measure

Program Code

$928PA&ED:PS&E:

R/W Sup:

Carryover

R31.8/R32.1

Con Sup:

Bridge Major Rehabilitation

$6,416Const:R/W:

19

37

24

Senate:

Assembly:

Congress:

19

37

24Congress

Assembly

Senate

Near Goleta, from 0.2 mile south to 0.4 milenorth of San Jose Creek Bridge No. 51-0217. Replace bridge.2386

1C360 $158

Subtotal: $18,758

2021-22 $3,459$156

$4,550

$12,052Total Project Cost: $30,810

051200013410/19/20218/18/20216/20/2019PA&ED:

RTL:R/W Cert:

4/1/2022Begin Con:

05-Santa Barbara-217 Prior19-20Prior21-22

201.1101 Bridge(s)Performance Measure

Program Code

$3,887PA&ED:PS&E:

R/W Sup:

Carryover

0.8/1.4

Con Sup:

Bridge Major Rehabilitation

$18,600Const:R/W:

19

37

24

Senate:

Assembly:

Congress:

19

37

24Congress

Assembly

Senate

Near Lompoc, at San Antonio Creek Bridge No.51-0237L/R. Bridge scour mitigation.

2563

1F810 $83

Subtotal: $1,324

2021-22 $1,692$99

$1,029

$3,508Total Project Cost: $4,832

05140000637/7/20212/4/20217/5/2019PA&ED:

RTL:R/W Cert:

1/4/2022Begin Con:

05-Santa Barbara-1 Prior19-2019-2021-22

201.1112 Bridge(s)Performance Measure

Program Code

$688PA&ED:PS&E:

R/W Sup:

New

M33.1

Con Sup:

Bridge Scour Mitigation

$1,241Const:R/W:

19

35

24

Senate:

Assembly:

Congress:

19

35

24Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 229 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Santa Barbara

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Carpinteria, at Arroyo Parida Creek BridgeNo. 51-113. Replace bridge (scour).

0335

39610 $905

Subtotal: $7,750

2019-20 $4,266$692

$1,310

$7,228Total Project Cost: $14,978

05000005141/21/20209/3/2019

6/29/2009PA&ED:

RTL:R/W Cert:

8/7/2020Begin Con:

05-Santa Barbara-192 PriorPriorPrior19-20

201.1111 Bridge(s)Performance Measure

Program Code

$960PA&ED:PS&E:

R/W Sup:

Carryover

15.4/15.6

Con Sup:

Bridge Scour Mitigation

$6,845Const:R/W:

19

35

23

Senate:

Assembly:

Congress:

19

35

23Congress

Assembly

Senate

Near Buellton, at Nojoqui Creek Bridge No. 51-0018L/R. Bridge rail replacement andwidening.2561

1F790 $99

Subtotal: $5,403

2019-20 $1,789$211

$1,218

$4,128Total Project Cost: $9,531

05140000611/29/202011/1/20198/29/2018PA&ED:

RTL:R/W Cert:

7/15/2020Begin Con:

05-Santa Barbara-101 Prior18-1918-1919-20

201.112773.0 Linear feetPerformance Measure

Program Code

$910PA&ED:PS&E:

R/W Sup:

Carryover

56.0

Con Sup:

Bridge Rail Replacement and Upgrade

$5,304Const:R/W:

19

37

24

Senate:

Assembly:

Congress:

19

37

24Congress

Assembly

Senate

Near Los Alamos, at San Antonio Creek BridgeNo. 51-0006. Bridge seismic restoration.

2567

1F830 $132

Subtotal: $2,110

2019-20 $1,228$23

$640

$2,567Total Project Cost: $4,677

05140000653/9/20209/1/20197/2/2018PA&ED:

RTL:R/W Cert:

9/17/2020Begin Con:

05-Santa Barbara-135 Prior18-1918-1919-20

201.1131 Bridge(s)Performance Measure

Program Code

$676PA&ED:PS&E:

R/W Sup:

Carryover

R7.2

Con Sup:

Bridge Seismic Restoration

$1,978Const:R/W:

19

35

24

Senate:

Assembly:

Congress:

19

35

24Congress

Assembly

Senate

Near Los Olivos, at Alamo Pintado PedestrianBridge No. 51-0076Y. Remove bridge.

2391

1C410 $56

Subtotal: $978

2019-20 $1,055$50

$350

$2,580Total Project Cost: $3,558

05120001394/8/2020

10/15/201912/3/2018PA&ED:

RTL:R/W Cert:

10/6/2020Begin Con:

05-Santa Barbara-154 Prior18-19Prior19-20

201.1191 Bridge(s)Performance Measure

Program Code

$1,125PA&ED:PS&E:

R/W Sup:

Carryover

R2.6

Con Sup:

Bridge Preventative Maintenance

$922Const:R/W:

19

37

24

Senate:

Assembly:

Congress:

19

37

24Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 230 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Santa Barbara

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

ROADWAY PRESERVATIONIn Carpinteria, from Casitas Pass Overcrossingto 0.2 miles north of Sheffield AvenueUndercrossing. Rehabilitate roadway.

(G13 Contingency)

2426

1C820 $5,560

Subtotal: $124,660

2019-20 $9,530$940

$30,800

$50,470Total Project Cost: $175,130

05120002367/1/20192/5/2019

11/27/2017PA&ED:

RTL:R/W Cert:

10/29/2019Begin Con:

05-Santa Barbara-101 PriorPriorPrior19-20

201.12026.4 Lane mile(s)Performance Measure

Program Code

$9,200PA&ED:PS&E:

R/W Sup:

Carryover

2.6/9.2

* Con Sup:

Roadway Rehabilitation (3R)

* Const, * Con Sup phase(s) are NOT authorized

$119,100* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

19

37

24

Senate:

Assembly:

Congress:

19

37

24Congress

Assembly

Senate

Near Santa Maria, from Solomon Road to Route166. Pavement rehabilitation.

2586

1G130 $795

Subtotal: $10,378

2019-20 $916$104$905

$2,440Total Project Cost: $12,818

051400011011/1/20198/1/20197/2/2018PA&ED:

RTL:R/W Cert:

5/21/2020Begin Con:

05-Santa Barbara-1 Prior18-1918-1919-20

201.12118.6 Lane mile(s)Performance Measure

Program Code

$515PA&ED:PS&E:

R/W Sup:

Carryover

R36.4/49.2

Con Sup:

Pavement Rehabilitation (CAPM)

$9,583Const:R/W:

19

35

24

Senate:

Assembly:

Congress:

19

35

24Congress

Assembly

Senate

Near Gaviota, from 1.0 mile south of GaviotaGorge Tunnel to 0.1 mile north of NojoquiCreek Bridge. Upgrade guard railing, widenshoulders, place High Friction SurfaceTreatment (HSFT), construct retaining walls,cold plane pavement, place Hot Mix Asphalt(HMA) and Rubberized Hot Mix Asphalt(RHMA) pavement.

(G13 Contingency)

2700

1H860 $21

Subtotal: $59,239

2021-22 $2,648$74

$5,026

$9,908Total Project Cost: $69,147

05170000029/22/20215/21/202112/2/2019PA&ED:

RTL:R/W Cert:

5/2/2022Begin Con:

05-Santa Barbara-101 Prior19-2019-2021-22

201.12127.8 Lane mile(s)Performance Measure

Program Code

$2,160PA&ED:PS&E:

R/W Sup:

Carryover

46.2/R52.3

* Con Sup:

Pavement Rehabilitation (CAPM)

* Const, * Con Sup phase(s) are NOT authorized

$59,218* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

19

37

24

Senate:

Assembly:

Congress:

19

37

24Congress

Assembly

Senate

In and near Santa Maria, from Lakeview Roadto Route 101. Upgrade Americans withDisabilities Act (ADA) curb ramps, cold planepavement, and place Rubberized Hot MixAsphalt (RHMA) pavement.

2629

1G970 $378

Subtotal: $14,750

2020-21 $1,869$1,832$2,396

$6,097Total Project Cost: $20,847

051600000811/19/20209/30/20206/16/2017PA&ED:

RTL:R/W Cert:

5/24/2021Begin Con:

05-Santa Barbara-135PriorPrior20-21

201.12124.4 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

11.7/17.8

Con Sup:

Pavement Rehabilitation (CAPM)

$14,372Const:R/W:

19

35

24

Senate:

Assembly:

Congress:

19

35

24Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 231 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Santa Barbara

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Lompoc, at combined segment of Route 246and Route 1, on Route 246, from 0.3 mile westof V Street to H Street; also on Route 1, from HStreet to 12th Street. Upgrade Americans withDisabilities Act (ADA) curb ramps, cold planepavement and place Hot Mix Asphalt (HMA) pavement.

2632

1H010 $350

Subtotal: $7,250

2021-22 $3,630$2,460$1,750

$7,840Total Project Cost: $15,090

051600001212/15/202112/10/20214/24/2017PA&ED:

RTL:R/W Cert:

7/27/2022Begin Con:

05-Santa Barbara-246PriorPrior21-22

201.1219.0 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Pavement Rehabilitation (CAPM)

$6,900Const:R/W:

19

37

24

Senate:

Assembly:

Congress:

19

37

24Congress

Assembly

Senate

Near Gaviota State Park. Rehabilitate andupgrade existing drainage system.

3330

0K330 $146

Subtotal: $3,746

2019-20 $1,430$245

$1,111

$3,566Total Project Cost: $7,312

05120000686/15/20206/15/20208/27/2018PA&ED:

RTL:R/W Cert:

12/4/2020Begin Con:

05-Santa Barbara-101 Prior18-1918-1919-20

201.1512 Culvert(s) (ea)Performance Measure

Program Code

$780PA&ED:PS&E:

R/W Sup:

Carryover

45.5

Con Sup:

Drainage System Restoration

$3,600Const:R/W:

19

37

24

Senate:

Assembly:

Congress:

19

37

24Congress

Assembly

Senate

MOBILITYIn Santa Ynez, from 0.2 mile east to 0.1 milewest of Edison Street/Baseline Avenue.Construct a roundabout to improve operationsand safety.

2674

1H310 $888

Subtotal: $7,715

2021-22 $1,440$418

$1,614

$4,265Total Project Cost: $11,980

051600006011/30/202111/12/20212/13/2020PA&ED:

RTL:R/W Cert:

7/22/2022Begin Con:

05-Santa Barbara-154 18-1920-2120-2121-22

201.31010 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

$793PA&ED:PS&E:

R/W Sup:

New

R5.8/R6.1

Con Sup:

Operational Improvements

$6,827Const:R/W:

19

37

24

Senate:

Assembly:

Congress:

19

37

24Congress

Assembly

Senate

CountySanta Barbara

PA&ED:PS&E:

R/W Sup:Con Sup:

$10,835$310,886

R/W:

Subtotal: $321,721

Const:$28,975$50,080$8,245

$67,357

$154,657

Total (Capital + Support): $476,378

Sorted by: Disctrict, County, Route and Post MilesPage 232 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Santa Clara

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MAJOR DAMAGE RESTORATIONNear Gilroy, at Sargent Bridge and OverheadNo. 39-0006L. Permanent restoration ofroadway settlement and southern abutmentwingwall movement.

1453B

4J030 $87

Subtotal: $1,468

2020-21 $780$52

$650

$2,132Total Project Cost: $3,600

04150002452/1/20211/2/2021

12/1/2019PA&ED:

RTL:R/W Cert:

6/15/2021Begin Con:

04-Santa Clara-101 18-1919-2019-2020-21

201.1311 Location(s)Performance Measure

Program Code

$650PA&ED:PS&E:

R/W Sup:

New

R0.8

Con Sup:

Permanent Restoration

$1,381Const:R/W:

17

30

19

Senate:

Assembly:

Congress:

17

30

19Congress

Assembly

Senate

COLLISION REDUCTIONNear Los Gatos, from south of Summit Road tonorth of Alma College Road. Install lighting,warning signs, flashing beacons, guardrail,rumble strips, wet-night visibility striping, andchannelizers, and apply High Friction SurfaceTreatment (HFST).

1453A

2K140 $70

Subtotal: $8,891

2019-20 $1,000$50

$1,550

$3,600Total Project Cost: $12,491

04160003736/15/20206/1/20203/1/2019PA&ED:

RTL:R/W Cert:

1/25/2021Begin Con:

04-Santa Clara-17 Prior18-1919-2019-20

201.010264 Collision(s) reducedPerformance Measure

Program Code

$1,000PA&ED:PS&E:

R/W Sup:

Carryover

0.0/3.4

Con Sup:

Safety Improvements

$8,821Const:R/W:

15

28

18

Senate:

Assembly:

Congress:

15

28

18Congress

Assembly

Senate

In and near Morgan Hill, from south of MastenAvenue to East Main Avenue. Install edgelineand shoulder rumble strips, concrete barrier, andreconstruct shoulders.

1483F

2J890 $10

Subtotal: $2,430

2018-19 $450$75

$675

$1,430Total Project Cost: $3,860

04150000225/6/20194/8/2019

5/17/2018PA&ED:

RTL:R/W Cert:

1/23/2020Begin Con:

04-Santa Clara-101 Prior18-1918-1918-19

201.01085 Collision(s) reducedPerformance Measure

Program Code

$230PA&ED:PS&E:

R/W Sup:

Carryover

R9.0/R16.8

Con Sup:

Safety Improvements

$2,420Const:R/W:

17

30

19

Senate:

Assembly:

Congress:

17

30

19Congress

Assembly

Senate

Near Gilroy, from east of Dunne Street/SanFelipe Road to the Merced County line. Placemedian barrier. 0480K

0J800 $60

Subtotal: $11,044

2019-20 $1,227$65

$1,766

$4,858Total Project Cost: $15,902

04140000675/15/20205/8/2020

12/3/2018PA&ED:

RTL:R/W Cert:

3/1/2021Begin Con:

04-Santa Clara-152 Prior18-1918-1919-20

201.01079 Collision(s) reducedPerformance Measure

Program Code

$1,800PA&ED:PS&E:

R/W Sup:

Carryover

21.8/R35.2

Con Sup:

Safety Improvements

$10,984Const:R/W:

17

30

19, 20

Senate:

Assembly:

Congress:

17

30

19, 20Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 233 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Santa Clara

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Cupertino, at northbound offramp to FoothillExpressway. Upgrade traffic signal system forright-turn movement.1488N

3J710 $180

Subtotal: $1,162

2019-20 $285$45

$285

$1,047Total Project Cost: $2,209

04150001844/30/20203/31/2020

12/31/2018PA&ED:

RTL:R/W Cert:

10/30/2020Begin Con:

04-Santa Clara-280 Prior18-1918-1919-20

201.01020 Collision(s) reducedPerformance Measure

Program Code

$432PA&ED:PS&E:

R/W Sup:

Carryover

11.3

Con Sup:

Safety Improvements

$982Const:R/W:

13

24

17

Senate:

Assembly:

Congress:

13

24

17Congress

Assembly

Senate

On various routes, in various cities, at variouslocations. Replace pedestrian push-buttons andsignal heads with Accessible Pedestrian Signals(APS) and countdown timers and refreshcrosswalk markings to enhance pedestriansafety.

1492E

0K080 $23

Subtotal: $10,734

2021-22 $1,241$36

$1,417

$3,633Total Project Cost: $14,367

04160000493/18/20223/2/2022

7/15/2020PA&ED:

RTL:R/W Cert:

7/29/2022Begin Con:

04-Santa Clara-Var 18-1920-2121-2221-22

201.01530 Collision(s) reducedPerformance Measure

Program Code

$939PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

$10,711Const:R/W:

10, 13, 15,17

24, 25, 27,28, 29, 30

17, 18, 19

Senate:

Assembly:

Congress:

10, 13, 15,17

24, 25, 27,28, 29, 30

17, 18, 19Congress

Assembly

Senate

In Santa Clara County, on Routes 9, 17, 85, 87,101, 152, 237, 280, 680, and 880 at various locations. Relocate or shield existing electricalcontroller cabinets and install twenty-eight newMaintenance Vehicle Pullouts (MVPs).

1486A

2J950 $50

Subtotal: $6,974

2021-22 $1,400$45

$1,600

$4,345Total Project Cost: $11,319

04150000433/15/20222/1/2022

11/10/2020PA&ED:

RTL:R/W Cert:

9/1/2022Begin Con:

04-Santa Clara-9 18-1920-2120-2121-22

201.01566 Collision(s) reducedPerformance Measure

Program Code

$1,300PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

$6,924Const:R/W:

10, 13, 15,17

24, 25, 27,28, 29, 30

17, 18, 19

Senate:

Assembly:

Congress:

10, 13, 15,17

24, 25, 27,28, 29, 30

17, 18, 19Congress

Assembly

Senate

Near Gilroy, from Llagas Creek Bridge to theMerced County line. Construct MaintenanceVehicle Pullouts (MVPs) and vegetation controlunder existing guardrail to improve highwayworker safety.

1452E

2K800 $10

Subtotal: $6,600

2021-22 $1,000$45

$700

$2,545Total Project Cost: $9,145

041700002511/30/202110/29/20218/31/2020PA&ED:

RTL:R/W Cert:

6/20/2022Begin Con:

04-Santa Clara-152 18-1919-2019-2020-21

201.23588 Location(s)Performance Measure

Program Code

$800PA&ED:PS&E:

R/W Sup:

New

11.2/R35.2

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$6,590Const:R/W:

17

30

19

Senate:

Assembly:

Congress:

17

30

19Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 234 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Santa Clara

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near San Jose, from Route 101 to Route17/880 Separation. Pave extended gore areasand narrow strips to improve highway workersafety.

1492D

4J960 $170

Subtotal: $4,005

2021-22 $770$62

$503

$2,115Total Project Cost: $6,120

041600002412/1/202110/1/20216/1/2020PA&ED:

RTL:R/W Cert:

9/1/2022Begin Con:

04-Santa Clara-280 18-1919-2021-2221-22

201.23539 Location(s)Performance Measure

Program Code

$780PA&ED:PS&E:

R/W Sup:

New

R0.0/L5.4

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$3,835Const:R/W:

15

27

19

Senate:

Assembly:

Congress:

15

27

19Congress

Assembly

Senate

In San Jose and Milpitas, from Route 101 toScott Creek Road at various locations.Construct maintenance worker safetyimprovements.

0481T

0J660 $10

Subtotal: $8,824

2018-19 $1,320$110

$1,320

$3,190Total Project Cost: $12,014

04140000231/15/20191/8/2019

9/26/2017PA&ED:

RTL:R/W Cert:

7/15/2019Begin Con:

04-Santa Clara-680 PriorPriorPrior18-19

201.235160 Location(s)Performance Measure

Program Code

$440PA&ED:PS&E:

R/W Sup:

Carryover

M0.0/M9.9

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$8,814Const:R/W:

10, 15

25, 27

17, 19

Senate:

Assembly:

Congress:

10, 15

25, 27

17, 19Congress

Assembly

Senate

MANDATESIn Sunnyvale, Mountain View, Los Altos, andPalo Alto, from Knickerbocker Drive to SanMateo County line. Upgrade pedestrian facilities to make compliant with the Americanswith Disabilities Act (ADA) Standards.

1495G

0K010 $1,614

Subtotal: $7,807

2021-22 $1,600$706

$1,600

$5,206Total Project Cost: $13,013

04160000205/2/20224/1/20226/1/2020PA&ED:

RTL:R/W Cert:

11/15/2022Begin Con:

04-Santa Clara-82 19-2020-2120-2121-22

201.36114 Curb ramp(s)Performance Measure

Program Code

$1,300PA&ED:PS&E:

R/W Sup:

New

18.2/26.4

Con Sup:

Americans with Disabilities Act New Curb Ramps

$6,193Const:R/W:

13

24

17

Senate:

Assembly:

Congress:

13

24

17Congress

Assembly

Senate

In Cupertino, Sunnyvale and Mountain View,from Stevens Creek Boulevard to Route 101;also in various cities, on Route 80 (PM 2.5/8.0),at various locations. Install and/or upgradeexisting curb ramps and pedestrian facilities toAmericans with Disabilities Act (ADA)Standards.

0434G

2G730 $75

Subtotal: $2,335

2018-19 $663$102$730

$1,937Total Project Cost: $4,272

04000212025/16/20195/1/2019

9/26/2017PA&ED:

RTL:R/W Cert:

12/23/2019Begin Con:

04-Santa Clara-85 PriorPriorPrior18-19

201.36138 Curb ramp(s)Performance Measure

Program Code

$442PA&ED:PS&E:

R/W Sup:

Carryover

18.0/24.1

Con Sup:

Americans with Disabilities Act New Curb Ramps

$2,260Const:R/W:

9, 13

15, 24

13, 18

Senate:

Assembly:

Congress:

9, 13

15, 24

13, 18Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 235 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Santa Clara

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

BRIDGE PRESERVATIONNear Saratoga, at Saratoga Creek Bridge No. 37-0074. Replace bridge.

0386F

3G630 $6,779

Subtotal: $18,447

2019-20 $1,400$396

$1,526

$6,122Total Project Cost: $24,569

04120004095/6/2020

4/15/20206/15/2018PA&ED:

RTL:R/W Cert:

10/19/2020Begin Con:

04-Santa Clara-9 Prior18-1918-1919-20

201.1101 Bridge(s)Performance Measure

Program Code

$2,800PA&ED:PS&E:

R/W Sup:

Carryover

4.9

Con Sup:

Bridge Major Rehabilitation

$11,668Const:R/W:

13

24

18

Senate:

Assembly:

Congress:

13

24

18Congress

Assembly

Senate

In various cities, on Routes 101 and 237 atvarious locations. Bridge rail upgrade at eightlocations.0481H

0J560 $30

Subtotal: $10,741

2019-20 $2,250$30

$2,700

$6,780Total Project Cost: $17,521

04140000136/15/20203/16/20209/14/2018PA&ED:

RTL:R/W Cert:

12/21/2020Begin Con:

04-Santa Clara-101 Prior18-1918-1919-20

201.1125956.0 Linear feetPerformance Measure

Program Code

$1,800PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Rail Replacement and Upgrade

$10,711Const:R/W:

13, 17

24, 30

17, 19, 20

Senate:

Assembly:

Congress:

13, 17

24, 30

17, 19, 20Congress

Assembly

Senate

In San Jose, at Bird Avenue OvercrossingBridge No. 37-0267 (PM R2.78); also in LosAltos Hills at Arastradero Road UndercrossingBridge No. 37-0251 L/R (PM 17.8). Bridgeseismic restoration.

1483K

2J750 $90

Subtotal: $2,504

2018-19 $1,034$66

$550

$2,794Total Project Cost: $5,298

04150003383/15/20193/1/2019

2/27/2018PA&ED:

RTL:R/W Cert:

10/28/2019Begin Con:

04-Santa Clara-280 PriorPriorPrior18-19

201.1133 Bridge(s)Performance Measure

Program Code

$1,144PA&ED:PS&E:

R/W Sup:

Carryover

R2.9/17.8

Con Sup:

Bridge Seismic Restoration

$2,414Const:R/W:

13, 15

24, 27

18, 19

Senate:

Assembly:

Congress:

13, 15

24, 27

18, 19Congress

Assembly

Senate

In various cities, on various routes at SaratogaCreek Bridge, Carnadero Creek Bridge, SanFrancisco Creek Bridge, San Tomas AquinoCreek Bridge, and Bodfish Creek Bridge.Bridge preventative maintenance.

1482R

2J780 $10

Subtotal: $2,401

2019-20 $750$44

$600

$2,294Total Project Cost: $4,695

04150000176/1/20205/1/2020

10/1/2018PA&ED:

RTL:R/W Cert:

12/22/2020Begin Con:

04-Santa Clara-Var Prior18-1918-1919-20

201.1195 Bridge(s)Performance Measure

Program Code

$900PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Preventative Maintenance

$2,391Const:R/W:

13, 15, 17

24, 28, 29,30

18, 19, 20

Senate:

Assembly:

Congress:

13, 15, 17

24, 28, 29,30

18, 19, 20Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 236 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Santa Clara

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

ROADWAY PRESERVATIONIn and near Los Gatos, Campbell and San Jose,from Hebard Way to Route 280. Pavementrehabilitation.1480B

1J970 $20

Subtotal: $30,161

2019-20 $2,750$150

$3,150

$7,800Total Project Cost: $37,961

04140004041/27/20201/17/20207/2/2018PA&ED:

RTL:R/W Cert:

7/15/2020Begin Con:

04-Santa Clara-17 Prior18-1918-1919-20

201.12150.0 Lane mile(s)Performance Measure

Program Code

$1,750PA&ED:PS&E:

R/W Sup:

Carryover

2.8/13.9

Con Sup:

Pavement Rehabilitation (CAPM)

$30,141Const:R/W:

15

28

18

Senate:

Assembly:

Congress:

15

28

18Congress

Assembly

Senate

In the cities of San Jose and Santa Clara, fromMcKendrie Street to El Camino Real. Pavementrehabilitation, Americans with Disabilities Act(ADA) upgrades, and installation of High-intensity Activated crossWalK (HAWK)systems.

1490Q

4J282 $180

Subtotal: $3,891

2018-19 $603$180$823

$1,606Total Project Cost: $5,497

04170005203/1/2019

1/15/20197/14/2017PA&ED:

RTL:R/W Cert:

9/11/2019Begin Con:

04-Santa Clara-8218-1918-1918-19

201.1213.4 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

9.8/R10.4

Con Sup:

Pavement Rehabilitation (CAPM)

$3,711Const:R/W:

10

25, 28

17, 19

Senate:

Assembly:

Congress:

10

25, 28

17, 19Congress

Assembly

Senate

In Mountain View, Los Altos, and Palo Alto,from 0.05 mile north of Route 237 to Sand HillRoad. Pavement rehabilitation.1498F

4J890 $360

Subtotal: $23,245

2021-22 $1,974$99

$1,974

$4,935Total Project Cost: $28,180

04160000238/11/20217/6/20213/3/2020PA&ED:

RTL:R/W Cert:

11/30/2021Begin Con:

04-Santa Clara-82 19-2020-2120-2121-22

201.12143.0 Lane mile(s)Performance Measure

Program Code

$888PA&ED:PS&E:

R/W Sup:

New

19.2/26.4

Con Sup:

Pavement Rehabilitation (CAPM)

$22,885Const:R/W:

13

24

18

Senate:

Assembly:

Congress:

13

24

18Congress

Assembly

Senate

In Gilroy, from 0.3 miles west of Santa TeresaBoulevard to Route 101. Rehabilitatepavement.1452D

2K750 $125

Subtotal: $14,290

2019-20 $1,600$58

$1,800

$4,858Total Project Cost: $19,148

041700001912/19/201812/5/20186/15/2018PA&ED:

RTL:R/W Cert:

6/14/2019Begin Con:

04-Santa Clara-152 PriorPriorPrior19-20

201.1217.9 Lane mile(s)Performance Measure

Program Code

$1,400PA&ED:PS&E:

R/W Sup:

Carryover

7.6/M10.2

Con Sup:

Pavement Rehabilitation (CAPM)

$14,165Const:R/W:

17

30

19, 20

Senate:

Assembly:

Congress:

17

30

19, 20Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 237 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Santa Clara

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Los Altos, Los Altos Hills, and PaloAlto, from Foothill Boulevard to north of SandHill Road (also in San Mateo County (PMR0.0/R2.1). Pavement rehabilitation.

0449A

3J320 $50

Subtotal: $47,624

2018-19 $3,284$48

$6,661

$11,846Total Project Cost: $59,470

04150001315/1/20194/1/2019

12/1/2017PA&ED:

RTL:R/W Cert:

10/8/2019Begin Con:

04-Santa Clara-280 PriorPriorPrior18-19

201.12190.0 Lane mile(s)Performance Measure

Program Code

$1,853PA&ED:PS&E:

R/W Sup:

Carryover

11.5/20.6

Con Sup:

Pavement Rehabilitation (CAPM)

$47,574Const:R/W:

13, 16

24, 28

18, 20

Senate:

Assembly:

Congress:

13, 16

24, 28

18, 20Congress

Assembly

Senate

In San Jose, from Route 85 to West JulianStreet. Roadway rehabilitation.

1492C

4J910 $304

Subtotal: $55,567

2021-22 $4,425$50

$6,581

$13,823Total Project Cost: $69,390

04160000106/30/20224/1/2022

10/1/2020PA&ED:

RTL:R/W Cert:

2/1/2023Begin Con:

04-Santa Clara-87 Prior20-2120-2121-22

201.12229.5 Lane mile(s)Performance Measure

Program Code

$2,767PA&ED:PS&E:

R/W Sup:

Carryover

0.0/6.1

Con Sup:

Roadway Rehabilitation (2R)

$55,263Const:R/W:

15

27

19

Senate:

Assembly:

Congress:

15

27

19Congress

Assembly

Senate

MOBILITYIn San Jose, in the eastbound direction fromNorth First Street to Zanker Road. Constructauxiliary lane.1492A

0K240 $255

Subtotal: $8,285

2021-22 $2,080$130

$1,560

$6,890Total Project Cost: $15,175

04160000602/1/20221/2/20226/1/2020PA&ED:

RTL:R/W Cert:

6/15/2022Begin Con:

04-Santa Clara-237 18-1919-2019-2021-22

201.310521 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

$3,120PA&ED:PS&E:

R/W Sup:

New

7.0/8.0

Con Sup:

Operational Improvements

$8,030Const:R/W:

10

25

17

Senate:

Assembly:

Congress:

10

25

17Congress

Assembly

Senate

In San Jose, in the westbound direction fromZanker Road to North First Street. Constructauxiliary lane.1492B

0K250 $57,823

Subtotal: $71,642

2021-22 $2,080$481

$1,750

$7,431Total Project Cost: $79,073

04160000616/1/20225/2/20228/3/2020PA&ED:

RTL:R/W Cert:

2/1/2023Begin Con:

04-Santa Clara-237 Prior20-2120-2121-22

201.310332 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

$3,120PA&ED:PS&E:

R/W Sup:

Carryover

7.0/8.0

Con Sup:

Operational Improvements

$13,819Const:R/W:

10

25

17

Senate:

Assembly:

Congress:

10

25

17Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 238 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Santa Clara

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

ROADSIDE PRESERVATIONIn the cities of San Jose, Santa Clara, andSunnyvale, from Route 85 to Route 237; also onRoute 85 (PM 0.0 to 1.1) and Route 237 (PM2.2 to R4.9). Repair and modernized roadsideirrigation facilities.

2020J

4J930 $15

Subtotal: $2,024

2020-21 $500$63

$625

$1,563Total Project Cost: $3,587

04160000175/11/20212/16/2021

10/10/2019PA&ED:

RTL:R/W Cert:

9/15/2021Begin Con:

04-Santa Clara-101 18-1919-2019-2020-21

201.21012 Acre(s)Performance Measure

Program Code

$375PA&ED:PS&E:

R/W Sup:

New

R26.4/46.4

Con Sup:

Highway Planting Restoration

$2,009Const:R/W:

13

24

17, 18

Senate:

Assembly:

Congress:

13

24

17, 18Congress

Assembly

Senate

CountySanta Clara

PA&ED:PS&E:

R/W Sup:Con Sup:

$68,400$294,696

R/W:

Subtotal: $363,096

Const:$32,030$36,466$3,188

$43,096

$114,780

Total (Capital + Support): $477,876

Sorted by: Disctrict, County, Route and Post MilesPage 239 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Santa Cruz

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONIn and near Santa Cruz, from 0.1 mile south ofRoute 1/17 Separation to 0.4 mile south ofPasatiempo Overcrossing; also on Route 17 (PM0.0/0.3). Realign southbound Route 17Connector to southbound Route 1.

2636

1H060 $658

Subtotal: $6,469

2019-20 $1,930$217

$1,973

$4,912Total Project Cost: $11,381

051600002011/1/20198/1/2019

11/1/2017PA&ED:

RTL:R/W Cert:

5/1/2020Begin Con:

05-Santa Cruz-1 PriorPriorPrior19-20

201.010140 Collision(s) reducedPerformance Measure

Program Code

$792PA&ED:PS&E:

R/W Sup:

Carryover

16.7/17.0

Con Sup:

Safety Improvements

$5,811Const:R/W:

17

29

18, 20

Senate:

Assembly:

Congress:

17

29

18, 20Congress

Assembly

Senate

Near Watsonville, at Lakeview Road. Constructroundabout and improve street lighting.

2625

1G990 $749

Subtotal: $5,230

2019-20 $1,341$441

$1,335

$3,899Total Project Cost: $9,129

05160000106/1/20204/1/2020

11/1/2017PA&ED:

RTL:R/W Cert:

11/1/2020Begin Con:

05-Santa Cruz-129 PriorPriorPrior19-20

201.01046 Collision(s) reducedPerformance Measure

Program Code

$782PA&ED:PS&E:

R/W Sup:

Carryover

1.4

Con Sup:

Safety Improvements

$4,481Const:R/W:

17

30

20

Senate:

Assembly:

Congress:

17

30

20Congress

Assembly

Senate

In Santa Cruz and Monterey Counties, fromsouth of Salinas Road to south of Larkin ValleyRoad Undercrossing. Construct MaintenanceVehicle Pullouts (MVPs), repairing guardrail,improve gate access and relocate irrigationequipment.

2452

1C980 $5

Subtotal: $2,905

2018-19 $1,097$49

$1,225

$3,023Total Project Cost: $5,928

05130000213/26/2019

12/31/201811/1/2017PA&ED:

RTL:R/W Cert:

11/21/2019Begin Con:

05-Santa Cruz-1 PriorPriorPrior18-19

201.23569 Location(s)Performance Measure

Program Code

$652PA&ED:PS&E:

R/W Sup:

Carryover

R0.0/R8.1

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,900Const:R/W:

17

29

20

Senate:

Assembly:

Congress:

17

29

20Congress

Assembly

Senate

MANDATESIn and near the city of Santa Cruz, from Route 1to north of Fall Creek Drive. Stormwaterimprovements.2569

1F920 $86

Subtotal: $2,110

2019-20 $1,192$1,287

$812

$4,036Total Project Cost: $6,146

05140000755/4/2020

4/27/202010/4/2017PA&ED:

RTL:R/W Cert:

10/30/2020Begin Con:

05-Santa Cruz-9 PriorPriorPrior19-20

201.3356.3 Acre(s) treated/pollutantPerformance Measure

Program Code

$745PA&ED:PS&E:

R/W Sup:

Carryover

0.1/7.5

Con Sup:

Storm Water Mitigation

$2,024Const:R/W:

17

29

18

Senate:

Assembly:

Congress:

17

29

18Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 240 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Santa Cruz

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Ben Lomond, from Holiday Lane to 4.7miles north of the northern junction of Routes236/9. Replace failed culverts systems and construct energy dissipaters.

2627

1G950 $271

Subtotal: $5,632

2021-22 $2,377$1,078$2,025

$6,925Total Project Cost: $12,557

05160000053/29/20223/1/20228/3/2020PA&ED:

RTL:R/W Cert:

9/7/2022Begin Con:

05-Santa Cruz-9 18-1920-2120-2121-22

201.33516 Acre(s) treated/pollutantPerformance Measure

Program Code

$1,445PA&ED:PS&E:

R/W Sup:

New

8.5/25.5

Con Sup:

Storm Water Mitigation

$5,361Const:R/W:

17

29

20

Senate:

Assembly:

Congress:

17

29

20Congress

Assembly

Senate

In Santa Cruz, from 0.7 mile north of Route1/17 Separation to Beulah Park Undercrossing.Landscape mitigation for EA 05-0Q600.1989Y

0Q601

Subtotal: $507

2018-19 $500$18

$537

$1,055Total Project Cost: $1,562

05140001456/5/20194/5/2019

8/28/2014PA&ED:

RTL:R/W Cert:

1/22/2020Begin Con:

05-Santa Cruz-17PriorPrior18-19

201.33510 Acre(s) treated/pollutantPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

0.7/1.4

Con Sup:

Storm Water Mitigation

$507Const:R/W:

15

27

15, 17

Senate:

Assembly:

Congress:

15

27

15, 17Congress

Assembly

Senate

In Santa Cruz County, on Routes 1, 9, 17, 129,and 152 at various locations. Install AccessiblePedestrian Signals (APS).2590

1G160 $11

Subtotal: $1,711

2018-19 $883$20

$486

$1,661Total Project Cost: $3,372

05140001181/11/201911/8/20188/1/2017PA&ED:

RTL:R/W Cert:

7/15/2019Begin Con:

05-Santa Cruz-Var PriorPriorPrior18-19

201.361176 Curb ramp(s)Performance Measure

Program Code

$272PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Americans with Disabilities Act New Curb Ramps

$1,700Const:R/W:

17

29, 30

18, 20

Senate:

Assembly:

Congress:

17

29, 30

18, 20Congress

Assembly

Senate

Near Watsonville, from 0.1 mile east of BeverlyDrive to Holohan Road/College Road.Construct pedestrian bridge next to the Corralitos Creek Bridge, concrete barrier,retaining wall, curb, gutter and sidewalk to meetAmericans with Disabilities Act (ADA)Standards.

2530

1F620 $247

Subtotal: $3,452

2021-22 $2,430$376

$1,776

$6,203Total Project Cost: $9,655

05140000395/2/20224/1/20227/1/2020PA&ED:

RTL:R/W Cert:

10/22/2022Begin Con:

05-Santa Cruz-152 18-1920-2120-2121-22

201.3615 Curb ramp(s)Performance Measure

Program Code

$1,621PA&ED:PS&E:

R/W Sup:

New

1.9/R2.0

Con Sup:

Americans with Disabilities Act New Curb Ramps

$3,205Const:R/W:

17

29

20

Senate:

Assembly:

Congress:

17

29

20Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 241 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Santa Cruz

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

BRIDGE PRESERVATIONNear Boulder Creek, at San Lorenzo RiverBridge No. 36-0052 (PM 13.61) and KingsCreek Bridge No. 36-0054 (PM 15.49). Replacebridges to maintain standards of safety andreliability.

2655

1H470 $660

Subtotal: $12,588

2021-22 $2,884$888

$4,158

$10,622Total Project Cost: $23,210

051600007810/29/2021

9/3/20214/10/2020PA&ED:

RTL:R/W Cert:

3/4/2022Begin Con:

05-Santa Cruz-9 Prior19-2019-2021-22

201.1102 Bridge(s)Performance Measure

Program Code

$2,692PA&ED:PS&E:

R/W Sup:

Carryover

13.6/15.5

Con Sup:

Bridge Major Rehabilitation

$11,928Const:R/W:

17

29

18

Senate:

Assembly:

Congress:

17

29

18Congress

Assembly

Senate

Near the city of Santa Cruz, on Routes 1 and 17at various locations. Bridge rail replacementand upgrades.2585

1F520

Subtotal: $4,167

2018-19 $902$47

$1,059

$2,008Total Project Cost: $6,175

05140000056/1/20183/1/20185/2/2015PA&ED:

RTL:R/W Cert:

12/1/2018Begin Con:

05-Santa Cruz-1PriorPrior18-19

201.1121375.0 Linear feetPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Rail Replacement and Upgrade

$4,167Const:R/W:

17

29

18, 20

Senate:

Assembly:

Congress:

17

29

18, 20Congress

Assembly

Senate

In Capitola, at Soquel Creek Bridge No. 36-0013. Place Rock Slope Protection (RSP) toprotect bridge foundation. 2736

1H480 $546

Subtotal: $2,774

2021-22 $1,370$196

$1,772

$4,929Total Project Cost: $7,703

05160000797/1/2021

4/29/202112/31/2019PA&ED:

RTL:R/W Cert:

2/1/2022Begin Con:

05-Santa Cruz-1 Prior19-2019-2021-22

201.1191 Bridge(s)Performance Measure

Program Code

$1,591PA&ED:PS&E:

R/W Sup:

Carryover

13.3

Con Sup:

Bridge Preventative Maintenance

$2,228Const:R/W:

17

29

18

Senate:

Assembly:

Congress:

17

29

18Congress

Assembly

Senate

ROADWAY PRESERVATIONNear the city of Santa Cruz, from North AptosUnderpass to Route 9. Rehabilitate pavement.

2432

1C850 $19

Subtotal: $14,971

2018-19 $1,030$10

$1,082

$2,728Total Project Cost: $17,699

05120002406/1/20186/1/2018

8/22/2016PA&ED:

RTL:R/W Cert:

2/1/2019Begin Con:

05-Santa Cruz-1 PriorPriorPrior18-19

201.12132.0 Lane mile(s)Performance Measure

Program Code

$606PA&ED:PS&E:

R/W Sup:

Carryover

10.2/17.5

Con Sup:

Pavement Rehabilitation (CAPM)

$14,952Const:R/W:

17

29

20

Senate:

Assembly:

Congress:

17

29

20Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 242 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Santa Cruz

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Davenport, from 1.4 miles north ofSwanton Road to 0.6 mile south of WaddellCreek. Replace and upgrade existingCorrugated Metal Pipe (CMP) culverts withReinforced Concrete Pipe (RCP) culverts.

1967

0J200 $84

Subtotal: $3,654

2021-22 $1,940$344

$1,365

$4,613Total Project Cost: $8,267

05120000697/19/20217/9/2021

1/30/2020PA&ED:

RTL:R/W Cert:

12/27/2021Begin Con:

05-Santa Cruz-1 Prior19-2019-2021-22

201.1514 Culvert(s) (ea)Performance Measure

Program Code

$964PA&ED:PS&E:

R/W Sup:

Carryover

31.9/35.7

Con Sup:

Drainage System Restoration

$3,570Const:R/W:

17

29

18

Senate:

Assembly:

Congress:

17

29

18Congress

Assembly

Senate

ROADSIDE PRESERVATIONNear Scotts Valley, from 0.06 miles south ofLaurel Road to 0.25 miles north of Laurel Road.Construct wildlife Undercrossing. Funding forPA&ED, PS&E and R/W only. Localcontributions to fund remaining components.

2593

1G260 $138

Subtotal: $138

2019-20 $2,013$226

$2,977Total Project Cost: $3,115

05140001312/4/2021

8/13/20207/17/2018PA&ED:

RTL:R/W Cert:

9/20/2021Begin Con:

05-Santa Cruz-17 Prior18-1918-19

201.2401 Location(s)Performance Measure

Program Code

$738PA&ED:PS&E:

R/W Sup:

Carryover

9.4/9.6

* Con Sup:

Roadside Enhancement

* Const, * Con Sup phase(s) are NOT authorized

* Const:R/W:

17

29

18

Senate:

Assembly:

Congress:

17

29

18Congress

Assembly

Senate

CountySanta Cruz

PA&ED:PS&E:

R/W Sup:Con Sup:

$3,474$62,834

R/W:

Subtotal: $66,308

Const:$12,900$21,889$5,197

$19,605

$59,591

Total (Capital + Support): $125,899

Sorted by: Disctrict, County, Route and Post MilesPage 243 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Shasta($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONNear Viola, from 0.4 mile east to 1.1 miles eastof Bridge Creek Road. Curve improvement.

3673

2H990 $14

Subtotal: $3,114

2019-20 $810$80

$730

$2,290Total Project Cost: $5,404

02170000451/2/2020

12/2/20191/16/2019PA&ED:

RTL:R/W Cert:

5/5/2020Begin Con:

02-Shasta-44 Prior18-1918-1919-20

201.01014 Collision(s) reducedPerformance Measure

Program Code

$670PA&ED:PS&E:

R/W Sup:

Carryover

51.6/52.2

Con Sup:

Safety Improvements

$3,100Const:R/W:

4

2

2

Senate:

Assembly:

Congress:

4

2

2Congress

Assembly

Senate

Near Shasta Lake City, at OBrien SafetyRoadside Rest Area (SRRA). Upgrade potablewater system and wastewater systems.3552

4G580 $3

Subtotal: $3,010

2019-20 $1,180$140$940

$2,660Total Project Cost: $5,670

021400002710/1/20197/1/2019

12/1/2017PA&ED:

RTL:R/W Cert:

3/1/2020Begin Con:

02-Shasta-5 PriorPriorPrior19-20

201.2351 Location(s)Performance Measure

Program Code

$400PA&ED:PS&E:

R/W Sup:

Carryover

R31.0/31.7

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$3,007Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

MANDATESIn Redding, from 0.1 mile north of SouthRedding Underpass to 0.1 mile north ofCalifornia Street. Construct Americans withDisabilities Act (ADA) compliant ramps andsidewalks.

3626

1H720 $402

Subtotal: $2,802

2021-22 $1,200$750

$1,050

$3,000Total Project Cost: $5,802

02160000338/13/20217/9/2021

9/30/2016PA&ED:

RTL:R/W Cert:

2/4/2022Begin Con:

02-Shasta-27318-1918-1921-22

201.37819 Curb ramp(s)Performance Measure

Program Code

$0PA&ED:PS&E:

R/W Sup:

New

14.9/15.7

Con Sup:

Americans with Disabilities Act PedestrianInfrastructure

$2,400Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

BRIDGE PRESERVATIONNear Dunsmuir, at Crag View DriveUndercrossing Bridge No. 06-0095 (PM 66.8);also at Sims Road Undercrossing No. 06-0111(PM 57.4). Replace bridges.

3543

4G41U $36

Subtotal: $16,896

2018-19 $2,880$260

$4,799

$9,189Total Project Cost: $26,085

02180000473/26/20192/22/20192/1/2018PA&ED:

RTL:R/W Cert:

8/27/2019Begin Con:

02-Shasta-5 PriorPriorPrior18-19

201.1102 Bridge(s)Performance Measure

Program Code

$1,250PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Major Rehabilitation

$16,860Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 244 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Shasta($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Lakehead, at O’Brien Undercrossing No.06-0148L. Rehabilitate bridge deck withconcrete overlay, upgrade bridge rails, andconstruct approach slabs.

3630

1H390 $7

Subtotal: $2,222

2020-21 $600$40

$580

$1,470Total Project Cost: $3,692

021600004110/26/20209/25/202011/5/2019PA&ED:

RTL:R/W Cert:

2/16/2021Begin Con:

02-Shasta-5 18-1919-2019-2020-21

201.1101 Bridge(s)Performance Measure

Program Code

$250PA&ED:PS&E:

R/W Sup:

New

R32.2

Con Sup:

Bridge Major Rehabilitation

$2,215Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

ROADWAY PRESERVATIONIn and near Anderson, from Route 273 toSacramento River Bridge. Roadwayrehabilitation, replace bridge, update signageand lighting, and add Intelligent TransportationSystem (ITS) elements.

3702

3H730 $1,221

Subtotal: $34,302

2018-19 $3,000$220

$6,900

$10,120Total Project Cost: $44,422

02180000243/26/20192/22/20198/11/2017PA&ED:

RTL:R/W Cert:

9/24/2019Begin Con:

02-Shasta-5PriorPrior18-19

201.1206.4 Lane mile(s)Performance Measure

Program Code

$0PA&ED:PS&E:

R/W Sup:

Carryover

R3.8/R7.0

Con Sup:

Roadway Rehabilitation (3R)

$33,081Const:R/W:

4

2

2

Senate:

Assembly:

Congress:

4

2

2Congress

Assembly

Senate

In and near Anderson, from south of RiversideAvenue Overcrossing to south of SouthBonnyview Road/Churn Creek Road Overcrossing. Rehabilitate roadway, upgrademedian barrier, update signage and lighting, andadd Intelligent Transportation System (ITS)elements. This project is combined with anexisting STIP project EA 02-4C403.

3670

2H880

Subtotal: $13,900

2018-19

$2,200

$2,200Total Project Cost: $16,100

02170000265/4/2018

11/30/20152/28/2013PA&ED:

RTL:R/W Cert:

10/30/2018Begin Con:

02-Shasta-5

18-19

201.12120.6 Lane mile(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

R6.2/R11.7

Con Sup:

Pavement Rehabilitation (CAPM)

$13,900Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

Near Burney, from 2.6 miles east of CarberryFlat Road to 0.3 mile east of Burney MountainPower Road. Rehabilitate pavement, upgradeguardrail, and make curbs Americans withDisabilities Act (ADA) compliant.

3618

1H570 $436

Subtotal: $11,601

2021-22 $1,300$1,020$2,430

$6,180Total Project Cost: $17,781

02160000364/4/20223/4/20229/8/2020PA&ED:

RTL:R/W Cert:

8/30/2022Begin Con:

02-Shasta-299 18-1920-2119-2021-22

201.12121.4 Lane mile(s)Performance Measure

Program Code

$1,430PA&ED:PS&E:

R/W Sup:

New

67.8/77.8

Con Sup:

Pavement Rehabilitation (CAPM)

$11,165Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 245 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Shasta($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

CountyShasta

PA&ED:PS&E:

R/W Sup:Con Sup:

$2,119$85,728

R/W:

Subtotal: $87,847

Const:$4,000

$10,970$2,510

$19,629

$37,109

Total (Capital + Support): $124,956

Sorted by: Disctrict, County, Route and Post MilesPage 246 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Sierra($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONIn Sierra, and El Dorado counties on Routes 49,89 and 193 at various locations. Upgrade guardrail to current standards.7778

4F630 $60

Subtotal: $1,470

2018-19 $605$10

$590

$1,290Total Project Cost: $2,760

03140002319/1/20188/1/2018

7/25/2017PA&ED:

RTL:R/W Cert:

3/1/2019Begin Con:

03-Sierra-49 PriorPriorPrior18-19

201.01513 Collision(s) reducedPerformance Measure

Program Code

$85PA&ED:PS&E:

R/W Sup:

Carryover

0.0/15.9

Con Sup:

Collision Severity Reduction

$1,410Const:R/W:

1

1, 5

1, 4

Senate:

Assembly:

Congress:

1

1, 5

1, 4Congress

Assembly

Senate

ROADWAY PRESERVATIONNear Truckee and Floriston, from 1.3 miles eastof the Nevada County line to the Nevada Stateline. Stabilize cut-slope erosion and preventrockfall by flattening the slope or installing adrapery system, concrete barrier, and drainagegutter.

7926

2H010 $80

Subtotal: $5,180

2021-22 $860$210$900

$2,340Total Project Cost: $7,520

031700004510/15/202110/1/20218/1/2019PA&ED:

RTL:R/W Cert:

4/1/2022Begin Con:

03-Sierra-80 18-1919-2019-2021-22

201.1501 Location(s)Performance Measure

Program Code

$370PA&ED:PS&E:

R/W Sup:

New

1.3/1.6

Con Sup:

Roadway Protective Betterments

$5,100Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

CountySierra

PA&ED:PS&E:

R/W Sup:Con Sup:

$140$6,510

R/W:

Subtotal: $6,650

Const:$455

$1,465$220

$1,490

$3,630

Total (Capital + Support): $10,280

Sorted by: Disctrict, County, Route and Post MilesPage 247 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Siskiyou

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONIn and near various cities, at various locations,from Shasta County line to Oregon State line(PM R69.293). Enhance traffic safety byimproving the roadside clear recovery zone.

3507

4F520 $95

Subtotal: $3,635

2021-22 $1,000$200

$1,250

$3,450Total Project Cost: $7,085

02130000028/23/20217/23/20215/1/2020PA&ED:

RTL:R/W Cert:

12/14/2021Begin Con:

02-Siskiyou-5 18-1920-2120-2121-22

201.01535 Collision(s) reducedPerformance Measure

Program Code

$1,000PA&ED:PS&E:

R/W Sup:

New

0.0/R69.2

Con Sup:

Collision Severity Reduction

$3,540Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

Near Weed, from 0.2 mile south to 0.3 milenorth of Weed Airport Safety Roadside RestArea (SRRA). Upgrade wastewater and watersystems.

3657

2H130 $11

Subtotal: $1,674

2020-21 $770$30

$680

$1,740Total Project Cost: $3,414

02160001149/16/20208/12/2020

10/16/2019PA&ED:

RTL:R/W Cert:

4/14/2021Begin Con:

02-Siskiyou-5 18-1919-2019-2020-21

201.2352 Location(s)Performance Measure

Program Code

$260PA&ED:PS&E:

R/W Sup:

New

R25.4/R25.9

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$1,663Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

BRIDGE PRESERVATIONNorth of Fort Jones, from 0.3 mile south to 0.3mile north of West Moffett Creek Road atMoffett Creek Bridge No. 02-0042. Bridgereplacement.

3546

4G440 $237

Subtotal: $4,157

2020-21 $700$80

$1,540

$3,660Total Project Cost: $7,817

02140000138/28/20207/31/20209/6/2019PA&ED:

RTL:R/W Cert:

2/26/2021Begin Con:

02-Siskiyou-3 Prior19-2019-2020-21

201.1101 Bridge(s)Performance Measure

Program Code

$1,340PA&ED:PS&E:

R/W Sup:

New

38.0/38.6

Con Sup:

Bridge Major Rehabilitation

$3,920Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

In Dunsmuir, from Central DunsmuirUndercrossing to 0.1 mile north of SiskiyouAvenue at Sacramento River Bridge andOverhead No. 02-0002. Replace southboundbridge deck.

3614

1H480 $269

Subtotal: $14,619

2021-22 $2,660$450

$3,480

$8,030Total Project Cost: $22,649

02160000191/21/2022

12/15/20214/15/2020PA&ED:

RTL:R/W Cert:

9/20/2022Begin Con:

02-Siskiyou-5 Prior19-2019-2021-22

201.1101 Bridge(s)Performance Measure

Program Code

$1,440PA&ED:PS&E:

R/W Sup:

Carryover

2.5/3.0

Con Sup:

Bridge Major Rehabilitation

$14,350Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 248 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Siskiyou

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Mt. Shasta, at Azalea Road OvercrossingNo. 02-0126. Rehabilitate bridge.

3631

1H400 $7

Subtotal: $1,858

2020-21 $750$40

$710

$1,820Total Project Cost: $3,678

021600004210/26/20209/25/202010/7/2019PA&ED:

RTL:R/W Cert:

4/10/2021Begin Con:

02-Siskiyou-5 18-1919-2019-2020-21

201.1101 Bridge(s)Performance Measure

Program Code

$320PA&ED:PS&E:

R/W Sup:

New

R8.3

Con Sup:

Bridge Major Rehabilitation

$1,851Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

In and near Yreka at Louie Road Overcrossing(OC) No. 02-0137 (PM R31.2), Moonlit OaksAvenue Undercrossing (UC) No. 02-0159R&L(PM R45.6), Miner Street UC No. 02-0158R&L(PM R47.6), and North Yreka Separation No. 02-0150R&L (PM R48.2); also in Redding, ShastaCounty, at N273-N5 Connector OC No. 06-0137G (PM R18.5). Establish standard verticalclearance and improve to standard truckcapacity.

ACCELERATED BRIDGE (PA&ED Only)

3696

3H640 $149

Subtotal: $28,349

2020-21 $1,820$90

$6,200

$10,900Total Project Cost: $39,249

02180000037/21/20206/19/20203/1/2019PA&ED:

RTL:R/W Cert:

12/22/2020Begin Con:

02-Siskiyou-5 Prior19-2019-2020-21

201.3228 Bridge(s)Performance Measure

Program Code

$2,790PA&ED:* PS&E:

* R/W Sup:

Carryover

* Con Sup:

Trans Permit Requirements for Bridges

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

$28,200* Const:* R/W:

4

2

2

Senate:

Assembly:

Congress:

4

2

2Congress

Assembly

Senate

ROADWAY PRESERVATIONIn Yreka, from 0.4 mile north of Laura Lane toJuniper Drive; also on Route 263 from Route 3to 1.0 mile south of Long Gulch Road (PM49.07 to 49.41). Reconstruct pavementstructural section, replace sidewalk, driveways,curb ramps and pedestrian signals to meetcurrent Americans with Disabilities Act (ADA)Standards, designate bikeways with new signageand pavement delineation.

3643

1H520 $1,482

Subtotal: $54,432

2021-22 $2,200$5,880$9,650

$19,560Total Project Cost: $73,992

02170000093/21/20223/4/2022

11/4/2019PA&ED:

RTL:R/W Cert:

9/27/2022Begin Con:

02-Siskiyou-3 18-1919-2019-2021-22

201.12013.0 Lane mile(s)Performance Measure

Program Code

$1,830PA&ED:PS&E:

R/W Sup:

New

R46.8/R48.0

Con Sup:

Roadway Rehabilitation (3R)

$52,950Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

In and near Dunsmuir and Mt. Shasta, fromSacramento River Bridge Overhead to BlackButte Overhead. Roadway rehabilitation.

(G13 Contingency)

3685

3H320 $135

Subtotal: $116,175

2021-22 $5,090$80

$12,860

$19,650Total Project Cost: $135,825

02170000973/10/202210/4/202110/2/2020PA&ED:

RTL:R/W Cert:

9/27/2022Begin Con:

02-Siskiyou-5 Prior20-2120-2121-22

201.12225.4 Lane mile(s)Performance Measure

Program Code

$1,620PA&ED:PS&E:

R/W Sup:

Carryover

2.7/R15.9

* Con Sup:

Roadway Rehabilitation (2R)

* Const, * Con Sup phase(s) are NOT authorized

$116,040* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

4

2

2

Senate:

Assembly:

Congress:

4

2

2Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 249 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Siskiyou

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Happy Camp, from 0.3 miles west ofSwillup Creek Bridge to Route 263. Drainagesystem restoration. 3601

1H090 $200

Subtotal: $2,270

2019-20 $730$530

$1,060

$3,360Total Project Cost: $5,630

02150001053/2/2020

2/17/20203/29/2019PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

02-Siskiyou-96 Prior18-1918-1919-20

201.15120 Culvert(s) (ea)Performance Measure

Program Code

$1,040PA&ED:PS&E:

R/W Sup:

Carryover

23.0/103.4

Con Sup:

Drainage System Restoration

$2,070Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

MOBILITYIn Siskiyou and Shasta Counties, on Routes 5and 89 at various locations. UpgradeTransportation Management System (TMS)field elements.

3556

4G630 $196

Subtotal: $3,796

2018-19 $710$140$720

$1,960Total Project Cost: $5,756

02140000301/28/20191/22/2019

12/15/2017PA&ED:

RTL:R/W Cert:

8/6/2019Begin Con:

02-Siskiyou-5 PriorPriorPrior18-19

201.31516 Field element(s)Performance Measure

Program Code

$390PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

$3,600Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

CountySiskiyou

PA&ED:PS&E:

R/W Sup:Con Sup:

$2,781$228,184

R/W:

Subtotal: $230,965

Const:$12,030$16,430$7,520

$38,150

$74,130

Total (Capital + Support): $305,095

Sorted by: Disctrict, County, Route and Post MilesPage 250 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Solano($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MAJOR DAMAGE RESTORATIONIn Benicia, from north of Industrial Way tosouth of Lake Herman Road. Repair slipoutsand stabilize slope.1498M

4J040 $38

Subtotal: $1,078

2019-20 $514$22

$521

$1,617Total Project Cost: $2,695

04150002462/28/2020

11/20/20197/31/2018PA&ED:

RTL:R/W Cert:

9/28/2020Begin Con:

04-Solano-680 Prior18-1918-1919-20

201.1311 Location(s)Performance Measure

Program Code

$560PA&ED:PS&E:

R/W Sup:

Carryover

R1.9/R2.0

Con Sup:

Permanent Restoration

$1,040Const:R/W:

3

14

5

Senate:

Assembly:

Congress:

3

14

5Congress

Assembly

Senate

BRIDGE PRESERVATIONNear Rio Vista, at Miner Slough Bridge No. 23-0035. Replace bridge.

0886

0G660 $2,884

Subtotal: $27,384

2019-20 $3,500$1,098$3,500

$11,098Total Project Cost: $38,482

04000003435/30/20204/30/20209/29/2017PA&ED:

RTL:R/W Cert:

12/20/2020Begin Con:

04-Solano-84 PriorPrior18-1919-20

201.1101 Bridge(s)Performance Measure

Program Code

$3,000PA&ED:PS&E:

R/W Sup:

Carryover

12.0/12.4

Con Sup:

Bridge Major Rehabilitation

$24,500Const:R/W:

5

8

5

Senate:

Assembly:

Congress:

5

8

5Congress

Assembly

Senate

Near Fairfield, at Suisun Creek Bridge No. 23-0007. Scour mitigation.

0487R

4G872 $5

Subtotal: $765

2019-20 $600$20

$600

$2,420Total Project Cost: $3,185

04160001534/1/20204/1/20209/3/2018PA&ED:

RTL:R/W Cert:

10/1/2020Begin Con:

04-Solano-80 Prior18-1918-1919-20

201.1112 Bridge(s)Performance Measure

Program Code

$1,200PA&ED:PS&E:

R/W Sup:

Carryover

14.6

Con Sup:

Bridge Scour Mitigation

$760Const:R/W:

2, 3

10, 11

2, 3

Senate:

Assembly:

Congress:

2, 3

10, 11

2, 3Congress

Assembly

Senate

In and near Vallejo, Dixon and Vacaville, atRoute 80/29 Separation Bridge No. 23-0087,McCune Creek Bridge No. 23-0084L/R andHorse Creek Bridge No. 23-0077L. Bridgepreventative maintenance.

0480N

0J600 $423

Subtotal: $1,802

2019-20 $880$66

$880

$2,816Total Project Cost: $4,618

04140000175/31/20202/28/20208/31/2018PA&ED:

RTL:R/W Cert:

11/2/2020Begin Con:

04-Solano-80 Prior18-1918-1919-20

201.1194 Bridge(s)Performance Measure

Program Code

$990PA&ED:PS&E:

R/W Sup:

Carryover

1.1/34.5

Con Sup:

Bridge Preventative Maintenance

$1,379Const:R/W:

3

11, 14

3, 5

Senate:

Assembly:

Congress:

3

11, 14

3, 5Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 251 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Solano($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Rio Vista, at the Cache Slough FerryCrossing. Upgrade the existing fender systems,concrete ramps, and swing gate systems, modifythe ferry boat deck surface, and install trafficcounter and Vehicle Detection Systems (VDS).

0480D

4H060 $350

Subtotal: $12,980

2021-22 $2,080$260

$2,080

$6,500Total Project Cost: $19,480

04130000816/1/20225/1/2022

10/1/2020PA&ED:

RTL:R/W Cert:

12/1/2022Begin Con:

04-Solano-84 18-1920-2120-2121-22

201.1191 Bridge(s)Performance Measure

Program Code

$2,080PA&ED:PS&E:

R/W Sup:

New

2.5

Con Sup:

Bridge Preventative Maintenance

$12,630Const:R/W:

5

8

3

Senate:

Assembly:

Congress:

5

8

3Congress

Assembly

Senate

In Vallejo, at Route 80/29 Separation BridgeNo. 23-0087. Replace bridge.

ACCELERATED BRIDGE (PA&ED Only)1452F

2K840 $15

Subtotal: $11,937

2019-20 $2,624$22

$2,416

$7,119Total Project Cost: $19,056

04170000316/8/20205/4/2020

12/3/2018PA&ED:

RTL:R/W Cert:

1/15/2021Begin Con:

04-Solano-80 Prior19-2019-2019-20

201.3221 Bridge(s)Performance Measure

Program Code

$2,057PA&ED:* PS&E:

* R/W Sup:

Carryover

1.1

* Con Sup:

Trans Permit Requirements for Bridges

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

$11,922* Const:* R/W:

3

14

5

Senate:

Assembly:

Congress:

3

14

5Congress

Assembly

Senate

In Vallejo, from Magazine Street OvercrossingNo. 23-0066 to Redwood Street OvercrossingNo. 23-0114. Increase vertical clearance at sixovercrossing structures.

ACCELERATED BRIDGE

0481R

0J710 $10

Subtotal: $15,961

2018-19 $2,154$154

$1,859

$6,037Total Project Cost: $21,998

04140000296/30/20197/1/2019

6/29/2018PA&ED:

RTL:R/W Cert:

6/1/2020Begin Con:

04-Solano-80 Prior18-1918-1918-19

201.3226 Bridge(s)Performance Measure

Program Code

$1,870PA&ED:PS&E:

R/W Sup:

Carryover

1.8/4.4

Con Sup:

Trans Permit Requirements for Bridges

$15,951Const:R/W:

3

11

3

Senate:

Assembly:

Congress:

3

11

3Congress

Assembly

Senate

ROADWAY PRESERVATIONIn and near Rio Vista, from Currie Road toSacramento County line. Roadwayrehabilitation.

(G13 Contingency)

0480P

0J630 $2,983

Subtotal: $76,183

2021-22 $5,780$2,890

$11,560

$26,010Total Project Cost: $102,193

04140000202/1/20222/1/2022

10/1/2019PA&ED:

RTL:R/W Cert:

8/1/2022Begin Con:

04-Solano-12 Prior19-2019-2021-22

201.1209.7 Lane mile(s)Performance Measure

Program Code

$5,780PA&ED:PS&E:

R/W Sup:

New

20.6/26.4

* Con Sup:

Roadway Rehabilitation (3R)

* Const, * Con Sup phase(s) are NOT authorized

$73,200* Const:

* Construction Capital and * Construction Support phase are NOT authorized

R/W:

3

11

3

Senate:

Assembly:

Congress:

3

11

3Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 252 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Solano($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

CountySolano

PA&ED:PS&E:

R/W Sup:Con Sup:

$6,708$141,382

R/W:

Subtotal: $148,090

Const:$17,537$18,132$4,532

$23,416

$63,617

Total (Capital + Support): $211,707

Sorted by: Disctrict, County, Route and Post MilesPage 253 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Sonoma

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MAJOR DAMAGE RESTORATIONNear Jenner, from 0.3 to 0.4 mile north ofMyers Grade Road. Permanent restoration ofroadway slipouts.0482T

0J300 $215

Subtotal: $14,071

2020-21 $2,496$208

$2,288

$7,098Total Project Cost: $21,169

041300043312/15/20209/15/20204/15/2019PA&ED:

RTL:R/W Cert:

8/15/2021Begin Con:

04-Sonoma-1 18-1918-1918-1920-21

201.1312 Location(s)Performance Measure

Program Code

$2,106PA&ED:PS&E:

R/W Sup:

New

26.7/27.0

Con Sup:

Permanent Restoration

$13,856Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

Near Petaluma, north of Pepper Road. Repairslide and drainage system.

0481B

0J100 $850

Subtotal: $2,174

2018-19 $850$150$850

$2,273Total Project Cost: $4,447

04130004083/15/2019

12/13/20186/15/2018PA&ED:

RTL:R/W Cert:

8/30/2019Begin Con:

04-Sonoma-101 Prior18-19Prior18-19

201.1311 Location(s)Performance Measure

Program Code

$423PA&ED:PS&E:

R/W Sup:

Carryover

9.0

Con Sup:

Permanent Restoration

$1,324Const:R/W:

2

2

5

Senate:

Assembly:

Congress:

2

2

5Congress

Assembly

Senate

COLLISION REDUCTIONNear Schellville, from north of Tolay CreekBridge to south of Yellow Creek Bridge. Widenfor standard shoulders, upgrade curves tostandard, and install rumble strips.

0738

0G680 $6,264

Subtotal: $31,264

2019-20 $3,750$1,800$4,200

$12,250Total Project Cost: $43,514

04000200076/15/20206/1/2020

6/30/2018PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

04-Sonoma-121 Prior18-19Prior19-20

201.01013 Collision(s) reducedPerformance Measure

Program Code

$2,500PA&ED:PS&E:

R/W Sup:

Carryover

3.4/6.5

Con Sup:

Safety Improvements

$25,000Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

In Sonoma County, on Routes 12 and 116 atvarious locations; also in Marine County, onRoutes 1 and 131 at various locations; and inNapa County on Routes 29 and 121 at variouslocations. Install hybrid beacons, stop and yieldlines, crosswalks and bulbouts, and upgrade curb ramps to enhance pedestrian safety.

1492G

0K130 $36

Subtotal: $2,813

2021-22 $960$70

$850

$2,680Total Project Cost: $5,493

04160000451/2/20229/1/20215/1/2020PA&ED:

RTL:R/W Cert:

6/1/2022Begin Con:

04-Sonoma-12 18-1919-2019-2021-22

201.01527 Collision(s) reducedPerformance Measure

Program Code

$800PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Collision Severity Reduction

$2,777Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 254 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Sonoma

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In various cities on Routes 12, 101, and 116 atvarious locations; also in Marin County onRoute 101 at various locations. Highway workersafety improvements.

0480E

0J680 $10

Subtotal: $2,200

2018-19 $550$44

$550

$1,452Total Project Cost: $3,652

04140000255/1/2019

3/20/201910/31/2017PA&ED:

RTL:R/W Cert:

12/10/2019Begin Con:

04-Sonoma-12 PriorPriorPrior18-19

201.23527 Location(s)Performance Measure

Program Code

$308PA&ED:PS&E:

R/W Sup:

Carryover

9.5/31.3

Con Sup:

Roadside Safety Improvements/ Freeway Maintenance Access

$2,190Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

MANDATESNear Monte Rio and Cloverdale, on Routes 116and 128; also in Marin County, on Route 101, at0.4 mile north of Sir Francis Drake Boulevard(PM 9.25). Stabilized soil and erosion controlto mitigate for storm water quality.

1487F

2J840 $370

Subtotal: $3,186

2019-20 $670$80

$655

$2,090Total Project Cost: $5,276

041500008512/1/2019

11/30/20199/30/2018PA&ED:

RTL:R/W Cert:

5/15/2020Begin Con:

04-Sonoma-116 Prior18-19Prior19-20

201.33512.1 Acre(s) treated/pollutantPerformance Measure

Program Code

$685PA&ED:PS&E:

R/W Sup:

Carryover

8.5/10.5

Con Sup:

Storm Water Mitigation

$2,816Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

Near Guerneville, from Brookside Lane to RiverRoad. Upgrade curb ramps and sidewalk, andinstall Accessible Pedestrian Signals (APS)pushbuttons to make facilities compliant withthe Americans with Disabilities Act (ADA)Standards.

1491B

4J460 $68

Subtotal: $3,058

2021-22 $850$225$850

$2,225Total Project Cost: $5,283

04150003515/2/2022

1/20/20224/1/2020PA&ED:

RTL:R/W Cert:

11/11/2022Begin Con:

04-Sonoma-116 18-1919-2019-2021-22

201.36118 Curb ramp(s)Performance Measure

Program Code

$300PA&ED:PS&E:

R/W Sup:

New

11.8/R12.2

Con Sup:

Americans with Disabilities Act New Curb Ramps

$2,990Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

BRIDGE PRESERVATIONIn and near Sonoma, at Sonoma Creek BridgeNo. 20-0027 and Hooker Creek Bridge No. 20-0030. Scour mitigation.0269M

4H050 $150

Subtotal: $9,150

2019-20 $2,650$500

$2,000

$6,669Total Project Cost: $15,819

04130000802/7/2020

12/16/20196/1/2018PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

04-Sonoma-12 PriorPriorPrior19-20

201.1112 Bridge(s)Performance Measure

Program Code

$1,519PA&ED:PS&E:

R/W Sup:

Carryover

25.8/33.3

Con Sup:

Bridge Scour Mitigation

$9,000Const:R/W:

2

2

1

Senate:

Assembly:

Congress:

2

2

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 255 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Sonoma

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Santa Rosa, at Todd RoadOvercrossing (OC) No. 20-0172 (PM 16.54) andBaker Avenue OC No. 20-0173 (PM 19.00);also in Marin County near Navato, at MillerCreek Road OC No. 27-0082 (PM 15.57).Upgrade bridge rails.

1451A

2K240 $116

Subtotal: $4,459

2021-22 $780$130$988

$2,548Total Project Cost: $7,007

04160003949/1/20218/1/2021

10/1/2019PA&ED:

RTL:R/W Cert:

3/1/2021Begin Con:

04-Sonoma-101 18-1919-2019-2021-22

201.1121395.0 Linear feetPerformance Measure

Program Code

$650PA&ED:PS&E:

R/W Sup:

New

16.5/19.0

Con Sup:

Bridge Rail Replacement and Upgrade

$4,343Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

Near Petaluma, at San Antonio Creek BridgesNo. 20-0019L/R. Abutment scour mitigationand channel sediment cleaning to addressflooding.

1487D

3J080 $160

Subtotal: $1,157

2021-22 $416$24

$468

$1,890Total Project Cost: $3,047

041500007812/1/202112/1/202110/1/2020PA&ED:

RTL:R/W Cert:

6/1/2022Begin Con:

04-Sonoma-101 Prior20-2120-2121-22

201.1192 Bridge(s)Performance Measure

Program Code

$982PA&ED:PS&E:

R/W Sup:

Carryover

0.0

Con Sup:

Bridge Preventative Maintenance

$997Const:R/W:

3

10

2

Senate:

Assembly:

Congress:

3

10

2Congress

Assembly

Senate

ROADWAY PRESERVATIONIn and near Santa Rosa, from Llano Road toFarmers Lane. Rehabilitate pavement, upgradeguardrail to make standard and upgrade curbramps to make Americans with Disabilities Act(ADA) compliant.

1493M

0K520 $280

Subtotal: $27,961

2021-22 $2,900$66

$3,350

$8,400Total Project Cost: $36,361

041600009812/1/202111/1/20214/1/2020PA&ED:

RTL:R/W Cert:

5/2/2022Begin Con:

04-Sonoma-12 18-1919-2019-2021-22

201.12122.0 Lane mile(s)Performance Measure

Program Code

$2,084PA&ED:PS&E:

R/W Sup:

New

11.0/T17.4

Con Sup:

Pavement Rehabilitation (CAPM)

$27,681Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

In and near Sonoma, from Vallejo Avenue toeast of Leveroni Road/Napa Road. Pavementrehabilitation.0488K

1J360 $5

Subtotal: $6,213

2019-20 $870$62

$746

$2,486Total Project Cost: $8,699

04140002022/1/20201/2/20204/1/2018PA&ED:

RTL:R/W Cert:

7/30/2020Begin Con:

04-Sonoma-12 PriorPriorPrior19-20

201.1217.6 Lane mile(s)Performance Measure

Program Code

$808PA&ED:PS&E:

R/W Sup:

Carryover

35.1/38.9

Con Sup:

Pavement Rehabilitation (CAPM)

$6,208Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 256 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Sonoma

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Windsor, Healdsburg, andCloverdale, from Old Redwood Highway to 2.0miles south of Mendocino County line.Roadway rehabilitation.

1482F

0J642 $890

Subtotal: $69,090

2018-19 $6,799$170

$7,600

$19,718Total Project Cost: $88,808

04140004766/28/20196/20/20196/30/2018PA&ED:

RTL:R/W Cert:

11/1/2019Begin Con:

04-Sonoma-101 PriorPriorPrior18-19

201.12243.2 Lane mile(s)Performance Measure

Program Code

$5,149PA&ED:PS&E:

R/W Sup:

Carryover

29.3/R54.3

Con Sup:

Roadway Rehabilitation (2R)

$68,200Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

Near Jenner, from south of Fort Ross Road tonorth of Moon Rock Campground at various locations. Rehabilitate drainage culverts.1453J

1K730 $321

Subtotal: $4,577

2021-22 $1,369$429

$1,385

$3,927Total Project Cost: $8,504

04160003076/1/2022

6/15/202210/15/2020PA&ED:

RTL:R/W Cert:

1/1/2023Begin Con:

04-Sonoma-1 Prior20-2120-2121-22

201.15122 Culvert(s) (ea)Performance Measure

Program Code

$744PA&ED:PS&E:

R/W Sup:

Carryover

30.8/40.6

Con Sup:

Drainage System Restoration

$4,256Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

Near Gualala, from north of Moon RockCampground to 0.1 mile north of Vantage Road.Rehabilitate drainage culverts.1462M

1K750 $382

Subtotal: $5,143

2021-22 $1,571$286

$1,040

$3,947Total Project Cost: $9,090

04160003096/15/20226/15/2022

10/15/2020PA&ED:

RTL:R/W Cert:

1/16/2023Begin Con:

04-Sonoma-1 Prior20-2120-2121-22

201.15126 Culvert(s) (ea)Performance Measure

Program Code

$1,050PA&ED:PS&E:

R/W Sup:

Carryover

41.5/54.6

Con Sup:

Drainage System Restoration

$4,761Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

MOBILITYNear Vallejo, at east of Route 121. ReplaceWeigh-in-Motion (WIM) systems.

0763L

1A210 $10

Subtotal: $2,290

2018-19 $592$20

$554

$1,672Total Project Cost: $3,962

04140004876/15/20195/1/20194/1/2018PA&ED:

RTL:R/W Cert:

9/1/2019Begin Con:

04-Sonoma-37 PriorPriorPrior18-19

201.3212 Location(s)Performance Measure

Program Code

$506PA&ED:PS&E:

R/W Sup:

Carryover

2.6

Con Sup:

Weigh Stations

$2,280Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 257 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Sonoma

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

CountySonoma

PA&ED:PS&E:

R/W Sup:Con Sup:

$10,127$178,679

R/W:

Subtotal: $188,806

Const:$20,614$28,073$4,264

$28,374

$81,325

Total (Capital + Support): $270,131

Sorted by: Disctrict, County, Route and Post MilesPage 258 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Stanislaus

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONNear Westley, at the Westley Safety RoadsideRest Area (SRRA). Upgrade water andwastewater systems.3009

0W630 $5

Subtotal: $4,006

2018-19 $904$6

$806

$1,976Total Project Cost: $5,982

10120000218/1/20187/2/2018

6/30/2015PA&ED:

RTL:R/W Cert:

3/1/2019Begin Con:

10-Stanislaus-5 PriorPriorPrior18-19

201.2351 Location(s)Performance Measure

Program Code

$260PA&ED:PS&E:

R/W Sup:

Carryover

27.0/27.5

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$4,001Const:R/W:

12

26

18

Senate:

Assembly:

Congress:

12

26

18Congress

Assembly

Senate

In and near Turlock, from north of Golf Road tonorth of Taylor Road. Highway worker safety improvements.3143

0X660 $3

Subtotal: $2,096

2018-19 $595$18

$574

$1,493Total Project Cost: $3,589

101300024911/15/201810/15/2018

7/7/2017PA&ED:

RTL:R/W Cert:

5/2/2019Begin Con:

10-Stanislaus-99 PriorPriorPrior18-19

201.23540 Location(s)Performance Measure

Program Code

$306PA&ED:PS&E:

R/W Sup:

Carryover

R1.1/R7.3

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,093Const:R/W:

12

26

19

Senate:

Assembly:

Congress:

12

26

19Congress

Assembly

Senate

In and near Modesto, at various locations from0.1 mile south of Modesto Undercrossing toWoodland Avenue. Pave areas behind the goreand at slopes, upgrade guardrail and placevegetative control and construct MaintenanceVehicle Pullouts (MVPs) to reduce maintenanceand improve highway worker safety.

3189

0X670 $8

Subtotal: $3,700

2019-20 $1,232$0

$673

$2,235Total Project Cost: $5,935

101600002710/1/20199/15/20193/1/2019PA&ED:

RTL:R/W Cert:

4/15/2020Begin Con:

10-Stanislaus-99 18-1918-19

19-20

201.23531 Location(s)Performance Measure

Program Code

$330PA&ED:PS&E:

R/W Sup:

New

R13.8/R17.6

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$3,692Const:R/W:

14

25

11

Senate:

Assembly:

Congress:

14

25

11Congress

Assembly

Senate

MANDATESIn Modesto, from 0.1 mile south of KansasAvenue and 0.4 mile north of Route 132Separation; also on adopted Route 132alignment right-of-way, from 0.2 mile west ofEmerald Avenue and 0.3 mile east of EmeraldAvenue (PM 13.7/14.3). Hazardous wastemitigation.

3125

1E700 $27

Subtotal: $2,427

2018-19 $916$18

$900

$2,647Total Project Cost: $5,074

101500011511/1/201810/1/20183/15/2018PA&ED:

RTL:R/W Cert:

3/1/2019Begin Con:

10-Stanislaus-99 PriorPriorPrior18-19

201.3303 Location(s)Performance Measure

Program Code

$813PA&ED:PS&E:

R/W Sup:

Carryover

R16.5/R16.7

Con Sup:

Hazardous Waste Mitigation

$2,400Const:R/W:

12

26

18

Senate:

Assembly:

Congress:

12

26

18Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 259 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Stanislaus

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Riverbank, at 2nd Street and 4th Street.Upgrade curb ramps, sidewalk and crosswalks.

3010B

0W902 $87

Subtotal: $397

2018-19 $715$180$200

$1,095Total Project Cost: $1,492

10170001556/14/20195/31/2019

PA&ED:

RTL:R/W Cert:

1/31/2020Begin Con:

10-Stanislaus-108PriorPrior18-19

201.3616 Curb ramp(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Americans with Disabilities Act New Curb Ramps

$310Const:R/W:

Senate:

Assembly:

Congress:Congress

Assembly

Senate

In Waterford, from Reinway Avenue to F Street.Upgrade pedestrian facilities to make compliantwith the Americans with Disabilities Act (ADA)Standards.

3241

1G420 $84

Subtotal: $2,084

2021-22 $1,337$723$718

$3,461Total Project Cost: $5,545

10170000139/1/20218/2/2021

5/29/2019PA&ED:

RTL:R/W Cert:

3/18/2022Begin Con:

10-Stanislaus-132 18-1918-1918-1921-22

201.36122 Curb ramp(s)Performance Measure

Program Code

$683PA&ED:PS&E:

R/W Sup:

New

27.2/28.0

Con Sup:

Americans with Disabilities Act New Curb Ramps

$2,000Const:R/W:

14

26

18

Senate:

Assembly:

Congress:

14

26

18Congress

Assembly

Senate

ROADWAY PRESERVATIONIn and near Riverbank, at 8th Street. Repairslope with retaining wall.

5411

0H480 $52

Subtotal: $1,876

2018-19 $1,439$98

$631

$2,168Total Project Cost: $4,044

10120001934/17/20192/28/20196/30/2015PA&ED:

RTL:R/W Cert:

10/30/2019Begin Con:

10-Stanislaus-108PriorPrior18-19

201.1502 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

33.2

Con Sup:

Roadway Protective Betterments

$1,824Const:R/W:

12, 14

25, 26

18

Senate:

Assembly:

Congress:

12, 14

25, 26

18Congress

Assembly

Senate

In and near Ceres and Modesto, at variouslocations from Mitchell Road to KansasAvenue; also in Merced County, on Route 59near the city of Merced, at Childs Avenue (PM14.0). Upgrade drainage pump plants.

3251

1E620 $13

Subtotal: $6,453

2020-21 $1,142$93

$1,991

$3,504Total Project Cost: $9,957

10160000179/9/2020

8/10/20206/29/2019PA&ED:

RTL:R/W Cert:

3/26/2021Begin Con:

10-Stanislaus-99 18-1919-2019-2020-21

201.1516 Culvert(s) (ea)Performance Measure

Program Code

$278PA&ED:PS&E:

R/W Sup:

New

R10.0/R16.8

Con Sup:

Drainage System Restoration

$6,440Const:R/W:

12

17, 25, 26

18

Senate:

Assembly:

Congress:

12

17, 25, 26

18Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 260 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Stanislaus

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MOBILITYNear Ceres and Modesto, in the northbounddirection from Hatch Road onramp to S. 9thStreet offramp. Construct auxiliary lane.0037

0L870 $1,259

Subtotal: $5,009

2019-20 $1,427$141

$1,012

$3,690Total Project Cost: $8,699

10150000036/1/20205/1/20202/1/2018PA&ED:

RTL:R/W Cert:

11/16/2020Begin Con:

10-Stanislaus-99 PriorPriorPrior19-20

201.310110 Daily vehicle hour(s) of delay (DVHD)Performance Measure

Program Code

$1,110PA&ED:PS&E:

R/W Sup:

Carryover

R13.4/R13.8

Con Sup:

Operational Improvements

$3,750Const:R/W:

12

26

18

Senate:

Assembly:

Congress:

12

26

18Congress

Assembly

Senate

In San Joaquin, Merced, Stanislaus, andSacramento Counties, at various routes andlocations. Upgrade TTI System.3286

1G440 $6

Subtotal: $1,625

2019-20 $377$4

$401

$945Total Project Cost: $2,570

10180000834/7/2020

1/28/20207/1/2019PA&ED:

RTL:R/W Cert:

8/17/2020Begin Con:

10-Stanislaus-99 18-1918-1918-1919-20

201.315161 Field element(s)Performance Measure

Program Code

$163PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Transportation Management Systems

$1,619Const:R/W:

5, 12, 14, 18

26

11, 13, 18

Senate:

Assembly:

Congress:

5, 12, 14, 18

26

11, 13, 18Congress

Assembly

Senate

CountyStanislaus

PA&ED:PS&E:

R/W Sup:Con Sup:

$1,544$28,129

R/W:

Subtotal: $29,673

Const:$3,943

$10,084$1,281$7,906

$23,214

Total (Capital + Support): $52,887

Sorted by: Disctrict, County, Route and Post MilesPage 261 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Sutter($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONIn Live Oak, at Elm Street and PenningtonRoad. Intersection safety improvements.

8381

2H230 $100

Subtotal: $3,900

2019-20 $630$620$660

$2,410Total Project Cost: $6,310

03170000839/1/20199/1/20198/1/2017PA&ED:

RTL:R/W Cert:

3/1/2020Begin Con:

03-Sutter-99 PriorPriorPrior19-20

201.01051 Collision(s) reducedPerformance Measure

Program Code

$500PA&ED:PS&E:

R/W Sup:

Carryover

40.0/40.5

Con Sup:

Safety Improvements

$3,800Const:R/W:

4

3

3

Senate:

Assembly:

Congress:

4

3

3Congress

Assembly

Senate

ROADWAY PRESERVATIONIn Live Oak, from 0.1 mile north of ColemanAvenue to 0.2 mile north of Ramsdell Drive.Roadway rehabilitation.8378

1H150

Subtotal: $18,100

2019-20 $380$50

$1,500

$1,950Total Project Cost: $20,050

03160000619/1/20199/1/20199/1/2018PA&ED:

RTL:R/W Cert:

3/1/2020Begin Con:

03-Sutter-99 Prior19-20Prior19-20

201.1204.8 Lane mile(s)Performance Measure

Program Code

$20PA&ED:PS&E:

R/W Sup:

Carryover

39.4/41.0

Con Sup:

Roadway Rehabilitation (3R)

$18,100Const:R/W:

4

3

3

Senate:

Assembly:

Congress:

4

3

3Congress

Assembly

Senate

ROADSIDE PRESERVATIONIn Sutter, Glenn, Colusa, Yuba, Placer, Yolo,and Sacramento Counties, at various locations.Advance mitigation credit purchases for futureSHOPP construction projects expected toimpact sensitive species.

8380

1H520 $1,400

Subtotal: $1,400

2018-19 $4$43$1

$110Total Project Cost: $1,510

03160001763/4/20193/4/20192/1/2019PA&ED:

RTL:R/W Cert:

5/1/2019Begin Con:

03-Sutter-99 Prior19-2019-2018-19

201.2409 Location(s)Performance Measure

Program Code

$62PA&ED:PS&E:

R/W Sup:

Carryover

0.0/42.4

Con Sup:

Roadside Enhancement

Const:R/W:

1, 3

3, 7

4, 6

Senate:

Assembly:

Congress:

1, 3

3, 7

4, 6Congress

Assembly

Senate

CountySutter

PA&ED:PS&E:

R/W Sup:Con Sup:

$1,500$21,900

R/W:

Subtotal: $23,400

Const:$582

$1,014$713

$2,161

$4,470

Total (Capital + Support): $27,870

Sorted by: Disctrict, County, Route and Post MilesPage 262 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Tehama

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONNear Red Bluff, from 2.3 miles east to 2.8 mileseast of Dry Creek Bridge. Curve improvement.

3640

1H970 $216

Subtotal: $3,216

2019-20 $670$210$670

$1,940Total Project Cost: $5,156

02160000518/16/20197/19/20195/10/2018PA&ED:

RTL:R/W Cert:

11/29/2019Begin Con:

02-Tehama-36 PriorPriorPrior19-20

201.01020 Collision(s) reducedPerformance Measure

Program Code

$390PA&ED:PS&E:

R/W Sup:

Carryover

12.6/13.1

Con Sup:

Safety Improvements

$3,000Const:R/W:

4

3

1

Senate:

Assembly:

Congress:

4

3

1Congress

Assembly

Senate

Near Red Bluff, from west of Basler Road toeast of Diamond Star Road. Curve improvement.3663

2H630 $476

Subtotal: $3,676

2019-20 $885$685

$1,200

$3,465Total Project Cost: $7,141

02160001563/26/20202/24/2020

11/20/2018PA&ED:

RTL:R/W Cert:

7/14/2020Begin Con:

02-Tehama-36 Prior18-1918-1919-20

201.01016 Collision(s) reducedPerformance Measure

Program Code

$695PA&ED:PS&E:

R/W Sup:

Carryover

26.6/27.6

Con Sup:

Safety Improvements

$3,200Const:R/W:

4

3

1

Senate:

Assembly:

Congress:

4

3

1Congress

Assembly

Senate

Near Mineral, from 0.1 mile to 1.2 miles east ofRoute 89. Curve improvement.

3641

1H740 $401

Subtotal: $4,725

2019-20 $751$50

$1,240

$2,881Total Project Cost: $7,606

02160000527/1/2019

5/31/20193/2/2018PA&ED:

RTL:R/W Cert:

10/15/2019Begin Con:

02-Tehama-36 PriorPriorPrior19-20

201.01024 Collision(s) reducedPerformance Measure

Program Code

$840PA&ED:PS&E:

R/W Sup:

Carryover

87.8/88.8

Con Sup:

Safety Improvements

$4,324Const:R/W:

4

3

1

Senate:

Assembly:

Congress:

4

3

1Congress

Assembly

Senate

Near Red Bluff, from Nine Mile HillOvercrossing to 0.1 mile north of BowmanRoad Overcrossing. Improve median clearrecovery zone and widen inside shoulder tomake standard for enhanced errant vehiclesafety.

3632

1H470 $470

Subtotal: $5,000

2020-21 $800$40

$1,030

$2,800Total Project Cost: $7,800

02160000443/22/20212/19/20213/2/2020PA&ED:

RTL:R/W Cert:

8/17/2021Begin Con:

02-Tehama-5 18-1919-2019-2020-21

201.01530 Collision(s) reducedPerformance Measure

Program Code

$930PA&ED:PS&E:

R/W Sup:

New

36.3/41.6

Con Sup:

Collision Severity Reduction

$4,530Const:R/W:

4

3

1

Senate:

Assembly:

Congress:

4

3

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 263 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Tehama

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MANDATESNear Los Molinos, from Josephine Street to LosMolinos Creek Bridge. Construct curb ramps,sidewalks, lighting and drainage improvements.3606

1H320 $891

Subtotal: $5,491

2018-19 $460$230$640

$1,640Total Project Cost: $7,131

02150001263/19/20192/12/2019

12/15/2017PA&ED:

RTL:R/W Cert:

8/3/2019Begin Con:

02-Tehama-99 PriorPriorPrior18-19

201.37828 Curb ramp(s)Performance Measure

Program Code

$310PA&ED:PS&E:

R/W Sup:

Carryover

12.0/12.6

Con Sup:

Americans with Disabilities Act PedestrianInfrastructure

$4,600Const:R/W:

4

3

1

Senate:

Assembly:

Congress:

4

3

1Congress

Assembly

Senate

BRIDGE PRESERVATIONNear Los Molinos, from 0.2 mile south to 0.2mile north of Champlin Slough Bridge No. 08-0006. Replace bridge to correct scour criticalconditions.

3642

1H510 $90

Subtotal: $4,460

2021-22 $1,170$90

$990

$3,100Total Project Cost: $7,560

021600014811/24/202110/22/2021

5/5/2020PA&ED:

RTL:R/W Cert:

4/19/2022Begin Con:

02-Tehama-99 18-1920-2120-2121-22

201.1111 Bridge(s)Performance Measure

Program Code

$850PA&ED:PS&E:

R/W Sup:

New

9.0/9.3

Con Sup:

Bridge Scour Mitigation

$4,370Const:R/W:

4

3

1

Senate:

Assembly:

Congress:

4

3

1Congress

Assembly

Senate

In Red Bluff, at Sacramento River Bridge No.08-0095L/R. Retrofit bridges.

3515

4F590 $56

Subtotal: $22,156

2019-20 $1,659$280

$3,962

$7,493Total Project Cost: $29,649

021300001012/25/201911/24/20197/17/2018PA&ED:

RTL:R/W Cert:

6/24/2020Begin Con:

02-Tehama-5 Prior18-1918-1919-20

201.1132 Bridge(s)Performance Measure

Program Code

$1,592PA&ED:PS&E:

R/W Sup:

Carryover

R25.4

Con Sup:

Bridge Seismic Restoration

$22,100Const:R/W:

4

2

2

Senate:

Assembly:

Congress:

4

2

2Congress

Assembly

Senate

In Tehama County, on Routes 5, 32, and 36 atvarious locations; also in Shasta County onRoutes 5 and 44; also in Lassen County onRoute 299 at various locations. Bridge scourprevention at nine bridges.

3549

4G530 $147

Subtotal: $1,547

2019-20 $720$50

$600

$2,150Total Project Cost: $3,697

02140000233/30/20202/28/20202/18/2019PA&ED:

RTL:R/W Cert:

8/26/2020Begin Con:

02-Tehama-Var Prior18-1918-1919-20

201.1199 Bridge(s)Performance Measure

Program Code

$780PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Preventative Maintenance

$1,400Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 264 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Tehama

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

ROADWAY PRESERVATIONIn Red Bluff, from east of Baker Road to east ofEast Sand Slough Bridge. Pavementrehabilitation.3558

4G540 $122

Subtotal: $6,722

2019-20 $650$240

$1,020

$2,610Total Project Cost: $9,332

02140000248/2/20197/2/2019

12/22/2017PA&ED:

RTL:R/W Cert:

2/19/2020Begin Con:

02-Tehama-36 PriorPriorPrior19-20

201.12110.1 Lane mile(s)Performance Measure

Program Code

$700PA&ED:PS&E:

R/W Sup:

Carryover

40.3/42.1

Con Sup:

Pavement Rehabilitation (CAPM)

$6,600Const:R/W:

4

3

1

Senate:

Assembly:

Congress:

4

3

1Congress

Assembly

Senate

Near Red Bluff, from Shasta County line toRoute 32 at various locations. Drainage systemrestoration.3550

4G560 $351

Subtotal: $2,876

2019-20 $660$620

$1,310

$3,350Total Project Cost: $6,226

021400002510/10/2019

9/3/20197/23/2018PA&ED:

RTL:R/W Cert:

2/13/2020Begin Con:

02-Tehama-36 Prior18-1918-1919-20

201.15125 Culvert(s) (ea)Performance Measure

Program Code

$760PA&ED:PS&E:

R/W Sup:

Carryover

0.0/100.0

Con Sup:

Drainage System Restoration

$2,525Const:R/W:

4

3

1

Senate:

Assembly:

Congress:

4

3

1Congress

Assembly

Senate

MOBILITYNear Red Bluff, from 0.3 mile north of SnivelyRoad Overcrossing to 0.4 mile north ofBowman Road Overcrossing. Upgradesouthbound Cottonwood Commercial VehicleEnforcement Facility (CVEF).

3611

1H680 $35

Subtotal: $13,235

2021-22 $2,170$50

$2,320

$4,990Total Project Cost: $18,225

021600001011/8/202110/8/20215/5/2020PA&ED:

RTL:R/W Cert:

5/17/2022Begin Con:

02-Tehama-5 18-1920-2120-2121-22

201.3211 Location(s)Performance Measure

Program Code

$450PA&ED:PS&E:

R/W Sup:

New

39.0/41.9

Con Sup:

Weigh Stations

$13,200Const:R/W:

4

3

1

Senate:

Assembly:

Congress:

4

3

1Congress

Assembly

Senate

ROADSIDE PRESERVATIONIn Tehama, Lassen, Modoc, Plumas, Shasta, andTrinity Counties at various locations. Advancemitigation credit purchases for future SHOPPconstruction projects expected to impactsensitive habitats.

3627

1H640 $1,357

Subtotal: $1,357

2018-19 $0$100

$0

$100Total Project Cost: $1,457

02160000319/14/20189/14/20187/2/2018PA&ED:

RTL:R/W Cert:

10/15/2018Begin Con:

02-Tehama-Var

Prior

201.2406 Location(s)Performance Measure

Program Code

$0PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Roadside Enhancement

$0Const:R/W:

1, 4

1, 3

1

Senate:

Assembly:

Congress:

1, 4

1, 3

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 265 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Tehama

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

CountyTehama

PA&ED:PS&E:

R/W Sup:Con Sup:

$4,612$69,849

R/W:

Subtotal: $74,461

Const:$8,297

$10,595$2,645

$14,982

$36,519

Total (Capital + Support): $110,980

Sorted by: Disctrict, County, Route and Post MilesPage 266 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Trinity($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONNear Platina, from 3.7 miles to 3.0 miles west ofHayfork Creek Bridge. Curve improvement.

3653

2H050 $52

Subtotal: $5,332

2019-20 $1,130$130

$1,680

$3,700Total Project Cost: $9,032

02160000932/18/20202/4/20202/1/2019PA&ED:

RTL:R/W Cert:

7/15/2020Begin Con:

02-Trinity-36 Prior18-1918-1919-20

201.01012 Collision(s) reducedPerformance Measure

Program Code

$760PA&ED:PS&E:

R/W Sup:

Carryover

R34.7/R35.3

Con Sup:

Safety Improvements

$5,280Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

Near Salyer, from 0.1 mile east to 0.6 mile eastof White House Gulch Road. Improve roadsideclear recovery zone.3557

4G500 $166

Subtotal: $4,266

2019-20 $1,655$70

$2,135

$4,410Total Project Cost: $8,676

02140000319/16/20198/16/20194/27/2018PA&ED:

RTL:R/W Cert:

3/3/2020Begin Con:

02-Trinity-299 Prior18-1918-1919-20

201.0153 Collision(s) reducedPerformance Measure

Program Code

$550PA&ED:PS&E:

R/W Sup:

Carryover

1.9/2.3

Con Sup:

Collision Severity Reduction

$4,100Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

In Trinity County, on Route 299 and Route 3 atvarious locations; also in Shasta County on Route 299 at PM 0.1. Make worker safety improvements.

3555

4G610 $79

Subtotal: $2,579

2018-19 $745$160$775

$2,105Total Project Cost: $4,684

02140000283/18/20192/11/201911/9/2017PA&ED:

RTL:R/W Cert:

8/13/2019Begin Con:

02-Trinity-299 PriorPriorPrior18-19

201.23512 Location(s)Performance Measure

Program Code

$425PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,500Const:R/W:

1, 2

1, 2

1, 2

Senate:

Assembly:

Congress:

1, 2

1, 2

1, 2Congress

Assembly

Senate

Near Salyer, at the Francis B. Matthews SafetyRoadside Rest Area (SRRA). Upgrade potable water system and wastewater system. 3559

4G620 $0

Subtotal: $2,300

2019-20 $860$50

$590

$1,970Total Project Cost: $4,270

02140000298/15/20197/1/2019

8/16/2018PA&ED:

RTL:R/W Cert:

4/8/2020Begin Con:

02-Trinity-299 Prior18-19Prior19-20

201.2351 Location(s)Performance Measure

Program Code

$470PA&ED:PS&E:

R/W Sup:

Carryover

3.6

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,300Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 267 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Trinity($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MANDATESNear Douglas City, at various locations from 1.2miles east of Lewiston Road to 0.5 mile west ofShasta County line. Perform storm watermitigation improvements at sixteen locations tomeet Statewide National Pollutant DischargeEliminating System (NPDES) permit mandategoals.

3637

1H700 $345

Subtotal: $3,545

2021-22 $1,200$380

$1,100

$3,540Total Project Cost: $7,085

02160000493/28/20222/25/20229/8/2020PA&ED:

RTL:R/W Cert:

8/30/2022Begin Con:

02-Trinity-299 18-1920-2120-2121-22

201.335108 Acre(s) treated/pollutantPerformance Measure

Program Code

$860PA&ED:PS&E:

R/W Sup:

New

64.7/71.7

Con Sup:

Storm Water Mitigation

$3,200Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

BRIDGE PRESERVATIONNear Trinity Center, from north of Preacher Meadows Road to north of El Dorado Way. Replace Swift Creek Bridge No. 05-0059. 3485

4F220 $820

Subtotal: $9,447

2019-20 $1,680$100

$2,090

$4,800Total Project Cost: $14,247

02120000735/21/20204/16/20201/17/2019PA&ED:

RTL:R/W Cert:

12/1/2020Begin Con:

02-Trinity-3 Prior18-1918-1919-20

201.1101 Bridge(s)Performance Measure

Program Code

$930PA&ED:PS&E:

R/W Sup:

Carryover

58.7/61.9

Con Sup:

Bridge Major Rehabilitation

$8,627Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

In Trinity County, at Dobbins Gulch Bridge No.05-0042 (PM 0.6), Stuart Fork Bridge No. 05-0055 (PM 43.9) and Mule Creek Bridge No. 05-0056 (PM 48.5); also on Route 299, at GrassValley Creek Bridge No. 05-0013 (PM 65.5). Repair unsound concrete, replace bearings andjoint seals, repair bridge decks, and installbarrier and approach slabs.

3633

1H500 $206

Subtotal: $6,506

2021-22 $1,030$230

$2,060

$4,220Total Project Cost: $10,726

02160000452/22/20221/21/20227/2/2020PA&ED:

RTL:R/W Cert:

8/9/2022Begin Con:

02-Trinity-3 Prior20-2120-2121-22

201.1194 Bridge(s)Performance Measure

Program Code

$900PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Preventative Maintenance

$6,300Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

In Trinity County on Routes 299 and 36 and inSiskiyou County on Route 96 at various locations. Bridge preventative maintenance at 9bridges.

3516

4F600 $40

Subtotal: $6,840

2019-20 $1,400$150

$1,910

$4,410Total Project Cost: $11,250

02130000129/13/20199/6/2019

9/28/2018PA&ED:

RTL:R/W Cert:

2/14/2020Begin Con:

02-Trinity-299 Prior18-1918-1919-20

201.1199 Bridge(s)Performance Measure

Program Code

$950PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Preventative Maintenance

$6,800Const:R/W:

1

1

1

Senate:

Assembly:

Congress:

1

1

1Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 268 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Trinity($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

ROADWAY PRESERVATIONNear Burnt Ranch,from 0.4 mile east ofHennessey Road to 0.3 mile west of BurntRanch Road. Install rockfall drapery system.3579

0H410 $22

Subtotal: $2,101

2019-20 $470$70

$500

$1,240Total Project Cost: $3,341

021500001910/11/2019

9/4/20197/24/2018PA&ED:

RTL:R/W Cert:

2/13/2020Begin Con:

02-Trinity-299 Prior18-1918-1919-20

201.1501 Location(s)Performance Measure

Program Code

$200PA&ED:PS&E:

R/W Sup:

Carryover

10.9/11.2

Con Sup:

Roadway Protective Betterments

$2,079Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

Near Junction City, at west of Canyon CreekBridge. Install rockfall drapery system.

3592

0H690 $32

Subtotal: $3,032

2019-20 $580$200$630

$1,740Total Project Cost: $4,772

021500005510/11/2019

9/4/20197/24/2018PA&ED:

RTL:R/W Cert:

2/13/2020Begin Con:

02-Trinity-299 Prior18-1918-1919-20

201.1501 Location(s)Performance Measure

Program Code

$330PA&ED:PS&E:

R/W Sup:

Carryover

43.1/43.3

Con Sup:

Roadway Protective Betterments

$3,000Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

Near Trinity Center, from 0.9 miles south ofTrinity River Bridge to Siskiyou County line atvarious locations. Drainage system restoration.3586

0H540 $365

Subtotal: $3,808

2019-20 $850$1,450$1,580

$5,270Total Project Cost: $9,078

021500004910/10/2019

9/3/20199/1/2018PA&ED:

RTL:R/W Cert:

2/13/2020Begin Con:

02-Trinity-3 Prior18-1918-1919-20

201.15135 Culvert(s) (ea)Performance Measure

Program Code

$1,390PA&ED:PS&E:

R/W Sup:

Carryover

30.0/T85.0

Con Sup:

Drainage System Restoration

$3,443Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

Near Salyer, at various locations from 0.1 milewest of White House Gulch Road to 0.4 mile west of Slattery Pond Road. Rehabilitateculverts.

3668

2H810 $311

Subtotal: $5,701

2021-22 $980$330$990

$3,230Total Project Cost: $8,931

02170000128/19/20217/19/20216/3/2020PA&ED:

RTL:R/W Cert:

12/14/2021Begin Con:

02-Trinity-299 Prior20-2120-2121-22

201.15118 Culvert(s) (ea)Performance Measure

Program Code

$930PA&ED:PS&E:

R/W Sup:

Carryover

1.6/45.2

Con Sup:

Drainage System Restoration

$5,390Const:R/W:

2

2

2

Senate:

Assembly:

Congress:

2

2

2Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 269 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Trinity($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

CountyTrinity

PA&ED:PS&E:

R/W Sup:Con Sup:

$2,438$53,019

R/W:

Subtotal: $55,457

Const:$8,695

$12,580$3,320

$16,040

$40,635

Total (Capital + Support): $96,092

Sorted by: Disctrict, County, Route and Post MilesPage 270 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Tulare($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONOn Route 63 and 137, near Visalia and Exter atvarious locations. Construct rumble strips.

6897

0U040 $5

Subtotal: $1,718

2020-21 $550$5

$500

$1,445Total Project Cost: $3,163

061500019110/14/2020

9/1/202012/2/2019PA&ED:

RTL:R/W Cert:

5/26/2021Begin Con:

06-Tulare-63 Prior19-2019-2020-21

201.01025 Collision(s) reducedPerformance Measure

Program Code

$390PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Safety Improvements

$1,713Const:R/W:

16

26

22

Senate:

Assembly:

Congress:

16

26

22Congress

Assembly

Senate

Near Porterville, from west of Route 65 to S.Plano Road. Landscape mitigation.

3032A

0S311

Subtotal: $400

2018-19 $330

$490

$820Total Project Cost: $1,220

061800008811/2/201810/2/20187/19/2016PA&ED:

RTL:R/W Cert:

5/3/2019Begin Con:

06-Tulare-19018-19

18-19

201.0100 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

R15.1/16.9

Con Sup:

Safety Improvements

$400Const:R/W:

18

26

21, 23

Senate:

Assembly:

Congress:

18

26

21, 23Congress

Assembly

Senate

In and near Porterville, from 0.4 mile north ofAvenue 136 to 0.2 mile north of Linda VistaAvenue; also on Route 190, from 0.2 mile westof the Route 65/190 Separation to Blue HeronParkway. Construct Maintenance VehiclePullouts (MVPs), gore paving, drainageimprovements, new fencing and relocation ofpullboxes and controller cabinets.

6813

0U730 $13

Subtotal: $4,413

2020-21 $940$18

$710

$2,278Total Project Cost: $6,691

06160000287/15/20207/1/2020

7/15/2019PA&ED:

RTL:R/W Cert:

2/1/2021Begin Con:

06-Tulare-65 18-1919-2019-2020-21

201.23529 Location(s)Performance Measure

Program Code

$610PA&ED:PS&E:

R/W Sup:

New

17.5/22.0

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$4,400Const:R/W:

14

26

21, 23

Senate:

Assembly:

Congress:

14

26

21, 23Congress

Assembly

Senate

Near Tipton, at the Philip S. Raine SafetyRoadside Rest Area (SRRA). Upgrade water,sewer and irrigation facilities.6885

0U770 $50

Subtotal: $8,050

2021-22 $1,750$12

$2,250

$4,562Total Project Cost: $12,612

06160000358/4/20212/2/2021

7/18/2019PA&ED:

RTL:R/W Cert:

1/3/2022Begin Con:

06-Tulare-99 18-1919-2019-2021-22

201.2352 Location(s)Performance Measure

Program Code

$550PA&ED:PS&E:

R/W Sup:

New

22.3

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$8,000Const:R/W:

16

26

22

Senate:

Assembly:

Congress:

16

26

22Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 271 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Tulare($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In Tulare, from north of Bardsley Avenue tonorth of Prosperity Avenue. Roadside safetyimprovements.6700

0R170

Subtotal: $2,700

2018-19 $624$24

$430

$1,333Total Project Cost: $4,033

06140000513/1/20192/1/2019

8/25/2017PA&ED:

RTL:R/W Cert:

8/1/2019Begin Con:

06-Tulare-99 PriorPriorPrior18-19

201.23526 Location(s)Performance Measure

Program Code

$255PA&ED:PS&E:

R/W Sup:

Carryover

28.9/31.0

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$2,700Const:R/W:

18

26

23

Senate:

Assembly:

Congress:

18

26

23Congress

Assembly

Senate

Near Kingsburg, from 0.2 mile south to 0.4 milenorth of Avenue 384 Overcrossing at the C. H.Warlow Safety Roadside Rest Area (SRRA).Upgrade water and wastewater systems tocomply with Federal and State statutes andregulatory requirements.

6882

0V760 $170

Subtotal: $4,411

2021-22 $1,666$36

$1,705

$4,276Total Project Cost: $8,687

06160002203/25/20223/21/20221/2/2020PA&ED:

RTL:R/W Cert:

9/1/2022Begin Con:

06-Tulare-99 18-1919-2019-2021-22

201.2351 Location(s)Performance Measure

Program Code

$869PA&ED:PS&E:

R/W Sup:

New

51.6/52.2

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$4,241Const:R/W:

12

31

22

Senate:

Assembly:

Congress:

12

31

22Congress

Assembly

Senate

BRIDGE PRESERVATIONIn Tipton, at Avenue 152 Overcrossing (No. 46-0191). Replace bridge.

6679

0Q910 $343

Subtotal: $7,864

2019-20 $1,730$54

$1,354

$3,591Total Project Cost: $11,455

06140000053/2/20202/3/20202/1/2018PA&ED:

RTL:R/W Cert:

8/3/2020Begin Con:

06-Tulare-99 PriorPriorPrior19-20

201.1101 Bridge(s)Performance Measure

Program Code

$453PA&ED:PS&E:

R/W Sup:

Carryover

19.4

Con Sup:

Bridge Major Rehabilitation

$7,521Const:R/W:

8, 14, 16

23, 26

23

Senate:

Assembly:

Congress:

8, 14, 16

23, 26

23Congress

Assembly

Senate

Near Woodlake, at Yokohl Creek Bridge No. 46-0011 (PM 1.39); also at Kaweah River BridgeNo. 46-0073 (PM 4.19). Replace bridges toupgrade to current standards, facilitate bike laneshoulders, and upgrade guard railing.

6787

0U280 $395

Subtotal: $12,495

2020-21 $2,260$645

$1,940

$6,170Total Project Cost: $18,665

06150002934/26/20214/15/2021

12/13/2019PA&ED:

RTL:R/W Cert:

10/5/2021Begin Con:

06-Tulare-245 Prior19-2019-2020-21

201.1102 Bridge(s)Performance Measure

Program Code

$1,325PA&ED:PS&E:

R/W Sup:

Carryover

1.4

Con Sup:

Bridge Major Rehabilitation

$12,100Const:R/W:

12

26

22

Senate:

Assembly:

Congress:

12

26

22Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 272 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Tulare($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Pixley, at Avenue 48 Overcrossing(OC) No. 46-0165 (PM 6.2), Davis Avenue OCNo. 46-0172 (PM 12.6), and Avenue 100 OCNo. 46-0173 (PM 12.8). Upgrade bridge railingto current standards and install approachrailings.

6788

0U270 $108

Subtotal: $2,228

2020-21 $1,122$30

$1,048

$2,940Total Project Cost: $5,168

06150002952/1/2021

1/15/202111/20/2019PA&ED:

RTL:R/W Cert:

10/15/2021Begin Con:

06-Tulare-99 18-1919-2019-2020-21

201.1121493.0 Linear feetPerformance Measure

Program Code

$740PA&ED:PS&E:

R/W Sup:

New

Con Sup:

Bridge Rail Replacement and Upgrade

$2,120Const:R/W:

16

31

22

Senate:

Assembly:

Congress:

16

31

22Congress

Assembly

Senate

Near Kingsburg, on Route 201 at Sand Creekand Friant-Kern Canal Bridge; also on Route216, at Kaweah River Bridge. Bridge railreplacement.

6521

0H200 $450

Subtotal: $9,821

2018-19 $3,900$617

$2,357

$8,602Total Project Cost: $18,423

06120001576/22/20176/21/20174/20/2015PA&ED:

RTL:R/W Cert:

1/21/2019Begin Con:

06-Tulare-201 PriorPriorPrior18-19

201.1121188.0 Linear feetPerformance Measure

Program Code

$1,728PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Bridge Rail Replacement and Upgrade

$9,371Const:R/W:

14, 16

29, 31

19, 20

Senate:

Assembly:

Congress:

14, 16

29, 31

19, 20Congress

Assembly

Senate

ROADWAY PRESERVATIONIn Tulare, Fresno and Madera Counties, onRoute 99 at various locations. Upgrade existingpumps and control systems at eleven pumpingplants.

6795

0U230 $65

Subtotal: $5,205

2019-20 $2,060$620

$2,230

$5,560Total Project Cost: $10,765

061500029711/20/201911/8/20197/13/2018PA&ED:

RTL:R/W Cert:

5/11/2020Begin Con:

06-Tulare-99 Prior18-1918-1919-20

201.15111 Culvert(s) (ea)Performance Measure

Program Code

$650PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Drainage System Restoration

$5,140Const:R/W:

8, 12, 14

21, 26, 31

16, 21, 22

Senate:

Assembly:

Congress:

8, 12, 14

21, 26, 31

16, 21, 22Congress

Assembly

Senate

Between Springville and Camp Nelson, fromeast of Balch Park Road to west of WishonDrive. Replace deteriorated culverts andupgrade existing Guardrail.

6286

0H140 $246

Subtotal: $3,096

2019-20 $950$210$800

$2,760Total Project Cost: $5,856

06160001943/15/20203/1/2020

11/17/2018PA&ED:

RTL:R/W Cert:

2/1/2021Begin Con:

06-Tulare-190 PriorPriorPrior19-20

201.15117 Culvert(s) (ea)Performance Measure

Program Code

$800PA&ED:PS&E:

R/W Sup:

Carryover

34.7/39.7

Con Sup:

Drainage System Restoration

$2,850Const:R/W:

16

26

23

Senate:

Assembly:

Congress:

16

26

23Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 273 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Tulare($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

CountyTulare

PA&ED:PS&E:

R/W Sup:Con Sup:

$1,845$60,556

R/W:

Subtotal: $62,401

Const:$8,370

$17,882$2,271

$15,814

$44,337

Total (Capital + Support): $106,738

Sorted by: Disctrict, County, Route and Post MilesPage 274 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Tuolumne

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONAt various locations, from Sonora toDardanelle; also on Route 49 in Sonora (PM17.4 to 17.6) and in Stanislaus County on Route108 in and near Riverbank (PM 28.5 to 33.4).Upgrade guardrail to make standard.

3234

1C400 $173

Subtotal: $3,260

2021-22 $972$11

$554

$2,171Total Project Cost: $5,431

101700002511/30/202110/18/202111/2/2020PA&ED:

RTL:R/W Cert:

7/1/2022Begin Con:

10-Tuolumne-108 18-1920-2120-2121-22

201.01531 Collision(s) reducedPerformance Measure

Program Code

$634PA&ED:PS&E:

R/W Sup:

New

L1.3/53.3

Con Sup:

Collision Severity Reduction

$3,087Const:R/W:

12, 14

25, 26

18, 19

Senate:

Assembly:

Congress:

12, 14

25, 26

18, 19Congress

Assembly

Senate

ROADWAY PRESERVATIONNear Long Barn, from 0.1 mile east of the eastjunction of Long Barn Road to 2.3 miles east ofCow Creek Road. Pavement rehabilitation.0157

46210 $88

Subtotal: $18,058

2020-21 $1,152$8

$2,092

$3,939Total Project Cost: $21,997

10130002661/1/2021

12/1/202010/1/2019PA&ED:

RTL:R/W Cert:

7/15/2021Begin Con:

10-Tuolumne-108 Prior19-2019-2020-21

201.12151.6 Lane mile(s)Performance Measure

Program Code

$687PA&ED:PS&E:

R/W Sup:

Carryover

R18.9/38.8

Con Sup:

Pavement Rehabilitation (CAPM)

$17,970Const:R/W:

14

25

19

Senate:

Assembly:

Congress:

14

25

19Congress

Assembly

Senate

Near Buck Meadows, from Elder Lane toYosemite National Park boundary. Pavementrehabilitation.0335

0E960 $6

Subtotal: $20,526

2018-19 $1,070$55

$2,793

$4,849Total Project Cost: $25,375

101300025412/7/201811/7/20183/3/2018PA&ED:

RTL:R/W Cert:

7/10/2019Begin Con:

10-Tuolumne-120 PriorPriorPrior18-19

201.1212.0 Lane mile(s)Performance Measure

Program Code

$931PA&ED:PS&E:

R/W Sup:

Carryover

32.7/R56.5

Con Sup:

Pavement Rehabilitation (CAPM)

$20,520Const:R/W:

12

25

4

Senate:

Assembly:

Congress:

12

25

4Congress

Assembly

Senate

Near Strawberry, from east of Old StrawberryRoad to west of Beardsley Road. Rockfallmitigation at four locations.3137

0Y800 $43

Subtotal: $2,671

2018-19 $625$75

$560

$2,010Total Project Cost: $4,681

10150000071/15/2019

12/31/201811/1/2017PA&ED:

RTL:R/W Cert:

8/30/2019Begin Con:

10-Tuolumne-108 PriorPriorPrior18-19

201.1504 Location(s)Performance Measure

Program Code

$750PA&ED:PS&E:

R/W Sup:

Carryover

32.3/34.6

Con Sup:

Roadway Protective Betterments

$2,628Const:R/W:

14

25

19

Senate:

Assembly:

Congress:

14

25

19Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 275 of 290 Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Tuolumne

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Haden Flat, east of Cherry Lake Road. Stabilize slope erosion.

3136

0Y790 $6

Subtotal: $1,206

2018-19 $493$48

$363

$1,554Total Project Cost: $2,760

10150000061/15/201912/1/20189/1/2017PA&ED:

RTL:R/W Cert:

6/26/2019Begin Con:

10-Tuolumne-120 PriorPriorPrior18-19

201.1501 Location(s)Performance Measure

Program Code

$650PA&ED:PS&E:

R/W Sup:

Carryover

48.8

Con Sup:

Roadway Protective Betterments

$1,200Const:R/W:

12

25

4

Senate:

Assembly:

Congress:

12

25

4Congress

Assembly

Senate

CountyTuolumne

PA&ED:PS&E:

R/W Sup:Con Sup:

$316$45,405

R/W:

Subtotal: $45,721

Const:$3,652$4,312

$197$6,362

$14,523

Total (Capital + Support): $60,244

Sorted by: Disctrict, County, Route and Post MilesPage 276 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Ventura

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MAJOR DAMAGE RESTORATIONIn Ventura County, south of Point Mugu StatePark (PM 4.0) and Sycamore Canyon Road (PM4.2). Construct secant walls at two locations asa permanent slope restoration solution tostabilize the slope and prevent continuederosion. Two previous Director Orders: EA 07-4X370 and EA 07-4X760 were executed to remove slide material and repair embankment,roadway and drainage systems.

4930

31820 $766

Subtotal: $27,945

2019-20 $1,900$100

$2,600

$5,800Total Project Cost: $33,745

071500028612/16/2019

9/3/20199/28/2018PA&ED:

RTL:R/W Cert:

7/16/2020Begin Con:

07-Ventura-1 Prior18-1918-1919-20

201.1312 Location(s)Performance Measure

Program Code

$1,200PA&ED:PS&E:

R/W Sup:

Carryover

4.0/4.2

Con Sup:

Permanent Restoration

$27,179Const:R/W:

26

44

27

Senate:

Assembly:

Congress:

26

44

27Congress

Assembly

Senate

Near Point Mugu State Park, at Big SycamoreCreek No. 52-0011. Shoreline embankmentrestoration by replacing Rock Slope Protection(RSP), constructing seawalls and secantretaining wall, and upgrade guardrail.

5181

33350 $442

Subtotal: $11,541

2021-22 $3,240$1,000$3,880

$10,420Total Project Cost: $21,961

07160003128/2/20217/1/20217/1/2019PA&ED:

RTL:R/W Cert:

3/2/2022Begin Con:

07-Ventura-1 Prior19-2019-2021-22

201.1311 Location(s)Performance Measure

Program Code

$2,300PA&ED:PS&E:

R/W Sup:

Carryover

4.5/4.6

Con Sup:

Permanent Restoration

$11,099Const:R/W:

27

44

26

Senate:

Assembly:

Congress:

27

44

26Congress

Assembly

Senate

Near Moorpark, from Sand Canyon Road toBalcom Canyon Road. Permanent restoration ofslope damage by constructing retaining wall,paving shoulder, and placing Rock SlopeProtection (RSP).

5294

34290 $353

Subtotal: $5,755

2020-21 $3,000$175

$2,000

$6,025Total Project Cost: $11,780

07170003331/4/20219/1/20208/1/2019PA&ED:

RTL:R/W Cert:

8/2/2021Begin Con:

07-Ventura-118 18-1919-2019-2020-21

201.1311 Location(s)Performance Measure

Program Code

$850PA&ED:PS&E:

R/W Sup:

New

12.0/13.2

Con Sup:

Permanent Restoration

$5,402Const:R/W:

19

37

26

Senate:

Assembly:

Congress:

19

37

26Congress

Assembly

Senate

COLLISION REDUCTIONNear Ojai, north of North Fork Matilija CreekBridge No. 52-450. Widen the roadway by 4feet, upgrade rock block barrier, and place HighFriction Surface Treatment (HFST).

5145

33230 $64

Subtotal: $3,144

2021-22 $1,460$40

$1,550

$3,710Total Project Cost: $6,854

071600025712/15/202111/15/20213/30/2021PA&ED:

RTL:R/W Cert:

7/10/2022Begin Con:

07-Ventura-33 18-1920-2120-2121-22

201.01529 Collision(s) reducedPerformance Measure

Program Code

$660PA&ED:PS&E:

R/W Sup:

New

18.9/19.1

Con Sup:

Collision Severity Reduction

$3,080Const:R/W:

19

37

26

Senate:

Assembly:

Congress:

19

37

26Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 277 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Ventura

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near various cities, at various locations,from 0.2 mile south of Lakeview Canyon Roadto Hobson Road Undercrossing. Upgradeguardrails, end treatments, and bridgeconnections, and add vegetation control underguardrails. Remove and replace dikes.

5231

33900 $80

Subtotal: $6,550

2021-22 $2,800$35

$2,000

$5,785Total Project Cost: $12,335

071700010810/4/20218/23/20219/30/2019PA&ED:

RTL:R/W Cert:

5/5/2022Begin Con:

07-Ventura-101 18-1919-2021-2221-22

201.015345 Collision(s) reducedPerformance Measure

Program Code

$950PA&ED:PS&E:

R/W Sup:

New

0.0/R38.9

Con Sup:

Collision Severity Reduction

$6,470Const:R/W:

19, 27

37, 44

24, 26

Senate:

Assembly:

Congress:

19, 27

37, 44

24, 26Congress

Assembly

Senate

In and near various cities, at various locations,from 0.2 mile north of Westlake Boulevardto0.3 mile north of Hobson Road. Upgradeguardrails, end treatments, and bridgeconnections, and add vegetation control underguardrails. Remove and replace dikes.

5082

33110 $29

Subtotal: $9,805

2021-22 $1,733$20

$1,750

$3,895Total Project Cost: $13,700

071600022510/4/20218/23/20219/30/2019PA&ED:

RTL:R/W Cert:

5/5/2020Begin Con:

07-Ventura-101 18-1918-1919-2021-22

201.01593 Collision(s) reducedPerformance Measure

Program Code

$392PA&ED:PS&E:

R/W Sup:

New

0.9/R39.2

Con Sup:

Collision Severity Reduction

$9,776Const:R/W:

19, 27

37, 44

24, 26

Senate:

Assembly:

Congress:

19, 27

37, 44

24, 26Congress

Assembly

Senate

In and near Thousand Oaks, from Los AngelesCounty line to 0.3 mile north of CamarilloSprings Road. Construct access trails andMaintenance Vehicle Pullouts (MVPs), relocateirrigation facilities, install access gates, railingsand breakaway post sleeves, pave gore, narrow and slope areas.

5030

32560 $20

Subtotal: $4,935

2020-21 $1,523$46

$2,117

$4,200Total Project Cost: $9,135

071600008612/1/202010/1/202010/1/2019PA&ED:

RTL:R/W Cert:

7/1/2021Begin Con:

07-Ventura-101 18-1919-2020-2120-21

201.23594 Location(s)Performance Measure

Program Code

$514PA&ED:PS&E:

R/W Sup:

New

0.0/11.1

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$4,915Const:R/W:

19, 27

44

26

Senate:

Assembly:

Congress:

19, 27

44

26Congress

Assembly

Senate

In Simi Valley, from First Street to YosemiteStreet. Construct Maintenance Vehicle Pullouts(MVPs) and access roads, pave gore areas,install smart irrigation controllers and accessgates. Plant vines at bridge wingwalls.

4894

31650 $10

Subtotal: $3,260

2018-19 $1,369$39

$1,292

$3,377Total Project Cost: $6,637

07150002102/1/2019

11/15/20186/26/2017PA&ED:

RTL:R/W Cert:

10/1/2019Begin Con:

07-Ventura-118 PriorPriorPrior18-19

201.235100 Location(s)Performance Measure

Program Code

$677PA&ED:PS&E:

R/W Sup:

Carryover

R24.1/R29.7

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$3,250Const:R/W:

27

38

25, 26

Senate:

Assembly:

Congress:

27

38

25, 26Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 278 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Ventura

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MANDATESIn Ventura County, at various locations; also onRoute 101 (PM 22.0/43.6), Route 34 (PM4.3/17.7) and Route 150 (PM 2.5/34.4).Construct and install stormwater treatment BestManagement Practices (BMPs) Includingbiofiltration swales, gross solid removal devicesand Austin Vault Sand Filters.

5012

32270 $126

Subtotal: $10,466

2021-22 $2,650$40

$3,750

$8,940Total Project Cost: $19,406

071600006712/15/202111/1/20217/2/2020PA&ED:

RTL:R/W Cert:

7/5/2022Begin Con:

07-Ventura-1 18-1920-2120-2121-22

201.33590.6 Acre(s) treated/pollutantPerformance Measure

Program Code

$2,500PA&ED:PS&E:

R/W Sup:

New

0.0/28.5

Con Sup:

Storm Water Mitigation

$10,340Const:R/W:

19, 27

37, 44, 50

24, 26, 33

Senate:

Assembly:

Congress:

19, 27

37, 44, 50

24, 26, 33Congress

Assembly

Senate

In the city of Ventura, from south of SeawardAvenue to Ventura River. Stabilize soil anderosion control.4813

31130 $20

Subtotal: $1,843

2018-19 $1,196$24

$959

$2,274Total Project Cost: $4,117

071500000912/14/201810/5/20186/9/2017PA&ED:

RTL:R/W Cert:

6/19/2019Begin Con:

07-Ventura-101 PriorPriorPrior18-19

201.33522.5 Acre(s) treated/pollutantPerformance Measure

Program Code

$95PA&ED:PS&E:

R/W Sup:

Carryover

27.5/31.0

Con Sup:

Storm Water Mitigation

$1,823Const:R/W:

19

37

24

Senate:

Assembly:

Congress:

19

37

24Congress

Assembly

Senate

Near the city of Ventura, from County Drive toSanta Clara River. Construct stormwatertreatment Best Management Practices (BMPs)infiltration basin.

5204

33600 $10

Subtotal: $6,021

2021-22 $1,961$44

$1,680

$4,635Total Project Cost: $10,656

07160003759/15/20217/15/2021

12/30/2019PA&ED:

RTL:R/W Cert:

4/15/2022Begin Con:

07-Ventura-118 18-1919-2019-2021-22

201.33542 Acre(s) treated/pollutantPerformance Measure

Program Code

$950PA&ED:PS&E:

R/W Sup:

New

1.2/1.8

Con Sup:

Storm Water Mitigation

$6,011Const:R/W:

19

37

26

Senate:

Assembly:

Congress:

19

37

26Congress

Assembly

Senate

In Santa Paula, from Peck Road to Santa PaulaCreek. Stabilize soil and install irrigationsystem.4815

31150 $30

Subtotal: $2,461

2018-19 $916$102

$1,379

$2,527Total Project Cost: $4,988

071500001211/30/201810/1/20186/28/2017PA&ED:

RTL:R/W Cert:

7/8/2019Begin Con:

07-Ventura-126 PriorPriorPrior18-19

201.33522.5 Acre(s) treated/pollutantPerformance Measure

Program Code

$130PA&ED:PS&E:

R/W Sup:

Carryover

R10.2/R12.7

Con Sup:

Storm Water Mitigation

$2,431Const:R/W:

19

37

26

Senate:

Assembly:

Congress:

19

37

26Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 279 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Ventura

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Ventura and Ojai, from north of SycamoreDrive to Fairview Road. Construct and upgradecurb ramps, sidewalks and driveways to meetcurrent Americans with Disabilities Act (ADA)Standards.

5010

32320 $4,141

Subtotal: $10,622

2021-22 $4,620$1,100$3,798

$10,498Total Project Cost: $21,120

071600006212/15/202111/1/20219/3/2019PA&ED:

RTL:R/W Cert:

7/15/2022Begin Con:

07-Ventura-33 18-1918-1919-2021-22

201.36164 Curb ramp(s)Performance Measure

Program Code

$980PA&ED:PS&E:

R/W Sup:

New

6.5/12.8

Con Sup:

Americans with Disabilities Act New Curb Ramps

$6,481Const:R/W:

19

37

26

Senate:

Assembly:

Congress:

19

37

26Congress

Assembly

Senate

In and near Ventura and Moorpark, from NorthRoute 126 Junction to 0.3 mile west ofPrinceton Avenue. Reconstruct curb ramps,construct new sidewalks, install AccessiblePedestrian Signals (APS) and upgradethermoplastic pavement marking crosswalks.

5233

33920 $2,941

Subtotal: $6,885

2021-22 $2,000$1,624$1,500

$6,124Total Project Cost: $13,009

07170001193/15/20223/1/2022

3/15/2020PA&ED:

RTL:R/W Cert:

8/15/2022Begin Con:

07-Ventura-118 18-1919-2019-2021-22

201.36193 Curb ramp(s)Performance Measure

Program Code

$1,000PA&ED:PS&E:

R/W Sup:

New

0.5/T18.8

Con Sup:

Americans with Disabilities Act New Curb Ramps

$3,944Const:R/W:

19, 27

37, 44

26

Senate:

Assembly:

Congress:

19, 27

37, 44

26Congress

Assembly

Senate

In and near cities of Ojal and Santa Paula, fromRoute 33 to Route 126. Construct and upgradecurb ramps and sidewalks to comply withAmericans with Disabilities Act (ADA)Standards.

4746

30670 $556

Subtotal: $5,105

2019-20 $1,000$100

$1,000

$3,008Total Project Cost: $8,113

07140001793/30/20205/1/20197/2/2018PA&ED:

RTL:R/W Cert:

10/1/2020Begin Con:

07-Ventura-150 Prior18-1918-1919-20

201.361134 Curb ramp(s)Performance Measure

Program Code

$908PA&ED:PS&E:

R/W Sup:

Carryover

16.6/34.4

Con Sup:

Americans with Disabilities Act New Curb Ramps

$4,549Const:R/W:

19

37

26

Senate:

Assembly:

Congress:

19

37

26Congress

Assembly

Senate

BRIDGE PRESERVATIONNear the city of Ventura, at Ventura OverheadNo. 52-0040. Replace corroded steel spans ofbridge and upgrade bridge railing to currentstandards.

4972

31960 $983

Subtotal: $4,548

2021-22 $2,500$540

$1,650

$5,890Total Project Cost: $10,438

071600002512/15/202111/15/202112/14/2018PA&ED:

RTL:R/W Cert:

8/15/2022Begin Con:

07-Ventura-1 Prior18-1918-1921-22

201.1101 Bridge(s)Performance Measure

Program Code

$1,200PA&ED:PS&E:

R/W Sup:

Carryover

21.5

Con Sup:

Bridge Major Rehabilitation

$3,565Const:R/W:

37

24

Senate:

Assembly:

Congress:

37

24Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 280 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Ventura

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Oak View, at San Antonio Creek BridgeNo. 52-0065. Scour mitigation and bridge railupgrade.4496

29130 $2,750

Subtotal: $5,210

2018-19 $1,112$600

$1,460

$4,812Total Project Cost: $10,022

07120000831/25/20191/4/2019

6/30/2017PA&ED:

RTL:R/W Cert:

9/6/2019Begin Con:

07-Ventura-33 PriorPriorPrior18-19

201.1111 Bridge(s)Performance Measure

Program Code

$1,640PA&ED:PS&E:

R/W Sup:

Carryover

7.6

Con Sup:

Bridge Scour Mitigation

$2,460Const:R/W:

19

37

26

Senate:

Assembly:

Congress:

19

37

26Congress

Assembly

Senate

Near Sea Cliff, at Willow Creek Bridge No. 52-003; also in Ojai, on Route 33 at North ForkMatilija Bridges No. 52-0044 (PM 15.8) andNo. 52-0173 (PM16.1). Upgrade bridge railingsto meet current standards.

4601

29650 $818

Subtotal: $3,475

2020-21 $2,300$465

$2,000

$5,723Total Project Cost: $9,198

071300009912/1/202011/1/202011/5/2018PA&ED:

RTL:R/W Cert:

7/2/2021Begin Con:

07-Ventura-1 Prior20-2120-2120-21

201.112724.0 Linear feetPerformance Measure

Program Code

$958PA&ED:PS&E:

R/W Sup:

Carryover

28.2

Con Sup:

Bridge Rail Replacement and Upgrade

$2,657Const:R/W:

19

37

24, 26

Senate:

Assembly:

Congress:

19

37

24, 26Congress

Assembly

Senate

Near Ojai, at North Fork Matilija Creek No. 52-0173. Paint steel portion of bridge and replacemissing rivets of bottom flanges for preventativemaintenance to preserve and extend the life ofbridge.

5008

32300 $30

Subtotal: $690

2021-22 $850$50

$620

$1,840Total Project Cost: $2,530

071600006010/31/2021

9/1/202112/15/2018PA&ED:

RTL:R/W Cert:

6/2/2022Begin Con:

07-Ventura-33 Prior18-1918-1921-22

201.1191 Bridge(s)Performance Measure

Program Code

$320PA&ED:PS&E:

R/W Sup:

Carryover

16.1

Con Sup:

Bridge Preventative Maintenance

$660Const:R/W:

19

37

26

Senate:

Assembly:

Congress:

19

37

26Congress

Assembly

Senate

ROADWAY PRESERVATIONIn the city of Ventura, from North 101 Junction- Solimar Undercrossing to Hobson County ParkRoad. Cold plane and overlay pavement,upgrade guardrail/end treatment, install trafficsigns and crosswalks.

5018

32390 $14

Subtotal: $10,214

2021-22 $1,850$60

$3,350

$5,885Total Project Cost: $16,099

071600007212/15/202111/1/20217/15/2020PA&ED:

RTL:R/W Cert:

8/5/2022Begin Con:

07-Ventura-1 19-2020-2120-2121-22

201.12111.7 Lane mile(s)Performance Measure

Program Code

$625PA&ED:PS&E:

R/W Sup:

New

21.3/27.1

Con Sup:

Pavement Rehabilitation (CAPM)

$10,200Const:R/W:

19

37, 44

24, 26

Senate:

Assembly:

Congress:

19

37, 44

24, 26Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 281 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Ventura

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Ojai, Mira Monte and MeinersOaks, from Burham Road to Gorham Road; alsoon Route 33 from 33/150 Junction to MeinersRoad. Cold plane and overlay pavement, upgrade guardrail and signs.

5014

32370 $221

Subtotal: $5,809

2020-21 $1,500$250

$1,700

$4,050Total Project Cost: $9,859

071600006910/5/20208/5/20209/3/2019PA&ED:

RTL:R/W Cert:

4/8/2021Begin Con:

07-Ventura-150 18-1919-2019-2020-21

201.12115.6 Lane mile(s)Performance Measure

Program Code

$600PA&ED:PS&E:

R/W Sup:

New

R13.3/19.0

Con Sup:

Pavement Rehabilitation (CAPM)

$5,588Const:R/W:

19

37

26

Senate:

Assembly:

Congress:

19

37

26Congress

Assembly

Senate

In and near cities of Thousand Oaks andMoorpark, from Route 101 to Route 118.Rehabilitate pavement.4688

30250 $860

Subtotal: $93,305

2018-19 $7,500$100

$17,000

$25,489Total Project Cost: $118,794

07130004796/14/20195/15/20199/29/2017PA&ED:

RTL:R/W Cert:

7/9/2020Begin Con:

07-Ventura-23 PriorPriorPrior18-19

201.12257.0 Lane mile(s)Performance Measure

Program Code

$889PA&ED:PS&E:

R/W Sup:

Carryover

R3.3/R11.5

Con Sup:

Roadway Rehabilitation (2R)

$92,445Const:R/W:

27

44

26

Senate:

Assembly:

Congress:

27

44

26Congress

Assembly

Senate

Near Sea Cliff, from Padre Juan Canyon RoadOvercrossing to Punta Gorda PedestrianUndercrossing. Rehabilitate roadway.4687

30240 $70

Subtotal: $19,340

2019-20 $1,700$200

$2,100

$4,100Total Project Cost: $23,440

07130004882/14/20202/11/20199/21/2018PA&ED:

RTL:R/W Cert:

8/28/2020Begin Con:

07-Ventura-101 Prior18-1918-1919-20

201.12221.6 Lane mile(s)Performance Measure

Program Code

$100PA&ED:PS&E:

R/W Sup:

Carryover

R36.7/R40.3

Con Sup:

Roadway Rehabilitation (2R)

$19,270Const:R/W:

19

37

24

Senate:

Assembly:

Congress:

19

37

24Congress

Assembly

Senate

MOBILITYIn Thousand Oaks and Camarillo, from WendyDrive to Pleasant Valle Road, at the northboundand southbound Commercial VehicleEnforcement Facilities. Replace concrete slabsand repair and replace asphalt concrete.

5081

33100 $8

Subtotal: $2,014

2020-21 $1,550$20

$850

$2,420Total Project Cost: $4,434

07160002208/10/20206/15/20206/29/2016PA&ED:

RTL:R/W Cert:

3/10/2021Begin Con:

07-Ventura-10118-1918-1920-21

201.3212 Location(s)Performance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

New

9.0/9.2

Con Sup:

Weigh Stations

$2,006Const:R/W:

27

44

26

Senate:

Assembly:

Congress:

27

44

26Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 282 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Ventura

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Moorepark, at the eastbound andwestbound Commercial Vehicle EnforcementFacilities. Construct new modular office facilityand install overhead truck scale on/off messagesigns.

5255

34160 $44

Subtotal: $1,194

2021-22 $800$16

$400

$1,516Total Project Cost: $2,710

071700019410/15/2021

8/1/20218/18/2019PA&ED:

RTL:R/W Cert:

5/1/2022Begin Con:

07-Ventura-118 18-1919-2019-2021-22

201.3212 Location(s)Performance Measure

Program Code

$300PA&ED:PS&E:

R/W Sup:

New

13.3/15.6

Con Sup:

Weigh Stations

$1,150Const:R/W:

19, 27

37, 44

26

Senate:

Assembly:

Congress:

19, 27

37, 44

26Congress

Assembly

Senate

CountyVentura

PA&ED:PS&E:

R/W Sup:Con Sup:

$15,386$246,751

R/W:

Subtotal: $262,137

Const:$20,738$53,030$6,790

$62,385

$142,943

Total (Capital + Support): $405,080

Sorted by: Disctrict, County, Route and Post MilesPage 283 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Yolo

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

MAJOR DAMAGE RESTORATIONNear Esparto, west of Cache Creek Bridge No.22-0019. Install rock fall barrier to stabilizeslope and minimize rock fall onto the traveledway.

8668

3H460 $55

Subtotal: $1,855

2018-19 $550$80

$220

$1,350Total Project Cost: $3,205

03180000026/14/20196/9/20199/3/2018PA&ED:

RTL:R/W Cert:

12/1/2019Begin Con:

03-Yolo-16 Prior18-1918-1918-19

201.1311 Location(s)Performance Measure

Program Code

$500PA&ED:PS&E:

R/W Sup:

Carryover

4.0

Con Sup:

Permanent Restoration

$1,800Const:R/W:

3

4

3

Senate:

Assembly:

Congress:

3

4

3Congress

Assembly

Senate

Near West Sacramento, from 3.7 miles north ofClarksburg Road to Levee Access Road.Permanent restoration of damaged pavementand supporting levee embankment.

9058

2H460 $7,200

Subtotal: $59,150

2019-20 $1,930$990

$5,890

$10,890Total Project Cost: $70,040

03170001141/1/2020

12/1/20198/15/2018PA&ED:

RTL:R/W Cert:

9/1/2020Begin Con:

03-Yolo-84 Prior18-1918-1919-20

201.1311 Location(s)Performance Measure

Program Code

$2,080PA&ED:PS&E:

R/W Sup:

Carryover

13.3/15.7

Con Sup:

Permanent Restoration

$51,950Const:R/W:

3

4

3

Senate:

Assembly:

Congress:

3

4

3Congress

Assembly

Senate

COLLISION REDUCTIONNear Cadenasso, from 0.4 mile west of CountyRoad 79 to 0.4 mile east of County Road 79;also from Esparto to 0.2 mile west of Route 505.Shoulder widening, curve correction, left-turnchannelization, signalization and two-way left- turn lanes.

8655A

0C472 $7,989

Subtotal: $27,379

2018-19 $2,570$2,500$4,850

$9,920Total Project Cost: $37,299

03140002721/15/2018

12/12/20176/24/2015PA&ED:

RTL:R/W Cert:

5/16/2018Begin Con:

03-Yolo-16PriorPrior18-19

201.010330 Collision(s) reducedPerformance Measure

Program Code

PA&ED:PS&E:

R/W Sup:

Carryover

20.5/31.6

Con Sup:

Safety Improvements

$19,390Const:R/W:

5

2

2

Senate:

Assembly:

Congress:

5

2

2Congress

Assembly

Senate

Near Capay, from Capay Canal Bridge toCounty Road 85; also in Esparto from OrleansStreet to County Road 21A (PM 27.5/28.3).Improve pedestrian safety and operations forbicycles and motorists.

8663

4F170 $408

Subtotal: $1,900

2018-19 $490$140$390

$1,400Total Project Cost: $3,300

031400006312/1/2018

11/15/201812/1/2017PA&ED:

RTL:R/W Cert:

6/1/2019Begin Con:

03-Yolo-16 PriorPriorPrior18-19

201.01529 Collision(s) reducedPerformance Measure

Program Code

$380PA&ED:PS&E:

R/W Sup:

Carryover

25.2/28.3

Con Sup:

Collision Severity Reduction

$1,492Const:R/W:

3

4

3

Senate:

Assembly:

Congress:

3

4

3Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 284 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Yolo

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

In and near Woodland, from the Sacramento County line to Colusa County line.Improvements to reduce maintenance workerexposure.

8572

4F830 $10

Subtotal: $1,950

2018-19 $400$20

$420

$1,080Total Project Cost: $3,030

031400030011/1/20189/1/2018

10/10/2017PA&ED:

RTL:R/W Cert:

5/15/2019Begin Con:

03-Yolo-5 PriorPriorPrior18-19

201.23532 Location(s)Performance Measure

Program Code

$240PA&ED:PS&E:

R/W Sup:

Carryover

0.4/R28.9

Con Sup:

Roadside Safety Improvements/ FreewayMaintenance Access

$1,940Const:R/W:

3

4

3

Senate:

Assembly:

Congress:

3

4

3Congress

Assembly

Senate

MANDATESIn and near Woodland, from East Main Street toCounty Road 13 at various locations. UpgradeAmericans with Disabilities Act (ADA)facilities.

5833

3F140

Subtotal: $410

2018-19 $140$30

$170

$450Total Project Cost: $860

03120000728/15/20188/1/2018

12/1/2017PA&ED:

RTL:R/W Cert:

1/3/2019Begin Con:

03-Yolo-5 PriorPriorPrior18-19

201.36123 Curb ramp(s)Performance Measure

Program Code

$110PA&ED:PS&E:

R/W Sup:

Carryover

R6.5/R17.6

Con Sup:

Americans with Disabilities Act New Curb Ramps

$410Const:R/W:

3, 6

4, 7, 9

3, 6

Senate:

Assembly:

Congress:

3, 6

4, 7, 9

3, 6Congress

Assembly

Senate

BRIDGE PRESERVATIONIn West Sacramento, at the Sacramento RiverBridge and Overhead No. 22-0026L/R.Rehabilitate bridge.8901

0F250 $482

Subtotal: $33,242

2019-20 $1,550$75

$3,640

$6,255Total Project Cost: $39,497

03000000754/1/20203/1/20209/1/2018PA&ED:

RTL:R/W Cert:

10/1/2020Begin Con:

03-Yolo-80 Prior18-1918-1919-20

201.1102 Bridge(s)Performance Measure

Program Code

$990PA&ED:PS&E:

R/W Sup:

Carryover

R11.3

Con Sup:

Bridge Major Rehabilitation

$32,760Const:R/W:

6

4

3

Senate:

Assembly:

Congress:

6

4

3Congress

Assembly

Senate

Near Winters, at Putah Creek Bridge No. 22-0072L/R, from Solano County line to 0.4 milesouth of Route 128; also in Solano County, from0.3 mile south to the Yolo County line (PMR10.3 to R10.6). Seismic retrofit of two parallelbridges.

9504

2H450 $215

Subtotal: $14,175

2021-22 $1,755$371

$2,662

$5,729Total Project Cost: $19,904

03170001133/15/20223/1/20222/1/2020PA&ED:

RTL:R/W Cert:

7/15/2022Begin Con:

03-Yolo-505 18-1919-2019-2021-22

201.1132 Bridge(s)Performance Measure

Program Code

$941PA&ED:PS&E:

R/W Sup:

New

0.0/0.2

Con Sup:

Bridge Seismic Restoration

$13,960Const:R/W:

3

4

3

Senate:

Assembly:

Congress:

3

4

3Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 285 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Yolo

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Woodland, at County Road 96Overcrossing (OC) No. 22-0155 (PM R14.27),County Road 95 OC No. 22-0156 (PM R15.85),and Zamora OC No. 22-0157 (PM R17.62); alsoin Colusa County, in and near Williams at EStreet OC No. 15-0067 (PM R17.98) andLurline Avenue OC No. 15-0075 (PM R22.74).Establish standard vertical clearance.

ACCELERATED BRIDGE (PA&ED Only)

5869

3H391 $620

Subtotal: $16,320

2019-20 $1,570$430

$2,470

$6,170Total Project Cost: $22,490

03170003494/15/20204/1/20202/1/2019PA&ED:

RTL:R/W Cert:

9/15/2020Begin Con:

03-Yolo-5 Prior19-2019-2019-20

201.3225 Bridge(s)Performance Measure

Program Code

$1,700PA&ED:* PS&E:

* R/W Sup:

Carryover

* Con Sup:

Trans Permit Requirements for Bridges

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

$15,700* Const:* R/W:

3, 4

3, 4

3

Senate:

Assembly:

Congress:

3, 4

3, 4

3Congress

Assembly

Senate

Near Woodland, at Wye Line RoadOvercrossing (OC) No. 22-0158 (PM 4.49),County Road 6 OC No. 22-0138 (PM R25.57),County Line Road OC No. 22-0139 (R28.92).Establish standard vertical clearance.

ACCELERATED BRIDGE (PA&ED Only)

8563

0F760 $655

Subtotal: $11,687

2020-21 $1,885$98

$3,901

$6,628Total Project Cost: $18,315

03170000314/1/20213/1/2021

10/1/2019PA&ED:

RTL:R/W Cert:

10/1/2021Begin Con:

03-Yolo-5 Prior20-2120-2120-21

201.3223 Bridge(s)Performance Measure

Program Code

$744PA&ED:* PS&E:

* R/W Sup:

Carryover

4.4/R28.9

* Con Sup:

Trans Permit Requirements for Bridges

* Const, * R/W, * PS&E, * R/W Sup, * Con Sup phase(s) are NOT authorized

$11,032* Const:* R/W:

3

4

3

Senate:

Assembly:

Congress:

3

4

3Congress

Assembly

Senate

MOBILITYIn various counties, on various routes at variouslocations. Repair and install permanentAutomatic Vehicle Classification (AVC) truckdata collection stations.

8571

0H410 $80

Subtotal: $9,480

2018-19 $1,000$190

$1,900

$4,090Total Project Cost: $13,570

031500016510/1/20189/1/20181/1/2018PA&ED:

RTL:R/W Cert:

3/1/2019Begin Con:

03-Yolo-5 PriorPriorPrior18-19

201.31569 Field element(s)Performance Measure

Program Code

$1,000PA&ED:PS&E:

R/W Sup:

Carryover

Con Sup:

Transportation Management Systems

$9,400Const:R/W:

1, 3, 4, 6

1, 3, 4, 6, 7,8, 9, 11

1, 3, 4, 6, 7

Senate:

Assembly:

Congress:

1, 3, 4, 6

1, 3, 4, 6, 7,8, 9, 11

1, 3, 4, 6, 7Congress

Assembly

Senate

CountyYolo

PA&ED:PS&E:

R/W Sup:Con Sup:

$17,714$159,834

R/W:

Subtotal: $177,548

Const:$8,685

$13,840$4,924

$26,513

$53,962

Total (Capital + Support): $231,510

Sorted by: Disctrict, County, Route and Post MilesPage 286 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Yuba($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

COLLISION REDUCTIONNear Marysville, from Laurellen Road to SouthHoncut Creek Bridge. Widen shoulders andimprove clear recovery zone.9819

4F380 $9,858

Subtotal: $80,593

2019-20 $4,884$6,227$9,030

$24,047Total Project Cost: $104,640

03140001535/20/20205/5/20203/1/2018PA&ED:

RTL:R/W Cert:

11/20/2020Begin Con:

03-Yuba-70 PriorPriorPrior19-20

201.01080 Collision(s) reducedPerformance Measure

Program Code

$3,906PA&ED:PS&E:

R/W Sup:

Carryover

16.2/25.8

Con Sup:

Safety Improvements

$70,735Const:R/W:

4

3

3

Senate:

Assembly:

Congress:

4

3

3Congress

Assembly

Senate

Near Smartsville, from the Yuba River Bridgeto east of Smartsville Road. Realign and widenroadway.9590

3F510 $2,750

Subtotal: $51,250

2018-19 $3,500$1,000$6,871

$16,071Total Project Cost: $67,321

03130000205/1/2019

4/16/20199/1/2017PA&ED:

RTL:R/W Cert:

12/1/2019Begin Con:

03-Yuba-20 PriorPriorPrior18-19

201.01520 Collision(s) reducedPerformance Measure

Program Code

$4,700PA&ED:PS&E:

R/W Sup:

Carryover

R18.0/20.3

Con Sup:

Collision Severity Reduction

$48,500Const:R/W:

2

3

3

Senate:

Assembly:

Congress:

2

3

3Congress

Assembly

Senate

Near Linda and Marysville, from 0.3 mile southof Feather River Boulevard to Yuba RiverBridge. Install concrete median barrier.9821

0H510 $10

Subtotal: $5,210

2018-19 $500$40

$590

$1,480Total Project Cost: $6,690

031500020110/15/20189/15/20188/27/2017PA&ED:

RTL:R/W Cert:

4/1/2019Begin Con:

03-Yuba-70 PriorPriorPrior18-19

201.0153 Collision(s) reducedPerformance Measure

Program Code

$350PA&ED:PS&E:

R/W Sup:

Carryover

R11.0/13.6

Con Sup:

Collision Severity Reduction

$5,200Const:R/W:

4

3

3

Senate:

Assembly:

Congress:

4

3

3Congress

Assembly

Senate

BRIDGE PRESERVATIONIn Marysville, at the Feather River Bridge No.18-009. Scour mitigation and retrofit piers.

8140

3F560 $1,887

Subtotal: $28,328

2020-21 $2,700$200

$4,100

$8,240Total Project Cost: $36,568

03130000334/1/20213/1/20212/1/2019PA&ED:

RTL:R/W Cert:

7/1/2021Begin Con:

03-Yuba-20 Prior20-2120-2120-21

201.1111 Bridge(s)Performance Measure

Program Code

$1,240PA&ED:PS&E:

R/W Sup:

Carryover

0.1

Con Sup:

Bridge Scour Mitigation

$26,441Const:R/W:

3

3

4

Senate:

Assembly:

Congress:

3

3

4Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 287 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Yuba($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Near Marysville, from 0.1 mile north of BinneyJunction Underpass to 0.3 mile north ofLaurellen Road, at Simmerly Slough Bridge No.16-0019. Replace bridge.

9812

1E060 $3,800

Subtotal: $72,300

2018-19 $3,050$750

$5,200

$10,600Total Project Cost: $82,900

03120000686/1/20195/1/2019

6/21/2017PA&ED:

RTL:R/W Cert:

12/1/2019Begin Con:

03-Yuba-70 PriorPriorPrior18-19

201.1111 Bridge(s)Performance Measure

Program Code

$1,600PA&ED:PS&E:

R/W Sup:

Carryover

15.5/16.5

Con Sup:

Bridge Scour Mitigation

$68,500Const:R/W:

1

3

2

Senate:

Assembly:

Congress:

1

3

2Congress

Assembly

Senate

ROADWAY PRESERVATIONNear Marysville, from 0.1 mile east of LomaRica Road to 0.2 mile west of Spring ValleyRoad. Rehabilitate roadway. 9587

2F320 $1,400

Subtotal: $12,100

2018-19 $1,610$950

$1,600

$5,320Total Project Cost: $17,420

03000205943/15/20183/1/2018

6/13/2016PA&ED:

RTL:R/W Cert:

1/2/2019Begin Con:

03-Yuba-20 PriorPriorPrior18-19

201.1204.4 Lane mile(s)Performance Measure

Program Code

$1,160PA&ED:PS&E:

R/W Sup:

Carryover

8.0/10.2

Con Sup:

Roadway Rehabilitation (3R)

$10,700Const:R/W:

2

3

3

Senate:

Assembly:

Congress:

2

3

3Congress

Assembly

Senate

Near Marysville, from Marysville Road to YubaRiver (Parks Bar) Bridge. Rehabilitateroadway.9579

0A570 $9,400

Subtotal: $47,500

2018-19 $2,210$2,300$6,900

$15,110Total Project Cost: $62,610

03000205934/15/20194/1/20198/1/2017PA&ED:

RTL:R/W Cert:

12/29/2019Begin Con:

03-Yuba-20 PriorPriorPrior18-19

201.1209.9 Lane mile(s)Performance Measure

Program Code

$3,700PA&ED:PS&E:

R/W Sup:

Carryover

13.3/R17.8

Con Sup:

Roadway Rehabilitation (3R)

$38,100Const:R/W:

4

3

3

Senate:

Assembly:

Congress:

4

3

3Congress

Assembly

Senate

In and near Marysville, from 14th Street toCemetery Road. Roadway rehabilitation.

9820

0H160 $5,000

Subtotal: $90,000

2020-21 $3,500$2,500$5,500

$14,500Total Project Cost: $104,500

031500008210/2/20209/18/20201/2/2019PA&ED:

RTL:R/W Cert:

3/26/2021Begin Con:

03-Yuba-70 Prior18-1918-1920-21

201.1205.0 Lane mile(s)Performance Measure

Program Code

$3,000PA&ED:PS&E:

R/W Sup:

Carryover

14.9/15.6

Con Sup:

Roadway Rehabilitation (3R)

$85,000Const:R/W:

4

3

3

Senate:

Assembly:

Congress:

4

3

3Congress

Assembly

Senate

Sorted by: Disctrict, County, Route and Post MilesPage 288 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Yuba($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

CountyYuba

PA&ED:PS&E:

R/W Sup:Con Sup:

$34,105$353,176

R/W:

Subtotal: $387,281

Const:$19,656$21,954$13,967$39,791

$95,368

Total (Capital + Support): $482,649

Sorted by: Disctrict, County, Route and Post MilesPage 289 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Project List Yuba($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FYSupport Congr Dist

Sorted by: Disctrict, County, Route and Post MilesPage 290 of 290Sorted by: County, Program Category, Program Code, Route and Post Miles

Exhibit F

 

 

This page left blank intentionally

California Department of Transportation

2018 SHOPP 22

EXHIBIT G: 2018 SHOPP Long Lead Projects

Long Lead Project List SHOPP Long Lead projects, which require more than four years to develop due to complex environmental and preliminary engineering work.

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Long Lead Project List

Support

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MAJOR DAMAGE RESTORATIONNear Crescent City, at Last Chance Grade, fromWilson Creek Bridge to 3.8 miles north ofWilson Creek Bridge. Permanent roadwayrestoration and realignment. PA&ED and R/Wfunds are requested for geotechnical evaluation($5 million) of the current seven alternativesand for the environmental clearance ($5 million)needed to perform geotechnical work.

1112

0F280 $75

Subtotal: $75

2030-31$10,000

$10,000Total Project Cost: $10,075

01150000999/2/20307/1/2030

2/16/2026PA&ED:

RTL:R/W Cert:

10/14/2031Begin Con:

01-Del Norte-101 Prior25-2625-2630-31

201.1311 Location(s)Performance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

CarryoverLong Lead

12.0/15.5

Con Sup:

Permanent Restoration

* R/W, * PA&ED phase(s) is authorized

Const:* R/W:

Approximate project estimates: PA&ED $52,600,000, R/W $89,600,000,Con $1,610,000,000.

Note: Due to the complexity of the project,$10.0 million is assigned to gather data(geotechnical and preliminary environmentalwork) that will identify risk and assist in projectdevelopment.

BRIDGE PRESERVATIONNear Hoopa, at Trinity River Bridge No. 04 -0137. Upgrade bridge rails, widen forpedestrian access, and strengthen for truck permit load capacity.

2432

0F600$29,764$1,576

Subtotal: $31,340

2022-23$2,621$2,895$1,138$3,287

$9,941Total Project Cost: $41,281

01160000292/1/2023

12/27/202212/27/2021PA&ED:

RTL:R/W Cert:

9/1/2023Begin Con:

01-Humboldt-96 18-1921-2221-2222-23

201.1121328 Linear FeetPerformance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

NewLong Lead

12.3

Con Sup:

Bridge Rail Replacement and Upgrade

* PA&ED phase(s) is authorized

Const:R/W:

Note: Complexity of environmental studies andlengthy coordination with environmentalagencies is anticipated.

Near Weitchpec, at Klamath River Bridge No.04-0144. Seismically retrofit bridge, upgradebridge rails, and provide shoulders andpedestrian access.

2423

0F350$34,640

$138

Subtotal: $34,778

2022-23$2,434$2,648

$342$6,931

$12,355Total Project Cost: $47,133

01150001148/23/20227/7/2022

4/25/2020PA&ED:

RTL:R/W Cert:

1/12/2023Begin Con:

01-Humboldt-96 18-1919-2019-2022-23

201.1131 Bridge(s)Performance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

NewLong Lead

22.9

Con Sup:

Bridge Seismic Restoration

* PA&ED phase(s) is authorized

Const:R/W:

Note: Complexity of alternatives and presenceof cultural resources, additional design changesand mitigations require extensive environmentalconsultations and clearances.

In Rio Dell, at Eel River Bridge No. 04-0016R.Seismic retrofit.

2301B

0A111$26,813

$44

Subtotal: $26,857

2022-23$5,433$5,113

$216$4,632

$15,394Total Project Cost: $42,251

01160001488/1/20228/1/20225/1/2021PA&ED:

RTL:R/W Cert:

1/1/2023Begin Con:

01-Humboldt-101 Prior20-2120-2122-23

201.1131 Bridge(s)Performance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

CarryoverLong Lead

M53.9

Con Sup:

Bridge Seismic Restoration

* PA&ED phase(s) is authorized

Const:R/W:

Note: Complexity and duration ofenvironmental consultation and permitting dueto endangered species.

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 1 of 9

Exhibit G

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Long Lead Project List

Support

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MANDATESNear Bishop, from North See Vee Lane to NorthBarlow Lane. Upgrade Americans withDisabilities Act (ADA) curb ramps, driveways,and pedestrian push buttons, refresh striping, relocate signals, and improve pedestrian andbicycle access.

2641

36680$9,901$6,378

Subtotal: $16,279

2023-24$1,530$3,340$1,670$2,190

$8,730Total Project Cost: $25,009

091600002111/20/202310/2/202310/1/2020PA&ED:

RTL:R/W Cert:

6/19/2024Begin Con:

09-Inyo-395 18-1920-2120-2123-24

201.36115 Curb Ramp(s)Performance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

NewLong Lead

117.3/117.8

Con Sup:

Americans with Disabilities Act New Curb Ramps

* PA&ED phase(s) is authorized

Const:R/W:

Note: Potential R/W acquisition difficulties maydelay schedule and increase cost.

ROADWAY PRESERVATIONNear Bakersfield, from 0.1 miles east of AsheRoad to Route 99 Separation. Rehabilitateroadway including reconstruction of travel laneswith Jointed Plain Concrete Pavement (JPCP),widen intersections and shoulders to meetcurrent standards, add bicycle lanes, medianlane to accommodate two-way turning, installdrainage inlets and stormwater basin, sidewalksand upgrade ADA ramps to current standards.

6805

0V610$26,500$14,200

Subtotal: $40,700

2023-24$3,200$2,500$6,300$4,600

$16,600Total Project Cost: $57,300

061600022210/2/20239/1/20239/1/2020PA&ED:

RTL:R/W Cert:

3/1/2024Begin Con:

06-Kern-119 Prior20-2120-2123-24

201.12010.0 Lane Mile(s)Performance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

CarryoverLong Lead

28.2/31.3

Con Sup:

Roadway Rehabilitation (3R)

* PA&ED phase(s) is authorized

Const:R/W:

Note: Project involves 70 affected parcels.Permits may be delayed if property owners areunresponsive.

BRIDGE PRESERVATIONNear Hopland, from 0.1 mile south to 0.3 milenorth of Russian River Bridge No. 10-0082 (PM9.24). Bridge seismic and rail upgrade andwiden for standard shoulders with partial orcomplete structure replacement.

4526

0A130$44,499

$600

Subtotal: $45,099

2022-23$1,176$1,953

$165$9,351

$12,645Total Project Cost: $57,744

01160000012/1/2023

1/15/202310/1/2021PA&ED:

RTL:R/W Cert:

8/1/2023Begin Con:

01-Mendocino-101 18-1921-2221-2222-23

201.1131 Bridge(s)Performance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

NewLong Lead

9.2/9.9

Con Sup:

Bridge Seismic Restoration

* PA&ED phase(s) is authorized

Const:R/W:

Note: Lengthy railroad coordination,environmental and geotechnical challenges.

COLLISION REDUCTIONNear Bridgeport, from north of Route 270Junction to Green Creek Road. Widenshoulders to eight feet, install rumble strips,improve sight distance, and upgrade signing andstriping to current standards.

2639

36940$7,623

$471

Subtotal: $8,094

2023-24$1,300$1,240

$590$2,330

$5,460Total Project Cost: $13,554

09170000147/14/20234/18/20234/1/2021PA&ED:

RTL:R/W Cert:

1/23/2024Begin Con:

09-Mono-395 18-1920-2120-2123-24

201.01554 Collisions ReducedPerformance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

NewLong Lead

69.9/71.9

Con Sup:

Collision Severity Reduction

* PA&ED phase(s) is authorized

Const:R/W:

Note: Inadequate suitable area forenvironmental mitigation plant reestablishment.

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 2 of 9

Exhibit G

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Long Lead Project List

Support

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Near Bridgeport, from Burcham Flat Road to0.3 mile south of Route 395/108 Junction.Widen shoulders, install rumble strips, andcorrect superelevation at three curves.

2460

36800$12,567$1,855

Subtotal: $14,422

2022-23$1,395$1,764

$395$2,084

$5,638Total Project Cost: $20,060

09170000116/8/20236/8/20236/1/2021PA&ED:

RTL:R/W Cert:

12/14/2023Begin Con:

09-Mono-395 18-1920-2120-2122-23

201.01555 Collisions ReducedPerformance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

NewLong Lead

91.6/93.4

Con Sup:

Collision Severity Reduction

* PA&ED phase(s) is authorized

Const:R/W:

Note: Potential requirement of 404 permit.

BRIDGE PRESERVATIONNear Lucia from 0.1 mile south to 0.2 milenorth of Limekiln Creek Bridge No. 44-0058.Replace bridge.2524

1F510$64,644

$704

Subtotal: $65,348

2024-25$3,500

$0$416

$13,865

$17,781Total Project Cost: $83,129

05140000044/3/20253/5/2025

12/2/2021PA&ED:

RTL:R/W Cert:

Begin Con:

05-Monterey-1 Prior21-2221-2224-25

201.1101 Bridge(s)Performance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

CarryoverLong Lead

20.9/21.3

Con Sup:

Bridge Major Rehabilitation

* PA&ED phase(s) is authorized

Const:R/W:

Note: Potential R/W concerns relating to a StatePark and complexity and duration of environmental studies.

Near Carmel-by-the-Sea, at the Garrapata CreekBridge No. 44-0018. Replace bridge railing tomeet current traffic safety standards.2696

1H800$3,000

$5

Subtotal: $3,005

2022-23$1,600$1,900

$130$1,300

$4,930Total Project Cost: $7,935

05160001632/14/2023

10/21/20224/2/2021PA&ED:

RTL:R/W Cert:

Begin Con:

05-Monterey-1 18-1920-2120-2122-23

201.112603 Linear FeetPerformance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

NewLong Lead

63.0

Con Sup:

Bridge Rail Replacement and Upgrade

* PA&ED phase(s) is authorized

Const:R/W:

Note: Due to the complexity and duration ofenvironmental studies, including a CoastalDevelopment Permit.

ROADWAY PRESERVATIONNear Lucia, north of Mill Creek Bridge.Stabilize highway segment caused by erosion.

3030

0P300$9,402

$100

Subtotal: $9,502

2024-25$2,376$2,748

$185$4,400

$9,709Total Project Cost: $19,211

05160000471/2/2025

12/1/20249/1/2021PA&ED:

RTL:R/W Cert:

6/1/2025Begin Con:

05-Monterey-1 18-1921-2221-2224-25

201.1501 Location(s)Performance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

NewLong Lead

18.5/18.7

Con Sup:

Roadway Protective Betterments

* PA&ED phase(s) is authorized

Const:R/W:

Note: Environmental Permits may require morethan standard storm water treatment BMPs. Thiswould affect cost, project foot print, possibleR/W needs, and additional area forenvironmental review.

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 3 of 9

Exhibit G

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Long Lead Project List

Support

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

BRIDGE PRESERVATIONIn St. Helena, at Sulphur Creek Bridge No. 21-0016 and York Creek Bridge No. 21-0017.Upgrade bridge rails.1462K

2K150$4,188

$748

Subtotal: $4,936

2022-23$1,040

$800$500$800

$3,140Total Project Cost: $8,076

04160003754/3/20231/3/20233/1/2021PA&ED:

RTL:R/W Cert:

10/2/2023Begin Con:

04-Napa-29 18-1920-2120-2122-23

201.112328 Linear FeetPerformance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

NewLong Lead

28.4/29.3

Con Sup:

Bridge Rail Replacement and Upgrade

* PA&ED phase(s) is authorized

Const:R/W:

Note: Complexity and duration ofenvironmental and right of way issues due tofish passage permitting and potentialcondemnation.

BRIDGE PRESERVATIONIn the city of Sacramento, at the West EndViaduct No. 24-0069L/R. Improve to standardtruck capacity.5863

1H610$120,000

$900

Subtotal: $120,900

2023-24$5,700$5,800

$400$24,000

$35,900Total Project Cost: $156,800

03160001909/1/2023

7/14/20234/2/2020PA&ED:

RTL:R/W Cert:

3/6/2024Begin Con:

03-Sacramento-5 Prior19-2019-2023-24

201.3222 Bridge(s)Performance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

CarryoverLong Lead

23.6/24.3

Con Sup:

Trans Permit Requirements for Bridges

* PA&ED phase(s) is authorized

Const:R/W:

Note: Schedule risk due to railroadcoordination, land acquisitions, hazardousmaterial, public input, and environmentalpermitting.

BRIDGE PRESERVATIONNear Needles, from Park Moabi Road to TopockRoad at the Colorado River Bridge No. 54-0415. Bridge rehabilitation and/orreplacement. Caltrans will be the lead agencyand will share half of all costs with ADOT asindicated via a signed Letter of Intent.

3001S

0R380$28,800

$169

Subtotal: $28,969

2023-24$2,650$3,759

$431$8,332

$15,172Total Project Cost: $44,141

08120000678/15/20232/1/20232/1/2021PA&ED:

RTL:R/W Cert:

4/15/2024Begin Con:

08-San Bernardino-40 Prior20-2120-2123-24

201.1101 Bridge(s)Performance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

CarryoverLong Lead

153.9/154.7

Con Sup:

Bridge Major Rehabilitation

* PA&ED phase(s) is authorized

Const:R/W:

Note: Complexity of environmental andgeotechnical investigations. Extensivecoordination required with Arizona resourceagencies.

MANDATESNear Pauma Valley, from 0.2 mile west to 0.1mile east of Pauma Creek Bridge No. 57-0077;also, 6.0 miles west of Santa Ysabel, at 1.8miles west of San Luis Rey River Bridge at theWigham Creek Culvert (PM 45.3). Remediatefish passage and improve water quality byreplacing existing creek crossings with naturalbottom bridges.

1195

42220$14,300

$303

Subtotal: $14,603

2023-24$2,244$3,680

$262$4,073

$10,259Total Project Cost: $24,862

11150001794/18/20243/13/20245/31/2022PA&ED:

RTL:R/W Cert:

11/7/2024Begin Con:

11-San Diego-76 18-1923-2423-2423-24

201.335140.0 Acres Treated/PollutantPerformance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

NewLong Lead

29.3/29.6

Con Sup:

Storm Water Mitigation

* PA&ED phase(s) is authorized

Const:R/W:

Note: Extensive coordination with externalagencies and extensive hydrological andenvironmental studies.

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 4 of 9

Exhibit G

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Long Lead Project List

Support

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

BRIDGE PRESERVATIONIn the city of San Diego and Coronado from SanDiego-Coronado Bay Bridge to the Route 75/5Connector Overcrossing. Bridge rehabilitation.1065

40940

Subtotal: $0

TBD$2,593

$2,593Total Project Cost: $2,593

1112000071TBDTBD

6/29/2018PA&ED:

RTL:R/W Cert:

TBDBegin Con:

11-San Diego-75 Prior18-1918-19TBD

201.1101 Bridge(s)Performance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

CarryoverLong Lead

R20.5/R22.0

Con Sup:

Bridge Major Rehabilitation

* PA&ED phase(s) is authorized

Const:R/W:

Note: Extensive studies using most currentseismological and geotechnical models areneeded to evaluate the existing bridge piles.

In the city of San Diego, at various locationsfrom Quince Street Overcrossing Bridge No. 57-0216K to Washington Street OvercrossingBridge No. 57-0220. Replace bridge rail withinCabrillo Freeway Historic District.

1276

43013$9,473

$256

Subtotal: $9,729

2024-25$4,740$2,409

$212$3,633

$10,994Total Project Cost: $20,723

11170001713/7/2025

1/16/20257/29/2022PA&ED:

RTL:R/W Cert:

7/11/2025Begin Con:

11-San Diego-163 18-1922-2322-2324-25

201.1121959 Linear FeetPerformance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

NewLong Lead

1.6/2.8

Con Sup:

Bridge Rail Replacement and Upgrade

* PA&ED phase(s) is authorized

Const:R/W:

Note: Extensive environmental studies areneeded because all bridge locations are within aHistoric District.

BRIDGE PRESERVATION In Stockton, at the Stockton Channel ViaductBridge No. 29-0176L/R. Bridge rehabilitationto address structural and load carrying capacitydeficiencies.

3133

0X460$815,000

$0

Subtotal: $815,000

TBD$4,169

$4,169Total Project Cost: $819,169

10120002599/30/2024

10/30/2020PA&ED:

RTL:R/W Cert:

5/30/2025Begin Con:

10-San Joaquin-5 Prior20-2120-21TBD

201.1102 Bridge(s)Performance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

CarryoverLong Lead

26.5

Con Sup:

Bridge Major Rehabilitation

* PA&ED phase(s) is authorized

Const:R/W:

Note: Due to the complexity of project longerdesign time are anticipated.

BRIDGE PRESERVATIONNear Guadalupe, at the Santa Maria RiverBridge No. 49-0042; also in Santa BarbaraCounty (PM 50.3/50.6). The bridge is scourcritical and needs to be replaced. The existingbridge will be used for traffic handling duringconstruction and then demolished. The highwaywill need to be realigned as a result of the newbridge location. The new bridge will providestandard lane and shoulder widths and include aprotected walkway.

2650

1H440$28,461

$530

Subtotal: $28,991

2022-23$2,294$4,290

$455$9,660

$16,699Total Project Cost: $45,690

051600007410/1/20229/1/20223/1/2020PA&ED:

RTL:R/W Cert:

Begin Con:

05-San Luis Obispo-1 Prior19-2019-2022-23

201.1101 Bridge(s)Performance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

CarryoverLong Lead

0.0/0.3

Con Sup:

Bridge Major Rehabilitation

* PA&ED phase(s) is authorized

Const:R/W:

Note: Complexity and duration ofenvironmental studies.

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 5 of 9

Exhibit G

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Long Lead Project List

Support

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

MANDATESIn Burlingame, Hillsborough, and Millbrae,from Barroilhet Avenue to Millbrae Avenue.Upgrade curb ramps and sidewalks to ADAstandards.

0730D

1G900$9,120

$844

Subtotal: $9,964

2022-23$3,320$1,200

$700$1,000

$6,220Total Project Cost: $16,184

04000206192/1/20232/1/20238/1/2020PA&ED:

RTL:R/W Cert:

9/1/2023Begin Con:

04-San Mateo-82 Prior20-2120-2122-23

201.37882 Curb Ramp(s)Performance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

CarryoverLong Lead

12.9/15.9

Con Sup:

Americans with Disabilities Act PedestrianInfrastructure

* PA&ED phase(s) is authorized

Const:R/W:

Note: Complex environmental studies due topresence of historic resource (Tree Rows), andpublic opposition to potential tree removal.

ROADWAY PRESERVATIONIn the cities of San Mateo and Burlingame, fromEast Santa Inez Avenue to Murchison Drive.Rehabilitate roadway, improve drainage, andupgrade existing curb ramps and sidewalks toADA standards.

1496J

0K810$86,061$2,215

Subtotal: $88,276

2023-24$8,181$8,181$4,091

$12,270

$32,723Total Project Cost: $120,999

04160001422/1/2024

11/1/202311/1/2021PA&ED:

RTL:R/W Cert:

8/1/2024Begin Con:

04-San Mateo-82 Prior21-2221-2223-24

201.12015.2 Lane Mile(s)Performance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

CarryoverLong Lead

12.3/15.8

Con Sup:

Roadway Rehabilitation (3R)

* PA&ED phase(s) is authorized

Const:R/W:

Note: Presence of historic trees, potential todisturb nesting birds, public opposition to treeremoval, complexity and duration ofenvironmental studies.

COLLISION REDUCTIONNear Santa Maria, from 0.2 mile north of Route135 Junction to Route 166 Junction. Widenshoulders, install rumble strips, upgradeguardrails and relocate objects from within theclear recovery zone.

2667

1H610$15,401$4,053

Subtotal: $19,454

2023-24$1,736$1,942$1,237$4,379

$9,294Total Project Cost: $28,748

05160000977/14/20237/14/20234/13/2021PA&ED:

RTL:R/W Cert:

2/22/2024Begin Con:

05-Santa Barbara-1 18-1920-2120-2123-24

201.015103 Collisions ReducedPerformance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

NewLong Lead

R35.0/49.2

Con Sup:

Collision Severity Reduction

* PA&ED phase(s) is authorized

Const:R/W:

Note: Complex environmental studies will berequired due to endangered species existingwithin project limits.

BRIDGE PRESERVATIONNear Goleta, at Refugio Road UndercrossingNo. 51-0215L/R. Replace bridges.

2448

1C950$34,640

$20

Subtotal: $34,660

2022-23$2,200

$0$100

$0

$2,300Total Project Cost: $36,960

05130000182/21/2023

12/21/20224/3/2020PA&ED:

RTL:R/W Cert:

Begin Con:

05-Santa Barbara-101 Prior19-2019-2022-23

201.1102 Bridge(s)Performance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

CarryoverLong Lead

R36.6

Con Sup:

Bridge Major Rehabilitation

* PA&ED phase(s) is authorized

Const:R/W:

Note: Complexity and duration of environmental studies.

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 6 of 9

Exhibit G

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Long Lead Project List

Support

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

ROADWAY PRESERVATIONIn and near the town of Shasta, from west ofCrystal Creek Road to Trinity Alley. Roadwayrehabilitation.3680

3H310$69,236$6,269

Subtotal: $75,505

2024-25$4,130$5,110

$490$6,820

$16,550Total Project Cost: $92,055

02170000837/22/20246/21/20245/2/2022PA&ED:

RTL:R/W Cert:

3/4/2025Begin Con:

02-Shasta-299 Prior21-2221-2224-25

201.12014.4 Lane Mile(s)Performance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

CarryoverLong Lead

R7.6/18.3

Con Sup:

Roadway Rehabilitation (3R)

* PA&ED phase(s) is authorized

Const:R/W:

Note: Complex environmental studies due toimpacts to 70 known cultural resources, biological sites and consultation with over 20resource agencies.

BRIDGE PRESERVATIONNear Somes Bar, from 0.6 mile east to 1.3 mileseast of Irving Creek Bridge at Stanshaw Creek(PM R8.2); also, from 1.6 miles east of IrvingCreek Bridge to 1.6 miles west of Ti CreekBridge at Sandy Bar Creek (PM 9.1). Replacedeteriorated large-diameter culverts withnatural-bottom structures, reduce fish passagebarriers, and adjust new approaches.

3622

1H780$16,830

$37

Subtotal: $16,867

2023-24$1,910$2,730

$170$4,660

$9,470Total Project Cost: $26,337

02160000352/20/20241/19/202410/1/2021PA&ED:

RTL:R/W Cert:

8/27/2024Begin Con:

02-Siskiyou-96 18-1921-2221-2223-24

201.1102 Bridge(s)Performance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

CarryoverLong Lead

R7.9/R9.4

Con Sup:

Bridge Major Rehabilitation

* PA&ED phase(s) is authorized

Const:R/W:

Note: Complexity and duration ofenvironmental studies, and consultation withnumerous agencies.

Near Happy Camp, from 0.9 mile west to 0.4mile west of Gordons Ferry Road at Cade Creek(PM 43.4 to 43.8); also, near Seiad Valley atPortuguese Creek (PM 57.0). Replacedeteriorated large-diameter culverts withnatural-bottom structures, reduce fish passagebarriers, and adjust new approaches.

3620

1H590$6,760

$48

Subtotal: $6,808

2023-24$1,720$2,740

$160$2,840

$7,460Total Project Cost: $14,268

02160000251/29/2024

12/29/20239/7/2021PA&ED:

RTL:R/W Cert:

7/2/2024Begin Con:

02-Siskiyou-96 18-1921-2221-2223-24

201.1102 Bridge(s)Performance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

CarryoverLong Lead

43.4/57.0

Con Sup:

Bridge Major Rehabilitation

* PA&ED phase(s) is authorized

Const:R/W:

Note: Complexity and duration ofenvironmental studies, and consultation withnumerous agencies.

Near Horse Creek, at Horse Creek Bridge No.02-0117, from 0.4 mile west of Klamath RiverBridge to 2.0 miles west of Kohl Creek.Replace bridge on new alignment to correctscour critical conditions, improve safety, andreduce operational deficiencies.

3629

1H360$19,760

$993

Subtotal: $20,753

2023-24$2,640$2,810

$830$4,300

$10,580Total Project Cost: $31,333

021600004010/1/20233/1/20239/1/2021PA&ED:

RTL:R/W Cert:

4/27/2024Begin Con:

02-Siskiyou-96 18-1921-2221-2223-24

201.1111 Bridge(s)Performance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

CarryoverLong Lead

76.8/78.0

Con Sup:

Bridge Scour Mitigation

* PA&ED phase(s) is authorized

Const:R/W:

Note: Environmental approval requires 36months due to Section 7 formal consultationwith NOAA.

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 7 of 9

Exhibit G

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Long Lead Project List

Support

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

ROADWAY PRESERVATIONIn and near West Sacramento, from east ofMace Boulevard to Sacramento River Bridge;also on Route 50, from Route 80 to JeffersonBoulevard Overcrossing (PM 0.0/2.5). Rehabilitate pavement by placing ContinuousReinforced Concrete, rehabilitate bridge decks,median widening at three locations, upgradebridge railings, and construct an auxiliary lane.

8784

4F650$277,665

$866

Subtotal: $278,531

2023-24$10,337$18,186$4,928

$31,323

$64,774Total Project Cost: $343,305

03140002332/1/2024

12/1/20231/1/2022PA&ED:

RTL:R/W Cert:

11/1/2024Begin Con:

03-Yolo-80 18-1921-2221-2223-24

201.12048.4 Lane Mile(s)Performance Measure

Program Code

* PA&ED:PS&E:

R/W Sup:

NewLong Lead

4.3/R11.4

Con Sup:

Roadway Rehabilitation (3R)

* PA&ED phase(s) is authorized

Const:R/W:

Note: Lengthy railroad coordination, potentialutility conflicts. Removal of oleander couldresult in negative public reaction and couldimpact classified landscape freeway status.

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 8 of 9

Exhibit G

Post Mile

Location/DescriptionPPNO EA

Prog Year Capital

2018 SHOPP Long Lead Project List

Support

($1,000)

EFIS Milestones

RteDist- Co- COSAllocation

FY

Sorted by: County, Program Category, Program Code, Route and Post Miles Page 9 of 9

Exhibit G

California Department of Transportation

2018 SHOPP 23

EXHIBIT H: Pre 2018 SHOPP projects

Pre 2018 SHOPP Projects Projects allocated in prior SHOPP documents currently in construction.

Pre 2018 SHOPP Projects Currently in Construction

IndexNo. Project ID Dist EA PPNO CCA Date Program01 1214000057 12 0N540 5011A 07/01/2018 Major Damage02 1212000057 12 0H225 4096N 07/01/2018 Mobility03 0712000108 07 29220 4504 07/02/2018 Safety04 0712000107 07 29210 4503 07/02/2018 Safety05 0714000223 07 30790 4774 07/02/2018 Pavement06 0112000128 01 0B440 2342 07/04/2018 Major Damage07 0714000101 07 30550 4728 07/05/2018 Safety08 0812000026 08 0R120 0207J 07/05/2018 Safety09 0417000305 04 4K390 1457B 07/05/2018 Major Damage

010 0812000336 08 1C610 0028C 07/05/2018 Mandates011 0812000331 08 1C560 0186F 07/05/2018 Mandates012 0712000100 07 27600 4173 07/05/2018 Mandates013 0700020869 07 20211 4137 07/06/2018 Pavement014 0712000030 07 29010 4489 07/06/2018 Safety015 0700000517 07 27490 4151 07/06/2018 Mandates016 0700000524 07 27590 4172 07/06/2018 Mandates017 0712000216 07 29340 4550 07/09/2018 Safety018 0713000013 07 29470 4583 07/09/2018 Pavement019 0814000184 08 0G842 3001G 07/09/2018 Roadside Preservation020 0714000151 07 30620 4736 07/10/2018 Pavement021 1215000081 12 0N821 2200B 07/10/2018 Mobility022 1214000108 12 0N780 2530G 07/10/2018 Mobility023 1214000110 12 0N800 2864B 07/10/2018 Mobility024 1212000058 12 0H226 4928B 07/10/2018 Mobility025 0417000311 04 4K450 1457H 07/11/2018 Major Damage026 0417000312 04 4K460 1457J 07/11/2018 Major Damage027 0417000314 04 4K480 1457M 07/11/2018 Major Damage028 0812000335 08 1C600 0234V 07/13/2018 Mandates029 0712000068 07 29110 4493 07/13/2018 Mandates030 0200000288 02 37890 3090 07/15/2018 Bridge031 0400000482 04 1A290 0756F 07/15/2018 Bridge032 0314000163 03 4F440 5847 07/15/2018 Mobility033 1200000211 12 0H270 3184 07/15/2018 Drainage034 0316000079 03 1H260 4295 07/15/2018 Major Damage035 1012000313 10 0X560 3011 07/16/2018 Safety036 0500000857 05 0T540 2285 07/16/2018 Safety037 0812000337 08 1C620 0098F 07/16/2018 Mandates038 0813000139 08 1E050 0050N 07/16/2018 Safety039 0814000115 08 1E860 0014M 07/20/2018 Pavement040 0713000149 07 29740 4614 07/20/2018 Safety041 1100020258 11 40450 0905 07/25/2018 Mobility042 0713000398 07 3X021 4656 07/25/2018 Major Damage

Exhibit H Page 1 of 11

Pre 2018 SHOPP Projects Currently in Construction

IndexNo. Project ID Dist EA PPNO CCA Date Program

043 0214000063 02 4G820 3567 07/27/2018 Pavement044 0715000132 07 3X711 4859 07/30/2018 Major Damage045 0713000486 07 30210 4684 07/31/2018 Pavement046 0714000244 07 30600 4733 07/31/2018 Roadway Preservation047 0612000136 06 0E350 1772 07/31/2018 Safety048 0413000125 04 4G970 0481F 07/31/2018 Safety049 0700020935 07 28740 4414 07/31/2018 Safety050 0712000034 07 29040 4490 07/31/2018 Mandates051 0516000146 05 1H730 2683 08/01/2018 Major Damage052 0616000129 06 0V300 6792 08/01/2018 Safety053 0615000048 06 0S470 6730 08/01/2018 Pavement054 1200000217 12 0H440 4051 08/01/2018 Mandates055 0116000189 01 0G450 4651 08/01/2018 Major Damage056 0112000114 01 0B300 1080 08/01/2018 Major Damage057 0615000119 06 0T950 6804 08/01/2018 Safety058 0516000165 05 1H820 2698 08/02/2018 Safety059 1112000206 11 41490 1070 08/07/2018 Mobility060 0700021033 07 28730 4406 08/16/2018 Mandates061 0700020899 07 28710 4391 08/30/2018 Safety062 0713000333 07 3X950 4575 08/30/2018 Major Damage063 1013000049 10 40160 0126 08/30/2018 Pavement064 0900020055 09 35080 0604 09/01/2018 Safety065 0112000112 01 0B280 1078 09/01/2018 Major Damage066 1212000104 12 0J650 4926D 09/01/2018 Mandates067 0415000100 04 3J200 1488A 09/03/2018 Major Damage068 0415000104 04 3J240 1488E 09/03/2018 Major Damage069 0415000105 04 3J250 1488F 09/03/2018 Major Damage070 0700000506 07 27240 4060 09/04/2018 Mandates071 0413000296 04 4H880 0211Z 09/05/2018 Safety072 0512000186 05 1C660 2420 09/06/2018 Safety073 0715000280 07 31800 4916 09/10/2018 Bridge074 0217000056 02 3H100 3677 09/10/2018 Major Damage075 1016000059 10 1F270 3212 09/14/2018 Major Damage076 1100000421 11 29910 1067 09/14/2018 Bridge077 0417000279 04 4K210 1456F 09/17/2018 Major Damage078 0417000290 04 4K270 1456E 09/17/2018 Major Damage079 0915000045 09 36460 0660 09/19/2018 Safety080 0217000075 02 3H260 3678 09/19/2018 Major Damage081 0317000197 03 2H890 3632 09/19/2018 Major Damage082 1100020311 11 29230 0916 09/20/2018 Mandates083 0413000050 04 4G800 0130B 09/20/2018 Bridge084 0700000533 07 27750 4197 09/24/2018 Mandates

Exhibit H Page 2 of 11

Pre 2018 SHOPP Projects Currently in Construction

IndexNo. Project ID Dist EA PPNO CCA Date Program

085 0700000534 07 27760 4198 09/24/2018 Mandates086 0700000535 07 27770 4197 09/24/2018 Mandates087 1114000024 11 41430 1123 09/24/2018 Bridge088 1115000126 11 42150 1172 09/25/2018 Bridge089 1000000033 10 0F280 3248 09/28/2018 Mandates090 1112000137 11 41080 1086 09/28/2018 Safety091 0413000055 04 4G810 0250B 09/28/2018 Bridge092 1000020459 10 0U520 3005 09/28/2018 Safety093 0217000087 02 1H760 3646 09/28/2018 Major Damage094 0815000057 08 1F840 3005E 09/28/2018 Safety095 0815000062 08 1F850 3004K 09/28/2018 Safety096 0715000283 07 2750U 4157 10/01/2018 Mandates097 0614000105 06 0S310 3032 10/01/2018 Safety098 1212000092 12 0M500 3401A 10/01/2018 Safety099 0814000059 08 1E650 0033S 10/01/2018 Safety

0100 0613000049 06 0Q260 6654 10/01/2018 Pavement0101 0700001891 07 4Y700 4386 10/01/2018 Bridge0102 1012000018 10 0W600 0326 10/01/2018 Pavement0103 0113000082 01 0C241 1098 10/01/2018 Major Damage0104 0812000338 08 1C630 0012H 10/01/2018 Mobility0105 0417000307 04 4K410 1457D 10/01/2018 Major Damage0106 0713000034 07 29600 4597 10/01/2018 Safety0107 0112000111 01 0B270 1077 10/01/2018 Major Damage0108 0812000339 08 1C640 0033R 10/01/2018 Mobility0109 0712000077 07 29100 4492 10/01/2018 Mandates0110 0217000089 02 1H800 3648 10/03/2018 Major Damage0111 0417000313 04 4K470 1457K 10/04/2018 Major Damage0112 0217000095 02 1H530 3682 10/05/2018 Major Damage0113 0417000316 04 4K500 1458B 10/08/2018 Major Damage0114 1114000126 11 41911 1130 10/10/2018 Roadway Preservation0115 1112000138 11 41090 1104 10/10/2018 Safety0116 0215000021 02 4F58U 3514 10/15/2018 Bridge0117 0414000127 04 1J020 0481W 10/15/2018 Safety0118 0413000236 04 4H000 0085Y 10/15/2018 Safety0119 0515000031 05 1G450 2604 10/15/2018 Safety0120 0217000099 02 3H330 3686 10/18/2018 Major Damage0121 0400020738 04 2G350 0501A 10/19/2018 Safety0122 0515000007 05 1G380 2596 10/25/2018 Safety0123 0317000231 03 3H110 3321 10/25/2018 Major Damage0124 0414000521 04 2J480 1487B 10/30/2018 Major Damage0125 0413000295 04 4H870 0487P 10/31/2018 Safety0126 0412000027 04 3G210 2119Q 10/31/2018 Mandates

Exhibit H Page 3 of 11

Pre 2018 SHOPP Projects Currently in Construction

IndexNo. Project ID Dist EA PPNO CCA Date Program

0127 1013000239 10 0Y550 3079 10/31/2018 Mandates0128 0616000084 06 0U990 6780 11/01/2018 Safety0129 0315000119 03 0H270 9157 11/01/2018 Safety0130 0300020420 03 1F400 5067 11/01/2018 Mobility0131 1012000017 10 0W590 0303 11/01/2018 Pavement0132 0216000103 02 2H120 3656 11/01/2018 Major Damage0133 0112000184 01 0B690 3097 11/01/2018 Mandates0134 0412021276 04 3G140 0371Q 11/01/2018 Mandates0135 0616000025 06 0U710 6790 11/01/2018 Safety0136 1013000078 10 0G340 4736 11/01/2018 Pavement0137 0417000407 04 0P180 1461E 11/06/2018 Major Damage0138 0300020597 03 3E050 5096 11/06/2018 Drainage0139 0915000041 09 36580 0656 11/08/2018 Pavement0140 0713000492 07 30070 4679 11/08/2018 Pavement0141 0712000075 07 29080 4491 11/09/2018 Mandates0142 0417000049 04 2K910 1452M 11/15/2018 Major Damage0143 1000020638 10 0K021 5423Y 11/17/2018 Bridge0144 0116000171 01 0G340 4648 11/19/2018 Major Damage0145 0417000409 04 0P200 1461N 11/19/2018 Major Damage0146 1113000044 11 29280 1088 11/21/2018 Mandates0147 0413000132 04 4H010 0085X 11/23/2018 Safety0148 1114000023 11 41440 1124 11/27/2018 Bridge0149 1112000070 11 40930 1059 11/27/2018 Bridge0150 0413000059 04 4G890 0086R 11/30/2018 Bridge0151 0513000037 05 1F030 2476 11/30/2018 Safety0152 0900020090 09 35210 0611 11/30/2018 Mandates0153 0816000062 08 1G700 3004M 11/30/2018 Major Damage0154 0112000127 01 0B430 2341 12/01/2018 Major Damage0155 0612000106 06 0P290 6636 12/01/2018 Safety0156 0113000013 01 0C590 7011 12/01/2018 Safety0157 0600000188 06 0J530 6428 12/01/2018 Safety0158 0112000134 01 0B510 4551 12/01/2018 Major Damage0159 1200020267 12 0J610 2723A 12/01/2018 Mandates0160 1200020268 12 0J620 2729A 12/01/2018 Mandates0161 1200020269 12 0J630 2737A 12/01/2018 Mandates0162 1013000050 10 3A730 0282 12/03/2018 Pavement0163 0218000008 02 3H670 3698 12/05/2018 Major Damage0164 1114000125 11 41910 1129 12/11/2018 Roadway Preservation0165 0812000256 08 1C060 0015N 12/11/2018 Pavement0166 0714000224 07 30800 4775 12/12/2018 Pavement0167 0217000126 02 3H440 3692 12/14/2018 Major Damage0168 0112000189 01 0B820 7009 12/15/2018 Safety

Exhibit H Page 4 of 11

Pre 2018 SHOPP Projects Currently in Construction

IndexNo. Project ID Dist EA PPNO CCA Date Program

0169 0714000080 07 12997 4765 12/17/2018 Mobility0170 0815000101 08 0N971 0258P 12/17/2018 Safety0171 0514000054 05 1F710 2542 12/17/2018 Pavement0172 0800001010 08 0N560 0211S 12/17/2018 Bridge0173 0800001011 08 0N591 0210K 12/17/2018 Bridge0174 0400020618 04 1G860 0730C 12/20/2018 Safety0175 0714000222 07 30780 4773 12/20/2018 Pavement0176 0712000008 07 29120 4494 12/20/2018 Mandates0177 0814000196 08 1F280 3001C 12/21/2018 Bridge0178 1100000392 11 29520 0919 12/28/2018 Safety0179 0412000635 04 1SS58 0312T 12/28/2018 Major Damage0180 0400001256 04 4S660 0308J 12/28/2018 Major Damage0181 0414000339 04 1A904 1067B 12/28/2018 Mandates0182 0413000292 04 4H860 0487N 12/28/2018 Safety0183 0400021254 04 2G940 0522R 12/28/2018 Major Damage0184 0412000491 04 4G490 0116Q 12/28/2018 Safety0185 0415000191 04 3J740 1488Q 12/28/2018 Major Damage0186 0412000116 04 20950 0326A 12/30/2018 Bridge0187 0214000006 02 4G380 3540 12/30/2018 Pavement0188 0400001044 04 3S910 0713G 12/30/2018 Major Damage0189 0414000021 04 0J640 0480G 12/31/2018 Pavement0190 0414000421 04 2J070 1480S 12/31/2018 Safety0191 0714000165 07 30640 4747 12/31/2018 Mobility0192 0412000314 04 4G220 0775F 12/31/2018 Safety0193 0212000011 02 4E640 3472 12/31/2018 Bridge0194 0400020616 04 1G840 0730E 12/31/2018 Mandates0195 0112000188 01 0B830 4564 12/31/2018 Mandates0196 0413000370 04 0J000 0820P 12/31/2018 Safety0197 0212000033 02 4E690 3478 12/31/2018 Roadside Preservation0198 0413000122 04 4G980 0481D 12/31/2018 Safety0199 0714000246 07 30860 4780 12/31/2018 Mobility0200 0114000116 01 0E640 3101 01/01/2019 Safety0201 0313000165 03 3F760 2705 01/02/2019 Safety0202 0112000126 01 0B420 2340 01/02/2019 Major Damage0203 0414000123 04 1J010 0488J 01/02/2019 Safety0204 0500000576 05 49280 4928A 01/07/2019 Roadway Preservation0205 0400000827 04 2A490 0608K 01/10/2019 Bridge0206 0712000015 07 28990 4485 01/10/2019 Mandates0207 0814000195 08 1F270 3001E 01/10/2019 Bridge0208 1016000133 10 1F640 3222 01/11/2019 Major Damage0209 0200000016 02 0E090 3346 01/15/2019 Bridge0210 0112000138 01 0B560 4556 01/15/2019 Major Damage

Exhibit H Page 5 of 11

Pre 2018 SHOPP Projects Currently in Construction

IndexNo. Project ID Dist EA PPNO CCA Date Program

0211 0500000049 05 0F700 7000 02/01/2019 Bridge0212 0200000603 02 2E800 3426 02/01/2019 Mobility0213 0812000165 08 0R780 0050L 02/01/2019 Safety0214 0414000542 04 2J660 1482M 02/01/2019 Safety0215 0217000141 02 3H550 3694 02/01/2019 Major Damage0216 1200000187 12 0H205 3448 02/01/2019 Roadside Preservation0217 1200020130 12 0H206 3421I 02/01/2019 Roadside Preservation0218 0200020042 02 3E410 3435 02/06/2019 Mobility0219 0800020582 08 0Q890 0010C 02/06/2019 Bridge0220 0700020994 07 28810 4416 02/15/2019 Pavement0221 0712000016 07 29000 4486 02/15/2019 Safety0222 0713000484 07 30230 4686 02/15/2019 Pavement0223 1213000116 12 0N110 4849C 02/15/2019 Major Damage0224 0613000022 06 0G980 6349 02/15/2019 Pavement0225 1112000141 11 41120 1084 02/15/2019 Safety0226 0112000293 01 0C430 4572 02/15/2019 Bridge0227 0513000142 05 0N190 4019 02/27/2019 Mobility0228 0814000175 08 0G770 9991C 02/28/2019 Mobility0229 0700020927 07 28720 4405 02/28/2019 Mandates0230 0412000490 04 4G480 0780G 02/28/2019 Safety0231 1212000090 12 0M490 2545 03/01/2019 Safety0232 0612000108 06 0K810 6605 03/01/2019 Bridge0233 0714000219 07 30740 4769 03/08/2019 Pavement0234 0814000085 08 0E551 0195M 03/15/2019 Mobility0235 0413000052 04 4G850 0681Q 03/15/2019 Bridge0236 0115000036 01 0E840 2407 03/19/2019 Bridge0237 0715000234 07 31700 4958 03/29/2019 Safety0238 0415000331 04 4J340 1490E 03/29/2019 Pavement0239 0614000114 06 0S340 3034 03/30/2019 Pavement0240 0313000017 03 3F480 5103 04/01/2019 Safety0241 0714000021 07 30140 4703 04/03/2019 Pavement0242 1100000313 11 28230 0909 04/03/2019 Mandates0243 0317000015 03 1H880 6249 04/05/2019 Safety0244 0812000071 08 0R350 0107F 04/10/2019 Bridge0245 0214000143 02 0H200 3573 04/10/2019 Safety0246 1215000008 12 0N910 2382 04/12/2019 Major Damage0247 0218000028 02 3H750 3704 04/16/2019 Major Damage0248 1012000039 10 0G720 0337 04/18/2019 Bridge0249 0613000034 06 0Q320 6651 04/19/2019 Safety0250 0700000085 07 1170U 0309N 04/29/2019 Pavement0251 1014000101 10 1C180 3091 04/30/2019 Pavement0252 0412000347 04 1A672 0159Q 05/01/2019 Bridge

Exhibit H Page 6 of 11

Pre 2018 SHOPP Projects Currently in Construction

IndexNo. Project ID Dist EA PPNO CCA Date Program

0253 1215000023 12 0P020 2442 05/01/2019 Safety0254 0713000483 07 30260 4689 05/13/2019 Pavement0255 0713000481 07 30220 4685 05/14/2019 Pavement0256 1114000045 11 24400 1107 05/17/2019 Mobility0257 0812000072 08 0R340 0200J 05/21/2019 Bridge0258 1100020265 11 40570 1020 05/23/2019 Safety0259 1100020271 11 40580 1022 05/24/2019 Mandates0260 1213000036 12 0M910 4317 06/01/2019 Mandates0261 0713000241 07 3X870 4567 06/12/2019 Major Damage0262 0812000288 08 1C100 0179G 06/14/2019 Pavement0263 0700020042 07 4Y850 4383 06/19/2019 Bridge0264 0714000094 07 2838U 4328 07/01/2019 Safety0265 0700021842 07 28270 4293 07/01/2019 Safety0266 0713000012 07 29460 4584 07/01/2019 Safety0267 0500020020 05 0G040 0040B 07/01/2019 Pavement0268 0713000489 07 30080 4680 07/01/2019 Pavement0269 1200020180 12 0L720 4124 07/01/2019 Safety0270 0112000001 01 0A990 2329 07/01/2019 Safety0271 0100000186 01 43060 0046D 07/01/2019 Bridge0272 0113000124 01 0E100 2383 07/01/2019 Bridge0273 0512000074 05 1C100 2358 07/01/2019 Safety0274 0616000026 06 0U720 6793 07/01/2019 Safety0275 0415000066 04 3G59U 8315V 07/01/2019 Pavement0276 0615000050 06 0S490 6729 07/05/2019 Pavement0277 0513000022 05 1C990 2458 07/08/2019 Safety0278 1212000096 12 0M520 3089A 07/10/2019 Safety0279 1113000018 11 41530 1103 07/12/2019 Safety0280 0714000304 07 30980 4799 07/15/2019 Safety0281 0316000080 03 0F351 6913 07/15/2019 Mobility0282 0415000012 04 4A09A 0382E 07/15/2019 Bridge0283 0700021272 07 25262 3725B 07/17/2019 Pavement0284 0713000485 07 30060 4678 07/17/2019 Pavement0285 0700020923 07 28670 4387 07/25/2019 Mandates0286 0816000072 08 1E581 0238T 07/26/2019 Safety0287 0715000064 07 31240 4834 07/30/2019 Mandates0288 0213000094 02 4G250 3536 07/30/2019 Mandates0289 0212000032 02 4E680 3477 07/30/2019 Safety0290 0700021123 07 28910 4457 07/30/2019 Mobility0291 0700021166 07 1W240 4580 07/31/2019 Bridge0292 0614000038 06 0R140 3036 08/01/2019 Pavement0293 0700000552 07 28150 4279 08/01/2019 Mandates0294 0513000020 05 1C970 2456 08/01/2019 Safety

Exhibit H Page 7 of 11

Pre 2018 SHOPP Projects Currently in Construction

IndexNo. Project ID Dist EA PPNO CCA Date Program

0295 1213000101 12 0N090 4558A 08/01/2019 Safety0296 0700000182 07 18312 2163A 08/05/2019 Pavement0297 0516000151 05 1H780 2688 08/06/2019 Major Damage0298 0716000112 07 32610 5036 08/06/2019 Major Damage0299 1115000140 11 41852 0559 08/09/2019 Pavement0300 1200020177 12 0J400 3174 08/15/2019 Pavement0301 0713000154 07 29720 4616 08/15/2019 Safety0302 0800000431 08 0L710 0242K 08/15/2019 Mandates0303 0416000128 04 0K700 1495C 08/17/2019 Major Damage0304 0716000306 07 33340 5180 08/28/2019 Major Damage0305 0800020191 08 0Q300 0237P 08/30/2019 Safety0306 0413000123 04 4H260 0133H 08/30/2019 Mandates0307 0713000037 07 29580 4595 08/30/2019 Safety0308 0713000194 07 29750 4617 09/05/2019 Safety0309 0713000017 07 29530 4588 09/05/2019 Safety0310 0416000119 04 4H751 0158G 09/10/2019 Safety0311 0713000276 07 29860 4630 09/11/2019 Safety0312 1100000215 11 26220 1063 09/13/2019 Bridge0313 0414000518 04 2J460 1485C 09/13/2019 Major Damage0314 0400020620 04 1G870 0730F 09/16/2019 Safety0315 0400000772 04 28382 0832A 09/30/2019 Safety0316 0300020462 03 2F080 9580 10/01/2019 Mandates0317 0713000310 07 29930 4650 10/01/2019 Safety0318 0713000335 07 3X960 4576 10/03/2019 Major Damage0319 0213000031 02 4F770 3522 10/15/2019 Pavement0320 0213000008 02 4F570 3513 10/15/2019 Bridge0321 0212000012 02 4E650 3473 10/31/2019 Bridge0322 0400000160 04 0A710 0044C 11/01/2019 Mobility0323 0215000056 02 4G03U 3533 11/01/2019 Safety0324 0112000283 01 0C370 4573 11/01/2019 Bridge0325 0913000007 09 35780 0615 11/01/2019 Safety0326 0612000114 06 0N990 6598 11/09/2019 Bridge0327 0200020196 02 4E020 3449 11/15/2019 Pavement0328 1113000115 11 00271 0778A 11/22/2019 Mobility0329 0713000029 07 29620 4592 11/27/2019 Safety0330 1212000018 12 0M350 4952B 12/01/2019 Safety0331 0413000140 04 4H210 0636S 12/01/2019 Pavement0332 0112000137 01 0B550 4555 12/01/2019 Major Damage0333 0112000150 01 0B260 1076 12/01/2019 Safety0334 0112000133 01 0B500 4550 12/02/2019 Major Damage0335 0712000102 07 25840 3858 12/02/2019 Mandates0336 0215000066 02 36841 3595 12/02/2019 Mobility

Exhibit H Page 8 of 11

Pre 2018 SHOPP Projects Currently in Construction

IndexNo. Project ID Dist EA PPNO CCA Date Program

0337 1214000066 12 0N600 5364 12/02/2019 Pavement0338 0213000033 02 4F790 3524 12/02/2019 Mandates0339 0713000033 07 29590 4596 12/09/2019 Safety0340 0712000109 07 29230 4505 12/13/2019 Safety0341 0313000239 03 3F920 4296 12/15/2019 Facilities0342 1214000092 12 0N710 3143A 12/20/2019 Safety0343 1115000139 11 41851 0558 12/30/2019 Pavement0344 0413000258 04 4H200 0378E 12/30/2019 Pavement0345 0415000334 04 4J370 16543 12/30/2019 Mobility0346 0400020145 04 4S780 0315D 12/30/2019 Major Damage0347 0417000130 04 4G115 0521K 12/31/2019 Mobility0348 0416000348 04 3G641 0587G 12/31/2019 Bridge0349 0200020154 02 3E720 3453 12/31/2019 Pavement0350 1113000045 11 29200 1087 12/31/2019 Mandates0351 0413000371 04 17245 0085Q 12/31/2019 Safety0352 0213000057 02 4F990 3529 12/31/2019 Pavement0353 0417000128 04 3G603 0521M 01/01/2020 Mobility0354 0413000162 04 4H580 0483W 01/02/2020 Pavement0355 0200000161 02 2C090 3212 01/02/2020 Bridge0356 0812000098 08 0K291 0159J 01/15/2020 Pavement0357 0200000022 02 0E180 3349 01/17/2020 Bridge0358 0212000031 02 4E670 3476 01/17/2020 Roadside Preservation0359 0213000005 02 4F550 3519 01/17/2020 Bridge0360 1112000017 11 40870 1062 01/27/2020 Pavement0361 0600020018 06 0K290 6744 02/01/2020 Mobility0362 0713000314 07 29960 4652 02/07/2020 Safety0363 1213000068 12 0M960 4096M 02/10/2020 Pavement0364 0713000162 07 24070 3323 02/14/2020 Mobility0365 0713000161 07 25710 3821 02/14/2020 Mobility0366 0113000046 01 0C750 3095 02/15/2020 Safety0367 0714000073 07 30460 4719 02/18/2020 Mobility0368 0213000095 02 4G240 3535 02/27/2020 Bridge0369 1014000145 10 1C300 5002 02/28/2020 Mobility0370 1115000068 11 28882 1035 03/12/2020 Mobility0371 0216000169 02 2H740 3665 03/12/2020 Major Damage0372 0614000253 06 0S610 6724 03/16/2020 Major Damage0373 0414000106 04 15500 0064A 03/20/2020 Mobility0374 1112000193 11 41480 1068 03/30/2020 Safety0375 0414000366 04 4G591 0729Q 04/01/2020 Major Damage0376 0200000080 02 1C750 3208 04/15/2020 Bridge0377 0500020290 05 0Q600 1989 04/17/2020 Mandates0378 0214000022 02 4G520 3548 04/25/2020 Bridge

Exhibit H Page 9 of 11

Pre 2018 SHOPP Projects Currently in Construction

IndexNo. Project ID Dist EA PPNO CCA Date Program

0379 1214000075 12 0N640 2860M 05/21/2020 Safety0380 0713000092 07 29680 4602 07/01/2020 Pavement0381 0612000105 06 0K460 6601 07/01/2020 Bridge0382 0713000435 07 30040 4676 07/01/2020 Mandates0383 0412000644 04 2A11A 0348J 07/31/2020 Bridge0384 0812000029 08 0R160 0206Y 07/31/2020 Safety0385 0700020900 07 28660 4390 08/12/2020 Mandates0386 0712000095 07 29170 4500 08/28/2020 Bridge0387 0313000139 03 3F570 5959 09/01/2020 Bridge0388 0712000016 07 29000 4486 09/02/2020 Safety0389 0300000458 03 3C380 3258 10/01/2020 Mandates0390 1213000100 12 0N080 2859A 10/01/2020 Safety0391 0615000207 06 0U120 6751 10/01/2020 Bridge0392 0614000009 06 0G851 6678 10/01/2020 Pavement0393 0713000493 07 30300 4691 10/27/2020 Mandates0394 0700021023 07 28820 4419 10/30/2020 Mandates0395 0600020148 06 46150 6508 11/01/2020 Pavement0396 0714000238 07 3009U 4681 12/24/2020 Pavement0397 0517000044 05 49283 4928W 12/29/2020 Roadway Preservation0398 0513000169 05 0T001 2267Y 12/31/2020 Safety0399 0700000142 07 13820 0444E 12/31/2020 Bridge0400 0713000239 07 29370 4552 01/14/2021 Mobility0401 0214000036 02 4G550 3560 01/15/2021 Pavement0402 1213000182 12 0N220 2769D 01/15/2021 Mobility0403 0713000478 07 30290 4693 01/20/2021 Pavement0404 1214000037 12 0H234 1984 02/26/2021 Mobility0405 1215000082 12 0N822 2200C 02/26/2021 Mobility0406 0714000220 07 30760 4771 04/20/2021 Pavement0407 0700021113 07 28920 4458 05/03/2021 Mandates0408 0515000084 05 0T631 2292Y 05/07/2021 Safety0409 0713000224 07 29770 4620 06/03/2021 Safety0410 0900020002 09 33500 0566 07/01/2021 Safety0411 0714000092 07 30520 4725 07/08/2021 Major Damage0412 0714000221 07 30770 4772 07/14/2021 Pavement0413 0414000367 04 4G592 0729R 07/15/2021 Major Damage0414 0612000157 06 0H200 6521 07/19/2021 Bridge0415 0700020870 07 20212 4137A 07/21/2021 Pavement0416 0712000076 07 29070 4497 08/16/2021 Bridge0417 0400001217 04 4S220 0313E 10/14/2021 Major Damage0418 0416000152 04 4G871 0487Q 10/31/2021 Bridge0419 0415000355 04 4J260 1490H 11/30/2021 Major Damage0420 0715000008 07 31120 4812 12/03/2021 Pavement

Exhibit H Page 10 of 11

Pre 2018 SHOPP Projects Currently in Construction

IndexNo. Project ID Dist EA PPNO CCA Date Program

0421 0513000101 05 0G071 0707Y 12/14/2021 Roadway Preservation0422 0515000079 05 1E051 2470Y 12/30/2021 Safety0423 0412000642 04 2594A 0378F 12/31/2021 Pavement0424 0414000120 04 3A87A 0333M 04/01/2022 Bridge0425 0813000213 08 0J851 0238P 04/29/2022 Bridge0426 0713000057 07 29660 4599 07/01/2022 Bridge0427 0713000031 07 29640 4594 07/18/2022 Safety0428 0715000083 07 31320 4841 08/22/2022 Pavement0429 0217000046 02 3H000 3674 11/23/2022 Major Damage0430 0412000581 04 2A441 0485U 12/14/2022 Safety0431 0713000019 07 29520 4587 02/06/2023 Safety0432 1215000075 12 0C78U 5054 07/20/2023 Mobility0433 0413000054 04 4G830 0440Q 10/16/2023 Bridge0434 0713000270 07 29850 4629 12/21/2023 Mobility0435 0700000488 07 26040 3917 08/27/2025 Bridge

Exhibit H Page 11 of 11

California Department of Transportation

2018 SHOPP 24

EXHIBIT I: Northern and Southern SHOPP Hearing Public Comments

Public Comments Northern SHOPP Hearing – February 28, 2018 Southern SHOPP Hearing – March 22, 2018

Caltrans Response to Public Comments from Northern SHOPP Hearing February 28, 2018

On the proposed 2018 SHOPP

Page 1 of 2

Existing law requires the California Department of Transportation (Caltrans) to prepare and transmit to the California Transportation Commission (Commission), by January 31 of each even year, a four-year State Highway Operation and Protection Program (SHOPP). The following speaker card was received at the Northern SHOPP.

Speaker Card from Esther Postiglione – California Works

Caltrans Response: One of the many objectives that we have to try and look at when we put the SHOPP together is our balance between highway transportation, transit, bike/ped and we take that very seriously. One of the slides that I showed earlier showed the performance at a project level that we are now requiring for all our projects. Every project in the 2018 SHOPP has this performance definition and within that performance definition the number is over thirty different complete streets activities that our districts can define that they are doing. These run the range from putting in new curb ramps to adding sidewalks to building bike lanes to putting in crosswalks. We did some analysis of the 2018 SHOPP projects of those that permit bicycle and pedestrian access; approximately thirty-eight percent of all projects had some element of complete street and there is a very detailed breakdown across the thirty-some-odd different activities that are being accomplished and how much of each one is being accomplished. So we are at thirty-eight percent, I don’t know off the top of my head what the 2016 baseline number was but I was kind of on the front lines along with Bruce and some of his staff in trying to get the 2016 number. We didn’t even have the data to do it. We literally had to go back to all of our districts have them

Caltrans Response to Public Comments from Northern SHOPP Hearing February 28, 2018

On the proposed 2018 SHOPP

Page 2 of 2

review every planning document for every project in the 2016 SHOPP and evaluate whether complete streets were done. So we are in a much better place today we have the information in a database its quantified by quantity, location information so we…the point that Esther brings up is a good one we are trying to improve in this area as well. We are trying to improve across the board I think that is evidence from where we were two years ago and where we are now It’s like night and day better but we are up at thirty-eight percent I think that is a pretty decent percentage of projects that has some element of complete streets in them.

Caltrans Response to Public Comments from Southern SHOPP Hearing March 22, 2018

On the proposed 2018 SHOPP

Page 1 of 2

Existing law requires the California Department of Transportation (Caltrans) to prepare and transmit to the California Transportation Commission (Commission), by January 31 of each even year, a four-year State Highway Operation and Protection Program (SHOPP). The following speaker card was received at the Southern SHOPP.

Speaker Card from Bill Sandkey – City of Coronado Council Member

Caltrans Response: Thank you Madam Chair, Commissioners, and staff, and especially your email team, really appreciate your help. Um…I want for the record note our our bridge is not on your list, okay, thank you very much. And commend District 11 Director when she was District 11 Director, Laurie Berman, for taking good care of our bridge. And congratulations on your position. Umm…let’s see, the City of Coronado resp-resp respectfully requests that the California Transportation Commission allocate funds to approve safety on the San Diego-Coronado Bay Bridge. The bridge carries about ninety thousand (90,000) vehicle trips a day, on a given weekday. It’s a critical component of the San Diego Transportation system linking City of Coronado, which attracts between 2-3 million visitors a year to our island, and it also hosts three major federal military installations. That link is fragile. During a recent morning commute, an explosives threat at the gate to naval base North Island, stopped traffic through town over the bridge and all the way back to Interstate 5; that’s almost a four (4) mile backup. And it was impossible for the emergency EOD folks who were on the wrong side of the bridge to get to the gate to solve the problem and it made the closure of the base gate take several hours longer than

Caltrans Response to Public Comments from Southern SHOPP Hearing March 22, 2018

On the proposed 2018 SHOPP

Page 2 of 2

it had to. It’s a fragile link. Across the span there are different challenges. Different safety challenges. Um…I handed out uh…the clerk was kind of enough to hand out the um incident report from the San Diego Union Tribune on a pickup truck that came over the rail on a bridge approach, and sadly on a weekend event landed in a park and killed four innocent people attending a picnic. It was a tragic accident and one that that pointed out to many people safety deficiencies on the Coronado Bridge. That’s on the approach ramp area. At the mid span area of the bridge, in the 50 years the bridge has been open, there’s been thousands of incidents that have disrupted the operational efficiency of the bridge and caused safety problems across the vehicle and pedestrian spectrum. Um…my point is the San Diego Bridge, which is a lifeline to Coronado is a safety-- past safety problems and you guys have had opportunities to fix it. A third problem is our approach where the bridge-highway speeds turn into a residential neighborhood, and that kind of goes back to the place where the bridge was designed to enter Coronado, which happens to go from the 50 mile an hour speed limit to a 25 or 30 mile an hour residential zone and we could use some safety improvements in that area as well. Umm… Commissioners, I urgently ask you to do something with your uh SHOPP funding to improve safety on the Coronado Bridge. This is for many members of our community a very emotional issue, and I understand your reticence to act on an emotional problem, but for us it’s a safety issue, it’s an operational issue, and and I’m new at this, but I read that S.H.O.P.P. and the S of safety, O is operations, and you got a chance to help our community, and I hope you do so. Thank you.

Caltrans Response to Public Comments from Southern SHOPP Hearing March 22, 2018

On the proposed 2018 SHOPP

Page 1 of 2

Existing law requires the California Department of Transportation (Caltrans) to prepare and transmit to the California Transportation Commission (Commission), by January 31 of each even year, a four-year State Highway Operation and Protection Program (SHOPP). The following speaker card was received at the Southern SHOPP.

Speaker Card from Blair King – City of Coronado

Caltrans Response: Thank you. Good morning, Commissioners. I just wanted to point out three areas that I think that uh our request align with the SHOPP program goals. Uh…the the three areas are: bridge preservation, bridge rail replacement upgrades, mobility operation improvement, and collision reduction. In terms of the bridge preservation and bridge rail project, this is a 50 year old bridge. There were 34 inch high barriers installed, they designed that way to be low enough to allow an unobstructed view from the bridge. However, since the bridge opening per CalTrans, 5 vehicles have driven off the bridge, the most recent being 2016, which resulted in 4 deaths. Uh…the bridge rails are inadequate and they’re too low. The second is mobility operations improvements, which is also a SHOPP program goal, just mentioned to you previously. Uh…we have tracked the number of bridge closures, they are quite frequent. They are only two ways in and out. It takes about ninety thousand vehicles. The average closure over the last three years has lasted one hour. Uh…the longest closure is six hours. Those types of backups produce backups on Interstate 5 and also the alternative route. Typically, if there is a long closure on the Coronado Bridge,

Caltrans Response to Public Comments from Southern SHOPP Hearing March 22, 2018

On the proposed 2018 SHOPP

Page 2 of 2

there is a corresponding sympathetic accident on State Route 75. So, a closure on the Coronado Bridge will result in an accident on State Route 75, which is the alternative to the Coronado Bridge. The third is in terms of collision reduction and severity. There’s no shoulders on the bridge. Uh, there’s no safety zones for first responders, pedestrians, broken down vehicles, uh…which causes the bridge then to be closed down in both directions. Again, what I mentioned is highway speeds on I-5 due to uh… backups on the bridge, which typically last one hour at least in length and can last up to six hours. Uh…causes high vehicles at a higher area of speed to slow to zero within a short period of time. We think that our request is consistent with SHOPP program goals would like your consideration. Thank you.

 

 

This page left blank intentionally

California Department of Transportation

2018 SHOPP 25

EXHIBIT J: Commission Adoption of the 2018 SHOPP Program Resolution G-18-13

SHOPP Adoption Resolution G-18-13

 

 

This page left blank intentionally

!"̂$

!"̂$

!"̂$

!"̂$

!"̂$

!"c$

!"c$

!"c$

!"̀$

?m

!"̀$

!"b$

!"a$

!"a$

!"̂$

INYO

KERN

SAN BERNARDINO

FRESNO

RIVERSIDE

SISKIYOU

TULARE

LASSEN

MODOC

MONO

SHASTA

IMPERIAL

TRINITY

SAN DIEGO

TEHAMA

HUMBOLDT

PLUMAS

MONTEREY

MENDOCINO

LOS ANGELES

BUTTE

MADERA

LAKE

MERCED

KINGS

TUOLUMNE

VENTURA

GLENN

SAN LUIS OBISPO

PLACER

YOLO

SONOMA

EL DORADO

SANTA BARBARA

NAPA

COLUSA

MARIPOSA

SIERRA

STANISLAUS

NEVADAYUBA

ALPINE

SOLANO

SANTACLARA

ORANGE

ALAMEDA

AMADOR

SAN BENITO

SAN JOAQUIN

DEL NORTE

CALAVERASMARIN

SUTTER

SACRAMENTO

CONTRACOSTA

SAN MATEO

SANTA CRUZ

SAN FRANCISCO

2018 SHOPPPrimary Asset" Pavement

" Bridge

" Culvert(s)

" TMSSupplementary Asset! Highway Lighting

! Overhead Signs

! Roadside Rest Facilities

! Sidewalks and Park & Ride ADA Infracstructure

! Transportation-Related Facilities

! Weigh-In-Motion ScalesProject Objectives# PO

State HighwaysCounty Boundaries

While the data on this map has been examined for accuracy, Caltrans disclaims any responsibilityfor the accuracy or correctness of the data. In no event shall Caltrans become liable to users ofthis map, or to any other party, for any loss or damages, consequential or otherwise, including butnot limited to time, money, or goodwill, arising from the use of this map product.

±

California Department of TransportationDivision of Transportation Programming

January 2018

0 40 8020 Miles