![Page 1: 2017 Bond Program, Proposition D - Dallas...• Presentation (20 Minutes) • Moderated Conversation (30 Minutes) • Questions/Input collected via index cards during presentation](https://reader035.vdocuments.us/reader035/viewer/2022071001/5fbd5f29f54e0550c05fcdc1/html5/thumbnails/1.jpg)
March 25, 2019
Matt Penk, P.E. Assistant Director Capital ImprovementsDallas Water Utilities
2017 Bond Program, Proposition D:Hughes Lane at Kalani PlaceStorm Drainage Improvement Project
![Page 2: 2017 Bond Program, Proposition D - Dallas...• Presentation (20 Minutes) • Moderated Conversation (30 Minutes) • Questions/Input collected via index cards during presentation](https://reader035.vdocuments.us/reader035/viewer/2022071001/5fbd5f29f54e0550c05fcdc1/html5/thumbnails/2.jpg)
Welcome/Introductions/Opening Remarks
• Welcome/Introduction: Honorable Lee Kleinman Council District 11
• Team Introductions: Matt Penk
• Presentation: Clifton Miller / Matt Penk
2
![Page 3: 2017 Bond Program, Proposition D - Dallas...• Presentation (20 Minutes) • Moderated Conversation (30 Minutes) • Questions/Input collected via index cards during presentation](https://reader035.vdocuments.us/reader035/viewer/2022071001/5fbd5f29f54e0550c05fcdc1/html5/thumbnails/3.jpg)
Agenda
• Project History & Purpose
• Proposed Improvements
• Schedule and Next Steps
• Community Conversation
3
![Page 4: 2017 Bond Program, Proposition D - Dallas...• Presentation (20 Minutes) • Moderated Conversation (30 Minutes) • Questions/Input collected via index cards during presentation](https://reader035.vdocuments.us/reader035/viewer/2022071001/5fbd5f29f54e0550c05fcdc1/html5/thumbnails/4.jpg)
Process• Presentation (20 Minutes)
• Moderated Conversation (30 Minutes) • Questions/Input collected via index cards during presentation• Moderator sorts and groups index cards with similar content and
directs questions/input to City staff for response
• Post meeting questions/inputs can be directed to City’s Project Team
4
![Page 5: 2017 Bond Program, Proposition D - Dallas...• Presentation (20 Minutes) • Moderated Conversation (30 Minutes) • Questions/Input collected via index cards during presentation](https://reader035.vdocuments.us/reader035/viewer/2022071001/5fbd5f29f54e0550c05fcdc1/html5/thumbnails/5.jpg)
Project History & Purpose
5
![Page 6: 2017 Bond Program, Proposition D - Dallas...• Presentation (20 Minutes) • Moderated Conversation (30 Minutes) • Questions/Input collected via index cards during presentation](https://reader035.vdocuments.us/reader035/viewer/2022071001/5fbd5f29f54e0550c05fcdc1/html5/thumbnails/6.jpg)
Drainage Area
• Part of White RockCreek Tributary #6
• Total Drainage Area at Hughes Lane ~ 105 acres
• Includes 4 private pondsin series
6
![Page 7: 2017 Bond Program, Proposition D - Dallas...• Presentation (20 Minutes) • Moderated Conversation (30 Minutes) • Questions/Input collected via index cards during presentation](https://reader035.vdocuments.us/reader035/viewer/2022071001/5fbd5f29f54e0550c05fcdc1/html5/thumbnails/7.jpg)
7
Drainage Area - Ponds
![Page 8: 2017 Bond Program, Proposition D - Dallas...• Presentation (20 Minutes) • Moderated Conversation (30 Minutes) • Questions/Input collected via index cards during presentation](https://reader035.vdocuments.us/reader035/viewer/2022071001/5fbd5f29f54e0550c05fcdc1/html5/thumbnails/8.jpg)
Drainage System • Drained at Hughes Lane
through a morning glory and auxiliary spillway
• Drainage system built by developer around 1960 to serveneighborhood drainage
• Additional connectivity to the City’sstorm drainage system in the 1970’s
8
![Page 9: 2017 Bond Program, Proposition D - Dallas...• Presentation (20 Minutes) • Moderated Conversation (30 Minutes) • Questions/Input collected via index cards during presentation](https://reader035.vdocuments.us/reader035/viewer/2022071001/5fbd5f29f54e0550c05fcdc1/html5/thumbnails/9.jpg)
Flood Risk Management
• Flooding concerns expressed since the 1970’s
• Additional inlets added on Hughes Lane in 1974
• Flood risk management project included in City’s Unfunded Needs Inventory in 1979
• Flooding persisted and a study was initiated in 1988 that recommended upsizing underground pipes and modifications to the spillway
9
![Page 10: 2017 Bond Program, Proposition D - Dallas...• Presentation (20 Minutes) • Moderated Conversation (30 Minutes) • Questions/Input collected via index cards during presentation](https://reader035.vdocuments.us/reader035/viewer/2022071001/5fbd5f29f54e0550c05fcdc1/html5/thumbnails/10.jpg)
Hughes Lane Flooding
10
![Page 11: 2017 Bond Program, Proposition D - Dallas...• Presentation (20 Minutes) • Moderated Conversation (30 Minutes) • Questions/Input collected via index cards during presentation](https://reader035.vdocuments.us/reader035/viewer/2022071001/5fbd5f29f54e0550c05fcdc1/html5/thumbnails/11.jpg)
Flood Risk Management• In 2017 the City commissioned a study to reassess
current conditions and flood risk on Hughes Lane at Kalani Place
• Study included field evaluation, survey, and flood modeling
• Study concluded: • Hughes Lane is overtopped during a 1-year storm• Hughes Lane considered hazardous crossing in 100-year storm• Improvements needed to alleviate flooding and hazardous road
condition
11
![Page 12: 2017 Bond Program, Proposition D - Dallas...• Presentation (20 Minutes) • Moderated Conversation (30 Minutes) • Questions/Input collected via index cards during presentation](https://reader035.vdocuments.us/reader035/viewer/2022071001/5fbd5f29f54e0550c05fcdc1/html5/thumbnails/12.jpg)
Proposed Improvements
12
![Page 13: 2017 Bond Program, Proposition D - Dallas...• Presentation (20 Minutes) • Moderated Conversation (30 Minutes) • Questions/Input collected via index cards during presentation](https://reader035.vdocuments.us/reader035/viewer/2022071001/5fbd5f29f54e0550c05fcdc1/html5/thumbnails/13.jpg)
Drainage Improvements
• 2017 Study recommended the following: • Approximately 115-foot long dual 6’ x 6’ box culvert
under Hughes Lane
• Overflow weir from pond and channel connected to box culvert
• Approximately 30 feet of open back inlets on Hughes Lane draining to 36” pipe connected to box culvert
13
![Page 14: 2017 Bond Program, Proposition D - Dallas...• Presentation (20 Minutes) • Moderated Conversation (30 Minutes) • Questions/Input collected via index cards during presentation](https://reader035.vdocuments.us/reader035/viewer/2022071001/5fbd5f29f54e0550c05fcdc1/html5/thumbnails/14.jpg)
Implementation
• 2017 Bond Program includes $800,000 for drainage improvements for this project (design and construction)
• Design request for qualifications has been completed and design firm selected
• City Council consideration of the design contract planned for May 22, 2019
14
![Page 15: 2017 Bond Program, Proposition D - Dallas...• Presentation (20 Minutes) • Moderated Conversation (30 Minutes) • Questions/Input collected via index cards during presentation](https://reader035.vdocuments.us/reader035/viewer/2022071001/5fbd5f29f54e0550c05fcdc1/html5/thumbnails/15.jpg)
Schedule / Next Steps
15
![Page 16: 2017 Bond Program, Proposition D - Dallas...• Presentation (20 Minutes) • Moderated Conversation (30 Minutes) • Questions/Input collected via index cards during presentation](https://reader035.vdocuments.us/reader035/viewer/2022071001/5fbd5f29f54e0550c05fcdc1/html5/thumbnails/16.jpg)
Next Steps • Design team will begin design in Late Spring/Early
Summer 2019• Proposed work will be advanced and community
updated in Fall 2019• Design will incorporate neighborhood feedback,
where possible, and is anticipated to be completeSummer 2020
• Construction may begin as early as Fall 2020 andbe completed Summer 2021
16
![Page 17: 2017 Bond Program, Proposition D - Dallas...• Presentation (20 Minutes) • Moderated Conversation (30 Minutes) • Questions/Input collected via index cards during presentation](https://reader035.vdocuments.us/reader035/viewer/2022071001/5fbd5f29f54e0550c05fcdc1/html5/thumbnails/17.jpg)
Community Update Milestones
17
Phase Date Comments
Preliminary Design Fall 2019 Community Update
Final Design Summer 2020 Community Update
Construction Start Fall 2020 Community Meeting
Construction Completion
Summer 2021 Community Update
![Page 18: 2017 Bond Program, Proposition D - Dallas...• Presentation (20 Minutes) • Moderated Conversation (30 Minutes) • Questions/Input collected via index cards during presentation](https://reader035.vdocuments.us/reader035/viewer/2022071001/5fbd5f29f54e0550c05fcdc1/html5/thumbnails/18.jpg)
Dallas Water Utilities Project Team
18
Team Member /Contact Information Role Matt Penk, [email protected]
Assistant Director Capital Improvements
Abidur Khan, [email protected]
Sr. Program Manager Stormwater Project Management
Shazia Ahmed, [email protected]
Project ManagerStormwater Project Management
Estela [email protected]
Sr. Community Engagement Specialist
![Page 19: 2017 Bond Program, Proposition D - Dallas...• Presentation (20 Minutes) • Moderated Conversation (30 Minutes) • Questions/Input collected via index cards during presentation](https://reader035.vdocuments.us/reader035/viewer/2022071001/5fbd5f29f54e0550c05fcdc1/html5/thumbnails/19.jpg)
Community Conversation
19
![Page 20: 2017 Bond Program, Proposition D - Dallas...• Presentation (20 Minutes) • Moderated Conversation (30 Minutes) • Questions/Input collected via index cards during presentation](https://reader035.vdocuments.us/reader035/viewer/2022071001/5fbd5f29f54e0550c05fcdc1/html5/thumbnails/20.jpg)
Adjourn
20