2016 CA BUILDING CODE UPDATES2.24.2017

AGENDA – 2016 CALIFORNIA BUILDING CODE UPDATESI . S T R U C T U R A L C B C U P D AT E S

- A L L O W A B L E B U I L D I N G H E I G H T S + A R E A S

- F I R E W A L L S

- W O O D F R A M E D B U I L D I N G S

- C R O S S L A M I N A T E D T I M B E R

- B A L C O N I E S + D E C K S

- 2 0 1 9 C B C – W H A T T O E X P E C T

I I . M E P M U LT I F A M I LY S F C O D E C H A N G E S

- S O L A R R E A D Y B U I L D I N G S

- F A L L P R O T E C T I O N G U A R D S

- F I L T R A T I O N

- I N D E P E N D E N T E X H A U S T S Y S T E M S

- W I N D O W + D O O R S W I T C H E S

- C O M M I S S I O N I N G

- E V C H A R G I N G S T A T I O N S + S F G B O

- I N S U L A T I O N

- S T O R M W A T E R C O N T R O L P L A N + R E C Y C L E D W A T E R

- T 2 4 E N V E L O P E C R I T E R I A

2016 vs 2013 – ALLOWABLE BUILDING HEIGHTS + AREAS

2016 vs 2013 – ALLOWABLE BUILDING HEIGHTS + AREAS

2016 CBC – FIRE WALLS

2013 CBC – WOOD FRAMED BUILDINGS

2016 CBC – WOOD FRAMED BUILDINGS

2013 vs 2016 CBC – WOOD FRAMED BUILDING

2013 CBC

2016 CBC

2016 CBC – WOOD FRAMED BUILDINGS

2016 CBC – CROSS LAMINATED TIMBER | SECTION 202

2016 CBC – BALCONIES + DECKS

American Society of Civil Engineers

(ASCE 2010) International Building Code(IBC 2015)

National Earthquake Hazards Reduction Program

(NEHRP 2009)

California Building Code (CBC 2016)

2019 CALIFORNIA BUILDING CODE – WHAT TO EXPECT

MEP MULTIFAMILY SF CODE CHANGES12.24.2017

NATURALLY-VENTILATED PARKING - CODE

SOLAR READY BUILDINGS – TITLE 24

SOLAR READY BUILDINGS – SF BETTER ROOFS ORD.

FALL PROTECTION GUARDS- OSHA

FALL PROTECTION GUARDS- CBC

FILTRATION – ARTICLE 38: MERV-13

INDEPENDENT EXHAUST SYSTEMS – CMC

KITCHEN EXHAUST – SF: DUCTED KITCHEN HOODS

EXHAUST OPENINGS – WIRE MESH SCREEN: CMC

EXHAUST TERMINATIONS – CMC

COMMISSIONING –TITLE 24

• Cx Required if >3 Stories

EV CHARGING STATIONS –CALGREEN

• 4-10% of Spots EV-Charging ‘Ready’

EV CHARGING STATIONS –CALGREEN

• 4-10% of Spots EV-Charging ‘Ready’• 10 yrs: 50%?

or

SFGBO – LEED?

WALL INSULATION – WOOD-FRAME: T24 >3 STORIESPrescriptive Requirements• 2013: R22 Batt + 1” Continuous• 2016: R22 Batt + 1” Continuous

Minimum Requirements• 2013: R11 Batt + No Continuous• 2016: R19 Batt + No Continuous

WALL INSULATION – METAL-FRAME: T24 >3 STORIESPrescriptive Requirements• 2013: R19 Batt + 1” Continuous• 2016: R19 Batt + 2” Continuous

Minimum Requirements• 2013: R19 Batt + 1” Continuous• 2016: R19 Batt + ½” Continuous

• Sites >5000 SF: Reduce Runoff

STORMWATER CONTROL PLAN – SFPUC

• Dual-plumb if >40,000 SF and in Purple Zone

RECYCLED WATER – SFPUC: DUAL-PLUMBING

• Applies to Entire SF if >250,000 SF• On-Site Rain/Foundation/Gray Water

Treatment • Use for 100% of Toilet Flushing/ Irrigation

RECYCLED WATER – SFPUC: TREATMENT

Units Capex Opex100-400 $165,000 $40,000400-900 $195,000 $50,000900-2000 $235,000 $55,000