Page 1: 20140818 downtown gateway stakeholder workshop

Capital Metro MetroRail – Red Line

ImprovementsProject Connect Gateway

Downtown Multimodal Station

1

Page 2: 20140818 downtown gateway stakeholder workshop

Agenda• Challenges & Opportunities • How we got here• What we heard so far– Issues– Priorities

• Early Concepts • Next Steps

2

Page 3: 20140818 downtown gateway stakeholder workshop

CHALLENGES & OPPORTUNITIES

3

Page 4: 20140818 downtown gateway stakeholder workshop

Residents

Jobs

Events

Visitors

Challenges & Opportunities

4

Page 5: 20140818 downtown gateway stakeholder workshop

Challenges & Opportunities

• Convention Center• Park & Museums• Fire/EMS Facility• Hotels & Homes• Transit Hub• Events

5

Page 6: 20140818 downtown gateway stakeholder workshop

Challenges & Opportunities

6

Page 7: 20140818 downtown gateway stakeholder workshop

Challenges & Opportunities

30

Page 8: 20140818 downtown gateway stakeholder workshop

Challenges & Opportunities • $50M awarded to Capital Metro by TxDOT – $28M – 4 additional vehicles to increase frequency– $22M – permanent downtown station

• Earlier $11M TIGER Grant for related Red Line upgrades

8

Page 9: 20140818 downtown gateway stakeholder workshop

30

Page 10: 20140818 downtown gateway stakeholder workshop

Challenges & Opportunities

100

~260’

Page 11: 20140818 downtown gateway stakeholder workshop

30

Page 12: 20140818 downtown gateway stakeholder workshop

31

Page 13: 20140818 downtown gateway stakeholder workshop

32

Page 14: 20140818 downtown gateway stakeholder workshop

14

33

Page 15: 20140818 downtown gateway stakeholder workshop

1534

Page 16: 20140818 downtown gateway stakeholder workshop

16

Page 17: 20140818 downtown gateway stakeholder workshop

Have we missed any challenges & opportunities?

18

Page 18: 20140818 downtown gateway stakeholder workshop

How we got here

19

Page 19: 20140818 downtown gateway stakeholder workshop

Aust

in B

icyc

le P

lan

(200

9)

Dow

ntow

n Au

stin

Pla

n (2

011)

Imag

ine

Aust

in (2

012)

Proj

ect C

onne

ct (2

013)

CAM

PO 2

035

(201

0)

Crea

te A

ustin

(2

009) Park

s & R

ec P

lan

(201

1)

This

Initi

ativ

eCo

ncep

t Bui

lt

How we got here

20

Page 20: 20140818 downtown gateway stakeholder workshop

21

How we got here

Stak

ehol

der O

utre

ach

This

Initi

ativ

eCo

ncep

t Dev

elop

men

t

Conc

ept B

uilt

Fina

l Des

ign

Cons

truc

tion

& P

ublic

Out

reac

h

Publ

ic O

utre

ach

Desig

n Co

mpe

titio

n or

Con

trac

t

& P

ublic

Out

reac

h

Envi

ronm

enta

l Rev

iew

&

Publ

ic O

utre

ach

Mat

chin

g Lo

cal

Fund

s

Gra

nt F

undi

ng

2015

TxD

OT

UTP

Allo

catio

n

Page 21: 20140818 downtown gateway stakeholder workshop

Any questions/concerns about the process so far?

Page 22: 20140818 downtown gateway stakeholder workshop

WHAT WE HEARD SO FAR

23

Page 23: 20140818 downtown gateway stakeholder workshop

What we heard so far

24

Page 24: 20140818 downtown gateway stakeholder workshop

What we heard so far - Issues1. Relocate AFD/EMS Function

2. Presence of multimodal hub and consider future expansion

3. 4th, 5th, Neches, Red River traffic circulation

4. LAB alignment & pedestrian connectivity to nearby areas (i.e. Waller Creek)

5. Hilton and Convention Center operations, access, and plans

6. Historical significance of Brush Square

7. Trees & green space

8. Public space operations & maintenance

9. Limited space for events, functions, and increasing activity

25

Page 25: 20140818 downtown gateway stakeholder workshop

What we heard so far - Priorities1. Gateway for downtown Austin

2. Pedestrian/bicycle circulation & connectivity

3. Front yard for Convention Center/Hilton/flexible diverse use public space

4. Public services (restroom, water, etc.)

5. Vehicular circulation & connectivity

6. Repose/shade/shelter

7. Safety & security

8. Active supportive edge/adjacent uses

9. Convention space

26

Page 26: 20140818 downtown gateway stakeholder workshop

Gateway

• Confluence of regional transportation• Primary downtown access point • “First impression”• Supports diverse activities and uses• Iconic & memorable

27

Page 27: 20140818 downtown gateway stakeholder workshop

Gateway: Pioneer Square, Portland

• Former parking garage• National design

competition• Planned with MAX light

rail• Friends of Pioneer Square• Opened 1984, Tri-Met

hub in 1986• Portland Streetcar in

2001

28

Page 28: 20140818 downtown gateway stakeholder workshop

Gateway: Denver Union Station – 16th St. Mall

29

Page 29: 20140818 downtown gateway stakeholder workshop

37

2 Tracks/1 Platform 2 Tracks/1 Platform

Page 30: 20140818 downtown gateway stakeholder workshop

31

CriteriaHow well does the

solution meet criteria?

Capital Metro Operational Needs - 3 platform positions, 2 bus bays

Capital Metro User Experience - ease of transfers, accessibility

Top Constraints (from 5/23 workshop)

Relocate AFD/EMS Function

Presence of multimodal hub and consider future expansion

4th, 5th, Neches, Red River traffic circulation

LAB alignment & pedestrian connectivity to nearby areas (such as Waller Creek)

Hilton and Convention Center operations, access, and plans

Top Functions (from 5/23 workshop)

Gateway for downtown Austin

Pedestrian circulation & connectivity

Front yard for CC/Hilton/flexible diverse use public space

Public services (restroom, water, etc.)

Vehicular circulation & connectivity

Other Stakeholder Needs

Consider connector bridge concepts

Allow for valet/parking circulation

Maintain pedestrian crossings of 4th Street

Maintain Red River service access and circulation

Maintain CC & Hilton ingress/egress

Maintain recently added event space along 4th Street

Noise/vibration between CC & Hilton

Consider ongoing operations & maintenance funding for park/plaza

Maintain Car2Go car sharing operations

Maintain B-Cycle bike sharing operations

Page 31: 20140818 downtown gateway stakeholder workshop

39

3 Tracks/2 Platforms

Page 32: 20140818 downtown gateway stakeholder workshop

33 39

Page 33: 20140818 downtown gateway stakeholder workshop

39

Page 34: 20140818 downtown gateway stakeholder workshop

JUST CONCEPTUAL, FOLKS!

Don’t get too excited/worried.

35

Page 35: 20140818 downtown gateway stakeholder workshop

36

Page 36: 20140818 downtown gateway stakeholder workshop

37

Page 37: 20140818 downtown gateway stakeholder workshop

38

Page 38: 20140818 downtown gateway stakeholder workshop

39

Page 39: 20140818 downtown gateway stakeholder workshop

40

Page 40: 20140818 downtown gateway stakeholder workshop

41

Page 41: 20140818 downtown gateway stakeholder workshop

42

Page 42: 20140818 downtown gateway stakeholder workshop

43

Page 43: 20140818 downtown gateway stakeholder workshop

44

Page 44: 20140818 downtown gateway stakeholder workshop

45

Page 45: 20140818 downtown gateway stakeholder workshop

46

Page 46: 20140818 downtown gateway stakeholder workshop

47

Page 47: 20140818 downtown gateway stakeholder workshop

48

Page 48: 20140818 downtown gateway stakeholder workshop

49

Page 49: 20140818 downtown gateway stakeholder workshop

50

Page 50: 20140818 downtown gateway stakeholder workshop

51

Page 51: 20140818 downtown gateway stakeholder workshop

52

Next Steps

Stak

ehol

der O

utre

ach

This

Initi

ativ

eCo

ncep

t Dev

elop

men

t

Conc

ept B

uilt

Fina

l Des

ign

Cons

truc

tion

& P

ublic

Out

reac

h

Publ

ic O

utre

ach

Desig

n Co

mpe

titio

n or

Con

trac

t

& P

ublic

Out

reac

h

Envi

ronm

enta

l Rev

iew

&

Publ

ic O

utre

ach

Mat

chin

g Lo

cal

Fund

s

Gra

nt F

undi

ng

2015

TxD

OT

UTP

Allo

catio

n

Page 52: 20140818 downtown gateway stakeholder workshop

Comments or Questions?

Page 53: 20140818 downtown gateway stakeholder workshop

Who else should know about this?

Page 54: 20140818 downtown gateway stakeholder workshop

Stay involved!

Thanks!