![Page 1: 2014 09 02 TCC Coe - Tuggeranongtuggeranong.org.au/wp-content/uploads/2014/09/Coe... · sequencing of the initial route stages should be the Belconnen to Civic route, then the Woden-Tuggeranong](https://reader035.vdocuments.us/reader035/viewer/2022071516/6139e1e60051793c8c00baf5/html5/thumbnails/1.jpg)
3/09/2014
1
Capital Metro
Alistair Coe MLA
Capital MetroRoute: Gungahlin to the City (Flemington
Road & Northbourne Avenue)
Length: 12.5km
Construction Cost: $614m (published Govt figure)
Operational Cost: Unknown
Passengers: 3,500 commuters
Trains: 12
System: median aligned and overhead wires
![Page 2: 2014 09 02 TCC Coe - Tuggeranongtuggeranong.org.au/wp-content/uploads/2014/09/Coe... · sequencing of the initial route stages should be the Belconnen to Civic route, then the Woden-Tuggeranong](https://reader035.vdocuments.us/reader035/viewer/2022071516/6139e1e60051793c8c00baf5/html5/thumbnails/2.jpg)
3/09/2014
2
The Issues• Cost• Economic Benefit• Patronage• Other Routes• Other Transport Options• Travel Time• Parking Rates• Road Changes
Capital Metro
Cost• Gold Coast Light Rail: $929 million to $1.2 billion
(13km)
• Edinburgh Light Rail cost $1.41 Billion (14km)
• It would cost $10.9 billion to roll Light Rail out across the ACT based on the cost of Gold Coast Light Rail
Capital Metro
![Page 3: 2014 09 02 TCC Coe - Tuggeranongtuggeranong.org.au/wp-content/uploads/2014/09/Coe... · sequencing of the initial route stages should be the Belconnen to Civic route, then the Woden-Tuggeranong](https://reader035.vdocuments.us/reader035/viewer/2022071516/6139e1e60051793c8c00baf5/html5/thumbnails/3.jpg)
3/09/2014
3
Operational Cost
‘The operational arrangements and parameters for Capital Metro are being defined; therefore it would be premature, at this stage of the project, to provide an operational cost estimate’
Simon Corbell MLA, Question No.66 – 14 February 2014
Opposition expects the tram to cost $60m to $100m per year
Capital Metro
Economic Benefit
Capital Metro
Bus Rapid Transit return is double that of light rail
![Page 4: 2014 09 02 TCC Coe - Tuggeranongtuggeranong.org.au/wp-content/uploads/2014/09/Coe... · sequencing of the initial route stages should be the Belconnen to Civic route, then the Woden-Tuggeranong](https://reader035.vdocuments.us/reader035/viewer/2022071516/6139e1e60051793c8c00baf5/html5/thumbnails/4.jpg)
3/09/2014
4
Productivity Commission Assessment:
Capital Metro
“The cost-benefit analysis took into account a range of factors including journey times, and avoided environmental impacts and accidents (ACT Government 2012).
“In summary, a cost-benefit analysis showed BRT to be a greatly superior option than LRT. That a less reliable form of analysis based on less up-to-date information showed LRT to be slightly superior, would not appear to provide a sound basis for overlooking this and deciding to proceed with light rail.”
Page 95
Infrastructure Australia Assessment:
Capital Metro
“The case for favouring light rail over bus rapid transit has not been strongly made, especially when the submission itself points to the stronger economic performance of a bus rapid transit option.”
Infrastructure Australia, 2012-2013 Assessment Brief
![Page 5: 2014 09 02 TCC Coe - Tuggeranongtuggeranong.org.au/wp-content/uploads/2014/09/Coe... · sequencing of the initial route stages should be the Belconnen to Civic route, then the Woden-Tuggeranong](https://reader035.vdocuments.us/reader035/viewer/2022071516/6139e1e60051793c8c00baf5/html5/thumbnails/5.jpg)
3/09/2014
5
Capital Metro
Patronage
• How and why was Gungahlin to the City chosen?• No analysis of options since 2003.• Who is travelling north to Gungahlin at 8:30am?
• Gungahlin to City– Demand one-way– No tourist attractions– No airport
Capital MetroChoice of Routes
![Page 6: 2014 09 02 TCC Coe - Tuggeranongtuggeranong.org.au/wp-content/uploads/2014/09/Coe... · sequencing of the initial route stages should be the Belconnen to Civic route, then the Woden-Tuggeranong](https://reader035.vdocuments.us/reader035/viewer/2022071516/6139e1e60051793c8c00baf5/html5/thumbnails/6.jpg)
3/09/2014
6
2003 Assessment:
Capital Metro
“In order to maximise the project economic benefit, the sequencing of the initial route stages should be the Belconnen to Civic route, then the Woden-Tuggeranong to Civic route and then the Kingston-Manuka Loop. These routes all attract comparable revenues per kilometre with the Belconnen to Civic line and good returns per kilometre.”
Canberra Public Transport Feasibility Study, page 10-1, 2003
Capital Metro
![Page 7: 2014 09 02 TCC Coe - Tuggeranongtuggeranong.org.au/wp-content/uploads/2014/09/Coe... · sequencing of the initial route stages should be the Belconnen to Civic route, then the Woden-Tuggeranong](https://reader035.vdocuments.us/reader035/viewer/2022071516/6139e1e60051793c8c00baf5/html5/thumbnails/7.jpg)
3/09/2014
7
Stop 400m 800m
Stop 1 - Gungahlin Town Centre (Hibberson Street) 567 2628Stop 2 - Manning Clark Crescent 778 2301Stop 3 - Mapleton Avenue 1040 2630Stop 4 - Nullabor Avenue 512 1897Stop 5 - Well Station Drive 224 465Stop 6 - Lysaght Street 0 0Stop 7 - EPIC 50 300Stop 8 - Phillip Avenue 531 1698Stop 9 - Swindon Street 662 1326Stop 10 - Dickson 681 1340Stop 11 - Owen Flats 1188 2098Stop 12 - Macarther Avenue 1413 2888Stop 13 - Condamine Street 1231 1675Stop 14 - Elouera Street 1658 2838Stop 15 - City (Alinga Street) 2100 3000
Stop 400m 800m
Total 12,635 27,084
Percentage of Canberra's Population 3% 7%
Gungahlin Residents Who Can Walk to Tram Stop
3,121 9,921
Percentage of Gungahlin's Population 6% 21%
People near stops
Capital Metro
Projected Light Rail Patronage
Capital Metro Website
Capital Metro
![Page 8: 2014 09 02 TCC Coe - Tuggeranongtuggeranong.org.au/wp-content/uploads/2014/09/Coe... · sequencing of the initial route stages should be the Belconnen to Civic route, then the Woden-Tuggeranong](https://reader035.vdocuments.us/reader035/viewer/2022071516/6139e1e60051793c8c00baf5/html5/thumbnails/8.jpg)
3/09/2014
8
Current Bus Services• Routes:
30, 31, 39, 56, 57, 58, 251, 252, 200, 202, 712, 714
• 119 buses (88 southbound)• 7am to 9am (Northbourne corrdior): 3,100
Capital Metro
ACTION Buses (Now)
Southbound:• 88 bus services
between 7am and 9am• Express buses• Time: 19-25min (peak)
• 3,100 (current)
Light Rail (2020)
Southbound:• 24 tram services
between 7am and 9am• No express trams• Time: 25min (peak)
• 3,500 (projected 2021)
Bus v Tram
Capital Metro
![Page 9: 2014 09 02 TCC Coe - Tuggeranongtuggeranong.org.au/wp-content/uploads/2014/09/Coe... · sequencing of the initial route stages should be the Belconnen to Civic route, then the Woden-Tuggeranong](https://reader035.vdocuments.us/reader035/viewer/2022071516/6139e1e60051793c8c00baf5/html5/thumbnails/9.jpg)
3/09/2014
9
Bus Rapid Transit
Dedicated lane option
Capital Metro
Intersection priority option
Capital Metro
![Page 10: 2014 09 02 TCC Coe - Tuggeranongtuggeranong.org.au/wp-content/uploads/2014/09/Coe... · sequencing of the initial route stages should be the Belconnen to Civic route, then the Woden-Tuggeranong](https://reader035.vdocuments.us/reader035/viewer/2022071516/6139e1e60051793c8c00baf5/html5/thumbnails/10.jpg)
3/09/2014
10
Redevelopment of Northbournewithout light rail
Capital Metro
Alternative• Never say never• Need to improve on 25+ minute commute• Improvements to bus priority measures on
Northbourne• Improvements to suburban bus connections
Capital Metro
![Page 11: 2014 09 02 TCC Coe - Tuggeranongtuggeranong.org.au/wp-content/uploads/2014/09/Coe... · sequencing of the initial route stages should be the Belconnen to Civic route, then the Woden-Tuggeranong](https://reader035.vdocuments.us/reader035/viewer/2022071516/6139e1e60051793c8c00baf5/html5/thumbnails/11.jpg)
3/09/2014
11
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
9,000
CanberraM
urcia (Spain)Salt Lake City (U
SA)Zaragoza (Spain)M
onterry (Mexico)
Gold Coast (Australia)Charlotte (U
SA)Phoenix (U
SA)Saarbruken (Germ
any)Auckland (N
Z)Houston (U
SA)Tenerife (Spain)Tacom
a (USA)
Gudalajara (Mexico)
Portland (USA)
Oceanside (U
SA)N
orfolk (USA)
Cagliari (Italy)Edinburgh (U
K)M
endoza (Argentina)Krakow
(Poland)Padua (Italy)Buffalo (U
SA)Le M
ans (France)M
inneapolis (USA)
Brest (France)Seattle (U
SA)Lausanne (Sw
itzerland)Dijon (France)Sheffield (U
K)Reim
s (France)N
ottingham (U
K)Birm
ingham (U
K)Caen (France)M
ulhouse (France)Seville (Spain)Rabat (M
orocco)London (U
K)M
adrid (Spain)M
exico City (Mexico)
Parla (Spain)Grenoble (France)
Cities with trams Density per km2
Capital Metro