    Lake Cham lain Brid e Re lacement

    NYSDOT Main Office, 50 Wolf Rd, Albany NYFebruar 1, 2010

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    2/42

    Introduction - (Geoff Wood, NYSDOT)

    -

    ,

    Project Overview (Design Team)

    Concurrent Activities & Site Access

    Sitework and Approaches

    Bridge

    Foundations & SubstructureAgenda

    Approach Superstructure

    Delta Pier

    Superstructure Articulation

    Special Provisions

    Construction

    Staging Areas

    Heav Liftin Techni ues

    Sequencing / Schedule

    2

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    3/42

    Lake Champlain Bridge Replacement Project

    NYSDOT contracted project

    Introduction

    Modified Bid Letting

    Bid Documents 3rd Week In February Two scheduled addendums

    Bid Documents will be available online

    3

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    4/42

    Contract Schedule

    Preliminary Plans Released to Contractors

    February 1, 2010

    Bid Set Released to Contractors

    February 22, 2010

    Pre-Bid Meetin

    ContractSchedule

    March 9, 2010

    Final Addenda Released to Contractors ,

    Bid Letting

    April 15, 2010

    Award

    April 30, 2010

    * All dates are approximate

    4

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    5/42

    ProjectOverview

    5

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    6/42

    Concurrent Activities and Site Access

    Active Demolition until June 1, 2010

    Removal of former bridge and piersfrom waterway

    Piers removed to 2 ft below mudline Temporary Ferry Operation

    ProjectOverview

    acen o r ge s e

    Non-routine maintenance

    Causewa

    Installed as part of demolitioncontract

    6

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    7/42

    Concurrent Activities and Site Access

    Archeological sites on both shoresProjectOverview

    7

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    8/42

    Concurrent Activities and Site Access

    4 Potential Staging Areas in NY

    Van Slooten Harbour Marina in Port Henry, NY

    ProjectOverview

    New York State Department of EnvironmentalConservations Crown Point Maintenance Center

    Private property along NY Route 185

    Area adjacent to the Crown Point Visitors center

    2 Potential Staging Areas in VT

    ,reputedly owned by Dana and Lorraine Franklin

    State of Vermont property south of the former bridge alongVT Route 125

    8

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    9/42

    Concurrent Activities and Site Access

    Potential Staging Areas

    1.Van Slooten HarbourMarina

    ProjectOverview

    . Champlain LLCproperty

    3.NYSDEC Crown PointMaintenance Center

    4.Private property alongNY Route 185

    5.State of Vermontproperty south of theormer r ge a ong

    Route 125

    6.Area adjacent to theCrown Point Visitorscenter

    9

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    10/42

    Concurrent Activities and Site Access

    Potential StagingAreas

    ProjectOverview

    1.Cottonwood onLake ChamplainLLC property

    . property south ofthe former bridgealong VT Route 125

    New York

    1.Van SlootenHarbour Marina

    2.Area adjacent to theCrown Point Visitors

    3.NYSDEC CrownPoint MaintenanceCenter

    10

    . along NY Route 185

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    11/42

    Sitework and Approaches

    Retaining Wall

    NYSDOT Bituminous ConcreteDesign

    Overview

    11

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    12/42

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    13/42

    Sitework and Approaches

    DesignOverview

    Retaining Wall north side Graded Slope adjacent to Chimney Point

    s or c e

    VAOT Bituminous Concrete

    13

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    14/42

    Vermont Approach

    DesignOverview

    14

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    15/42

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    16/42

    Bathymetric Survey

    ProjectOverview

    16

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    17/42

    Drilled Shafts

    Water Piers, except Pier 7

    Casings Driven withTemplate

    DesignOverview

    NY & VT Causeways

    Water-based Rig

    NYSDOT Specifications

    Cross Sonic Logging

    17

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    18/42

    Substructure - Foundations Pile Caps

    Geometry

    Suggested Construction Sequence Bottom slab cast on formwork above OHW (98.0)

    ProjectOverview

    Lowered to Elevation 90.0

    Construction joints permissible to avoid mass

    concreting Vertical reinforcement across construction joints

    18

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    19/42

    Substructure Foundations

    Abutments Special Provisions

    ProjectOverview

    Spread Footing

    Pier 7

    19

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    20/42

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    21/42

    Substructure Main Span Piers (4&5)

    ProjectOverview

    21

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    22/42

    Approach Spans Steel Girder

    7 approach spans; 4 NY and 3 VT

    Spans lengths range from 240 ft to 250 ft

    Plate Girders

    8 ft depth at 10 ft spacingProjectOverview

    Conventional cast-in-place deck on corrugated

    metal deck SIP forms Epoxy rebar

    22

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    23/42

    Approach Spans Multi Steel Girder

    ProjectOverview

    23

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    24/42

    Delta Pier Span

    At Piers 4 & 5ProjectOverview

    24

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    25/42

    Delta Pier Span

    Cross beam

    ProjectOverview

    25

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    26/42

    Main Span - Network Tied Arch

    Inclined Hangers (Stay Cables) that cross twice

    ProjectOverview

    26

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    27/42

    Main Span Network Tied Arch

    Plate Girder Arch Rib

    Pre cast deck panels Galvanized rebar

    ProjectOverview

    27

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    28/42

    Main Span - Cable Hangers

    All Stay Cable Manufacturers (VSL, DSI,Freyssinet) have applicable systems

    Detailed for Freyssinet H1000 System

    All cables 7 Strand TendonProjectOverview

    re a r ca e ays

    Lengths Vary from 14 to 81 ft

    Total of 64 Stays

    UHMW Cable Connector Assemblies

    28

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    29/42

    Main Span Network Tied Arch

    ProjectOverview

    Joint) Upper Lateral Bracing

    W18x76

    29

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    30/42

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    31/42

    - Precast Concrete Panels with Cast-in-Place

    Closures

    ProjectOverview

    Flat anchorage system

    31

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    32/42

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    33/42

    At arch: Compression Joints

    Articulated Superstructure - Joints

    ProjectOverview

    At abutments: Modular Joints

    33

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    34/42

    Progress Photographs / Live

    Video

    Micropiles

    Metalizing

    SpecialProvisions

    Work in Navigable Waterways

    Cofferdams System for Erosion Protection

    Pedestrian Railing

    Cable Hangers Navigation Lighting

    Post-Tensioning

    FRP Maintenance and

    Walkways

    Engineer

    I/D Clause

    Avoid Interference with Ferry Modular Expansion System

    Disk Bearings

    Erection of Arch Span including

    Operations

    Possible Overlap with

    Demolition Contract

    Construction and Float-InOperations

    Drilled Shaft Foundations

    Aviation Beacon ??

    34

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    35/42

    Material Coatings

    Steel superstructure Spray application

    SpecialProvisions

    Can be applied in most shop and field environments

    Cold process; does not cause distortion of welds or

    steel from high temperatures Higher initial cost than painting, but lower life cycle

    costs

    35

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    36/42

    Material Coatings

    Enhanced corrosion protectionSpecialProvisions

    36

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    37/42

    Stay Cables

    Protection)

    Blisters above roadwaySpecial

    Provisions

    HDPE Pipe anchorages (subject to Leak Test)

    37

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    38/42

    Stay Cables

    Leak Test 96 hours Axial Fatigue Test

    SpecialProvisions

    38

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    39/42

    Construction Methods

    Float-in arch span

    Construction

    39

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    40/42

    Heavy Lifting Technique

    Construction

    40

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    41/42

    Anticipated Construction Schedule

    Construction APRIL '10 MAY '10 JUNE '10 JULY '10 AUGUST '10 SEPT. '10 October '10 NOV. '10 DECEMBER '10 JANUARY '11 FEBRUARY '11 MARCH '11 APRIL '11 MAY '11 JUNE '11 JULY '11WEEK 1 2 3 4 1 2 3 4 1 2 3 4 5 1 2 3 4 1 2 3 4 1 2 3 4 5 1 2 3 4 1 2 3 4 1 2 3 4 5 1 2 3 4 1 2 3 4 1 2 3 4 5 1 2 3 4 1 2 3 4 1 2 3 4 5 1 2 3 4

    LAKE CHAMPLAIN BRIDGE CONSTRUCTION SCHEDULE

    Post Design and Construction

    RFI's/Shop Drawings/As-Builts/Field Mtgs.

    Mobilization - Foundations/Pile Caps

    Foundations/Pile Caps

    Mobilization - Abutments/Piers/Superstructure

    Approach Span Superstructures

    Main Span

    41

  • 8/14/2019 2010.02.01 Lake Champlain Bridge Contractors Presentation

    42/42

    42