20 + 150 salem st | saugus, ma the channel · commercial, but since that time the town of saugus...

8
THE CHANNEL 4-ACRE DEVELOPMENT 20 + 150 SALEM ST | SAUGUS, MA

Upload: others

Post on 13-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 20 + 150 SALEM ST | SAUGUS, MA THE CHANNEL · commercial, but since that time the Town of Saugus has expressed a major interest in activating this underutilized parcel. In 2014, the

THE CHANNEL4-ACRE DE VELOPMENT

20 + 150 SALEM ST | SAUGUS, MA

Page 2: 20 + 150 SALEM ST | SAUGUS, MA THE CHANNEL · commercial, but since that time the Town of Saugus has expressed a major interest in activating this underutilized parcel. In 2014, the

THE CHANNEL

ROU

TE 107THE CHANNEL

Wheelabrator 60 employees

Avai labit y of Clean Energy

GE Aviat ion2,500 employees

Average sa lar y of $75,000.00 plus

Page 3: 20 + 150 SALEM ST | SAUGUS, MA THE CHANNEL · commercial, but since that time the Town of Saugus has expressed a major interest in activating this underutilized parcel. In 2014, the

THE CHANNEL | HIGHLIGHTS

HIGH VISIBIL IT Y AND TRAFFIC COUNTS

NE W ZONINGOPPOR TUNITIES

TRANSIT ORIENTEDDE VELOPMENT

PROXIMITY TO POPULARDESTINATIONS

PROXIMTIT Y TOPUBLIC TRANSPORTATION

Lynn Gear WorksChar les Pats ios Development

1.5 mi l l ion s f of development

Ful l bui ld out to be completed 2022

WATERFRONTACCESS

R iver works Stat ionPubl ic access agreed in M ay 2017

Construc t ion to begin 2019

Page 4: 20 + 150 SALEM ST | SAUGUS, MA THE CHANNEL · commercial, but since that time the Town of Saugus has expressed a major interest in activating this underutilized parcel. In 2014, the

THE CHANNEL

Page 5: 20 + 150 SALEM ST | SAUGUS, MA THE CHANNEL · commercial, but since that time the Town of Saugus has expressed a major interest in activating this underutilized parcel. In 2014, the

THE CHANNEL | DESCRIPTIONPHYSICAL LOCATIONThe project site is located at 20 and 150 Salem Turnpike along the Saugus River in Saugus, MA (see image previous page). The property is bound by the Saugus River to the north, land owned by Refuse Energy to the east, land owned by unknown entity to the south, and the Salem Turnpike (Route 107) to the west. The site is located on the east side of the Salem Turnpike at the intersection of Ballard Street. It should be noted that the entire site is within the Rumney Marshes Area of Critical Environmental Concern (ACEC), which includes the Saugus and Pines Rivers and the wetlands up to the 100 year fl ood elevation as delineated by the Federal Emergency Management Agency (FEMA) fl ood maps.

PUBLIC TRANSPORTATION:The site has direct access to 5 diff erent bus lines which connect directly to Wonderland Station and MBTA’s Blue Line located 3.5 miles to the south. In addition to this connection, the Riverworks Commuter Rail Station (set to become public in 2019) is located 0.8 miles to the north and can be accessed by foot in less than 15 minutes.

PROXIMITY TO POPULAR DESTINATIONS:The site is located within 4 miles of 3 major retail shopping centers including Walmart to the north east (1.8 miles), the Northgate Mall to the south west (3.2 miles) and Wonderland Marketplace to the south east (3.3 miles). Just past the Northgate Mall to the east there is convenient access to Route 1 and beyond. In addition to brick and mortar experiences, the expansive Rumney Marsh provides hiking trails and opportunities to interact with nature. Revere Beach is 4 miles to the south east and the popular Nahant Beach is 4.0 miles to the east.

In addition to the existing destinations, the most accessible and exciting development of all is set to begin construction in 2018. Lynn Gear Works is a proposed 65.5-acre transit oriented development that will bring 1.5 million sf of new development within a 1 mile radius of The Channel. The Lynn Gear Works development is setting a new precedent for mixed-use development in this area and will assist in bringing The Channel to its full potential.

Page 6: 20 + 150 SALEM ST | SAUGUS, MA THE CHANNEL · commercial, but since that time the Town of Saugus has expressed a major interest in activating this underutilized parcel. In 2014, the

THE CHANNEL

Page 7: 20 + 150 SALEM ST | SAUGUS, MA THE CHANNEL · commercial, but since that time the Town of Saugus has expressed a major interest in activating this underutilized parcel. In 2014, the

100'

240'

240'

100'

40'40

'

40'40

'

40'40

'

120'

120'

120'

120'

120'

120'

INV. 12" STEEL

R=9.69I=7.1

INV. 12" RCPOUTFALL = 4.03

GUY

GU

Y

MW

BALLARD STREET

IKE

SAUGUS RIVER

)

SAUGUS RIVER

STONERIP-RAP

FENDERFENDER

RIP-RAPSTONE

PROP. 1' RET WALL

PROP. 1'-2' RET WALL

PROPOSEDSIGN

GATEPROPOSED PROP FENCE

PROPOSED FENCE

PR

OP

OS

ED

FE

NC

E

PROPOSEDGATE

PROPOSED FENCE

APPROXIMATE OUTLINE

LEVEL

N/FWILLIAM O'DONNELL,

GEORGE PIKE,MARY O'BRIEN,

SIDNEY & BURNHAM PIKEBOOK 15216 PAGE 143

RESYSCEMA

No. 100

L.

ght is not to exceed 90 ft.

R T

E.

1 0

7S

E L

FS

T O

R A

G E

3 L

ev

el

- 2

40

' x

10

0' 1 Level - 120' x 40'

1 Level - 120' x 40'

1 Level - 120' x 40'

FENCE6' STOCKADE

GR

AN

ITE

CU

RB

CONCBOUNFOUN

1 STORYCONCRETE

BLOCK

EXISTING

18'x9'(typ.)

1

2

4

3

5

9

10

8

7

6

11

12

13

14

17

16

15

18

4' W

IDE

WAL

K

ED

GE

PA

VE

ME

NT

EDGE PAVEMENT

EDGE PAVEMENT

CC

BE

RM

R=9.69I=7.1

BALLARD STREET

IKE

)G

RA

NIT

E C

UR

B

THE CHANNEL | ZONINGZONING ANALYSIS + HISTORYRoute 107 Storage, LLC. is in full ownership of the 4 acre development which was previously permitted as a storage facility in 2008. In 2008, the Route 107 corridor was zoned strictly commercial, but since that time the Town of Saugus has expressed a major interest in activating this underutilized parcel. In 2014, the Town of Saugus approved the creation of Article 18: Waterfront Mixed Use Overlay District (see map). The new zoning overlay allows for the following uses (according .pdf located on the Town of Saugus website dated March 27, 2014).

“The WMUOD zoning bylaw is established to integrate a mix of land uses which will promote public access to the water and create more sustainable land uses. It encompasses:

• Existing industrial uses and new light industrial uses fostered by emerging technology.• Innovative and sustainable building and site design.• A variety and balance of commercial, retail and residential uses.• A mix of water dependent, water related and non-water-related uses.• Preservation and growth of the fi shing industry and related uses• Opportunities for aff ordable housing.• Public access to the Saugus River, Pines River, waterfront and nearby estuaries and provide

connections to recreational resources.• Provision for water-based transportation options”

PREVIOUSLY REVIEWED OPTIONS:

arina

Page 8: 20 + 150 SALEM ST | SAUGUS, MA THE CHANNEL · commercial, but since that time the Town of Saugus has expressed a major interest in activating this underutilized parcel. In 2014, the

THE CHANNEL4-ACRE DE VELOPMENT

20 + 150 SALEM ST. | SAUGUS, MA