1681 26th street (former papermate site development agreement
TRANSCRIPT
1681 26TH STREET
(FORMER PAPERMATE SITE)
DEVELOPMENT AGREEMENT Planning Commission
September 11, 2013
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
PROJECT LOCATION
2 310,504 sf (7.1 acre) site
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
PROJECT LOCATION
3
Subject Property Comparable to 3.5 Downtown Blocks
Future Bergamot
LRT Station
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
PROJECT SITE CONTEXT
4
Water Gardens
Red Bull Offices
Office Buildings
SMC Academy of Entertainment & Technology Penn Station
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
PROJECT DESCRIPTION
471 residential units (363,280 sf) and 27 artist work/live units
75 units of affordable and workforce housing
29,934 sf of neighborhood retail
375,000 sf of of creative office
1,936 parking spaces in 3-level subterranean garage
379 more spaces than required by draft Bergamot Area Plan at Plan adoption
2.47 FAR
Maximum actual height of 84’
5
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
FLOAT-UP PROJECT CONCEPT – USES + SITE PLAN
6
Use Square Feet
Creative Office 495,000
Retail 47,000
Residential 325 units
Creative Office
Residential/ Retail Creative Office/
Retail Creative Office/ Retail
Residen-tial
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
DESIGN BACKGROUND: FLOAT-UP DISCUSSIONS
Direction from City Council to deal move forward with additional design work necessary in following areas:
Mix of Uses
Pedestrian-oriented major open space
Building scale and block size
Building modulation
Mitigate campus feel of development by approximating massing and bulk character seen throughout the city in mixed-use, pedestrian-oriented areas
Skyline variation
Location of Western Road
Street and sidewalk width
Parking garage access
7
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
PROPOSED PROJECT CONCEPT – USES + SITE PLAN
8
Use Square Feet
Creative Office 374,423
Retail 29,391
Residential 471 units
Artist Work/Live 27 units
Creative Office/ Retail Creative
Office/ Retail
Residential Residen-tial
Residential
Building 4 switched to residential
Included pedestrian-oriented major open space
Location of Western Road
Street and sidewalk width
Parking garage access
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
PARKING
Required Parking Based on draft Bergamot Area Plan requirements at Plan adoption
748 parking spaces for Residential
807 parking spaces for Commercial
Minimum of 653 shared parking spaces
Proposed 1,936 parking spaces
9
Bicycle Parking provided in accordance with draft Bergamot Area Plan 928 long-term 122 short-term 20 showers 323 lockers
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
BERGAMOT AREA PLAN POLICY CONSISTENCY
Urban Form Complies with urban form
concept Further Consideration
Mass and scale of Building 5
Open Space Complies
Providing open space
Further Consideration Viability of trees on deck Sidewalk widths
Circulation and Mobility Further Consideration
Supporting no net new PM peak trips (parking cash-out issue)
Parking pricing structure
Land Use Complies with land use mix Further Consideration
Range of units
10
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
11
PROJECT EVALUATION: MANDATORY DEVELOPMENT STANDARDS
Mandatory Standards
Building Height
FAR
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
MANDATORY STANDARDS: BUILDING HEIGHT AND FLOOR AREA
Intent to reduce mass of buildings at upper levels
Maximum FAR of 2.5 for Tier 3 project per draft BAP Already reduced from LUCE
maximum of 3.5 Building Modulation for top
two floors to be reduced by 90% and 50% of largest building floor plate
Conformance with design objectives to achieve same goal
Additional floor area reduction that corresponds to requested height over 75’ applies only to floor area between 75’ to 81’
12
79.5’
75’
90% of largest floor plate
50% of largest floorplate
18’
57’
70’
84’
18’
13’
13’
13’
13’
14’
Height above 13.5’ not counted (4.5’ height reduction)
Reduce floor area by % increase in height btw 75’ to 81’
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
13
PROJECT EVALUATION: FLEXIBLE STANDARDS
Building Modulation
Top Floor @ 50% of largest floor plate
Top Floor minus 1 @ 90% of largest floor plate
Maximum Floor Plate – 35,000 sf
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
FLEXIBLE STANDARDS FINDINGS
That meeting all development standards will prevent physical innovation in mixed-use development and/or building design
That the proposed design reinforces and enhances the establishment of a mixed-use pedestrian-oriented environment and sidewalk life in the Transit Village and Mixed-Use Creative Districts
That the proposed design supports local uses, including but not limited to the provision of housing, daily community needs and/or services, and/or public open space and green connections to adjoining neighborhoods
That the proposed design integrates features and amenities, including, but not limited to wider sidewalks, landscaping and trees and/or arts and cultural uses
That, where relevant, the proposed design maintains solar access for existing, adjacent or adjoining residential land uses
14
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
15
PROJECT EVALUATION: BAP DESIGN OBJECTIVES/GUIDELINES
Guidance for projects using flexible development standards
Encourage innovative ways to achieve design goals without prescriptive standards
Project does not conform with some design objectives
Objective 1: Open space
Objective 5: Building plane modulation
Objective 6: Height modulation
Objective 8: Integrate with and foster logical evolution of Bergamot’s industrial character
Objective 9: Innovative architecture
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
BUILDING 1
16
Co-planar north and south elevations
Articulation achieved through texture and balconies
270’ long elevations
Skyline variation only between each building
Proposed architectural projection
+70’
270’
+84’
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
BUILDING 2
17
Primarily rectangular building
Strategy appears to be vertical bays and horizontal articulation
Skyline variation
Does not conform with flexible standards
Proposed architectural projection +57’
+70’
+84’
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
BUILDING 3
18
Significant building offsets to create courtyards
60’ x 60’ courtyard dimensions – somewhat disproportionate to surrounding 80’ high building
+70’
+81’
+70’
+81’
+81’
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
BUILDING 4
19
Roughly 40’ wide building separation at upper levels
2-story volume beneath 5-story bridging element
Roughly 60’ wide separation at ground floor
Complies with draft BAP flexible standards on building modulation
+70’ +60’
+80’
+70’ +60’
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
BUILDING 5
20
Over 300’ long north elevation
Lack of natural light for ground floor units
Narrow area between buildings
Awkward transition between public and private space
+60’
+10’
300’+
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
OPEN SPACE
Distinction between design of public space and primarily site amenities
Major 31,000 sf open space on Site 1
Neighborhood park on Site 4
Plaza on Site 5
2 pedestrian pathways
21
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
WESTERN “A” STREET
22
Western “A” Street (Flexible)
Project Plan
Min Right-of-Way 68’ 60’
Min Ped Realm 13’10”-21’5”
13’
Min Through Zone 8’10”-13’5”
8’
Min Furnishing Zone 5-8’ 5’
Min/Max Lane Width 12’ 9’/11’
Min/Max Shared Travel Way -- --
Min/Max Parking Width 8’ 7’/8’
Min Ped/Vehicle Flex Space 8’ 12’
Parking Type Angled Parallel
BAP
Figure 7.10
(Page 226)
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
EASTERN “B” STREET
23
Eastern “B” Street (Shared)
Project Plan
Min Right-of-Way 52’ 50’
Min Ped Realm 10-18’ 8’
Min Through Zone 5-10’ 5’
Min Furnishing Zone 5-8’ 5’/7’
Min/Max Lane Width -- --
Min/Max Shared Travel Way 24’ 16’/20’
Min/Max Parking Width 8’ 7’/8’
Min Ped/Vehicle Flex Space -- --
Parking Type Parallel Parallel
BAP
Figure 7.12
(Page 230)
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
NEBRASKA AVE EXTENSION
Nebraska West (Complete)
Nebraska East (Shared)
Project Plan Project Plan
Min Right-of-Way 39’9” (half)
65’ 36’
(half) 65’
Min Ped Realm 16’8” 11’ 12’10” 8’
Min Through Zone 11’8” 5’ 7’10” 5’
Min Furnishing Zone 5’ 6’ 5’ 5’/7’
Min/Max Lane Width 11’ 10’ -- --
Min/Max Shared Travel Way -- -- 22’ 16’/20’
Min/Max Parking Width TBD 7’/8’ TBD 7’/8’
Min Ped/Vehicle Flex Space -- -- -- --
Parking Type TBD Parallel TBD Parallel
24
Complete Street Shared Street
BAP
Figure 7.02
(Page 209)
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
DEVELOPMENT AGREEMENT FRAMEWORK
Outside Building Permit Issuance Date Length of time for Developer to obtain building permit 10 years
Anticipates project being constructed in two phases and five buildings
Community benefits per Building On-site Publicly Accessible Open Space Early Childhood Initiative TMA and Bike Share Annual contribution Historic Preservation Annual contribution
Community Benefits per Phase Public transit stop enhancements Historic Preservation Initial Contribution
Joint obligations Streets Annual Monitoring Expo Buffer Park contribution Ongoing Landscaping Maintenance TDM Plan Local Hiring TMA and Bike Share Initial contribution
25
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
SIGNIFICANT PROJECT FEATURES
Affordable Housing 5% of units (25 units) @ Extremely Low Income
Utility Undergrounding Remove all overhead transmission, distribution, and electrical power
lines at project perimeter
Sustainability LEED Gold Certification 5% of parking spaces to be “EV Ready” Strive for net-zero water use in Creative Office Phase
Dual plumbing Non-potable water for toilet flushing and irrigation
Solar photovoltaic energy system that produces at least 5kw AC/1000 sf of building footprint area (alternative energy may be proposed to produce same amount of renewable energy)
Transportation Impact Fee Payment of up to approximately $5.1 fee
Arts Contribution $4/sf with first $500,000 set aside for Site 1 plaza programming Remainder for on-site public art
26
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
COMMUNITY BENEFITS
Surface easement for three new streets
$2M contribution for construction of Expo Buffer Park Payable 90 days after effective date of DA
On-site Public Accessible Open Space 31,000 sf Plaza + Eastern plaza: 8am – 11pm
14,000 sf Park + pathways & courtyards: 8am – 6pm
Up to $855,000 total contribution to TMA $30,000 initial contribution at first building permit
$3,000/building for life of project
Increases evenly to aggregate of $15,000 annually if at least 3 buildings constructed at Outside Permit Issuance Date
Up to $1,395,000 total contribution to Bikeshare $20,000 initial contribution at first building permit
$8,000/bldg in Creative Phase + $3,000/bldg in Residential Phase for life of project
27
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
COMMUNITY BENEFITS
Advance marketing preference to local workforce for housing units
27 artist work/live units including 1 unit at extremely low income Subject to initial and ongoing artist marketing plan Units required to comply with design guidelines
Up to $160,000 for transit improvements adjacent to project $80,000 payable with first building permit of each phase
Local hiring for construction and permanent jobs with commitment to interview qualified referrals
6 internships for Santa Monica High School and Santa Monica College students
Up to $200,000 annual contribution for Early Childhood Education Initiatives for life of project (up to $11M total) $0.2608/sf contribution per building for life of project
Up to $350,000 contribution for heritage preservation initiatives in underserved communities $25,000 initial contribution at each CofO for first 3 buildings $1,000/building for life of project
28
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
STREETS: PHASED APPROACH
29
Critical Temporary Improvements - network completion at 18 months from first CofO (if not already constructed with building) Nebraska Avenue Extension Western Street Olympic Sidewalk
Permanent Improvements With Site – Nebraska Avenue, Western Street, Olympic Sidewalk, Stewart Sidewalk, 26th
Sidewalk With first Building in Phase – Eastern Street; Stewart Street Crosswalk and Median At Outside Permit Issuance Date – All Streets and Sidewalks
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
TRANSPORTATION DEMAND MANAGEMENT PLAN
3 principles
Establish compliance requirements
Create measures that would likely achieve targets
Monitoring and reporting with non-compliance penalties
Conventional Measures
Already required by TDM ordinance, set as expectations by LUCE and BAP, or development standards
Augmented
PM peak hour trip caps with penalties for non-compliance
50% transit pass subsidy offered to all residents
50% Vanpool program subsidies
30
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
OUTSTANDING ISSUES
Transportation Allowance/Parking Cashout
Parking Pricing
Mix and affordable level of additional affordable housing
Affordable housing obligation of commercial component
Striving for net zero water use in residential component
Amount of financial security to be posted for street improvements
31
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
OUTSTANDING ISSUE: TRANSPORTATION ALLOWANCE
Staff proposal
Parking cash-out of at least $160 for employees whose employer leases parking for their employees regardless of employer size
Transportation allowance of at least $140 for employees who employer does not lease parking for their employees
Applicant proposal
Implement existing parking cash-out law
Applies to employers in following circumstances:
1) Employ at least 50 persons
2) Worksites in air basin designated as nonattainment
3) Subsidize employee parking that they don’t own
4) Can calculate the out-of-pocket expense of the parking subsidy they provide
5) Can reduce the number of parking spaces without penalty 32
Based on
parking
subsidy
Based on
monthly
price of
transit
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
OUTSTANDING ISSUE: PARKING PRICING
Staff Proposal
Consistent with Bergamot Area Plan
Minimum $8/day
Preferred rate for employees who are also TMA members
Variable rate structure for non-TMA members and peak-period Park and Ride commuters
Developer Proposal
Does not agree with preferred rate for employees who are also TMA members
33
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
OUTSTANDING ISSUE: ADDITIONAL AFFORDABLE HOUSING
Agreement on additional 10% of units (50 units)
Staff Proposal
Range of unit types and different affordability levels
20% at 80% AMI
40% at 110% AMI
40% at up to 150% AMI
Developer Proposal
All at 180% AMI
34
Rent Limits in AHPP Rents Beyond AHPP
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
OUTSTANDING ISSUE: AFFORDABLE HOUSING OBLIGATION FOR CREATIVE OFFICE PHASE
Staff Proposal
Separate obligation of Creative Office Phase regardless of whether Residential Phase is constructed or not
Augmented fee based on commercial nexus study
Fee may be offset through demonstrated partnership with Residential Phase developers for construction of on-site units
Applicant Proposal
Fee only applicable if building permits not issued for all 3 Residential Phase buildings
Fee based on commercial nexus study
Fee reduced by number of affordable units constructed in Residential Phase
35
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
OUTSTANDING ISSUE: SUSTAINABILITY FEATURES
Residential Phase Water Use
Energy Use
Staff Proposal Aggressive but realistic performance standards for toilet flushing,
showers, and clothes washers
Non-potable water for toilet flushing
Striving for meeting as much on-site energy needs with on-site renewable energy as possible
Energy performance standard of 10kBTU/ft2/yr for parking garage
Applicant Proposal Performance standards for toilet flushing, showers, and clothes
washers based on Energy Star
Does not agree with use of non-potable water for toilet flushing
Would like to maintain flexibility in technology for non-renewable energy
Does not agree to energy performance standard for parking garage
36
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
OUTSTANDING ISSUE: FINANCIAL SECURITY FOR STREET IMPROVEMENTS
Staff Proposal
Financial security that covers temporary and permanent improvements
Possible event of Non-Monetary Default where City may choose to terminate the development agreement
Applicant Proposal
Financial security that covers only permanent improvements
37
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
SUMMARY OF ECONOMIC ANALYSES
Value Enhancement Analysis Identifies additional development value that the project would
create relative to hypothetical Tier 1 project: $25.7M
Feasibility Statement Residual Land Value used as expression of feasibility for project
alternatives Tier 1: 63% less than current assessed value of property; 47% less
than proposed project’s estimated residual land value Zoning Compliance: 40% less than current assessed value of
property 15% less than proposed project’s estimated residual land value
Fiscal Impact Analysis Project would result in estimated net annual impact of $420,000 to
City’s General Fund
Economic Impact Analysis During construction: estimated $322M of one-time economic
benefit; 1,781 direct jobs During project operations: estimated $282M of annual recurring
economic activity; 1,448 direct jobs 38
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
ENVIRONMENTAL ANALYSIS
Original project studied in EIR consisted of more commercial use with less residential (541,822 sf of commercial and 325 residential units)
Draft EIR published January 12, 2012 for 45-day public comment period and extended for additional 14 days (total of 60 days)
341 comment letters received primarily focused on traffic, land use/planning, neighborhood effects, and alternatives
Applicant elected to pursue development of project substantially similar to Alternative 3 (Residential Alternative) after publication of Draft EIR
Final EIR published June 2013 includes all responses to comments
39
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
ENVIRONMENTAL ANALYSIS
Unavoidable Significant Impacts
Aesthetics – removal of coral trees from Olympic Blvd scenic corridor
Air Quality – construction and project-related VOCs and NOx
Construction Effects – localized construction emissions
Traffic Impacts
20 Approval Year plus Project intersections
22 Future Year plus Project intersections
6 street segments
40
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
ENVIRONMENTAL ANALYSIS
Alternatives Studied
No Project/Reasonably Foreseeable Alternative
Eliminates operational air quality impact
Reduces traffic impacts
Residential Alternative
Reduces traffic impacts
Reduced Project Alternative Environmentally Superior Alt
19% less floor area than proposed project
Eliminates operational air quality impact
Reduces traffic impacts
41
1681 26th St (former Papermate site) Development Agreement | Planning Commission | September 11, 2013
CONCLUSION
Outstanding Issues on Development Agreement Additional Affordable Housing unit mix and affordability level Affordable Housing Obligation of Creative Office Phase Parking Cashout/Transportation Allowance Parking Pricing Sustainability (Water Use for Residential Phase; Energy Use) Financial Security for Street Improvements
Outstanding Issues on Project Design Scale and length of Building 5 Skyline variation Building modulation Appropriateness of architectural projections Relationship between smaller open spaces and buildings on Sites 2 and 3 Resolving “campus feel” of project Lack of findings and conformance with design objectives and guidelines to
support deviation from flexible standards
42
Recommendation
Staff recommends Planning Commission review and provide comment on outstanding issues
Key Issues for Discussion