155 scen overview 37 en cn
TRANSCRIPT
-
7/30/2019 155 Scen Overview 37 en CN
1/3
Create New Bill of Materials
SAP Best Practices Baseline Package(China)
SAP Best Practices
-
7/30/2019 155 Scen Overview 37 en CN
2/3
Process Flow Diagram Create New Bill of Materials
E n g
i n e e r i n g
S p e c
i a l i s
t
E v e n
t
Raw, Semi, TradeMaterial:
Create Raw (ROH)Material (155.25)
Create Semi FinishedGood (HALB) Material(155.26)
Create Trading Good(HAWA) Material(155.27)
Create Bill of Materials
Need for a NewBill of Materials
End Process
CreateProductionVersion(155.33)
MaintainBOM
Configuration Material
Link(155.38)
CreateRouting(155.39)
Finished Material:
Create FinishedGood (FERT) Material (non configurable)(155.28)Create Finished
Good (FERT) Material (configurable)(155.29)
-
7/30/2019 155 Scen Overview 37 en CN
3/3
Legend
Symbol Description UsageComments
Band: Identifies a user role, such as AccountsPayable Clerk or Sales Representative. This bandcan also identify an organization unit or group,rather than a specific role.
The other process flow symbols in this table go intothese rows. You have as many rows as required tocover all of the roles in the scenario.
Role bandcontains taskscommon to thatrole.
External Events: Contains events that start or end thescenario, or influence the course of events in thescenario.
Flow line (solid): Line indicates the normal sequenceof steps and direction of flow in the scenario.Flow line (dashed): Line indicates flow to infrequently-used or conditional tasks in a scenario. Line canalso lead to documents involved in the process flow.
Connects twotasks in ascenario
process or anon-step event
Business Activity / Event: Identifies an action thateither leads into or out of the scenario, or an outsideProcess that happens during the scenario
Does notcorrespond to atask step in thedocument
Unit Process: Identifies a task that is covered in astep-by-step manner in the scenario
Corresponds toa task step inthe document
Process Reference: If the scenario references another scenario in total, put the scenario number and namehere.
Corresponds toa task step inthe document
Sub-Process Reference: If the scenario referencesanother scenario in part, put the scenario number,name, and the step numbers from that scenario here
Corresponds toa task step inthe document
Process Decision: Identifies a decision / branchingpoint, signifying a choice to be made by the enduser. Lines represent different choices emergingfrom different parts of the diamond.
Does notusuallycorrespond to atask step in thedocument;Reflects achoice to be
made after stepexecution
Symbol Description Usage Comments
To next / From last Diagram: Leadsto the next / previous page of theDiagram
Flow chart continues on the next /previous page
Hardcopy / Document: Identifies aprinted document, report, or form
Does not correspond to a taskstep in a document; instead, it isused to reflect a documentgenerated by a task step; thisshape does not have any outgoingflow lines
Financial Actuals: Indicates afinancial posting document
Does not correspond to a taskstep in a document; instead, it isused to reflect a documentgenerated by a task step; this
shape does not have any outgoingflow lines
Budget Planning: Indicates abudget planning document
Does not correspond to a taskstep in a document; instead, it isused to reflect a documentgenerated by a task step; thisshape does not have any outgoingflow lines
Manual Process: Covers a taskthat is manually done
Does not generally correspond toa task step in a document;instead, it is used to reflect a taskthat is manually performed, suchas unloading a truck in thewarehouse, which affects theprocess flow.
Existing Version / Data: This blockcovers data that feeds in from anexternal process
Does not generally correspond toa task step in a document;instead, this shape reflects datacoming from an external source;this step does not have anyincoming flow lines
System Pass / Fail Decision: Thisblock covers an automaticdecision made by the software
Does not generally correspond toa task step in the document;instead it is used to reflect anautomatic decision by the systemthat is made after a step has beenexecuted.
< F u n c
t i o n
>
E x
t e r n a
l
t o S A P
BusinessActivity /
Event
Unit Process
ProcessReference
Sub-Process
Reference
Process
Decision
DiagramConnection
Hardcopy /Document
FinancialActuals
BudgetPlanning
ManualProces
s
ExistingVersion /
Data
SystemPass/F
ailDecisio
n