120510 firestopping ejr

21
Sharing our Guidance Firestopping

Upload: sdouglass11

Post on 20-May-2015

183 views

Category:

Business


1 download

TRANSCRIPT

Page 1: 120510 firestopping ejr

Sharing our Guidance

Firestopping

Page 2: 120510 firestopping ejr

X

Firestopping

300.21 Spread of Fire or Products of CombustionElectrical installations in hollow spaces, vertical shafts, and ventilation or air-handling ducts shall be made so that the possible spread of fire or products of combustion will not be substantially increased. Openings around electrical penetrations through fire-resistant-rated walls, partitions, floors, or ceilings shall be firestopped using approved methods to maintain the fire resistance rating.

National Electric Code: Article 300 – Wiring Methods

04/12/23 2

FPN: Directories of electrical construction materials published by qualified testing laboratories contain many listing installation restrictions necessary to maintain the fire-resistive rating of assemblies where penetrations or openings are made. Building codes also contain restrictions on membrane penetrations on opposite sides of a fire-resistance-rated wall assembly. An example is the 600-mm (24-in.) minimum horizontal separation that usually applies between boxes installed on opposite sides of the wall. Assistance in complying with 300.21 can be found in building codes, fire resistance directories, and product listings.

Page 3: 120510 firestopping ejr

X

Firestopping

2703.1 PenetrationsPenetrations of walls, floors, ceilings, and assemblies required to have a fire-resistance rating shall be protected in accordance with Chapter 7. Where cables, conductors, and raceways penetrate fireblocking or draftstopping, such penetrations shall be protected by filling the annular space with an approved fireblocking material.

Ohio Building Code: Penetrations and Fire-Resistance-Rated Construction

04/12/23 3

712.3.1 Through PenetrationsThrough penetrations of fire-resistance-rated walls shall comply with Section 712.3.1.1 or 712.3.1.2.

Page 4: 120510 firestopping ejr

X

Firestopping

Ohio Building Code: Fire-Resistance-Rated Construction

04/12/23 4

712.3.1 Through Penetrations ExceptionsWhere the penetrating items are steel, ferrous or copper pipes, tubes or conduits, the annular space between the penetrating item and the fire-resistance-rated wall is permitted to be protected as follows:1.In concrete or masonry walls where the penetrating item is a maximum 6-inch (152 mm) nominal diameter and the area of the opening through the wall does not exceed 144 square inches (0.0929 m²), concrete, grout or mortar is permitted where it is installed the full thickness of the wall or the thickness required to maintain the fire-resistance rating; or2.The material used to fill the annular space shall prevent the passage of flame and hot gases sufficient to ignite cotton waste when subjected to ASTM E 119 time-temperature fire conditions under a minimum positive pressure differential of 0.01 inch (2.49 Pa) of water at the location of the penetration for the time period equivalent to the fire-resistance rating of the construction penetrated.

Page 5: 120510 firestopping ejr

X

Firestopping

Ohio Building Code: Fire-Resistance-Rated Construction

04/12/23 5

Membrane Penetration: An opening made through one side (wall, floor or ceiling membrane) of an assembly.

712.3.2 Membrane PenetrationsMembrane penetrations shall comply with Section 712.3.1. Where walls or partitions are required to have a fire-resistance rating, recessed fixtures shall be installed such that the required fire resistance will not be reduced.

Page 6: 120510 firestopping ejr

X

Firestopping

Ohio Building Code: Fire-Resistance-Rated Construction

04/12/23 6

712.3.2 Membrane Penetration Exceptions1.Membrane penetrations of maximum two-hour fire-resistance-rated walls and partitions by steel electrical boxes that do not exceed 16 square inches (0.0103 m²) in area, provided the aggregate area of the openings through the membrane does not exceed 100 square inches (0.0645 m²) in any 100 square feet (9.29 m²) of wall area. The annular space between the wall membrane and the box shall not exceed 1/8 inch (3.1 mm). Such boxes on opposite sides of the wall or partition shall be separated by one of the following:

1.1 By a horizontal distance of not less than 24 inches (610 mm);1.2 By a horizontal distance of not less than the depth of the wall cavity where the wall cavity is filled with cellulose loose-fill, rock wool or slag mineral wool insulation;1.3 By solid fireblocking in accordance with Section 717.2.1;1.4 By protecting both boxes with listed putty pads; or1.5 By other listed materials and methods.

Page 7: 120510 firestopping ejr

X

Firestopping

Ohio Building Code: Fire-Resistance-Rated Construction

04/12/23 7

712.3.2 Membrane Penetration Exceptions (cont.)2.Membrane penetrations by listed electrical boxes of any material, provided such boxes have been tested for use in fire-resistance-rated assemblies and are installed in accordance with the instructions included in the listing. The annular space between the wall membrane and the box shall not exceed 1/8 inch (3.1 mm) unless listed otherwise. Such boxes on opposite sides of the wall or partition shall be separated as follows:

2.1 By a horizontal distance of not less than 24 inches (610 mm);2.2 By solid fireblocking in accordance with 717.2.1;2.3 By protecting both boxes with listed putty pads; or2.4 By other listed materials and methods.

3.The annular space created by the penetration of an automatic sprinkler, provided it is covered by a metal escutcheon plate.

Page 8: 120510 firestopping ejr

X

Firestopping

Ohio Building Code: Fire-Resistance-Rated Construction

04/12/23 8

712.3.3 Ducts and Air Transfer OpeningsPenetrations of fire-resistance-rated walls by ducts that are not protected with dampers shall comply with Sections 712.2 through 712.3.1. Ducts and air transfer openings that are protected with dampers shall comply with Section 716.

712.4 Horizontal AssembliesPenetrations of a floor, floor/ceiling assembly or the ceiling membrane of a roof/ceiling assembly shall be protected in accordance with Section 707.

712.4.1 Fire-Resistance Rated AssembliesPenetrations of the fire-resistance rated floor, floor/ceiling assembly or the ceiling membrane of a roof/ceiling assembly shall comply with Sections 712.4.1.1 through 712.4.1.4.

Page 9: 120510 firestopping ejr

X

Firestopping

Ohio Building Code: Fire-Resistance-Rated Construction

04/12/23 9

712.4.1 Fire-Resistance Rated Assemblies Exceptions1.Penetrations by steel, ferrous or copper conduits, pipes, tubes or vents or concrete or masonry items through a single fire-resistance-rated floor assembly where the annular space is protected with materials that prevent the passage of flame and hot gases sufficient to ignite cotton waste when subjected to ASTM E 119 time-temperature fire conditions under a minimum positive pressure differential of 0.01 inch (2.49 Pa) of water at the location of the penetration for the time period equivalent to the fire-resistance rating of the construction penetrated. Penetrating items with a maximum 6-inch (152 mm) nominal diameter shall not be limited to the penetration of a single fire-resistance-rated floor assembly, provided the aggregate area of the openings through the assembly does not exceed 144 square inches (92 900 mm²) in any 100 square feet (9.3 m²) of floor area.

Page 10: 120510 firestopping ejr

X

Firestopping

Ohio Building Code: Fire-Resistance-Rated Construction

04/12/23 10

712.4.1 Fire-Resistance Rated Assemblies Exceptions (cont.)2.Penetrations in a single concrete floor by steel, ferrous or copper conduits, pipes, tubes or vents with a maximum 6-inch (152 mm) nominal diameter, provided the concrete, grout or mortar is installed the full thickness of the floor or the thickness required to maintain the fire-resistance rating. The penetrating items shall not be limited to the penetration of a single concrete floor, provided the area of the opening through each floor does not exceed 144 square inches (92 900 mm²).3.Penetrations by listed electrical boxes of any material, provided such boxes have been tested for use in fire-resistance-rated assemblies and installed in accordance with the instructions included in the listing.

Page 11: 120510 firestopping ejr

X

Firestopping

Ohio Building Code: Fire-Resistance-Rated Construction

04/12/23 11

712.4.1.2 Membrane PenetrationsPenetrations of membranes that are part of a fire-resistance-rated horizontal assembly shall comply with Section 712.4.1.1.1 or 712.4.1.1.2. Where floor/ceiling assemblies are required to have a minimum 1-hour fire-resistance rating, recessed fixtures shall be installed such that the required fire resistance will not be reduced.

712.4.1.2 Membrane Penetration Exceptions1.Membrane penetrations by steel, ferrous or copper conduits, pipes, tubes or vents, or concrete or masonry items where the annular space is protected either in accordance with Section 712.4.1.1 or to prevent the free passage of flame and the products of combustion. The aggregate area of the openings through the membrane shall not exceed 100 square inches (64 500 mm²) in any 100 square feet (9.3 m²) of ceiling area in assemblies tested without penetrations.

Page 12: 120510 firestopping ejr

X

Firestopping

Ohio Building Code: Fire-Resistance-Rated Construction

04/12/23 12

712.4.1.2 Membrane Penetration Exceptions (cont.)2.Ceiling membrane penetrations of maximum 2-hour fire-resistance-rated horizontal assemblies by steel electrical boxes that do not exceed 16 square inches (10 323 mm²) in area, provided the aggregate area of such penetrations do not exceed 100 square inches (44 500 mm²) in any 100 square feet (9.29 m²) of ceiling area, and the annular space between the ceiling membrane and the box does not exceed 1/8 inch (3.12 mm).3.Membrane penetrations by listed electrical boxes of any material, provided such boxes have been tested for use in fire-resistance-rated assemblies and are installed in accordance with the instructions included in the listing. The annular space between the ceiling membrane and the box shall not exceed 1/8 inch (3.1 mm) unless listed otherwise.4.The annular space created by the penetration of a fire sprinkler, provided it is covered by a metal escutcheon plate.

Page 13: 120510 firestopping ejr

X

Firestopping

Ohio Building Code: Fire-Resistance-Rated Construction

04/12/23 13

712.4.1.3 Ducts and Air Transfer OpeningsPenetrations of horizontal assemblies by ducts and air transfer openings shall comply with Section 716.

712.4.2 Nonfire-Resistance-Rated AssembliesPenetrations of horizontal assemblies without a required fire-resistance rating shall meet the requirements of Section 707 or shall comply with Section 712.4.2.1 or 712.4.2.2.

712.5 Penetrations in Smoke BarriersPenetrations in smoke barriers shall be tested in accordance with the requirements of UL 1479 for air leakage. The air leakage rate of the penetration assembly shall not exceed 5.0 cfm per square foot (0.025 m³/sm²) of penetration opening at 0.30 inch (7.47 Pa) of water for both the ambient temperature and elevated temperature tests.

Page 14: 120510 firestopping ejr

X

Firestopping

Ohio Building Code: Fire-Resistance-Rated Construction

04/12/23 14

707.4 Fire-Resistance RatingShaft enclosures shall have a fire-resistance rating of not less than 2 hours where connecting four stories or more, and not less than 1 hour where connecting less than four stories. The number of stories connected by the shaft enclosure shall include any basements but not any mezzanines. Shaft enclosures shall have a fire-resistance rating not less than the floor assembly penetrated, but need not exceed 2 hours.

Page 15: 120510 firestopping ejr

X

Firestopping

Ohio Building Code: Fire-Resistance-Rated Construction

04/12/23 15

716.1 GeneralThe provisions of this section shall govern the protection of duct penetrations and air transfer openings in assemblies required to be protected.

716.1.1 Ducts that Penetrate Fire-Resistance-Rated Assemblies Without Dampers.Ducts that penetrate fire-resistance-rated assemblies and are not required by this section to have dampers shall comply with the requirements of Sections 713.2 through 713.3.3. Ducts that penetrate horizontal assemblies not required to be contained within a shaft and not required by this section to have dampers shall comply with the requirements of Sections 713.4 through 713.4.2.2.

716.1.1.1 Ducts that Penetrate Nonfire-Resistance-Rated AssembliesThe space around a duct penetrating a nonfire-resistance-rated floor assembly shall comply with Section 716.6.3.

Page 16: 120510 firestopping ejr

X

Firestopping

Specified Technologies, Inc.: Explanation of the UL Numbering System

04/12/23 16

Through Penetration Firestop Systems (XHEZ)

Page 17: 120510 firestopping ejr

X

Firestopping

Specified Technologies, Inc.: Index of Common Firestopping Applications

04/12/23 17

Page 18: 120510 firestopping ejr

X

Firestopping

Specified Technologies, Inc.: Index of Common Firestopping Applications (cont.)

04/12/23 18

Page 19: 120510 firestopping ejr

X

Firestopping

Specified Technologies, Inc.: Index of Common Firestopping Applications (cont.)

04/12/23 19

Page 20: 120510 firestopping ejr

X

Firestopping

Example of a Typical Drawing

04/12/23 20

Page 21: 120510 firestopping ejr

TITLE OF PRESENTATION (ON MASTER SLIDE)CONCLUSION . . .

THANK YOU.