Page 1: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

1. What Are The Overall Objectives2. Where Are We Now 3. What Follows4. Evolution Of Design/ Current Size, Etc.5. Details Of Design Options6. Budget7. Staff Recommendation8. Where Do We Go From Here

OVER VIEW

Page 2: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

QUALITY

- QUALITY, ROBUST, ACCESSIBLE FACILITY THAT MEETS THE SPACE AND PROGRAM NEEDS OF USERS NOW AND IN THE FUTURE. POSITIVE EXPERIENCES OF USERS AND GENERATES REVENUE.

SCHEDULE

- MEET A TIMELINE IMPOSED BY FUNDING PROGRAM.

WHAT ARE THE OVERALL OBJECTIVES?

Page 3: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

BUDGET

- GET AS MUCH AS WE CAN IN THE BUILDING WITHIN A REASONABLE AND AFFORDABLE COST

SUSTAINABILITY

- MAKE SENSIBLE CHOICES ON EQUIPMENT, DESIGN AND BUILDING ENVELOPE TO REDUCE LONG TERM COSTS/CONSIDER THE ENVIRONMENT.

WHAT ARE THE OVERALL OBJECTIVES?

Page 4: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

- KEY POINT WHERE THE DESIGN ELEMENTS ARE BEING FIXED

- FOOTING DETAILS ARE MORE SIGNIFICANTLY ADVANCED BECAUSE OF ACCELERATED

SCHEDULE AND WILL DEFINE FOOTPRINT.

- FIRST COST ESTIMATE PREPARED. CLASS “D” TO “TEST” THE DESIGN.

- KEY DECISIONS MADE NOW, THEN ADVANCE TO MORE DETAILED, TENDER READY

DOCUMENT.

WHERE ARE WE NOW?

Page 5: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

- FURTHER DESIGN DEVELOPMENT ON ALL BUILDING DETAILS. REFINING DESIGN.

- FURTHER CLASS “C”, “B” AND “A” COST.

- WORK WITH THE STEERING COMMITTEE.

- ISSUE GENERAL TENDER FOR BALANCE OF WORK.

WHAT FOLLOWS?

Page 6: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

- UNDERSTAND THE DIFFERENCE BETWEEN FOOTPRINT AND TOTAL SQUARE FOOTAGE

- FIELD HOUSE AREA CALCULATION WORK FROM 2008 IS “LIGHT.

- TO ACCOMMODATE GOOD PLAY AND ALL SURFACES, FULL SIZED INDOOR FIELD, IT IS FELT THAT EXTRA SPACE IS NEEDED. THIS IS MOST OF THE FOOTPRINT

GROWTH.

“GROWTH” OF FACILITY

Page 7: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

-THERE ARE INTERIOR SPACES THAT HAVE INCREASED IN SIZE. MOST

OFTEN ON SECOND LEVEL AREAS (ASSOCIATION OFFICES, MEZZANINE,

FIELD VIEWING SPACES OR SECOND FLOOR), BUT ALSO IN CIRCULATION AND LOBBY SPACE. THIS IS THE

GROSS SQUARE FOOTAGE INCREASE VS FOOTPRINT INCREASE.

“GROWTH” OF FACILITY

Page 8: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

- ORIGINAL PROGRAM (2008)- TECHNICAL COMMITTEE WORK- STEERING COMMITTEE WORK- INFORMAL INPUT- PUBLIC INPUT WORKSHOP- STEERING COMMITTEE TOUR OF SIMILAR

FACILITIES GOOD – BAD – EXPERIENCES OF OTHERS

- TRYING TO GET AS MUCH BUILDING AS WE CAN AND ADDRESS ALL OBJECTIVES- BUILDING PROGRAM VS BUDGET

WHAT IS INFLUENCING DESIGN

Page 9: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

ALL (INCLUDING USERS)

- BRIGHT AND AIRY

- LIKE KEY FEATURES OF INVISTA CENTRE

- ROBUST, QUALITY, SPACE, ACCESSIBLE

- COST EFFECTIVE TO OPERATE

- SERVE AS A UNIFIED RECREATIONAL COMPLEX

WHAT THE COMMITTEE HEARD FROM USERS

Page 10: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

USERS

- ENSURE BIG ENOUGH LOBBY AND CIRCULATION AREA- SPACES TO SET UP REGISTRATION/ CONVENOR AREA, ETC.- STORAGE, STORAGE, STORAGE- DRESSING ROOM BIG ENOUGH (INVISTA

TOO SMALL) AND SHAPED RIGHT.- OFFICES FOR ASSOCIATIONS, GIVEN IT IS

THE COMMUNITY FACILITY AND HOME TO MINOR SPORTS ASSOCIATIONS

- VIEWING FOR SOCCER (SECOND FLOOR)- SOCCER DRESSING ROOMS NOT TO ACCESS

FIELD DIRECTLY

WHAT THE COMMITTEE HEARD FROM USERS (cont’d)

Page 11: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

ADJUSTED CLASS D BUDGET ESTIMAGE

$28,751,000

AVAILABLE CONSTRUCTION BUDGET

$25,369,000 (CITY’S BUDGET)

COST ESTIMATES

Page 12: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

1- REDUCE NORTH PARKING $80,000

2- REDUCE WEST PARKING $110,000

3-REDUCE BACK OF HOUSE $120,000

4-ELIMINATE MULTIPURPOSE/OFFICE RM $380,000

5-REDUCE SOCCER WALKING TRACK $200,000

6- REDUCE SIZE OF RINK 1 $280,000*

7-REDUCE THE TENNIS COURT SIZE $100,000

8-DEFERMENT OF UPPER FLOOR LOUNGE AT PADS 1

AND 2- $400,000*

Options:

Page 13: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

North Parking Lot Reduction #1

Page 14: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

West Parking Lot Reduction #2

Page 15: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

Axonometric Plan Area Reduction #3

Page 16: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

First Floor Plan Area Reduction #3

Page 17: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

Axonometric Plan Area Reduction #4

Page 18: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

First Floor Plan Area Reduction #4

Page 19: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

Axonometric Plan Area Reduction #5

Page 20: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

First Floor Plan Area Reduction #5

Page 21: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

Axonometric Plan Area Reduction #6

Page 22: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

First Floor Plan Area Reduction #6a

Page 23: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

Second Floor Plan Area Reduction #6a

Page 24: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

Building Sections Area Reduction #6a

Page 25: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

First Floor Plan Area Reduction #6b

Page 26: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

Second Floor Plan Area Reduction #6b

Page 27: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

Building Sections Area Reduction #6b

Page 28: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

Axonometric Plan Area Reduction #7

Page 29: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

First Floor Plan Area Reduction #7

Page 30: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

Axonometric Plan Area Reduction #8

Page 31: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

First Floor Plan Area Reduction #8

Page 32: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

1- REDUCE NORTH PARKING $80,000

2- REDUCE WEST PARKING $110,000

3-REDUCE BACK OF HOUSE $120,000

4-ELIMINATE MULTIPURPOSE/OFFICE RM $380,000

5-REDUCE SOCCER WALKING TRACK $200,000

6- REDUCE SIZE OF RINK 1 $280,000*

7-REDUCE THE TENNIS COURT SIZE $100,000

8-DEFERMENT OF UPPER FLOOR LOUNGE AT PADS 1 AND 2- $400,000*

Options 1-7 Total= $1,270,000

Page 33: 1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff

FROM THE REPORT

- CONSIDER REMOVAL OF OPTIONS 1-4

- STEERING COMMITTEE RECOMMENDS PROCEEDING WITH PROJECT AS

DESIGNED

STAFF RECOMMENDATION