1
Status of FNPB
Geoff Greene / Nadia Fomin
University of Tennessee
![Page 2: 1 Status of FNPB Geoff Greene / Nadia Fomin University of Tennessee](https://reader036.vdocuments.us/reader036/viewer/2022062423/5697bfbb1a28abf838ca0b9e/html5/thumbnails/2.jpg)
2
Spallation Neutron Source at ORNL
•1.4 GeV protons, 60Hz
•LHg Spallation target -> neutrons
•H2 moderator
•17m SM guide, curved
![Page 3: 1 Status of FNPB Geoff Greene / Nadia Fomin University of Tennessee](https://reader036.vdocuments.us/reader036/viewer/2022062423/5697bfbb1a28abf838ca0b9e/html5/thumbnails/3.jpg)
3
Target, Reflectors, and Moderators
Be reflector
Steel reflector
CryogenicH2 moderators
AmbientH2 0 moderator
Mercurytarget
Proton Beam
![Page 4: 1 Status of FNPB Geoff Greene / Nadia Fomin University of Tennessee](https://reader036.vdocuments.us/reader036/viewer/2022062423/5697bfbb1a28abf838ca0b9e/html5/thumbnails/4.jpg)
4
Flight Path 13
![Page 5: 1 Status of FNPB Geoff Greene / Nadia Fomin University of Tennessee](https://reader036.vdocuments.us/reader036/viewer/2022062423/5697bfbb1a28abf838ca0b9e/html5/thumbnails/5.jpg)
5
SNS Will Eventually Have 24 Neutron Flight Paths
1B - Disordered Mat’lsCommission 2010
2 - Backscattering Spectrometer Commission 2006
3 - High Pressure Diffractometer Commission 2008
4A - Magnetism Reflectometer Commission 2006
4B - Liquids ReflectometerCommission 2006
5 - Cold Neutron Chopper Spectrometer Commission 2007
18 - Wide Angle Chopper Spectrometer Commission 2007
17 - High Resolution Chopper SpectrometerCommission 2008
13 - Fundamental Physics Beamline Commission 2008
11A - Powder Diffractometer Commission 2007
12 - Single Crystal Diffractometer Commission 2009
7 - Engineering Diffractometer IDT CFI Funded Commission 2008
6 - SANS Commission 2007
14B - Hybrid Spectrometer Commission 2011
15 – Spin Echo
9 – VISION
![Page 6: 1 Status of FNPB Geoff Greene / Nadia Fomin University of Tennessee](https://reader036.vdocuments.us/reader036/viewer/2022062423/5697bfbb1a28abf838ca0b9e/html5/thumbnails/6.jpg)
6
Flight Path 13
• 13A – UCN Beamline
• nEDM
• 13B – Cold Neutrons
• NPDGamma
![Page 7: 1 Status of FNPB Geoff Greene / Nadia Fomin University of Tennessee](https://reader036.vdocuments.us/reader036/viewer/2022062423/5697bfbb1a28abf838ca0b9e/html5/thumbnails/7.jpg)
7
FNPB Performance Matches Model Predictions
![Page 8: 1 Status of FNPB Geoff Greene / Nadia Fomin University of Tennessee](https://reader036.vdocuments.us/reader036/viewer/2022062423/5697bfbb1a28abf838ca0b9e/html5/thumbnails/8.jpg)
8
SNS is now fully operational
~9 months of scheduled beam delivery per year
![Page 9: 1 Status of FNPB Geoff Greene / Nadia Fomin University of Tennessee](https://reader036.vdocuments.us/reader036/viewer/2022062423/5697bfbb1a28abf838ca0b9e/html5/thumbnails/9.jpg)
9
Reliability against schedule is quite good
Beam Delivery ~450 MWhrs/month
Accelerator Power typically ≥ 1MW and slowly increasing
![Page 10: 1 Status of FNPB Geoff Greene / Nadia Fomin University of Tennessee](https://reader036.vdocuments.us/reader036/viewer/2022062423/5697bfbb1a28abf838ca0b9e/html5/thumbnails/10.jpg)
10
Required Data Collection
David estimates that we need ~ 80 FULL MW-days of LH2 data*to attain a statistical sensitivity of ~10-8 on Aγ.
This estimate includes current best estimates of flux, polarization, transmission efficiencies, choppers bandwidth, run cycle losses, etc.
This estimate does NOT include LH2 reliability
At 450 MW-hrs/month, this implies that we need ~4.2 calendar months of live LH2 data.
*An additional ~12 days of Al data is estimated to be required