Prepared by

Richard MusselmanOperations Support EngineerRound Mountain Gold Corporation

Using Trimble 4D Control for High Wall Monitoring at Round Mountain Gold Corporation

Page 2: 1 Prepared by Richard Musselman Operations Support Engineer Round Mountain Gold Corporation Using Trimble 4D Control for High Wall Monitoring at Round

2

Round Mountain, NV, USA

Kettle River – BuckhornRepublic, WA, USA

Dvoinoye, RussiaKupol, RussiaFort Knox

Fairbanks, AK, USA

Tasiast, Mauritania

Lobo-Marte, ChileLa Coipa, Chile

Maricunga, Chile

Fruta del Norte, Ecuador

Chirano, Ghana

Paracatu, Brazil

KCorporate Offices

Toronto, ON, Canada

Kinross Gold

Page 3: 1 Prepared by Richard Musselman Operations Support Engineer Round Mountain Gold Corporation Using Trimble 4D Control for High Wall Monitoring at Round

3

Round Mountain Gold Corporation

• Joint Venture with Barrick Gold Corporation (50:50)

• Conventional Open Pit Mining

Page 4: 1 Prepared by Richard Musselman Operations Support Engineer Round Mountain Gold Corporation Using Trimble 4D Control for High Wall Monitoring at Round

4

Purpose of Slope Monitoring

Page 5: 1 Prepared by Richard Musselman Operations Support Engineer Round Mountain Gold Corporation Using Trimble 4D Control for High Wall Monitoring at Round

5

NE Highwall–T1/T2 FailureLooking Northeast

Looking Northeast

“Slip Face”

Round MtnPrior to Pit Expansion

Mining

Page 6: 1 Prepared by Richard Musselman Operations Support Engineer Round Mountain Gold Corporation Using Trimble 4D Control for High Wall Monitoring at Round

6

South Ramp Failure

South Haul Road

Back Break Structure

Alluvial Failure

Rock Failure

Toe HeaveLooking Southeast

Page 7: 1 Prepared by Richard Musselman Operations Support Engineer Round Mountain Gold Corporation Using Trimble 4D Control for High Wall Monitoring at Round

7

Damage to South Haul Road

Looking Southeast

Page 8: 1 Prepared by Richard Musselman Operations Support Engineer Round Mountain Gold Corporation Using Trimble 4D Control for High Wall Monitoring at Round

8

Solution

• 2 - Trimble S8 1” Robotic, DR HP, Long Range Instruments• 6 – Trimble NetR9 Ti-1 Reference Stations• 1 –Trimble 4D Control Software v3.0 with various licenses (Upgraded to

v4.1 in March 2013)

Page 9: 1 Prepared by Richard Musselman Operations Support Engineer Round Mountain Gold Corporation Using Trimble 4D Control for High Wall Monitoring at Round

9

Monitoring Strategy

Control Application ReportsWeb Based ReportsReport Generator ApplicationThreshold Alerts

Customized Accessto Database Tables

PostProcessing

WirelessMine

Network

TrimbleSQL ServerDatabase

TrimbleData

StorageServer

Trimble 4D Control Server•Post Processing•RTK•Terrestrial

Page 10: 1 Prepared by Richard Musselman Operations Support Engineer Round Mountain Gold Corporation Using Trimble 4D Control for High Wall Monitoring at Round

10

Mobile Slope Monitoring Station

Page 11: 1 Prepared by Richard Musselman Operations Support Engineer Round Mountain Gold Corporation Using Trimble 4D Control for High Wall Monitoring at Round

11

Monitoring Strategy–Field Configuration

Page 12: 1 Prepared by Richard Musselman Operations Support Engineer Round Mountain Gold Corporation Using Trimble 4D Control for High Wall Monitoring at Round

12

Trimble 4D Control Software

Terrestrial Displacement Chart

GNSS Scatter Plot

Page 13: 1 Prepared by Richard Musselman Operations Support Engineer Round Mountain Gold Corporation Using Trimble 4D Control for High Wall Monitoring at Round

13http://rmo-sql-02/t3dweb

Web Interface Functionality

Page 14: 1 Prepared by Richard Musselman Operations Support Engineer Round Mountain Gold Corporation Using Trimble 4D Control for High Wall Monitoring at Round

14

Before After

Average Amplitude 0.70 ft 0.13 ft

Measurements/day/prism 4 11

Historical Data Integration

Page 15: 1 Prepared by Richard Musselman Operations Support Engineer Round Mountain Gold Corporation Using Trimble 4D Control for High Wall Monitoring at Round

15

Why is slope monitoring valuable?

Page 16: 1 Prepared by Richard Musselman Operations Support Engineer Round Mountain Gold Corporation Using Trimble 4D Control for High Wall Monitoring at Round

16

3 electric shovels14 haul trucks

Protect Property?

Page 17: 1 Prepared by Richard Musselman Operations Support Engineer Round Mountain Gold Corporation Using Trimble 4D Control for High Wall Monitoring at Round

17

Maintain Production?

Page 18: 1 Prepared by Richard Musselman Operations Support Engineer Round Mountain Gold Corporation Using Trimble 4D Control for High Wall Monitoring at Round

18

Putting People First

Rigorous Financial Discipline High Performance Culture

Outstanding Corporate Responsibility