![Page 1: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/1.jpg)
1
Offshore Wind DevelopmentBluewater Wind LLC
Peter Mandelstam, Founder and President
Michigan Wind Energy Conference 2009
Detroit Cobo Hall
![Page 2: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/2.jpg)
2
Bluewater Wind is a developer of offshore wind energy committed to
bringing clean, reliable and affordable electricity to New York, Delaware,
Maryland, New Jersey, New England and the Great Lakes.
![Page 3: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/3.jpg)
3
Category Company Wind turbine Vestas
EPC Contractor Fluor Owner’s Engineer Ramboll Permitting Tetra Tech Offshore Electrical Engineering SEAS Interconnection/Onshore Electrical Engineering Energy Initiatives
Group Electrical Equipment Supply and Installation ABB Wind Resource Assessment AWS Truewind Wind Resource Assessment Garrad Hassan Wind Resource Assessment EMD Marine Field Studies Aqua Survey Marine Field Studies Ocean Surveys Federal Regulatory Affairs Hill & Kehne Insurance Marsh
The Bluewater Wind Team
One or more members have participated in the development of 23 of the world’s 30 offshore wind parks
![Page 4: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/4.jpg)
4
Bluewater Wind:Five Pillars of a Wind Project
• Wind Resource• Site Control / Access• Permits• Interconnection to Grid• Buyer of Energy
![Page 5: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/5.jpg)
5
Desired Qualities of an Offshore Wind Energy Site
• Avg. winds stronger than 18 mph
• Constructible water depths
• No significant water use conflicts
• Environmentally compatible areas
• Accessible transmission & ports
• Large available project area footprint
![Page 6: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/6.jpg)
6
Proposed Projects
Atlantic Ocean
Gulf of Mexico
Cape Wind Associates
Deep Water
W.E.S.T. LLC
Hull Municipal
Southern Company
Cuyahoga County
New Jersey
Delaware
Buzzards Bay
US Offshore Wind Estimates
ProjectState MW
Cape Wind MA 420
Hull Municipal MA 15
Buzzards Bay MA 300
New England RI, MA
400-850
NYPA, LIPA, Con Ed, EDC, MTA NY
500-1500
New Jersey (BPU) NJ 1000
Bluewater Wind DE +/-360
Southern Company GA 10
W.E.S.T. TX 150
Cuyahoga County OH +/-20
Total MW
3170-4620
Rhode Island
Project in Federal Waters
Project in State Waters
![Page 7: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/7.jpg)
7
Important Drivers for Offshore Wind
• Policy- RGGI: 10 participating states, successful auctions- Increasing number of states with RPS requirements- Potential national RPS in 2009- Increasing costs of carbon-based technologies
• Offshore Resources- Stronger, more consistent winds near load centers- Decreased access to high wind land-based sites- Fewer wildlife barriers far offshore (avian and bat)
• Market Signals- Rising fossil fuel prices- Climate change considerations; emissions reduction requirements- Economies of scale
![Page 8: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/8.jpg)
8
Bluewater’s project portfolio includes the following RPS states:
Delaware: 20% by 2019 New Jersey: 22.5% by 2021 New York: 25% by 2013 Rhode Island: 16% by 2020
Most of these states have little land-
based wind potential or have considerable roadblocks to large land-based wind…
Policy
![Page 9: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/9.jpg)
9
Supply Aligned With Demand
28% of coastal states use 78% of the electricity in the U.S.
Offshore Resources
![Page 10: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/10.jpg)
10
The Future of Fossil Fuels?• National stimulus legislation supports
renewable energy development• Volatility of fossil fuel prices = risk
and unpredictability• Emerging issue of national energy
security: lessen imports by supporting domestic energy sources
• Global warming on political agenda• Coal plants already being
reconsidered/avoided
Market Signals
![Page 11: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/11.jpg)
11
Delaware Project
![Page 12: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/12.jpg)
12
Delaware – The RFP• In 2006, Delmarva Power & Light customers saw an
average rate increase of 59%.
• May 1, 2006 - Delaware Legislature enacted House Bill 6 - encouraged new generation sources that provide stable energy prices- offer long term power purchase agreements (PPA)
• November 1, 2006 – Delmarva issues approved RFP for new generation under long-term contracts.
• Entire RFP process available at http://depsc.delaware.gov/irp.shtml
![Page 13: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/13.jpg)
13
Delaware – The Proposal• On December 22, 2006, Bluewater submitted bids
for offshore wind parks. Each is a 600 MW facility located approx 12 to 17 nm off the coast of Delaware.
• Bluewater was competing against a natural gas combined cycle plant and a coal-fired integrated gasification combined cycle facility.
• The three proposals are available online: http://depsc.delaware.gov/electric/irp/rfp_c.shtml
![Page 14: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/14.jpg)
14
Delaware – The Selection • May 8, 2007 – PSC voted unanimously
to order Delmarva to negotiate with Bluewater for an offshore wind contract.
• The two losing bidders, the coal plant and the NG plant, were voted to compete against each other to act as Bluewater's backup facility.
![Page 15: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/15.jpg)
15
Power Purchase Agreement (PPA) with Delmarva Power & Light
• First offshore PPA in the country• 200MW• Energy - $103.93/MWh (2009$)• Capacity - $70.23/kW year• RECs – estimated total $8,009,457 @ $15.23/MWh plus REC multiplier • 2.5% annual escalator• $0.74/MWh –average monthly distribution customer cost impact (2009$)
![Page 16: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/16.jpg)
16
Term Sheet with Delaware Municipal Electric Corporation
• Supply of energy, capacity, and RECs to nine municipally-owned electric distribution utilities
• 20 year agreement• Valued at $200 - $300 million over
life of contract
![Page 17: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/17.jpg)
17
Positive Economic Impact Coming to Delaware
• $1.6 Billion investment (450 MW park)• $200+ million direct economic impact for Delaware• State-wide economic development: Delaware as offshore staging
hub• Brings up to 500 construction and up to 80-100 O&M jobs to
Delaware• Brings large contracts to Delaware ports
– Construction– Operations and Maintenance
• Wind technician training at DelTech• Delaware union jobs• New businesses locate in places where electricity is affordable
and stable-priced• Increased tourism by 2.5% (University of Delaware)
![Page 18: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/18.jpg)
18
Supporters of the Bluewater Delaware Wind Park
• Vice President Joe Biden• US Senator Tom Carper• Lt. Governor John Carney• Delaware Treasurer Jack Markell• Delaware Insurance
Commissioner Matthew Denn • Delaware Municipal Electric
Corporation• Citizens for A Better Sussex• Citizens for Clean Power• Coalition for Climate Change
Study and Action• Delaware Audubon Society• Delaware Building &
Construction Trades Council• Delaware Nature Society• Endecon, Inc.• Epworth United Methodist
Church• Green Delaware
• League of Women Voters• Natures Path of Integrated Health• News Journal Editorial Board• Delaware Chapter of Sierra Club• Society of Natural History• St. Andrews School• Unitarian Universalists of
Southern Delaware• City of Dover• City of Lewes• City of Milford• City of New Castle• City of Newark• City of Seaford• Town of Clayton• Town of Middletown
![Page 19: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/19.jpg)
19
Public Support for BluewaterPolitical Cartoons
![Page 20: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/20.jpg)
20
Next Steps
![Page 21: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/21.jpg)
21
Example Offshore Wind Park Layout
Connection to existing grid at substation
Offshore transformer platform
ONSHORE
Submarine cable to shore
Wind turbine array
Intra-array submarine cables
OFFSHORE
![Page 22: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/22.jpg)
22
Met Tower Installation Met Tower Designs
Cape Wind Horns Rev
![Page 23: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/23.jpg)
23
Permitting Studies• Avian studies • Marine biological studies (mammals,
finfish, turtles, shellfish)• Benthic and fisheries habitat
assessment• Water quality studies• Cultural surveys• Navigation and FAA studies• Wetlands and other terrestrial systems
![Page 24: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/24.jpg)
24
Foundation InstallationHandling a Monopile
Source: RPS Energy Presentation
![Page 25: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/25.jpg)
25
Sub-sea Electrical Cable Installation
Cable-laying Vessel at Work
Source: www.hornsrev.dk
![Page 26: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/26.jpg)
26
Offshore Substation Installation
Lifting a Transformer Platform
![Page 27: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/27.jpg)
27
Turbine InstallationAssembling a Tower and Lifting a Bunny Ear
Source: www.mammoetvanoord.com
![Page 28: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/28.jpg)
28
Lessons From Delaware Success
• Engage the public early and often:– Identify all stakeholders– Educate, educate, educate– Honest and transparent communication– Visualizations play a critical role in
acceptance
![Page 29: 1 Offshore Wind Development Bluewater Wind LLC Peter Mandelstam, Founder and President Michigan Wind Energy Conference 2009 Detroit Cobo Hall](https://reader037.vdocuments.us/reader037/viewer/2022110321/56649ce35503460f949af73a/html5/thumbnails/29.jpg)
29
Thank YouFor more information contact:
Peter Mandelstam, Founder and President201.748.5000