1 mix model for executives fms 200 series fbp-fms288a
DESCRIPTION
3 Hi Mix/Low Vol vs. Hi Vol/Low Mix What single factor makes High volume/Low Mix different from High Mix/Low Volume? Takt Time for a single product = Time Available Demand What if we have many products through the same process? Takt Time for a Mix of Products = Time Available Total Demand A Mix Model assembly process requires more thought than single product due to variation with product velocity, WIP accumulation and bottleneck management