1 lunar exploration transportation system (lets) baseline design presentation 1/31/08

32
1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

Upload: esther-washington

Post on 02-Jan-2016

219 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

1

Lunar Exploration Transportation System (LETS)

Baseline Design Presentation

1/31/08

Page 2: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

2

Agenda

• Current CDD Summary

• Team Disciplines

• Technical Description of Baseline Design

• Assessment of Baseline Design using CDD

• Recommended Changes to the CDD

• Statement of Work (SOW) Summary

Page 3: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

3

Team Disciplines

• CDD Team– Eddie Kiessling

• Technical Assessment Team– Nick Case and Matthew Isbell

• Partnering Universities Team (SOW)– Seth Farrington

Page 4: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

4

CDD Summary

• Level 1 Requirements

• Figures of Merit

• Surface Objectives

• Concept Design Constraints

Page 5: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

5

Level 1 Requirements• Landed Mass TBD• 1st mission landing site is polar region• Design must be capable of landing at other lunar locations• Minimize cost across design• Launch Date NLT September 30th 2012• Mobility is required to meet objectives• Survivability ≥ 1 year• Lander/Rover must survive conops.• The mission shall be capable of meeting both SMD and ESMD

objectives.• The lander must land to a precision of ± 100m 3 sigma of the

predicted location.• The lander must be capable of landing at a slope of 12 degrees

(slope between highest elevated leg of landing gear and lowest elevated leg)

• The lander shall be designed for g-loads during lunar landing not to exceed the worst case design loads for any other phase of the mission (launch to terminal descent).

Page 6: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

6

Proposed FOMs

• Surface exploration• Maximized Payload Mass (% of total mass)• Objectives Validation: Ratio of SMD to ESMD: 2 to 1. • Conops: Efficiency of getting data in stakeholders hands

vs. capability of mission.• Mass of Power System: % of total mass.• Ratio of off-the-shelf to new Development

– Minimize cost

Page 7: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

7

• Single site goals:– Geologic context

• Determine lighting conditions every 2 hours over the course of one year• Determine micrometeorite flux• Assess electrostatic dust levitation and its correlation with lighting conditions

• Mobility goals:– Independent measurement of 15 samples in permanent dark and 5 samples in lighted

terrain• Each sampling site must be separated by at least 500 m from every other site

– Minimum: determine the composition, geotechnical properties and volatile content of the regolith

• Value added: collect geologic context information for all or selected sites• Value added: determine the vertical variation in volatile content at one or more sites

– Assume each sample site takes 1 earth day to acquire minimal data and generates 300 MB of data

• Instrument package baselines:– Minimal volatile composition and geotechnical properties package, suitable for a

penetrometer, surface-only, or down-bore package: 3 kg– Enhanced volatile species and elemental composition (e.g. GC-MS): add 5 kg– Enhanced geologic characterization (multispectral imager + remote sensing instrument

such as Mini-TES or Raman): add 5 kg

Surface Objectives

Page 8: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

8

Concept Design Constraints

• Surviving Launch– EELV Interface (Atlas 401)

• Mass• Volume• Power• Communications• Environments

– Guaranteed launch window

• Survive Cruise– Survive Environment

• Radiation• Thermal• Micrometeoroids

Page 9: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

9

Concept Design Constraints

• Lunar Environment (@ poles and equator)– Radiation– Micrometeoroid– Temperature– Dust– Lighting• Maximize use of OTS Technology (TRL 9)• Mission duration of 1 year• Surface Objectives

Reference: Dr. Cohen

Page 10: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

10

Mars Viking Lander

• First robotic lander to conduct scientific research on another planet

• Dry Mass 576 kg• Science 91kg• Dimensions 3x2x2m• Power:

– 2 RTG– 4 NiCd

• Survivability: -V1:6yrs 3mo-V2:3yrs 7mo

Page 11: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

11

Baseline Assessment

• Structures

• Thermal Systems

• Payload and Communications

• Power Systems

• GN&C

• Concept of Operations

Page 12: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

12

Structures

• EELV Interface– Titan III which delivered the Viking lander is comparable to the Atlas V-401

• The lander shall be designed for g-loads during lunar landing not to exceed the worst case design loads for any other phase of the mission (launch to terminal descent).– Mars Viking Lander experienced no more than 4 g during launch– LETS will experience no more than 5.5 g during launch

• The lander must be capable of landing at a slope of 12 degrees (slope between highest elevated leg of landing gear and lowest elevated leg)– Mars Viking used bonded aluminum honeycomb crush pads– LETS could use similar technologies

Page 13: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

13

Structures

• Lunar Environment (Radiation, Micrometeoroid, Temperature, Dust)– Thermal cycles vary greatly

• Viking thermal fluctuation was approx. ΔT=160 K • LETS can expect a thermal fluctuation approx. ΔT=273 K• εT = α*ΔT• σT = -E* α*ΔT

– Resistance to dust abrasion• Viking used a silicon paint to protect the surfaces from Martian dust• LETS could use a similar product

• Landed Mass (TBD)– Viking required a bio-shield and a aero-decelerator – LETS will not require these items– Viking structural frame used lightweight aluminum and bonded aluminum

honeycomb crush pads– LETS could use similar technologies and also benefit from major advancements

in materials

Page 14: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

14

Thermal Systems• Viking Thermal System

– Passive• Geometry

– Internal thermally controlled compartment– Structurally integrated thermal sinks– Increased or Decreased Surface Area where applicable

• Thermal Coatings– Proper infrared emittance– Proper solar absorbance

• Thermal Compartment– Critical equipment will be housed in compartment– Temperature will be dependent upon operating temperatures of critical

equipment• Insulation

– Thermal control between equipment and environment– Radiation shield

– Active• Heaters

– Continuous operation– Thermostatically controlled– Redundant systems

Page 15: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

15

Thermal Systems

• LETS Thermal System– Different Thermal Cycles

• Mars Temp. Range:148K to 298K• Lunar Temp. Range: 50K to 373K• Difference in more than 100°C total fluctuation• Heaters and Insulation changes to accommodate

different thermal cycles

– Statically charged lunar dust changes the absorptance, α of the spacecraft surfaces

– Use of polarized surfaces/coatings to reduce lunar dust accumulation

Page 16: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

16

Payload and Mobility

• Scientific Options– Measure 15 samples in the dark and 5 samples in light.

• The Viking Lander did not move, but it used an SSRA with a boom, collector head, and shroud unit, capable of collecting a variety of material elements.

– Each sampling site separated by 500 m. • The Viking Lander did not have this capability.

– Determine composition, geotechnical properties, and volatile content of regolith.

• The Viking Lander used an X-ray Fluorescent Spectrometer (XRFS) to perform a chemical analysis.

– Enhanced geological characterization (multi-spectral imager & remote sensing instrument).

• The XRFS plus a remote sensing instrument may be used for this function.

Page 17: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

17

Observation

• Camera Options– Viking Lander camera system

• Looked at surface and was able to measure optical density of the atmosphere

• Geologically characterize the surface

• Look for macroscopic evidence of life

– LETS camera system• Observe electrostatic dust on the horizon

• Study change in lighting conditions and the effects of surrounding environment

• Aid in Earth observation and control of data collection

Page 18: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

18

Communication

• Transmission options– Direct transmission used by Viking

• Relay from Viking Orbiter to Earth• UHF linked used to transmit data at speeds of 4000 and

16000bps

– Transmission Criteria for LETS• => 1 Earth day to transmit data

– Transmission Path Options• Direct transmission from the Moon to Earth• Storage of data until DLS is obtained• LRO (Assume) to relay data to Earth

Page 19: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

19

GN&C• The lander must land to a precision of ± 100m 3 sigma of the

predicted location.– Viking: Orbiter/Lander separation until the Lander was on the Martian

surface– The propulsion system along with a navigation system consisting of

radars, gyros, accelerometers, etc to guide the Lander through Mars atmosphere and a soft accurate landing on the Martian surface.

– GN&C was not responsible for any operations after landing– LETS: Operations will commence upon landing, and will continue for the

duration of the mission.

• The lander must be capable of landing at a slope of 12 degrees– GN&C in conjunction with structure will ensure that the Lander can

function on a 12 degree slope.

• Mobility is required to meet objectives– GN&C will be responsible for rover and SRV deployment.

Page 20: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

20

Power Systems

• Operational Period– Viking Mars Lander was 90 days– LETS will be 365 days

• Power Required Systems– Viking Lander

• Telemetry• Communication• Thermal systems• Instrumentation• Ascent and descent operations• Caution and warning systems• Power conditioning • Regulate power• Power storage

– LETS will be required to supply power to similar systems

Page 21: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

21

Power Systems

• Power Supply Options– Solar Cell– Battery– RTG

Page 22: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

22

Power Systems

• Radioisotope Thermoelectric Generator (RTG)– Nuclear Yield:

• Fuel: Plutonium – 238

– Nominal Heat Generation Rate:

• 682 Watts

– Weight & Dimensions:• 15.4 Kg (34 lbm)• 53 cm x 41 cm (23 in x 16

in)

– Power Output:• 35 to 780 Watts

Page 23: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

23

Power Systems

Advantages• ASRG/SRG (Nuclear)

– Constant Power Supply– Thermal Output can be utilized

for thermal systems– Requires Fewer Batteries

• Solar Panels– Minimize Cost– High Power to Weight Ratio– Clean Energy– Politically Safe

Disadvantages• ASRG/SRG (Nuclear)

– Political Affairs– Nuclear Waste– Hazardous / Contamination– Expensive

• Solar Panels– Degrade Over Time– Non-constant Power Supply– No Thermal Output– Susceptible to Lunar

Environmental Conditions– Requires Many Batteries

Page 24: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

24

Concept of Operations

Page 25: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

25

Concept of Operations

Page 26: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

26

SOW Committee

• Statement of Work for Partners

• Software

• Communications

Page 27: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

27

Statement of Work

• ESTACA– Sample Return Vehicle

• Southern University (SU)– Mobility Concepts

Page 28: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

28

SOW Committee

• Software Protocols– Computer Aided Design (CAD)

• Unigraphics NX as standard for UAH and Southern University

• CATIA as standard for ESTACA

– CAD Translation Options• TransMagic• MathdataHQ.com

• Professional Documents– MS Office

• Text Documents – MS Word • Spread Sheets – MS Excel• Slide Presentation – MS Power Point

Page 29: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

29

SOW Committee

• Communication Protocols– Meetings

• One meeting per week required

– Minutes will be required– UAH and ESTACA

• Teleconference, or a web-based video chat

– UAH and Southern University• Video conference, teleconference, or web-based video chat

Note: Minute template will be provided

• File Sharing Protocols– WebCT – Primary– Basic Email - Secondary

Page 30: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

30

Spring 2008 SchedulesActivity UAH Southern

University

Classes Start January 7 January 8

MLK Holiday January 21 January 21

Mardi Gras Holiday - - - - - - - - February 4-5

Founders Day - - - - - - - - March 10

Spring Break March 17-23 March 17-24

Last Day of Classes April 22 April 25

IPT Schedule

Page 31: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

31

CDD Recommendations

• Is the true design after we land?

Page 32: 1 Lunar Exploration Transportation System (LETS) Baseline Design Presentation 1/31/08

32

Questions?