1 gwadw elba 30.05.2006 the commissioning of the virgo interferometer h. heitmann observatoire de la...

47
1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte d’Azur, Nice for the VIRGO collaboration Evolution of commissioning Upgrades Recent commissioning activities Outlook

Upload: jaqueline-honor

Post on 30-Mar-2015

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

1 GWADW Elba 30.05.2006

The commissioningof the Virgo interferometer

H. Heitmann

Observatoire de la Côte d’Azur, Nice

for the VIRGO collaboration

• Evolution of commissioning

• Upgrades

• Recent commissioning activities

• Outlook

Page 2: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

2 GWADW Elba 30.05.2006

Status of commissioning before shutdown

Page 3: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

3 GWADW Elba 30.05.2006

Commissioning sensitivity evolution

Run C7duty cycle 64%14 h lock

Run C6duty cycle 90%40 h lock

Single armSingle armSingle armRecombinedRecycledRecycledRecycled

Page 4: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

4 GWADW Elba 30.05.2006

Problems with configuration up to C7

Fringes due to backscattering in mode cleaner=> Operate with reduced power (10%)

Non-monolithic, curved power recycling mirrorResonances => Control problemsShift sensitivity => alignment drifts

Page 5: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

5 GWADW Elba 30.05.2006

Recent upgrades

• New power recycling mirror

• New injection bench

Page 6: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

6 GWADW Elba 30.05.2006

VIRGO layout

Injection bench (IB)

Power recycling mirror

Page 7: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

7 GWADW Elba 30.05.2006

Power recycling mirror

Page 8: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

8 GWADW Elba 30.05.2006

120 mm

R=4100 mm

350 mm

Translations induce misalignment and jitter noiseflat mirror

Old power recycling mirror

PR mirror is • non-monolithic• curved (part of beam matching telescope)

Incident Beam

PR mirror transfer function

Page 9: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

9 GWADW Elba 30.05.2006

New power recycling mirror

Monolithic mirrorNo more internal resonances in the control band !!

Flat surfaces=> no more lens effect (no more part of input telescope)=> larger beam coming out of injection bench => parabolic telescope needed on IB

PR mirror transfer function

OldNew

Page 10: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

10 GWADW Elba 30.05.2006

Injection bench

Page 11: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

11 GWADW Elba 30.05.2006

Laser Frequency Noise

Power Recyclingmirror misaligned

Power Recyclingmirror aligned

Hz

Time

Fringes in the interferometer

Page 12: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

12 GWADW Elba 30.05.2006

Origin of the fringes

Backscattering in the mode cleaner

for enabling power recycling (C7 configuration)

Faraday Isolator needed on theinjection bench for full power operation

Injected power lowered to 700 mW

Laser lightBackscattered light

Page 13: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

13 GWADW Elba 30.05.2006

10% reflectivitymirror

Old injection bench

Page 14: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

14 GWADW Elba 30.05.2006

New injection bench

Main requirements:• Faraday isolator• Parabolic output telescope• Thinner suspension wires

more suitable resoance frequencies

Page 15: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

15 GWADW Elba 30.05.2006

New injection bench (OptoCad design)

Design and realizationEGO optics group

Parabolic outputtelescope

Faradayisolator

From laser

To interferometer

Mode cleaner

Page 16: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

16 GWADW Elba 30.05.2006New injection bench (above)

Page 17: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

17 GWADW Elba 30.05.2006

Referencecavity

New injection bench (below)

Page 18: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

18 GWADW Elba 30.05.2006

New injection bench status

Bench isinstalledalignedcontrolled

Beamoutput power 7 W (10x C7)matching: coupling into arm cavities 95-97%

Page 19: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

19 GWADW Elba 30.05.2006

Some recent commissioning activities

• The variable finesse locking technique

• Mode cleaner mirror radiation pressure

• Suspension improvements

• New injection system autoalignment

Page 20: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

20 GWADW Elba 30.05.2006

The variable finesse locking technique

Page 21: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

21 GWADW Elba 30.05.2006

Locking: Step 1

WE

NENI

WI

BSPR

• Power recycling mirror misaligned

=> no signal mixing

• Each cavity locked independently

• ITF output at « grey fringe » (50%)

Recombined interferometer

North arm

West

arm

50%

ControlsNE North cav. transmission PWE West cavity transmission PBS Dark fringe power DC

Page 22: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

22 GWADW Elba 30.05.2006

WE

NENI

WI

BSPR

• Laser locked on ITF common mode very high bandwidth loop

=> get rid of dominating

common mode signal

Recombined interferometer

North arm

West

arm

40%

ITF common mode

ControlsNE-WE North cav. transmission PBS Dark fringe power DClaser Recycling cavity pick-off PPR ITF reflection (3) P

Locking: Step 2

Page 23: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

23 GWADW Elba 30.05.2006

WE

NENI

WI

BSPR

• Power recycling mirror aligned

Recycled interferometer

North arm

West

arm

ITF common mode

40%

ControlsNE-WE North cav. transmission PBS Dark fringe power DClaser Recycling cavity pick-off PPR ITF reflection (3) P

Locking: Step 3

Page 24: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

24 GWADW Elba 30.05.2006

WE

NENI

WI

BSPR

• Stepwise going down to dark fringe

Recycled interferometer

North arm

West

arm

ITF common mode

5%

ControlsNE-WE North cav. transmission PBS Recy.cav. pick-off Q laser Recy.cav. pick-off PPR ITF reflection (3) P

Locking: Step 4

Page 25: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

25 GWADW Elba 30.05.2006

WE

NENI

WI

BSPR

0%

North arm

West

arm

ITF common mode

• Dark fringe reached

Recycled interferometer

ControlsNE-WE Dark fringe PBS Recy.cav. pick-off Q laser Recy.cav. pick-off PPR ITF reflection (3) P

Locking: Step 5

Page 26: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

26 GWADW Elba 30.05.2006

Mode cleaner mirror: radiation pressure

Page 27: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

27 GWADW Elba 30.05.2006

Mode cleaner mirror: radiation pressure effect

Frequency increase

y

MC locked full power MC locked 60% powerMC unlocked

x: 2.13 -> 1.97 Hz

y: 1.27 -> 2.0 Hz

mirror dimensions: 30x80 mm360 grams

Mode position changes with mirror alignment extra torque resonance frequency change

Problem:• Autoalignment loops became unstable• Corrector adaptation was needed

Page 28: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

28 GWADW Elba 30.05.2006

Recent mirror suspension improvements

Page 29: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

29 GWADW Elba 30.05.2006

Suspension: recent problems and solutions

30 mHz

acce

lero

met

er

ground-based

sensorsGround-independent control above 30 Hz

Mirror excitation with bad weather less stable lock

Changed suspension top stage control seismic

acceleration

noisy daycalm day

Micro-seismic peak(sea waves)

DAC noise on mirror actuation coils

Hierarchical control Rearrange forces going to the suspensionSwitch to low-noise coil drivers

Contr

ibuti

on t

o c

ontr

ol

(See talk by G. Losurdo)

Page 30: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

30 GWADW Elba 30.05.2006

New injection system autoalignment

Page 31: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

31 GWADW Elba 30.05.2006

Injection system autoalignment

Old systemIdea: if IB is rigid, no misalignments

(turned out not to be true)

IB under local control

New systemBeam aligned on fixed mechanical reference (external bench)Mode cleaner fully aligned on beamAutocentering of beam onto MC end mirror

Future enhancementBeam aligned on 3 km target

10%

2004

Mode cleaner transmitted power fluctuations

Page 32: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

32 GWADW Elba 30.05.2006

MATRIX

Old injection system autoalignment layout

Ref. cav.

MCmirror

Laser

M5

M6

Ref. cav. autoalignment

MATRIX

Injection bench

MC mirror autoalignment--Inj.B. local control--Beam autoalignment--

IB Coils

MCAA

Picomotors

Piezos

Wavefront sensors

Page 33: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

33 GWADW Elba 30.05.2006

MATRIX

New injection system autoalignment layout

Ref. cav.

MCmirror

Laser

M5

M6

MATRIX

RFC AA

Beam prealignment

MATRIX

MC IBAA

IB Coils

Ref.cav. autoalignment

Picomotors

Piezos

--

Injection bench

MC mirror autoalignment--Inj.B. autoalignment--Beam autoalignment--

DC position sensors

Wavefront sensors

Page 34: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

34 GWADW Elba 30.05.2006

Outlook

Page 35: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

35 GWADW Elba 30.05.2006

Present status

Full locking of interferometer1-2 hours locking periodsor 5 minutes …

Thermal effectsAffect recycling cavity stability(modulation sidebands drop)

30-50 Hz burst events (skeephs)Locking stability problems

Misalignment sensitivity?Hasten full autoalignment (5/10 d.o.f. OK)

2h0 1000 2000 3000 4000 5000 6000 7000

0.00

0.01

0.02

0.03

0.04

0.05

0.06

-2.0x10-5

0.0

2.0x10-5

4.0x10-5

6.0x10-5

8.0x10-5

1.0x10-4

1.2x10-4

1.4x10-4

1.6x10-4

1.8x10-4

2.0x10-4

2.2x10-4

2.4x10-4

Pr_

B5_D

C

time [s]

Pr_B5_DC_mean

Pr_B5_2f_ACq_mean

Carrier power

Sideband power

Time 0

Thermal effects in rec. cavity

Page 36: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

36 GWADW Elba 30.05.2006

Next steps

Improve sensitivityLow frequency

control noise (alignment)modulation frequency tuning (servo)

Medium frequencyscattered lightacoustic shielding in laser lab

High frequencyincreased powernew low-noise HF modulation generator

New MC mirrorbetter surface qualitylower losseslarger, heavier?

avoid radiation pressure problemsfacilitate control

...

Page 37: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

End

End

Page 38: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

38 GWADW Elba 30.05.2006

Old injection bench (OptoCad design)

10% reflectivitymirror for power reduction

From laser

To interferometer

Mode cleaner

Page 39: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

39 GWADW Elba 30.05.2006

14 hours locked

C7 (5 days Sept. 2005)

40 hours locked

Duty Cycle of last two commissioning runs

C6 (14 days Aug. 2005)

Page 40: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

40 GWADW Elba 30.05.2006

1. Mirror excitation in windy conditions=> more frequent unlocks when weather is bad

2. DAC noise on mirror actuation coilsHigh force needed for lock acquisition=> bad DAC dynamics in steady conditions (low force)

Micro-seismic peak(sea waves)

Suspension: recent problems

seismic acceleration

wind speed

susp displacement

noisy daycalm day

Page 41: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

41 GWADW Elba 30.05.2006

Suspension: inertial damping modification

L(s)H(s)

L+H = 1

accelerometer

LVDT

Inertial dampingInverted pendulum top platform is immobilized byHF accelerometers (inertial sensors)LF LVDT’s (ground based) => introduce seismic noise

SolutionReduced HF/LF cross-over frequency to 30 mHzNot so simple ... (see G. Losurdo’s talk)

LVDT = linear variable differential transformer

30 mHz

Page 42: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

42 GWADW Elba 30.05.2006

Suspension: hierarchical control

DC-0.01 HzTide control

0.01-5 Hz

5-50 Hz

After lock acquisition: reduction of mirror actuator gain=> reduction of DAC noise

Initial condition:-lock acquisition-all force goes to mirror

Static condition:-interferometer locked-force split according to frequency bands

DAC noise

Page 43: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

43 GWADW Elba 30.05.2006

1.4 Mo coalescence detection range

M31 (Andromeda) 700 kpc

C7 (19 Sept 05)

C6 (12 Ago 05)

Environmental disturbance re-injection through the control system

Page 44: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

44 GWADW Elba 30.05.2006

C7 noise budget

Page 45: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

45 GWADW Elba 30.05.2006

Mirror centering

Page 46: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

46 GWADW Elba 30.05.2006

Mirror centering

Needed because of astigmatism and suspected beam clipping

Advantage: learned techniques for mirror centering Necessary for reducing alignment noise which limits us at low frequencies

Two techniques usedVisual centering

Where possible…

Mirror shaking at natural resonanceFind frequency in longitudinal motion (locking error signal)

x

Page 47: 1 GWADW Elba 30.05.2006 The commissioning of the Virgo interferometer H. Heitmann Observatoire de la Côte dAzur, Nice for the VIRGO collaboration Evolution

47 GWADW Elba 30.05.2006

Beam splitter visual centering

Before centering After centering

cm

cm

Mirror

Coil

Local control camera imageobservation of diffused beam spot while moving mirror