3 07-Oct-2012 CLIC Module Working Group «BE-RF-PM» 3 Experimental Outline Phase 1: 5-13 February June 2011 Phase 1: 5-13 February June 2011 Study outcome: Results Analyzed Phase 2: 1-12 October 2012 (March – June 2013) Phase 2: 1-12 October 2012 (March – June 2013) Study outcome: The results are expected to be: (1)simulated, (2)processed and (3)compared CLIATLSS0076, CLIATLSS0077, CLIATLSS0078, CLIATLSS0079 Phase 3 (2013-…) Non-destructive testing Study outcome: To be discussed Achieved Experiments NameType Pilot radio-activationRadiation Testing 3-Point BendingMechanical Testing Uniaxial Compression TestingMechanical Testing Indicative samples Achieved Experiments NameType Large Sample Neutron Activation Analysis Radiation Testing Radiation FatigueRadiation Testing 3-Point BendingMechanical Testing Tensile TestingMechanical TestingTRANSCRIPT
107-Oct-2012 «BE-RF-PM»
Experiments on the Material Samples of the CLIC Two-Beam Module Supporting System:
PHASE 2
Nick Gazis
1
207-Oct-2012 CLIC Module Working Group «BE-RF-PM» 2
Contents
1. Experimental Outline
2. Material Testing (Phase 1)
3. Material Testing (Phase 2)
4. Actions & Schedule
307-Oct-2012 CLIC Module Working Group «BE-RF-PM» 3
Experimental Outline
Phase 1: 5-13 February 2011 25-30 June 2011
Study outcome: Results Analyzed
Phase 2: 1-12 October 2012
(March – June 2013)
Study outcome: The results are expected to be: (1)simulated,
(2)processed and (3)compared
CLIATLSS0076, CLIATLSS0077, CLIATLSS0078, CLIATLSS0079
Phase 3 (2013-…)
Non-destructive testingStudy outcome: To be discussed
To be confirmed
Achieved Experiments
Name TypePilot radio-activation Radiation Testing
3-Point Bending Mechanical Testing
Uniaxial Compression Testing Mechanical Testing
Indicative samples
Finished
Achieved Experiments
Name Type
Large Sample Neutron Activation Analysis Radiation Testing
Radiation Fatigue Radiation Testing
3-Point Bending Mechanical Testing
Tensile Testing Mechanical Testing
Ongoing
407-Oct-2012 CLIC Module Working Group «BE-RF-PM» 4
Phase 1: 05-13 February 2011 25-30 June 2011
EDMS References 1155133 & 1133745
507-Oct-2012 CLIC Module Working Group «BE-RF-PM» 5
Material Testing for Phase 1
Phase 1:5-13 February 2011
25-30 June 2011
Study outcome: Results Analyzed
Achieved Experiments
Name TypePilot radio-activation Radiation Testing
Three Point Bending Mechanical Testing
Uniaxial Compression Testing Mechanical Testing
Indicative samples
Girder material samples radiation testing at NCSR Demokritos (GR) on February 2011
I. k
Girder material samples mechanical testing at NTUA (GR) on June 2011
607-Oct-2012 CLIC Module Working Group «BE-RF-PM» 6
Phase 2: 01-12 October 2012 …
707-Oct-2012 CLIC Module Working Group «BE-RF-PM» 7
Material Testing for Phase 2
Mechanical Testing
Tensile TestingSiC samples: i. 4 samples of CLIATLSS0076ii. 4 samples of CLIATLSS0077
EPUMENT SAMPLES: i. 4 samples of CLIATLSS0078ii. 4 samples of CLIATLSS0079
NO RADIATION (reference specimens) Three Point Bending
Tensile TestingSiC samples: i. 4 samples of CLIATLSS0076ii. 4 samples of CLIATLSS0077
EPUMENT SAMPLES: i. 4 samples of CLIATLSS0078ii. 4 samples of CLIATLSS0079
NEUTRON RADIATION
Three Point Bending
Tensile TestingSiC samples: i. 4 samples of CLIATLSS0076ii. 4 samples of CLIATLSS0077
EPUMENT SAMPLES: i. 4 samples of CLIATLSS0078ii. 4 samples of CLIATLSS0079
PROTON RADIATION
Three Point Bending
Radiation Testing Samples
Group A
Group B
Group C*Optionally: Mechanical Impact testing on one (1) spare sample of each type
cw40 & cw41
Under preparation
807-Oct-2012 CLIC Module Working Group «BE-RF-PM» 8
Types of Specimen
Specimen SB (=SiC Bars) Height=90 mm, Thickness=6 mm
CLIATLSS0077
Specimen SD (=SiC Dog-bones) Height=70 mm, Thickness=6 mm
CLIATLSS0076
Specimen ED1 (=Epument Disks batch 1)
D=100 mm, Thickness=30 mm
CLIATLSS0078
Specimen ED2 (=Epument Disks batch 2)
D=200 mm, Thickness=60 mm
CLIATLSS0079
Dedicated specimen design for tensile strength testing
907-Oct-2012 CLIC Module Working Group «BE-RF-PM» 9
Reference samples and simulations
Acoustic sensorsStrain gages
Neutron Activation simulation: in progress
Size Effect: Under investigation
Cracking Patterns: under investigation
Preliminary test results:
Analysis deadline cw46
Testing report (by NTUA) cw48
*Data input from Sophie Mallows
Preliminary simulation results:
Analysis deadline cw46
Testing report (by NCSR Demokritos) cw49
1007-Oct-2012 CLIC Module Working Group «BE-RF-PM»10
Actions & Schedule
1. Design, procurement and delivery of samples for Phase 1 : Finished2. Irradiation testing (neutron radio-activation) for Phase 1 (at NCSR Demokritos): Finished 3. Mechanical testing (UCT1 and 3PB2 ) for the Phase 1 (at NTUA): Finished
4. Design, procurement and delivery of samples for Phase 2: Finished5. Neutron activation simulation (with Fispact3) for Phase 2 (at NCSR Demokritos):
preliminary results available on cw486. Mechanical testing (BDT4) for the reference samples of Phase 2 (at NTUA):
preliminary results available on cw49
7. Irradiation testing for the Phase 2: March-April 2013 (to be confirmed)8. Mechanical testing for the irradiated samples of Phase 2: May-June 2013 (to be confirmed)
UCT1: Uniaxial Tensile Testing3PB2: Three Point Bending
FISPACT3: dedicated software for activation simulationsBDT4: Brazilian Disc Testing