  • 7/25/2019 05-integritymanagement

    1/20

    Riser IntegrityManagement

    HSE Flexible Pipe Integrity Forum

    November, 2008, Aberdeen

  • 7/25/2019 05-integritymanagement

    2/20

    2

    ConclusionsV_

    Monitoring TechnologiesIV_

    Example of RIM System: DaliaIII_

    Main Interfaces for RIMII_

    _ IntroductionI

    Contents

  • 7/25/2019 05-integritymanagement

    3/20

    3

    ConclusionsV_

    Monitoring TechnologiesIV_

    Example of RIM System: DaliaIII_

    Main Interfaces for RIMII_

    _ IntroductionI

    Contents

  • 7/25/2019 05-integritymanagement

    4/20

    4

    ConclusionsV_

    Monitoring TechnologiesIV_

    Example of RIM System: DaliaIII_

    Main Interfaces for RIMII_

    _ IntroductionI

    Contents

  • 7/25/2019 05-integritymanagement

    5/20

    5

    Main Steps of Riser Integrity Management

    Task 1 Task 2 Task 3 Task 4

    Study Basis ofDesign

    Inspection &Monitoring

    Programme

    Definition

    Inspection &Monitoring

    Programme

    Execution

    Post-processingof riser data and

    conclusions

    about riser

    integrity

    Programme Preparation Onshore Offshore Operations IM Post-Processing

    Onshore

    Year N +1

    First Year

  • 7/25/2019 05-integritymanagement

    6/20

    6

    Main Interfaces

    1 -Order and Specify Riser

    2 Design, Manuf, Install Riser

    Integrate Monitoring hardware

    3 Failure Mode Analysis

    Provide data

    4 Define RIM programme

    5 Monitoring Hard and software

    data Aquisition, process

    Data management, Interpretation - 7

    Integrity Assessment - 8

    9 Act, Decide

    Operato

    r

    RiserManu

    f-Insta

    ller

    RIMSe

    rvice

    Provid

    er

    H&Sp

    rovider

    6 Provide Additional data

  • 7/25/2019 05-integritymanagement

    7/20

    7

    Responsibilities

    Operator

    Specify

    Provide Additional

    Data from System

    Act on Results

    Implement

    Recommendations

    Riser Manufacturer

    / Installer Provide Relevant

    Info Design

    Manufacturing

    Installation Commissioning

    Integrate hardware

    in Riser

    FMA

    Integrity

    Assessment

    Make

    Recommendations

    RIM Service

    Provider

    Establish RIM

    Programme

    Coordinate

    Activities

    Manage,

    Analyze data

    Interpret Data

    H&S Provider

    Provide

    Hardware,

    Software

    Install itOffshore

    Service and

    Maintain

    Data Transfer,

    Analysis

    Task 1

    &Task 2

    Task 3

    Task 4

  • 7/25/2019 05-integritymanagement

    8/20

    8

    ConclusionsV_

    Monitoring TechnologiesIV_

    Example of RIM System: DaliaIII_

    Main Interfaces for RIMII_

    _ IntroductionI

    Contents

  • 7/25/2019 05-integritymanagement

    9/20

    9

    Dalia RIM SCOPE

    'What: Monitoring, testing & inspection of 8 IPB risers, 2 GI & 4 WI risers

    ' Where: On Dalia flexible risers

    ' How long: During the entire field life

    ' How: Annual review of data & yearly follow-up report delivered to theClient + Annual optimization and adjustments of the schedule + regulargeneral interaction with asset

  • 7/25/2019 05-integritymanagement

    10/20

    10

    Involved Parties

    ' Operator : Total

    ' RIM Service Provider : Genesis (Technip)

    ' Riser Manufacturer & Installer: TechnipFrance / Flexifrance

    ' H&S Providers:

    Schlumberger: DTS system inspection & maintenance Force Technology: Vent Gas Monitoring system maintenance

  • 7/25/2019 05-integritymanagement

    11/20

    11

    Dalia RIM: Services Overview

    Operating Conditions

    Surveillance

    P,T enveloppe

    Peaks & shut-down

    DTS

    External IntegritySurveillance

    ROV & visual ins

    DTS

    Riser Mechanical &Plastic Ageing

    Vent gas analysis

    Polymer coupon

    Plastic ageing analysisFatigue analysis

    Annulus Integrity

    Monitoring

    Vacuum tests

    Vent system check-up

    Peaks & Shut-down

    Insp. & Maint. Of

    Monitoring System

    VGM

    DTS

    Riser IM

  • 7/25/2019 05-integritymanagement

    12/20

    12

    2008 Programme Review

    ' Inspection & maintenance on FPSO:

    DTS system: Completed by Schlumberger Vacuum tests & topsides inspections by Flexifrance:

    VGM system maintenance : Force Technology' Vent gas analysis: Performed in June 2008 Conclusions issued in the

    Yearly Report

    ' Yearly Report: To be issued in December 2008 / January 2009

    ' Key points:

    Importance of strong relationships between key players (knowledgetransfer, access to in-house experts)

    Initiate early discussion Data gathering is key

  • 7/25/2019 05-integritymanagement

    13/20

    13

    ConclusionsV_

    Monitoring TechnologiesIV_

    Example of RIM System: DaliaIII_

    Main Interfaces for RIMII_

    _ IntroductionI

    Contents

  • 7/25/2019 05-integritymanagement

    14/20

    14

    Flooded Annulus Detection

    Perform regular inspections to detect possible water ingress vacuum test

    N2 Gas injection and control of the injected volume

    Perform regular subsea examination

    Gas venting monitoring device Measure any sudden increase in the gas flowrate

    Presence of water at the venting ports

    Implement PIM (pipe integrity management) P & T history

    Fluid history

    Annulus history

    Annulus vent rate

    monitor

    0

    5

    10

    15

    20

    25

    30

    35

    40

    45

    50

    24.05.20

    0022:00

    25.05.20

    0010:00

    25.05.20

    0022:00

    26.05.20

    0010:00

    26.05.20

    0022:00

    27.05.20

    0010:00

    27.05.20

    0022:00

    28.05.20

    0010:00

    28.05.20

    0022:00

    29.05.20

    0010:00

    29.05.20

    0022:00

    30.05.20

    0010:00

    30.05.20

    0022:00

    31.05.20

    0010:00

    31.05.20

    0022:00

    01.06.20

    0010:00

    01.06.20

    0022:00

    02.06.20

    0010:00

    02.06.20

    0022:00

    03.06.20

    0010:00

    03.06.20

    0022:00

    04.06.20

    0010:00

    04.06.20

    0022:00

    05.06.20

    0010:00

    05.06.20

    0022:00

    06.06.20

    0010:00

    Average 3 Kanal 108

    Average 5 Kanal 108

    Tid Kanal 108

  • 7/25/2019 05-integritymanagement

    15/20

    15

    Temperature Monitoring: DTS (1/2)

    Distributed Temperature Sensing (DTS) technology :

    Raman Reflectometry (OTDR, analysis of back-scattered light)

    Continuous temperature profiles along each fibre with a resolution of 1m and very

    good accuracy (+/- 0.5C) and resolution about 0.1C

    Integration in the Flexible Pipe Manufacturing process:

    SS tubes integrated in Flexible Pipe Manufacture (Armour layer or bundle)

    Optical fibre inserted inside SS tubes

    SS tubes

  • 7/25/2019 05-integritymanagement

    16/20

    16

    Good Sensitivity of system

    Calibration of model to forecast temperature in different elements of

    Pipe.

    Applications

    Flow Assurance

    Annulus Flooding

    Temperature Monitoring: DTS (2/2)

  • 7/25/2019 05-integritymanagement

    17/20

    17

    Curvature Sensor

    subCRods : based on Optical Fibre FBG sensors GRP rod with 4 optical fibres

    Sensors at about 1m (or less) intervals

    Integration in Bend Stiffener

    4 moulded voids included in design

    Calibration of System

    Solutions have been developed

  • 7/25/2019 05-integritymanagement

    18/20

    18

    Acoustic Emission of wire Rupture

    Used on Full Scale test Several times 2002 Tensile test on the traction bench in LeTrait

    2007 Corrosion Fatigue test

    Additional work ongoing to qualify for Offshore use.

    Calibration, fixation and location on flexible pipe needs close

    collaboration

  • 7/25/2019 05-integritymanagement

    19/20

    19

    ConclusionsV_

    Monitoring TechnologiesIV_

    Example of RIM System: DaliaIII_

    Main Interfaces for RIMII_

    _ IntroductionI

    Contents

  • 7/25/2019 05-integritymanagement

    20/20

    20

    CONCLUSIONS Complex process

    Many players

    Many interfaces

    Technip view: Integrate under Company an Overall Service

    To add value to the process

    To deliver asset life expectations

    Each player needs to fulfill its role

    Flexible Manufacturer (in particular access to in-house expertise)

    Monitoring Hardware/Software Supplier

    RIM Service Provider (at start and during lifetime - importance of

    historical events recording)

    Operator