05-integritymanagement
TRANSCRIPT
-
7/25/2019 05-integritymanagement
1/20
Riser IntegrityManagement
HSE Flexible Pipe Integrity Forum
November, 2008, Aberdeen
-
7/25/2019 05-integritymanagement
2/20
2
ConclusionsV_
Monitoring TechnologiesIV_
Example of RIM System: DaliaIII_
Main Interfaces for RIMII_
_ IntroductionI
Contents
-
7/25/2019 05-integritymanagement
3/20
3
ConclusionsV_
Monitoring TechnologiesIV_
Example of RIM System: DaliaIII_
Main Interfaces for RIMII_
_ IntroductionI
Contents
-
7/25/2019 05-integritymanagement
4/20
4
ConclusionsV_
Monitoring TechnologiesIV_
Example of RIM System: DaliaIII_
Main Interfaces for RIMII_
_ IntroductionI
Contents
-
7/25/2019 05-integritymanagement
5/20
5
Main Steps of Riser Integrity Management
Task 1 Task 2 Task 3 Task 4
Study Basis ofDesign
Inspection &Monitoring
Programme
Definition
Inspection &Monitoring
Programme
Execution
Post-processingof riser data and
conclusions
about riser
integrity
Programme Preparation Onshore Offshore Operations IM Post-Processing
Onshore
Year N +1
First Year
-
7/25/2019 05-integritymanagement
6/20
6
Main Interfaces
1 -Order and Specify Riser
2 Design, Manuf, Install Riser
Integrate Monitoring hardware
3 Failure Mode Analysis
Provide data
4 Define RIM programme
5 Monitoring Hard and software
data Aquisition, process
Data management, Interpretation - 7
Integrity Assessment - 8
9 Act, Decide
Operato
r
RiserManu
f-Insta
ller
RIMSe
rvice
Provid
er
H&Sp
rovider
6 Provide Additional data
-
7/25/2019 05-integritymanagement
7/20
7
Responsibilities
Operator
Specify
Provide Additional
Data from System
Act on Results
Implement
Recommendations
Riser Manufacturer
/ Installer Provide Relevant
Info Design
Manufacturing
Installation Commissioning
Integrate hardware
in Riser
FMA
Integrity
Assessment
Make
Recommendations
RIM Service
Provider
Establish RIM
Programme
Coordinate
Activities
Manage,
Analyze data
Interpret Data
H&S Provider
Provide
Hardware,
Software
Install itOffshore
Service and
Maintain
Data Transfer,
Analysis
Task 1
&Task 2
Task 3
Task 4
-
7/25/2019 05-integritymanagement
8/20
8
ConclusionsV_
Monitoring TechnologiesIV_
Example of RIM System: DaliaIII_
Main Interfaces for RIMII_
_ IntroductionI
Contents
-
7/25/2019 05-integritymanagement
9/20
9
Dalia RIM SCOPE
'What: Monitoring, testing & inspection of 8 IPB risers, 2 GI & 4 WI risers
' Where: On Dalia flexible risers
' How long: During the entire field life
' How: Annual review of data & yearly follow-up report delivered to theClient + Annual optimization and adjustments of the schedule + regulargeneral interaction with asset
-
7/25/2019 05-integritymanagement
10/20
10
Involved Parties
' Operator : Total
' RIM Service Provider : Genesis (Technip)
' Riser Manufacturer & Installer: TechnipFrance / Flexifrance
' H&S Providers:
Schlumberger: DTS system inspection & maintenance Force Technology: Vent Gas Monitoring system maintenance
-
7/25/2019 05-integritymanagement
11/20
11
Dalia RIM: Services Overview
Operating Conditions
Surveillance
P,T enveloppe
Peaks & shut-down
DTS
External IntegritySurveillance
ROV & visual ins
DTS
Riser Mechanical &Plastic Ageing
Vent gas analysis
Polymer coupon
Plastic ageing analysisFatigue analysis
Annulus Integrity
Monitoring
Vacuum tests
Vent system check-up
Peaks & Shut-down
Insp. & Maint. Of
Monitoring System
VGM
DTS
Riser IM
-
7/25/2019 05-integritymanagement
12/20
12
2008 Programme Review
' Inspection & maintenance on FPSO:
DTS system: Completed by Schlumberger Vacuum tests & topsides inspections by Flexifrance:
VGM system maintenance : Force Technology' Vent gas analysis: Performed in June 2008 Conclusions issued in the
Yearly Report
' Yearly Report: To be issued in December 2008 / January 2009
' Key points:
Importance of strong relationships between key players (knowledgetransfer, access to in-house experts)
Initiate early discussion Data gathering is key
-
7/25/2019 05-integritymanagement
13/20
13
ConclusionsV_
Monitoring TechnologiesIV_
Example of RIM System: DaliaIII_
Main Interfaces for RIMII_
_ IntroductionI
Contents
-
7/25/2019 05-integritymanagement
14/20
14
Flooded Annulus Detection
Perform regular inspections to detect possible water ingress vacuum test
N2 Gas injection and control of the injected volume
Perform regular subsea examination
Gas venting monitoring device Measure any sudden increase in the gas flowrate
Presence of water at the venting ports
Implement PIM (pipe integrity management) P & T history
Fluid history
Annulus history
Annulus vent rate
monitor
0
5
10
15
20
25
30
35
40
45
50
24.05.20
0022:00
25.05.20
0010:00
25.05.20
0022:00
26.05.20
0010:00
26.05.20
0022:00
27.05.20
0010:00
27.05.20
0022:00
28.05.20
0010:00
28.05.20
0022:00
29.05.20
0010:00
29.05.20
0022:00
30.05.20
0010:00
30.05.20
0022:00
31.05.20
0010:00
31.05.20
0022:00
01.06.20
0010:00
01.06.20
0022:00
02.06.20
0010:00
02.06.20
0022:00
03.06.20
0010:00
03.06.20
0022:00
04.06.20
0010:00
04.06.20
0022:00
05.06.20
0010:00
05.06.20
0022:00
06.06.20
0010:00
Average 3 Kanal 108
Average 5 Kanal 108
Tid Kanal 108
-
7/25/2019 05-integritymanagement
15/20
15
Temperature Monitoring: DTS (1/2)
Distributed Temperature Sensing (DTS) technology :
Raman Reflectometry (OTDR, analysis of back-scattered light)
Continuous temperature profiles along each fibre with a resolution of 1m and very
good accuracy (+/- 0.5C) and resolution about 0.1C
Integration in the Flexible Pipe Manufacturing process:
SS tubes integrated in Flexible Pipe Manufacture (Armour layer or bundle)
Optical fibre inserted inside SS tubes
SS tubes
-
7/25/2019 05-integritymanagement
16/20
16
Good Sensitivity of system
Calibration of model to forecast temperature in different elements of
Pipe.
Applications
Flow Assurance
Annulus Flooding
Temperature Monitoring: DTS (2/2)
-
7/25/2019 05-integritymanagement
17/20
17
Curvature Sensor
subCRods : based on Optical Fibre FBG sensors GRP rod with 4 optical fibres
Sensors at about 1m (or less) intervals
Integration in Bend Stiffener
4 moulded voids included in design
Calibration of System
Solutions have been developed
-
7/25/2019 05-integritymanagement
18/20
18
Acoustic Emission of wire Rupture
Used on Full Scale test Several times 2002 Tensile test on the traction bench in LeTrait
2007 Corrosion Fatigue test
Additional work ongoing to qualify for Offshore use.
Calibration, fixation and location on flexible pipe needs close
collaboration
-
7/25/2019 05-integritymanagement
19/20
19
ConclusionsV_
Monitoring TechnologiesIV_
Example of RIM System: DaliaIII_
Main Interfaces for RIMII_
_ IntroductionI
Contents
-
7/25/2019 05-integritymanagement
20/20
20
CONCLUSIONS Complex process
Many players
Many interfaces
Technip view: Integrate under Company an Overall Service
To add value to the process
To deliver asset life expectations
Each player needs to fulfill its role
Flexible Manufacturer (in particular access to in-house expertise)
Monitoring Hardware/Software Supplier
RIM Service Provider (at start and during lifetime - importance of
historical events recording)
Operator