01.10.2015Weekly Meeting

HE,HB and HF RadDam Analysis with 2015 pp Data

Semiray Girgis, Hasan Huseyin Isik ,Ilknur Baldan, Yalcin Guler,

Shuichi Kunori, Eda Eskut, Isa Dumanoglu

1

Page 2: 01.10.2015 Weekly Meeting HE,HB and HF RadDam Analysis with 2015 pp Data Semiray Girgis, Hasan Huseyin Isik, Ilknur Baldan, Yalcin Guler, Shuichi Kunori,

2

- 2015 Raddiation Damage Study

HE Raddam Results HB Raddam Results HF Raddam Results

- Conclusions

Content

Page 3: 01.10.2015 Weekly Meeting HE,HB and HF RadDam Analysis with 2015 pp Data Semiray Girgis, Hasan Huseyin Isik, Ilknur Baldan, Yalcin Guler, Shuichi Kunori,

3

• CMSSW_7_4_8_patch1 is used.• HLT_Mu20_v*• Energy Cuts: 2 • Time < 15 ns.

Run InformationRun Number

Date Time magnetic Field

İnjection scheme

251562252116254790256171

2015.07.12 2015.07.20 2015.08.21 2015.09.08

4h. 40 min. 1h.5h. 8min.5h. 17 min.

3.8T 0T 3.8T 0T

50ns_296b_254_36_246_36bpi11inj50ns_482b_420_32_397_72bpi11inj25ns_315b_303_270_276_72bpi9inj25ns_459b_447_351_372_72bpi11inj

NOTE : Above information is for HE and HB Raddam analysis

Page 4: 01.10.2015 Weekly Meeting HE,HB and HF RadDam Analysis with 2015 pp Data Semiray Girgis, Hasan Huseyin Isik, Ilknur Baldan, Yalcin Guler, Shuichi Kunori,

4

Energy cut 2 GeV Comparison results for HE

Page 5: 01.10.2015 Weekly Meeting HE,HB and HF RadDam Analysis with 2015 pp Data Semiray Girgis, Hasan Huseyin Isik, Ilknur Baldan, Yalcin Guler, Shuichi Kunori,

5

HE_50ns vs 25ns Minus (0T)

Ratio= 256171(25ns)/252116(50ns)

50 ns25 ns

Page 6: 01.10.2015 Weekly Meeting HE,HB and HF RadDam Analysis with 2015 pp Data Semiray Girgis, Hasan Huseyin Isik, Ilknur Baldan, Yalcin Guler, Shuichi Kunori,

6

HE_50ns vs 25ns Plus(0T)

Ratio= 256171(25ns)/252116(50ns)

Page 7: 01.10.2015 Weekly Meeting HE,HB and HF RadDam Analysis with 2015 pp Data Semiray Girgis, Hasan Huseyin Isik, Ilknur Baldan, Yalcin Guler, Shuichi Kunori,

7

HE_50ns vs 25ns Minus(3.8T)

Ratio= 254790(25ns)/251562(50ns)

Page 8: 01.10.2015 Weekly Meeting HE,HB and HF RadDam Analysis with 2015 pp Data Semiray Girgis, Hasan Huseyin Isik, Ilknur Baldan, Yalcin Guler, Shuichi Kunori,

8

HE_50ns vs 25ns Plus (3.8T)

Ratio= 254790(25ns)/251251(50ns)

Page 9: 01.10.2015 Weekly Meeting HE,HB and HF RadDam Analysis with 2015 pp Data Semiray Girgis, Hasan Huseyin Isik, Ilknur Baldan, Yalcin Guler, Shuichi Kunori,

9

Muon_Pt

r256171B=0T25ns

r254790B=3.8T25ns

r252116B=0T50ns

r251562B=3.8T50ns

Page 10: 01.10.2015 Weekly Meeting HE,HB and HF RadDam Analysis with 2015 pp Data Semiray Girgis, Hasan Huseyin Isik, Ilknur Baldan, Yalcin Guler, Shuichi Kunori,

10

Energy cut 2 GeV Comparison results for HB

Page 11: 01.10.2015 Weekly Meeting HE,HB and HF RadDam Analysis with 2015 pp Data Semiray Girgis, Hasan Huseyin Isik, Ilknur Baldan, Yalcin Guler, Shuichi Kunori,

11

HB_50ns vs 25ns Minus (0T)

Page 12: 01.10.2015 Weekly Meeting HE,HB and HF RadDam Analysis with 2015 pp Data Semiray Girgis, Hasan Huseyin Isik, Ilknur Baldan, Yalcin Guler, Shuichi Kunori,

12

HB_50ns vs 25ns Plus(0T)

Page 13: 01.10.2015 Weekly Meeting HE,HB and HF RadDam Analysis with 2015 pp Data Semiray Girgis, Hasan Huseyin Isik, Ilknur Baldan, Yalcin Guler, Shuichi Kunori,

13

HB_50ns vs 25ns Minus(3.8T)

Page 14: 01.10.2015 Weekly Meeting HE,HB and HF RadDam Analysis with 2015 pp Data Semiray Girgis, Hasan Huseyin Isik, Ilknur Baldan, Yalcin Guler, Shuichi Kunori,

14

HB_50ns vs 25ns Plus (3.8T)

Page 15: 01.10.2015 Weekly Meeting HE,HB and HF RadDam Analysis with 2015 pp Data Semiray Girgis, Hasan Huseyin Isik, Ilknur Baldan, Yalcin Guler, Shuichi Kunori,

15

HF comparison results

Page 16: 01.10.2015 Weekly Meeting HE,HB and HF RadDam Analysis with 2015 pp Data Semiray Girgis, Hasan Huseyin Isik, Ilknur Baldan, Yalcin Guler, Shuichi Kunori,

16

Run InformationRun Number

magnetic Field

İnjection scheme Data Sets

251721254879256866

3.8T 3.8T 3.8T

50ns_476b_414_32_397_72bpi10inj25ns_458b_446_360_372_48bpi13inj25ns_1177b_1165_1080_1110_144bpi11inj

/ExpressPhysics/Run2015B-Express-v1/FEVT/ExpressPhysics/Run2015C-Express-v1/FEVT/ExpressPhysics/Run2015D-Express-v1/FEVT

• CMSSW_7_4_8_patch1 is used.• Energy Cuts: 2 GeV • -10 < Time < +15 ns.• We did not use any trigger for HF

Page 17: 01.10.2015 Weekly Meeting HE,HB and HF RadDam Analysis with 2015 pp Data Semiray Girgis, Hasan Huseyin Isik, Ilknur Baldan, Yalcin Guler, Shuichi Kunori,

17

HF_Depth1_Minus (3.8T)

Page 18: 01.10.2015 Weekly Meeting HE,HB and HF RadDam Analysis with 2015 pp Data Semiray Girgis, Hasan Huseyin Isik, Ilknur Baldan, Yalcin Guler, Shuichi Kunori,

18

HF_Depth2_Minus (3.8T)

Page 19: 01.10.2015 Weekly Meeting HE,HB and HF RadDam Analysis with 2015 pp Data Semiray Girgis, Hasan Huseyin Isik, Ilknur Baldan, Yalcin Guler, Shuichi Kunori,

19

HF_Depth1_Plus (3.8T)

Page 20: 01.10.2015 Weekly Meeting HE,HB and HF RadDam Analysis with 2015 pp Data Semiray Girgis, Hasan Huseyin Isik, Ilknur Baldan, Yalcin Guler, Shuichi Kunori,

20

HF_Depth2_Plus (3.8T)

Page 21: 01.10.2015 Weekly Meeting HE,HB and HF RadDam Analysis with 2015 pp Data Semiray Girgis, Hasan Huseyin Isik, Ilknur Baldan, Yalcin Guler, Shuichi Kunori,

21

Conclusion

• This week we analysed some 2015 runs which are taken at 3.8 T and 0 T for 25ns and 50 ns using HLT_Mu20_v* trigger , and we tried to understand the differences between runs.

• When we plotted the histograms we added ratio plots using 2GeV energy cut.

• Shuichi requested to extend raddam analysis including HF subdetector. After now we will continue to do this analysis for HF too.

• This week we focused on the specific runs. Next week we are planning to focus on 2015 A-B-C-D full data samples.

• When we have enough statistics we can give more information and we can show latest results about this analysis.