Concrete Water Tanks
Purpose
Focus on concrete tanks Enhance knowledge of tank options Multiple perspectives Provide forum for open discussion
2
Workshop Outline
Overview of Tank Options
Construction of Pre-Stressed Concrete Tanks DN Tanks
Concrete Tank Market
Structural/Seismic Consideration
West Yost Associates
DN Tanks
Ground Improvement Methods
Simon Wong Engineers
Purpose / Introduction
Engeo Geotechnical
West Yost Associates
DYK Company History Founded in 1961 by Max Dykmans, Sr.
Western United States
Over 1,000 tanks in operation
Water
Wastewater
Recycled Water
Chilled Water
International
3
Natgun Company History Founded in 1921 as National
Gunite Contracting Corporation
Primarily Eastern, Central and Southwestern United States
Over 1,500 tanks in operation
Water
Wastewater
Recycled Water
Chilled Water
• A true 50-50 merger• Co-CEO’s• Bill Hendrickson, DYK• Charles Crowley, Natgun• 4-Member board of directors• Equal representation from
both organizations
4
Why Merge? To combine our expertise and resources
to grow the prestressed concrete tank industry both domestically and internationally.
Complimentary strengths
Merger Benefits Build a better tank Safer jobsites Increased efficiencies Unmatched technical
expertise Tank options for
every project Increased
geographical diversity
5
What We Provide The highest value tank Custom sizes from
40,000 gallons to 40 million gallons +
Heights up to 85’
Design, construction, and GC capabilities
Can build 46 tanks simultaneously
6
Workshop Outline
Overview of Tank Options
Construction of Pre-Stressed Concrete Tanks
Concrete Tank Market
Structural/Seismic Consideration
Ground Improvement Methods
Purpose / Introduction
West Yost Associates
Welded Steel Prestressed Concrete Reinforced Concrete Bolted Steel
Potable Water Storage Tanks
7
ComparisonSteel Lower Initial Cost Higher Maintenance Cost Steel Material Cost Can Vary Less Complicated to Construct Numerous Experienced Contractors Easier to Tap or Modify
Concrete Higher Initial Cost Lower Maintenance Coatings Not Required Cathodic Protection Not Required Partial or Complete Burial Supports Multiple Uses Use of Local Materials and Labor
Roof Types
Flat Concrete Domed Aluminum Domed Concrete
8
Steel PSCFlat Roof
PSCDome Roof
Construction $1.3M $2.1M $1.9M
Present Worth Value of Maintenance
$0.9M $0.1M $0.1M
Total Present Worth Value
- 60 Year useful life- 3% discount rate- Subjective- May be manipulated
$2.2M $2.2M $2M
HYPOTHETICAL LIFE CYCLE COST ANALYSISPRESTRESSED CONCRETE VS. WELDED STEEL
Selection Criteria User Preference Experience Funding Initial Cost Life Cycle Cost Site Constraints Buried or Above Grade Style /Aesthetics
9
AWWA D110Tanks
Type I Cast-in-place with Vertical Post-Tension
Type II Shotcrete with Steel Diaphragm
Type III Pre-cast with Steel Diaphragm
Type IVCast-in-place with Steel Diaphragm
AWWA D110 ComparisonsType I
Most West Coast Experience Favored by Most Structural Engineers Numerous Experienced Contractors
Type III
Faster to Construct Potential Cost Savings Offers Competition
10
Bidding Type I & III Tanks Separate Specifications Performance Based Specifications Equivalent Structural Criteria Different Construction Techniques Unit Responsibility
Construction Issues Superintendent Experience Concrete source Curing method Concrete consolidation Time for Inspection
11
Lessons Learned Every project unique Competitive and changing market place Know your site Team effort
Owner User Engineers Contractor
Workshop Outline
Overview of Tank Options
Construction of Pre-Stressed Concrete Tanks DN Tanks
Concrete Tank Market
Structural/Seismic Consideration
Ground Improvement Methods
Purpose / Introduction