profile need objectives features system work flow expected outcome implementation conclusion
TRANSCRIPT
PRODUCTION PLANNING: SCHEDULING &
SIMULATION
Prepared By :Ankit Viramgama (080470116058)
PROVIDED BY :
Jagdish, Precision Casting Pvt. Ltd. (Sapar-veraval)
Owner: Mr. Himanshu Patel
GUIDED BY :
Ass Prof. Avani Vasant (HOD IT)Ass Prof. Rachit Adhvarya
AGENDA
Profile Need Objectives Features System work flow Expected outcome Implementation Conclusion
PROFILE
IDP: Production planning – Scheduling and Simulation software
Platform: java
Database tool: MySQL
Duration: 10 months
Company: Jagdish , PRECISION CASTING PVT. LTD. (Sapar-Veraval)
Internal guide: Ass. Prof. Rachit Adhvarya
Intro duction: Project would deal with the scheduling of all the on going processes of the company with best resource fit using mining technology.
NEED
Existing system Inventory management No system for scheduling
Problem while scheduling manually Estimated time -> not precise Resource utilization may not efficient High failure rate Work load (time & paper) Need experienced employee
OBJECTIVES
Better utilization of resources.
Precise forecasting of completion time.
Keeping eye on schedule remotely.
FEATURES
Precise decision for scheduling Resource utilization Fault tolerant Reduce overhead Learning from past Remote access
SYSTEM WORK FLOW
Get order information
Check for available resources
Allocate resource
Avail?
Calculate optimizatio
n
Update DB
Send to pending
optimized?
Represent pictorially
NO
NOYES
YES
EXPECTED OUTCOME
Standardized decision
Minimised failure rate
Best fit resource utilization
Precise estimation
IMPLEMENTATION
IMPLEMENTATION (NOW)
IMPLEMENTATION
IMPLEMENTATION
Class for Database connectivity. Class for process scheduling. Class to read and write excel file.
CONCLUSION
Project would fulfill all the objective. Successfully schedule and simulate the processes. Accuracy should be obtained due to use of past data.
THANK YOU !!