    10 Door Hardware Master Schedule

    PROJECT Offices and Library Addition

    (513) 423-8745 Zion Lutheran ChurchFax 10 N Breiel Blvd

    Middletown OH 45044

    ARCHITECT studioTECHNE Architects

    (216) 791-4410 12210 Euclid Ave

    Fax 791-4438 Cleveland OH 44106

    CONTRACTOR Dryden Builders

    (937) 439-2728 1741 Thomas Paine PkwyFax 439-2729 Centerville OH 45459

    11/11/10 Zion Church Offices and Library Addition 101111.pdf 1/10 [ less cut sh

    CONSOLIDATED

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    2/47

    New & improving online via cmsi.webs.com

    Scheduling and Procurement AdvisoryIMPORTANT

    Unless otherwise noted: each opening is configured with regard to project planningas quoted, all minimum and maximum references are identified without regard foraesthetics, and individual protection plates are intended for push side installation

    Ancillary details MUST be validated and subordinating attributes such as function,trim design, material or finish will be regarded accurate as detailed if not otherwiseformally revised prior to initializing production or procurement. Approvals forwardedwith questions, provisions or other conditional markings are not actionable until each

    particular reservation is resolved to CMS satisfaction

    Project analysis and scheduling is non-refundable and invoiced at 3% of the scopedvalue plus $200.00. Prior to initializing either production or procurement or prior toimplementing a change to one or the other formal approval MUST be provided withan indemnification recap. ONCE PRODUCTION, PROCUREMENT OR A CHANGEIS INITIATED, COMPONENTS CAN BE NEITHER CANCELED NOR RETURNED

    ANSI / BHMA Base Material & Finish References by schedule annotation

    ANSI US Finish Description Base Material Related sim

    313 Satin, dark bronze anodize Aluminum 695 710 613

    600 P Primed Steel 674

    613 10B Oxidized satin, oil rubbed Bronze 640 313

    640 10B Oxidized satin bronze plated/coated Steel 613 313

    690 Painted to match 613 Any 613 640695 Painted to match 313 Any 313 710 613

    11/11/10 Zion Church Offices and Library Addition 101111.pdf 2/10 [ less cut sh

    CONSOLIDATED

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    3/47

    New & improving online via cmsi.webs.com

    Door Index and Notes by schedule opening

    Mark Set Key ing Notes

    102-1 1.0

    104-1 2.0

    104-2 3.0 PASSAGE

    106-1 4.1

    106-2 3.0 PASSAGE

    106-3 4.1107-1 4.2 Roller stop to install atop the LHR107-2 door at Set 5.0

    107-2 5.0 ROLLER Frames prep'd for latches; strikes to be prep'd in the field

    108-1 2.0

    108-2 2.0

    110-1 2.0

    112-1 6.0 P USH + PU LL

    113-1 7.0 P USH + PU LL

    114-1 6.0 P USH + PU LL

    115-1 7.0 P USH + PU LL

    116-1 8.0 PASSAGE Configuration adapted from planning for conditionsOverlapping astragal by the rated doors provider

    Door and Frame References by schedule annotation

    Annotation Type Description

    HM Both Hollow Metal ANSI/SDI fabrication or construction

    SC Door Solid Core AWI or WDMA construction

    F Door Flush Standard wood veneer configuration

    G Door Glass Half-lite kit option

    SL Frame Side Lite Single or 2 sided option

    11/11/10 Zion Church Offices and Library Addition 101111.pdf 3/10 [ less cut sh

    CONSOLIDATED

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    4/47

    New & improving online via cmsi.webs.com

    Set: 1.0**

    clarify keyway & keying

    1 Sgl Door 102-1 Lobby 101 from Janitor 102 ~95O LHR

    Opening 3070 SCF door 13/4 HM frame 57/8

    Qty Mfgr Description Model Finish

    3 ea DON Standard weight hinges NRPBB74545 41/2x41/2 6401 ea DOR Storeroom leverset CL880D**-LRG 6131 ea DOR Overhead holder+stop 702F 6903 ea DON Silencers 1608 ASH

    Set: 2.0 **clarify keyway & keying

    1 Sgl Door 108-2 Office 104 to Conference 108 ~90O LH

    Opening 3070 SCF door 13/4 HMSL frame 53/4

    1 Sgl Door108-1

    Lobby 101 to Conference 108 ~90O

    RH Opening 3070 SCFG door 13/4 HM frame 57/8

    1 Sgl Door 104-1 Lobby 101 to Office 104 ~155O RH

    Opening 3070 SCFG door 13/4 HMSL frame 53/4

    1 Sgl Door 110-1 Corridor 111 to Library 110 ~175O LH

    Opening 3070 SCFG door 13/4 HMSL2 frame 53/4

    Qty Mfgr Description Model Finish

    3 ea DON Standard weight hinges BB74545 41/2x41/2 6401 ea DOR Classroom leverset CL870D**-LRG 6131 ea DOR Closer +hold 8616FC-FH regular 6903 ea DON Silencers 1608 ASH

    11/11/10 Zion Church Offices and Library Addition 101111.pdf 4/10 [ less cut sh

    CONSOLIDATED

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    5/47

    New & improving online via cmsi.webs.com

    Set: 3.0

    1 Sgl Door 104-2 Office 104 from Unnumbered Closet ~110O LHR1 Sgl Door 106-2 Office 106 from Unnumbered Closet ~110O LHR

    Opening 2670 SCF door 13/4 HM frame 57/8

    Qty Mfgr Description Model Finish

    3 ea DON Standard weight hinges BB74545 41/2x41/2 6401 ea DOR Passage leverset CL810-LRG 6131 ea DOR Overhead holder+stop 702F 690

    3 ea DON Silencers 1608 ASH

    Set: 4.1 **clarify keyway & keying

    1 Sgl Door 106-3 Office 104 to Office 106 ~180O RH

    Opening 3070 SCF door 13/4 HM frame 67/8

    1 Sgl Door 106-1 Office 104 to Office 106 ~90O RH

    Opening 3070 SCF door 13/4 HMSL frame 67/8

    Qty Mfgr Description Model Finish

    3 ea DON Standard weight hinges BB74545 41/2x41/2 6401 ea DOR Office leverset CL853D**-LRG 6131 ea DON Concave wall stop 1407 6133 ea DON Silencers 1608 ASH

    11/11/10 Zion Church Offices and Library Addition 101111.pdf 5/10 [ less cut sh

    CONSOLIDATED

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    6/47

    New & improving online via cmsi.webs.com

    Set: 4.2**

    clarify keyway & keying

    1 Sgl Door 107-1 Office 104 to Pastor's Office 107 ~90O LH

    Opening 3070 SCF door 13/4 HMSL frame 67/8

    Qty Mfgr Description Model Finish

    3 ea DON Standard weight hinges BB74545 41/2x41/2 6401 ea DOR Office leverset CL853D**-LRG 6131 ea DON Roller stop 1486 6133 ea DON Silencers 1608 ASH

    Roller stop to install atop the LHR door leaf forOpening 107-2 at Set 5.0

    Set: 5.0

    1 Pr Doors 107-2 Pastor's Office 107 from Unnumbered Closet ~85O LHR~180O RHR

    Opening 5070 26 SCF doors 13/4 HM frame 57/8

    Qty Mfgr Description Model Finish

    6 ea DON Standard weight hinges BB74545 41/2x41/2 6402 ea DON Roller latches 1700 6132 ea DOR Single fixed lever trims CL801-LRG 6131 ea DOR Overhead holder+stop 702F LHR 6901 ea DON Convex wall stop 1406 RHR 6132 ea DON Silencers 1608 ASH

    Frames to have preps for latch mechanisms; concealed strikes to use field preps

    11/11/10 Zion Church Offices and Library Addition 101111.pdf 6/10 [ less cut sh

    CONSOLIDATED

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    7/47

    New & improving online via cmsi.webs.com

    Set: 6.0

    1 Sgl Door 112-1 Corridor 111 from Women's Vestibule 112 ~90O LHR1 Sgl Door 114-1 Corridor 111 from Men's Vestibule 114 ~90O RHR

    Opening 3070 SCF door 13/4 HM frame 53/4

    Qty Mfgr Description Model Finish

    3 ea DON Standard weight hinges BB74545 41/2x41/2 6401 ea DOR Closer 8616FC-SPA parallel 6901 ea DON Push+pull plate set 72+7138 613

    1 ea DON Kydex kick plate 90SM 8 door width less 2 CHO1 ea DON Convex wall stop 1406 6133 ea DON Silencers 1608 ASH1 DON ADA Men's sign HS9060-01 for114-1 only CHO1 DON ADA Women's sign HS9060-05 for112-1 only CHO

    Set: 7.0

    1 Sgl Door 113-1 Women's Vestibule 112 to Women's Restroom 112 ~90O LH1 Sgl Door 115-1 Men's Vestibule 114 to Men's Restroom 115 ~90O RH

    Opening 3070 SCF door 13/4 HM frame 53/4

    Qty Mfgr Description Model Finish

    3 ea DON Standard weight hinges BB74545 41/2x41/2 6401 ea DOR Closer 8616FC-AF regular 6901 ea DON Push+pull plate set 72+7138 6131 ea DON Kydex kick plate 90SM 8 door width less 2 CHO

    1 ea DON Convex wall stop 1406 6133 ea DON Silencers 1608 ASH

    11/11/10 Zion Church Offices and Library Addition 101111.pdf 7/10 [ less cut sh

    CONSOLIDATED

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    8/47

    New & improving online via cmsi.webs.com

    Set: 8.0

    1 Pr Doors 116-1 Corridor 111 from Corridor 116 ~90O LHRA~90O RHR

    Opening 5670 30 HMF door 13/4 HM frame 57/8 180-min

    26 HMF door 13/4

    Qty Mfgr Description Model Finish

    6 ea DON Standard weight hinges BB74545 41/2x41/2 6401 ea DON Auto flush bolt set 1560 RHR 613

    1 ea DON Coordinator +closer mts 2021+(2)2051 6001 ea DOR Rated device+pass trim F9500B-YG23M LHR 6132 ea DOR Closers 8616FC-SPA parallel 6901 ea DOR Floor e-mag hold/release EM501 RHR 6951 ea DOR Wall e-mag hold/release EM508 LHR 6951 ea NGP Astragal gasketing 5050C door/door height COAL1 ea NGP Perimeter gasketing 5050C doors/frame perimeter COAL

    Configuration adapted from planning to suit the unbalanced three hour door pair conditionsOverlapping astragal to be furnished by the rated doors provider

    Keying Reference for clarification

    The following keyed component details must be clarified prior to obtaining cylinders forthis project as contracted:

    Keywaymanufacturer and type for an established system

    Keysets for each relevant opening, with complete mastering- and change-keydetails (either keyed alike, cross-keyed, keyed separate or keyed unique)

    Quantities of keys for each keyset

    IMPORTANT: Proprietary key system components (controlled either by a manufactureror by some other entity, such as a distributor, locksmith or an organization) were neitherspecified nor quoted for this project and are not includedas contracted

    11/11/10 Zion Church Offices and Library Addition 101111.pdf 8/10 [ less cut sh

    CONSOLIDATED

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    9/47

    New & improving online via cmsi.webs.com

    Component References by schedule annotation

    Manufacturer Description Model

    DON Don-Jo Manufacturing Push plates 72don-jo.com Adhesive-mount protection plates 90SM

    Wall stops, convex 1406Wall stops, concave 1407Roller stop, standard 1486

    Automatic flush bolt set 1560Silencers 1608

    Roller latches with flush strikes 1700Coordinator w/filler, sized 2021Closer clearance mounts 2051Pull plates 7138

    ADA Men's restroom sign HS9060-01ADA Women's restroom sign HS9060-05

    Ball bearing hinges, sized BB74545Non-removeable pin option NRP

    DOR Dorma Architectural Hardware Grade 1 Life/Safety hold/releases EM Seriesdorma-usa.com Standard floor mounted configuration 501

    Universal wall-mounted configuration 508

    Grade 1 overhead door controls 700 SeriesSized for 27~36 nominal door 02

    All scheduled products are Friction holder configuration F

    ARRA compliant Grade 1 cylindrical leversets CL800 SeriesBHMA Certified, where Non-functioning single dummy trim 01

    categories exist Passage function F75 10Office function F109 53Classroom function F84 70Storeroom function F86 80Standard key-in-lever cylinder DNo-return type ADA lever design -LRG

    (continued next page)

    11/11/10 Zion Church Offices and Library Addition 101111.pdf 9/10 [ less cut sh

    CONSOLIDATED

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    10/47

    New & improving online via cmsi.webs.com

    Component References (continued) by schedule annotation

    Manufacturer Description Model

    DOR Dorma Architectural Hardware Grade 1 surface closers 8600 Seriesdorma-usa.com Barrier free, size adjustable 1~6 16

    Full cover option FCFlat-formed regular/top-jamb arm -AFFriction-hold regular/top-jamb arm -FHHeavy duty Super Parallel Arm -SPA

    Grade 1 exit devices 9000 SeriesMortise type 9500Fire rated configuration FSized for 27~36 nominal door ...BPassage function ADA lever trim -YG23M

    NGP National Guard Products Perimeter gasketing seals 5050Cngpinc.com

    11/11/10 Zion Church Offices and Library Addition 101111.pdf 10/10 [ less cut sh

    CONSOLIDATED

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    11/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    12/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    13/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    14/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    15/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    16/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    17/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    18/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    19/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    20/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    21/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    22/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    23/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    24/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    25/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    26/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    27/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    28/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    29/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    30/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    31/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    32/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    33/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    34/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    35/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    36/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    37/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    38/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    39/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    40/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    41/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    42/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    43/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    44/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    45/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    46/47

  • 7/30/2019 Zion Church Offices and Library Addition 101111.pdf

    47/47