zeus mvd group: bonn univ., desy-hamburg, desy-zeuthen, hamburg univ., kek-japan, nikhef, oxford...
DESCRIPTION
Villa Olmo, Como October 2001 A. Polini3 A Microvertex for ZEUS at HERA ZEUS: upgrade of tracking system: MVD Straw Tube Tracker Global Tracking Trigger Tagging of long-lived particles (heavy flavour) Reconstruction of secondary vertices HERA: e ± p collider 2001 luminosity upgrade L = cm -2 s -1 higher sensitivity for very interesting, low cross sections major changes in interaction region last bending magnet inside experiment higher backgrounds, risks of radiation damageTRANSCRIPT
Villa Olmo, Como 15-19 October 2001 1 A. Polini
ZEUS MVD Group: Bonn Univ., DESY-Hamburg, DESY-Zeuthen, Hamburg Univ., KEK-Japan, NIKHEF, Oxford Univ., Padova, Torino, Bologna and Firenze Univ. and INFN, UCL.
The ZEUS The ZEUS Micro-Vertex DetectorMicro-Vertex Detector
Alessandro Polini DESY
Villa Olmo, Como 15-19 October 2001 A. Polini2
OutlineOutline
Physics Motivation Physics Motivation Detector DesignDetector Design Standalone Test Measurements Standalone Test Measurements Read-Out, DAQ and Control InfrastructureRead-Out, DAQ and Control Infrastructure First Experience after Installation in ZEUSFirst Experience after Installation in ZEUS Summary and OutlookSummary and Outlook
020406080
100120140160180200
0 20 40 60 80 100Voltage(V)
Current(nA)
14C (bias 51V)17C(bias 48V)20C(bias51V)23C(bias78V)23C(bias65V)30C(bias65V)
Villa Olmo, Como 15-19 October 2001 A. Polini3
A Microvertex for ZEUS at HERAA Microvertex for ZEUS at HERA
ZEUS:upgrade of tracking system: • MVD• Straw Tube Tracker• Global Tracking Trigger
• Tagging of long-lived particles (heavy flavour)
• Reconstruction of secondary vertices
HERA:e± p collider 2001 luminosity upgrade
L= 1.5 7.51031cm-2s-1
•higher sensitivity for very interesting, low cross sections•major changes in interaction region•last bending magnet inside experiment•higher backgrounds, risks of radiation damage
Villa Olmo, Como 15-19 October 2001 A. Polini4
Detector LayoutDetector LayoutForward Section
410 mm
The forward section consists of 4 wheels with 28 wedged sensors/layer providing r- information.
Barrel Section622 mm
The Barrel section provides 3 layers of support frames (ladders) which hold 5 full modules, 600 square sensors in total, providing r- and r-z space points.
e± p
Villa Olmo, Como 15-19 October 2001 A. Polini5
The Upilexconnection foils canbe bent and gluedto the ladder profile
Two half modulesare then glued togetherto form a full module
Five full modules aredisposed over a carbon fibre support
125 mm64
mm
Two single sensorsare glued and electrically connected by gold plated Upilex foils
Barrel MVD: Module and Ladder StructureBarrel MVD: Module and Ladder Structure
Villa Olmo, Como 15-19 October 2001 A. Polini6
Forward MVD LayoutForward MVD Layout
Forward wheels:• 112 Si planes with wedge shape (480 readout strips);• r- measurement;• 1 wheel made of 14x2 detectors;• 4 wheels placed @ z = 311, 441, 571 and 721 mm from IP.
Villa Olmo, Como 15-19 October 2001 A. Polini7
• n-doped silicon wafers (300 m thickness) with p+ implantations (12 or 14 m wide), HAMAMATSU PH. K.K.
• 512 (480 for forward sensors) readout channels.
• Using the capacitive charge sharing, the analogue readout of one strip every 6 allows a good resolution (<20 m) despite the readout pitch of 120 m.
• Highest coupling to the front end electronics if:
Cc >> Cint > Cb
The charge sharing is a non linearfunction of the interstrip
coordinate x
120 m
Interstrip coordinate x
Cb
Cc Cint
p+ implantation ofThe readout strip
p+ implantation ofthe intermediate strip
particle
20 m
QLEFT QRIGHT
Silicon Microstrip DetectorsSilicon Microstrip Detectors
Villa Olmo, Como 15-19 October 2001 A. Polini8
Front-end and Read-outFront-end and Read-out Front-end Chip HELIX 3.0Front-end Chip HELIX 3.0
– 128 channel analog pipelined programmable readout system specifically developed for the HERA environment.
– ENC[e] 400 + 40*C[pF] (no radiation damage included).– Data read-out and multiplexed over the analog out.– Internal Test Pulse and Failsafe Token Ring (8 chips) capability.
Read-outRead-out– 10 bit resolution ADC Modules with:
Common Mode, Pedestal and Noise Subtraction Strip Clustering 2 separate data buffers: cluster data (for trigger purposes)cluster data (for trigger purposes) and raw/strip data
for accepted events. Global Tracking TriggerGlobal Tracking Trigger
– Together with the Central Tracking Detector: new Global Tracking Trigger System.
1 full module raw data
Villa Olmo, Como 15-19 October 2001 A. Polini9
Hit Reconstruction: from previous Test Beam Hit Reconstruction: from previous Test Beam ResultsResults
Based on charge sharing
parameterization
Fast algorithmwith no assumption on charge sharing
angle (deg)
Large impact anglesrequire different reconstruction
algorithms
Intrinsic resolution ofa half module
Villa Olmo, Como 15-19 October 2001 A. Polini10
The MVD System TestThe MVD System Test Following the assembly up to the final MVD, extensive tests and
monitoring of the detector have been performed. A Standalone Test Environment with a dedicated Cosmic Trigger has
been set up.
Large cosmic sample acquired: 2.5 Million triggered events.
Aim: Final checks of modules, cabling, cooling Laser alignment measurements Setup a complete read-out scheme Study detector response with real data Monitoring of various system components:
Cooling, Temperature, Humidity, LV, HV, Noise, Pedestals ,Dark Current.
Villa Olmo, Como 15-19 October 2001 A. Polini11
MVD Cosmic System TestMVD Cosmic System Test Landau distributions from different ladders:
The expected difference in the peak position is clearly seen!
C0L1 (0º) C1L1 (50º)
C0L1
C1L1
S/N 13
Pedestal stable at the level of 1-2 ADC-counts Entries above 20 ADC-counts in noise-distribution: 36 /25 (barrel/forward) Channels with unstable noise-performance: 119 (total for barrel and forward)
Noise and Stability:
Villa Olmo, Como 15-19 October 2001 A. Polini12
MVD Cosmic System Test Results MVD Cosmic System Test Results
~80 m
Withoutany alignmentcorrection
Geometricalefficiency
Cyl. 0 Cyl. 1 Cyl. 2FaultyModules (4 of 206)
First Track fit using all modules but one: resolution ~80 mDominated by systematics, confident to reach final resolution of 20 m
Villa Olmo, Como 15-19 October 2001 A. Polini13
Detector I/V Observed PropertiesDetector I/V Observed PropertiesDuring the system test increasing leakage currents have been observed in some modules. Further studies have shown that at decreasing temperature the relative humidity rises and the breakdown voltage decreases
21.8° 62%h.
22.5° 31%h.A careful checking and control of the humidity is required for the ZEUS MVD!
020406080
100120140160180200
0 20 40 60 80 100Voltage(V)
Current(nA) 14C (bias 51V)
17C(bias 48V)20C(bias51V)23C(bias78V)23C(bias65V)30C(bias65V)
Increasing temperature
Villa Olmo, Como 15-19 October 2001 A. Polini14
MVD Commissioning in ZEUSMVD Commissioning in ZEUS
ZEUS RequirementsZEUS Requirements DAQ System and Global Tracking DAQ System and Global Tracking
Trigger Trigger Radiation MonitorRadiation Monitor First (Cosmic) ZEUS dataFirst (Cosmic) ZEUS data
Villa Olmo, Como 15-19 October 2001 A. Polini15
The ZEUS DetectorThe ZEUS Detector
bunch crossing time: 96 ns ZEUS: 3-Level Trigger System(Rate 500Hz405 Hz)
e±
27.5 GeV
p920 GeV
Event BuilderEvent Builder
Third Level TriggerThird Level Trigger
cpucpucpucpu cpucpu cpucpu cpucpu cpucpu
CALCAL CTDCTD
Offline TapeOffline Tape
Global Second Global Second Level TriggerLevel Trigger
GSLT Accept/RejectGSLT Accept/Reject
Global First Global First Level TriggerLevel Trigger
GFLT Accept/RejectGFLT Accept/Reject
CTDCTDFront EndFront End
CALCALFront EndFront End
Other Other ComponentsComponents
Other Other ComponentsComponents
CTDCTDSLTSLT
CALCALSLTSLT
CALCALFLTFLT
CTDCTDFLTFLT
~10 ms
5Hz5Hz
40Hz40Hz
500Hz500Hz
101077 Hz Hz
Eve
nt B
uffe
rs
Eve
nt B
uffe
rs
55 s p
ipel
ine
s pip
elin
e
55 s p
ipel
ine
s pip
elin
e
~0.7 s
Villa Olmo, Como 15-19 October 2001 A. Polini16
Network Connection to the ZEUS Event Builder
(~100 Hz)
The MVD Data Acquisition System and GTTThe MVD Data Acquisition System and GTT
ADCM modules
Lynx OS
CPU
AnalogLinksNIM + Latency Clock +
ControlADCM modules
Lynx OS
CPU
AnalogLinksNIM + Latency
Run Control and OnlineMonitoring Environment
Main MVDDAQ server, Local Control, Event-Builder Interface
Global Tracking Trigger Processors (GFLT rate 800 Hz)
ADCM modules
Lynx OS
CPU
AnalogLinksNIM + Latency Clock+
Control
VME (C+C Slave)Crate 1 (MVD bottom)
Analog Data
MVD HELIX Front-End & Patch-Boxes
Central Tracking Detector Read-out
CTD 2TP modules
Lynx OS
CPU
NIM + Latency
HELIX Driver Front-end
Lynx OS
CPU
GSLT 2TP modules
Lynx OS
CPU
Lynx OS
CPU
VME (C+C Slave)Crate 2 (MVD forward)
VME (C+C Master)Crate 0 (MVD top)
VME TP connection Data from CTD
NIM + Latency
TP connection to Global Second Level
Trigger
Global Second Level Trigger Decision
VME HELIX Driver Crate
Global First Level Trigger,Busy, Error
NIM + Latency
Slow control + Latency Clock modules
Fast Ethernet/ Gigabit Network
VME CPU Boot Server and Control
Clock+Control
MVD VME Readout
Villa Olmo, Como 15-19 October 2001 A. Polini17
The Global Tracking TriggerThe Global Tracking Trigger
Read-out Latency After GTT processing MVD-GTT Trigger Latency
ms
Concept: Combined second level trigger using information from CTD,
MVD (and the new Forward Tracker) Higher quality event reconstruction and rate reduction Z vertex resolution 9 cm (CTD only) 400 m
(MVD+CTD+GTT) Decision required within existing SLT (<15 ms)
Full online latency measurements and data file playback capability.
First average latencies obtained using MonteCarlo events through complete DAQ system and trigger algorithm are encouraging.
Input rate 400Hz
Dijet sampleDijet sample
Villa Olmo, Como 15-19 October 2001 A. Polini18
•16 PIN diodes in 8 modules ( 1cm2, zfwd=110, zrear=-100 cm) • continuous radiation measurement, beam dump
•8 RADFET (zfwd=200, zrear=-160 cm) • real-time integrating dosimeter:• wide dynamic range 1 mGy to 3kGy
•Thermo-luminescence dosimeters (TLD):• two types (neutron, photon sensitive)• measure precisely integrated dose (monthly exchanged)
The ZEUS Radiation Monitor SystemThe ZEUS Radiation Monitor System
Villa Olmo, Como 15-19 October 2001 A. Polini19
Radiation MonitoringRadiation Monitoring
Proton beam currentIn HERA Increase of
plateau current
PIN diode current
•~50 Gy absorbed so far (diode measurements, confirmed by Radfets & TLDs)
•Final diode readout with beam dump capability being finalized (automatic beam dump at integrated dose of 10..50 mGy per accident).
•Expected background irradiation in 5 years of operation (experiment lifetime): 50 Gy/year = 5 µGy/s
•MVD and readout electronics tested up to 3 kGy, operation still possible, but reduction of S/N
•Max. tolerable dose: 100-300 Gy/year = 10-30 µGy/s
MVD Leakage Current increased
~1A
During machine setupDuring machine setup
Villa Olmo, Como 15-19 October 2001 A. Polini20
ZEUS Cosmic Data with CTD and MVDZEUS Cosmic Data with CTD and MVDBefore HERA commissioning started (July 2001), there was a short time window for a cosmic data run with the full ZEUS detector.
A Cosmic Event based on a CTD and Calorimeter Trigger.
Villa Olmo, Como 15-19 October 2001 A. Polini21
Summary and OutlookSummary and Outlook System Test System Test
– Complete MVD-system has been tested continuously for a longer period.– Stable operation of: Slow Control, Cooling, LV and HV Systems.– Dark currents are fairly stable in time at depl. voltage ( dry air flow is
important!)– Pedestal and noise performance is good. Faulty modules <2%.– Cosmic results show expected performance (Landau distributions, etc.).
Installation and Commissioning in ZEUSInstallation and Commissioning in ZEUS – MVD installation was successful (detector integration, cable routing).– Functioning of the DAQ System, the GTT environment as well as the
Control infrastructure established.– Radiation monitoring (active and passive system) available and working
during HERA startup.– Encouraging results looking at the next high luminosity period.