zafar surveyor 1

9
ZAFAR Nawaz MOB: 0092-3485181817 E-Mail: [email protected] PERSONAL PROFILE: Date of Birth: 02 Feb 1971 Gender: Male Nationality: Pakistani Marital Status: Married Experience: 15 yrs LANGUAGES KNOWN : To write: English| Urdu | Arabic To speak: English| Urdu| Arabic Valid Saudi Driving License S O F T W A R E AutoCAD AutoCAD Land development AutoCAD Civil3d Leica Geo Office Flex line Sokkia Trimble Geomatics Office Prolink Vrsion-1,15 MS Word MS Excel CURRICULUM VITAE: Land Surveyor Objective: To seek an employment in a prestigious and reputable organization where I could have a clear path and professional growth and at the same time render my best service to the company. Highly carrier oriented position where I can devote my knowledge experience and skills for the development of the organization. I want to work in stiff and competitive environment. I wish to tackle different objectives with vigor and almost missionary zeal. Always takes advantage of opportunity to improve works and job assignments with the concurrence of superiors to implement such improvements Academic Profile: Diploma Civil Associate Engineer Diploma in Survey Pakistan Mineral Development Survey Institute Khewra Auto CAD, Desktop. Field Experience Professional experience of construction work. Elevated Metro Rail work. Floor and Cladding work. High-rise building and bridge work. Setting out Center Line, Horizontal Curves, and Vertical Curves. Layout of Box Culverts, Pipe Culverts and Drains. Traverse Close. Setting out Define Base Line Area Calculation MLM Re sectioning. Setting Out Coordinate. Cross Section Plot. Layout of Sewerage Line. Layout of Buildings line.

Upload: zafar-nawaz

Post on 14-Apr-2017

302 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: ZAFAR SURVEYOR 1

ZAFAR NawazMOB: 0092-3485181817E-Mail: [email protected]

PERSONAL PROFILE: Date of Birth: 02 Feb 1971Gender: MaleNationality: PakistaniMarital Status: Married Experience: 15 yrs

LANGUAGES KNOWN :

To write: English| Urdu | Arabic

To speak: English| Urdu| Arabic

Valid Saudi Driving License

S O F T W A R E

AutoCAD

AutoCAD Land development

AutoCAD Civil3d

Leica Geo Office

Flex line Sokkia

Trimble Geomatics Office

Prolink Vrsion-1,15

MS Word

MS Excel

CURRICULUM VITAE:Land Surveyor Objective:

To seek an employment in a prestigious and reputable organization where I could have a clear path and professional growth and at the same time render my best service to the company.

Highly carrier oriented position where I can devote my knowledge experience and skills for the development of the organization. I want to work in stiff and competitive environment. I wish to tackle different objectives with vigor and almost missionary zeal.

Always takes advantage of opportunity to improve works and job assignments with the concurrence of superiors to implement such improvements

Academic Profile: Diploma Civil Associate Engineer Diploma in Survey Pakistan Mineral Development Survey Institute Khewra

Auto CAD, Desktop.

Field Experience Professional experience of construction work.

Elevated Metro Rail work.

Floor and Cladding work.

High-rise building and bridge work.

Setting out Center Line, Horizontal Curves, and Vertical Curves.

Layout of Box Culverts, Pipe Culverts and Drains.

Traverse Close.

Setting out Define Base Line Area Calculation MLM Re sectioning.

Setting Out Coordinate.

Cross Section Plot.

Layout of Sewerage Line.

Layout of Buildings line.

Centre and level marking for underground water pipe line.

Foundation and grid axes marking.

Network of all survey points and Base point fixing by using of latest Software.

Auto cad related all site surveyor requirement drawing prepares, for major data

points selected & upload download for Survey work.

Use software like Leica geo office, Sokkia flexline for downloading and uploading

data.

Page 2: ZAFAR SURVEYOR 1

DETAIL PROFESSIONAL EXPERIENCE(SAUDI ARABIA)

Lievanse Arabia (MAADAN)

(Saudi Arabia)Contractor Lievanse Arabia

Project Ras Alkhair Sea Port

Period May 2014–August 2015Position Civil/hydrographic Surveyor

Quantity Surveyor of earth work

Duties and Responsibilities Supervision of hydrographic survey.

Calibration of Echo sounder and Tidal gauge .

Quantity calculation of dredge material on base of sounding data.

Area calculation of reclamation.

Coordination between Engineering and survey departments- and design department. Layout for Berth construction .

Records survey by preparing notes, records, drawings.

Maintain condition and adjustment of surveying equipment

Nesma & Partner (Fluor Saudi)(SADARA Jubail)

Contractor Nesma & Partner

Project SADARA

Period March 2013–March 2014Position Civil/Structural Surveyor

Duties and Responsibilities Layout for concrete structure of heavy mechanical equipment foundations.

Layout for drainage pipes and trenches.

Laying out center line and elevation for mechanical equipment installation.

Quantity calculation for refill material.

Coordination between Engineering and survey departments- and design department. Alignment of cladding work.

Records survey by preparing notes, records, drawings.

Page 3: ZAFAR SURVEYOR 1

Maintain condition and adjustment of surveying equipment

GSCC (Samsung Engineering)

(Cast House Aluminum smelter project MAADAN Ras alKahir)

Contractor GSCC

Project Cast House Aluminum Smelter Project MAADAN Period January 2012 –March 2013Position Civil/Structural Surveyor

Duties and Responsibilities Steel structural alignment, and elevation,

Alignment crane girder.

Laying out center line and elevation for mechanical equipment installation.

Making reports for data collection.

Coordination between Engineering and survey departments- and design department. Alignment of cladding work.

Records survey by preparing notes, records, drawings.

Maintain condition and adjustment of surveying equipment

MRK (Mohammed Rashid Alkhtlan)

(SATORP Saudi Arabian Total Oil Refinery Project)

Contractor MRK Alkhtlan

Project SATORPPeriod 05May 2011 –January 2012Position Chief Surveyor

Page 4: ZAFAR SURVEYOR 1

Managing survey team.

Coordination between Engineering and survey departments.

Collecting data from surveyors.

Reporting - setting of formworks and leveling of concrete works and

Coordination with consultant and Clint.

Laying out center line and elevation for mechanical equipment.

SEARAS INTERNATIONAL(MIDDLE EAST PROPULSION COMPANY LTD)

(AIRCRAFT ENGINE OVERHAULAND REPARING FICILITY KING KHALID AIRPORT RIYADH)

Contractor SEARAS INTERNATIONALProject MEPCOPeriod 04 April 2010 –05 May 2011Position Chief Surveyor

Duties and Responsibilities

Managing survey team .coordination between Engineering and survey departments-and designing department.

Collecting data from surveyors.

Reporting - setting of formworks and leveling of concrete works and

Final centre line marking for all foundation & prepare as build of anchor bolts.

Structural Column verticality checking & report submit to plant authority.

Horizontal and vertical alignment checking for Girder & Rail.

Topography survey, Data process, contouring & Excavation & Back filling quantity calculations as required.

Work under immediate supervision. Primary job functions typically report to a supervisor or manager.

Records survey by preparing notes, records, and drawings.

Maintain condition and adjustment of surveying equipment.

Checking of as built conditions that require the use of surveying techniques.

MMMP(AL Mashaar Al Mugaddassa Metro Project)

Contractor CRCC(China Railway Construction Corporation)Project Makkah Metro Period 04 January 2010 -1st April 2010Position Mechanical Surveyor

Page 5: ZAFAR SURVEYOR 1

Duties and Responsibilities Process of survey field data loaded & uploaded in Total Station Laying out centre line and elevation for mechanical equipment installation. Making reports for data collection. Coordination with main contractor

Al Dhary GroupAbu Hayderia super highway Lighting project

Contractor Al Dhary Group

Project Abu Hayderia super highway Lighting project

Period 2008 –2009

Position Land Surveyor

Duties and Responsibilities

Designing of light poles location, Location of points.

Demarcations of foundations, Handling and controlling the building.

Works and also leveling works. Preparing the As Built.

Survey Reports. And Coordination with Main contractor. Records survey by preparing notes, records, and drawings.

Drawing alignment by local co-ordinates system

AL SUWAIDI. (CONSTRUCTION CO, ) Consultant Daelim Saudi CoProject Saudi Kayan Jubail KSAPeriod Jun2008 Feb 2009Position Land Surveyor

Duties and Responsibilities Reporting’s setting of formworks and leveling of concrete works Alignment of lines staking out of coordinates, calculations. And coordination with client.

Checking of as built conditions that require the use of surveying techniques. Monthly checking of survey systems and their calibrations.

Prepare Checking report, before concrete

Making the pre pouring report before casting. Making the as built report after casting.

Preparation of data coordinates alignment for setting out

BO WON LEEConsultant Samsung EngineeringProject RAS ALZOREPeriod Jan 2008 Jun 2008Position Land Surveyor

Duties and Responsibilities Leveling, Cross Section,

Page 6: ZAFAR SURVEYOR 1

Piling work, pile cap elevation.

Traversing.

Topographic Survey.

Bench Mark Shifting. Alignment of lines staking out of coordinates, calculations.

Reporting’s setting of formworks and leveling of concrete works and coordination with client.

Records survey by preparing notes, records, drawings; writing legal description : applying computer aided design

technologies.

Maintain condition and adjustment of surveying equipment.

Checking of as built conditions that require the use of surveying techniques

CHUNJO SAUDI CoConsultant KBRProject Saudi Kayan Jubail KSAPeriod Aug2007 Jan2008Position Chief Land Surveyor

Duties and Responsibilities Alignment of lines staking out of coordinates, calculations.

Reporting’s setting of formworks and leveling of concrete works and coordination with client.

Pilling work. Calculation of coordinates from drawings

Making survey and as built report.

Traversing, and shifting benchmarks.

Make as built drawing using AutoCAD and land development.

JENCO CONSTRUCTION COMPANY

Project COMMUNITY ROAD ROYAL COMMISSION JUBAIL

Period May,2007 To Aug 2007

Position Land Surveyor.

Duties and Responsibilities Topography survey, Data process, contouring.

Setting out curve, and super-elevation.

Setting out road centerline and elevation of sub base of road.

Excavation & Back filling quantity calculations as required.

Calculations of coordinates setting out of coordinates.

Preparing of surveying reports As Built Surveying Reports, And controlling of pile levels

Al-Hazmi Est (Jazan Region)

Project Different Road and Housing Projects Jazan KSA

Page 7: ZAFAR SURVEYOR 1

Period May 2003-Jun 2007

Position Senior Surveyor

Duties and Responsibilities Construction of villas prepare plans, drawings and calculations for setting out in the field

Witness and approve installation of Base station(Master points), Bench marks, Established .

Work within precise or standards of accuracy all points established by Closed Traverse & open Traverse.

Review and approval of method statements.

Completes projects by coordinating with construction, and holdings improvement departments,

And all Sub-contractor & others.

Topography survey, Data process, contouring & Excavation & Back filling quantity calculations as required .

Work under immediate supervision..

Records survey by preparing notes, records, drawings; writing legal description : applying computer aided design

technologies.

Maintain condition and adjustment of surveying equipment.

Checking of as built conditions that require the use of surveying techniques

DETAIL PROFESSIONAL EXPERIENCE(Pakistan)

Malik Engineering Pvt LTDConsultant NESPAK

Project Cadet Collage Kallar Kahar

Period Oct 2000-Aug 2001

Position Surveyor

Duties and Responsibilities

Calculation, analysis and computation of measurements obtained during field surveys.

Topographic survey & Contouring

Process of survey field data loaded & uploaded in Total Station, G.P.S as require of field work.

Drawing alignment by local co-ordinates system.

Checking of as built conditions that require the use of surveying techniques.

Monthly checking of survey systems and their calibrations

Locates and determines land by measuring and calculating points, elevations, lines, angles, areas.

Prepare Local co-ordinates for particular station area.

Final centre line marking for all foundation & prepare as build of anchor bolts.

Structural Column verticality checking & report submit to plant authority