yoritaka tashiro/2010, august1 practical green infrastructure 2 greening the gateway ・・ in this...

30
Yoritaka Tashiro/2010, Au gust 1 ical n infrastructure 2 Greening the Gatewa s plan, local authority and developer are requested to recogn onal green infrastructure”, and to manage them as essential r Gateway is a complicated pattern of forms of land as urban parks, pla historic and matured village, neglected and re-vegetated min ands, and // nal agriculture farms, pastures on the river, planted areas o spital, university campus, old forest, heath, parkland on flo ODPM: Office of the Deputy Prime Minister

Upload: annika-wallett

Post on 01-Apr-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 1

PracticalGreen infrastructure 2 Greening the Gateway

・・ in this plan, local authority and developer are requested to recognize landscape as “functional green infrastructure”, and to manage them as essential resourcesof Thames Gateway

Landscape is a complicated pattern of forms of land as urban parks, planted roads,Gardens in historic and matured village, neglected and re-vegetated mining land,Derelict lands, and // Kent regional agriculture farms, pastures on the river, planted areas of shopping center, hospital, university campus, old forest, heath, parkland on flood plain         ODPM: Office of the Deputy Prime Minister

Page 2: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 2

Green Grid Kent Tameside

The concept of GG is to form a green infrastructure with new or existing green spaces and open spaces connected with each other

GG contributes to create multi-functioned spaces through improvement projects of foot-paths and cycle   paths, biodiversity,   biomass,  leisure, recreation,   flood risk management, grey water treatment, air quality,

And to improve images of East London as declined industrial area and of expensive land value by positive environmental improvement

Page 3: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 3

Green space = Land ( soil )+ water + life(fauna and flora

Fundamental method of networking

Physical network  →  spatial connection ( place ・ system ・ region )Ecological network  →  range of animal and plants   

Social network  →  behavior network

green space is nature as substancehouses, recreation spaces are living space as figure

Page 4: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 4

The Vision for the East London Green Grid is:

‘A living network of parks, green spaces, river and other corridors connecting urban areas to the river Thames, th

e green belt and beyond.’The objectives of the East London Green Grid are to:

East London communities. Provide high-quality strategic public areas along the river

tributaries and green areas.

Page 5: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 5

Provide a diversity of leisure, recreational uses and landscapes for people to escape, relax, learn, play and enjoy, and promote healthy living. Manage water collection, cleansing and flood risk with multi-functional spaces, and Provide beautiful, diverse and managed green infrastructure to the highest standards for people and wildlife.

Page 6: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 6

Page 7: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 7

Page 8: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 8

Page 9: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 9

Page 10: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 10

Page 11: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 11

Page 12: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 12

Page 13: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 13

Page 14: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 14

Page 15: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 15

ContentsForeword 31 Introduction 52 Existing green space projects and initiatives 83 The Delivery Framework 10– Spatial Planning 10– Indicative Spatial Framework 144 Funding 205 Key Challenges for Delivery 236 Roles and responsibilities 29– Pan-Gateway 29– Regional/Sub-Regional 44– Local 46– Site Specific 497 Mapping and monitoring 52

Page 16: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 16

1.2 Greening the Gateway contains two key objectives:

● that a network of varied and well-managed green space should bethe setting for new and existing residential and commercial areas;

● that the landscape should be regarded as functional green infrastructure, recognising a wide range of potential benefits from healthy recreation, to wildlife protection and enhancement, to flood risk management.

Page 17: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 17

1.5 The document outlines:

● some examples of green space initiatives now underway;● the delivery framework;● an indicative spatial framework to show where green space existsand where strategic green space is being planned;● funding provision;● key challenges for delivery;● the roles of Government, its Agencies and other delivery agents;● arrangements for monitoring delivery.

Page 18: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 18

2.3 Many practical greening initiatives are already underway across the Thames Gateway. These range from:

● neighbourhood projects, such as King George’s Fields in Barkingand Dagenham, to

● enhancements to local and country parks, such as the LondonRiverside Park in Havering and Wat Tyler Country Park in Basildon, to

● strategic initiatives, such as the “green grid” projects in east London, south Essex and north Kent. The “green grids” aim to improve the physical links between areas of green space into a wider network and form the sub-regional strategic frame work   for the creation of a multi-functional green infrastructure.

Page 19: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 19

Page 20: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 20

Page 21: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 21

Page 22: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 22

Page 23: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 23

Page 24: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 24

Page 25: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 25

Making the case for funding – Doncaster MetropolitanBorough Council’s green space Strategy

In 2001 Doncaster Council’s Best Value review, which included an assessment of green space services, found that cuts in excess of £1 million had been made to the budgets for the grounds maintenance, countryside and landscape teams. This led to difficulties in maintaining quality green space.

In response, the Council produced a green space Strategy which

provided the vision and delivery framework for enhancing Doncaster’s green areas./ ・・・・・・・・・・・The Council’s provision for and maintenance of green spaces rose from£1.8 million prior to 2001 to £9 million by 2004. Funding of the   Green spaces Department was also increased by £850,000 (from £2millionin 2000).

Page 26: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 26

Delivering multifunctionality

“We will encourage local authorities, developers and others to regard the landscape as functional green infrastructure …. Green spaces fulfil a range of practical roles which can enhance the quality of urban living in a number of important ways”(Section 4.1: Greening the Gateway)

Page 27: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 27

● reducing impacts of local air pollution;● protection and enhancement of biodiversity;● income generation via the ‘green economy’;● sustainable food production, such as allotments and communitygardens;● a bridge to the countryside;● networks of cyclepaths and pathways;● a sense of place and identity;● demonstrating the quality of the environment to residents, visitorsand potential investors.

Page 28: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 28

The Longterm Management of Quality Green space

“The management of the green   space network is absolutely critical tits effectiveness in enhancing the regeneration process and it must   be carefully considered and adequately resourced from the earliest   stage in the development   process”(Section 6.7, Greening the Gateway)

Page 29: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 29

• 6.8 CABE Space• CABE Space is part of the Commission for Architectur

e and the Built• Environment supported by ODPM. It champions excell

ence in the planning,• design, management and maintenance of public space

and in particular,• parks and green spaces. It is currently supporting five l

ocal authorities or• partnerships in the Thames Gateway through its advis

ory service on• Green space strategies.

Page 30: Yoritaka Tashiro/2010, August1 Practical Green infrastructure 2 Greening the Gateway ・・ in this plan, local authority and developer are requested to recognize

Yoritaka Tashiro/2010, August 30

B1 Kent Thameside

B1.1 Kent Thameside comprises the urban areas of Dartford and Gravesham north of the A2. Kent Thameside Delivery Board has agreed in its RegenerationFramework a target of 30,000 new homes and 50,000 new jobs for the period2001-26.

The housing target will be reviewed following the conclusion of the Examination in Public for the draft South East Plan, which currently sets a target for 24,700 dwellings in the period 2006-26.5

The majority of these new homes will be on redundant chalk quarries and redeveloped industrial land.