US Army Corps of Engineers BUILDING STRONG ® Yellowtail Reallocation Study Travis D. Yonts Water Resource Engineer Omaha District 29 Sept 2009

Upload: others

Post on 11-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

US Army Corps of EngineersBUILDING STRONG®

Yellowtail Reallocation Study

Travis D. YontsWater Resource EngineerOmaha District29 Sept 2009

Page 2: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®2

Presentation Overview

Project background

Reservoir simulation information

Summary of results

Questions

Page 3: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®3

Project Objective

Evaluate the change in flood reduction benefits due to reallocation of flood control storage to joint use storage for Yellowtail Dam.

Page 4: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®4

BIGHORN LAKE STORAGE ALLOCATIONDam Crest Elev. 3660.0

Top of Conservation Elev. 3547.00 (493,584 Acre -

Feet)

Surcharge -

52,829 Acre-Feet3657 (1,328,360 AF)

Exclusive Flood Control - 258,331 Acre - Feet3640 (1,070,029 Acre - Feet)

Joint Use - 240,342 Acre - Feet3614 (829,687 Acre - Feet)

Top of Dead Elev. 3296.50 (16,008 Acre -

Feet)

Active Conservation -

336,103 Acre -

Feet

Inactive Conservation -

477,576 Acre -

Feet

Dead -

16,008 Acre -

Feet

Page 5: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®5

PROPOSED STORAGE ALLOCATIONDam Crest Elev. 3660.0

3645 (1,137,514 Acre - Feet)

3614 (897,172 Acre - Feet)

Top of Conservation Elev. 3547.00 (493,584 Acre -

Feet)

Surcharge -

52,829 Acre-Feet3657 (1,328,360 AF)

Exclusive Flood Control - 190,846 Acre - Feet

Joint Use - 307,827 Acre - Feet

Top of Dead Elev. 3296.50 (16,008 Acre -

Feet)

Active Conservation -

336,103 Acre -

Feet

Inactive Conservation -

477,576 Acre -

Feet

Dead -

16,008 Acre -

Feet

Page 6: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®6

HEC-ResSim (Reservoir Evaluation System-Simulation)

Single or multiple reservoir systems

Flood control

Hydropower

Water supply (municipal, irrigation, etc)

Diversions

Navigation

Flow targets (max & min)

Period of record or event simulation

Page 7: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®7

Yellowtail ResSim Schematic

Billings

Bighorn Lake

Yellowtail Inflow

Yellowtail Outflow

St. Xavier

BighornMiles City

Sidney

Bigh

orn

Riv

er

Yellowstone River

Page 8: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®8

Data Requirements

Daily stream flow 1967-2006

Daily reservoir inflow, outflow, storage

Daily precipitation, evaporation

Elevation-area-capacity relationships

Spillway & outlet rating curves

Downstream discharge-damage functions

Reservoir operating criteria/storage zones

Project design floods

Local flow calculations

Page 9: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®9

ResSim Modeling Process

Gather input data

Construct and calibrate models► Period of record, inflow design flood, project design

flood, 1923 event► Establishment of a baseline condition

Develop reallocated condition► Increase top of joint use pool to 3645 ft msl

Evaluate change in net flood benefits between the baseline and reallocated simulations.

Page 10: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®10

Period of Record Model Results

Page 11: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®11

Summary of Analysis

Comparison of elevation and outflow data

Pool and flow duration relationships►Annual and seasonal

Pool probability

Flow frequency

Change in flood benefits►Yearly and period of record

Page 12: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®12

Summary of Analysis

Two period of record models created►Fixed guide curve

Drafts to elevation 3600 ft msl each spring•

Reallocation of joint use storage to 3645 ft msl

Based on historical operations►Time series guide curve

Drafts to an elevation based on spring inflow conditions

Reallocation of joint use storage to 3643 ft msl•

Not based on historical operations, but potential future operations

Page 13: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®13

Summary of Results

Detailed write-up of all period of record results included in the Yellowtail Dam Reallocation Study report.►Information presented is only a portion of all

period of record results.

Page 14: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®14

Summary of Results

Baseline (solid) vs. reallocated (dashed) elevation data

Period shown is 1967-1975

Fixed Guide Curve

Page 15: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®15

Summary of ResultsBaseline (solid) vs. reallocated (dashed)

outflow data Period shown is 1967-1975

Fixed Guide Curve

Page 16: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®16

Summary of Results

Annual Pool Probability analysis

Fixed Guide Curve

Page 17: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®17

Summary of Results

Fixed Guide Curve

Reach Difference in Average Annual ($1000)

% of Baseline

Reach 1 –

Miles City -1.8 1.1

Reach 2 –

Miles City -0.3 1.1

Reach 3 –

Sidney 0.3 1.5

Reach 5 –

Hardin 0.0 0.0

Reach 6 –

Bighorn 0.0 0.0

Baseline vs. reallocated change in flood benefits (average annual). Difference is reallocated –

baseline.

Page 18: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®18

Summary of Results

Time Series Guide Curve

Baseline (solid) vs. reallocated (dashed) elevation data

Period shown is 1967-1975

Page 19: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®19

Summary of Results

Time Series Guide Curve

Baseline (solid) vs. reallocated (dashed) outflow data

Period shown is 1967-1975

Page 20: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®20

Summary of Results

Time Series Guide Curve

Annual Pool Probability analysis

Page 21: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®21

Summary of Results

Time Series Guide Curve

Reach Difference in Average Annual ($1000)

% of Baseline

Reach 1 –

Miles City 2.2 1.4

Reach 2 –

Miles City 0.4 1.5

Reach 3 –

Sidney 0.2 1.0

Reach 5 –

Hardin 0.2 50.0

Reach 6 –

Bighorn 0.6 1.9

Baseline vs. reallocated change in flood benefits (average annual). Difference is reallocated –

baseline.

Page 22: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®22

Inflow Design Flood Results

Page 23: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®23

Comparison of Outflow Data

Peak inflow –

126,000 cfs

Baseline Outflow –

98,020 cfs

Reallocated Outflow –

98,350 cfs

Peak inflow –

126,000 cfs

Baseline Outflow –

98,020 cfs

Reallocated Outflow –

98,350 cfs

Page 24: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®24

Comparison of Elevation Data

Baseline Elevation –

3658.6 ft msl

Reallocated Elevation –

3658.9 ft msl

Baseline Elevation –

3658.6 ft msl

Reallocated Elevation –

3658.9 ft msl

Page 25: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®25

Results Summary

When comparing the baseline and reallocated simulations, increased pool elevation could be categorized as a dam safety issue.►Pool elevation in the reallocated scenario is

only 1.1 ft from the top of the dam.•

Changes in operations could create additional dam safety concerns.

Page 26: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®26

Project Design Flood Results

Page 27: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®27

Comparison of Outflow Data

Peak inflow –

37,100 cfs

Baseline Outflow –

20,500 cfs

Reallocated Outflow –

21,900 cfs

Peak inflow –

37,100 cfs

Baseline Outflow –

20,500 cfs

Reallocated Outflow –

21,900 cfs

Page 28: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®28

Comparison of Elevation Data

Baseline Elevation –

3655.6 ft msl

Reallocated Elevation –

3655.5 ft msl

Baseline Elevation –

3655.6 ft msl

Reallocated Elevation –

3655.5 ft msl

Page 29: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®29

Results Summary

When comparing the baseline and reallocated simulations, increased outflow could be categorized as a dam safety concern.►Outflow is 1,150 cfs above the listed Yellowtail

Afterbay capacity.•

Changes in operations could create additional dam safety concerns.

Page 30: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®30

1923 Flood Results

Page 31: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®31

Comparison of Outflow Data

Peak inflow –

43,200 cfs

Baseline Outflow –

20,000 cfs

Reallocated Outflow –

28,800 cfs

Peak inflow –

43,200 cfs

Baseline Outflow –

20,000 cfs

Reallocated Outflow –

28,800 cfs

Page 32: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®32

Comparison of Elevation Data

Baseline Elevation –

3648.8 ft msl

Reallocated Elevation –

3651.5 ft msl

Baseline Elevation –

3648.8 ft msl

Reallocated Elevation –

3651.5 ft msl

Page 33: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®33

Results Summary

When comparing the baseline and reallocated simulations, increased outflow could be categorized as a dam safety concern.►Outflow is 8,050 cfs above the listed Yellowtail

Afterbay capacity.•

Changes to operations could create additional dam safety concerns.

Page 34: Yellowtail Reallocation Study - Bureau of Reclamation€¦ · Summary of Analysis Two period of record models created Fixed guide curve • Drafts to elevation 3600 ft msl each spring

BUILDING STRONG®34

Next Steps

Detailed study addressing the impacts presented► Identify appropriate mitigation measures► Update and sensitivity analysis of downstream flood

damage curves► Analysis of downstream river capacity

Is environmental assessment needed?

Update flood control manual/Field Working Agreement► Approved by both the Bureau of Reclamation and