yellow building drawings
TRANSCRIPT
-
8/8/2019 Yellow Building Drawings
1/12
Westway
Ham
mersm
ithand
City
Line
West
Cros
sR
Westway
N
-
8/8/2019 Yellow Building Drawings
2/12
s R
Site Plan
0 10 20 30 40m
Ham
mersm
ithand
City
Lin
e
West
CrossR
oute
Sillv
erRoad
Evesham
Street
Nicho
lasRoad
Fresto
nRoad
Fresto
nRoad
St.Anns
Road
BardRoad
OlafStr
eet
Willow
Way
Stone
Leigh
Place
.AnnsL
eigh
Road
N
-
8/8/2019 Yellow Building Drawings
3/12
North Contextual Elevation
West Contextual Elevation
0 10 20 30 40m
-
8/8/2019 Yellow Building Drawings
4/12
Ground oor plan in context
0 5 10 15 20m
1
2
3
4
5
68
7
13
12
14
9
10
Nicholas Road
15
11
FrestonR
oad
FrestonR
oad
Bard
Road
Evensham
St reet
OlafSt reet
White Building Grey Building
Building 10
Building 11Building 9Building 4
N
West Cross route
KEY
1 Main entrance2 Reception area3 Atrium art space4 Caf5 Training area6 Press ofce
7 Showers / changingrooms
8 Server room9 Reprographics10 Post room11 Subtenants reception12 Lift lobby13 W.C14 Binstore
15 Restaurant
-
8/8/2019 Yellow Building Drawings
5/12
4
13 5
12
12
6
0 5 10 15 20m
N
2
3
3
1 4
7
2
3
3
2
1
2
7
11
14
14
2
3
1 4
7
2
8
9 5 6
3
10
Typical Floor Roof Plan
Mezzanine levelFifth Floor
KEY
1 Lift lobby2 WC area3 Open plan ofce space
4 Atrium bridge5 Private ofce
6 Meeting room7 Tea point8 Storage
9 Technical area10 Board area11 Show room12 Design desks13 Loggia14 Roof plant
-
8/8/2019 Yellow Building Drawings
6/12
0 5 10 15 20m
Elevation Plans Diagram
-
8/8/2019 Yellow Building Drawings
7/12
0 5 10 15 20m
West Elevation
-
8/8/2019 Yellow Building Drawings
8/12
South Elevation
0 5 10 15 20m
-
8/8/2019 Yellow Building Drawings
9/12
Long Section 1: 500 @ A3
0 5 10 15 20m
-
8/8/2019 Yellow Building Drawings
10/12
Short Section 1: 500 @ A3
0 5 10 15 20m
-
8/8/2019 Yellow Building Drawings
11/12
1
2
4
5
7
6
9 11
8
10
9 11
6
8
10
39
0
1
2m
Wall & Entrance detail.
KEY
1.
Roo
fSing
lep
lymem
brane,
InsulationandVB,
Steelprofled
dec
king
Acoustic
Liner
2.
Latt
iceroo
ftruss
3.
Entrance
door
4.
Serv
ices
distr
ibutionan
d
lig
htingsupport
frame
5.
Fa
br
icate
dstee
lsupport
frames
6.
In-s
itu
RC
frame
7.
Fu
llhe
ightg
lasssmo
ke
conta
inmenttoatr
ium
8.
Per
imeter
heating
9.A
irsupp
lyducts
10
.Serv
icesan
da
irdistr
ibution
throughraisedoor
11
.In
-situ
RC
slab
-
8/8/2019 Yellow Building Drawings
12/12
Wall & Roof detail
6
7
7
43
5
1
2
0 1 2m
KEY
1 In-situ exposed reinforcedconcrete frame.
2 Steel roof support frame box sections formed from weldedplate.
3 Roof lights high performancedouble glazed unit on insulatedpreformed aluminium kerb andmoulded GRP liners.
4 Main return air ducts and grills.5 Tubular steel lighting support rails.6 Full height toughened and laminated
structural glass screen as atriumsmoke reservoir.
7 Steel framed bridges and stairs to
atrium rubber covered aluminiumsteps and decking and perforatedaluminium soft panels.