school building drawing - moepiu.gov.np€¦ · school building drawing working drawings 1 storey-3...
TRANSCRIPT
LOAD BEARING WALL-CGI ROOFINGSCHOOL BUILDING DRAWING
WORKING DRAWINGS
1 STOREY-3 ROOM-HILL REGION
TABLE OF CONTENTS
TOTAL NUMBERS OF DRAWINGS : 15S.N. NAME OF DRAWINGS Sheet no
1.- TRENCH PLAN SHEET 1- FLOOR PLAN SHEET 2- ROOF PLAN SHEET 3- ELEVATION 1,2,3 & 4 SHEET 4- WALL SECTION A-A & FOUNDATION DETAIL SHEET 5- RCC BAND DETAIL SHEET 6- OPENING SCHEDULE MS-0- TYPICAL MS DOOR/WINDOW DETAILS MS-1- TYPICAL MS WINDOW DETAILS MS-2- TYPICAL MS DOOR(8ftX3ft) DETAILS MS-4- TYPICAL WOODEN DOOR & WINDOW DETAILS W-DOOR Alt2---
2.- STEEL ROOF TRUSS DETAILS TRUSS A- STEEL TRUSS DETAILINGS TRUSS B- STEEL TRUSS DETAILINGS TRUSS C--
ARCHITECTURAL DRAWINGS
STEEL TRUSS DRAWINGS
-
4. FURNITURE DRAWINGS- CLASSROOM FURNITURE -GRADE 1-3 F-1
Building Type: 1 Storey CGI Roof with Brick Masonry
Exte
rnal
Wal
l
Inte
rnal
Wal
l
Surf
ace
Type
&N
os
Fram
e
Shut
ter
Lock
Set
Type
Tow
erB
olt
Hin
ges
Han
dle
Type
&N
os
Fram
e
Shut
ter
Hoo
k
Tow
erB
olt
Hin
ges
Han
dle
Gril
l
Fram
e
Shut
ter
Stru
ctur
e
Cov
er
Fals
eC
eilin
g
Eave
sB
oard
1 Ground Floor
1.1 Class room IPS FB+TR CP+WP CP+WP1D1=2D2=2 MS WPP Aldrops
Al(150-300mm) SB-100 Al W=12 MS WPP NA
Al(75mm) SB-75 Al
Includedin MSframe EP1 EP1 MST CGI FCC WEP
1.4 Verandah IPS FB+TR CP+WP CP+WP1
2 External Wall & Others2.1 GL to Plinth Level CPP2.2 Super structure wall FB+TR
2.3Beams & wallband/stitch CP+WP
3.4 Apron
LEGENDS:
Symbol
Description ofsymbol Symbol Symbol Symbol
Description of
symbol Symbol
Description of
symbol
CP CementPlaster Al WP1 MS WPS
IPSCementScreedfloor
SB-125 WP2 MST WPP
FINISHING SCHEDULE
S.No.
Area FLOORFINISH
WALL COLUMN /BEAM/RAIL
S
CEILING DOOR WINDOW Door & Window Roof
Sections Hardware Sections Hardware Paint
Aluminium
Steel Butt Hinge-125mm
Steel Butt Hinge-100mm
Mild steel WoodenPanelled shutter
Shutter fromWater proof ply
and wooden style
Mild Steel tubulartruss:enamel
painted
Description ofsymbol
Wooden eaves withenamel paint
Description ofsymbol
Water ProofCement
Paint;White
Water ProofCement Paint;IPS
CementScreedfloor
SB-125 WP2 MST WPP
FBFairfaceBrick
SB-100 WP3 WEP
BSBrick onedgesoling
SB-75 EP1 FCC
CPP
CementPlasterwithPunning
EP2
TR
Steel Butt Hinge-125mm
Steel Butt Hinge-100mm
Steel Butt Hinge-75mm
Shutter fromWater proof ply
and wooden style
Mild Steel tubulartruss:enamel
painted
Red Terracotapaint
Wooden eaves withenamel paint
False ceiling withcladex sheet
Water ProofCement Paint;
Enamel paint
Room to ReadNepal
1. Only written dimensions to befollowed. Drawings not to bemeasured as per given scale
2. Any discrepancy or omissionin this drawing if found shallbe reported immediately tosite engineer
Title:-Trench Plan
Designed By:-Govinda DevkotaNEC No:1191-Civil
Project:-1 Storey/3Room/ Frm- Brick-CGI Roof -Hill Region
Date:2015-Nov
Revised Date:
5
1SHEET
Checked By:-
Approved By:-
2016-Jan
Structure Design By:-B. L. ShresthaNEC No:1186-Civil
1
A
7" 9" 8"
2'-0"
3'-1"
8" 1'-10" 8"
1'-10"
1'-6
"
8"1'
-6"
8"
2'-9
"
Detail at X-X
8"9"
9"8"
2'-9
"
3
A
3
8" 1'-3" 8"
2'-6"
8"9"
Detail at Y-Y
2'-0
"
1
B
C
8" 9" 8"
7"1'
-6"
2'-9
"
8"9"
9"8"
7'-8
"
9"8"
3'-8
"
9" 8" 9" 8"
2'-9"
Detail at Z-Z
4'-1
1"
8"3'
-7"
9"8"
2'-0"
2'-1
1"8"
4"
2'-0
"
1'-5" 1'-5"
2'-0
"
1
A
2 4 53
1 2 4 53
B
C
A
B
12'-5" 12'-5"
5'-8
"
12'-5" 12'-5" 12'-5" 12'-5"
53'-3"
49'-6"
24'-1
0"
12'-5" 12'-5"
24'-1
0"
16'-3
"
3'-0
"14
'-0"
3'-0
"
4 2
1
3
8'-2
"8'
-2"
3'-0
"5'
-8"
2'-9
"5'
-8"
3'-0
"4'
-10"
3'-4" 9'-7" 2'-9" 9'-8" 2'-9" 9'-8" 2'-9" 9'-7"
1'-10"
3'-4"
14'-3
" 20'-5"
40'-6"29'-7"52'-1"
KK
X
5'-8
"
Y
P
P
Z
4'-7
"
2'-0
"
1. Only written dimensions to be followed. Drawings notto be measured as per given scale
2. Any discrepancy or omission in this drawing if found shallbe reported immediately to site engineer
Room to ReadNepal
Title:-Wall Section &Foundation Detail
Project:-1 Storey/ From- Brick- CGI Roof -HillRegion
Date:2015-Nov
Revised Date:Designed By:-Govinda DevkotaNEC No:1191-Civil
Checked By:-
Approved By:-
Structure Design By:-B. L. ShresthaNEC No:1186-Civil
2'-6
"
9'-3
"
9'-3
"
26 Gauge color coated 2 Nos 8Feet long CGI Sheet (0.41mm,26g) for roofing at each side
5'-6
"1'
-3"
2
54
V2 S1S2V3
1
15'-6'
12'-0"
11'-11"
26'-3"
V1
S3V4
V2S1
1
V1S2
S3V4
V3
3'-0
"1'
-6"
2'-0"
6
9"
w
C B A
5'-6" 10'-9"
Base plate
7
1'-6
"
3" Thk PCC (1:3:6)
IPS floor finish
40mm thk screeding (1:6)
Compacted Earth6" Stone / 1 layer Brick soling
4
9"
2'-0" 2'-0" 9"
2'-9"2'-9"
3'-0
"
9"
6"
False Ceiling
WALL SECTION AT A-A
Ground Level
3" Thick PCC (1:3:6)
IPS floor finish
40mm thk screeding (1:6)
Compacted Earth6" Stone or Hard Core filling
3"1'
-0"
1'-6
"3'
-6"
9"9"
3" Thick PCC (1:3:6)
IPS floor finish
40mm thk screeding (1:6)
Compacted Earth6" Stone or Hard Core filling
Slope (1:40)atVerandah
6"6"
6"
1'-0"1'-0"
6"
Section at P-PDetail of steps & Verandah
9" 9"
2'-8
"4"
6"
3'-6
"
4" Thick RCC (1:2:4)with 10mm dia@6:c/c steel(Fe500) both ways
Brick Masonry(1:6)
1 layer brick soling/6" thick stone or Hardcore solingCompacted Earth
3'-6
"
4"
2'-0"
2'-9"
5'-9"
1'-6
"
1'-6"
9"
1 no 16 mm Ø Vertical steel
1 no 16 mm Ø Vertical steel
FOUNDATION DETAIL
9" 2'-0"
2'-0"9"
2'-0"9"
c
A
Date:2015--Nov
Room to ReadNepal
1. Only written dimensions to befollowed. Drawings not to bemeasured as per given scale
2. Any discrepancy or omission in thisdrawing if found shall be reportedimmediately to site engineer
Sheet Title:-Floor Plan for 3Rooms
Project:-1 Storey/3Rm/ Frm- Brick-CGI Roof -Hill Region
12'-5" 12'-5" 12'-5" 12'-5"
1
A
2 4 53
1 2 4 53
B
C
A
B
C
16'-3
"5'
-8"
23'-6
"
51'-9"
wD2
w
ww w w
1'-10"1'-6" 3'-0" 2'-1" 3'-0" 1'-6"
1'-6
"15
'-6"
1'-6
"5'
-0"
UP
12'-5" 12'-5"
ww
w www
12'-5"12'-5"
51'-9"
16'-3
"5'
-8"
23'-6
"
1'-6
"15
'-6"
1'-6
"5'
-0"
9"
1'-2"1'-2"
1'-2
"
1'-2
"
1'-1
"4'
-0"
A
A
4 2
1
3
1'-2
"
15'-6
"
Class Room 117'-0"x15'-6"Area=263 Sft
UP12'-0" 6'-0" 17'-0"
1'-5" 3'-0" 2'-1" 3'-0" 1'-6" 1'-6" 3'-0" 2'-1" 3'-0" 1'-6"1'-6" 3'-0" 2'-1" 3'-0" 1'-6" 1'-6" 3'-0" 2'-1" 3'-0" 1'-6"1'-3"
D2
1'-10"1'-8"
3'-0" 2'-0" 3'-0" 1'-5"1'-3"
1'-5" 3'-0" 2'-9" 3'-0" 1'-0" 1'-6" 3'-0" 1'-4"1'-3"1'-6" 3'-0" 1'-11" 3'-0" 1'-8"
D2
17'-0" 17'-0"
Office Room14'-0"x15'-6"Area=217 Sft
Class Room217'-0"x15'-6"Area=263 Sft
w
3'-0" 2'-3"
Pre fab panel will beused as partitionwall
1'-3"
Checked By:-
Approved By:-
2SHEET
Designed By:-Govinda DevkotaNEC No:1191-Civil
14'-1"
Structure Design By:-B. L. ShresthaNEC No:1186-Civil
Gab
le
A
1
A
A
4
1
3
B
B
2 4 53
1 2 4 53
B
C
A
B
C
2
2'-5" 12'-5" 12'-5" 2'-5"
15'-6
"
2'-5
"16
'-3"
2'-0
"
2'-5
"16
'-3"
5'-8
"2'
-0"
2'-5" 12'-5" 12'-5" 12'-5" 12'-5" 2'-5"
54'-4"
54'-4"
26'-3
"
14'-10" 12'-5" 12'-5" 14'-10"
13'-3
"13
'-0"
2'-0"
Projection of Truss
Projection of CGI sheet
(P1) (P2) (P2) (P1)
2'-0
"
3"
12'-5"
Gab
le
Trus
s
Trus
s
12'-5"
26'-3
"
13'-2
"13
'-2"
5'-8
"
2'-0"
54'-10"
Room to ReadNepal
1. Only written dimensions to be followed. Drawings notto be measured as per given scale
2. Any discrepancy or omission in this drawing if found shallbe reported immediately to site engineer
Sheet Title:-Roof Plan
Date:2015-10
Project:-1 Storey/3Rm/ Frm- Brick- CGI Roof-Hill Region
21'-1
1"
Trus
s
Checked By:-
Approved By:-
3SHEET
Designed By:-Govinda DevkotaNEC No:1191-Civil
Structure Design By:-B. L. ShresthaNEC No:1186-Civil
1. Only written dimensions to be followed. Drawings not
Room to ReadNepal
1. Only written dimensions to be followed. Drawings notto be measured as per given scale
2. Any discrepancy or omission in this drawing if found shallbe reported immediately to site engineer
Sheet Title:- ELEVATION 1,2,3& 4
Project:-1 Storey/3 Room/ Frm- Brick- CGIRoof -Hill Region
Date:2015-10
1'-6
"2'
-3"
3"2'
-8"
3"2'
-7"
Elevation-1
Elevation-3
1'-6
"8'
-0"
6'-8" 11'-4" 17'-0"
Designed By:-Govinda DevkotaNEC No:1191-Civil
Checked By:-
Approved By:-
4SHEET
G.L
Structure Design By:-B. L. ShresthaNEC No:1186-Civil
Elevation-4
Elevation-2
1'-0
"2'
-3"
3"2'
-7"
3"2'
-7"
3"
1'-6
"8'
-3"
1'-6"
2"
4'-6
"
1'-3"
15'-6"1'-6"5'-0"4'-0"
6"
2'-6
"5'
-9"
1'-0
"4'
-6"
9'-2
"
6"
CGI SHEET GABLECOVER
8'-3
"
CGI SHEET GABLE COVER
5'-0"
1. Only written dimensions to be followed. Drawings not
Elevation-4
Room to ReadNepal
1. Only written dimensions to be followed. Drawings notto be measured as per given scale
2. Any discrepancy or omission in this drawing if found shallbe reported immediately to site engineer
Project:-1 Storey/2Rm/ Frm- Brick- CGI Roof-Hill RegionDate:2015-Nov
Revised Date:2016-feb
Designed By:-Govinda DevkotaNEC No:1191-Civil
Checked By:-
Approved By:-
5SHEET
Structure Design By:-B. L. ShresthaNEC No:1186-Civil
2'-6
"
9'-3
"
9'-3
"
26 Gauge color coated 2 Nos 8Feet long CGI Sheet (0.41mm,26g) for roofing at each side
5'-6
"1'
-3"
2
3
4V2 S1
S2V3
1
15'-6'
12'-0"
11'-11"
26'-3"
V1
S3V4
V2S1
1
V1S2
S3V4
V3
3'-0
"1'
-6"
2'-0"
6
9"
w
C B A
5'-6" 10'-9"
Base plate
5
1'-6
"
3" Thk PCC (1:3:6)
IPS floor finish
40mm thk screeding (1:6)
Compacted Earth6" Stone / 1 layer Brick soling
4
9"
2'-0" 2'-0" 9"
2'-9"2'-9"3'
-0"
9"
6"
False Ceiling
WALL SECTION AT A-A
Ground Level
3" Thick PCC (1:3:6)
IPS floor finish
40mm thk screeding (1:6)
Compacted Earth6" Stone or Hard Core filling
3"1'
-0"
1'-6
"3'
-6"
9"9"
3" Thick PCC (1:3:6)
IPS floor finish
40mm thk screeding (1:6)
Compacted Earth6" Stone or Hard Core filling
Slope (1:40)atVerandah
6"6"
6"
1'-0"1'-0"
6"
Detail 1.Section at P-PDetail of steps & Verandah
9" 9"
2'-8
"4"
6"
3'-6
"
4" Thick RCC (1:2:4)with 10Ø@6 c/csteel(Fe500) both ways
Brick Masonry(1:6)
1 layer brick soling/6" thick stone or Hardcore solingCompacted Earth
3'-6
"
4"
2'-0"
2'-9"
5'-9"
1'-6
"
1'-6"
9"
1 no 16 mm Ø Vertical steel
1 no 16 mm Ø Vertical steel
FOUNDATION DETAIL FOR SAFE BEARINGCAPACITY=100KN/Sq.m
9" 2'-0"
2'-0"9"
2'-0"9"
6"4"
6"
FOOTING SCHEDULE FOR WEAK SOIL(Safe Bearing Capacity:50 kN/Sq.m)
TYPE
3'-6"
3'-6"
DEPTH OFFOUNDATION
SIZE OF RCC ATFOOTING
STEELBOTHWAY
REMARKS
F1(With Buttresswall)
10 Ø(Fe500)@6"C/CB=2'-0";H= 6";L=Throughout mainbuilding wall length
3'-6"F2(Verandah)F2(Verandah)
B=2'-9";H= 6";L=Throughout mainbuilding wall length
10 Ø(Fe500)@6"C/C
10 Ø(Fe500)@6"C/CB=1'-6";H= 6";L=Throughout theVerandah length
FOOTING SCHEDULE FOR SOFT SOIL (Safe Bearing Capacity-100 kN/Sq.m)
TYPE
3'-6"
3'-6"
DEPTH OFFOUNDATION
F1-Foundation atWall portion
SIZE OF RCC ATFOOTING
STEELBOTHWAY
REMARKS
F1(With Buttresswall)
10 Ø(Fe500)@6"C/CB=2'-0";H= 4";L=Throughout mainbuilding wall length
3'-6"F2(Verandah)F2(Verandah)
B=2'-9";H= 4";L=Throughout mainbuilding wall length
10 Ø(Fe500)@6"C/C
10 Ø(Fe500)@6"C/CB=1'-6";H= 4";L=Throughout theVerandah length
Title:-Wall Section &Foundation Detail
F1-Foundation atWall portion
IPS floor finish
Compacted Earth6" Stone or Hard Core filling
1 no 16 mm Ø Vertical steel
1. Only written dimensions to be followed.Drawings not to be measured as per givenscale
2. Any discrepancy or omission in this drawingif found shall be reported immediately tosite engineer
6SHEET
Room to ReadNepal
Title:-RCC Band Details
Project:-1 Storey/ From- Brick- CGI Roof -HillRegion
Date:2015-Nov
Revised Date:Designed By:-Govinda DevkotaNEC No:1191-Civil
Checked By:-
Approved By:-
Structure Design By:-B. L. ShresthaNEC No:1186-Civil
Elevation-1
8'-0
"5'
-6"
3'-0"3" 3"
A A
3'-0" 3"3"Sill Band
Stitch
Lintle Band
Plinth Band
SECTIONAL PLAN AT A-A
Vertical TiesVertical Ties
9"9"
12'-6"
wD
9"
3"
REINFORCEMENT FORVERTICAL TIE
Strengthening of Masonry Around Openings
Detail 3
12
3
45
6
7
12
3
9
56
7
8
1.Lintle Band2.3" thick Jamb Concrete3.Reinforcement for Vertical tie
8.Door
5.Brick wall6.Toothing in Brick7.Sill Band
9.RCC Plinth Band
4.Window
TYPICAL SECTION FORSTRENGTHENING OF MASONRYAROUND OPENING FOR DOOR
TYPICAL SECTION FORSTRENGTHENING OF MASONRYAROUND OPENING FOR WINDOW
Legend
RCC Band at Corner
RCC Band at TSection
1'-10"
9"9"
6" 6"
9"
6"
B
B
AA
D
D
C C
D
1'-3"
9"
Detail AtButtress withvertical steel
9"
Detail 4
REINFORCEMENT DETAILAT SILL,STITCH,LINTLE,ROOF,GABLE BANDS
9"
3"
1" 3"
Detail 5:RCC BandDetail
3. MINIMUM CLEAR COVER :-2. PROVIDE OVERLAP FOR SPLICING STEEL@60Xd1. CONCRETE : M15(1:2:4)NOTE:
a. All Bands : 25 mm4.VERTICAL REINFORCEMENT (AT BUTTRESS ,WINDOW & DOOR OPENINGS) STARTS FROM FOUNDATION.
1'-6"
Only written dimensions to be followed.
4.VERTICAL REINFORCEMENT (AT BUTTRESS ,WINDOW & DOOR
Particular Symbol LengthSN Height Remarks`
1
`2
Door with Double Shutter D1 3'-6" 8'-0"
`3
`4
`5
3'-0" 8'-0"
Number
0
3
Opening Schedule for 3 ROOM CGI model
Window with Ventilation W 3'-0" 5'-6" 13
Single shutter Dooor
Total 16
D2
Room to ReadNepal
School Room Program
1. Only written dimensions to be followed. Drawings not tobe measured as per given scale
2. Any discrepancy or omission in this drawing if found shallbe reported immediately to site engineer
Title:-DOOR/WINDOWSCHEDULE
Project:-School Building Construction
Date:2015-Oct
Door withVentilation
Door withVentilation
Designed By:-Govinda Devkota
Prepared By:-Keshab Paudel
Approved By:-
Checked By:-
MS-0
1. Only written dimensions to be followed. Drawings not to
Room to ReadNepal
School Room Program
Note: 5 mm gap between ms plate and wooden frame for easy fit considered in design
1'
Room to ReadNepal
School Room Program
1. Only written dimensions to be followed. Drawings not tobe measured as per given scale
2. Any discrepancy or omission in this drawing if found shallbe reported immediately to site engineer
Title:-MS DOOR/WINDOW-DETAILING
Project:-School Builidng Construction
Date:2015-Oct MS-1
40 LONG 12x12x3 SQUARE PIPE
40x40x4 MS ANGLE
40x40x4 MS ANGLE
NUT & BOLT
200 mm LONG HOLDFAST40x40x4 MS ANGLE
150/75 long HINGE INMS DOOR/WINDOW FRAME
40 x 40 x 4 MS FRAME
DETAIL AT "C"
40x40x4 MS ANGLE
100 LONG 25x25x3 MS ANGLEDETAIL AT "A"
DETAIL AT "B"
HOLDFASTDETAIL
1.5" wooden section along the MSframe to screw the HINGE
150/75 long HINGE IN
MS DOOR/WINDOW FRAME
40 x 40 x 4 MS FRAME
DETAIL AT "E"
40x40x4 MS ANGLE
100 LONG 25x25x3 MS ANGLE
40x40x4 MS ANGLE
100 LONG 25x25x3 mm MSANGLE
1'-6" 1'-6"
4"
3'-0"
2"
100 LONG 25x25x3 mm MSANGLE
4"4"
4"
1'
25X4 MS plate
MS VENTILATION FRAME
Note: 5 mm gap between ms plate and wooden frame for easy fitconsidered in design
Designed By:-Govinda DevkotaNEC No:1191-Civil
Prepared By:-Keshab Paudel
Approved By:-
Checked By:-1. Only written dimensions to be followed. Drawings not to
Note: 5 mm gap between ms plate and wooden frame for easy fit
Room to ReadNepal
School Room Program
Title:-TYPICAL DWG - MSWINDOW FRAME WITHWP PLYWOOD SHUTTER
Designed By:-Govinda DevkotaNEC No:1191-Civil
Project:-School Building Construction
Date:2015-Oct
Prepared By:-Keshab
MS-2
Note: 5 mm gap between ms plate and wooden frame for easy fit considered in design
25x4 MS PLATE
75 mm HINGE
100 LONG 25x25x3 mm MSANGLE
MS WINDOW FRAME & SHUTTER(Size=5'6"X3')
4"
83 4"83 4"
2"
3'-01 2"
11 2"4'-
23 4"11 2"
4'-6"
40x40x4 MS ANGLE
A
Plate with Hole for Tower bolt
4'-6"
4'-51 4"
3"X 1.5" STYLE
3"X 1.5" STYLE3"
5'-21 4"
212" 2"1'-514" 1'-534"
3'
40x40x4 MS ANGLE
100 LONG 25x25x3 mm MSANGLE
1'-6" 1'-6"
4"
3'
2"4"
1'
1'-6" 1'-6"
4"
3'
2"4"
1'
112"
212" 1'-134" 212" 212" 1'-314" 1"
40x40x4 MS ANGLE
1'-634" 1'-634"3'-234"
9 mm WP Plywood3"X 1.5" STYLE
Approved By:-
Checked By:-
2'-7
.0"
Room to ReadNepal
School Room Program
1. Only written dimensions to be followed.Drawings not to be measured as per givenscale
2. Any discrepancy or omission in thisdrawing if found shall be reportedimmediately to site engineer
Title:-TYPICAL DWG-MS DOORFRAME WITH WP PLYWOODSHUTTER
Project:-School Building Construction
Date:2015-Oct MS-4
2'-1134"2'-
23 4"
7'-3"
2'-10
1 2"9"
2'-53 4"
2"2'-
23 4"2"
2'-73 4"
113 4"
2'-10
3 4"83 4"
100 LONG25x25x3 MSANGLE
150 mm HINGE
100 LONG25x25x3 MSANGLE
MS DOOR FRAME & WP PLYWOOD SHUTTER(Size=8ft X3ft)
E
40x40x4 MS ANGLE
25X4 MM MSPLATE
Plate with Hole for Tower bolt
Plate with Holefor Tower bolt
C1'-1114" 912"
1'-6" 1'-6"
4"
3'
2"4"
1'
3"3"
1 2"2'-
10"
5"7'-23 4"
Note: 5 mm gap between ms plate and wooden frame for easy fit considered in design
2'-7
.0"
3"X 1.5" STYLE
5"X 1.5" STYLE
12 mm thick WP Plywood
4.5"X 1.5" STYLE
40x40x4 MS ANGLE
25X4 MS Plate
112"
Plate with Hole for Tower bolt
1'-6" 1'-6"3'
1'
2'-71 2"
9" 9"
2" 2'-7" 2"
3" 2'-412"
2'-11"
SHUTTER OPENINGOUTSIDE CLASSROOM
40x40x4 MS ANGLE
12 mm thick WP Plywood
41 2"3'-
23 4"
2'-5" 3"
Designed By:-Govinda DevkotaNEC No:1191-Civil
Prepared By:-Keshab
Approved By:-
Checked By:-1. Only written dimensions to be followed.1. Only written dimensions to be followed.
Drawings not to be measured as per given
B
B
SECTION AT B-BDOOR (D2)
3"X 4" FRAME
3"X 4" FRAME3"X 1.5" STYLE
1" THK. PANEL
3"X 1.5" STYLE1" THK. PANEL
3"X 1.5" STYLE
1" THK. PANEL
3"X 1.5" STYLE
12Ø Rod @4" c/c 1'
3"X 4" FRAME
3"X 4" FRAME3"X 1.5" STYLE
1" THK. PANEL
1" THK. PANEL
1" THK. PANEL
3"X 1.5" STYLE
3"X 1.5" STYLE
3"X 1.5" STYLE3"X 4" FRAME
12Ø Rod @4" c/c
12Ø Rod @5" c/c
C
Title:-Alternate 2:WoodenDoor(D2 ) ;& Window W1and Ventilation(V)detail
Perpared By:-Keshab PaudelChecked by:-Govinda DevkotaNEC No:1191-Civil
Room to ReadNepal
School Room Program
Project:-School BuildingConstruction/Hill type
Date:2015-Oct
Approved By:-
Checked By:-
C
3"X 4" FRAME
3"X 4" FRAME3"X 1.5" STYLE
12Ø Rod @4" c/c
C
Particular Symbol LengthSN Height Remarks
`2
Number
Opening Schedule for 3 Room Building
18
3'-0"
Total
1. Only written dimensions to be followed. Drawings not to bemeasured as per given scale
2. Any discrepancy or omission in this drawing if found shall bereported immediately to site engineer W-WINDOW-Alt 2)
`1
5'-6" 13
3'-0" 8'-0" 3Door
Window
D2
W
3'-0" 1'-0" 2` 3 Ventilation
at GableV
3"X 4" FRAME3"X 1.5" STYLE
12Ø Rod @4" c/c
truss tieRoom to ReadNepal
School Room Program
1. Only written dimensions to be followed.Drawings not to be measured as per givenscale
2. Any discrepancy or omission in this drawingif found shall be reported immediately tosite engineer
Sheet Title:-Steel Roof TrussDetail Designed By:-
Govinda DevkotaNEC No:1191-civil
Project:-1 Storey Frm- Brick- CGI Roof
Date:2015-Nov
FULL TRUSS DETAIL GRID 2 ,3& 4
2
3 4V2 S1S2
V3
1
8'-0"
8'-0"
26'-3"
V1
S3V4
V2S1V1
S2
S3V4
V3
6 5
C B A
11'-3"
5'-8"
6"
3'-3"
3'-3"
3'-3"
3'-3"
6"
11'3"
Checked By:-
Approved By:-
ATRUSS
4'-6
"
4
9'-3
"
5'-6
"1'
-3"
V1
6
V1
6
and welded throughout alongthe periphery
MS plate 1- 200X200X8
MS plate 200X200X8
MS PURLIN PLATE AT EDGES OF PURLINS
MS PURLIN PLATE ON RAFTER
50 NB (L) PURLIN
160x60x8 mm MS PLATE
13.5mm dia. HOLE FOR M12 BOLT
13.5mm dia. HOLE FOR M12 BOLT
160x60x6 mm MS PLATE
50 NB (L) PURLIN
60
50 NB (M) PIPERAFTER
50 NB PIPE (L) PURLIN
50X50X4 mm ANGLE (150 mmLONG) WELDED TO RAFTER
50 NB PIPE (L) PURLINu CLAMP FOR ANCHORING PURLIN WITH ANGLE
50 NB (M) PIPE RAFTER
15050X50X4 mm ANGLE (150 mmLONG) WELDED TO RAFTER
PURLIN & RAFTER JOINT DETAIL ON GABLE ENDAND ON WHEREVER PURLIN CONTINUED
DETAIL J2
ELEVATION X
ELEVATION X
u CLAMP FOR ANCHORING PURLIN WITH ANGLE
PURLIN JOINT DETAILS
12mm dia. NUT/BOLT
6mm TH. 60X160 PLATE8mm TH. 60X160 PLATE
6mm TH. 60X160 PLATE
50 NB PIPE (L) PURLIN50 NB PIPE (M) RAFTER
DETAIL J1
DETAIL 1
DETAIL AT 3
M12 Bolts
50 NB PIPE (M) (HORIZONATL TIE)
8mm TH. 160X160 SPLICE PLATE
DETAIL AT 2
150 50NB (M) RAFTER
4 NOS 14 dia.holes for M12 Bolts
160x160 PLATE (8mm Thick)
3590
35
SECTION AT A-ASPLICE PLATE DETAIL
300
150
MS
plat
e 150
mm
long
Eav
es b
oard
DETAIL AT 4
D - D
2 NOS 10Ø HOLESFOR 8Ø BOLTS
50 x 140 x 4 TH. PLATE
8mm plate welded to connect tie and rafter -minimum 150mm from the cornerand welded throughout alongthe periphery
EAVES BOARD FIXING DETAIL
50NB(L)PURLIN
150
75
50 x 140 x 4 TH. PLATE
1" wooden eaves board
Eaves Board detail along Gable wall end(This detail section is at perpendicular to the rafter)
7.5∅
110
5555 75
ANCHORING BOLT
300
75
375
150
NOTE: ALL DIMENSIONS ARE GIVEN IN MMSHEET TITLE: STEEL TRUSS DETAILING FOR CGI ROOFING BUILDING
160
Room to ReadNepal B
TRUSS
6 mm THICK MS PLATE
(FIXING OF GABLE RAFTER WITH GABLE BAND)
100
100 15
0
100
100 15
0
100
75mm hollow pipe post
Detail At the base of the post
10 dia.Cross rodswelded at the base50 NB PIPE (M) RAFTER
(HORIZONTAL MEMBER)
TOTAL 2 NOS.BASE PLATE FOR EACH TRUSS (REFER DETAIL E-E)
8 mm SHOE PLATE WELDED ONBASE PLATE VERTICALLY ON BOTH SIDEOF TRUSS HORIZONTAL MEMBER
2.0"
0.5"
1.5" 1.5"
0.5"
1.5"1.5"
8.5"
ANCHORAGE DETAIL AT WALL
50NB (M) RAFTER
4 NO.S 13.5 dia.holes for M12 Bolts
8.5"x8.5" PLATE (8mm TH.)
8.5"
3.0"1.5"
Base Plate
150
225
50 NB(L) Purlin Pipe-1st from end
u CLAMP FOR ANCHORING 225mm25NB(M) eaves support pipe piece
225mm long 25NB(M) eaves support pipe
2 NOS 10Ø HOLESFOR 8Ø BOLTS
50 x 140 x 4 TH. PLATE
End plate detail
NOTE: ALL DIMENSIONS ARE GIVEN IN MM;UNLESS OTHERWISE MENTIONED
lower clamp welded with eavessupport pipe
Room to ReadNepal C
TRUSSStructure Design By:-B. L. ShresthaNEC No:1186-Civil
Designed By:-Govinda DevkotaNEC No:1191-civil
Checked By:- Approved By:- Structure Design By:-B. L. ShresthaNEC No:1186-Civil
Designed By:-Govinda DevkotaNEC No:1191-civil
Approved By:-Checked By:-
DETAIL AT 5
Middle PURLIN DETAIL
LENGTH (L1)
PURLIN PLATE 6 mm PURLIN PLATE
End PURLIN DETAIL
LENGTH (L2)
6 mm PURLIN PLATE
Eaves board Plate
4 mm plate
Bolt from 12 dia. bar
8mm plate welded to connect tie and rafter -minimum 150mm from the cornerand welded throughout alongthe peripheryMS plate 1( 200X200X8)
MS plate 2( 200X200X8)
MS Plate 200x200X8 mm
MS Tubular Post 65NB(M)
MS Plate 2(200x200X8)
50 75
MS Plate 6mm thick
MS Plate 1(200x200X8)
13.5 mm hole for 12mm dia bolt
35 35130
13.5 mm hole for 12mm dia bolt or MS Steel
50
6 mm PURLIN PLATE
Eaves board Plate
75ANCHORING BOLT
300
75
375
6 mm THICK MS PLATE
(FIXING OF GABLE RAFTER WITH GABLE BAND)
100
100 15
0
100
100 15
0
100
75mm hollow pipe post
Detail At the base of the post
10 dia.Cross rodswelded at the base50 NB PIPE (M) RAFTER
(HORIZONTAL MEMBER)
TOTAL 2 NOS.BASE PLATE FOR EACH TRUSS (REFER DETAIL E-E)
8 mm SHOE PLATE WELDED ONBASE PLATE VERTICALLY ON BOTH SIDEOF TRUSS HORIZONTAL MEMBER
2.0"
0.5"
1.5" 1.5"
0.5"
1.5"1.5"
8.5"
ANCHORAGE DETAIL AT WALL
50NB (M) RAFTER
4 NO.S 13.5 dia.holes for M12 Bolts
8.5"x8.5" PLATE (8mm TH.)
8.5"
3.0"1.5"
Base Plate
150
225
50 NB(L) Purlin Pipe-1st from end
u CLAMP FOR ANCHORING 225mm25NB(M) eaves support pipe piece
225mm long 25NB(M) eaves support pipe
2 NOS 10Ø HOLESFOR 8Ø BOLTS
50 x 140 x 4 TH. PLATE
End plate detail
NOTE: ALL DIMENSIONS ARE GIVEN IN MM;UNLESS OTHERWISE MENTIONED
lower clamp welded with eavessupport pipe
Room to ReadNepal C
TRUSSStructure Design By:-B. L. ShresthaNEC No:1186-Civil
Designed By:-Govinda DevkotaNEC No:1191-civil
Approved By:-Checked By:-
DETAIL AT 5
Bolt from 12 dia. bar
8mm plate welded to connect tie and rafter -minimum 150mm from the cornerand welded throughout alongthe peripheryMS plate 1( 200X200X8)
MS plate 2( 200X200X8)
MS Plate 200x200X8 mm
MS Tubular Post 65NB(M)
MS Plate 2(200x200X8)
50 75
MS Plate 6mm thick
MS Plate 1(200x200X8)
13.5 mm hole for 12mm dia bolt
35 35130
13.5 mm hole for 12mm dia bolt or MS Steel
50
NOTE: ALL DIMENSIONS ARE GIVEN IN MM;
13.5 mm hole for 12mm dia bolt or MS Steel
1 3
ISOMETRIC VIEW1'-11"
4'2'
3'-10"
10"
SIDE ELEVATION
10"
0.5" 0.5"
2'-0"
19mm thk.BLOCKBOARDmoulded with 12mm thk. salwooden bead
3x62 mm Pan Head Screw2"x1.5"wooden section
2" 2'-2" 2"
2
Designed By:-Govinda Devkota
Prepared By:-Keshab Paudel
ROOM TO READNEPAL
DATE:2015-Nov
Note:1.Each & Every edges o the furniture should berounded.2.Painting finishing should be as per below :-
2.1. Wood primer2. 2. 2 coat Enamel paint-NS
Standard
Stationery/Instruction material Storage Rack (5'x4')forTeacher & Student
1'
side SectionalView
3"1"
1'1"
1'1"
6"1"
1'1"
4'-2
"
4'
3"1'
1'6"
1'1'-
0" ISO 9001/NSstandard 6mm thickPlywood at backside
19mm Blockboard(ISO 9001/NSstandard)withWooden beat
1'-0"
3"WoodenBase
4'-2
"Drawer forTeacher Uses
3-D view (Front)
4
ISOMETRIC VIEW1'-11"
4'2'
3'-10"
12"
12"
0.5" 0.5"
2'-0"
19mm thk.BLOCKBOARDmoulded with 12mm thk. salwooden bead
3x62 mm Pan Head Screw2"x1.5"wooden section
2" 2'-2" 2"
(GRADE 1 & 2) LOW DESK (2 SIDE SITTING)FOR 3X2 CHILDREN
(GRADE 3) LOW DESK (2 SIDE SITTING)FOR 3X2 CHILDREN
PLAN
5'-10" 1"1"
1"1 2"
R2"R2"
R2" R2"1" 1" 1 2"
6'
4'
3'-1
1"1 2"
5'-10"
WHITE BOARD
F-1Approved By:-
Checked By:- ClassroomFurnitureGrade 1,2&3
R2"1" 1111 222222""
4'
3'-1
1"
Classroom