POTENTIAL STRATEGIC DEVELOPMENT SITE WEST OF CARTERTON OXFORDSHIRE
FOUL WATER DRAINAGE INFRASTRUCTURE OPTIONS
Hannah, Reed and Associates Limited Marlborough House High Street Kidlington OX5 2DN X210165/PHS/DKP/March 2011 Revision: A
COPYRIGHT THIS DOCUMENT MUST NOT BE COPIED OR REPRODUCED WITHOUT THE PRIOR PERMISSION OF HANNAH, REED AND ASSOCIATES LIMITED
Hannah Reed
![Page 2: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/2.jpg)
Potential Strategic Development Site West of Carterton Foul Water Drainage Infrastructure Report Crest Nicholson Strategic Projects Revision A
X210165/PHS/DKP/August 2010 Page 2 Hannah-Reed
CONTENTS PAGE NO.
1 EXECUTIVE SUMMARY 3 2 INTRODUCTION 4 3 FOUL WATER DRAINAGE OPTIONS 5 4 CONCLUSIONS AND RECOMMENDATIONS 9
APPENDICES
A Site Location Plan B Thames Water Asset Location Plans C British Geological Survey Map Extract
D Foul Water Management Strategy Options E Ground Investigation Report
![Page 3: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/3.jpg)
Potential Strategic Development Site West of Carterton Foul Water Drainage Infrastructure Report Crest Nicholson Strategic Projects Revision A
X210165/PHS/DKP/August 2010 Page 3 Hannah-Reed
1 Executive Summary Hannah Reed and Associates have carried out an investigation into the Foul Water Drainage Management aspects of a potential housing development at Carterton, West Oxfordshire. The site is identified in West Oxfordshire District Council’s Draft Core Strategy 2011 as a possible option for development, and lies to the west of the town. This report was prepared on behalf of Crest Nicholson Strategic Projects in support of a site allocation application to be submitted to West Oxfordshire District Council (WODC). The study has examined the Local Development Plan documents, which have identified a potential need for up to 1300 new dwellings. A technical appraisal has been carried out to address potential foul water drainage issues and provide possible solution options for a proposed development on land west of Carterton. The study has identified that there are two potential options for the management of foul waste water generated by the proposed development:
i. Up-grade the existing public sewer system and treatment works, following consultation with Thames Water Utilities Ltd and connect to the public foul sewer taking into consideration the peak and daily foul waste water flows.
ii. Provide an on-site foul waste water treatment plant, taking into consideration the peak and daily foul waste water flows. The on-site treatment plant could either be connected to the existing public foul sewer following limited up-grading of the existing public sewer system or be discharged to land following tertiary treatment.
The site investigation found that the soil has a permeability rate of approximately 2.59 x 10-6 m/s, which indicates that infiltration techniques such as reed beds and infiltration basins would be feasible to manage the treated discharge water. Suitable planting of native trees such as Poplars and Willow around the treatment plant and constructed wetlands would provide screening of the treatment plant from the existing and proposed residential dwellings as well as creating a habitat for native wildlife. It is concluded that the site is in a sustainable location. Some positive benefits could accrue from developing the site, including possible upgrading of the existing public sewers and sewage treatment works and improvement of the local wildlife habitats through tree planting and wetland construction.
![Page 4: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/4.jpg)
Potential Strategic Development Site West of Carterton Foul Water Drainage Infrastructure Report Crest Nicholson Strategic Projects Revision A
X210165/PHS/DKP/August 2010 Page 4 Hannah-Reed
2 Introduction West Oxfordshire District Council published their Local Development Framework (LDF) Draft Core Strategy in January 2011. The proposed development consists of the construction of approximately 1300 dwellings with associated infrastructure. The proposals also include a potential new primary school, leisure facilities and the development of the Shill Brook Valley into an ecology park. A new access road will be constructed, which incorporates a road bridge and pedestrian and cycle bridge over the Shill Brook. This report addresses the potential impact of a proposed development on land to the west of Carterton and provides strategic options to mitigate the potential options and where possible provide betterment to the site and the surrounding area.
![Page 5: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/5.jpg)
Potential Strategic Development Site West of Carterton Foul Water Drainage Infrastructure Report Crest Nicholson Strategic Projects Revision A
X210165/PHS/DKP/August 2010 Page 5 Hannah-Reed
3 Foul Drainage Options 3.1 This study has been carried out to examine the foul waste water drainage issues
which relate to the potential development of the site to the west of Carterton. See site Location Plan in Appendix A. The work has included analysis of local planning documents, Building Regulations Approved Document H, existing public sewers and treatment plants in the vicinity and the existing site’s geological and hydrological conditions to provide appropriate foul waste water management options.
3.2 Government guidance contained within DETR Circular 03/99/ WO 10/99
‘Planning requirements in respect of the use of non-mains sewerage incorporating septic tanks in new development’ and Building Regulations Approved Document H provides a hierarchy of foul wastewater drainage options that must be considered and discounted in the following order:
a. Connection to the public sewer b. Package sewage treatment plant c. Septic Tank d. If none of the above are feasible a cesspool
3.3 The proposed development consists of the construction of approximately 1300
dwellings with associated infrastructure. The proposals also include a potential new primary school, leisure facilities and the development of the Shill Brook Valley into an ecology park. A new access road will be constructed, which incorporates a road bridge and pedestrian and cycle bridge over the Shill Brook. Therefore, to allow for a possible future increase in the potential housing need, the estimation of the foul waste water peak and daily flow rates has been calculated on the assumption of 1300 dwellings with an average of 3 bedrooms.
3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996
“Drain and Sewer Systems Outside Buildings”, Annex C “Calculation of Wastewater Flows for Drain Systems”.
3.5 The following should be considered when assessing the use factors and
consequential peak flow rates in a wastewater drain:
The number and type of appliances to be connected and the possibility of coincidence of discharge from different appliances
The rate of discharge from each appliance The average duration of discharge from each appliance The likely use interval of each appliance
The following empirical formula may be used:
____ Q = kDU √∑DU
![Page 6: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/6.jpg)
Potential Strategic Development Site West of Carterton Foul Water Drainage Infrastructure Report Crest Nicholson Strategic Projects Revision A
X210165/PHS/DKP/August 2010 Page 6 Hannah-Reed
Where; Q is the wastewater design flow rate, in litres per second kDU is a frequency factor, dimensionless. Typical values given in Table 3.5.1 DU is the discharge unit (a characteristic value of the rate of wastewater
outflow of a sanitary appliance), dimensionless. Typical values are given in Table 3.5.2
Table 3.5.1: Typical frequency factors (kDU): Type of Building kDU
Dwellings, guesthouses, offices (intermittent use) 0.5
Hospitals, school, restaurant, hotel (frequent use) 0.7
Toilets and/or shower open to the public (congested use) 1.0
Laboratory buildings (special use) 1.2 Table 3.5.2: Typical values of discharge units (DU): Type of Appliance DU
Washbasin, shower 0.3 to 0.6
Bath, kitchen sink 0.8 to 1.3
Dishwasher 0.2 to 0.8
Household washing machine 0.5 to 0.8
WCs 1.2 to 2.5 Table 3.5.3: The estimated Discharge Unit flow rate: Discharge Unit
Type No. Of DUs flow rate
(l/s) flow per
DU Wash hand basin 1300 0.45 585 WC single flush 1300 1.85 2405 Bath 1300 1.05 1365 Washing Machine 1300 0.65 845 Shower 1300 0.45 585 Kitchen Sink 1300 1.05 1365 Dishwasher 1300 0.50 650 ∑ DU = 7800
____ Q = 0.5 √7800 = 44.1 litres / second
3.6 The Thames Water Asset Location Plans included in Appendix B show the
locations of public sewers within the vicinity of the proposed development site. The plans show that there is a gravity sewer to the east of the site running along Upavon Way. This sewer continues for a short distance westward along the B4477 to a pumping station that discharges via a rising main.
![Page 7: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/7.jpg)
Potential Strategic Development Site West of Carterton Foul Water Drainage Infrastructure Report Crest Nicholson Strategic Projects Revision A
X210165/PHS/DKP/August 2010 Page 7 Hannah-Reed
3.7 West Oxfordshire District Council’s Draft Core Strategy Sustainability Appraisal has identified that there is no capacity at the Brize Norton Sewage pumping station, which is overwhelmed during wet weather. It also identifies that the existing sewage treatment works would require up-grading to deal with additional wastewater from a significant new development.
3.8 Therefore, in accordance with the foul waste water drainage hierarchy the
proposed development should connect to the public sewer and include proposals for up-grading of the existing foul drainage system and sewage treatment plant following consultation with Thames Water Utilities Ltd.
3.9 The proposed site is of sufficient size to provide its own on-site waste water
treatment. Therefore, in accordance with the foul waste water drainage hierarchy, if following consultation with Thames Water Utilities it is not feasible to up-grade the existing sewer system and treatment works, an on-site treatment plant could be provided. See possible location of on-site treatment plant in Appendix D.
3.10 The size of the treatment plant should be based on the peak and daily flow
produced by the proposed 1300 dwelling development. The peak flow has been estimated in section 3.5. The daily flow has been estimated on the assumption that the proposed dwellings will have an average of 3 bedrooms.
3.11 The British Water Code of Practice, suggests that a daily foul flow volume of 180
litres per person per day should be used for the sizing of treatment systems for residential dwellings.
A 3 bedroom dwelling is estimated to house 5 people. Therefore, a 1300 dwelling estate would produce a daily foul waste water flow of: 180(1300x5) = 1,170,000 litres per day or 1170m3/day. This equates to an average foul waste water flow of 13.5 l/s. 3.12 It may be possible to discharge the treated effluent to the existing Thames Water
sewer system and treatment works following the up-grading of the existing public sewers’ and treatment plant’s capacities.
3.13 If following consultation it is not possible to discharge the treated effluent to the
public sewer it could be possible to discharge the effluent to land following tertiary treatment such as constructed wetlands or reed beds, which significantly reduce chemicals in the discharge and consequently also significantly reduce odours.
3.14 The British Geological Survey Map Sheet 236 for Witney, an extract of which is
included in Appendix C, indicates that the site is underlain by Cornbrash and Forest Marble, which is in turn underlain by White Limestone.
![Page 8: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/8.jpg)
Potential Strategic Development Site West of Carterton Foul Water Drainage Infrastructure Report Crest Nicholson Strategic Projects Revision A
X210165/PHS/DKP/August 2010 Page 8 Hannah-Reed
3.15 A ground investigation was carried out at the site to confirm the geology and the permeability of the soil, which would assist in determining if it would be appropriate to utilise infiltration techniques to mitigate the and manage the treated discharge water , e.g. soakaways, infiltration basins and reed beds.
3.16 The site investigation confirmed that the site has a capping of topsoil over Forest
Marble. Forest Marble consists of thin layers of clayey and sandy limestone brash and sandy clay resting upon weak to moderately strong thinly and thickly bedded limestone rock. The limestone rock layer resisted penetration by the excavation equipment used
3.17 Cornbrash and Forest Marble are moderately permeable and have typical
permeability rates of 1.0x10-5m/s and 3.5x10-6m/s respectively. As a result the geological conditions at the site are likely to be suitable for infiltration techniques, which would allow discharge to land.
3.18 The site investigation found that the soil has a permeability rate of approximately
2.59 x 10-6 m/s, which indicates that infiltration techniques such as reed beds and infiltration basins would be feasible to manage the treated discharge water.
3.18 Suitable planting of native trees such as Poplars and Willow around the treatment
plant and constructed wetlands would provide screening of treatment plant from the existing and proposed residential dwellings as well as creating a habitat for native wildlife.
![Page 9: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/9.jpg)
Potential Strategic Development Site West of Carterton Foul Water Drainage Infrastructure Report Crest Nicholson Strategic Projects Revision A
X210165/PHS/DKP/August 2010 Page 9 Hannah-Reed
4 Conclusions and Recommendations 4.1. The study has identified that there are two potential options for the management
of foul waste water generated by the proposed development:
i. Up-grade the existing public sewer system and treatment works, following consultation with Thames Water Utilities Ltd and connect to the public foul sewer taking into consideration the peak and daily foul waste water flows.
ii. Provide an on-site foul waste water treatment plant, taking into consideration the peak and daily foul waste water flows. The on-site treatment plant could either be connected to the existing public foul sewer following limited up-grading of the existing public sewer system or be discharged to land following tertiary treatment.
4.2. Cornbrash and Forest Marble are moderately permeable and have typical permeability rates of 1.0x10-5m/s and 3.5x10-6m/s respectively. As a result the geological conditions at the site are suitable for infiltration techniques, which would allow discharge to land.
4.3 A ground investigation was carried out at the site to confirm the geology and the
permeability of the soil, which would assist in determining if it would be appropriate to utilise infiltration techniques to mitigate the and manage the treated discharge water , e.g. soakaways, infiltration basins and reed beds.
4.4 The site investigation confirmed that the site has a capping of topsoil over Forest
Marble. Forest Marble consists of thin layers of clayey and sandy limestone brash and sandy clay resting upon weak to moderately strong thinly and thickly bedded limestone rock. The limestone rock layer resisted penetration by the excavation equipment used
4.5 Cornbrash and Forest Marble are moderately permeable and have typical
permeability rates of 1.0x10-5m/s and 3.5x10-6m/s respectively. As a result the geological conditions at the site are likely to be suitable for infiltration techniques, which would allow discharge to land.
4.6 The site investigation found that the soil has a permeability rate of approximately
2.59 x 10-6 m/s, which indicates that infiltration techniques such as reed beds and infiltration basins would be feasible to manage the treated discharge water.
4.7 Suitable planting of native trees such as Poplars and Willow around the treatment
plant and constructed wetlands would provide screening of the treatment plant from the existing and proposed residential dwellings as well as creating a habitat for native wildlife.
![Page 10: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/10.jpg)
Potential Strategic Development Site West of Carterton Foul Water Drainage Infrastructure Report Crest Nicholson Strategic Projects Revision A
X210165/PHS/DKP/August 2010 Page 10 Hannah-Reed
Appendix A Site Location Maps
![Page 11: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/11.jpg)
Potential Strategic Development Site West of Carterton Foul Water Drainage Infrastructure Report Crest Nicholson Strategic Projects Revision A
X210165/PHS/DKP/August 2010 Page 11 Hannah-Reed
Land West of Carterton Site Location Maps
Grid Coordinates 426800mE 206600mN
![Page 12: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/12.jpg)
Potential Strategic Development Site West of Carterton Foul Water Drainage Infrastructure Report Crest Nicholson Strategic Projects Revision A
X210165/PHS/DKP/August 2010 Page 12 Hannah-Reed
Appendix B Thames Water Asset Location Plans
![Page 13: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/13.jpg)
Asset Location Search
Page 1 of 54
Thames Water Utilities Ltd Property Insight PO Box 3189 Slough SL1 4WW DX 151280 Slough 13 T 0118 925 1504 F 0118 923 6655/57 E [email protected] www.twpropertyinsight.co.uk Registered in England and Wales No. 2366661, Registered office Clearwater Court, Vastern Road Reading RG1 8DB
Debbie Prichard Hannah Reed and Associates Ltd Marlborough House High Street OXFORD OX5 2DN
Search address supplied Land West Of
Carterton Oxfordshire
Your reference X210165 Our reference ALS/ALS Standard/2010_1812670 Search date 13 May 2010
OUR PRICES WILL BE CHANGING FROM 1st APRIL 2010. Thames Water Property Insight will be increasing the price of its Asset Location Search as indicated below. Prices with effect from 1st April 2010 are as follows: Site Size (m2) Price (excl. VAT) STANDARD Price (excl. VAT) 24-HOUR RESPONSE 0-250,000 £46.00 £91.60 250,001-500,000 £92.00 £183.20 500,001-750,000 £138.00 £274.80 750,001-1,000,000 £184.00 £366.40 Over 1,000,000 Price on application Price on application To avoid delays, please ensure that relevant personnel within your company are made aware of these changes as appropriate. If you require any further information or have any queries, please do not hesitate to contact the Customer Support Team on 0118 925 1504. Credit card payments are available. Please phone 01189 251509 You are now able to order your Asset Location Search requests online by visiting www.twpropertyinsight.co.uk
![Page 14: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/14.jpg)
Asset Location Search
Page 2 of 54
Thames Water Utilities Ltd Property Insight PO Box 3189 Slough SL1 4WW DX 151280 Slough 13 T 0118 925 1504 F 0118 923 6655/57 E [email protected] www.twpropertyinsight.co.uk Registered in England and Wales No. 2366661, Registered office Clearwater Court, Vastern Road Reading RG1 8DB
Search address supplied: Land West Of, Carterton, Oxfordshire, Dear Sir / Madam An Asset Location Search is recommended when undertaking a site development. It is essential to obtain information on the size and location of clean water and sewerage assets to safeguard against expensive damage and allow cost-effective service design. This search provides maps showing the position, size of Thames Water assets close to the proposed development and also manhole cover and invert levels, where available. Please note that none of the charges made for this report relate to the provision of Ordnance Survey mapping information. The replies contained in this letter are given following inspection of the public service records available to this company. No responsibility can be accepted for any error or omission in the replies. You should be aware that the information contained on these plans is current only on the day that the plans are issued. The plans should only be used for the duration of the work that is being carried out at the present time. Under no circumstances should this data be copied or transmitted to parties other than those for whom the current work is being carried out. Thames Water do update these service plans on a regular basis and failure to observe the above conditions could lead to damage arising to new or diverted services at a later date. Contact Us If you have any further queries regarding this enquiry please feel free to contact a member of the team on 0118 925 1504, or use the address below: Thames Water Utilities Ltd Property Insight Tel: 0118 925 1504 PO Box 3189 Fax: 0118 923 6657 Slough SL1 4WW Email: [email protected] Web: www.twpropertyinsight.co.uk
![Page 15: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/15.jpg)
Asset Location Search
Page 3 of 54
Thames Water Utilities Ltd Property Insight PO Box 3189 Slough SL1 4WW DX 151280 Slough 13 T 0118 925 1504 F 0118 923 6655/57 E [email protected] www.twpropertyinsight.co.uk Registered in England and Wales No. 2366661, Registered office Clearwater Court, Vastern Road Reading RG1 8DB
Waste Water Services
Please provide a copy extract from the public sewer map. The following quartiles have been printed as they fall within Thames' sewerage area: SP2605SW SP2605NW SP2606SW SP2606NW SP2607SW SP2605SE SP2605NE SP2606SE SP2606NE SP2607SE SP2706SW SP2706NW SP2707SW SP2707SE Enclosed is a map showing the approximate lines of our sewers. Our plans do not show sewer connections from individual properties or any sewers not owned by Thames Water unless specifically annotated otherwise. Records such as "private" pipework are in some cases available from the Building Control Department of the relevant Local Authority. Where the Local Authority does not hold such plans it might be advisable to consult the property deeds for the site or contact neighbouring landowners. This report relates only to sewerage apparatus of Thames Water Utilities Ltd, it does not disclose details of cables and or communications equipment that may be running through or around such apparatus. The sewer level information contained in this response represents all of the level data available in our existing records. Should you require any further Information, please refer to the relevant section within the 'Further Contacts' page found later in this document. For your guidance: • The Company is not generally responsible for rivers, watercourses,
ponds, culverts or highway drains. If any of these are shown on the copy extract they are shown for information only.
• Sewers indicated on the extract of the public sewer map as being subject to an agreement under Section 104 of the Water Industry Act
![Page 16: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/16.jpg)
Asset Location Search
Page 4 of 54
Thames Water Utilities Ltd Property Insight PO Box 3189 Slough SL1 4WW DX 151280 Slough 13 T 0118 925 1504 F 0118 923 6655/57 E [email protected] www.twpropertyinsight.co.uk Registered in England and Wales No. 2366661, Registered office Clearwater Court, Vastern Road Reading RG1 8DB
1991 are not an ‘as constructed’ record. It is recommended that these details are checked with the developer.
Clean Water Services
Please provide a copy extract from the public water main map. The following quartiles have been printed as they fall within Thames' water area: SP2605SW SP2605NW SP2606SW SP2606NW SP2607SW SP2605SE SP2605NE SP2606SE SP2606NE SP2607SE SP2706SW SP2706NW SP2707SW SP2707SE Enclosed is a map showing the approximate positions of our water mains and associated apparatus. Please note that records are not kept of the positions of individual domestic supplies. For your information, there will be a pressure of at least 10m head at the outside stop valve. If you would like to know the static pressure, please contact our Customer Centre on 0845 920 0800. The Customer Centre can also arrange for a full flow and pressure test to be carried out for a fee. For your guidance: • Assets other than vested water mains may be shown on the plan, for
information only. • If an extract of the public water main record is enclosed, this will show
known public water mains in the vicinity of the property. It should be possible to estimate the likely length and route of any private water supply pipe connecting the property to the public water network.
![Page 17: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/17.jpg)
Asset Location Search
Page 5 of 54
Thames Water Utilities Ltd Property Insight PO Box 3189 Slough SL1 4WW DX 151280 Slough 13 T 0118 925 1504 F 0118 923 6655/57 E [email protected] www.twpropertyinsight.co.uk Registered in England and Wales No. 2366661, Registered office Clearwater Court, Vastern Road Reading RG1 8DB
Payment for this Search An invoice is enclosed. Please send remittance to Thames Water Utilities Ltd., PO Box 223, Swindon, SN38 2TW.
![Page 18: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/18.jpg)
Asset Location Search
Page 6 of 54
Thames Water Utilities Ltd Property Insight PO Box 3189 Slough SL1 4WW DX 151280 Slough 13 T 0118 925 1504 F 0118 923 6655/57 E [email protected] www.twpropertyinsight.co.uk Registered in England and Wales No. 2366661, Registered office Clearwater Court, Vastern Road Reading RG1 8DB
Further contacts:
Waste Water queries
Should you require verification of the invert levels of public sewers, by site measurement, you will need to approach the relevant Thames Water Area Network Office for permission to lift the appropriate covers. This permission will usually involve you completing a TWOSA form. For further information please contact our Customer Centre on Tel: 0845 920 0800. Alternatively, a survey can be arranged, for a fee, through our Customer Centre on the above number. If you have any questions regarding sewer connections, building over issues or any other questions regarding operational issues please direct them to our service desk. Which can be contacted by writing to:
Developer Services (Waste Water) Thames Water Clear Water Court Vastern Road Reading RG1 8DB Tel: 0845 850 2777 Fax: 0118 923 6613 Email: [email protected]
Should you require any further information regarding budget estimates, diversions or stopping up notices then please contact:
DevCon Team Asset Investment Thames Water Maple Lodge STW Denham Way Rickmansworth Hertfordshire WD3 9SQ Tel: 01923 898 072 Fax: 01923 898 106 Email: [email protected]
![Page 19: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/19.jpg)
Asset Location Search
Page 7 of 54
Thames Water Utilities Ltd Property Insight PO Box 3189 Slough SL1 4WW DX 151280 Slough 13 T 0118 925 1504 F 0118 923 6655/57 E [email protected] www.twpropertyinsight.co.uk Registered in England and Wales No. 2366661, Registered office Clearwater Court, Vastern Road Reading RG1 8DB
Clean Water queries Should you require any advice concerning clean water operational issues or clean water connections, please contact our Kew Service Desk by writing to:
Clean Water Design Thames Water Utilities 1 Kew Bridge Road Brentford Middlesex TW8 0EF
Tel: 0845 850 2777 Fax: 0208 213 8833 Email: [email protected]
![Page 20: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/20.jpg)
Page 8 of 54
Asset Location Search Sewer Map - ALS/ALS Standard/2010_1812670 SP2605SW
FW
Def
Issues
1.22m FW
85.9m
88.6m
88.9m
GP
War
d Bdy
1.22m RH
B 44
7 7
1.22m
RH
FW
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 426250,205250 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 21: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/21.jpg)
Page 9 of 54
NB. Levels quoted in metres Ordnance Newlyn Datum. The value -9999.00 indicates that no survey information is available
Manhole Reference Manhole Cover Level Manhole Invert Level N/a
n/a
n/a
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken.
![Page 22: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/22.jpg)
Page 10 of 54
Asset Location Search Sewer Map - ALS/ALS Standard/2010_1812670 SP2605NW
SS
96.3m
88.8m
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 426250,205750 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 23: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/23.jpg)
Page 11 of 54
NB. Levels quoted in metres Ordnance Newlyn Datum. The value -9999.00 indicates that no survey information is available
Manhole Reference Manhole Cover Level Manhole Invert Level N/a
n/a
n/a
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken.
![Page 24: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/24.jpg)
Page 12 of 54
Asset Location Search Sewer Map - ALS/ALS Standard/2010_1812670 SP2606SW
100.4m
98.6m
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 426250,206250 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 25: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/25.jpg)
Page 13 of 54
NB. Levels quoted in metres Ordnance Newlyn Datum. The value -9999.00 indicates that no survey information is available
Manhole Reference Manhole Cover Level Manhole Invert Level N/a
n/a
n/a
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken.
![Page 26: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/26.jpg)
Page 14 of 54
Asset Location Search Sewer Map - ALS/ALS Standard/2010_1812670 SP2606NW
Field Farm
Alvescot
101.2m
100.9m
101.3m
100.2m
CR
ED & Ward Bdy
Alvescot Field
Alvescot StudCottage
Stable Cottage
Farm House
The Bungalow
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 426250,206750 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 27: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/27.jpg)
Page 15 of 54
NB. Levels quoted in metres Ordnance Newlyn Datum. The value -9999.00 indicates that no survey information is available
Manhole Reference Manhole Cover Level Manhole Invert Level N/a
n/a
n/a
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken.
![Page 28: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/28.jpg)
Page 16 of 54
Asset Location Search Sewer Map - ALS/ALS Standard/2010_1812670 SP2607SW
101.6m
99.4m
CR
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 426250,207250 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 29: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/29.jpg)
Page 17 of 54
NB. Levels quoted in metres Ordnance Newlyn Datum. The value -9999.00 indicates that no survey information is available
Manhole Reference Manhole Cover Level Manhole Invert Level N/a
n/a
n/a
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken.
![Page 30: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/30.jpg)
Page 18 of 54
Asset Location Search Sewer Map - ALS/ALS Standard/2010_1812670 SP2605SE
Springfield House
FB
91.1mGP
Football Ground
Runway Approach Lights
B 4020
Rosebarn Cottage
(kennels)
GP
B 40
20
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 426750,205250 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 31: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/31.jpg)
Page 19 of 54
NB. Levels quoted in metres Ordnance Newlyn Datum. The value -9999.00 indicates that no survey information is available
Manhole Reference Manhole Cover Level Manhole Invert Level N/a
n/a
n/a
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken.
![Page 32: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/32.jpg)
Page 20 of 54
Asset Location Search Sewer Map - ALS/ALS Standard/2010_1812670 SP2605NE
92.5m
93.6m
94.9m
GP
Lay-by
B 4477
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 426750,205750 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 33: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/33.jpg)
Page 21 of 54
NB. Levels quoted in metres Ordnance Newlyn Datum. The value -9999.00 indicates that no survey information is available
Manhole Reference Manhole Cover Level Manhole Invert Level N/a
n/a
n/a
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken.
![Page 34: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/34.jpg)
Page 22 of 54
Asset Location Search Sewer Map - ALS/ALS Standard/2010_1812670 SP2606SE
Kenns Farm
90.8m
B 4477
B 44
77
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 426750,206250 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 35: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/35.jpg)
Page 23 of 54
NB. Levels quoted in metres Ordnance Newlyn Datum. The value -9999.00 indicates that no survey information is available
Manhole Reference Manhole Cover Level Manhole Invert Level N/a
n/a
n/a
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken.
![Page 36: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/36.jpg)
Page 24 of 54
Asset Location Search Sewer Map - ALS/ALS Standard/2010_1812670 SP2606NE
Alvescot Down
Path
(um
)
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 426750,206750 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 37: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/37.jpg)
Page 25 of 54
NB. Levels quoted in metres Ordnance Newlyn Datum. The value -9999.00 indicates that no survey information is available
Manhole Reference Manhole Cover Level Manhole Invert Level N/a
n/a
n/a
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken.
![Page 38: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/38.jpg)
Page 26 of 54
Asset Location Search Sewer Map - ALS/ALS Standard/2010_1812670 SP2607SE
Alvescot Down
Alvescot Downs Farm Cottages
Path ( um)
1 2
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 426750,207250 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 39: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/39.jpg)
Page 27 of 54
NB. Levels quoted in metres Ordnance Newlyn Datum. The value -9999.00 indicates that no survey information is available
Manhole Reference Manhole Cover Level Manhole Invert Level N/a
n/a
n/a
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken.
![Page 40: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/40.jpg)
Page 28 of 54
Asset Location Search Sewer Map - ALS/ALS Standard/2010_1812670 SP2706SW
300
150
225
300
300
150
225
225
150
150
150
150
150
150
150
300
300
150
150
150
150
!
200
??
??
??
??
??
??
??
??
??
??
??
??
??
??
??
??
??
??
??
??
.
.
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
4002
3001
4001
4101
4102
3401
23022301
2303
2201
3201
3304
3302
3101
3303
3402
3301
3102
4401
4301
4201
4402
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
#
BrookShill
Bridge
Kenns Farm
Issues
Rest
CS
93.5m
94.2m
86.0m
86.4m
87.4m
91.6m
94.7m
94.6m
94.3m
ED &
Ward B
dy
Chapel of
Track
Pumping Station
Path
B 44
77
CO
RB
ETT R
OA
DMINTY CLOSE
11
3
22
64
52
38a
70
33
6
19a
60
66
10
54
77a
40
58a
1
29
81
77
79
58
9
23
20
19
5
1
B 4477
Shill
38
97.7
B 4477 29
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 427250,206250 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 41: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/41.jpg)
Page 29 of 54
NB. Levels quoted in metres Ordnance Newlyn Datum. The value -9999.00 indicates that no survey information is available
Manhole Reference Manhole Cover Level Manhole Invert Level 4201 4301 4401 4402 3001 4001 3101 3102 3201 2201 2303 2302 2301 3304 3302 3303 3301 3402 3401 4002 4101 - 4102
94.73 95.12 94.53 96.75 87.09 90.22 n/a n/a n/a n/a 85.2 85.84 85.72 87.98 89.01 91.19 92.01 n/a 91.67 93.74 93.44 - 93.63
93.72 93.1 92.65 95.07 84.19 88.92 n/a n/a n/a n/a 83.01 84.04 83.97 85.33 87.01 89.32 89.06 n/a 89.67 91.49 91.89 - 92.14
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken.
![Page 42: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/42.jpg)
Page 30 of 54
Asset Location Search Sewer Map - ALS/ALS Standard/2010_1812670 SP2706NW
150
150
150
225
150
150
225
225
150
225
225
225
225
225150
150
225
150
150
150
225
225
150
150 150
150
150
225
150
150150
225
.
.
.
.
.
..
..
..
..
.
. .
..
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
4506
45024503
4504
4804
4805
49044903
2901
2801
2802
2701
3904
3602
3801
3902
2702
3601
3501
3903
3603
3901
3701
3502
3503
3702
4501
4902
4801
4901
3604
4802
4803
4505
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!
!
!!
!
Alvescot Down
Def
LB
TCB
St Joseph's
CS
98.5m98.8m
98.6m
92.0m
94.5m
96.3m
97.3m
Balancing Tank
School, Carterton
El Sub S
ta
Playground
Catholic Primary
SM
UPAV
ON
WAY
DRIVE
LAVE
ND
ER
B 44
77
PLACE
STIR
LIN
GC
LOS
E
WIN
DSO
R
AVENUE
RICHENS DRIVE
ARU
ND
EL
11
5
4
16
14
9
6
44
43
30
12
1
29
23
40
26
45
31
17
37
25
63
10
33
36
20
70
19
50
24
76
15
3
80
75
7984
71
90
96
22
19
1
16
16
1
24
16
29
11
16
30
12
CLO
SE
10
16
1
Balancing Tank
59 30
12
CLO
SE
1
23
14
1
14
6
4
1
20
EDGEWORTH
CARR
27
78
81
85
91
97
74
70
14
El Sub Sta
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 427250,206750 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 43: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/43.jpg)
Page 31 of 54
NB. Levels quoted in metres Ordnance Newlyn Datum. The value -9999.00 indicates that no survey information is available
Manhole Reference Manhole Cover Level Manhole Invert Level 4902 4801 4802 2901 2801 2802 2701 2702 3601 3902 3904 3801 3602 3903 3901 3603 3701 3702 3604 4901 4503 4504 4803 4804 4805 4904 4903 4505 4506 4502 3503 3502 3501 4501
98.41 98.2 97.85 98.61 98.11 97.22 97.58 96.72 n/a 99 98.95 98.51 94.13 99.15 99.33 94.47 97.69 98 96.07 98.69 98 97.98 97.9 97.81 97.87 98.15 98.44 96.67 98.07 97.97 92.51 92.29 n/a 96.41
95.76 96.3 94.66 93.91 93.56 93.22 n/a 93.64 n/a 94 95.8 96.36 91.88 94.11 96.83 92.89 94.23 94.44 93.37 94.49 94.94 95.33 94.71 95.13 95.27 94.7 94.54 94.94 96.11 94.7 91.71 90.51 n/a 94.07
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken.
![Page 44: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/44.jpg)
Page 32 of 54
Asset Location Search Sewer Map - ALS/ALS Standard/2010_1812670 SP2707SW
900
900
150
150
150
150
225150
150
150
375 ASSUMED ROUTE AND OUTFALL
900225
!
..
..
..
.
..
.
..
.
. .
.
.
1
%
%
%
%
%
%
%
%
%
%
%
3404
3403
3401
4401
4203
4201
4202
4001
3001
3002
4104
4103
4002
4102
4101
!
!
!
!
!
!
!
=
!
!
=
=
=
!
!
Alvescot
Alvescot Down
Downs Farm
101.4m
100.7m
100.0m
99.3m
Pond
ED &
War
d Bd
y
El Sub Sta
Playgrou
nd
B 44
77
STIR
LIN
G
FALC
ON
CLO
SE
HERON CLO
SE
Sunset View
25
1
14
15
20
13
30
7
8
19
21
10
6
5
3
30
14
1
13
7
8W
ARW
ICK
CLO
SE
CLO
SE
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 427250,207250 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 45: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/45.jpg)
Page 33 of 54
NB. Levels quoted in metres Ordnance Newlyn Datum. The value -9999.00 indicates that no survey information is available
Manhole Reference Manhole Cover Level Manhole Invert Level 4102 4101 4203 4201 4202 4104 4103 3404 3001 3002 3403 3401 4401 4001 - 4002
100.65 100.88 101.26 100.97 100.91 101.23 101.36 90.05 99.65 99.97 100.69 100.58 101.41 99.43 - 100.21
98.85 98.68 97.96 96.57 97.56 98.98 98.41 88.37 97.75 98.27 97.81 98.79 98.86 97.88 - 98.66
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken.
![Page 46: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/46.jpg)
Page 34 of 54
Asset Location Search Sewer Map - ALS/ALS Standard/2010_1812670 SP2707SE
10-64971
PROPOSED NETWORK PENDING ADOPTIONAGREEMENT/LEADBITTER CONSTR/10-29935
SYCAMORE DRIVE
AS CONSTRUCTED NETWORK UNDER ADOPTIONAGREEMENT. OXFORD CITIZENS HA
BURFORD ROAD CARTERTON150
225
150
150
150
150
225
150
225
150
225
150
15015
0150
150
225
150
150
300
150
150
150
150
225
150 150
225
225
150150
225
TO BE
ABANDONED
150
225
150
100
1 3
150
150150
225
225
225
150
150
225
150
150
0
150
150
150
150
<<
<<!
.
..
. .
.
.
.
.
..
. .. .
.
. ..
.
. ..
. .
. .
.
..
.
..
..
.
..
..
.
..
.
..
. .
.
. ..
..
...
..
..
..
..
. .. .. .
.. ..
. ..
. ..
.
.
.
.
..
. .
. .
. .
..
.
..
. .. .
..
. .
. ..
. .
.
. .
.
. .
..
. .. .
.
.
.
..
.
..
.
..
.......
..
.
..
.
U
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
%
% %
%
%
%
%
%
%
%%%
%
%
%
%
% %
%
%
%
%
%
%
%
%
%
%%
%
%%
%%
%
%
%%
%
%
%
%
%
%
%
%
%
%
%
%
%%
%
%
%
%
8301
930284078406
84108408
84018409
8402
8405
8404 8403
5201
5202
6201
6504
6401
6301
9301
9401
9402
9201
9202
9102
9403
9303
9101
90
8001
8113
8002
8013
8003
8012
8114
8020
8004
8106
8019
8021
8016
8017
8005
8006
8018
9001
9002
7004
7003
7001
7005
8009
8008
8025
8024
8107
8015
8014
8022
8023
8007
7101 8105
8108
71027107
81017108 81028109 8115
81107109 812081198103811181048117 81168112
81187111 7110
720372027201 82078206
82028201 820382047204
8205
8208
8302
8011
8010
5105
5001
5102
5103
5101
5002
5104
6102
6101
6103
6001
6104
6002
60046005
6108
7103
7106
7002
7105
!
!
!
!
!
=
=
!
!
=
! !!
!!
!
!
!
=
!
=
=!
=
!
=!
!
!
!
!
!
=
!
!
!
!
!
!
!!
!
!
!
!
!
!=
!
=
!
!
!
!
!
!
!!
!
!
!
!
!
!
!
!!
!
!
! !
!
!
!
!
!
=
!
!
!
!
!
!
!
!
=!
!
!
!
!
!
=
=
!
=
=
!!
!
!
!
!
!
!
!
!
!
=
!
!
!
=
!
!
!
!
!
!
CARTERTON
College
Community
Carterton
101.3m
100.3m
99.3m
98.3m
99.8m
96.2m
99.2m
98.8m
ED &
Ward B
dy
El Sub Sta
Playground
UPAVON WAY
DRIVE
B 4477
KESTREL CLOSE PLACE
CLOSE
DOVETREES
NORTHOLT ROAD
LORD
CLOSE
LIME TREE CLOSE
RO
CK
CLO
SEROCK ROAD
FINC
HD
ALE
CLO
SE
LAUREL
BUR
FORD
RO
AD
SYC
AM
OR
E D
RIV
E
POU
LTN
EY
Blaiford
House
Corner House
Blenheim
94.6m
Fairseat
Court
11
9 to 11
116
110
1 to 25
35 to 45
23 to 33
1
6
34
3
14
20
39
8
28
15
12
22
13
35
66
18
50
23
47
3129 30
24
26
32
9
5
75
51
49
120
7
2
21
45
38
10
58
37
17
100
92
19
108
25
88
46
40a
56
16
42
78
63
44
59
27
33
4102
10436
40b
40
65
18
13
2
14
23
1
14
33
35
66
2228
11
1
4
15
37
12
14
32
15
11
31
14
22
26
14
11
7
El Sub S
ta
51
45
1
8
4
4
21
24
24
2
12
El Sub S
ta
1
17
11
27
16
6
1
42
39
1
El Sub Sta
14
31
11
7
38
1
1
14
8
22
12
7
6
3
35
14
28
5
1
63
B 4020
FAULDER AVENUE
ROWAN CLOSE
ROBINSON CLOSE
MERLIN CLOSE
ST JOHN'S
118
SYCAMORE
15 to 21
18
2
21
122
9098
42
5768
1
CLO
SE
El Sub Sta
23
4027
28
UPAVON WAY
15
7
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 427750,207250 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 47: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/47.jpg)
Page 35 of 54
NB. Levels quoted in metres Ordnance Newlyn Datum. The value -9999.00 indicates that no survey information is available
Manhole Reference Manhole Cover Level Manhole Invert Level 8401 9001 9302 9002 9301 8008 8009 8024 8025 8101 7201 8207 8206 8201 7204 8406 9401 9201 8007 8015 8105 8102 8109 8103 8118 8004 8012 8016 8017 8019 8020 8021 8106 8208 8410 8403 8023 8107 8108 8110 8111 8112 8202 8302 8407 8405 8011 8005 8010 8006 8402 8018 9102 9202 5101 5102 5105 5103 5104 5201 5202 6201 6102 6401 6001 6103 6104 6301 6002 6004 6005 6108 7103 6101 6504 9403 9101 9003 9303 7106 7002 7105 8301 8204 8119 8003 8013 8116 8205 8114 8404
100.04 95.82 99.74 95.57 98.07 96.58 96.81 96.71 97.18 100.81 98.46 98.42 98.37 98.02 98.46 n/a 100.2 96.55 96.18 96.52 96.78 97.09 97.19 97.24 97.49 95.68 n/a n/a 95.76 n/a 96 96.42 96.25 97.04 98.43 101.59 96.67 96.6 96.91 97.33 97.6 97.6 97.83 101.59 n/a n/a 95.5 95.5 95.29 95.36 100.37 n/a 95.13 95.62 99.65 100.77 100.98 100.93 100.44 101.32 101.17 100.91 99.87 101.03 99.28 99.82 99.85 100.56 n/a n/a n/a 99.29 n/a n/a 101.04 100.79 94.47 94.08 98.67 99.25 n/a 98.89 98.89 97.78 97.06 96.13 96.11 96.98 97.76 96.26 n/a
96.99 94.54 96.8 94.73 96.27 95.21 95.51 95.09 95.43 99.45 97.28 97.13 96.93 95.84 96.51 97.08 97.55 94.27 94.86 94.63 94.84 95.56 95.32 95.6 96.44 94.07 n/a n/a 94.27 n/a 95.1 95.04 95.15 95.09 96.34 97.59 94.67 94.72 95.06 95.94 96.28 96.43 96.17 100.63 96.88 n/a 93.84 94.03 93.69 94.62 97.12 n/a 93.28 93.61 95.55 95.92 96.18 97.18 97.64 97.17 97.72 98.06 99.28 99.54 97.5 99.47 99.41 98.61 n/a n/a n/a 98.32 n/a n/a 99.78 98.22 93.25 92.08 96.95 98.6 n/a 98.03 97.14 96.41 96.03 94.24 94.28 96.2 96.61 95.03 n/a
![Page 48: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/48.jpg)
Page 36 of 54
Manhole Reference Manhole Cover Level Manhole Invert Level 8409 8104 7001 7005 7101 7102 7110 7203 7202 7003 7004 7107 7108 7109 7111 9402 8408 8001 8014 8117 8203 8002 8120 8113 8022 8115 5001 5002
n/a 96.95 97.51 97.3 98.3 97.87 98.9 98.81 98.5 n/a n/a 98.93 n/a n/a n/a 100.39 n/a 96.47 96.36 97.45 n/a 96.41 97.2 96.73 96.42 97.17 99.05 98.71
96.43 95.85 96.47 95.56 96.72 96.47 97.73 97.59 97.39 n/a n/a 98.12 n/a n/a n/a 98.06 96.68 94.6 94.42 96.16 n/a 94.51 95.75 94.84 94.45 95.74 94.95 95.26
The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken.
![Page 49: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/49.jpg)
Page 37 of 54
ALS Sewer Map Key
Foul: A sewer designed to convey waste water from domestic andindustrial sources to a treatment works.
Surface Water: A sewer designed to convey surface water (e.g. rainwater from roofs, yards and car parks) to rivers or watercourses.
Combined: A sewer designed to convey both waste water and surfacewater from domestic and industrial sources to a treatment works.
Trunk Surface Water
Storm Relief
Vent Pipe
Proposed Thames SurfaceWater Sewer
Gallery
Surface Water RisingMain
Sludge Rising Main
Vacuum
Public Sewer Types (Operated & Maintained by Thames Water)
Notes:1) All levels associated with the plans are to Ordnance Datum Newlyn.
2) All measurements on the plans are metric.
3) Arrows (on gravity fed sewers) or flecks (on rising mains) indicate direction offlow.
4) Most private pipes are not shown on our plans, as in the past, this information hasnot been recorded.
5) ‘na’ or ‘0’ on a manhole level indicates that data is unavailable.
Trunk Foul
Trunk Combined
Bio-solids (Sludge)
Proposed Thames WaterFoul Sewer
Foul Rising Main
Combined Rising Main
Proposed Thames WaterRising Main
Sewer FittingsA feature in a sewer that does not affect the flow in the pipe. Example: a ventis a fitting as the function of a vent is to release excess gas.
Operational ControlsA feature in a sewer that changes or diverts the flow in the sewer. Example:A hydrobrake limits the flow passing downstream.
Air Valve
Dam Chase
Fitting
Meter
Vent Column
Control Valve
Drop Pipe
Ancillary
Weir
End ItemsEnd symbols appear at the start or end of a sewer pipe. Examples: anUndefined End at the start of a sewer indicates that Thames Water has noknowledge of the position of the sewer upstream of that symbol, Outfall on asurface water sewer indicates that the pipe discharges into a stream or river.
Outfall
Undefined End
Inlet
Other SymbolsSymbols used on maps which do not fall under other general categories
Summit
Public/Private Pumping Station/
Invert Level
Change of characteristic indicator (C.O.C.I.)
Other Sewer Types (Not Operated or Maintained by Thames Water)
Areas
Lines denoting areas of underground surveys, etc.
Agreement
Chamber
Operational Site
Conduit Bridge
Foul Sewer
Combined Sewer
Culverted Watercourse
Surface Water Sewer
Gulley
Proposed
Abandoned Sewer
Tunnel
6) The text appearing alongside a sewer line indicates the internal diameter ofthe pipe in milimetres. Text next to a manhole indicates the manholereference number and should not be taken as a measurement. If you areunsure about any text or symbology present on the plan, please contact amember of Property Insight on 0118 925 1504.
P PM
W
![Page 50: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/50.jpg)
Page 38 of 54
Asset Location Search Water Map - ALS/ALS Standard/2010_1812670 SP2605SW
!
¤
¤¤
FW
Def
Issues
1.22m FW
85.9m
88.6m
88.9m
GP
War
d Bdy
1.22m RH
B 44
77
1.22m
RH
FW
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 426250,205250 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 51: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/51.jpg)
Page 39 of 54
Asset Location Search Water Map - ALS/ALS Standard/2010_1812670 SP2605NW
SS
96.3m
88.8m
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 426250,205750 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 52: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/52.jpg)
Page 40 of 54
Asset Location Search Water Map - ALS/ALS Standard/2010_1812670 SP2606SW
100.4m
98.6m
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 426250,206250 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 53: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/53.jpg)
Page 41 of 54
Asset Location Search Water Map - ALS/ALS Standard/2010_1812670 SP2606NW
6" S
TR
ATE
GIC
¤
Field Farm
Alvescot
101.2m
100.9m
101.3m
100.2m
CR
ED & Ward Bdy
Alvescot Field
Alvescot StudCottage
Stable Cottage
Farm House
The Bungalow
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 426250,206750 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 54: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/54.jpg)
Page 42 of 54
Asset Location Search Water Map - ALS/ALS Standard/2010_1812670 SP2607SW
6"
6"
¤
101.6m
99.4m
CR
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 426250,207250 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 55: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/55.jpg)
Page 43 of 54
Asset Location Search Water Map - ALS/ALS Standard/2010_1812670 SP2605SE
Springfield House
FB
91.1mGP
Football Ground
Runway Approach Lights
B 4020
Rosebarn Cottage
(kennels)
GP
B 40
20
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 426750,205250 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 56: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/56.jpg)
Page 44 of 54
Asset Location Search Water Map - ALS/ALS Standard/2010_1812670 SP2605NE
1985
STR
ATEG
IC 2
00m
m D
I
92.5m
93.6m
94.9m
GP
Lay-by
B 4477
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 426750,205750 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 57: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/57.jpg)
Page 45 of 54
Asset Location Search Water Map - ALS/ALS Standard/2010_1812670 SP2606SE
200m
m S
TRAT
EGIC
Kenns Farm
90.8m
B 4477
B 44
77
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 426750,206250 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 58: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/58.jpg)
Page 46 of 54
Asset Location Search Water Map - ALS/ALS Standard/2010_1812670 SP2606NE
6" STRATEGIC
Alvescot Down
Path
(um
)
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 426750,206750 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 59: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/59.jpg)
Page 47 of 54
Asset Location Search Water Map - ALS/ALS Standard/2010_1812670 SP2607SE
Alvescot Down
Alvescot Downs Farm Cottages
Path ( um)
1 2
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 426750,207250 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 60: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/60.jpg)
Page 48 of 54
Asset Location Search Water Map - ALS/ALS Standard/2010_1812670 SP2706SW
100mm
(198
6)ST
RATE
GIC
200
mm
DI
2"(198
6)ST
RATE
GIC
200
mm
DI
100mm
(1986)STRATEGIC 200m
m DI
200mm 2"
200mm STRATEGIC3"
4" ===> DISINFEC
TION TAPPIN
G
2"
100mm
4
12" STRAT
EGIC
250mm
STR
ATE
GIC
250mm STRATEGIC
! !
!
!
!
!
!!
!
!
-
¤
¤¤
¤ ¤ ¤
¤
¤ ¤¤
¤
¤
¤
¤¤
¤ ¤
¤
¤¤
¤
¤
¤
;
BrookShill
Bridge
Kenns Farm
Issues
Rest
CS
93.5m
94.2m
86.0m
86.4m
87.4m
91.6m
94.7m
94.6m
94.3m
ED &
Ward B
dy
Chapel of
Track
Pumping Station
Path
B 44
77
CO
RB
ETT R
OA
D
11
3
22
64
52
38a
70
33
6
19a
60
66
10
54
77a
40
58a
1
29
81
77
79
58
9
23
20
19
5
1
B 4477B 4477
Shill
MINTY CLOSE
38
97.7
29
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 427250,206250 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 61: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/61.jpg)
Page 49 of 54
Asset Location Search Water Map - ALS/ALS Standard/2010_1812670 SP2706NW
4"
6"
4"
4"
4"
3"
6"
4"
4"
4"
3"
4"
3"
4"
4"
3"
3"
3"
100mm
100mm
3"
12"
STR
ATE
GIC
12" STR
ATE
GIC
!
!
!
!
!
!
!
!
!
!
!
!
!
!¤
¤
¤
¤ ¤
¤
¤
¤
¤
¤
¤
¤
¤ ¤
¤ ¤
¤
¤
¤
¤
¤
¤
¤
¤
¤
¤
Alvescot Down
Def
LB
TCB
St Joseph's
CS
98.5m98.8m
98.6m
92.0m
94.5m
96.3m
97.3m
Balancing Tank
School, Carterton
El Sub S
ta
Playground
Catholic Primary
SM
UPAV
ON
WAY
DRIVE
LAVE
ND
ER
B 44
77
PLACE
STIR
LIN
GC
LOS
E
WIN
DSO
R
EDGEWORTH
CARR AVENUE
RICHENS DRIVE
ARU
ND
EL
11
5
4
16
14
9
6
44
43
30
12
1
29
23
40
26
45
31
17
37
25
63
10
33
36
20
70
19
50
24
76
15
3
27
80
75
7984
71
90
96
22
19
1
16
16
1
24
16
29
11
16
30
12
CLO
SE
10
16
1
Balancing Tank
59 30
12
CLO
SE
1
23
14
14
1
14
6
El Sub Sta
4
1
20
78
81
85
91
97
74
70
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 427250,206750 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 62: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/62.jpg)
Page 50 of 54
Asset Location Search Water Map - ALS/ALS Standard/2010_1812670 SP2707SW
3"
3"
3"
3"
3"
3"
3"
3"
3"12
" STR
ATEG
IC
!
!
!
!
!
!
!
!
!
!
¤
¤
¤ ¤
¤
¤
¤
Alvescot
Alvescot Down
Downs Farm
101.4m
100.7m
100.0m
99.3m
Pond
ED &
War
d Bd
y
El Sub Sta
Playgrou
nd
WAR
WIC
K C
LOS
E
B 44
77
STIR
LIN
GC
LOS
E
FALC
ON
CLO
SE
HERON CLO
SE
Sunset View
25
1
14
15
20
13
30
7
8
19
21
10
6
5
3
30
14
1
13
7
8
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 427250,207250 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 63: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/63.jpg)
Page 51 of 54
Asset Location Search Water Map - ALS/ALS Standard/2010_1812670 SP2707SE
4"
125mm
80mm
100m
m
90mm
100mm
DISINFECTION TAPPING
3"
4"
4"
4"
100mm ST
100m
3"
3"
3"
3"
3"
3"
3"3"
3"
100mm
6"
3" PVC
100mm
3"
3"3"
80mm
6"
100mm
100mm
3" 100mm
3"
3"
12" STRATEGIC
12" STRATEGIC
===> DISINFECTION TAPPING
12" PVC
"
(
(
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
¤
¤
¤
¤
¤
¤
¤
¤
¤
¤
¤
¤
¤
¤
¤¤ ¤
¤
¤
¤ ¤
¤¤ ¤
¤
¤
¤
¤
¤¤
¤
¤
¤
¤ ¤
¤
¤
¤¤ ¤¤
¤ ¤
¤
¤
¤
¤ ¤
¤
¤ ¤
¤
¤
¤
¤
CARTERTON
College
Community
Carterton
101.3m
100.3m
99.3m
98.3m
99.8m
96.2m
99.2m
98.8m
ED &
Ward B
dy
El Sub Sta
Playground
UPAVON WAY
DRIVE
B 4020
B 4477
KESTREL CLOSE PLACE
FAULDER AVENUE
CLOSE
DOVETREES
ROWAN CLOSE
NORTHOLT ROAD
LORD
CLOSE
LIME TREE CLOSE
RO
CK
CLO
SEROCK ROAD
FINC
HD
ALE
CLO
SE
LAUREL
BUR
FORD
RO
AD
ROBINSON CLOSE
SYC
AM
OR
E D
RIV
EMERLIN CLOSE
POU
LTN
EY
Blaiford
House
Corner House
Blenheim
94.6m
Fairseat
Court
11
9 to 11
116
110
SYCAMORE
1 to 25
35 to 45
23 to 33
1
6
34
3
14
20
39
8
28
15
12
22
13
35
66
18
50
23
47
3129 30
24
26
32
9
5
75
51
49
120
7
2
21
45
38
10
122
37
17
100
92
19
108
25
88
46
40a
56
16
42
78
57
63
44
59
27
33
4102
10436
40b
40
65
12
31
El Sub Sta
El Sub S
ta
1
18
21
15
14
38
14
1
11
22
18
1
4
17
32
15
1
11
4
35
14
11
23
11
14
1
26
5
7
23
16
21
13
4
33
2
24
24
2
1211
7
37
15
28
27
16
39
14
42
8
1
El Sub Sta
14
31
22
El Sub S
ta
12
45
1
1
14
8
35
22
2
6
3
66
14
28
51
1
7
63
ST JOHN'S
118
15 to 21
58
9098
42
68
28
CLO
SE
7
4027
UPAVON WAY
The width of the displayed area is 500m and the centre of the map is located at OS coordinates 427750,207250 The position of the apparatus shown on this plan is given without obligation and warranty, and the accuracy cannot be guaranteed. Service pipes are not shown but their presence should be anticipated. No liability of any kind whatsoever is accepted by Thames Water for any error or omission. The actual position of mains and services must be verified and established on site before any works are undertaken. Based on the Ordnance Survey Map with the Sanction of the controller of H.M. Stationery Office, License no. WU298557 Crown Copyright Reserved.
![Page 64: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/64.jpg)
Page 52 of 54
ALS Water Map Key
PIPE DIAMETER DEPTH BELOW GROUND
Up to 300mm (12”) 900mm (3’)
300mm - 600mm (12” - 24”) 1100mm (3’ 8”)
600mm and bigger (24” plus) 1200mm (4’)
DistributionMain: The most common pipe shown on water maps.With few exceptions, domestic connections are only made todistribution mains.
Trunk Main: A main carrying water from a source of supply to atreatmentplant or reservoir, or from one treatmentplant or reservoirto another. Also a main transferring water in bulk to smaller watermains used for supplying individual customers.
Supply Main: A supply main indicates that the water main is usedas a supply for a single property or group of properties.
Fire Main: Where a pipe is used as a fire supply, the word FIRE willbe displayed along the pipe.
Metered Pipe: A metered main indicates that the pipe in questionsupplies water for a single property or group of properties and thatquantity of water passing through the pipe is metered even thoughthere may be no meter symbol shown.
Transmission Tunnel: A very large diameter water pipe. Mosttunnels are buried very deep underground. These pipes are notexpected to affect the structural integrity of buildingsshown on themap provided.
ProposedMain: A main that is still in the planningstages or in theprocess of being laid. More details of the proposed main and itsreference number are generally included near the main.
Water Pipes (Operated & Maintained by Thames Water)
HydrantsSingle Hydrant
MetersMeter
ValvesGeneral PurposeValve
Air Valve
End ItemsSymbol indicating what happens at the end of �a water main.
Blank Flange
Capped End
Undefined End
Manifold
Customer Supply
Fire Supply
Emptying Pit
Operational SitesBooster Station
Other
Other (Proposed)
Pumping Station
Service Reservoir
Shaft Inspection
TreatmentWorks
Unknown
Other Symbols
Other Water Pipes (Not Operated or Maintained by Thames Water)
Data Logger
Other Water Company Main: Occasionally other water companywater pipes may overlap the border of our clean water coveragearea. These mains are denoted in purple and in most cases havethe owner of the pipe displayed along them.
Private Main: Indiates that the water main in question is not ownedby Thames Water. These mains normally have text associated withthem indicating the diameter and owner of the pipe.
3” SUPPLY
3” FIRE
3” METERED
L
CF
4”
16”
Water Tower
?
Pressure ControlValve
CustomerValve
![Page 65: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/65.jpg)
Potential Strategic Development Site West of Carterton Foul Water Drainage Infrastructure Report Crest Nicholson Strategic Projects Revision A
X210165/PHS/DKP/August 2010 Page 13 Hannah-Reed
Appendix C British Geological Survey Map Extract
![Page 66: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/66.jpg)
Potential Strategic Development Site West of Carterton Foul Water Drainage Infrastructure Report Crest Nicholson Strategic Projects Revision A
X210165/PHS/DKP/August 2010 Page 14 Hannah-Reed
British Geological Map Sheet 236 – Witney
Key: Alluvium Cornbrash Forest Marble with Limestone Forest Marble Oxford Clay
FMb (L)
KlC
FMb
CB
![Page 67: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/67.jpg)
Potential Strategic Development Site West of Carterton Foul Water Drainage Infrastructure Report Crest Nicholson Strategic Projects Revision A
X210165/PHS/DKP/August 2010 Page 15 Hannah-Reed
Appendix D Foul Water Management Options
![Page 68: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/68.jpg)
![Page 69: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/69.jpg)
Potential Strategic Development Site West of Carterton Foul Water Drainage Infrastructure Report Crest Nicholson Strategic Projects Revision A
X210165/PHS/DKP/August 2010 Page 16 Hannah-Reed
Appendix E Site Investigation Report
![Page 70: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/70.jpg)
Geotechnical andGeoenvironmentalConsultants
GROUND Our Ref: S.3909
INVESTIGATIONSERVICES Your Ref:
28 February 2011Debbie PrichardHannah-ReedMarlborough HouseHigh StreetKidlingtonOX5 2DN
Dear Debbie
PERMEABILITY TESTING - LAND WEST OF CARTERTON, OXFORDSHIRE
We have completed the soil infiltration tests in respect of the above and accordinglyenclose location plan, trial pit logs and permeability test results.
In summary, three trial pits were excavated to depths of between 1.40m and 1.80m.Each pit was then filled with potable water which was allowed to drain whilemeasurements of the falling head were recorded over a three day period.
The results of the excavation work reveal the geology to comprise a capping oftopsoil over Forest Marble, which consists of thin layers of clayey and sandylimestone brash and sandy clay resting upon weak to moderately strong thinly andthickly bedded limestone rock. This rock layer resisted penetration by theexcavation equipment in TP2 and TP3. TP2 and TP3 remained dry duringexcavation work while in TP1 perched groundwater was recorded entering the pit at0.60m depth.
The results of the permeability testing indicate the Forest Marble has a low tomedium permeability classification with calculated soil infiltration rates of 4.23 x10-7 m/sec and 2.59 x 10-6 m/sec. The infiltration rate in TP1 was not calculated duelack of robust data.
15 Bostock Road, Abingdon, Oxon OX14 1DPTel (01235) 521631 Fax (01235) 553972Web: www.gis-geotec.come-mail: [email protected]
![Page 71: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/71.jpg)
Hannah-Reed Permeability testing -Land west of Carterton,
28 February 2011 Report No. S.3909 Oxfordshire
Martyn Paul Boughton BSc (Hons) Julian M Huxham BSc (Hons)FGS
Page 2
PERMEABILITY ASSESSMENT AND SOAKAWAY DESIGN
Surface water currently infiltrates the open soft landscaping either percolatingdirectly into the soil fabric or via surface runoff down gradient into channels andvalleys.
There were areas of surface flooding and pooling developed around localiseddepressions or in areas where the ground topography was either flat or level withconsequential slow vertical infiltration of surface water into the soil.
New development at the site is likely to increase the rate of surface runoff ifdrainage waters are discharged directed into localised soakage chambers withoutsome degree of attenuation. The implications of the development on surface waterrunoff will be evaluated via a Flood Risk Assessment (FRA) however that is likely toconclude that the drainage strategy for the site should be based on a preference forrainwater harvesting and infiltration drainage with attenuation to mitigate thepotential for increased run off.
In consideration of the drainage area (for example 50m2) and the permeability testresults, the following table provides indicative infiltration drainage design.
Table 1 – Indicative Infiltration Drainage Design
Infiltration TestLocation and depth
Slowest InfiltrationRate
Soakaway for 50m2
Impermeable Area for 1in30 year up to 24 hour event
(Note 1)
Comments
TP1 1.45m No calculation N/A Further testingrequired in thislocality
TP2 1.40m 2.59 x 10-6 m/sec 1.88m x 1.99m (L x W) x1.05m effective depthHalf empty time – 15 hours
Cubiform chamber willsuit ground conditions
TP3 1.80m 4.23 x 10-7 m/sec 15.81m x 0.24m (L x W) x1.05m effective depthHalf empty time – 23 hours
Long narrow pitrequired to dischargewaters effectively.Cubiform chamberunacceptable
Notes:1. BRE 365 Soakaway Design methodology, based on drainage through soakaway sides only (effective
depth) with a factor of safety of 1 is applied as it assumes the base may silt up with time, granularbackfill porosity with 30% free volume design aims for a soakaway to be les than half full in 24hours following a storm event based on M5 - 60 minutes rainfall and 60 minutes rainfall duration
2. No allowance has been made for possible climate change effects. It may be necessary to include anallowance of +20% to the peak rainfall intensity for design storm events.
![Page 72: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/72.jpg)
Hannah-Reed Permeability testing -Land west of Carterton,
28 February 2011 Report No. S.3909 Oxfordshire
Martyn Paul Boughton BSc (Hons) Julian M Huxham BSc (Hons)FGS
Page 3
Of course, the indicative infiltration drainage design is for illustrative purposes only,a more specific design based on the actual land area available and various stormduration permutations should be considered. It should be noted these calculatedvalues have been based on a software programme produced from the official BREDigest 365 Soakaway Design.
It should be noted that the (f) values were extrapolated on the basis of a single setof results for TP3 and two sets of results for TP2 and not the standard three sets.Therefore the results do not necessarily reflect natural working conditions wherebythe soil has previously been saturated. The designer should therefore take this intoconsideration when designing the soakaway chambers.
The indicative infiltration drainage design shows that infiltration drainage couldform a component of the drainage strategy for the development of the site. Theunderlying rock layer, which was not penetrated should be further exploited withadditional testing to confirm its effectiveness as a drainage medium which weanticipate may yield higher permeability potential. We recommend addition testingis conducted over a more intensive area at greater depths and within a relatively dryperiod to avoid surface waters entering the test pits.
Permissions to drain into the ground should be sought from the EnvironmentAgency given the site overlies a Secondary (A) Aquifer. It is anticipated acceptancewill be granted for provision of discharge of all roof drainage without demurral buthardstanding drainage will require installation of interceptors. It is likely that adepth limit will be imposed on the level of the soakaway chambers.
Should you have any queries regarding the above, please do not hesitate to contactthe undersigned.
For and on behalf ofGround Investigation ServicesYours sincerely
Martyn Boughton (Partner)
Email: [email protected]
Enc Site Plan and Infiltration Test Results
![Page 73: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/73.jpg)
Trial Pit position (infiltration Test)
Land west of Carterton, Oxfordshire
Fig
1
Ground Investigation Report No.
Services S.3909TRIAL PIT LOCATION PLAN
Date: February 2011 Fax 01235 553972
CLIENT: Hannah-Reed Ground Investigation Services
15 Bostock Road
SITE: Abingdon OX14 1DP
Tel 01235 521631
Five
TP1
TP2
TP3
![Page 74: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/74.jpg)
Depth (m)
Brown clayey sand
TOPSOIL
Soft orange brown sandy CLAY
Medium dense rubbly LIMESTONE brash with some to much interbedded
orange brown sandy clay
Firm light grey mottled orange brown CLAY with some to much fine gravel sized
limestone fragments and a little sand pockets
Weak to moderately strong thinly bedded LIMESTONE rock with a little interbedded
orange brown clayey sand
FOREST MARBLE
Test Pit Dimensions: 1.40 x 0.55 x 1.45m (Length x width x depth - metres)
Date of Testing: Logged by: MPB
Checked by: JMH
SOAKAGE TEST DATA
Elapsed
time in
Minutes Test 1 Test 2 Test 3#
0 0.51
30 0.51
60 0.51
90 0.51
120 0.505
180 0.505
240 0.50
300 0.495
360 0.49
1410 0.44
1590 0.44
1770 0.44
2850 0.44
3030 0.44
REMARKS: It was not possible to complete testing in accordance with BRE Standards due to rising
water levels as a result of perched groundwater entering the pit
# Tests 2 and 3 not undertaken
CLIENT: Hannah-Reed BRE DIGEST 365 : 1991
SITE : SOAKAWAY DESIGN
Date: February 2011
TEST PIT DATA TRIAL PIT NO. 1
Strata Description
GL
0.60
1.30
0.20
0.90
Weather: Mild, dry and bright
Depth to Water (metres)
#
14-16 February 2011
Groundwater strike: 0.60m (seepage)
Groundwater standing:
Fig.Services
15 Bostock Road, Abingdon OX14 1DP S.3909 2Tel 01235 521631 Fax 01235 553972
INSUFFICIENT DATA TO CALCULATE
Land west of Carterton, Oxfordshire
Ground Investigation
PERMEABILITY TESTReport No.
SOIL INFILTRATION RATE, f
![Page 75: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/75.jpg)
Depth (m)
Brown clayey sand with some limestone fragments
TOPSOIL
Medium dense rubbly LIMESTONE brash with some to much interbedded orange brown
sandy clay
Firm light grey mottled orange brown CLAY with some fine gravel sized
limestone fragments
Moderately strong LIMESTONE rock
FOREST MARBLE
Test Pit Dimensions: 1.40 x 0.55 x 1.40m (Length x width x depth - metres)
Date of Testing: Logged by: MPB
Checked by: JMH
SOAKAGE TEST DATA
Elapsed
time in
Minutes Test 1 Test 2 Test 3#
0 0.60 0.43
30 0.65 0.48
60 0.69 0.53
90 0.73 0.56
120 0.77 0.60
180 0.83 0.66
240 0.88 0.71
300 0.92 0.75
360 0.79
400 0.83
1140© 1.40©
1350@ 1.40@
1410 1.26
1530 1.29
2101© 1.40©
REMARKS: © Interpolated time when dry
@ Actual time when dry
# Test 3 not undertaken due to limited time constraints
* Soil infiltration rate based on extrapolated data
Test 2 used to calculate infiltration rate
CLIENT: Hannah-Reed BRE DIGEST 365 : 1991
SITE : SOAKAWAY DESIGN
Date: February 2011
SOIL INFILTRATION RATE, f
2.59 x 10-6 m/sec *
Land west of Carterton, Oxfordshire
Ground Investigation
PERMEABILITY TESTReport No. Fig.
Services15 Bostock Road, Abingdon OX14 1DP S.3909 3Tel 01235 521631 Fax 01235 553972
Groundwater standing: Dry Weather: Mild, dry and bright
Depth to Water (metres)
1.15
1.40
14-16 February 2011
Groundwater strike: Dry
0.35
TEST PIT DATA TRIAL PIT NO. 2
Strata Description
GL
![Page 76: X210165 Foul Drainage Options Report Rev A March 2011planningconsultation.westoxon.gov.uk/gf2.ti/awf...3.4 The Peak Flow rate has been estimated in accordance with BS EN 752-1:1996](https://reader033.vdocuments.us/reader033/viewer/2022060922/60ae666b4c117e4bc7386a1d/html5/thumbnails/76.jpg)
Depth (m)
Brown clayey sand with some limestone fragments
TOPSOIL
Soft to firm orange brown sandy CLAY with some fine to medium gravel sized
limestone fragments
Medium dense rubbly LIMESTONE brash with some to much interbedded orange brown
sandy clay
Moderately strong LIMESTONE rock
FOREST MARBLE
Test Pit Dimensions: 1.50 x 0.55 x 1.80m (Length x width x depth - metres)
Date of Testing: Logged by: MPB
Checked by: JMH
SOAKAGE TEST DATA
Elapsed
time in
Minutes Test 1 Test 2 Test 3#
0 0.53
30 0.57
60 0.63
90 0.66
120 0.70
180 0.75
240 0.80
1290 1.05
1470 1.06
1650 1.07
2730 1.13
2910 1.14
12105© 1.80©
REMARKS: © Interpolated time when dry
# Test 2 and 3 not undertaken due to limited time constraints
* Soil infiltration rate based on extrapolated data
Test 1 used to calculate infiltration rate
CLIENT: Hannah-Reed BRE DIGEST 365 : 1991
SITE : SOAKAWAY DESIGN
Date: February 2011
Fig.Services
15 Bostock Road, Abingdon OX14 1DP S.3909 4Tel 01235 521631 Fax 01235 553972
SOIL INFILTRATION RATE, f
4.23 x 10-7 m/sec *
Land west of Carterton, Oxfordshire
Ground Investigation
PERMEABILITY TESTReport No.
14-16 February 2011
Groundwater strike: Dry
Groundwater standing: Dry Weather: Mild, dry and bright
Depth to Water (metres)
#
1.80
TEST PIT DATA TRIAL PIT NO. 3
Strata Description
GL
0.35
0.85