wynn everett transportation...
TRANSCRIPT
![Page 1: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/1.jpg)
Wynn Everett Transportation Plan
June 20, 2014
![Page 2: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/2.jpg)
Overview
2
![Page 3: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/3.jpg)
Ideal Location in Regional Transportation Network
3
![Page 4: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/4.jpg)
Holistic, Multi-Modal, Sustainable Transportation Strategy
Rail
Buses
Bikes
Cars
Boats
Walking
4
Wynn Everett
![Page 5: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/5.jpg)
MEPA TimeLine
• Expanded Environmental Notification Form (EENF), filed May 31, 2013
• Secretary’s Certificate on EENF and scope of DEIR, issued on July 26, 2013
• Draft Environmental Impact Report (DEIR), filed December 16, 2013
• Secretary’s Certificate on DEIR and scope of FEIR, issued on February 21, 2014
• FEIR filing June 30th—Secretary’s Certificate anticipated by August 15, 2014
EENF DEIR Certificate FEIR Certificate Certificate
5
![Page 6: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/6.jpg)
• President, The Dirigo Group
– International consulting practice focused on management of large capital projects
– Example projects in Boston, Abu Dhabi, Saudi Arabia
• Senior Lecturer – Massachusetts Institute of Technology and Harvard Business School
– 22 years of graduate school teaching on project delivery and development
– Additional teaching in China, Argentina, UK, Peru, UAE
• Role on Wynn Everett Project
– Development Manager – responsible for all aspects of onsite development
• Experience
– Nearly 30 years of managing complex capital projects
– Chief Operating Officer for Allston Development Group, the real estate development arm of Harvard University
– Director of Capital Programs and Logan Modernization for the Massachusetts Port Authority
– Consulting work throughout the world
Chris Gordon, P.E.
6
![Page 7: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/7.jpg)
• Education
– Masters Degree in Civil Engineering, MIT
– Bachelors Degree in Civil Engineering, University of Maine
– Licensed Professional Engineer
• Awards & Recognition
– 2001 Person of the Year for the Construction Management Association of America for both the New England region and the country
– 2000 Government Engineer of the Year by the Boston Society of Civil Engineers
– 2003 Manuel Carballo Governor’s Award for Excellence in Public Service
– Governor appointee as Co-Chair of the Special Commission on Public Construction Reform that, in 2004, resulted in landmark reform of all public construction laws in the Commonwealth.
– Board member of the National Research Council’s Board on Infrastructure and the Built Environment
– Trustee of the Engineering Center Education Trust, a corresponding editor of the American Society of Civil Engineers Engineering Management Journal, and has been a speaker at numerous conferences.
Chris Gordon, P.E. (cont.)
7
![Page 8: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/8.jpg)
Summary of Qualifications
• B.S. in Civil Engineering, Rensselaer Polytechnic Institute, 1993
• Registered Professional Engineer in MA, CT, NY, RI, NH, NC
• Certified Professional Traffic Operations Engineer (PTOE) by the Institute of Transportation Engineers (ITE)
• Over 21 years’ experience in traffic engineering and transportation planning
Representative Project Experience
• Seaport Square in South Boston
• Bulfinch Triangle development parcels, Boston
• Residences @ Malden Station, Malden
• East Milton Square Parking and Access Study, Milton
• EMC Westborough-Southborough Campus*
• Water Street Mills, Stonington, CT*
• I-93/I-95 Interchange Transportation Study, Woburn/Reading/Stoneham*
*completed while at another firm
Keri Pyke, P.E., PTOE
8
![Page 9: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/9.jpg)
Transportation Analysis
9
![Page 10: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/10.jpg)
Transportation Analysis
• Traffic impact analysis focuses on intersections; they are the most constrained element of the transportation system
• Primary measure of
effectiveness (MOE) = Level of Service (LOS)
• In urban areas, LOS D is
considered acceptable.
10
![Page 11: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/11.jpg)
Transportation Analysis Steps
11
Existing Conditions No-Build
Conditions Build Conditions • Collect traffic data
• Analyze intersections
• Analyze transit services
• Review safety
• Project to horizon year • Add background growth
rate • Add other
projects’ trips • Re-analyze
intersections/transit
• Add Project’s trips to No-Build volumes
• Re-analyze intersections/transit
Build Mitigated Conditions
• Propose mitigation for locations with impact • Re-analyze intersections/transit to demonstrate that
impact is mitigated • Mitigate to No-Build condition (LOS)
![Page 12: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/12.jpg)
Trip Assignment Process
12
Trip Generation
• ITE’s Trip Generation Manual, 9th edition, 2012 • Trips generated based on land use, usually floor area, can also
be rooms/units or employees • Trip rates vary by time period (daily, peak hour) • No ITE data for gaming component; collected data at 6 other
gaming facilities • For a multi-use development, determine “captured” trips • Credit for “pass-by” trips • Sum all land uses to determine total vehicle trips
![Page 13: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/13.jpg)
Trip Assignment Process
13
Trip Generation Mode Split
• Disaggregates vehicle trips to person trips • VOR varies by type of trip (work, home, recreation,
etc.) and by vehicle type • Apply VOR to unadjusted vehicle trips • Apply percentage by mode (auto/taxi, transit, tour
bus, walk/bike, water shuttle, etc.) • Mode split percentages based on U.S. Census data
and TMG market analysis • For modes that use autos or other non-transit
vehicles, divide by VOR to convert person trips back to vehicle trips
(total vehicle trips) x (VOR) x mode split (%) = person trips by mode person trips /VOR = adjusted vehicle trips
![Page 14: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/14.jpg)
Trip Assignment Process
14
Trip Generation Mode Split
Trip Distribution/ Assignment
• Assigns vehicle trips to the roadway network • For patrons, based on TMG market study • Patron trips assigned to Project site garage • For employees, based on city/town populations
within one hour’s drive of the site • Employee trips assigned to three off-site parking
locations
![Page 15: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/15.jpg)
Trip Assignment Process
15
Trip Generation Mode Split
Trip Distribution/ Assignment
Project-generated Trips =
![Page 16: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/16.jpg)
MEPA MA Environmental Protection Act
• Requires that state agencies and major projects involving state agencies study the environmental consequences of their actions.
• “Use all practicable means and measures to minimize damage to
the environment," by studying alternatives to the proposed project, and developing enforceable mitigation commitments, which will become conditions for the project if and when they are permitted.
• It is NOT a permitting process • It DOES include significant public participation, seeking comment
from citizens, state, regional and local agencies.
16
![Page 17: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/17.jpg)
EENF Transportation Analysis
• Evaluated existing traffic volumes at 5 locations • Summarized existing pedestrian, bicycle, and transit
facilities • Summarized future conditions analysis in DEIR
– Future background traffic growth – Permitted projects to be included in No- Build case – Other transportation network improvements
• Initial estimates of project trip generation • Proposed study area for DEIR (43 locations) • Proposed recommended access to Project site • Proposed TDM measures to reduce auto trips • Proposed transportation mitigation
17
![Page 18: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/18.jpg)
EENF Study Area
18
![Page 19: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/19.jpg)
EENF – Proposed DEIR Study Area
19
![Page 20: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/20.jpg)
DEIR Study Area
20
32
![Page 21: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/21.jpg)
DEIR Transportation Analysis
• Analyzed intersection capacity at 57 locations (7 cities)
• Analyzed transit capacity for MBTA Orange Line and local bus service
• Prepared detailed Project trip generation
• Prepared detailed Project trip distribution
• Proposed recommended access to Project site
• Proposed TDM measures to reduce auto trips
• Proposed transportation mitigation
21
![Page 22: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/22.jpg)
DEIR – Comparison of Roadway and Resort Friday Peak Hours
22
![Page 23: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/23.jpg)
Trip Distribution – Patrons
23
![Page 24: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/24.jpg)
Trip Distribution – Employees
24
![Page 25: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/25.jpg)
DEIR and FEIR Travel Mode Shares
25
DEIR FEIR
Travel Mode Patrons Employees Patrons Employees
Automobile
Park on-site 69% 0% 63% 0%
Taxi 8% 0% 8% 0%
Park remotely (connect to employee shuttle) 0% 44% 0% 41%
Subtotal 77% 44% 71% 41%
Public Transportation
Orange Line (connect to transit shuttle) 10% 20% 10% 20%
Local bus 0% 10% 0% 10%
Water transportation 3% 3% 6% 3%
Subtotal 13% 33% 16% 33%
Tour Bus 10% 0% 10% 0%
Premium Park and Ride 0% 0% 3% 3%
Walk/Bicycle 0% 3% 0% 3%
Neighborhood Employee Shuttle 0% 20% 0% 20%
Total 100% 100% 100% 100%
![Page 26: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/26.jpg)
DEIR and FEIR Trip Summaries
26
DEIR FEIR
Patron Vehicle
Trips
Employee Vehicle
Trips
Total Vehicle
Trips
Patron Vehicle
Trips
Employee Vehicle
Trips
Total Vehicle
Trips
Friday Daily (vpd) In 8,983 1,793 10,776 8,289 1,459 9,748
Out 8,983 1,793 10,776 8,289 1,459 9,748
Total 17,966 3,586 21,552 16,578 2,918 19,496
Friday p.m. Peak Hour (vph)
In 745 126 871 723 12 735
Out 703 169 872 672 12 684
Total 1,448 295 1,743 1,395 24 1,419
Saturday Daily (vpd) In 10,656 2,072 12,728 10,354 1,817 12,171
Out 10,656 2,072 12,728 10,354 1,817 12,171
Total 21,312 4,144 25,456 20,708 3,634 24,342
Saturday Afternoon Peak Hour (vph)
In 880 148 1,028 880 135 1,015
Out 836 177 1,013 824 114 938
Total 1,716 325 2,041 1,704 249 1,953
![Page 27: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/27.jpg)
Change in Friday p.m. Peak Hour Volumes
Location
Existing (2013)
Volume (vph)
No-Build (2023)
Volume (vph)
Project-generated Trips (vph)
Build (2023)
Volume (vph)
Change in Volume Build to No-Build
(%)
Alford Street (Route 99) Bridge, Charlestown
2,702 3,220 540 3,760 17%
Rutherford Avenue (Route 99), north of City Square, Charlestown
2,814 2,955 197 3,152 7%
Mystic Valley Parkway (Route 16), east of Wellington Circle, Medford
5,778 6,764 105 6,869 2%
Revere Beach Parkway (Route 16), east of Sweetser Circle, Everett
4,886 5,417 112 5,529 2%
Note: Friday p.m. peak hour of roadways is 4:30-5:30 p.m. Wynn’s peak hour occurs between 9:00-10:00 p.m. on a Friday night.
27
![Page 28: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/28.jpg)
Transportation Plan
• Rail Connections
• MBTA Subway Connections
• Water Transportation
• Premium Park and Ride
• MBTA Local Bus
• Pedestrians and Cyclists
• Off-site Employee Parking
• Improved Roadway Network
• Transportation Demand Management (TDM)
28
![Page 29: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/29.jpg)
Rail Connections
29
![Page 30: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/30.jpg)
30
MBTA Subway Connections
![Page 31: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/31.jpg)
Water Transportation
31
![Page 32: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/32.jpg)
Premium Park and Ride
32
![Page 33: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/33.jpg)
MBTA Local Bus
33
![Page 34: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/34.jpg)
Pedestrians and Cyclists
34
![Page 35: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/35.jpg)
Off-site Employee Parking
35
Malden Center
Wellington Station
Lower Broadway/ Beacham Street area
![Page 36: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/36.jpg)
Improved Roadway Network
36
![Page 37: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/37.jpg)
Wynn’s Proposed Transportation Improvement Plan $50 Million
37
Wellington Circle, Medford – widening, signal timing
improvements
Santilli Circle, Everett – flyover, widening, signal
improvements
Sweetser Circle, Everett– pavement markings, signing
improvements
Sullivan Square and Cambridge Street, Boston – widening,
signal upgrades
Lower Broadway, Everett – widening, signal timing and streetscape improvements
![Page 38: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/38.jpg)
Comparison of Transportation Mitigation among Large Projects in the Commonwealth
38
*Amount includes improvements to utility infrastructure and open space
Location
Development Area
(million square feet)
Developer's Transportation
Mitigation ($ Millions)
Public Expenditure ($ Millions)
Seaport Square, South Boston 6.3 31 0
Assembly Row, Somerville 5.7 20 (100)
NorthPoint, Cambridge 5.2 1 (120)
Wynn Everett 2.6 50 0
Station Landing, Medford* 1.1 5 0
![Page 39: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/39.jpg)
Lower Broadway Improvements
39
![Page 40: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/40.jpg)
40
Lower Broadway Improvements Preferred Site Access Plan
![Page 41: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/41.jpg)
41
Lower Broadway Improvements Alternate Site Access Plan
![Page 42: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/42.jpg)
42
Lower Broadway Improvements
![Page 43: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/43.jpg)
43
Lower Broadway Improvements
![Page 44: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/44.jpg)
44
Santilli Circle Improvements
![Page 45: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/45.jpg)
45
Sweetser Circle Improvements
![Page 46: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/46.jpg)
46
Wellington Circle Improvements
![Page 47: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/47.jpg)
47 Sullivan Square Improvements
![Page 48: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/48.jpg)
48
Truck Loop - Everett
![Page 49: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/49.jpg)
Transportation Demand Management
• Transportation coordinator on-site
• Guaranteed ride home
• Ride sharing program
• MBTA Charlie Cards provided for employees and sold on-site for guests
• Provide information regarding public transportation services to employees and guests
• ZipCar on-site
• Hubway bike share on-site
• Covered, secure bicycle parking in parking garage
• Electric vehicle charging stations in parking garage
• Employee and patron shuttles to Malden and Wellington stations
• Water shuttle to downtown Boston
• Aggressive marketing and incentive plans
49
![Page 50: Wynn Everett Transportation Planmassgaming.com/wp-content/uploads/Wynn-MA-Transportaion-Plan-6.… · Wynn Everett Transportation Plan ... –Permitted projects to be included in](https://reader031.vdocuments.us/reader031/viewer/2022022012/5b1600d27f8b9a5b4b8c9839/html5/thumbnails/50.jpg)
Summary
• Comprehensive, exhaustive analysis
• Holistic, multi-modal approach
• All impacts mitigated
• On-going monitoring and refinements
• High performing transportation network
50