7/27/2019 WRSWI LACE-Network Element Creation
1/72
1 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
WCDMA Radio
Planning Specialist Work InstructionsL A C E
- network element creation
-
7/27/2019 WRSWI LACE-Network Element Creation
2/72
2 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
Network Element creation with LACE
This document presents step-by-step instructions for addition of new networkelements to existing or in-build UMTS network from parameters flow point of view
It is designed mainly for radio network planners
-
7/27/2019 WRSWI LACE-Network Element Creation
3/72
3 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
ROLLOUT PHASE
Network Element creation with LACE
PROJECTPREPARATION
PHASE
NE CREATION& INTEGRATION
TASKS
VALIDATIONTASKS
Phase consists ofone-time preparationtasks like design ofexcel templates andPE adjustments toproject needs.
Phase consist of two main groups of tasks:
First, which is the core of LACE, focuses on activities regardingradio parameters flow from project excelsheet via PlanEditor toRNC.
Second is about verification of implemented data.
-
7/27/2019 WRSWI LACE-Network Element Creation
4/72
4 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
LACE steps for new network element creation1/5
Steps forproject preparation
1. Under Excel prepare 2 templates in which you will keep NodeB, Cells(in one workbook) and Neighbours relations (in separate workbook).You will use one Exel file per RNC to keep track for your networkobjects.
2. Under PlanEditordefine CSV mapping. This mapping is set of rulesapplied during importing to data taken from your excel sheet, in orderto put it into PlanEditor.
3. Under PlanEditorverify if your project default settings for NodeB, Cellsand Neighbours are the same as default PlanEditor templates. If not,under PlanEditorupdate the default template values.
-
7/27/2019 WRSWI LACE-Network Element Creation
5/725 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
LACE steps for new netwrok element creation2/5
Steps forcreation of network elements
4. Under Excel type in data for new elements to be created in RNC. Savethe excelsheet.
5. Under Excel save the data as CSV file. One file for NodeBs and Cells,The second file for adjacencies.
6. Under Radio Access Configurators Planning Interface upload andsave current parameters of RNC to which you are going to add newnetwork element.
7. Under PlanEditorimport the plan downoaded in step 6. Whenimporting choose option import actual data....
8. Under PlanEditorcheck that objects like CoCo, HOPS and FMCS doexist in the RNC. If not create them.
-
7/27/2019 WRSWI LACE-Network Element Creation
6/726 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
LACE steps for new netwrok element creation3/5
Steps forcreation of network elements-cont.
9. Under PlanEditorcreate and activate new planwith RNC RN 1.5profile.
10. Under PlanEditorimport CSV file with WBTS and WCEL objects. Thisis the one of the two files that you have prepared in step 5.
11. Under PlanEditor import second CSV file with ADJS objects. This filehas been also prepared in step 5.
12. Under PlanEditorvalidate parameters of newly created objects.
13. Under PlanEditorexport the plan to XML RAML 1.0 file.
14. Under Radio Access Configurator Planning Interface download theplan to RNC.
-
7/27/2019 WRSWI LACE-Network Element Creation
7/727 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
LACE steps for new netwrok element creation4/5
Steps forvalidation of plan downloaded to RNC.
15. Under Radio Access Configurator Planning Interface upload the planfrom RNC (in the same way as in step 6)
16. Under Plan Editor import the uploaded actual RNC data on top ofcurrent plan. Switch on logfile during the import.
17. Under Plan Editoranalyse the logfile to check differences betweenyour plan and the one implemented. Take actions if needed.
18. Under Plan Editoranalyse export bufferwith exclude option to checkparameters which are missing in network although they wererequested in your plan. Take actions if needed.
19. To add new set of network elements go to step 4
-
7/27/2019 WRSWI LACE-Network Element Creation
8/728 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to prepare excel templates for RANobjects creation 1/5
Excel templates are just predefined files which will include RF data that isparameters of RAN objects like WBTS, WCEL and ADJS
These templates will be used not only to store the data, but also to transfer yourdata to the network to make it running
You need one set of templates per one RNC
The format of each template can be very flexible, and project dependent,
however you have to follow certain rules like:
1. Keep WBTS and WCEL data in one workbook and ADJS in separateworkbook or file
2. Keep minum required parameters for each objects like Ids, Names,Scrambling code, etc. Common parameters will be taken from templates.
3. Keep information about WBTS and ADJS objects in rows it means eachrow of excelsheet represents one WBTS (or ADJS) while each columnrepresents parameter for the object
4. Keep information about WCELs in one row which refers to their parentWBTS
-
7/27/2019 WRSWI LACE-Network Element Creation
9/72
9 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to prepare excel templates for RANobjects creation 2/5
Here you can see an example of template file. It includes some values fordemonstration purposes
The file consists of two workbooks WCEL which includes minimum set of parameters for WBTS and
WCEL objects definition ADJS which includes minimum set of parameters for ADJS objects
definition
Double click the icon to see the file
-
7/27/2019 WRSWI LACE-Network Element Creation
10/72
10 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to prepare excel templates for RANobjects creation 3/5
Example of WCEL workbook consists of 32 columns A-AE. They includeparameters which are obligatory for WBTS and WCEL creation under RNC
Column A includes data reference to parent RNC. Columns B-D include data of WBTS object.
Please note that column D template name, if empty, refers to PlanEditor default template forWBTS. If not empty then it refers to template with given name. Setting of remaining (notmentioned in columns B-D) WBTS parameters is done during import to PlanEditor basing onthese template values.
Columns E-M as N-V and W-AE include data of WCEL objects. As in this example template there are 3 WCELs per WBTS. Each of mentioned column groups
includes parameters for single WCEL. So in one row parameters for 3 WCELs are provided Similarly to WBTS also each of 3 WCEL objects has template name column avaliable.
-
7/27/2019 WRSWI LACE-Network Element Creation
11/72
11 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to prepare excel templates for RANobjects creation 4/5
Example of ADJS workbook consists of 22 columns A-V. They includeparameters which are obligatory for ADJS creation under RNC
Columns A and B includes data reference to parent RNC and WBTS Columns C-V include data of ADJS objects.
Please note that columns E template name and F template set if empty, refer to PlanEditordefault template and template set for ADJS. If not empty then they refer to templates with givennames. Setting of remaining ADJS parameters is done during import to PlanEditor basing onthese templates values.
Columns V includes AdjCPICHTxPwr parameter, please note that itsvalue is not user interface value but RAC db value.
It means that istead of providing for example 33dBm here one should provide value multipliedby 10 in this example 330.
H t l t l t f RAN
-
7/27/2019 WRSWI LACE-Network Element Creation
12/72
12 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
SUMMARY Excel templates are needed as input for the LACE process
You should define global project templates for WBTS,WCEL and ADJS
Your templates should keep minimum number of parameters, ascommon parameters can be easily taken from PlanEditor templates
during import In order to be easily handled by PlanEditor parameters should be defined
in columns while network objects should be put in rows
How to prepare excel templates for RANobjects creation 5/5
BACK
-
7/27/2019 WRSWI LACE-Network Element Creation
13/72
13 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to define CSV mapping under PE 1/12
CSV (comma separated values) mapping is part of import interface ofPlanEditor .
It enables easy way to grab the parameters from excelsheet templates intoPlanEditor: 1) Excelsheet is saved as CSV file 2) CSV file is imported to PE3) PE import module interpretes CSV data with defined CSV mapping.
Columns of our excel templates standing for parameters are mapped toparameter structure valid for PE. That is why proper construction of exceltemplates (keep parameters in columns) is so important.
Definition of CSV mapping is one-time process. You set it once per PEdatabase that is mdb file. If you will decide to use several mdb files (oneper RNC for example) you have to remember to set CSV mapping for eachof them. Also you need to update the mapping when you decide to changethe structure of excel template (in order to add new parameter for example).
This definition can be done manually, but it might be more convinient to
prepare a special file with mapping this file can be used many times fordifferent mdb files for example.
-
7/27/2019 WRSWI LACE-Network Element Creation
14/72
14 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to define CSV mapping under PE 2/12There is following excel sheet with data to be inputed to PE:
Data of the exel sheet might be also presented like this:
RNC
WBTS
WCEL
RNC
WBTS
WCEL
RNCId=205
RNCName=RN25
Template_name=
WBTSId= 3307
WBTSName=3307U
Template_name=
CId= 13307
LCRId=1
Template_name=
LAC=10205
RNCId=205
RNCName=RN25
Template_name=
WBTSId= 3307
WBTSName=3307U
Template_name=
CId= 13307
LCRId=1
Template_name=
LAC=10205
NOTE:In real life projects you will probobly never add RNCobjects to your excel sheet, so please take it as anexample only. Quite realistic example of exceltemplate was provided on slide 9.
To put this data from excelsheet to Plan Editor weneed to define specialmapping rules under PEimport interface, which willtranslate data from excel
format to PE format.
-
7/27/2019 WRSWI LACE-Network Element Creation
15/72
15 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to define CSV mapping under PE 3/12
1. Go to Import
2. Choose Importprofiles...
3. Select DefaultCSV Profile from
Profile Name
4. Select ... fromCSV Mapping
-
7/27/2019 WRSWI LACE-Network Element Creation
16/72
16 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to define CSV mapping under PE 4/12
Object Number specifies howmany types ofnetwork elementsare included inCSV file. Here wecan see 3 objects
Class is relatedwith ObjectNumber. This issome kind ofmapping. In thisexample we cansee suchmapping: ObjectNumber 1-RNC,Object Number 2-
WBTS and ObjectNumber 3-WCEL
Column Numberprovides number of the
column in our exceltemplate where
Parameter for givenClass is located. In
this example: column 1(means A) of excel
sheet includesParameter RNCId for
class RNC, but alsoWBTS and WCEL
Parameterprovides name of
parameter forcetrain object
Class
Above you can see predefined CSV mapping table
-
7/27/2019 WRSWI LACE-Network Element Creation
17/72
17 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to define CSV mapping under PE 5/12 For object number 1, which is RNC,
parameters are given in columns 1-4 (A-D) ofexcel sheet. These parameters are RncId,RNCName, template_name and nms_id
The first row of excel file includes headerwith parameters names. This is notnecessary that these names are exactly thesame as Parameter value in CSV mapping.The header row might be also missing fromthis file. It is only needed for plannerconvinience.
Following rows of excel file include networkelement data. In this example we have RNC205, WBTS 3307 and WCEL 13307 definedin row 2 of excel sheet and RNC 207, WBTS2272 and WCEL 12272 defined in row 3
-
7/27/2019 WRSWI LACE-Network Element Creation
18/72
18 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to define CSV mapping under PE 6/12 For object number 2, which is WBTS,
parameters are given in columns 1, 5-7 (A, E-G) of excel sheet. These parameters areRncId,WBTSId, WBTSName and
template_name
You can see that parameter RNCId isreferred not only by RNC object but also byWBTS and WCEL objects. This is done forhierarchy purposes. In the same time you donot need to provide same parameter in excelsheet many times only once and refer to itwhen needed.
-
7/27/2019 WRSWI LACE-Network Element Creation
19/72
19 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to define CSV mapping under PE 7/12How to define your own mapping for excelsheet template like this attached to slide 9?
This can be done manually:
1. Press New
2. Provide namefor mapping table
3. Define mappings for WBTS and WCEL objects.First remove old mappings then create object no 1,select class to WBTS, next provide avaliableparameters from excel sheet. Please note that in
this example COCOId parameter is assumed to bethe same as WBTSId
-
7/27/2019 WRSWI LACE-Network Element Creation
20/72
20 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to define CSV mapping under PE 8/12Instead of manual definition of mapping table you can use automatic configuration of PE
First you need to prepare 3 files as attached examples:
c_import_table_mapping.cf the file which includes mappingdata for WBTS and ADJS objects basing on input data definedin excel template
c_import_profile.cf the file includes new names of profiles
which will be displayed under import profiles. The description ofprofiles is placed in c_import_table_mapping.cf. In thisexample two profiles are created: WBTS Creation and ADJSCreation
makefile.cf the file defines what changes should be addedto the existing PE database. It refers to both files described
above.
-
7/27/2019 WRSWI LACE-Network Element Creation
21/72
21 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to define CSV mapping under PE 9/12When files are ready you have to apply them to PlanEditor database:
1. Press Config
3. Select UpdateDatabase
4. Press Settings
2. ChooseDatabase
-
7/27/2019 WRSWI LACE-Network Element Creation
22/72
22 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to define CSV mapping under PE 10/12
5. Provide path toMakefile.cf
6. Provide path toremaining *.cffiles
7.Provide filename for logfile, ifneeded
8. You can checkMakefile.cf to be sure
what is inside it and whatchanges are planned
9. Finally press
Update toexecute thechanges
10. Before the update PEwill shut DB. Before ithappens, usual questionappears. Answer no.
11. Update isdone. Shortsummary ispresented witherrors and
warnings. Youcan check thelogfile to identifythem. To see theupdate effectyou need toreopen thedatabase
-
7/27/2019 WRSWI LACE-Network Element Creation
23/72
23 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to define CSV mapping under PE 11/12
12. After re-openingthe databse andchoosing importprofile you can seethat WBTSCreation profilewas added to thelist. Also ADJS
Creation profile wasadded. Now you areprepared to transferdata between yourexcelsheettemplates and PlanEditor
-
7/27/2019 WRSWI LACE-Network Element Creation
24/72
24 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to define CSV mapping under PE 12/12
SUMMARY CSV mapping table is part of PE import interface
Mapping table is used for translation of data from excel sheet templateinto PlanEditor database
Mapping table definition is done under PlanEditor. It can be done
manually, but also automatically with usage of specially preparedconfiguration files.
BACKBACK
How to verify that your project defaults are
-
7/27/2019 WRSWI LACE-Network Element Creation
25/72
25 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to verify that your project defaults arethe same as PE templates
Usually most of the radio parameters of network elements in your project should be taken from Nokia defaultvalues. You can check these current Nokia defaults values in current version of PlanEditor.
1. Select TemplateDetails fromTemplates menu
2. Choose object
for which you wishto check NokiaDefault values. Incase of RadioPlanner thenetwork elementsunder interestusually would beWBTS, WCEL,ADJS, HOPS,FMCS
BACKBACK
H t d t d f lt t l t d PE?
-
7/27/2019 WRSWI LACE-Network Element Creation
26/72
26 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to update default template under PE?1/6
If for some reason Nokia default values from PlanEditor do not match yourdefaults (for example Pekka J. Ranta has issued new parameters
adjustments, or after optimisation you decided to change some values to fitbetter your environment) and you are sure you want to keep your values,then you should update PE default profiles. Those profiles are used duringdata import from your excel sheet to PlanEditor. As you remember excelsheet includes only minimal set of parameters rest of them is takenautomatically from PE templates. That is why it is important to keep this
templates uptodate. Updating templates might be done manually or automatically
Manual changes are done straight under Templates window, as it is shownon slide 25
If there is bigger amout of parameters that should be updated, then
automatic update is reccomended. This uses PE database updatemechanism introduced on slides 20-21. Please see next slide for details
H t d t d f lt t l t d PE?
-
7/27/2019 WRSWI LACE-Network Element Creation
27/72
27 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to update default template under PE?2/6
First we need to recognize which parameters are different from current PEdefault values.
Next we create file with these parameters. Lets name this filec_parameter_declatations.cf. Here is an example of such a file
Then we create Makefile.cf which includes reference for previous file.
Next step is similar as it was with CSV mapping tables import. See next
pages
H t d t d f lt t l t d PE?
-
7/27/2019 WRSWI LACE-Network Element Creation
28/72
28 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to update default template under PE?3/6When files are ready you have to apply them to PlanEditor database:
1. Press Config
3. Select UpdateDatabase
4. Press Settings
2. ChooseDatabase
H t d t d f lt t l t d PE?
-
7/27/2019 WRSWI LACE-Network Element Creation
29/72
29 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to update default template under PE?4/6
5. Provide path toMakefile.cf
6. Provide path toc_parameter_declarations.cf file
7.Provide filename for logfile, ifneeded
8. You can checkMakefile.cf to be sure
what is inside it and whatchanges are planned
9. Finally press
Update toexecute thechanges
10. Before the update PEwill shut DB. Before ithappens, usual questionappears. Answer no.
11. Update isdone. Shortsummary ispresented witherrors andwarnings. Youcan check thelogfile to identifythem. To see theupdate effectyou need toreopen thedatabase
How to update default template under PE?
-
7/27/2019 WRSWI LACE-Network Element Creation
30/72
30 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to update default template under PE?5/6
12. After re-openingthe databse andchoosing templates
menu you can see thatWCEL(or otherobject) default profilewas updatedaccording to your listof parametersincluded inc_parameter_declarations.cf
How to update default template under PE?
-
7/27/2019 WRSWI LACE-Network Element Creation
31/72
31 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to update default template under PE?6/6
SUMMARY
We need to update PE default templates for network elements in order toadjust Nokia default parameters with project specific values.
Update of templates is done under PlanEditor. It can be done manually,but also automatically with usage of specially prepared configuration fileslike it was in case of CSV mapping table.
BACKBACK
How to save data as CSV file under Excel
-
7/27/2019 WRSWI LACE-Network Element Creation
32/72
32 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to save data as CSV file under Excel
PlanEditor is able to read CSV data. That is why we need to convert exceldata to CSV format. It is very easy operation just choose CSV when
saving the document uder excel.
Choose CSV asfile type
BACKBACK
How to upload and save parameters of RNC
-
7/27/2019 WRSWI LACE-Network Element Creation
33/72
33 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to upload and save parameters of RNC1/8
For RNC parameters management at least 3 applications might be used:
NEMU used maninly by RNC engineers for live changes of networkelements under specified RNC. This aplication is not directly used inLACE process, but might be helpful. Ask RNC eng. for assistance.
Planning Interface to Radio Access Configurator- Internet Explorerbased aplication which makes consistency checking and provides
your RNW plan to/from Radio Access. You can run this aplication if youhave CITRIX connection to RAC defined. If you have problems with itask OSS eng. for assistance.
RAN Plan Management OSS aplication, part of NetAct Radio AccessConfigurator also avaliable via CITRIX connection. It helps with
preparation, aproving, downloading/uploading and activation of RNWplan to/from proper RNC. OSS engineer should be able to help you incase of problems.
How to upload and save parameters of RNC
-
7/27/2019 WRSWI LACE-Network Element Creation
34/72
34 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
Radio Access Configurator
How to upload and save parameters of RNC2/8
The process of uploading current RNC data looks as follows:
RNCRAN Plan
ManagementPlanningInterfaceDB
PlannersWorkstation
STEP 1From your workstationrun (usually via CITRIX)RAN Plan Management.
If it is not configured askOSS engineer for help
STEP 2From RAN PL M selecttarget RNC and uploadits current data.
As a result of step 2current data is copiedfrom RNC to RAC DB
STEP 3Again from yourworkstation run (usuallyvia CITRIX) PlanningInterface. If it is notconfigured ask OSSengineer for help
STEP 4From PI select ExportActual Configuration
from RAC, select RNCand save data to localdisk.
As a result of step 4current data is copiedfrom DB of RAC toselected location (usuallyplanners workstation)
UPLOAD
How to upload and save parameters of RNC
-
7/27/2019 WRSWI LACE-Network Element Creation
35/72
35 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to upload and save parameters of RNC3/8
1. Activate -highlight the operation ActualConfigurations for uploading ofparticular RNCs actual parameters. Inthis case, the remote OMC is havingRNC 202 & 205.
2. Select to be uploaded,e.g. RNC-205.
3. Click to start the uploadingprocess.
4. The status of the parameter uploadingis shown and will automatically
disappear when operation has beencompleted.
1.
2.
3.
4.
Slide by Ryan Lim
How to upload and save parameters of RNC
-
7/27/2019 WRSWI LACE-Network Element Creation
36/72
36 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to upload and save parameters of RNC4/8
Slide by Ryan Lim
1.1. Activate , the
following login info is required:Username : [obtain from OSS eng.]Password : [obtain from OSS eng.]
2. Select this is where we perform theexport of the uploaded Actual RNCparameters, to be used for import intoPlanEditor subsequently.
2.
How to upload and save parameters of RNC
-
7/27/2019 WRSWI LACE-Network Element Creation
37/72
37 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to upload and save parameters of RNC5/8
Slide by Ryan Lim
1.
1. Select the RNC required toexport, e.g. RNC-205
2. Click
2.
How to upload and save parameters of RNC
-
7/27/2019 WRSWI LACE-Network Element Creation
38/72
38 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
o to up oad a d sa e pa a ete s o C6/8
Slide by Ryan Lim
1.
1. Note that the default C:drive is the HDD of the OSSserver. Please remember toselect the to save the exportedRNC parameter data tolocal HDDs destination
directory.
2. Do NOT save theparameter file with thedefault filename provided(with extension *.cgi). Seenext slide
2.
How to upload and save parameters of RNC
-
7/27/2019 WRSWI LACE-Network Element Creation
39/72
39 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
p p7/8
Slide by Ryan Lim
1.
1. Remember to save theexport file with extension*.gz (zip file format), e.g.rnc205_0929_1330.gz
Suggested file namingformat standard :rncXXX_MMDD_Time.gz
Also, remember to renamethe *.XML file to be thesame format,
rncXXX_MMDD_Time.xml
2. Click
2.
How to upload and save parameters of RNC
-
7/27/2019 WRSWI LACE-Network Element Creation
40/72
40 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
p p8/8
Slide by Ryan Lim
SUMMARY
Upload RNC parameters means to get its current data (in oposite todownload which means to put data to RNC)
Upload is done with two applications: RAN Plan Management andPlanner Interface. Those should be avaliable via CITRIX connection.
Try to request OSS engineer to do the upload if proper tools are notavaliable or there is any problem with them.
BACK
How to import a plan as actual under PE 1/2
-
7/27/2019 WRSWI LACE-Network Element Creation
41/72
41 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to import a plan as actual under PE 1/2
The current- so called actual data which was downloaded from RNC will be reference data on top of whichwell make our own plan like adding new network element. The whole process is done with PE. That is whywe need to import current RNC data to PE.
STEP 1Select Import actualdata from Import menu
STEP 2Select Default RNCRN1.5 profile
STEP 3Select ... and providefilename of XML fileuploaded from RNC
STEP 4Select Import actual
data...
STEP 5Press Import...
How to import a plan as actual under PE 2/2
-
7/27/2019 WRSWI LACE-Network Element Creation
42/72
42 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
How to import a plan as actual under PE 2/2
STEP 6Press Yes
Import inprogress
STEP 7To checkplan that
was loadedselect
Browser
RNC 205 withits child
objects wasloaded under
NMS 1
BACK
How to check that NE do exist in RNC 1/5
-
7/27/2019 WRSWI LACE-Network Element Creation
43/72
43 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
In theory - the logical hierarchy structure of network elements under RNC looks like this:
RNC
WBTS
WCEL
ADJS
CoCo
FMCSFMC
S
HOPSHOPS
RNC is a parent for WBT, WCEL andADJ but also for additional objects.
These additional objects are:
CoCo connection configurationreffered by WBTS. There must beone CoCo defined per WBTS
FMCS for frequencymeasurements reffered byWCEL. There must be two FMCSobject defined per RNC one forRT data and the second for NRTdata
HOPS for handover patchparameters referred by ADJSThere must be two HOPS objectdefined per RNC one for RTdata and the second for NRT data
How to check that NE do exist in RNC 2/5
-
7/27/2019 WRSWI LACE-Network Element Creation
44/72
44 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
In practice - before integrating new NodeB to network you must be sure that CoCoobject for the new WBTS is already created and FMCS and HOPS objects do existin this RNC. Usually CoCo Id is the same as WBTS Id (this must be agreed with
person who create CoCo transmission or RNC eng.)
STEP 1select
Browser
STEP 2select RNC
STEP 3Check thatCoCo with
proper IDexists
STEP 4Check thatFMCS do
exist for atleast RT
data
STEP 5Check thatHOPS do
exist for atleast RT data
How to check that NE do exist in RNC 3/5
-
7/27/2019 WRSWI LACE-Network Element Creation
45/72
45 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
If you realize that CoCo object is missing for any of new sites you can: ask RNC engineerto create them manually with Object Browser under NEMU, or ask TRS plannerto create them under PE as part of your plan, or
create them by yourselfif you have knowledge of VPI/VCI definitions
If you realize that FMCS orHOPS objects are missing then you can: ask RNC engineer to create them manually with Object Browser under NEMU create them by yourself, but remember tocreate and activate new plan first
STEP 1In order to
createFMCS or
HOPSselect RNC
underinterest andthen press
createobjectsbutton
STEP 2Selectwhich
objects areto be
created
How to check that NE do exist in RNC 4/5
-
7/27/2019 WRSWI LACE-Network Element Creation
46/72
46 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
STEP 3Providebasic
informationas Intra
FMCIdentificatio
n andpress
Createbutton
STEP 4SelectNext
class in
order tocreateHOPSobject
STEP 5Similarly
perform forHOP object provide IDnumber and
pressCreatebutton
STEP 6press
Finish toend
creationprocess
How to check that NE do exist in RNC 5/5
-
7/27/2019 WRSWI LACE-Network Element Creation
47/72
47 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
STEP 7RefreshObject
Browser
view tocheck thatdesired
objects arecreated
BACK
SUMMARY
Before we start to prepare Radio NetworkPlan data we have to be sure that allrequired elements are ready in RNC
These network elements are CoCo, FMCSand HOPS
RNC engineer and TRS planner can provideassistance related to these NE
How to create and activate new plan underPE
-
7/27/2019 WRSWI LACE-Network Element Creation
48/72
48 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
PE 1/3 Under PlanEditor all users operations like network element creation and deletion or
parameters modyfication are recorded uder so called plan.
You can imagine a plan as a container for mentioned operations. When all actions are done and ready for implementation in RNC you move data
from your container to xml file which keeps instructions and parameters for RNC.
Each time you want to add new network elements to network you should create newplan under PlanEditor
PREREQUISITS
Actual networkdata was
imported intoPE
STEP 1ChoosePlans
button from
menu
How to create and activate new plan underPE
-
7/27/2019 WRSWI LACE-Network Element Creation
49/72
49 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
PE 2/3
STEP 3Provide
descriptivename foryour plan
STEP 2Choose New
Plan... button from
menu
STEP 4Enter planned date
for planimplementation
STEP 5Choose Default
RNC RN 1.5 profile
STEP 6Press Create
button
How to create and activate new plan underPE 3/3
-
7/27/2019 WRSWI LACE-Network Element Creation
50/72
50 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
PE 3/3STEP 7
Choose Yes toactivate newly created
plan
NOTE:You can always checkwhich plan is currently
active from this place
NOTE:Values in fields Editorand Status are to be
entered manually and arenot compolsory
BACK
How to import CSV file to PE 1/4
-
7/27/2019 WRSWI LACE-Network Element Creation
51/72
51 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
PE import functionality together with specially created CSV mappings allows forimporting data created in step 5 into current plan.
Data is imported in two parts: first WBTS and WCEL objects, then ADJS objects
STEP 2Choose WBTS
Creation profile
STEP 1Choose Import
Data buttonfrom menu bar
STEP 3Provide path
and filename ofCSV file withWBTS and
WCEL objectscreated in step
5
STEP 4Choose
Import planand otheroptions as
shown STEP 6Confirm with
Yes
STEP 5Press Import
How to import CSV file to PE 2/4
-
7/27/2019 WRSWI LACE-Network Element Creation
52/72
52 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
STEP 9Accept import
STEP 7Preview import
buffer
STEP 8Check briefly ifimported datais as expected
for instatnceif there is no
red indicationin column
Value whichmeans that
imported valueis out of range
How to import CSV file to PE 3/4
-
7/27/2019 WRSWI LACE-Network Element Creation
53/72
53 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
STEP 10After importing WBTS
and WCEL objectsimport ADJS objectswith ADJS Creation
profile
STEP 11Provide path and
filename of CSV filewith ADJS objectscreated in step 5
STEP 12Press Import
STEP 13Check briefly ifimported datais as expected
for instatnceif there is no
red indicationin column
Value whichmeans that
imported valueis out of range
STEP 14Accept import
How to import CSV file to PE 4/4
-
7/27/2019 WRSWI LACE-Network Element Creation
54/72
54 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
BAC
K
STEP 15Refresh the view
under Object
Browser. If importhas succeded youshould be able tosee new objects(in green) under
hierarchy structure
How to validate parameters under PE 1/3
-
7/27/2019 WRSWI LACE-Network Element Creation
55/72
55 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
Next step after dataimport to PlanEditor isdata validation
PlanEditor has in-buildqueries for most ofnetwork elementswhich help to checkconsistency ofparameters before
introducing them to anetwork
It is possible to createuser specyfic queries,as well
STEP 1Choose
Query buttonfrom menu bar
STEP 2Select object type for whichyou want to run queries. In
our case it would be WBTS orWCEL or ADJS. Here WBTS is
chosen
STEP 3Press Query button-all
records related toselected object with its
parameters are displayed
How to validate parameters under PE 2/3
-
7/27/2019 WRSWI LACE-Network Element Creation
56/72
56 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
STEP 4Select StoredQueries and
Updates tab.
As resultavaliablequeries forpreviouslyselectednetwork
element aredisplayed.
STEP 5Select first query
from the list
As result details ofcurrent querry isdisplayed in SQL
form
STEP 6To run selected
querry pressQuery button
How to validate parameters under PE 3/3
-
7/27/2019 WRSWI LACE-Network Element Creation
57/72
57 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
BACK
After query is run all recordsthat do not match criteria aredisplayed. Then user should
check those records andcorrect parameters uderinvestigation. Here no records
were returned. It meanseverything is OK
NEXTYou can run queries for other
objects in this case toperform complete verificationqueries you should run it for
WBTS, WCEL and ADJS
ADDITIONALY
You can create and run yourown queries for selectedobject choosing Ad-hoc
Queries
How to export plan under PE 1/2
-
7/27/2019 WRSWI LACE-Network Element Creation
58/72
58 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
When data is verified it is ready for export to RNC.
STEP 1
ChooseExport buttonfrom menu bar
STEP 2Select Export planand Export button
STEP 3Press Move to Export Buffer to prepare
data for export
STEP 4Press View Export Buffer to check data for
export
How to export plan under PE 2/2
-
7/27/2019 WRSWI LACE-Network Element Creation
59/72
59 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
BACK
STEP 5Be sure that
chosen profileis equal to
Default RNCRN1.5
All your planneddata which isgoing to be
implemented toRNC is visible here
STEP 6Provide filenamefor exported data.
Remember aboutXML extension asfile is recorded inRAML 1.0 format
STEP 7Press Exportto move datafrom export
buffer to XMLfile
How to download plan to RNC 1/8
-
7/27/2019 WRSWI LACE-Network Element Creation
60/72
60 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
Radio Access Configurator
The process of downloading planned data to RNC looks as follows:
RNCRAN Plan
ManagementPlanningInterfaceDB
PlannersWorkstation
STEP 3Again, from yourworkstation run (usuallyvia CITRIX) RAN PlanManagement. If it is not
configured ask OSSengineer for help
STEP 4
From RAN PL M select PlannedConfigurations then prepare,aprove, download and activateyour plan
As a result of step 4Radio Network Plan iscopied from RAC DBto RNC
STEP 1
From your workstationrun (usually via CITRIX)Planning Interface. If it isnot configured ask OSSengineer for help
STEP 2From PI selectImport Plan to RAC.Provide patch andfilename of XML fileexported fromPlanEditor.
DOWNLOAD
How to download plan to RNC 2/8
-
7/27/2019 WRSWI LACE-Network Element Creation
61/72
61 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
1.1. Activate , the
following login info is required:Username : omcPassword : omc
2. Select this iswhere we perform the import of thePlans (ADJS Addition, ADJS Deletion,Mass Parameter Modifications, Add NewSites etc), to be implemented in RNC.
2.
Slide by Ryan Lim
How to download plan to RNC 3/8
-
7/27/2019 WRSWI LACE-Network Element Creation
62/72
62 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
1.
1. Click to select the
Plan in XML format to beimported
2. Click
2.
Slide by Ryan Lim
How to download plan to RNC 4/8
-
7/27/2019 WRSWI LACE-Network Element Creation
63/72
63 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
1.
1. Plan imported successfully intoRAC
Slide by Ryan Lim
How to download plan to RNC 5/8
-
7/27/2019 WRSWI LACE-Network Element Creation
64/72
64 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
1. Activate -highlight the operation PlannedConfigurations.
2. Highlight the new plan to beprepared for activation.
3. Click to prepare the plan forimplementation.In sequence ofApprove => Download=> Activate
1.
2.
3.
Slide by Ryan Lim
How to download plan to RNC 6/8
-
7/27/2019 WRSWI LACE-Network Element Creation
65/72
65 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
1. Confirmation of the actions or the itemsof the plan can be viewed by clicking the
1.
Slide by Ryan Lim
How to download plan to RNC 7/8
-
7/27/2019 WRSWI LACE-Network Element Creation
66/72
66 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
1. Highlight the operation.
2. Highlight the Subplan to active thesequence ofApprove =>Download => Activate
3. Click theplan to RNC. When the downloadoperation is completed, the statusbox will disappear.
2.
3.
Slide by Ryan Lim
How to download plan to RNC 8/8
-
7/27/2019 WRSWI LACE-Network Element Creation
67/72
67 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
1. Click the plan in RNC.When the activation operation is
completed, the status box willdisappear and we can view underthe RNC RNW Object Browserchanges that were introduced byour plan.
1.
BACK
Slide by Ryan Lim
How switch on the logfile during import 1/2
-
7/27/2019 WRSWI LACE-Network Element Creation
68/72
68 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
After downloading data from RNC import it back to PE on top of your plan. Duringimport provide Log file name to enable logging difrences between RNC data andplanned Data
STEP 1Choose Profile
as on thepicture
STEP 2Provide location
of actual datafrom RNC
STEP 3Select Importactual data...
STEP 4Select ...
STEP 5Provide
filename for logfile
STEP 6Press Import
STEP 7Confirm with
yes
How switch on the logfile during import 2/2
-
7/27/2019 WRSWI LACE-Network Element Creation
69/72
69 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
Data in ObjectBrowser BEFOREimport of actual
data newlycreated objects are
green
Data in ObjectBrowser AFTERimport of actualdataimpoted
objects change toblue
BACK
How to analyse the logfile 1/1
-
7/27/2019 WRSWI LACE-Network Element Creation
70/72
70 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
BACK
After import logfile is created. Check this logfile with notepad.
In the logfile you will find the info what parameters or object were created/deleted/modifiedoutside your plan. You should ask other planners or RNC engineer in order to clarify why these
changes were done. In the example below it looks like there was WBTS object created outside your plan (your plan
does not include creation of this WBTS but it exists in RNC), ADJS was removed andPtxPrimaryCPICH for WCEL with LCRID 3 of WBTS 2183 was changed, as well as MHAparameter for WCEL 2 of WBTS 2201
How to analyse the export buffer1/2
-
7/27/2019 WRSWI LACE-Network Element Creation
71/72
71 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
You should also check if all requested objects were created under RNC.For this you check export buffer as below
First sign thatsome objects
were not createdunder RNC (do
not exist in actual
RNC plan) iscolour of objects
under ObjectBrowser. Here we
can see thatsome ADJS are
still green
STEP 1Mark Excludeimplemented..
STEP 2Press Move toExport Buffer
STEP 3Press View
Export Buffer...
How to analyse the export buffer2/2
-
7/27/2019 WRSWI LACE-Network Element Creation
72/72
72 NOKIA LACE-network element creation.PPT / 26-09-2003 / BPi Company Confidential
BACK
STEP 4Select profile as
shown
Buffer includesdata that was notimplemented to
RNC. You shouldverify with RNC
enginner whatwas the problemwith this data.
If you think thatthis data should
be anyway put toRNC performexport once
again.
STEP 5Provide the
filename
STEP 6Export dataonce again